Review List for EA 08-1F760

Review
No
Review Type
 
Received by
Caltrans
Comments anticipated
to agency
Comments sent
to agency
1 100% Submittal 04/21/2022  06/02/2022  06/07/2022 
2 100% Submittal 06/14/2022  07/26/2022  06/28/2022 
1 60% Submittal 09/17/2021  10/29/2021  10/28/2021 
1 95% Submittal 12/24/2021  02/04/2022  02/22/2022 
2 95% Submittal 12/24/2021  02/04/2022  02/22/2022 
3 95% Submittal 12/24/2021  02/04/2022  02/22/2022 
4 95% Submittal 01/18/2022  03/01/2022  03/02/2022 
5 95% Submittal 01/18/2022  03/01/2022  03/02/2022 
6 95% Submittal 01/18/2022  03/01/2022  03/02/2022 
7 95% Submittal 03/11/2022  04/22/2022  04/06/2022 
1 Design Standard Decision Document 07/24/2018  09/04/2018  08/24/2018 
2 Design Standard Decision Document 09/20/2018  11/01/2018  10/23/2018 
3 Design Standard Decision Document 10/31/2018  12/12/2018  11/29/2018 
4 Design Standard Decision Document 12/07/2018  01/18/2019  12/21/2018 
5 Design Standard Decision Document 01/07/2022  02/18/2022  01/21/2022 
6 Design Standard Decision Document 04/07/2022  05/19/2022  04/19/2022 
7* Design Standard Decision Document 04/21/2022  06/02/2022  04/26/2022 
1 Draft PR 03/11/2019  04/22/2019  04/29/2019 
2 Draft PR 11/12/2019  12/24/2019  12/11/2019 
3 Draft PR 02/27/2020  04/09/2020  03/11/2020 
4 Draft PR 04/20/2020  06/01/2020  05/06/2020 
5 Draft PR 06/05/2020  07/17/2020  06/15/2020 
6 Draft PR 06/18/2020  07/30/2020  06/22/2020 
7 Draft PR 06/23/2020  08/04/2020  06/23/2020 
1 Drainage Report (Final) 09/17/2021  10/29/2021  10/28/2021 
2 Drainage Report (Final) 12/24/2021  02/04/2022  01/27/2022 
3* Drainage Report (Final) 03/11/2022  04/22/2022  04/04/2022 
1 Drainage Report (Preliminary) 06/27/2018  08/08/2018  08/01/2018 
1 GADs 04/17/2018  05/29/2018  05/09/2018 
2 GADs 07/24/2018  09/04/2018  08/24/2018 
3* GADs 09/20/2018  11/01/2018  10/15/2018 
1 Geotechnical Design Report (Final) 12/06/2021  01/17/2022  01/05/2022 
2* Geotechnical Design Report (Final) 01/07/2022  02/18/2022  02/22/2022 
1 Geotechnical Design Report (Preliminary) 04/16/2019  05/28/2019  05/13/2019 
2 Geotechnical Design Report (Preliminary) 05/20/2019  07/01/2019  06/04/2019 
3 Geotechnical Design Report (Preliminary) 06/04/2019  07/16/2019  06/20/2019 
1 Life Cycle Cost Analysis 12/28/2018  02/08/2019  01/17/2019 
2 Life Cycle Cost Analysis 01/22/2019  03/05/2019  02/06/2019 
3 Life Cycle Cost Analysis 02/13/2019  03/27/2019  03/05/2019 
4* Life Cycle Cost Analysis 03/14/2019  04/25/2019  03/26/2019 
1 Materials Report (Final) 11/30/2021  01/11/2022  12/20/2021 
2* Materials Report (Final) 01/07/2022  02/18/2022  02/22/2022 
1 Materials Report (Preliminary) 09/13/2018  10/25/2018  10/16/2018 
2 Materials Report (Preliminary) 11/13/2018  12/25/2018  12/04/2018 
3 Materials Report (Preliminary) 12/28/2018  02/08/2019  01/17/2019 
4* Materials Report (Preliminary) 02/07/2019  03/21/2019  02/25/2019 
1* Operations Analysis 07/19/2018  08/30/2018  08/08/2018 
1 Other 12/04/2017  01/15/2018  12/18/2017 
2 Other 09/28/2021  11/09/2021  10/20/2021 
3 Other 09/28/2021  11/09/2021  10/20/2021 
4 Other 09/28/2021  11/09/2021  10/20/2021 
5 Other 11/24/2021  01/05/2022  12/10/2021 
6 Other 11/24/2021  01/05/2022  12/07/2021 
7 Other 01/18/2022  03/01/2022  03/02/2022 
8 Other 01/18/2022  03/01/2022  03/02/2022 
9 Other 03/16/2022  04/27/2022  03/17/2022 
10* Other 03/17/2022  04/28/2022  04/05/2022 
1 Project Report (PR) 09/04/2020  10/16/2020  10/08/2020 
2 Project Report (PR) 10/06/2020  11/17/2020  10/19/2020 
3 Project Report (PR) 10/19/2020  11/30/2020  10/22/2020 
1 Project Study Report - Proj. Dev. Sup. (PSR-PDS) 02/08/2017  03/22/2017  02/22/2017 
1 Request for Information (RFI) 02/28/2024  04/10/2024  03/18/2024 
2 Request for Information (RFI) 03/22/2024  05/03/2024  04/17/2024 
3 Request for Information (RFI) 04/10/2024  05/22/2024  04/17/2024 
1 Right of Way Data Sheets 04/15/2019  05/27/2019  05/06/2019 
2 Right of Way Data Sheets 05/15/2019  06/26/2019  06/03/2019 
1 Structures (APS/BSDS) 11/24/2021  01/05/2022  12/07/2021 
1 SWDR - PA&ED 06/27/2018  08/08/2018  08/01/2018 
2 SWDR - PA&ED 05/14/2019  06/25/2019  06/05/2019 
3 SWDR - PA&ED 08/21/2019  10/02/2019  09/09/2019 
4* SWDR - PA&ED 09/19/2019  10/31/2019  09/27/2019 
5 SWDR - PA&ED 09/03/2020  10/15/2020  09/25/2020 
1 SWDR - PS&E 09/23/2021  11/04/2021  10/28/2021 
2 SWDR - PS&E 12/24/2021  02/04/2022  01/27/2022 
3 SWDR - PS&E 03/11/2022  04/22/2022  04/05/2022 
4* SWDR - PS&E 04/21/2022  06/02/2022  05/11/2022 
1 TMP Datasheet (PS&E) 09/14/2021  10/26/2021  10/26/2021 
2 TMP Datasheet (PS&E) 12/24/2021  02/04/2022  01/26/2022 
3* TMP Datasheet (PS&E) 03/11/2022  04/22/2022  04/05/2022 
1 Traffic Forecasting 01/24/2018  03/07/2018  02/07/2018 
2 Traffic Forecasting 03/16/2018  04/27/2018  03/30/2018 
3* Traffic Forecasting 04/23/2018  06/04/2018  05/10/2018 

* indicates document was approved.

’Comments anticipated to agency‘ date is based on a 6-week turnaround.