Review List for EA 08-0F580

Review
No
Review Type
 
Received by
Caltrans
Comments anticipated
to agency
Comments sent
to agency
1* 100% Submittal 07/27/2011  09/07/2011  07/27/2011 
1 30% Submittal 01/09/2009  02/20/2009  02/19/2009 
1 60% Submittal 07/22/2009  09/02/2009  09/17/2009 
1 95% Submittal 02/10/2010  03/24/2010  03/30/2010 
2 95% Submittal 01/18/2011  03/01/2011  03/03/2011 
3* 95% Submittal 04/29/2011  06/10/2011  07/27/2011 
1 Draft PR 06/06/2007  07/18/2007  07/20/2007 
2 Draft PR 10/15/2007  11/26/2007  11/27/2007 
3 Draft PR 12/26/2007  02/06/2008  02/06/2008 
4 Draft PR 03/17/2008  04/28/2008  04/24/2008 
5 Draft PR 06/10/2008  07/22/2008  06/30/2008 
6 Draft PR 01/22/2009  03/05/2009  01/29/2009 
7 Draft PR 04/22/2009  06/03/2009  05/01/2009 
8* Draft PR 05/21/2009  07/02/2009  05/21/2009 
1 Drainage Report (Final) 07/22/2009  09/02/2009  08/19/2009 
2* Drainage Report (Final) 02/10/2010  03/24/2010  03/11/2010 
1* Erosion Control Plan (4:1) 04/07/2008  05/19/2008  04/17/2008 
1 Fact Sheet (Advisory) 07/25/2007  09/05/2007  09/07/2007 
2 Fact Sheet (Advisory) 10/29/2007  12/10/2007  12/10/2007 
3 Fact Sheet (Advisory) 12/12/2007  01/23/2008  02/11/2008 
4* Fact Sheet (Advisory) 02/19/2008  04/01/2008  04/08/2008 
1 GADs 07/25/2007  09/05/2007  09/07/2007 
2 GADs 10/29/2007  12/10/2007  12/10/2007 
3 GADs 12/26/2007  02/06/2008  02/06/2008 
4 GADs 03/12/2008  04/23/2008  04/08/2008 
5* GADs 04/30/2008  06/11/2008  05/01/2008 
1 Geotechnical Design Report (Final) 07/22/2009  09/02/2009  09/01/2009 
2 Geotechnical Design Report (Final) 02/10/2010  03/24/2010  03/11/2010 
3 Geotechnical Design Report (Final) 01/18/2011  03/01/2011  02/14/2011 
4 Geotechnical Design Report (Final) 04/29/2011  06/10/2011  05/16/2011 
5* Geotechnical Design Report (Final) 07/18/2011  08/29/2011  07/20/2011 
1 Geotechnical Design Report (Preliminary) 12/18/2007  01/29/2008  01/23/2008 
2* Geotechnical Design Report (Preliminary) 03/26/2008  05/07/2008  04/16/2008 
1 Life Cycle Cost Analysis 05/06/2010  06/17/2010  06/07/2010 
2* Life Cycle Cost Analysis 08/19/2010  09/30/2010  09/01/2010 
1 Materials Report (Final) 07/22/2009  09/02/2009  08/27/2009 
2 Materials Report (Final) 02/10/2010  03/24/2010  03/11/2010 
3* Materials Report (Final) 01/18/2011  03/01/2011  02/11/2011 
1* Materials Report (Preliminary) 09/11/2007  10/23/2007  10/18/2007 
1 Operations Analysis 10/19/2006  11/30/2006  12/08/2006 
2 Operations Analysis 05/23/2007  07/04/2007  07/02/2007 
3 Operations Analysis 10/15/2007  11/26/2007  11/08/2007 
4 Operations Analysis 12/18/2007  01/29/2008  01/23/2008 
5* Operations Analysis 02/07/2008  03/20/2008  02/26/2008 
1 Operations Analysis (Revised/Updated/Supplemental) 02/27/2009  04/10/2009  03/25/2009 
2* Operations Analysis (Revised/Updated/Supplemental) 03/27/2009  05/08/2009  04/02/2009 
1 Other 01/19/2011  03/02/2011  02/03/2011 
1 Project Report (PR) 10/28/2009  12/09/2009  12/03/2009 
2* Project Report (PR) 12/07/2009  01/18/2010  12/21/2009 
1 Right of Way Data Sheets 12/03/2008  01/14/2009  12/24/2008 
2* Right of Way Data Sheets 01/28/2009  03/11/2009  01/28/2009 
1 Right of Way Requirements 06/02/2009  07/14/2009  06/25/2009 
1 SWDR - PA&ED 09/14/2007  10/26/2007  10/25/2007 
2 SWDR - PA&ED 01/23/2008  03/05/2008  03/04/2008 
3 SWDR - PA&ED 05/07/2008  06/18/2008  05/28/2008 
4* SWDR - PA&ED 06/10/2008  07/22/2008  06/25/2008 
1 SWDR - PS&E 07/22/2009  09/02/2009  09/01/2009 
2 SWDR - PS&E 02/10/2010  03/24/2010  03/11/2010 
3 SWDR - PS&E 01/18/2011  03/01/2011  02/14/2011 
4 SWDR - PS&E 04/29/2011  06/10/2011  05/12/2011 
5* SWDR - PS&E 05/25/2011  07/06/2011  07/25/2011 
1 TMP Datasheet (PA&ED) 09/26/2007  11/07/2007  10/30/2007 
2 TMP Datasheet (PA&ED) 05/07/2008  06/18/2008  05/27/2008 
3* TMP Datasheet (PA&ED) 06/10/2008  07/22/2008  06/12/2008 
1 TMP Datasheet (PS&E) 07/22/2009  09/02/2009  08/19/2009 
2 TMP Datasheet (PS&E) 02/10/2010  03/24/2010  03/11/2010 
3 TMP Datasheet (PS&E) 01/18/2011  03/01/2011  02/14/2011 
4 TMP Datasheet (PS&E) 04/29/2011  06/10/2011  05/17/2011 
5* TMP Datasheet (PS&E) 05/25/2011  07/06/2011  05/26/2011 

* indicates document was approved.

’Comments anticipated to agency‘ date is based on a 6-week turnaround.