Caltrans Logo
 

Review List for EA 08-1L910

Review
No
Review Type
 
Received by
Caltrans
Comments anticipated
to agency
Comments sent
to agency
1 100% Submittal 01/23/2024  03/05/2024  02/21/2024 
2 100% Submittal 03/14/2024  04/25/2024  Pending 
1 30% Submittal 11/05/2021  12/17/2021  12/09/2021 
1 60% Submittal 06/17/2022  07/29/2022  07/15/2022 
1 95% Submittal 01/13/2023  02/24/2023  03/16/2023 
2 95% Submittal 11/20/2023  01/01/2024  12/06/2023 
1 CEM1302 Positive Work Zone Protection 02/28/2024  04/10/2024  Pending 
1 Design Standard Decision Document 02/22/2022  04/05/2022  03/17/2022 
2 Design Standard Decision Document 03/23/2022  05/04/2022  04/19/2022 
3 Design Standard Decision Document 04/22/2022  06/03/2022  06/09/2022 
1 Drainage Report (Final) 04/15/2022  05/27/2022  05/06/2022 
2 Drainage Report (Final) 01/13/2023  02/24/2023  03/16/2023 
3 Drainage Report (Final) 11/20/2023  01/01/2024  12/06/2023 
1 GADs 11/12/2021  12/24/2021  11/30/2021 
1 Geotechnical Design Report (Final) 06/17/2022  07/29/2022  07/15/2022 
2 Geotechnical Design Report (Final) 01/13/2023  02/24/2023  02/21/2023 
3* Geotechnical Design Report (Final) 04/20/2023  06/01/2023  04/25/2023 
1 Materials Report (Final) 06/17/2022  07/29/2022  07/15/2022 
2 Materials Report (Final) 01/13/2023  02/24/2023  03/16/2023 
3 Materials Report (Final) 04/20/2023  06/01/2023  05/12/2023 
1 Operations Analysis 01/14/2022  02/25/2022  01/31/2022 
2 Operations Analysis 02/07/2022  03/21/2022  03/07/2022 
1 Other 09/16/2021  10/28/2021  10/14/2021 
2 Other 12/15/2021  01/26/2022  01/14/2022 
3 Other 02/01/2022  03/15/2022  03/17/2022 
4 Other 03/23/2022  05/04/2022  04/07/2022 
5 Other 06/17/2022  07/29/2022  07/15/2022 
6 Other 10/11/2022  11/22/2022  11/22/2022 
7 Other 01/13/2023  02/24/2023  03/16/2023 
8 Other 01/13/2023  02/24/2023  03/16/2023 
9 Other 07/06/2023  08/17/2023  08/17/2023 
10 Other 01/04/2024  02/15/2024  01/22/2024 
11 Other 01/23/2024  03/05/2024  03/26/2024 
12 Other 01/23/2024  03/05/2024  03/26/2024 
13 Other 02/28/2024  04/10/2024  Pending 
1 Right of Way Data Sheets 08/15/2023  09/26/2023  08/24/2023 
2 Right of Way Data Sheets 01/04/2024  02/15/2024  01/11/2024 
1 Right of Way Requirements 09/12/2022  10/24/2022  10/10/2022 
2 Right of Way Requirements 10/12/2022  11/23/2022  10/27/2022 
3 Right of Way Requirements 11/01/2022  12/13/2022  11/10/2022 
1 SWDR - PS&E 04/15/2022  05/27/2022  05/04/2022 
2 SWDR - PS&E 01/13/2023  02/24/2023  02/18/2023 
3 SWDR - PS&E 11/20/2023  01/01/2024  12/06/2023 
4 SWDR - PS&E 01/02/2024  02/13/2024  01/18/2024 
1 Traffic Forecasting 10/18/2021  11/29/2021  12/13/2021 

* indicates document was approved.

’Comments anticipated to agency‘ date is based on a 6-week turnaround.