Review List for EA 08-45210
Review No |
Review Type |
Received by Caltrans |
Comments anticipated to agency |
Comments sent to agency |
---|---|---|---|---|
1 | 100% Submittal | 05/10/2019 | 06/21/2019 | 06/18/2019 |
1 | 60% Submittal | 01/09/2017 | 02/20/2017 | 03/10/2017 |
1 | 95% Submittal | 12/12/2018 | 01/23/2019 | 02/11/2019 |
1 | Design Standard Decision Document | 07/03/2020 | 08/14/2020 | 08/27/2020 |
2 | Design Standard Decision Document | 10/02/2020 | 11/13/2020 | 11/13/2020 |
3 | Design Standard Decision Document | 12/15/2020 | 01/26/2021 | 01/14/2021 |
4* | Design Standard Decision Document | 01/22/2021 | 03/05/2021 | 02/02/2021 |
1 | Draft PR | 11/02/2012 | 12/14/2012 | 01/02/2013 |
2 | Draft PR | 02/28/2013 | 04/11/2013 | 05/02/2013 |
3 | Draft PR | 09/25/2014 | 11/06/2014 | 12/04/2014 |
4 | Draft PR | 03/27/2015 | 05/08/2015 | 05/18/2015 |
5 | Draft PR | 07/20/2015 | 08/31/2015 | 09/28/2015 |
6 | Draft PR | 06/20/2016 | 08/01/2016 | 07/18/2016 |
7 | Draft PR | 09/21/2016 | 11/02/2016 | 11/07/2016 |
8 | Draft PR | 09/21/2016 | 11/02/2016 | 10/17/2016 |
9* | Draft PR | 11/14/2016 | 12/26/2016 | 01/10/2017 |
10 | Draft PR | 11/16/2016 | 12/28/2016 | 01/10/2017 |
1* | Drainage Report (Final) | 12/12/2018 | 01/23/2019 | 01/11/2019 |
1 | Drainage Report (Preliminary) | 01/09/2017 | 02/20/2017 | 02/10/2017 |
1 | Erosion Control Plan (4:1) | 06/20/2007 | 08/01/2007 | 08/10/2007 |
1 | Fact Sheet (Advisory) | 06/20/2007 | 08/01/2007 | 08/14/2007 |
1 | Fact Sheet (Mandatory) | 06/20/2007 | 08/01/2007 | 08/10/2007 |
1 | Fact Sheet (Ramp Metering) | 09/15/2014 | 10/27/2014 | 11/18/2014 |
2* | Fact Sheet (Ramp Metering) | 04/03/2015 | 05/15/2015 | 07/23/2015 |
1 | GADs | 06/08/2015 | 07/20/2015 | 08/24/2015 |
2 | GADs | 09/10/2015 | 10/22/2015 | 12/10/2015 |
3* | GADs | 02/08/2016 | 03/21/2016 | 04/18/2016 |
1* | GADs (Revised/Updated/Supplemental) | 11/22/2017 | 01/03/2018 | 01/04/2018 |
1 | Geotechnical Design Report (Final) | 01/04/2019 | 02/15/2019 | 02/25/2019 |
1 | Geotechnical Design Report (Preliminary) | 04/09/2014 | 05/21/2014 | 05/30/2014 |
2* | Geotechnical Design Report (Preliminary) | 08/01/2014 | 09/12/2014 | 09/03/2014 |
1 | Life Cycle Cost Analysis | 11/02/2012 | 12/14/2012 | 12/26/2012 |
2 | Life Cycle Cost Analysis | 02/19/2014 | 04/02/2014 | 04/24/2014 |
3* | Life Cycle Cost Analysis | 06/06/2014 | 07/18/2014 | 07/18/2014 |
1 | Life Cycle Cost Analysis (PS&E) | 05/24/2019 | 07/05/2019 | 06/17/2019 |
1 | MAR/NCR (District) | 11/02/2012 | 12/14/2012 | 01/02/2013 |
2 | MAR/NCR (District) | 02/28/2013 | 04/11/2013 | 04/25/2013 |
3 | MAR/NCR (District) | 07/10/2015 | 08/21/2015 | 09/22/2015 |
1 | MAR/NCR (FHWA-Final Approval) | 11/22/2017 | 01/03/2018 | 12/21/2017 |
2 | MAR/NCR (FHWA-Final Approval) | 01/04/2018 | 02/15/2018 | 02/28/2018 |
1 | MAR/NCR (FHWA-Finding of Acceptability) | 06/03/2016 | 07/15/2016 | 06/29/2016 |
2 | MAR/NCR (FHWA-Finding of Acceptability) | 07/18/2016 | 08/29/2016 | 08/01/2016 |
3* | MAR/NCR (FHWA-Finding of Acceptability) | 08/02/2016 | 09/13/2016 | 08/17/2016 |
1 | Materials Report (Final) | 12/12/2018 | 01/23/2019 | 01/23/2019 |
2 | Materials Report (Final) | 04/26/2019 | 06/07/2019 | 05/31/2019 |
1 | Materials Report (Preliminary) | 11/02/2012 | 12/14/2012 | 01/14/2013 |
2 | Materials Report (Preliminary) | 04/09/2014 | 05/21/2014 | 05/30/2014 |
3 | Materials Report (Preliminary) | 08/01/2014 | 09/12/2014 | 10/01/2014 |
4* | Materials Report (Preliminary) | 11/04/2014 | 12/16/2014 | 12/03/2014 |
1 | Operations Analysis | 01/11/2013 | 02/22/2013 | 02/11/2013 |
2 | Operations Analysis | 02/28/2013 | 04/11/2013 | 04/12/2013 |
3 | Operations Analysis | 02/12/2014 | 03/26/2014 | 04/21/2014 |
4 | Operations Analysis | 06/06/2014 | 07/18/2014 | 06/27/2014 |
1 | Operations Analysis (Revised/Updated/Supplemental) | 12/20/2007 | 01/31/2008 | 02/05/2008 |
2* | Operations Analysis (Revised/Updated/Supplemental) | 04/10/2008 | 05/22/2008 | 05/15/2008 |
1* | Other | 12/29/2014 | 02/09/2015 | 02/06/2015 |
2 | Other | 06/05/2015 | 07/17/2015 | 07/17/2015 |
3* | Other | 08/03/2015 | 09/14/2015 | 09/09/2015 |
4 | Other | 10/22/2015 | 12/03/2015 | 12/30/2015 |
5 | Other | 03/19/2019 | 04/30/2019 | 03/20/2019 |
1 | Project Report (PR) | 05/18/2017 | 06/29/2017 | 08/08/2017 |
2 | Project Report (PR) | 08/14/2017 | 09/25/2017 | 09/20/2017 |
3 | Project Report (PR) | 09/21/2017 | 11/02/2017 | 09/28/2017 |
4* | Project Report (PR) | 10/03/2017 | 11/14/2017 | 10/30/2017 |
1 | Right of Way Data Sheets | 06/20/2007 | 08/01/2007 | 08/10/2007 |
2* | Right of Way Data Sheets | 12/20/2007 | 01/31/2008 | 01/31/2008 |
3 | Right of Way Data Sheets | 05/07/2013 | 06/18/2013 | 06/07/2013 |
4 | Right of Way Data Sheets | 03/17/2014 | 04/28/2014 | 05/01/2014 |
5 | Right of Way Data Sheets | 07/17/2014 | 08/28/2014 | 09/03/2014 |
6* | Right of Way Data Sheets | 09/22/2014 | 11/03/2014 | 01/07/2015 |
7 | Right of Way Data Sheets | 04/07/2017 | 05/19/2017 | 04/27/2017 |
8* | Right of Way Data Sheets | 05/11/2017 | 06/22/2017 | 06/15/2017 |
1 | Right of Way Requirements | 08/31/2016 | 10/12/2016 | 10/12/2016 |
2 | Right of Way Requirements | 06/02/2017 | 07/14/2017 | 06/23/2017 |
3* | Right of Way Requirements | 11/27/2017 | 01/08/2018 | 12/01/2017 |
1 | SWDR - PA&ED | 11/02/2012 | 12/14/2012 | 01/03/2013 |
2 | SWDR - PA&ED | 04/07/2014 | 05/19/2014 | 05/19/2014 |
3 | SWDR - PA&ED | 06/23/2014 | 08/04/2014 | 10/08/2014 |
4 | SWDR - PA&ED | 04/11/2017 | 05/23/2017 | 05/24/2017 |
5* | SWDR - PA&ED | 06/14/2017 | 07/26/2017 | 07/12/2017 |
1 | SWDR - PS&E | 01/09/2017 | 02/20/2017 | 03/06/2017 |
2 | SWDR - PS&E | 01/04/2019 | 02/15/2019 | 02/25/2019 |
3 | SWDR - PS&E | 04/26/2019 | 06/07/2019 | 06/17/2019 |
4 | SWDR - PS&E | 12/11/2019 | 01/22/2020 | 01/09/2020 |
5 | SWDR - PS&E | 03/16/2020 | 04/27/2020 | 04/16/2020 |
6 | SWDR - PS&E | 06/26/2020 | 08/07/2020 | 07/07/2020 |
1* | TMP Datasheet (PA&ED) | 11/02/2012 | 12/14/2012 | 12/31/2012 |
2* | TMP Datasheet (PA&ED) | 07/10/2014 | 08/21/2014 | 09/03/2014 |
1 | TMP Datasheet (PS&E) | 01/09/2017 | 02/20/2017 | 02/03/2017 |
2 | TMP Datasheet (PS&E) | 01/02/2019 | 02/13/2019 | 02/23/2019 |
3 | TMP Datasheet (PS&E) | 03/19/2019 | 04/30/2019 | 04/09/2019 |
4* | TMP Datasheet (PS&E) | 04/26/2019 | 06/07/2019 | 05/13/2019 |
1 | Traffic Forecasting | 12/20/2007 | 01/31/2008 | 01/31/2008 |
2* | Traffic Forecasting | 03/13/2008 | 04/24/2008 | 04/10/2008 |
3* | Traffic Forecasting | 10/22/2012 | 12/03/2012 | 12/06/2012 |
* indicates document was approved.
’Comments anticipated to agency‘ date is based on a 6-week turnaround.