to agency
1 100% Submittal 01/29/2020  03/11/2020  02/11/2020 
2 100% Submittal 03/11/2020  04/22/2020  04/01/2020 
3 100% Submittal 04/20/2020  06/01/2020  05/12/2020 
1 95% Submittal 06/24/2019  08/05/2019  08/05/2019 
2 95% Submittal 10/28/2019  12/09/2019  12/02/2019 
1 Design Standard Decision Document 03/10/2020  04/21/2020  03/18/2020 
2 Design Standard Decision Document 04/06/2020  05/18/2020  04/14/2020 
3 Design Standard Decision Document 04/27/2020  06/08/2020  05/05/2020 
1 Drainage Report (Final) 01/06/2020  02/17/2020  01/27/2020 
2* Drainage Report (Final) 04/20/2020  06/01/2020  04/30/2020 
1 Drainage Report (Preliminary) 06/24/2019  08/05/2019  08/05/2019 
2 Drainage Report (Preliminary) 10/28/2019  12/09/2019  12/02/2019 
1 Geotechnical Design Report (Final) 07/15/2019  08/26/2019  08/05/2019 
2* Geotechnical Design Report (Final) 01/09/2020  02/20/2020  01/28/2020 
1 Geotechnical Design Report (Preliminary) 10/28/2019  12/09/2019  12/02/2019 
1 Materials Report (Final) 07/15/2019  08/26/2019  08/05/2019 
2* Materials Report (Final) 01/07/2020  02/18/2020  02/04/2020 
1 Materials Report (Preliminary) 10/28/2019  12/09/2019  12/02/2019 
1 Other 06/24/2019  08/05/2019  08/05/2019 
2 Other 10/28/2019  12/09/2019  12/02/2019 
3 Other 10/28/2019  12/09/2019  12/02/2019 
4 Other 11/19/2019  12/31/2019  12/11/2019 
5* Other 01/06/2020  02/17/2020  01/17/2020 
6 Other 01/08/2020  02/19/2020  01/29/2020 
7* Other 01/23/2020  03/05/2020  01/30/2020 
8* Other 01/24/2020  03/06/2020  02/03/2020 
1 SWDR - PS&E 06/24/2019  08/05/2019  08/05/2019 
2 SWDR - PS&E 10/28/2019  12/09/2019  12/02/2019 
3 SWDR - PS&E 01/06/2020  02/17/2020  01/27/2020 
4 SWDR - PS&E 01/28/2020  03/10/2020  02/03/2020 
5* SWDR - PS&E 04/20/2020  06/01/2020  04/30/2020 

* indicates document was approved.