Caltrans Logo
 

Review List for EA 08-1E030

Review
No
Review Type
 
Received by
Caltrans
Comments anticipated
to agency
Comments sent
to agency
1 95% Submittal 07/01/2014  08/12/2014  07/30/2014 
2 95% Submittal 10/15/2014  11/26/2014  11/20/2014 
3 95% Submittal 01/14/2015  02/25/2015  02/17/2015 
1 Drainage Report (Final) 07/01/2014  08/12/2014  07/25/2014 
2* Drainage Report (Final) 10/13/2014  11/24/2014  10/22/2014 
1 Fact Sheet (Advisory) 12/24/2013  02/04/2014  01/24/2014 
2 Fact Sheet (Advisory) 02/20/2014  04/03/2014  03/05/2014 
3 Fact Sheet (Advisory) 03/17/2014  04/28/2014  04/17/2014 
4 Fact Sheet (Advisory) 05/01/2014  06/12/2014  05/08/2014 
5* Fact Sheet (Advisory) 05/15/2014  06/26/2014  05/28/2014 
1 Fact Sheet (Mandatory) 12/24/2013  02/04/2014  01/24/2014 
2 Fact Sheet (Mandatory) 02/20/2014  04/03/2014  03/05/2014 
3 Fact Sheet (Mandatory) 03/17/2014  04/28/2014  04/17/2014 
4 Fact Sheet (Mandatory) 05/01/2014  06/12/2014  05/08/2014 
5* Fact Sheet (Mandatory) 05/15/2014  06/26/2014  06/03/2014 
1 Fact Sheet (Supp/Advisory) 10/13/2014  11/24/2014  10/31/2014 
2 Fact Sheet (Supp/Advisory) 11/20/2014  01/01/2015  12/09/2014 
3 Fact Sheet (Supp/Advisory) 02/10/2015  03/24/2015  03/02/2015 
4* Fact Sheet (Supp/Advisory) 04/02/2015  05/14/2015  04/09/2015 
1 GADs 12/09/2013  01/20/2014  01/09/2014 
2 GADs 02/20/2014  04/03/2014  04/11/2014 
3* GADs 05/05/2014  06/16/2014  06/03/2014 
1 Geotechnical Design Report (Final) 07/01/2014  08/12/2014  07/25/2014 
2 Geotechnical Design Report (Final) 11/04/2014  12/16/2014  11/19/2014 
3* Geotechnical Design Report (Final) 01/14/2015  02/25/2015  02/02/2015 
1 Materials Report (Final) 07/01/2014  08/12/2014  07/25/2014 
2* Materials Report (Final) 11/04/2014  12/16/2014  12/04/2014 
1 Operations Analysis 11/14/2013  12/26/2013  12/04/2013 
2 Operations Analysis 12/10/2013  01/21/2014  12/31/2013 
3* Operations Analysis 01/30/2014  03/13/2014  02/06/2014 
1 Other 06/18/2014  07/30/2014  06/23/2014 
2 Other 02/19/2015  04/02/2015  04/02/2015 
3 Other 04/13/2015  05/25/2015  04/13/2015 
4* Other 04/14/2015  05/26/2015  04/16/2015 
1 Right of Way Data Sheets 08/27/2014  10/08/2014  09/15/2014 
2* Right of Way Data Sheets 02/23/2015  04/06/2015  03/16/2015 
1 Right of Way Requirements 08/21/2014  10/02/2014  09/30/2014 
1 Structures (APS/BSDS) 03/11/2014  04/22/2014  03/26/2014 
2 Structures (APS/BSDS) 05/05/2014  06/16/2014  05/19/2014 
1 SWDR - PS&E 07/01/2014  08/12/2014  07/29/2014 
2 SWDR - PS&E 10/13/2014  11/24/2014  10/30/2014 
3 SWDR - PS&E 01/14/2015  02/25/2015  02/02/2015 
4* SWDR - PS&E 04/06/2015  05/18/2015  04/15/2015 
1 TMP Datasheet (PS&E) 07/01/2014  08/12/2014  07/25/2014 
2* TMP Datasheet (PS&E) 10/13/2014  11/24/2014  10/21/2014 

* indicates document was approved.

’Comments anticipated to agency‘ date is based on a 6-week turnaround.