1 100% Submittal 02/12/2019  03/26/2019  Pending 
2 100% Submittal 03/11/2019  04/22/2019  Pending 
3 100% Submittal 04/02/2019  05/14/2019  Pending 
1 60% Submittal 08/20/2018  10/01/2018  09/14/2018 
2 60% Submittal 10/10/2018  11/21/2018  11/14/2018 
1 95% Submittal 12/24/2015  02/04/2016  02/05/2016 
2 95% Submittal 12/11/2018  01/22/2019  Pending 
1 Design Standard Decision Document 02/11/2019  03/25/2019  Pending 
1 Drainage Report (Final) 10/27/2015  12/08/2015  11/23/2015 
2 Drainage Report (Final) 08/17/2018  09/28/2018  10/30/2018 
3 Drainage Report (Final) 12/28/2018  02/08/2019  Pending 
4 Drainage Report (Final) 01/23/2019  03/06/2019  Pending 
1 Drainage Report (Preliminary) 07/20/2015  08/31/2015  08/03/2015 
2* Drainage Report (Preliminary) 08/09/2017  09/20/2017  09/25/2017 
1 Fact Sheet (Combined) 08/02/2017  09/13/2017  08/15/2017 
2 Fact Sheet (Combined) 08/25/2017  10/06/2017  09/18/2017 
3 Fact Sheet (Combined) 09/22/2017  11/03/2017  10/31/2017 
4 Fact Sheet (Combined) 11/17/2017  12/29/2017  12/05/2017 
1* GADs 07/20/2015  08/31/2015  08/03/2015 
2 GADs 08/02/2017  09/13/2017  08/15/2017 
3 GADs 08/25/2017  10/06/2017  09/18/2017 
4* GADs 10/02/2017  11/13/2017  12/08/2017 
1* GADs (Revised/Updated/Supplemental) 08/24/2015  10/05/2015  09/10/2015 
2 GADs (Revised/Updated/Supplemental) 09/02/2015  10/14/2015  09/22/2015 
3 GADs (Revised/Updated/Supplemental) 10/02/2015  11/13/2015  11/16/2015 
1 Geotechnical Design Report (Final) 11/21/2018  01/02/2019  Pending 
2 Geotechnical Design Report (Final) 01/23/2019  03/06/2019  Pending 
1 Geotechnical Design Report (Preliminary) 08/16/2017  09/27/2017  09/12/2017 
2 Geotechnical Design Report (Preliminary) 09/22/2017  11/03/2017  10/23/2017 
3 Geotechnical Design Report (Preliminary) 09/22/2017  11/03/2017  10/23/2017 
4 Geotechnical Design Report (Preliminary) 09/27/2017  11/08/2017  10/25/2017 
5 Geotechnical Design Report (Preliminary) 10/09/2017  11/20/2017  10/30/2017 
6* Geotechnical Design Report (Preliminary) 11/13/2017  12/25/2017  12/05/2017 
7* Geotechnical Design Report (Preliminary) 11/13/2017  12/25/2017  11/21/2017 
8* Geotechnical Design Report (Preliminary) 11/16/2017  12/28/2017  12/05/2017 
1* Life Cycle Cost Analysis 11/30/2017  01/11/2018  12/05/2017 
2* Life Cycle Cost Analysis 12/06/2017  01/17/2018  12/07/2017 
1 Materials Report (Final) 08/02/2018  09/13/2018  09/14/2018 
2 Materials Report (Final) 10/10/2018  11/21/2018  11/27/2018 
1 Materials Report (Preliminary) 09/04/2015  10/16/2015  09/23/2015 
2 Materials Report (Preliminary) 10/15/2015  11/26/2015  11/19/2015 
3 Materials Report (Preliminary) 08/14/2017  09/25/2017  09/12/2017 
4 Materials Report (Preliminary) 09/26/2017  11/07/2017  10/10/2017 
5 Materials Report (Preliminary) 10/25/2017  12/06/2017  11/08/2017 
6* Materials Report (Preliminary) 11/17/2017  12/29/2017  12/04/2017 
1* Operations Analysis 06/23/2015  08/04/2015  07/16/2015 
2* Operations Analysis 06/23/2015  08/04/2015  07/07/2015 
3* Operations Analysis 07/13/2015  08/24/2015  07/27/2015 
4 Operations Analysis 02/23/2017  04/06/2017  03/16/2017 
5* Operations Analysis 05/12/2017  06/23/2017  06/05/2017 
1* Operations Analysis (Revised/Updated/Supplemental) 07/21/2015  09/01/2015  08/04/2015 
1* Other 02/23/2017  04/06/2017  03/16/2017 
2 Other 04/03/2017  05/15/2017  04/20/2017 
1* Project Study Report - Project Report (PSR-PR) 11/22/2017  01/03/2018  12/15/2017 
1 Right of Way Data Sheets 08/20/2015  10/01/2015  09/10/2015 
2 Right of Way Data Sheets 09/22/2015  11/03/2015  10/16/2015 
3 Right of Way Data Sheets 11/13/2017  12/25/2017  12/11/2017 
1 Right of Way Requirements 09/02/2015  10/14/2015  09/22/2015 
2 Right of Way Requirements 07/25/2018  09/05/2018  08/02/2018 
3* Right of Way Requirements 08/21/2018  10/02/2018  11/08/2018 
1 SWDR - PA&ED 07/19/2017  08/30/2017  08/15/2017 
2* SWDR - PA&ED 09/12/2017  10/24/2017  10/05/2017 
3 SWDR - PA&ED 12/28/2018  02/08/2019  01/16/2019 
1 SWDR - PS&E 07/01/2015  08/12/2015  07/15/2015 
2 SWDR - PS&E 10/27/2015  12/08/2015  11/23/2015 
3 SWDR - PS&E 12/24/2015  02/04/2016  02/03/2016 
4 SWDR - PS&E 02/25/2016  04/07/2016  03/21/2016 
5 SWDR - PS&E 08/17/2018  09/28/2018  11/07/2018 
6 SWDR - PS&E 12/28/2018  02/08/2019  01/16/2019 
1 TMP Datasheet (PA&ED) 08/13/2015  09/24/2015  09/10/2015 
2* TMP Datasheet (PA&ED) 10/02/2017  11/13/2017  10/26/2017 
1 TMP Datasheet (PS&E) 05/21/2018  07/02/2018  05/22/2018 
2 TMP Datasheet (PS&E) 06/11/2018  07/23/2018  06/18/2018 
3 TMP Datasheet (PS&E) 06/25/2018  08/06/2018  07/06/2018 
1 Traffic Forecasting 09/27/2016  11/08/2016  10/07/2016 
2 Traffic Forecasting 10/13/2016  11/24/2016  10/26/2016 
3 Traffic Forecasting 10/21/2016  12/02/2016  11/09/2016 
4 Traffic Forecasting 11/21/2016  01/02/2017  11/29/2016 