Review List for EA 08-0J400

Review
No
Review Type
 
Received by
Caltrans
Comments anticipated
to agency
Comments sent
to agency
1 Design Standard Decision Document 06/07/2018  07/19/2018  07/11/2018 
2* Design Standard Decision Document 08/02/2018  09/13/2018  08/15/2018 
1 Draft PR 07/27/2017  09/07/2017  08/03/2017 
2 Draft PR 01/17/2018  02/28/2018  02/28/2018 
3 Draft PR 04/09/2018  05/21/2018  05/03/2018 
4 Draft PR 07/19/2018  08/30/2018  08/14/2018 
5 Draft PR 08/28/2018  10/09/2018  09/19/2018 
6 Draft PR 12/05/2019  01/16/2020  01/10/2020 
7 Draft PR 05/11/2022  06/22/2022  Pending 
1 Drainage Report (Preliminary) 07/07/2015  08/18/2015  08/06/2015 
2 Drainage Report (Preliminary) 11/17/2015  12/29/2015  11/24/2015 
3* Drainage Report (Preliminary) 02/24/2016  04/06/2016  03/01/2016 
4 Drainage Report (Preliminary) 01/05/2017  02/16/2017  01/31/2017 
5* Drainage Report (Preliminary) 04/20/2017  06/01/2017  05/04/2017 
1 Fact Sheet (Combined) 06/15/2017  07/27/2017  08/29/2017 
2 Fact Sheet (Combined) 10/05/2017  11/16/2017  11/20/2017 
3 Fact Sheet (Combined) 02/02/2018  03/16/2018  03/29/2018 
1 Fact Sheet (Ramp Metering) 11/02/2017  12/14/2017  01/03/2018 
2* Fact Sheet (Ramp Metering) 02/02/2018  03/16/2018  02/20/2018 
1 GADs 06/15/2017  07/27/2017  08/29/2017 
2 GADs 10/05/2017  11/16/2017  12/05/2017 
3 GADs 02/02/2018  03/16/2018  03/26/2018 
4 GADs 06/07/2018  07/19/2018  07/11/2018 
5* GADs 07/30/2018  09/10/2018  08/07/2018 
1 Geotechnical Design Report (Preliminary) 09/02/2015  10/14/2015  09/30/2015 
2 Geotechnical Design Report (Preliminary) 11/23/2015  01/04/2016  12/15/2015 
3* Geotechnical Design Report (Preliminary) 02/24/2016  04/06/2016  03/01/2016 
4* Geotechnical Design Report (Preliminary) 01/03/2017  02/14/2017  02/01/2017 
1 Life Cycle Cost Analysis 02/04/2016  03/17/2016  03/04/2016 
2* Life Cycle Cost Analysis 03/28/2016  05/09/2016  04/11/2016 
3* Life Cycle Cost Analysis 12/28/2016  02/08/2017  01/23/2017 
1 MAR/NCR (District) 04/23/2018  06/04/2018  05/22/2018 
2 MAR/NCR (District) 08/14/2018  09/25/2018  09/13/2018 
3 MAR/NCR (District) 01/23/2019  03/06/2019  02/11/2019 
4 MAR/NCR (District) 11/25/2019  01/06/2020  01/10/2020 
1 Materials Report (Preliminary) 02/04/2016  03/17/2016  03/04/2016 
2 Materials Report (Preliminary) 03/28/2016  05/09/2016  04/14/2016 
3* Materials Report (Preliminary) 05/05/2016  06/16/2016  05/19/2016 
4* Materials Report (Preliminary) 12/28/2016  02/08/2017  01/23/2017 
1 Operations Analysis 01/24/2014  03/07/2014  03/05/2014 
2 Operations Analysis 04/25/2014  06/06/2014  07/09/2014 
3 Operations Analysis 11/03/2014  12/15/2014  11/21/2014 
4 Operations Analysis 02/09/2015  03/23/2015  03/18/2015 
1 Operations Analysis (Revised/Updated/Supplemental) 05/05/2016  06/16/2016  06/01/2016 
2 Operations Analysis (Revised/Updated/Supplemental) 02/08/2017  03/22/2017  03/13/2017 
3 Operations Analysis (Revised/Updated/Supplemental) 04/05/2017  05/17/2017  05/03/2017 
4 Operations Analysis (Revised/Updated/Supplemental) 05/25/2017  07/06/2017  06/30/2017 
1 Other 05/12/2013  06/23/2013  06/28/2013 
2 Other 05/06/2015  06/17/2015  06/30/2015 
3 Other 09/01/2015  10/13/2015  09/10/2015 
4 Other 09/01/2015  10/13/2015  09/17/2015 
5 Other 11/05/2015  12/17/2015  11/19/2015 
6* Other 12/28/2016  02/08/2017  01/23/2017 
7 Other 12/28/2016  02/08/2017  01/31/2017 
8 Other 11/02/2017  12/14/2017  01/03/2018 
9* Other 02/28/2018  04/11/2018  04/02/2018 
1 Right of Way Data Sheets 09/01/2015  10/13/2015  09/29/2015 
2 Right of Way Data Sheets 11/13/2017  12/25/2017  01/11/2018 
3* Right of Way Data Sheets 01/31/2018  03/14/2018  03/01/2018 
1 Structures (APS/BSDS) 12/28/2016  02/08/2017  01/23/2017 
1 SWDR - PA&ED 07/15/2015  08/26/2015  09/17/2015 
2 SWDR - PA&ED 01/03/2017  02/14/2017  02/01/2017 
3 SWDR - PA&ED 02/27/2017  04/10/2017  04/05/2017 
1 TMP Datasheet (PA&ED) 07/15/2015  08/26/2015  09/03/2015 
2 TMP Datasheet (PA&ED) 11/05/2015  12/17/2015  01/07/2016 
3 TMP Datasheet (PA&ED) 01/19/2016  03/01/2016  02/04/2016 
4* TMP Datasheet (PA&ED) 02/17/2016  03/30/2016  03/01/2016 
5* TMP Datasheet (PA&ED) 12/28/2016  02/08/2017  01/23/2017 

* indicates document was approved.

’Comments anticipated to agency‘ date is based on a 6-week turnaround.