Caltrans Logo
 

Review List for EA 08-46461

Review
No
Review Type
 
Received by
Caltrans
Comments anticipated
to agency
Comments sent
to agency
1* 100% Submittal 06/28/2011  08/09/2011  07/07/2011 
1 95% Submittal 01/20/2011  03/03/2011  02/14/2011 
2 95% Submittal 04/05/2011  05/17/2011  05/04/2011 
1 Drainage Report (Final) 03/14/2011  04/25/2011  04/08/2011 
2* Drainage Report (Final) 04/20/2011  06/01/2011  05/18/2011 
1 Encroachment Permit ($1-$3 Mil) 06/14/2011  07/26/2011  09/07/2011 
1 Erosion Control Plan (4:1) 03/09/2011  04/20/2011  04/07/2011 
2* Erosion Control Plan (4:1) 04/13/2011  05/25/2011  05/10/2011 
1 Fact Sheet (Advisory) 06/23/2011  08/04/2011  07/07/2011 
2 Fact Sheet (Advisory) 05/07/2014  06/18/2014  05/21/2014 
1 Fact Sheet (Mandatory) 06/23/2011  08/04/2011  07/07/2011 
1 Fact Sheet (Supp/Advisory) 04/08/2011  05/20/2011  05/10/2011 
1 Geotechnical Design Report (Final) 01/04/2010  02/15/2010  02/03/2010 
2 Geotechnical Design Report (Final) 06/23/2010  08/04/2010  07/30/2010 
3* Geotechnical Design Report (Final) 07/07/2011  08/18/2011  07/07/2011 
1 Life Cycle Cost Analysis (PS&E) 06/23/2010  08/04/2010  07/30/2010 
2 Life Cycle Cost Analysis (PS&E) 07/07/2011  08/18/2011  07/07/2011 
1 Materials Report (Final) 01/04/2010  02/15/2010  02/10/2010 
2 Materials Report (Final) 06/23/2010  08/04/2010  07/30/2010 
3 Materials Report (Final) 07/07/2011  08/18/2011  07/07/2011 
1 Other 06/23/2010  08/04/2010  07/30/2010 
2* Other 11/16/2010  12/28/2010  11/24/2010 
3 Other 02/18/2011  04/01/2011  03/15/2011 
4 Other 02/18/2011  04/01/2011  03/15/2011 
5* Other 03/16/2011  04/27/2011  03/17/2011 
6 Other 01/15/2014  02/26/2014  02/24/2014 
1* Right of Way Requirements 12/02/2010  01/13/2011  12/03/2010 
1 SWDR - PS&E 03/09/2011  04/20/2011  04/07/2011 
2 SWDR - PS&E 04/13/2011  05/25/2011  05/10/2011 
3 SWDR - PS&E 06/28/2011  08/09/2011  07/05/2011 
4* SWDR - PS&E 07/05/2011  08/16/2011  07/07/2011 
1 TMP Datasheet (PS&E) 12/22/2009  02/02/2010  01/14/2010 
2 TMP Datasheet (PS&E) 06/23/2010  08/04/2010  07/30/2010 
3* TMP Datasheet (PS&E) 02/12/2011  03/26/2011  02/25/2011 

* indicates document was approved.

’Comments anticipated to agency‘ date is based on a 6-week turnaround.