Review List for EA 08-1G800
Review No |
Review Type |
Received by Caltrans |
Comments anticipated to agency |
Comments sent to agency |
---|---|---|---|---|
1 | 60% Submittal | 07/21/2022 | 09/01/2022 | 08/29/2022 |
1 | 95% Submittal | 03/16/2023 | 04/27/2023 | 05/19/2023 |
2 | 95% Submittal | 02/20/2024 | 04/02/2024 | 03/22/2024 |
1 | CEM1302 Positive Work Zone Protection | 06/16/2022 | 07/28/2022 | 08/29/2022 |
2 | CEM1302 Positive Work Zone Protection | 03/16/2023 | 04/27/2023 | 04/25/2023 |
3 | CEM1302 Positive Work Zone Protection | 04/17/2023 | 05/29/2023 | 05/18/2023 |
4 | CEM1302 Positive Work Zone Protection | 03/04/2024 | 04/15/2024 | 03/22/2024 |
1 | Design Standard Decision Document | 09/21/2020 | 11/02/2020 | 10/19/2020 |
2 | Design Standard Decision Document | 11/06/2020 | 12/18/2020 | 12/02/2020 |
3 | Design Standard Decision Document | 01/11/2021 | 02/22/2021 | 02/05/2021 |
4 | Design Standard Decision Document | 02/17/2021 | 03/31/2021 | 03/05/2021 |
5* | Design Standard Decision Document | 03/11/2021 | 04/22/2021 | 03/18/2021 |
6 | Design Standard Decision Document | 01/06/2022 | 02/17/2022 | 01/18/2022 |
1 | Draft PR | 11/13/2020 | 12/25/2020 | 12/10/2020 |
2 | Draft PR | 01/28/2021 | 03/11/2021 | 03/09/2021 |
3 | Draft PR | 03/24/2021 | 05/05/2021 | 05/10/2021 |
4 | Draft PR | 08/24/2021 | 10/05/2021 | 10/23/2021 |
1 | Drainage Report (Final) | 03/16/2023 | 04/27/2023 | 05/18/2023 |
2 | Drainage Report (Final) | 02/20/2024 | 04/02/2024 | 03/22/2024 |
1 | Drainage Report (Preliminary) | 05/27/2020 | 07/08/2020 | 07/03/2020 |
2 | Drainage Report (Preliminary) | 07/24/2020 | 09/04/2020 | 08/12/2020 |
3 | Drainage Report (Preliminary) | 09/10/2020 | 10/22/2020 | 09/30/2020 |
4* | Drainage Report (Preliminary) | 10/02/2020 | 11/13/2020 | 10/26/2020 |
5 | Drainage Report (Preliminary) | 06/16/2022 | 07/28/2022 | 08/29/2022 |
1 | GADs | 07/21/2020 | 09/01/2020 | 08/11/2020 |
2 | GADs | 09/25/2020 | 11/06/2020 | 10/23/2020 |
3 | GADs | 11/04/2020 | 12/16/2020 | 11/19/2020 |
4 | GADs | 11/25/2020 | 01/06/2021 | 12/16/2020 |
5* | GADs | 01/11/2021 | 02/22/2021 | 02/05/2021 |
1 | Geotechnical Design Report (Final) | 08/12/2022 | 09/23/2022 | 09/01/2022 |
2 | Geotechnical Design Report (Final) | 04/10/2023 | 05/22/2023 | 05/18/2023 |
3 | Geotechnical Design Report (Final) | 02/20/2024 | 04/02/2024 | 03/22/2024 |
1 | Geotechnical Design Report (Preliminary) | 03/25/2020 | 05/06/2020 | 04/15/2020 |
2 | Geotechnical Design Report (Preliminary) | 07/24/2020 | 09/04/2020 | 08/11/2020 |
3 | Geotechnical Design Report (Preliminary) | 08/26/2020 | 10/07/2020 | 09/14/2020 |
4* | Geotechnical Design Report (Preliminary) | 09/15/2020 | 10/27/2020 | 09/30/2020 |
1 | Materials Report (Final) | 08/09/2022 | 09/20/2022 | 09/01/2022 |
2 | Materials Report (Final) | 04/10/2023 | 05/22/2023 | 05/18/2023 |
1 | Materials Report (Preliminary) | 03/25/2020 | 05/06/2020 | 04/20/2020 |
2 | Materials Report (Preliminary) | 10/14/2020 | 11/25/2020 | 11/09/2020 |
3 | Materials Report (Preliminary) | 12/01/2020 | 01/12/2021 | 12/17/2020 |
4* | Materials Report (Preliminary) | 01/27/2021 | 03/10/2021 | 02/16/2021 |
1 | Operations Analysis | 05/20/2019 | 07/01/2019 | 06/13/2019 |
1 | Other | 01/07/2017 | 02/18/2017 | Pending |
2 | Other | 05/11/2017 | 06/22/2017 | Pending |
3 | Other | 07/06/2017 | 08/17/2017 | Pending |
4 | Other | 07/20/2017 | 08/31/2017 | Pending |
5 | Other | 08/07/2017 | 09/18/2017 | Pending |
6 | Other | 12/06/2017 | 01/17/2018 | Pending |
7 | Other | 12/13/2017 | 01/24/2018 | Pending |
8 | Other | 01/03/2018 | 02/14/2018 | Pending |
9 | Other | 10/09/2019 | 11/20/2019 | 11/15/2019 |
10 | Other | 02/18/2020 | 03/31/2020 | 03/09/2020 |
11 | Other | 03/17/2020 | 04/28/2020 | 03/25/2020 |
12 | Other | 10/14/2020 | 11/25/2020 | 11/04/2020 |
13 | Other | 03/30/2022 | 05/11/2022 | 04/26/2022 |
14 | Other | 02/20/2024 | 04/02/2024 | 03/22/2024 |
1 | Preliminary Environmental Assessment Report (PEAR) | 07/20/2017 | 08/31/2017 | Pending |
1 | Project Report (PR) | 11/09/2021 | 12/21/2021 | 12/01/2021 |
2 | Project Report (PR) | 01/04/2022 | 02/15/2022 | 01/24/2022 |
3 | Project Report (PR) | 02/02/2022 | 03/16/2022 | 02/22/2022 |
4* | Project Report (PR) | 02/23/2022 | 04/06/2022 | 03/03/2022 |
1 | Project Study Report - Proj. Dev. Sup. (PSR-PDS) | 03/16/2018 | 04/27/2018 | Pending |
2 | Project Study Report - Proj. Dev. Sup. (PSR-PDS) | 08/01/2018 | 09/12/2018 | Pending |
1 | Right of Way Conceptual Cost Estimate | 07/06/2017 | 08/17/2017 | Pending |
1 | Right of Way Data Sheets | 11/16/2020 | 12/28/2020 | 12/07/2020 |
1 | Right of Way Requirements | 11/11/2021 | 12/23/2021 | 12/22/2021 |
2 | Right of Way Requirements | 01/10/2022 | 02/21/2022 | 02/03/2022 |
3 | Right of Way Requirements | 07/26/2022 | 09/06/2022 | 08/10/2022 |
4 | Right of Way Requirements | 08/17/2022 | 09/28/2022 | 09/12/2022 |
5* | Right of Way Requirements | 09/13/2022 | 10/25/2022 | 09/29/2022 |
1 | Right of Way Requirements (Revised) | 06/21/2023 | 08/02/2023 | 07/06/2023 |
1 | SWDR - PA&ED | 05/27/2020 | 07/08/2020 | 07/02/2020 |
2 | SWDR - PA&ED | 07/31/2020 | 09/11/2020 | 08/18/2020 |
3 | SWDR - PA&ED | 09/11/2020 | 10/23/2020 | 09/28/2020 |
4 | SWDR - PA&ED | 10/05/2020 | 11/16/2020 | 10/26/2020 |
5 | SWDR - PA&ED | 11/13/2020 | 12/25/2020 | 12/07/2020 |
1 | SWDR - PID | 08/08/2017 | 09/19/2017 | Pending |
2 | SWDR - PID | 12/06/2017 | 01/17/2018 | Pending |
3 | SWDR - PID | 08/01/2018 | 09/12/2018 | 08/28/2018 |
1 | SWDR - PS&E | 06/16/2022 | 07/28/2022 | 08/29/2022 |
2 | SWDR - PS&E | 03/16/2023 | 04/27/2023 | 05/18/2023 |
3 | SWDR - PS&E | 02/20/2024 | 04/02/2024 | 03/22/2024 |
1 | TMP Datasheet (PA&ED) | 03/24/2020 | 05/05/2020 | 04/21/2020 |
1 | TMP Datasheet (PS&E) | 06/16/2022 | 07/28/2022 | 08/29/2022 |
2 | TMP Datasheet (PS&E) | 03/16/2023 | 04/27/2023 | 05/18/2023 |
1 | Traffic Engineering Performance Assessment (TEPA) | 07/05/2017 | 08/16/2017 | Pending |
2 | Traffic Engineering Performance Assessment (TEPA) | 12/06/2017 | 01/17/2018 | Pending |
3 | Traffic Engineering Performance Assessment (TEPA) | 01/16/2018 | 02/27/2018 | Pending |
1 | Traffic Forecasting | 02/14/2019 | 03/28/2019 | 03/15/2019 |
2 | Traffic Forecasting | 04/02/2019 | 05/14/2019 | 05/14/2019 |
* indicates document was approved.
’Comments anticipated to agency‘ date is based on a 6-week turnaround.