Caltrans Logo
 

Review List for EA 08-46810

Review
No
Review Type
 
Received by
Caltrans
Comments anticipated
to agency
Comments sent
to agency
1* 100% Submittal 06/27/2011  08/08/2011  06/28/2011 
1 30% Submittal 07/21/2009  09/01/2009  09/03/2009 
1 60% Submittal 03/17/2010  04/28/2010  05/25/2010 
1 95% Submittal 07/30/2010  09/10/2010  09/28/2010 
2 95% Submittal 12/27/2010  02/07/2011  02/09/2011 
3* 95% Submittal 03/11/2011  04/22/2011  03/30/2011 
1 Drainage Report (Final) 03/17/2010  04/28/2010  04/27/2010 
2 Drainage Report (Final) 07/30/2010  09/10/2010  09/16/2010 
3 Drainage Report (Final) 12/27/2010  02/07/2011  01/11/2011 
4* Drainage Report (Final) 03/11/2011  04/22/2011  03/23/2011 
1 Fact Sheet (Ramp Metering) 08/05/2010  09/16/2010  09/27/2010 
2 Fact Sheet (Ramp Metering) 10/21/2010  12/02/2010  10/25/2010 
3* Fact Sheet (Ramp Metering) 01/02/2011  02/13/2011  01/20/2011 
1 Fact Sheet (Supp/Advisory) 08/05/2010  09/16/2010  09/27/2010 
2 Fact Sheet (Supp/Advisory) 10/21/2010  12/02/2010  11/17/2010 
3 Fact Sheet (Supp/Advisory) 11/24/2010  01/05/2011  12/28/2010 
4* Fact Sheet (Supp/Advisory) 01/24/2011  03/07/2011  02/08/2011 
1 Fact Sheet (Supp/Mandatory) 08/05/2010  09/16/2010  09/28/2010 
2 Fact Sheet (Supp/Mandatory) 10/21/2010  12/02/2010  11/16/2010 
3 Fact Sheet (Supp/Mandatory) 11/24/2010  01/05/2011  12/28/2010 
4* Fact Sheet (Supp/Mandatory) 01/24/2011  03/07/2011  01/31/2011 
1 Geotechnical Design Report (Final) 03/17/2010  04/28/2010  04/27/2010 
2 Geotechnical Design Report (Final) 07/30/2010  09/10/2010  09/13/2010 
3* Geotechnical Design Report (Final) 11/09/2010  12/21/2010  11/23/2010 
1 Life Cycle Cost Analysis 03/17/2010  04/28/2010  04/27/2010 
2 Life Cycle Cost Analysis 07/30/2010  09/10/2010  09/16/2010 
3 Life Cycle Cost Analysis 02/07/2011  03/21/2011  02/22/2011 
4* Life Cycle Cost Analysis 03/07/2011  04/18/2011  03/14/2011 
1 Materials Report (Final) 03/17/2010  04/28/2010  04/27/2010 
2 Materials Report (Final) 07/30/2010  09/10/2010  09/16/2010 
3 Materials Report (Final) 11/09/2010  12/21/2010  11/30/2010 
4* Materials Report (Final) 12/07/2010  01/18/2011  01/07/2011 
1 Other 11/05/2010  12/17/2010  12/21/2010 
2 Other 02/07/2011  03/21/2011  02/09/2011 
3* Other 03/17/2011  04/28/2011  04/01/2011 
1 Right of Way Requirements 12/04/2008  01/15/2009  01/15/2009 
2 Right of Way Requirements 02/09/2009  03/23/2009  02/26/2009 
3 Right of Way Requirements 05/01/2009  06/12/2009  05/06/2009 
4 Right of Way Requirements 05/20/2009  07/01/2009  06/02/2009 
5* Right of Way Requirements 09/02/2009  10/14/2009  09/15/2009 
6 Right of Way Requirements 02/25/2010  04/08/2010  03/17/2010 
1 SWDR - PS&E 03/17/2010  04/28/2010  04/27/2010 
2 SWDR - PS&E 07/30/2010  09/10/2010  09/16/2010 
3 SWDR - PS&E 12/27/2010  02/07/2011  01/14/2011 
4 SWDR - PS&E 03/11/2011  04/22/2011  03/28/2011 
5* SWDR - PS&E 04/25/2011  06/06/2011  05/03/2011 
1 TMP Datasheet (PS&E) 03/17/2010  04/28/2010  04/27/2010 
2 TMP Datasheet (PS&E) 07/30/2010  09/10/2010  09/13/2010 
3* TMP Datasheet (PS&E) 10/21/2010  12/02/2010  11/30/2010 

* indicates document was approved.

’Comments anticipated to agency‘ date is based on a 6-week turnaround.