Review List for EA 08-34160

Review
No
Review Type
 
Received by
Caltrans
Comments anticipated
to agency
Comments sent
to agency
1 100% Submittal 02/07/2012  03/20/2012  02/22/2012 
1 30% Submittal 04/01/2009  05/13/2009  05/21/2009 
1 60% Submittal 01/05/2010  02/16/2010  02/25/2010 
1 95% Submittal 06/09/2010  07/21/2010  07/19/2010 
2 95% Submittal 07/13/2011  08/24/2011  08/30/2011 
1 Draft PR 01/20/2009  03/03/2009  03/11/2009 
2 Draft PR 07/13/2009  08/24/2009  09/09/2009 
3* Draft PR 10/05/2009  11/16/2009  10/14/2009 
1 Drainage Report (Final) 01/05/2010  02/16/2010  03/08/2010 
2 Drainage Report (Final) 06/09/2010  07/21/2010  07/15/2010 
3 Drainage Report (Final) 07/14/2011  08/25/2011  08/30/2011 
4 Drainage Report (Final) 02/07/2012  03/20/2012  02/22/2012 
1 Drainage Report (Preliminary) 04/01/2009  05/13/2009  05/14/2009 
1 Fact Sheet (Advisory) 04/21/2008  06/02/2008  06/05/2008 
2 Fact Sheet (Advisory) 07/09/2008  08/20/2008  08/22/2008 
3* Fact Sheet (Advisory) 08/28/2008  10/09/2008  11/14/2008 
1 Fact Sheet (Ramp Metering) 09/15/2008  10/27/2008  10/28/2008 
2* Fact Sheet (Ramp Metering) 10/29/2008  12/10/2008  11/04/2008 
1 Fact Sheet (Supp/Advisory) 09/16/2010  10/28/2010  10/14/2010 
2* Fact Sheet (Supp/Advisory) 11/12/2010  12/24/2010  12/24/2010 
1 Fact Sheet (Supp/Mandatory) 07/06/2010  08/17/2010  08/17/2010 
1 GADs 04/21/2008  06/02/2008  06/03/2008 
2 GADs 07/09/2008  08/20/2008  08/22/2008 
3* GADs 11/04/2008  12/16/2008  12/16/2008 
1 Geotechnical Design Report (Final) 01/05/2010  02/16/2010  03/08/2010 
2 Geotechnical Design Report (Final) 05/19/2010  06/30/2010  06/24/2010 
3* Geotechnical Design Report (Final) 07/02/2010  08/13/2010  08/03/2010 
1 Geotechnical Design Report (Preliminary) 11/14/2007  12/26/2007  01/04/2008 
2* Geotechnical Design Report (Preliminary) 01/09/2009  02/20/2009  01/26/2009 
1 Life Cycle Cost Analysis 07/13/2009  08/24/2009  08/18/2009 
2 Life Cycle Cost Analysis 11/10/2009  12/22/2009  12/16/2009 
3 Life Cycle Cost Analysis 01/05/2010  02/16/2010  01/27/2010 
4 Life Cycle Cost Analysis 02/09/2010  03/23/2010  03/05/2010 
5 Life Cycle Cost Analysis 03/11/2010  04/22/2010  05/03/2010 
6* Life Cycle Cost Analysis 05/05/2010  06/16/2010  05/26/2010 
1 MAR/NCR (Interstates) 04/29/2008  06/10/2008  06/17/2008 
2 MAR/NCR (Interstates) 10/15/2008  11/26/2008  11/04/2008 
3* MAR/NCR (Interstates) 11/17/2008  12/29/2008  12/29/2008 
4 MAR/NCR (Interstates) 04/20/2010  06/01/2010  05/11/2010 
1 Materials Report (Final) 07/13/2009  08/24/2009  09/01/2009 
2 Materials Report (Final) 11/10/2009  12/22/2009  01/12/2010 
3 Materials Report (Final) 05/11/2010  06/22/2010  07/15/2010 
4 Materials Report (Final) 08/03/2010  09/14/2010  08/24/2010 
5* Materials Report (Final) 12/08/2010  01/19/2011  12/13/2010 
1 Materials Report (Preliminary) 12/09/2008  01/20/2009  01/30/2009 
1 Operations Analysis 09/12/2007  10/24/2007  11/02/2007 
2 Operations Analysis 11/15/2007  12/27/2007  12/26/2007 
3 Operations Analysis 01/14/2008  02/25/2008  02/06/2008 
4* Operations Analysis 03/03/2008  04/14/2008  03/26/2008 
1 Other 10/20/2011  12/01/2011  11/02/2011 
1 Project Report (PR) 01/05/2010  02/16/2010  02/08/2010 
2* Project Report (PR) 03/15/2010  04/26/2010  03/18/2010 
1 Right of Way Data Sheets 11/13/2008  12/25/2008  12/10/2008 
2 Right of Way Data Sheets 02/23/2009  04/06/2009  04/06/2009 
3* Right of Way Data Sheets 04/16/2009  05/28/2009  05/15/2009 
1 Right of Way Requirements 03/23/2009  05/04/2009  05/13/2009 
2 Right of Way Requirements 05/15/2009  06/26/2009  06/02/2009 
3 Right of Way Requirements 06/29/2009  08/10/2009  07/15/2009 
4* Right of Way Requirements 07/29/2009  09/09/2009  09/01/2009 
1 SWDR - PA&ED 08/14/2008  09/25/2008  09/29/2008 
2 SWDR - PA&ED 11/03/2008  12/15/2008  12/15/2008 
3* SWDR - PA&ED 01/13/2009  02/24/2009  01/13/2009 
1 SWDR - PS&E 01/05/2010  02/16/2010  03/08/2010 
2 SWDR - PS&E 06/09/2010  07/21/2010  07/07/2010 
3 SWDR - PS&E 07/14/2011  08/25/2011  08/30/2011 
4 SWDR - PS&E 02/07/2012  03/20/2012  02/13/2012 
1 TMP Datasheet (PS&E) 01/05/2010  02/16/2010  03/02/2010 
2 TMP Datasheet (PS&E) 06/09/2010  07/21/2010  07/07/2010 

* indicates document was approved.

’Comments anticipated to agency‘ date is based on a 6-week turnaround.