Proj No. |
Co | Project Desc. |
Agency |
Caltrans Engineer | Status | Review Count |
Noon-0000 (000)
|
RIV | Perris Boulevrad from Ramona Expressway to Perris Valley Storm Drain Lateral "A" |
Roadway Rehab |
|
Moreno Valley (MorV) |
Eric Tang |
No comments |
0 |
DE-0007 (802)
|
SBd | On Grove Ave from Belmont St to Airport Dr. |
Grade Separation & Widening |
|
Ontario |
Osabuogbe Igbinedion |
09/06/2007: Mail Received (Final Voucher) -view comment history- |
0 |
DE-0007 (810)
|
SBd | In the City to Ontario on I-10 at Haven Ave. and Archibald Ave. |
Landscaping and Irrigation |
|
Ontario |
Marcos Amancio |
09/03/2015: Mail Received (Final Voucher 8/31/2012, Purge on 2/2016, 1 copy, 0 originals) -view comment history- |
0 |
DE-0007 (811)
|
SBd | I-10 at Archibald Avenue Interchange |
Landscaping and Irrigation |
|
Ontario |
Marcos Amancio |
08/06/2015: Mail Received (Final Voucher, Purge 02/2016, 1 Copy, 0 originals) -view comment history- |
0 |
HP21STPL-0027 (012)
|
RIV | Nason and SR60 intercahnge |
Modify Off and On-ramp |
|
Moreno Valley |
Chigo Dike |
11/19/2015: Mail Received (Final Invoice #16 (Con.) 1 original (Incomplete Pkg.) 0 copies) -view comment history- |
1 |
DPIL-0061 (025)
|
SBd | Interchange at I-15 and Mojave Drive |
Ramp widening and new parallel bridge overcrossing |
|
Victorville |
Nivine K. Georges |
No comments |
0 |
HP21-0151 (217)
|
SBd | I-15/Main Street IC, Hesperia |
EA 08-370202/9S; ACIM-IM*** |
|
Hesperia |
Sean Yeung |
10/27/2015: Mail Received (FROE (PE) 1 original, 2 copies) -view comment history- |
0 |
HP21L-0193 (001)
|
SBd | (DO NOT USE!) in Sbd county on state route 79 |
No activity; Realignment |
|
Adelanto |
Savat Khamphou |
No comments |
0 |
HP21L-0499 (001)
|
SBd | I-10 AND PEPPER AVE AND VALLEY BLVD. |
CONSTRUCT INTERCHANGE |
|
San Bernardino County 0071 |
Ramiro Martinez |
No comments |
0 |
HP21L-0499 (002)
|
SBd | Pepper @ I-10. |
At I-10 modification of Pepper Avenue interchange. Widen bridge from 5 to 7 lanes and add auxiliary lanes to freeway. |
|
San Bern. County (CR-SBdCo) |
Sylvester Lin |
12/16/2015: Mail Received (Final Invoice (PE) 1 original, 2 copies. No supporting documents) -view comment history- |
0 |
HP21IMDL-0499 (003)
|
SBd | I-10/Pepper Avenue, San Bernardino County.
Local Assistance Advantage ID. 0816000008
|
I-10 / Pepper Avenue interchange, Br. No. 54-0531. PPNO 3001F
Replace Pepper Ave. Bridge Structure over I-10, widen from 3-5 lanes to provide for one additional through lane, one additional southbound turn lane and construct minor ramp improvements, minor arterial street improvement, and ancillary improvement |
|
San Bern. Associated Government (SBA) (old) |
Evita Premdas |
05/20/2019: Mail Received (progress invoice 10; 1 original, 2 copies.) -view comment history- |
0 |
HP21L-1188 (001)
|
RIV | IN THE CITY OF TEMECULA ON OVERLAND DR OVERCROSSING FROM YNEZ RD TO JEFFERSON AVE. |
CONSTRUCT ROADWAY & OVERCROSSING BRIDGE |
|
Temecula |
Eric Tang |
No comments |
0 |
HP21L-1530 (002)
|
RIV | MARCH AFB AT OLEANDER AVE: I-215 TO MARCH INLAND PORT |
ROADWAY REHAB.,EXTENSION & RELOCATION |
|
March JPA |
Eric Tang |
12/06/2007: Mail Received (Final Voucher) -view comment history- |
0 |
EEM-2003 (053)
|
RIV | West of Hwy 79, south of Scott Rd. & northeast of Temecula City |
Acquire approx. 57 acres - Acquisition project |
|
Riverside County 0065 |
Harish Rastogi |
No comments |
0 |
EEM-2003 (066)
|
SBd | Metrolink Line at Milliken Avenue - Rancho Cucamonga Metrolink Station Beautification |
Install additional passenger amenities, scenic landscapes and cultural displays. |
|
Rancho Cucamonga |
Osabuogbe Igbinedion |
No comments |
0 |
EEM-2003 (107)
|
RIV | First Street Bridge Extension between Pujol Street and Front Street - Old Town Southern Gateway Landscaping/Rotary Park Expansion |
Provide roadside recreational improvements including landscaping; hardscape & greenways,pathways etc |
|
Temecula |
Eric Tang |
No comments |
0 |
EEM-2006 (024)
|
RIV | Along I-10 in Central Riverside County at Palm Drive/Gene Autry Trail |
Resource Lands - Coachella Valley Preserve Acquisition |
|
Friends of the Desert Mountains |
Evita Premdas |
No comments |
0 |
EEM-2006 (027)
|
RIV | I-15@Cantu Galleano Ranch road interchange |
Highway Landscape and urban forestry - I-15@Cantu Galleano Ranch road interchange enhancement |
|
Riv. County (CR-RivCo) |
Evita Premdas |
No comments |
0 |
EEM-2008 (031)
|
SBd | Blue Jay Road Big Bear Lake at SR 18 PM 46.3 |
Improvements, grading, drainage, xeriscape-landscaping, picnic pavailion, walking trails. |
|
Big Bear Lake |
Sean Yeung |
No comments |
0 |
ER-2425 (027)
|
RIV | RIVER ROAD BRIDGE @ SANTA ANA RIVER |
Emergency Opening |
|
Riverside County 0065 |
Harish Rastogi |
No comments |
0 |
ER-2425 (028)
|
RIV | IN THE CITY OF CORONA ON RINCON ST. FROM SMITH AVE. TO CORYDEN ST. - DAF# RIV-093-086 |
RESTORATION |
|
Corona |
Harish Rastogi |
No comments |
0 |
ER-2438 (001)
|
RIV | IN THE CITY OF LAKE ELSINORE AT (6) VARIOUS LOCATIONS: DAF'S RIV-93-62,63,64,65,66,67 |
EMERGENCY REPAIR |
|
Lake Elsinore |
Harish Rastogi |
01/05/2007: Mail Received (FINAL VOUCHER) -view comment history- |
0 |
ER-2443 (001)
|
RIV | In the City of Perris at Various Locations. Storm 93-1. DAF's: Riv-93-69,70,71. |
Emergency Repair |
|
Perris |
Harish Rastogi |
No comments |
0 |
ER-2469 (001)
|
RIV | In the City of Indian Wells - El Dorado Dr. & Fred Waring Drive - DAF#s RIV-93- 14 & 15 |
Emergency Opening |
|
Indian Wells (Ind W) |
Harish Rastogi |
No comments |
0 |
MG-3041 (011)
|
RIV | Unknown |
Per Patrick close out project. SB |
|
Riverside County 0065 |
Harish Rastogi |
No comments |
0 |
ER-3666 (002)
|
Riv | In Riverside County on De Luz Road, 5600' North of Camaron - DAF# SKM-RIVCO-010-0 - Storm CA98-1 |
EO/FA - Restoration-Contract |
|
Riverside County 0065 |
Laura Zaninovich |
No comments |
0 |
ER-3666 (005)
|
RIV | In Riverside County on Van Buren Blvd. -e/o Mockingbird Canyon Rd. - DAF# SKM-RIVCO-003-0 |
Restoration/Contract |
|
Riverside County 0065 |
Harish Rastogi |
No comments |
0 |
ER-3667 (001)
|
RIV | In the City of Moreno Valley on Nason Street at Cottonwood Avenue. - DAF# SKM-MORV-001-0 |
EO/FA |
|
Moreno Valley (MorV) |
Harish Rastogi |
No comments |
0 |
ER-3667 (003)
|
RIV | In the City of Riverside on Linden Street between Cranford Ave. and Iowa Ave. - DAF# SKM-RIV-001-0 |
EO/FA |
|
Riverside |
Harish Rastogi |
No comments |
0 |
ER-4005 (001)
|
SBd | In the City of Rancho Cucamonga on Banyan Ave (Summit Ave), at Etiwanda Creek - (DAF# RMC-RCUC-001-0) |
Emergency Opening-Contract |
|
Rancho Cucamonga |
Marcos Amancio |
03/26/2014: Mail Received (Received FROE) -view comment history- |
0 |
ER-4208 (001)
|
SBd | Rock Springs Road at Mojave River |
Emergency opening and restoration |
|
San Bern. County (CR-SBdCo) |
Harish Rastogi |
02/21/2017: 02/212017 Project archived in D8 Database, project file purged on 7/7/2015. -view comment history- |
0 |
ER-4208 (002)
|
SBd | Etiwanda Avenue at Sanbernardino avenue in San Bernardino County |
Emergeny opening and restoration |
|
San Bern. County (CR-SBdCo) |
Leslie Avila |
02/21/2017: 02/212017 Project archived in D8 Database, project file purged on 7/7/2015. -view comment history- |
0 |
ER-4208 (003)
|
SBd | Indian Trail at Mojave river in SanBernardino County |
Emergency opening and restoration |
|
San Bern. County (CR-SBdCo) |
Karen Nguyen |
02/21/2017: 02/212017 Project archived in D8 Database, project file purged on 7/7/2015. -view comment history- |
0 |
ER-4208 (004)
|
SBd | Hinkley Road at the Mojave River, in San Bernardino County. |
Emergency Opening and Restoration-Cave in of Road Surface at each side approach of bridge, undermining of approaches. |
|
San Bern. County (CR-SBdCo) |
Harish Rastogi |
02/21/2017: 02/212017 Project archived in D8 Database, project file purged on 7/7/2015. -view comment history- |
0 |
ER-4208 (005)
|
SBd | Pipes Canyon Road from Pioneertown Road to Old Woman Springs Road, in San Bernardino County |
Emergency Opening Only |
|
San Bern. County (CR-SBdCo) |
Harish Rastogi |
02/21/2017: 02/212017 Project archived in D8 Database, project file purged on 7/7/2015. -view comment history- |
0 |
ER-4208 (006)
|
SBd | Lenwood Road at the Mojave River, in San Bernardino County
CRS Map location: 15T24, J3 |
Emergency Opening and Restoration |
|
San Bernardino County 0071 |
Harish Rastogi |
05/01/2008: Mail Received (Received final for Lenwood road repair onapril 29, 08.) -view comment history- |
0 |
ER-4208 (007)
|
SBd | Dart Canyon Road South of Edelweiss Drive, in San Bernardino County
CRS Map #15U53, E1 |
Emergency Opening
Debris flow onto the road for a length of approximately 800 feet. Some road washout. Culvert plugged. |
|
San Bernardino County 0071 |
Harish Rastogi |
No comments |
0 |
ER-4208 (008)
|
SBd | Crestline Cutoff Project, San Bernardino County |
Remove the material and replace with compacted with fills properly keyed into and benched into firm underlyong rock. Replacing asphalt paving and striping. |
|
San Bern. County (CR-SBdCo) |
David Lee |
05/01/2008: Mail Received (Final detail estimate does not match invoice contract total cost and final detail summary. Resubmit) -view comment history- |
0 |
ER-4208 (009)
|
SBd | SEVEN OAKS ROAD AT THE SANTA ANA RIVER |
Replace Shoulder using fill dirt, replace roadway, unclog drainage pipes using backhoe |
|
San Bernardino County 0071 |
Harish Rastogi |
04/01/2008: Mail Received (final inv) -view comment history- |
0 |
ER-4208 (010)
|
SBd | Lytle Creek Road, in San Bernardino County
CRS Map # 15U51 |
Emergency Opening and Restoration
Roadway Cleanup and Repair |
|
San Bern. County (CR-SBdCo) |
David Lee |
01/10/2014: Mail Received (Received Final Voucher 08/08/2005 to 06/13/2013) -view comment history- |
0 |
ER-4208 (011)
|
SBd | Mount Baldy Road north of Icehouse Canyon, |
Roadway clean up and repair |
|
San Bern. County (CR-SBdCo) |
Harish Rastogi |
02/21/2017: 02/21/2017 Project archived in D8 Database, project file purged on 01/24/2017. -view comment history- |
0 |
ER-4208 (011)
|
SBd | Mount Baldy Road North of Icehouse Canyon, in San Bernardino County.
CRS Map # 14U54 |
Emergency Opening and Restoration; Roadway Cleanup and Repair |
|
San Bernardino County 0071 |
Harish Rastogi |
No comments |
0 |
ER-4208 (012)
|
SBd | Glen Helen Parkway at Cajon Creek, in San Bernardino County;
CRS Map #: 15U51, K5 |
Emergency Opening and Restoration, Roadway repair and PR of concrete box culvert. |
|
San Bern. County (CR-SBdCo) |
David Lee |
02/21/2017: 02/21/2017 Project archived in D8 Database, project file purged on 01/24/2017. -view comment history- |
0 |
ER-4208 (013)
|
SBd | Glen Helen Parkway at Lyttle Creek |
Emergency Opening |
|
San Bern. County (CR-SBdCo) |
David Lee |
No comments |
0 |
ER-4208 (013)
|
SBd | Glen Helen Parkway at Lytle Creek, in San Bernardino County.
CRS Map #: 15U51, G8 |
Emergency Opening-Roadway Excavation, replacement of dip section, continuing protective and safety measures. |
|
San Bern. County (CR-SBdCo) |
Marcos Amancio |
02/21/2017: 02/212017 Project archived in D8 Database, project file purged on 7/7/2015. -view comment history- |
0 |
ER-4208 (014)
|
SBd | Balfrin Drive at Berne Drive, in San Bernardino County.;CRS Map # 15U53, E2 |
Emergency Opening-Roadway washed out due to culvert failure. |
|
San Bern. County (CR-SBdCo) |
Harish Rastogi |
02/21/2017: 02/21/2017 Project archived in D8 Database, project file purged on 01/24/2017. -view comment history- |
0 |
ER-4208 (015)
|
SBd | Arrowhead Lake Road |
Debris removal ; Replace shoulder using fill dirt |
|
San Bern. County (CR-SBdCo) |
Marcos Amancio |
02/21/2017: 02/212017 Project archived in D8 Database, project file purged on 7/7/2015. -view comment history- |
0 |
ER-4208 (016)
|
SBd | Minneola Road at the Mojave River in San Bernardino County. CRS Map #: 16T23, D3 |
Emergency Opening and Restoration |
|
San Bern. County (CR-SBdCo) |
Harish Rastogi |
02/21/2017: 02/21/2017 Project archived in D8 Database, project file purged on 01/24/2017. -view comment history- |
0 |
ER-4208 (017)
|
SBd | Alabama Street at City Creek in San Bernardino County;CRS Map #: 14V13, K8 |
Emergency Opening and Restoration |
|
San Bern. County (CR-SBdCo) |
Harish Rastogi |
11/21/2016: DLAE signs Exhibit 17-A, Cover Letter & Final Report of Expenditures Checklist, and Exhibit 17-C, Final Inspection Form. -view comment history- |
0 |
ER-4208 (020)
|
SBd | Pioneertown Road 0.75 miles N of Wamego Trail north for 2 miles, in San Bernardino County.
CRS Map # 117V11 |
Emergency Opening-Roadway Cleanup and Repair |
|
San Bern. County (CR-SBdCo) |
Marcos Amancio |
No comments |
0 |
ER-4209 (001)
|
RIV | Etiwanda Avenue south of Fourth street |
Clifornia 2005 storm (ER)--Sawcutting pavement, roadway excavation, placing roadway embankment,base, asphalt concrete pavement, AC dike and pavement delinenation |
|
Ontario |
Marcos Amancio |
No comments |
0 |
ER-4209 (002)
|
SBd | Menlo Drive at Sheephorn Road, in Big Bear Lake.
CRS Map: 16U52, E2 |
Emergency Opening and Restoration-Mudslide undermined 200' of road. Road is unstable. Stabilize road with soldier piles, crib walls, grading, and retaining walls.
|
|
Big Bear Lake |
Sean Yeung |
No comments |
0 |
ER-4209 (003)
|
SBd | Wildwood Canyon Road, in the City of Yucaipa. |
Emergency Opening |
|
Yucaipa |
Harish Rastogi |
02/21/2017: 02/21/2017 Project archived in D8 Database, project file purged on 01/24/2017. -view comment history- |
0 |
ER-4209 (006)
|
SBd | Base line , Highland avenue |
Emergency opening and repairs |
|
San Bern. County (CR-SBdCo) |
Harish Rastogi |
No comments |
0 |
ER-4210 (001)
|
RIV | De Luz Road from Rancho California Rd. to the San Diego County Line, in Riverside County.
CRS Map # 15w33 to 15w53 |
Emergency Opening and Restoration |
|
Riverside County 0065 |
Harish Rastogi |
No comments |
0 |
ER-4210 (002)
|
RIV | Old Elsinore Road, in Riverside County, from Aloha Street to San Jacinto Road. CRS Map # 15v53 |
Emergency Opening and Restoration-DAF updated to match the completed PR project. |
|
Riv. County (CR-RivCo) |
Harish Rastogi |
No comments |
0 |
ER-4210 (003)
|
RIV | Rancho California Road from Temecula City Limits to De Luz Road, in Riverside County.
CRS Map # 15w34 to 15w44 |
Emergency Opening and Restoration- |
|
Riv. County (CR-RivCo) |
Harish Rastogi |
No comments |
0 |
ER-4210 (004)
|
RIV | Riverview Drive from Peralta to Avenue Juan Diaz, in Riverside County.;CRS Map # 15v31 |
Emergency Opening and Restoration-modified on 2/22/07 to reflect final costs of PR. |
|
Riv. County (CR-RivCo) |
Ron Akers |
No comments |
0 |
ER-4210 (005)
|
RIV | San Jacinto Road from Old Elsinore Rd. to Lukens Ln, in Riverside County.
CRS Map # 15v53 |
Emergency Opening and Restoration |
|
Riverside County 0065 |
Harish Rastogi |
No comments |
0 |
ER-4210 (006)
|
RIV | Scott Road from Lindenberger to Ashford, in Riverside County.
CRS Map # 15w24 |
Emergency Opening and Restoration |
|
Riverside County 0065 |
Harish Rastogi |
No comments |
0 |
ER-4210 (007)
|
RIV | River Road Bridge at the Santa Ana River, in Riverside County. |
Emergency Opening |
|
Riverside County 0065 |
Harish Rastogi |
No comments |
0 |
ER-4210 (008)
|
RIV | Box Canyon Road from All American Canal to Shavers Well, in Riverside County |
Emergency Opening |
|
Riverside County 0065 |
Harish Rastogi |
No comments |
0 |
ER-4210 (009)
|
RIV | Ramon Road from San Miguelito Drive to Desert Moon Drive, in Riverside County |
Emergency Opening and Debris Removal |
|
Riverside County 0065 |
Harish Rastogi |
No comments |
0 |
ER-4210 (010)
|
RIV | Pala road at Pechenga Creek, City of Temecula |
Emergency opening-Replaced damaged culverts, filled slopes, placed rip raps and recinstructed the roadway |
|
Riverside County 0065 |
Harish Rastogi |
02/25/2008: Mail Received (Pala Road Progress Final) -view comment history- |
0 |
ER-4210 (012)
|
RIV | Beaumont Avenue at Marshall Creek, in Riveside County.
CRS Map # 16V31, B6 |
Emergency Opening and Roadway Repair |
|
Riverside County 0065 |
Harish Rastogi |
No comments |
0 |
ER-4210 (013)
|
RIV | El Toro Road from Nichols Road to Lindell Road, in Riverside County-
CRS Map # 15w12, F5 |
Emergency Opening |
|
Riv. County (CR-RivCo) |
Ron Akers |
No comments |
0 |
ER-4210 (014)
|
RIV | Van Buren Road & Bridge at the Santa Ana River, in Riverside County.
CRS Map # 15v31, D5 |
Emergency Opening, Roadway, and Bridge Repair |
|
Riverside County 0065 |
Harish Rastogi |
No comments |
0 |
ER-4210 (015)
|
RIV | Lucretia Road at Day Creek Crossing.
CRS Map # 14v35, around H4 |
Emergency Opening-Roadway Repair |
|
Riverside County 0065 |
Harish Rastogi |
No comments |
0 |
ER-4210 (016)
|
RIV | Bautista Road at Bautista Creek Crossing, in Riverside County.
CRS Map # 16w12, E7 |
Emergency Opening, Roadway Repair |
|
Riverside County 0065 |
Harish Rastogi |
No comments |
0 |
ER-4210 (017)
|
RIV | San Timoteo Canyon Road, in Riverside County.
|
Emergency Opening |
|
Riverside County 0065 |
David Franceschelli |
No comments |
0 |
ER-4210 (018)
|
RIV | Ellis Avenue from Theda St. to Marie St.
CRS Map # 15v53, C8 |
Emergency Opening and Roadway Repair |
|
Riverside County 0065 |
Harish Rastogi |
No comments |
0 |
ER-4210 (019)
|
RIV | Mockingbird Canyon road |
Emergency opening |
|
Riverside County 0065 |
Harish Rastogi |
No comments |
0 |
ER-4211 (001)
|
RIV | Avenue 44 at the Whitewater Storm Channel, in Indio |
Emergency Opening and Restoration-Due to heavy rain, Avenue 44 at Whitewater Storm Channel has been completely washed away |
|
Indio |
Harish Rastogi |
No comments |
0 |
ER-4211 (004)
|
RIV | Golf Club Drive at the Palm Canyon Wash, in the city of Palm Springs.
CRS Map #: 17V51, B5 |
Emergency Opening and Restoration |
|
Palm Springs |
Harish Rastogi |
No comments |
0 |
ER-4211 (005)
|
RIV | Country Club Drive, Whitewater River Channel Crossing in City of Rancho Mirage |
The proposed project consists of storm damage repair to the Country Club drive Crossing of the Whitewater River Channel in the city of Rancho Mirage in Riverside county. No roadway widening or right of way will be required. |
|
Rancho Mirage |
Harish Rastogi |
No comments |
0 |
ER-4211 (006)
|
RIV | Cajalco road and Cajalco road bridge at Temescal Washington |
Restore damaged road shoulder and embankment slopes, restore damaged bridge abutment, channelize Temescal wash and Bedford canyon wash leading to the bridge, and install a detention/debris basin upstream of the bridge. |
|
Corona |
Harish Rastogi |
04/15/2008: Mail Received (completion and report of expendtirues) -view comment history- |
0 |
ER-4211 (007)
|
RIV | Foothill Parkway (Chase Drive/El Cerrito Rd) at State Street, in Corona
CRS Map #14V55, G1 |
Emergency Opening-Roadway Repair |
|
Corona |
Steven Jaimes |
No comments |
0 |
ER-4211 (007)
|
RIV | Foothill Parkway (Chase Drive/El Cerrito Rd) at State Street |
Roadway Repair |
|
Corona |
Chigo Dike |
No comments |
0 |
ER-4211 (008)
|
RIV | SR 74, ( In Perris ) From Wasson Canyon Rd to 7th Street |
Road Widening and alignment
RFoadway Debris cleanup and repair |
|
RCTC |
Harish Rastogi |
05/16/2008: Mail Received (Copy of cost breakdown for force account invoices) -view comment history- |
0 |
ER-4809 (004)
|
SBd | Third Avenue, in Hesperia. DAF # RXM-HES-003-0 |
Adv* Draft Id #0800020472 |
|
Hesperia |
Sean Yeung |
09/02/2016: DLAE signs revised CE/CE Determination Form, an update to version signed on 9/30/2015. -view comment history- |
0 |
STPL-5033 (005)
|
SBd | Arrowhead - Mill to 3rd St |
Engineer to Update |
|
San Bernardino |
Osabuogbe Igbinedion |
No comments |
0 |
CMAQLG-5033 (006)
|
SBd | Rialto Ave |
Engineer to Update |
|
San Bernardino |
Evita Premdas |
No comments |
0 |
STPL-5033 (010)
|
SBd | IN THE CITY OF SAN BERNARDINO ON ORANGE SHOW RD: ARROWHEAD AVE TO TIPPECANOE AVE. |
CONSTRUCT STREET /TWO BRIDGES/SIGNAL |
|
San Bernardino |
Evita Premdas |
No comments |
0 |
STPLX-5033 (011)
|
SBd | Rialto Avenue overhead at the AT&SF RR (Br. No. 54C-0378) and on Highland Avenue over Del Rosa Channel (Br. No. #54C-0227) |
Barrier rail replacement |
|
San Bernardino |
Marcos Amancio |
No comments |
0 |
BRSTPLZ-5033 (013)
|
SBd | IN THE CITY OF SAN BERNARDINO MT. VERNON AVE @ BNSF RAILROAD BRIDGE, BRD. NO. 54C-0066 |
BRIDGE REPLACEMENT/SEISMIC RETROFIT |
|
San Bernardino |
Eric Tang |
12/06/2006: Mail Received (final voucher) -view comment history- |
0 |
CML-5033 (014)
|
SBd | Waterman Avenue and Washington Street/Barton Road |
Upgrade signals and left turn pocket extension |
|
San Bernardino |
Evita Premdas |
01/31/2006: Mail Received (Final Invoice 2nd Round.) -view comment history- |
0 |
STPLE-5033 (015)
|
SBd | In the City of San Bernardino at the Metrolink Station (Santa Fe Depot). |
Station Rehabilitation |
|
San Bernardino |
Evita Premdas |
04/10/2006: Mail Received (Final Invoice and Report of Expenditures for the Santa Fe Depot Rehab at Metrolink Station) -view comment history- |
0 |
BRLSZD-5033 (021)
|
SBd | Various bridge locations over flood control channels |
Seismic Retrofit |
|
San Bernardino |
Eric Tang |
No comments |
0 |
BRLSZD-5033 (022)
|
SBd | Various railroad overhead locations |
Seismic retrofit |
|
San Bernardino |
Eric Tang |
No comments |
0 |
CML-5033 (023)
|
SBd | Intersection of Rialto Avenue and Sierra Way |
New traffic signals and interconnect |
|
San Bernardino |
Evita Premdas |
No comments |
0 |
CML-5033 (024)
|
SBd | 40th Street from Kendall Drive to Sepulveda Avenue |
New signals and interconnect |
|
San Bernardino |
Evita Premdas |
No comments |
0 |
CML-5033 (025)
|
SBd | Intersection of 16th Street and Medical Center Drive |
New signals and interconnect |
|
San Bernardino |
Evita Premdas |
No comments |
0 |
STPLH-5033 (026)
|
SBd | Baseline Street from Victoria Avenue to 1000 feet west |
Roadway illumination |
|
San Bernardino |
Evita Premdas |
No comments |
0 |
STPL-5033 (027)
|
SBd | State Street from 5th Street at Foothill Boulevard to 16th Street |
New road |
|
San Bernardino |
Evita Premdas |
08/11/2006: Mail Received (replacement billing pages for State Street between SR 210 and Foothill Blvd) -view comment history- |
0 |
HP21L-5033 (028)
|
SBd | City of San Bernardino Metrolink Station (Santa Fe Depot) |
Station rehabilitation |
|
San Bernardino |
Marcos Amancio |
04/10/2006: Mail Received (Final Invoice and Report of Expenditures for Santa Fe Depot Rehab at Metrolink Station) -view comment history- |
0 |
CML-5033 (029)
|
SBd | Pershing Avenue and Redick Avenue |
East Valley Regional LNG/LCNG fueling facility |
|
San Bernardino |
Marcos Amancio |
01/08/2009: Mail Received (Final Voucher For Payment UNDER 23usc 117) -view comment history- |
0 |
CML-5033 (030)
|
SBd | Intersection of University Parkway and Kendall Drive |
Left turn lanes |
|
San Bernardino |
Evita Premdas |
No comments |
0 |
STPLHSR-5033 (031)
|
SBd | Intersections of Mount Vernon Avenue at 9th Street and 9th Street at "L" Street |
New pedestrian signals |
|
Corona |
Evita Premdas |
No comments |
0 |
STPLHG-5033 (032)
|
SBd | Intersection of Highland Avenue and "E" Street |
Protected left-turn signal phasing |
|
San Bernardino |
Marcos Amancio |
06/04/2008: Mail Received (Final Voucher) -view comment history- |
0 |
STPLH-5033 (033)
|
SBd | Intersection of 30th Street and "E" Street |
Protected left-turn signal phasing |
|
San Bernardino |
Marcos Amancio |
06/04/2008: Mail Received (FINAL vOUCHER) -view comment history- |
0 |
SR2SL-5033 (034)
|
SBd | Intersection of 18th Street and "E" Street |
Traffic signal |
|
San Bernardino |
Osabuogbe Igbinedion |
06/18/2007: Mail Received (First and Final) -view comment history- |
0 |
SR2SL-5033 (035)
|
SBd | Various locations near San Bernardino City Unified schools |
Curb, gutter, sidewaik, and pavement markings |
|
San Bernardino |
Marcos Amancio |
05/29/2008: Mail Received (Final) -view comment history- |
0 |
STPLH-5033 (036)
|
SBd | Intersection of 5th Street and "F" Street |
Mast arms |
|
San Bernardino |
Marcos Amancio |
11/12/2008: Mail Received (Final Voucher for Payment Under U.S.C. 117) -view comment history- |
0 |
STPLH-5033 (038)
|
SBd | Shandin Hills Middle School near the intersection of Litle Mountain Drive and Morgan Road |
Pedestrian-activated traffic signal |
|
San Bernardino |
Marcos Amancio |
09/06/2007: Mail Received (Final Voucer) -view comment history- |
0 |
CML-5033 (039)
|
SBd | Metrolink Station at 1170 West Third Street in San Bernardino |
Parking structure |
|
San Bernardino |
Carol Green |
02/21/2017: 02/212017 Project archived in D8 Database, project file purged on 7/7/2015.
-view comment history- |
0 |
STPLH-5033 (040)
|
SBd | Intersection of Rialto Avenue and "I" Street |
Upgrade Signals |
|
San Bernardino |
Carol Green |
06/19/2007: Mail Received (RFA for PE) -view comment history- |
0 |
STPLH-5033 (041)
|
SBd | Left-turn pocket and signal phasing at 9th and H |
Upgrade Signals |
|
San Bernardino |
Marcos Amancio |
05/29/2009: Mail Received (Corrections to RFA package) -view comment history- |
0 |
BRLS-5033 (042)
|
SBd | Mount Vernon Avenue over the Atchison Topeka and Santa Fe Railroad yard |
Bridge replacement |
|
San Bernardino |
Vu Ngo |
04/05/2018: Accounting Received Final Invoice -view comment history- |
0 |
SR2SL-5033 (043)
|
SBd | Along 28th and 29th Street From Sierra Way to Wall Ave in the vicinity of Wilson Elementary School. |
Construct curb, gutter, sidewalks and ADA access ramps |
|
San Bernardino |
Carol Green |
No comments |
0 |
STPL-5033 (044)
|
SBd | State Street from 5th Street at Foothill Boulevard to 16th Street |
Extend and Construct (2) Lanes of Roadway(1.5 Miles) to connect State Street to Rancho Avenue |
|
San Bernardino |
Ron Akers |
10/07/2015: Files returned to D8. -view comment history- |
0 |
HSIPL-5033 (045)
|
SBd | Industrial Parkway from 400 feet west of Lexington Way to Palm Avenue |
2-way left turn lane and restrictive parking signage |
|
San Bernardino |
Harish Rastogi |
08/04/2016: DLAE signs Exhibit 17-A, Cover Letter & Federal Report of Expenditures Checklist, and Exhibit 17-C, Final Inspection Form. -view comment history- |
1 |
HSIPL-5033 (045)
|
SBd | Industrial Parkway from 400 feet west of Lexington Way to Palm Avenue |
2-way left turn lane and restrictive parking signage |
|
San Bernardino |
Carol Green |
07/27/2016: Mail Received (FROE/Final invoice. 1 original, 1 copy.) -view comment history- |
0 |
HSIPL-5033 (046)
|
SBd | Various Locations |
Install Speed Feedback Signs at Various Locations |
|
San Bernardino |
Harish Rastogi |
02/14/2017: Submit revised final invoice/FROE to LPA.
PROJECT INACTIVE 02-20-2017 -view comment history- |
2 |
HSIPL-5033 (049)
|
SBd | INTERSECTION OF BASE LINE ST AND CALIFORNIA AVE. |
MODIFY TRAFFIC SIGNALS; CONSTRUCT SOUTH LEG DRIVEWAY APPROACH. |
|
San Bernardino |
Carol Green |
04/22/2013: Follow‐up on the e‐mail 4/3/2013. Request for additional information on the escalated environmental cost prompting City to withdraw the project. Request to formalize withdrawal in formal letter head. -view comment history- |
1 |
HSIPL-5033 (050)
|
SBd | Ninth Street and Sierra Way |
Install Protected/Permissive left turn phasing and pedestrian countdown heads, constuct curb ramps |
|
San Bernardino |
Aaron Duque |
10/06/2021: final vouchered and closed -view comment history- |
1 |
HSIPL-5033 (051)
|
SBd | Ninth Street and Arrowhead Ave Upgrade Signals; install protected left turn phasing |
Ninth Street and Arrowhead Ave Upgrade Signals; install protected left turn phasing |
|
San Bernardino |
Aaron Duque |
03/10/2021: Mail Received (approved FL; received on 3/3/2021.) -view comment history- |
1 |
BRLS-5033 (052)
|
SBd | Second Street over Historic Warm Creek. Bridge# 54C0411 |
Construct new 4 lane bridge and demolish existing 4 lane bridge. Bridge 54C0411
200 feet east of existing bridge |
|
San Bernardino |
Enrique Gonzalez |
03/10/2023: Mail Received (HBP Requested Information; Received 03/09/2023) -view comment history- |
16 |
ATPL-5033 (053)
|
SBd | SIDE WALK GAP CLOSURE SRTS PROJECT ( VARIOUS LOCATIONS ) |
CONSTRUCT SIDEWALK, CURB AND GUTTER INFRASTRUCTURE, NEW CROSS WALK STRIPPINGSTREET LIGHTS, ADA ACCESSIBLE CURB RAMPS AND EDUCATION ENCOURAGEMENT |
|
San Bernardino |
Karen Nguyen |
01/27/2023: Mail Received (Final Invoice 5 Inquiry; Received 01/26/2023) -view comment history- |
1 |
ATPL-5033 (054)
|
SBd | SIDE WALK GAP CLOSURE SRTS PROJECT ( VARIOUS LOCATIONS ) |
CONSTRUCT SIDEWALK, CURB AND GUTTER INFRASTRUCTURE, NEW CROSS WALK STRIPPINGSTREET LIGHTS, ADA ACCESSIBLE CURB RAMPS AND EDUCATION ENCOURAGEMENT |
|
San Bernardino |
Karen Nguyen |
12/01/2022: Mail Received (Approved FL; Received 11/28/2022) -view comment history- |
0 |
SSARPL-5033 (055)
|
SBd | Various Location in city-wide of San Bernardino |
Scope of work the Systemic Safety Analysis Report (SSAR) is expected to accomplish:
The SSAR will focus on evaluating traffic signals, signage, and street lighting in the City. All existing traffic signals and street lights will be evaluated on a city-wide basis. Only signage near public schools in the City will be evaluated and included in the SSARP. |
|
San Bernardino |
Esayas Hagos |
06/11/2018: Mail Received (Invoice No.1 (PE) 1 original, 2 copies) -view comment history- |
0 |
HSIPL-5033 (056)
|
SBd | Two hundred twenty-four (224) signalized intersections on various arterials. |
Upgrade various signal hardware components, including traffic signal heads, push buttons, and pedestrian signal heads.
H9-08-021 |
|
San Bernardino |
Karen Nguyen |
01/30/2023: Mail Received (Progress Invoice No.5; Received 01/27/2023) -view comment history- |
2 |
HSIPL-5033 (057)
|
SBd | Forty-nine (49) signalized intersections along Mt. Vernon Avenue from Highland Avenue to Johnston Street, Baseline Street from Del Rosa Avenue to California Street, and Highland Avenue from Medical Center Drive to Victoria Avenue |
Implement advanced dilemma zone detection |
|
San Bernardino |
Karen Nguyen |
01/30/2023: Mail Received (Progress Invoice No.5; Received 01/27/2023) -view comment history- |
1 |
LRSPL-5033 (058)
|
SBd | Throughout the City of San Bernardino |
The City of San Bernardino's Local Roadway Safety Plan will focus on identifying opportunities to improve traffic safety on roadways in the City using solutions from the engineering, education, enforcement, and emergency services toolboxes. |
|
San Bernardino |
Karen Nguyen |
05/15/2023: Mail Received (Final Invoice No.2; Received 05/15/2023) -view comment history- |
0 |
None Yet-5033 (999)
|
SBd | Inland Empire Good Movement Gateway
VARIOUS |
Intial Stage
VARIOUS |
|
San Bernardino |
Osabuogbe Igbinedion |
No comments |
0 |
M-MG-5058 (001)
|
RIV | Engineer to Update |
Engineer to Update |
|
Riverside |
Nivine K. Georges |
No comments |
0 |
STPLGDB-5058 (002)
|
RIV | Hole @ Jones |
Engineer to Update |
|
Riverside |
Nivine K. Georges |
No comments |
0 |
STPLG-5058 (008)
|
RIV | 3rd @ Lime |
Traffic Signal |
|
Riverside |
Nivine K. Georges |
No comments |
0 |
STPLG-5058 (009)
|
RIV | Madison @ Lincoln |
Engineer to Update |
|
Riverside |
Nivine K. Georges |
No comments |
0 |
CMLN-5058 (020)
|
RIV | Citywide in the City of Riverside |
Installing 170 Controllers Coordination |
|
Riverside |
Matthew Sapp |
No comments |
0 |
STPLNG-5058 (030)
|
Riv | IN THE CITY OF RIVERSIDE AT ORANGE STR AND SR 60 RAMP TERMINALS |
SIGNALS |
|
Riverside |
Steven Nguyen |
No comments |
0 |
STPLG-5058 (032)
|
RIV | Engineer to Update |
Engineer to Update |
|
Riverside |
Nivine K. Georges |
No comments |
0 |
32L0-5058 (035)
|
RIV | Van Buren Blvd |
Placement of erosion control measures, shoulder backing on slopes, traffic control |
|
Riverside |
Chigo Dike |
06/14/2017: Project was created in error for the City of Riverside. This project actually belongs to Jurupa Valley. -view comment history- |
0 |
STPLG-5058 (038)
|
RIV | In the City of Riverside at the intersection of Tyler St & Cypress Ave. |
Install Traffic Signal & Widen Left Turn |
|
Riverside |
Nivine K. Georges |
06/14/2006: Mail Received (Final Voucher) -view comment history- |
0 |
STPLE-5058 (039)
|
RIV | Engineer to Update |
Engineer to Update |
|
Riverside |
Nivine K. Georges |
12/14/2007: Mail Received (Request for Construction Authorization Package) -view comment history- |
0 |
STPL-5058 (045)
|
RIV | La Sierra Ave. between Gramercy and Arlington |
Widen Roadway |
|
Riverside |
Chigo Dike |
No comments |
0 |
STPLX-5058 (046)
|
RIV | Various Channel Crossings |
Install Barrier Railing |
|
Riverside |
Osabuogbe Igbinedion |
No comments |
0 |
STPLZ-5058 (049)
|
RIV | Victoria Avenue from Myrtle Avenue to Woodbine Street, Br. No. 56C-0055 |
Seismic retrofit |
|
Riverside |
Harish Rastogi |
02/21/2017: 02/212017 Project archived in D8 Database, project file purged on 7/7/2015.
-view comment history- |
0 |
STPLG-5058 (055)
|
RIV | VAN BUREN BLVD AT CLEVELAND AVE |
New Signals |
|
Riverside |
Nivine K. Georges |
01/05/2007: Mail Received (FINAL VOUCHER) -view comment history- |
0 |
CMLN-5058 (057)
|
RIV | In the City of Riverside on La Sierra Avenue at SR 91 |
Interchange recontruction |
|
Riverside |
Chigo Dike |
06/25/2007: Mail Received (Executed agreement between City of Riv and Harris & Asso) -view comment history- |
0 |
STPL-5058 (060)
|
RIV | Alessandro Boulevard from Mission Grove Parkway to Sycamore Canyon Boulevard |
Road Rehabilitation |
|
Riverside |
Nivine K. Georges |
No comments |
0 |
CML-5058 (061)
|
RIV | City Corporation Yard at 8095 Lincoln Avenue |
Install CNG refueling station |
|
Riverside |
Nivine K. Georges |
No comments |
0 |
STPLNER-5058 (062)
|
RIV | SR 91-Pierce Street interchange |
Landscaping and sidewalk |
|
Riverside |
Nivine K. Georges |
No comments |
0 |
STPL-5058 (063)
|
RIV | Various arterial streets |
Road rehabilitation |
|
Riverside |
Nivine K. Georges |
07/02/2007: Mail Received (RFA for Construction) -view comment history- |
0 |
CMHPLUL-5058 (064)
|
RIV | Jurupa Ave. Underpass at Union Pacific. |
Construct railroad underpass at the existing at grade crossing at Jurupa Ave., and close existing at grade crossing at Mountain View Ave |
|
Riverside |
Chigo Dike |
02/21/2017: 02/212017 Project archived in D8 Database, project file purged on 7/7/2015. -view comment history- |
0 |
CMLN-5058 (065)
|
RIV | SR 91 interchange at Van Buren Boulevard |
Reconstruct ramps & widen overcrossing |
|
Riverside |
Chigo Dike |
11/21/2007: Mail Received (CWA Cycle 5 Budget Authority Lapsing June 30th) -view comment history- |
1 |
STPLER-5058 (066)
|
RIV | University Avenue from Eucalyptus Avenue to Ottawa Avenue |
Streetscape enhancements |
|
Riverside |
Steven Jaimes |
No comments |
0 |
PNRSL-5058 (066)
|
RIV | Jurupa Ave. Underpass at Union Pacific. |
Construct railroad underpass at the existing at grade crossing at Jurupa Ave., and close existing at grade crossing at Mountain View Ave. |
|
Riverside |
Chigo Dike |
No comments |
0 |
STPLER-5058 (067)
|
RIV | Victoria Avenue from Harrison Street to Adams Street/Auto Center Drive |
Historic parkway restoration @ Victoria Ave. |
|
Riverside |
Marcos Amancio |
01/03/2017: Project archived in D8 Database, project file purged prior to 12/27/2016. -view comment history- |
0 |
STPLR-5058 (068)
|
RIV | Palmyrita,Columbia, Kansas Avenue, Third Street |
Gates/Cants, Surfacing |
|
Riverside |
Nivine K. Georges |
No comments |
0 |
STPL-5058 (069)
|
RIV | Various arterial streets - FY 01-02 rehabilitation |
Road rehabilitation |
|
Riverside |
Nivine K. Georges |
No comments |
0 |
SR2SL-5058 (070)
|
RIV | Garfield Street from Adams Street to Via San Jose |
Curb, gutter, and sidewalk |
|
Riverside |
Nivine K. Georges |
No comments |
0 |
STPL-5058 (071)
|
RIV | Various arterial streets - FY 02-03 rehabilitation |
Road rehabilitation |
|
Riverside |
Chigo Dike |
01/24/2006: Mail Received (Reimbursement of Federal Funds) -view comment history- |
0 |
STPL-5058 (072)
|
RIV | Arlington Avenue From Fairhaven Drive to Tyler Street |
Rehabilitation |
|
Riverside |
Nivine K. Georges |
06/25/2008: Mail Received (Letter from City of Riverside to Tasia Papajohn with FHWA) -view comment history- |
0 |
DEML05-5058 (073)
|
RIV | Various locations in the City of Riverside including Iowa Ave. |
Railroad Grade Separations- including Iowa Avene Grade Separation |
|
Riverside |
Chigo Dike |
04/11/2012: Mail Received (Final Invoice) -view comment history- |
0 |
RPSTPLE-5058 (074)
|
RIV | SR-60/ Market Street Interchange Landscaping |
Interchange Landscaping SR-60/ Market Street |
|
Riverside |
Chigo Dike |
02/21/2017: 02/212017 Project archived in D8 Database, project file purged on 7/7/2015.
-view comment history- |
0 |
STPL-5058 (075)
|
RIV | Orange Terrace Parkway from Trautwein Road to Van Buren Boulevard |
Road rehabilitation of Orange Terrace Pkwy |
|
Riverside |
Chigo Dike |
06/30/2008: Mail Received (RFA for Construction package) -view comment history- |
0 |
TCIF-5058 (076)
|
RIV | Columbia Avenue at the Burlington Northern Santa Fe Railroad (BNSF) tracks east of Chicago Avenue |
Grade separation |
|
Riverside |
Chigo Dike |
06/26/2012: Mail Received (Final Invoice (Resubmit)) -view comment history- |
0 |
STPL-5058 (077)
|
RIV | Hole Avenue from La Sierra Avenue to Magnolia Avenue |
Road Rehabilitation |
|
Riverside |
Marcos Amancio |
02/21/2017: 02/212017 Project archived in D8 Database, project file purged on 7/7/2015.
-view comment history- |
0 |
SR2SL-5058 (078)
|
RIV | Vicinity of various elementary and intermediate schools throughout the city |
Upgrade pedestrian signals |
|
Riverside |
Marcos Amancio |
02/21/2017: 02/212017 Project archived in D8 Database, project file purged on 7/7/2015.
-view comment history- |
0 |
RPESPLE-5058 (079)
|
RIV | Alessandro Blvd - Mission Grove Pkwy to Sycamore Canyon Blvd |
Alessandro Blvd Median Landscaping |
|
Riverside |
Chigo Dike |
01/03/2017: Project archived in D8 Database, project file purged prior to 12/27/2016. -view comment history- |
1 |
STPL-5058 (080)
|
RIV | Riverside Avenue between Tipperary Way and Elizabeth Street |
Construct a grade separation (underpass) at Riverside Avenue and the Union Pacific Railroad at-grade crossing. Construct new 4-lane grade separation. |
|
Riverside |
Chigo Dike |
06/07/2018: Mail Received (Final Invoice ) -view comment history- |
0 |
CML-5058 (081)
|
RIV | On Third Street from Vine Street to Park Avenue. |
Construct a railroad underpass at the existing at-grade crossing of Third Street and the Burlington Northern Santa Fe (BNSF) railroad. Third Street will be lowered from about Vine Street to Park Avenue and a bridge will be constructed to convey rail traffic. The project will require the realignment of Commerce Street, construction of slopes, retaining walls, and a storm water pump station as well as the relocation of wet and dry utilities.
(OLD PROJ DESC) Construct a grade separation (underpass) at Streeter Avenue and the Union Pacific railroad at-grade crossing. Carry Dewey Avenue across Streeter Avenue on a bridge. (OLD PROJ DESC) |
|
Riverside |
Matthew Sapp |
11/10/2022: Mail Received (Inactive Project Notification; Received 11/9/2022) -view comment history- |
0 |
PNRSTCIL-5058 (082)
|
RIV | Iowa Avenue Grade Separation in City of Riverside |
Replace existing 4 lane Railroad Crossing with a 4 lane O.C. Grade Separation on Iowa Ave. between Spring St. & Palmyrita Ave. with Pedestrian improvements & recomstruct Citrus St. Intersection |
|
Riverside |
Chigo Dike |
05/24/2016: Final invoice and FROE were sent to HQ accounting on May 5, 2016 for processing. Invoice has been paid. -view comment history- |
0 |
TCIF-5058 (083)
|
RIV | Magnolia Avenue between Sunnyside Drive and Elizabeth Street |
Grade Separation |
|
Riverside |
Chigo Dike |
12/02/2013: Mail Received (Received Revised Final Invoice (#4)) -view comment history- |
0 |
HPLUL-5058 (084)
|
RIV | Victoria Avenue (Underground Utilities), from Washington Street to Maude Street |
Undergrounding of existing overhead utilities on Victoria Avenue between Washington Street and Maude Street |
|
Riverside |
Chigo Dike |
08/31/2009: Mail Received (PES Forms (6 copies)) -view comment history- |
0 |
STPTCIFL-5058 (086)
|
RIV | Streeter Avenue Grade Separation Project |
Railroad/Highway grade separation (Underpass) at the Union Pacific Railroad tracks from Beatty Drive to Lantana Street. |
|
Riverside |
Matthew Sapp |
10/11/2018: Mail Received (Final Invoice Cover, 1 original) -view comment history- |
1 |
HSIPL-5058 (087)
|
RIV | Third Street Bike Lane Installation
Third St. (Blaine St.) between Mulberry St. and Watkins Dr. |
Widen road; restripe and widen Class II bike lanes; install detection systems,signs and markings |
|
Riverside |
Chigo Dike |
06/23/2016: Mail Received (Invoive (Past Due Notice) 1 copy, 0 originals) -view comment history- |
3 |
HSIPL-5058 (088)
|
RIV | Canyon Crest Dr./Ransom Rd.; Canyon Crest Dr./Via Vista Dr.; Canyon Crest Dr./Mission Grove Pkwy.
|
Install traffic signals, signs, and striping
|
|
Riverside |
Chigo Dike |
10/23/2015: Mail Received (Final Invoice. "NOT a Caltrans Invoice" Phase no indicated, 1 copy, 0 originals ) -view comment history- |
4 |
STPL-5058 (090)
|
RIV | In Riverside Quiet Zone Crossing Improvements |
UPGRADE OF 14 AT-GRADE HWY-RAIL CROSSINGS & ONE PEDESTRIAN ONLY AT-GRADE CROSSING ALONG THE BNSF SAN BERNARDINO SUBD. & ONE AT-GRADE HWY-RAIL CROSSING ALONG THE UPRR LOS ANGELES SUBD WITHIN THE CITY OF RIVERSIDE. THE IMPROVEMENTS ARE NEEDED TO OPTIMIZE SAFETY AT THE CROSSINGS AND ALLOW FOR QUIET ZONE TO MITIGATE EXISTING AND PROJECTED TRAIN HORN NOISE IMPACTS. |
|
Riverside |
Enrique Gonzalez |
01/02/2018: Mail Received (Invoice Final Cover Letters, 1 Original, 2 copies) -view comment history- |
4 |
SR2SL-5058 (091)
|
RIV | Madison St. between Orchard St. and Delaware St.; Jefferson St. between Garfield St. and Arlington Ave. |
Install traffic signals and crosswalks, including signalized mid-block crosswalk; construct curb ramps; removes crosswalk; relocate traffic signal. |
|
Riverside |
Chigo Dike |
03/28/2014: Mail Received (Received Final invoice) -view comment history- |
0 |
HSIPL-5058 (092)
|
RIV | Arlington Ave from Fairhaven Drive to City Limits |
Street widening improvements to provide paved shoulders, rumble strips, lighting, right-turn and left-turn lanes, and retaining wall improvements. (HSIP Cycle 5) |
|
Riverside |
Matthew Sapp |
03/26/2019: Mail Received (invoice 7 (final); 1 original, 2 copies.) -view comment history- |
4 |
STPL-5058 (093)
|
RIV | Indiana Avenue from Vallejo Street to Auto Center Drive |
Resurfacing of the existing asphalt pavement. Replacement of badly deteriorated pavement sections and re-striping |
|
Riverside |
Chigo Dike |
06/20/2017: DLAP signed Final Invoice/FROE -view comment history- |
1 |
STPL-5058 (094)
|
RIV | SR-91 at Adams Street PM 15.4 15.7 - Eastbound on/off Ramps |
Reconfigure SR-91 Eastbound on/off Ramps at Adams Street |
|
Riverside |
Matthew Sapp |
10/26/2022: Mail Received (Progress Invoice No.9; Received 10/26/2022) -view comment history- |
0 |
CMAQ-5058 (095)
|
RIV | 9th and Lime streets to 9th and Mulberry streets. |
Pedestrian/Bicycle bridge across SR-91 connecting the Metrolink station to downtown Riverside |
|
Riverside |
Chigo Dike |
08/07/2014: E-mail to City asking they contact PPM & notify them of the project -view comment history- |
0 |
ATPL-5058 (096)
|
RIV | Northwesterly part of the City of Riverside primarily within Ward 1. |
CTC ID 0519. PPR dated 05-19-14. Project Title: Downtown and Adjoining Areas Bicycle and Ped Improvements. Adv. #0815000073
City of Riverside requested for State-Only Funding (09-29-14)
Total Project Cost: $997,000
Total Fund Request: $877,000 (CON)
Match Funds: $120,000 (City of Riverside matching funds)
The project is situated in the northwesterly part of the City of Riverside primarily within Ward 1, the project will install 17 miles of Class II bike lanes, sidewalk improvements on Palm ave, a bike station, kiosks, upgraded flashing beacons, reate a bike stagging area, expansion of the bike share program, two bike corrals, bulb outs, and a walking path on Glenwood Dr. |
|
Riverside |
Matthew Sapp |
10/20/2021: Mail Received (Invoice Extension Request; received on 10/20/2021) -view comment history- |
0 |
ATPL-5058 (097)
|
RIV | Norte Vista Sidewalk Improvements |
The project proposes to install ramps, driveway approches and side walk on one side of four streets surrounding Norte Vista High School, Rosemary Kennedy and Twinhill Elementary Schools. |
|
Riverside |
Matthew Sapp |
05/16/2023: Mail Received (Final Invoice No.5; Received 05/16/2023) -view comment history- |
3 |
CML-5058 (098)
|
RIV | Bicycle Share Program |
Install bicycle kiosk at various locations i Riverside for the bicycle share program. City hall Breezway, UCR and Metrolink station. |
|
Riverside |
Eduardo Moreno-Castaneda |
03/01/2021: 3/1/21 Final Invoice and FROE sent to LPA -view comment history- |
0 |
CML-5058 (100)
|
RIV | Bruce Avenue from Adair Avenue to Lake Street |
Construct 2,100 feet 6.5' wide sidewalk on one side of Bruce Avenue. |
|
Riverside |
Enrique Gonzalez |
08/15/2018: DLAP signed FROE and Exhibit 17-C -view comment history- |
3 |
ATPL-5058 (101)
|
RIV | Five residential streets that do not currently have sidewalks around wells middle school and Arlanza Elementary School in the City of Riverside |
The Project proposes to install ADA ramps, driveway approaches and side walks on one side of five streets surrounding Wells Middle School and Arlanza Elementary School. |
|
Riverside |
Matthew Sapp |
05/23/2022: Mail Received (paper submittal; past due notice; dated 3/26/2020.) -view comment history- |
9 |
STPL-5058 (102)
|
RIV | Buchanan Street to Banbury Drive. |
Street widening with curb and gutter, new median landscaping and irrigation, utility relocation, Pavement maintenance and sidewalk, curb gutter and wheelchair replacement on Magnolia between Buchanan and Banbury drive. |
|
Riverside |
Matthew Sapp |
11/30/2021: Mail Received (final invoice 3; received on 11/30/2021.) -view comment history- |
19 |
ATP-5058 (103)
|
RIV | Iowa Avenye and Martin Luther King Blvd. Bicycle Improvements |
Construction of class ii bicycle lanes on Iowa Ave, MLK Blvd and University Avenue. |
|
Riverside |
Eduardo Moreno-Castaneda |
03/23/2017: DLAE signs Exhibit 22-O, Request for Funding Allocation, Local ATP Projects, for construction phase of work. -view comment history- |
0 |
CML-5058 (104)
|
RIV | Magnolia Avenue from First Street to Buchanan Street |
Upgrade Signals |
|
Riverside |
Matthew Sapp |
01/06/2022: Mail Received (FROE; received on 1/5/2022.) -view comment history- |
2 |
ATPL-5058 (105)
|
RIV | Citywide Bicycle and Pedestrian Improvements |
Bicycle and Pedestrian Improvements |
|
Riverside |
Matthew Sapp |
02/10/2022: Mail Received (approved FL; received on 2/9/2022.) -view comment history- |
1 |
HSIPL-5058 (106)
|
RIV | Various locations throughout the City |
Install High Friction Surface Treatment at 5 Locations. Construct 2 HAWK signals, deploy new signal timing plans for 35 traffic signals in the downtown area. |
|
Riverside |
Matthew Sapp |
05/02/2023: Mail Received (Progress Invoice No.4; Received 05/01/2023) -view comment history- |
1 |
HSIPL-5058 (107)
|
RIV | All currently interconnected traffic signals within the City of Riverside |
Install new model 2070 controllers, with an upgraded controller software and central system. |
|
Riverside |
Matthew Sapp |
01/19/2023: Mail Received (Inactive Justification; Received 01/17/2023) -view comment history- |
0 |
LRSPL-5058 (108)
|
RIV | Throughout the City of Riverside |
Local Roads Safety Plan |
|
Riverside |
Matthew Sapp |
07/19/2022: Mail Received (Executed Master Agreement, Approved FL, & PSA; Received 07/19/2022) -view comment history- |
0 |
ATPL-5058 (109)
|
RIV | 1.28 mile of ADA-compliant sidewalk on Carmine St, Richmond St, Norwood Ave, Doverwood Dr, a portion of Butler Drive, and College Ave |
Pedestrian Walkway |
|
Riverside |
Matthew Sapp |
05/19/2023: Mail Received (Final Invoice No.4; Received 05/17/2023) -view comment history- |
0 |
STPL-5065 (003)
|
SBd | In the City of Colton on North La Cadena- Valley Blvd to Mt. Vernon Ave. |
Signal Interconnect |
|
Colton |
Sean Yeung |
03/10/2008: Mail Received (STPL 5065 003 Final Inspection Form) -view comment history- |
0 |
HPLUL-5065 (005)
|
SBd | Seismic Retrofit |
Seismic Retrofit |
|
Colton |
Sean Yeung |
09/27/2016: Mail Received (2016 Bridge Survey, 1 copy 0 originals. 5065(017) same form) -view comment history- |
0 |
STPLZ-5065 (007)
|
SBd | IN THE CITY OF COLTON AT VARIOUS BRIDGE LOCATIONS, BRD. #'S 54C-007, 078, 079, 375, 384, 599 & 634. |
SEISMIC RETROFIT |
|
Colton |
Sean Yeung |
07/18/2016: Mail Received (HQ to Dist.8 Memorandum. Structure type selection, 2 copies, 0 originals) -view comment history- |
0 |
STPL-5065 (008)
|
SBd | Main Street and Iowa Avenue |
Main & Iowa; Turning lanes and traffic signals |
|
Colton |
Sean Yeung |
01/10/2014: Mail Received (Received Final Voucher 6/11/2004 to 09/30/2013) -view comment history- |
1 |
CML-5065 (009)
|
SBd | Barton Road from Reche Canyon Road to Hunts Lane |
Barton Road;Widen and extend turning lanes and signal synchronization |
|
Colton |
Pamela Wells |
03/01/2021: Final Progress Invoice and FROE submitted to LPA -view comment history- |
0 |
STPLER-5065 (010)
|
SBd | Colton Avenue from Valley Boulevard to "G" Street in San Bernardino |
Colton Avenue;Bike path |
|
Colton |
Sean Yeung |
04/30/2020: Local Agency Engagement - Project is closed-out and paid. -view comment history- |
0 |
STPLH-5065 (011)
|
SBd | Interesection of Valley Boulevard and Mount Vernon Avenue |
Upgrade signals and lane restriping |
|
Colton |
Sean Yeung |
04/30/2020: Local Agency Engagement - Project is closed-out and paid. -view comment history- |
0 |
SR2SL-5065 (012)
|
SBd | Olive street from 2nd street to Terrace Avenue to "C" street |
SR2S; Curb, gutter, sidewalk, pavement markings, and signing |
|
Colton |
Sean Yeung |
04/30/2020: Local Agency Engagement - Project is closed-out and paid. -view comment history- |
0 |
SRTSL-5065 (013)
|
SBd | Valencia Drive, Laurel Street, Bonita Drive, Oak Street, Norman Road and Pennsylvania Ave |
Close Sidewalk Gaps |
|
Colton |
Sean Yeung |
04/30/2020: Local Agency Engagement - Project is closed-out and paid. -view comment history- |
2 |
BRLSZ-5065 (014)
|
SBd | La Cadena Drive over the Santa Ana River near Rancho Avenue, Br. No. 54C-0077 |
Seismic Retrofit |
|
Colton |
Enrique Gonzalez |
02/03/2023: Mail Received (Progress Invoice No.20; Received 01/31/2023) -view comment history- |
17 |
STPLZ-5065 (015)
|
SBd | La Cadena Drive underpass at the Burlington Northern Santa Fe railroad tracks, Br. No. 54C-0078 |
Seimic Retrofit |
|
Colton |
Armand Rubio |
06/17/2020: SCO date of 05/21/2020 -view comment history- |
0 |
STPLZ-5065 (016)
|
SBd | Pedestrian overcrossing over La Cadena Drive near Maple Street, Br. No. 54C-0079 |
Seismic Retrofit |
|
Colton |
Armand Rubio |
03/19/2020: Mail Received (invoice 7c (final); 1 original, 0 copy.) -view comment history- |
0 |
BRLSZ-5065 (017)
|
SBd | Mount Vernon Avenue over the Santa Ana River near "M" Street, Br. No. 54C-0100 |
Seismic Retrofit |
|
Colton |
Enrique Gonzalez |
05/02/2023: Mail Received (Progress Invoice No.10; Received 04/24/2023) -view comment history- |
0 |
STPLZ-5065 (018)
|
SBd | West "C" Street underpass at the Union Pacific Railroad tracks near hermosa Avenue, Br. No. 54C-0375 |
Seismic Retrofit |
|
Colton |
Armand Rubio |
05/28/2020: BAR request has been requested again with LPA. -view comment history- |
0 |
STPLZ-5065 (019)
|
SBd | West "C" Street underpass at the Burlington Northern Santa Fe Railroad tracks west of 7th Street, Br. No. 54C-0384 |
Seismic Retrofit |
|
Colton |
Pamela Wells |
09/15/2020: Mail Received (final invoice 7C; to staff and V-drive.) -view comment history- |
0 |
STPLZ-5065 (020)
|
SBd | Pedestrian overcrossing over Rancho Avenue near West "G" Street, Br. No. 54C-0599 |
Seismic Retrofit |
|
Colton |
Armand Rubio |
12/11/2019: Mail Received (progress invoice 8; 1 original, 0 copy.) -view comment history- |
0 |
SR2SL-5065 (021)
|
SBd | Adjacent to North 10th Street from East B Street to East Olive Street |
Sidewalk gap closure |
|
Colton |
Sean Yeung |
04/30/2020: Local Agency Engagement call - Project closed out and paid 3 years ago. -view comment history- |
0 |
SRTSL-5065 (022)
|
SBd | Intersection of Randall Ave. and Eucalyptus Ave.
Morris Elementary and William Jehue Middle School |
Install solar-powered flashing beacons and warning signs |
|
Colton |
Sean Yeung |
04/30/2020: Local Agency Engagement call - Project closed out and paid. -view comment history- |
0 |
HPLUL-5065 (023)
|
SBd | Mt Vernon Ave. Bridge No. 54C-0101over UPRR, 0.2 mile South of I-10 EB on-off ramp. |
Rehabilitation and Widening of Bridge No. 54C-0101from 2 to 4 lanes |
|
Colton |
Karen Nguyen |
05/02/2023: Mail Received (Progress Invoice No.20; Received 04/24/2023) -view comment history- |
24 |
BRLS-5065 (024)
|
SBd | Barton Road at West Barton OH, BR No. 54C-0379 |
Bridge Replacement |
|
Colton |
Karen Nguyen |
05/02/2023: Mail Received (Progress Invoice No.13; Received 04/27/2023) -view comment history- |
0 |
HPLUL-5065 (025)
|
SBd | Washington Street to La Cadena |
Construct new 4 lane roadway, grade separation with two railroad tracks |
|
Colton |
Pamela Wells |
06/17/2020: Project funds got repurposed to 5065(028) -view comment history- |
0 |
HSIPL-5065 (026)
|
SBd | At various intersections along Mount Vernon Avenue. |
Upgrade traffic signals |
|
Colton |
Pamela Wells |
04/07/2022: closed 3/15/2022 -view comment history- |
5 |
ATPLNI-5065 (027)
|
SBd | City of Colton - ATP Plan |
City of Colton - ATP Plan
Advantage ID No.:
PPNO. 1157
ATPLNI: City of Colton - Active Transportation Plan
2014 Active Transportation Program - Cycle 1 ATP Statewide and Small Urban and Rural project awarded by the CTC (Resolution G-14-17) on 8/20/14. CTC ATP ID 0546. Programmed for ATP funding in FY 14-15 as a non-infrastructure project for Construction. Total project cost is $ 265,000.
2015 RTIP Amendment 1 SCAG Approval date of 09/30/2014
FTIP Project ID: 20150104 for SR2S
2015 RTIP Amendment 1 SCAG Approval date of 12/16/2014; OR,
FTIP Project ID: 20150106 for SRTS
01/26/2015 - etp/Sly
+++++++++++++++++++++++++++++++++++++++++++++++
|
|
Colton |
Pamela Wells |
09/30/2020: Notified City regarding rejection of the invoice. -view comment history- |
0 |
FERPL16-5065 (028)
|
SBd | Reche Canyon Road to Hunts Lane/Washington Street |
Realignment of Reche Canyon road to Hunts Lane/ Washington Street. Construction of (4) four new lane road with total of 0.30 mile. |
|
Colton |
Steven Stockman |
04/25/2023: Progress Invoice No. 5 sent to LPA -view comment history- |
0 |
HSIPL-5065 (029)
|
SBd | Thirteen (13) selected crosswalks near five Colton public schools with a high proportion of students who bike or walk to school. |
Install RRFBs, signs, high visibility crosswalk re-striping and yield lines, and ADA-compliant curb ramps. |
|
Colton |
Pamela Wells |
01/27/2023: Mail Received (Progress Invoice No.5; Received 01/25/2023) -view comment history- |
1 |
ATPSB1L-5065 (030)
|
SBd | Jehue Corridor S. of Randall Avenue from Eucalyptus Avenue to John Juarez Way |
Class I Bicycle and Pedestrian path |
|
Colton |
Pamela Wells |
08/19/2022: Mail Received (Scope Change Request; Received 08/18/2022) -view comment history- |
0 |
LRSPL-5065 (031)
|
SBd | Throughout the City of Colton |
Local Road Safety Plan (LRSP)
FY 19-20 LRSP Project ID LSRP061. Use State funds awarded on 12/03/19 at a maximum reimbursement of 90% up to $58,500. Allocation effective 6/04/20. CRS Maps 15V12 & 15V22 - various. PL |
|
Colton |
Pamela Wells |
01/27/2023: Mail Received (Progress Invoice No.1; Received 01/25/2023) -view comment history- |
0 |
HSIPSL-5065 (032)
|
SBd | Replace damaged guardrails and improve existing guardrails at various locations citywide including Mt Vernon, La Cadena Drive and Barton Road
|
Replace damaged guardrails and improve existing guardrails at various locations citywide including Mt Vernon, La Cadena Drive and Barton Road
H10-08-005 |
|
Colton |
Pamela Wells |
05/19/2023: Mail Received (Allocation Letter(CON); Received 05/16/2023) -view comment history- |
0 |
BRLS-5074 (001)
|
RIV | Lakeshore Dr./San Jacinto River Bridge # 56C-0049 |
Bridge Replacement |
|
Lake Elsinore |
Osabuogbe Igbinedion |
07/13/2006: Mail Received (Lakeshore Dr over the San Jacinot River Final Billing) -view comment history- |
0 |
STPL-5074 (006)
|
RIV | Lakeshore Drive @ High Street |
Widening & Rehabilitation |
|
Lake Elsinore |
Pamela Wells |
No comments |
0 |
STPLZ-5074 (007)
|
RIV | Auto Center Drive/Casino Drive over SAN JACINTO RIVER, BRD. 56C0309 |
SEISMIC RETROFIT |
|
Lake Elsinore |
Chigo Dike |
09/13/2013: Mail Received (HBP survey completed) -view comment history- |
0 |
STPLZ-5074 (008)
|
RIV | Seismic Retrofit at Casino Drive (Auto Center Drive) Bridge 56C0309 |
Seismic Retrofit |
|
Lake Elsinore |
Eduardo Moreno-Castaneda |
03/22/2023: Progress Invoice No. 7 sent to LPA -view comment history- |
0 |
STPL-5074 (010)
|
RIV | I-15 at Railroad Canyon Road |
Interchange Study |
|
Lake Elsinore |
Nivine K. Georges |
No comments |
0 |
CMLG-5074 (011)
|
RIV | SR-74 AT COLLIER/CENTRAL AVE; AND AT COLLIER AVE/RIVERSIDE AVE |
New Signals |
|
Lake Elsinore |
Enrique Gonzalez |
06/26/2014: E-mailed City asking for Final Report of Expenditures -view comment history- |
0 |
STPLER-5074 (013)
|
RIV | Lake Elsinore Outlet Channel from Graham Avenue to Sumner Avenue |
Pedestrian and bike corridor |
|
Lake Elsinore |
Enrique Gonzalez |
02/21/2017: 02/212017 Project archived in D8 Database, project file purged on 7/7/2015. -view comment history- |
0 |
SRTSL-5074 (014)
|
RIV | Various locations throughout the city |
Use Advantage Id. 08-1200-0230
Federal Safe Routes to School, Infrastructure project. Project ID. SRTS3-08-10; $355,400,000 programmed in 2012/2013. CON and CE only |
|
Lake Elsinore |
Enrique Gonzalez |
11/16/2015: Mail Received (FROE (Con.), 1 original, 2 copies) -view comment history- |
5 |
BRLS-5074 (015)
|
RIV | Temescal Canyon Road over Temescal Wash, approximately 0.2 miles west of Lake Street in City of Lake Elsinore 56C0050 |
Bridge Replacement, Replace an existing 2-lane bridge with a 4-lane bridge over Temescal Wash |
|
Lake Elsinore |
Matthew Sapp |
08/19/2022: Mail Received (Progress Invoice No.17; Received 08/18/2022) -view comment history- |
26 |
SR2SL-5074 (016)
|
RIV | Terra Cotta Middle School along Lake Street. |
Extend bicycle lanes; modify crosswalks and signage; reconfigure parking lot; connect school sidewalk |
|
Lake Elsinore |
Enrique Gonzalez |
01/12/2016: Mail Received (PES, 1 original, 5 copies) -view comment history- |
0 |
STPL-5074 (017)
|
RIV | Gunnerson Street between SR-74 (Riverside Drive) and Lakeshore Drive |
Pavement Rehabilitation and minor storm drain improvements |
|
Lake Elsinore |
Enrique Gonzalez |
08/07/2017: DLAP signed Final Invoice/FROE and Exhibit 17-C Final Inspection Form -view comment history- |
2 |
SSARP-5074 (018)
|
RIV | Throughout the City of Lake Elsinore |
The City of Lake Elsinore aims to develop a Systemic Safety Analysis Report (SSAR) that focuses on evaluating the City’s entire roadway network using a defined set of criteria to identify and prioritize safety projects to submit for future HSIP funding consideration. In preparation of the SSAR, the City will evaluate at least three years of the most current collision data from the following sources: UC Berkeley Transportation Injury Mapping System (TIMS), California I-SWITRS database, and the Police Department’s list of High Crash Concentration Locations. A systemic approach will be used to conduct an initial broad analysis of the entire City to identify intersections and roadway segments that have high concentrations of collisions for future analysis. Also roadways with a past history of fatal and severe injury collisions will be reviewed. |
|
Lake Elsinore |
Matthew Sapp |
02/25/2020: Mail Received (progress invoice 2; 1 original, 0 copy.) -view comment history- |
0 |
HSIPL-5074 (019)
|
RIV | Eight signalized intersections throughout the city. |
Install Dim. Zone detection, flashing beacons, left turn phasing. H9-08-009 |
|
Lake Elsinore |
Eduardo Moreno-Castaneda |
01/30/2023: Mail Received (Progress Invoice No.7; Received 01/27/2023) -view comment history- |
1 |
HSIPL-5074 (020)
|
RIV | Ten (10) intersections throughout the City of Lake Elsinore |
Unique Project ID: H9-08-011 - Cycle 9 BCR Awarded
Install advanced dilemma zone detection, protected left turns, and pedestrian countdown heads.
PE = $240,000 / CON = $1,108,900 / Total = $1,348,900 Max. Reimbursement Ratio = 100%
RFA Deadlines: PE 9/30/2019 CON 6/30/2022 |
|
Lake Elsinore |
Eduardo Moreno-Castaneda |
05/19/2023: Mail Received (Approved FL; Received 05/16/2023) -view comment history- |
0 |
ATPL-5074 (021)
|
RIV | The project is located in the City of Lake Elsinore between the Lake Levee trail and Palomar Trail in the southwest part of the City. |
Construct 1 Mile of safety improvements including Multi-Use Trail, one viewpoint, retaining walls, safety fences, striping and pedestrian lights to connect places of destinations.
PPNO:1262 |
|
Lake Elsinore |
Eduardo Moreno-Castaneda |
05/08/2023: Mail Received (Progress Invoice No.4; Received 05/08/2023) -view comment history- |
0 |
CMLG-5075 (006)
|
RIV | Ramona Boulevard and Main Street |
Install Traffic Signal |
|
San Jacinto |
Marcos Amancio |
01/27/2006: Mail Received (Materials Certificate
No exceptions to plans and specs) -view comment history- |
0 |
STPL-5075 (013)
|
RIV | Ramona Expressway from State Street (SR 79) to Lake Park Drive |
Road rehabilitation |
|
San Jacinto |
Albert Vergel de Dios |
No comments |
0 |
RPSTPLE-5075 (014)
|
RIV | Estudillo Heritage Park bounded by 7th, West Main, and Ash Streets and Dillon Drive |
Landscaping around the park perimeter |
|
San Jacinto |
Albert Vergel de Dios |
04/27/2010: Mail Received (letter to ray wolfe regarding submittal of final invoice materials FYI) -view comment history- |
0 |
HSIPL-5075 (015)
|
RIV | Citywide |
Install pedestrian countdown heads |
|
San Jacinto |
Chigo Dike |
12/11/2017: Mail Received (NES (3 copies and 3 CDs)) -view comment history- |
1 |
HSIPL-5075 (016)
|
RIV | 33 Intersections Citywide |
Install crosswalk and Signs |
|
San Jacinto |
Matthew Sapp |
05/09/2018: FROE sent to HQ Accounting and forwarded to Alberta Snowden and Patrick Louie -view comment history- |
4 |
ATPL-5075 (017)
|
RIV | Los Rosas Rd./De Ana Dr./ Young St./ Hewitt St./Chase/St./7th St. |
Pedestrian and Bike Path |
|
San Jacinto |
Matthew Sapp |
12/26/2018: Mail Received (close out package with final invoice, 1 original, 1 copy.) -view comment history- |
0 |
STPLN-5075 (018)
|
RIV | San Jacinto Avenue from Seventh Street to Menlo Avenue |
San Jacinto Avenue Pavement Rehabilitation |
|
San Jacinto |
Chigo Dike |
06/05/2018: Mail Received (FROE, Final Invoice ) -view comment history- |
3 |
HSIPL-5075 (019)
|
RIV | Intersection of San Jacinto Ave. and Shaver St.
Functional classification: Other Principal Arterial CRS Map: 16V51 |
FTIP Proj ID: SCAG015 Unique Proj ID: H9-08-023 Programmed in SCAG's 2019 FTIP amendment no.2 for 18/19 FFY. Total project cost of 519K, HSIP 467K, Local 51K.
Install a new traffic signal with protected left turn phasing, pedestrian push buttons and lead pedestrian intervals at San Jacinto Avenue and Shaver Street; ADA ramps; sidewalk installation on the east side of San Jacinto Avenue from Shaver Street to Seventh Street minor road widening near Shaver Street and lane width adjustments through signing and striping of existing lanes to accommodate protected left turn movements. |
|
San Jacinto |
Matthew Sapp |
04/14/2023: Mail Received (Award Package; Received 04/10/2023) -view comment history- |
0 |
ATPL-5075 (020)
|
RIV | Western Riverside County in the City of San Jacinto. Beginning at Palm Ave., along 7th Ave., Chase St., Sagecrest Dr., Camino Los Vientos, Eagle Dr., Idyllwild Dr., Young St., ending at Community College Dr. at Ramona Expressway |
Installation of approximately 36,900 linear feet Class I and II bike lanes, approximately 12,900 linear feet of sidewalk, installation of pedestrian ramps, and 4-way stop. |
|
San Jacinto |
Matthew Sapp |
12/02/2020: Mail Received (final invoice 3; to staff and V-drive.) -view comment history- |
1 |
HSIPL-5075 (021)
|
RIV | Sanderson Avenue from Cottonwood Avenue to Ramona Expressway |
Project will widen paved shoulders, install crash impact attenuators around fixed objects, install centerline rumble strips, add safety lighting, install radar speed limit signs and re-stripe roadway. |
|
San Jacinto |
Albert Vergel de Dios |
08/20/2021: Mail Received (FROE; received on 8/16/2021.) -view comment history- |
1 |
LRSPL-5075 (022)
|
RIV | Throughout the city of San Jacinto |
Study City roads to create implementation plan to reduce/eliminate roadway accidents |
|
San Jacinto |
Frisco Soloman |
05/25/2021: Final invoice sent to LPA -view comment history- |
0 |
MISC-5083 (000)
|
SBd | |
Redlands |
Savat Khamphou |
No comments |
0 |
SRTS-5083 (000)
|
SBd | |
Redlands |
Carol Green |
No comments |
0 |
STPLZ-5083 (001)
|
SBd | Seismic Retrofit |
Seismic Retrofit |
|
Redlands |
Eric Tang |
No comments |
0 |
BRLS-5083 (003)
|
SBd | Orange Street over the Santa Ana River, Br. No. 54C-0594. |
Bridge replacement |
|
Redlands |
Omar Sanchez |
03/20/2008: Mail Received (Federal Report of Expenditures) -view comment history- |
0 |
BRLS-5083 (004)
|
SBd | Alabama Street over the Santa Ana River, Bridge No. 54C-0643. |
Bridge replacement |
|
Redlands |
Marcos Amancio |
11/01/2005: Mail Received (Award Package for Alabama St.) -view comment history- |
0 |
TCSP-E2CA-5083 (010)
|
SBd | Citrus Avenue from 6th Street to 7th Street. Project No. assigned is E2CA(010). |
Traffic studies and parking structures |
|
Redlands |
Eduardo Moreno-Castaneda |
05/21/2013: Mail Received (Copy of Finance Letter from HQ) -view comment history- |
6 |
STPLHSR-5083 (010)
|
SBd | Various locations on local streets surrounding the schools |
Construct curb, gutter, sidewalks and curb ramps; install traffic signs, striping, and pavement markings; relocate crosswalks. |
|
Redlands |
Marcos Amancio |
12/06/2012: Mail Received (Final Packet) -view comment history- |
0 |
STPLHSR-5083 (011)
|
SBd | Highland Avenue and Gary; Cypress Avenue and Monterey; Lassen and San Bernardino Ave. |
Install in-pavement crosswalk lights, pavement markings and striping; Construct curb, gutter, sidewalks and curb ramps for 3 Schools (Cope MS, Middle MS, Clement MS). |
|
Redlands |
Marcos Amancio |
01/07/2014: Mail Received (Received Final Voucher 6/9/11 to 7/11/13) -view comment history- |
0 |
SR2SL-5083 (012)
|
SBd | Various locations along 4 surrounding schools. Clement Middle School, Franklin Elementary School, Judson Brown Elementary School, and Lugonia Elementary School. |
Construct new sidewalks , curb ramps, and crosswalks. |
|
Redlands |
Marcos Amancio |
03/31/2017: Final Invoice processed via SCO -view comment history- |
1 |
SRTSL-5083 (013)
|
SBd | Various locations surrounding Kingsbury Elementary, Smiley Elementary, and Cope Middle School. |
Linear sidewalk approximately 3.48 miles and 53 ADA ramps. |
|
Redlands |
Marcos Amancio |
05/11/2016: Submit Final Invoice/FROE to LPA. Project is INACTIVE. -view comment history- |
4 |
HSIPL-5083 (014)
|
SBd | On Various Public Streets in The Vicinity of 14 Public Schools, C&G, Sidewalks, Ramps, Signs & Pavement Markings. |
Curb, gutter, sidewalk, curb ramps, signage, striping, and pavement marking. |
|
Redlands |
Marcos Amancio |
01/19/2017: DLAE signs Exhibit 17-A, Cover Letter & Federal Report of Expenditures Checklist, and Exhibit 17-C, Final Inspection Form. -view comment history- |
3 |
SLPPL-5083 (015)
|
SBd | Redlands Blvd and Alabama St Intersection |
Widen and realign Redlands Blvd at Alabama st |
|
Redlands |
Marcos Amancio |
02/13/2017: Mail Received (Final invoice (state), 1 orignal, 0 copy.) -view comment history- |
0 |
HSIPL-5083 (016)
|
SBd | Pioneer Avenue/Orange Street in City of Redlands |
Install Traffic Signals and Turn Phasing |
|
Redlands |
Omar Sanchez |
07/31/2020: SEQ 6 was created to adjust cost for PE. PE needs $819.88 to final voucher and close out. -view comment history- |
4 |
HSIPL-5083 (017)
|
SBd | Citrus Avenue Between Univ. St. and Wabash Ave in the City of Redlands |
Install 1.6 Miles of Green Bike Lanes on Citrus Avenue Between Univ. St. and Wabash Ave. |
|
Redlands |
Esayas Hagos |
12/31/2018: Final Invoice sent to LPA. -view comment history- |
2 |
HSIPL-5083 (018)
|
SBd | In Redlands - Various |
The City of Redlands was provided the authorization to utilize the remaining construction funds from HSIPL-5083(014) project for a supplemental bike lane striping project (green bike lane enhancements) in the amount of $196,479. SCAG FTIP Back-Up list, Unique Project ID HSIP4-08-021. Adv. ID:0815000209 |
|
Redlands |
Marcos Amancio |
12/28/2017: Field Review with Sid Chowdhury -view comment history- |
1 |
HSIPL-5083 (019)
|
SBd | Redlands Blvd (at the intersections of State, Ninth, Seventh and Fifth)
-Cajon Street (Vine Street)
-Orange Street (Shoppers Lane)
-Citrus Avenue (Central Avenue) |
Install rectangular rapid flashing beacons. HSIP Cycle 7 (HSIP7-08-016), $300,300. Current Programmed Federal Funds @ $270,270 FFY16/17; Local Funds @ $30,030 for CE/CON.
Adv. No. 0816000157 |
|
Redlands |
Eduardo Moreno-Castaneda |
11/08/2021: Final Invoice No. 3 sent to LPA -view comment history- |
3 |
HSIPL-5083 (020)
|
SBd | Various locations throughout the City |
Install Emergency Vehicle Preemption at Signalized Intersections
HSIP Cycle 8, Unique Project ID H8-08-016, Total Project Cost $1,188,000
Adv ID#0817000147 |
|
Redlands |
Eduardo Moreno-Castaneda |
01/27/2023: Mail Received (Progress Invoice No.8; Received 01/24/2023) -view comment history- |
1 |
HSIPL-5083 (021)
|
SBd | Various Locations Throughout the City |
Install Pedestrian Countdown Heads at Signalized Intersections
HSIP Cycle 8, Unique Project ID H8-08-017, Total Project Cost $244,400
Adv ID#0817000148 |
|
Redlands |
Steven Stockman |
01/27/2023: Mail Received (Progress Invoice No.7; Received 01/24/2023) -view comment history- |
1 |
SSARP-5083 (022)
|
SBd | Throughout City of Redlands |
Miscellaneous - Other = SSARP |
|
Redlands |
Omar Sanchez |
08/03/2020: City has turned required documents to close out. I need to follow-up on the status. -view comment history- |
0 |
BPMPL-5083 (023)
|
SBd | Various location in the city of Redlands. 54C0098;54C0187;54C0188;54C0190;54C0191;54C0192; 54C0371;54C0372;54C0373;54C0381;54C0427;54C0428;54C0432;54C0434;54C0534;54C0710;54C0711 |
PSTUDY002-CTIP ID 230-0000-0395. PM00196. To develop a BPMP Plan only. |
|
Redlands |
Karen Nguyen |
01/27/2023: Mail Received (FROE; Received 01/24/2023) -view comment history- |
0 |
HSIPL-5083 (024)
|
SBd | Orange Blossom Trail at Alabama Street and Tennessee Street. |
Install pedestrian crossings with enhanced safety features. |
|
Redlands |
Steven Stockman |
04/07/2023: Mail Received (Approved FL & PSA; Received 03/27/2023) -view comment history- |
1 |
LRSPL-5083 (025)
|
SBd | Throughout the City of Redlands |
Develop a Local Roadway Safety Plan (LRSP). |
|
Redlands |
Eduardo Moreno-Castaneda |
02/10/2023: Mail Received (FROE; Received 02/07/2023) -view comment history- |
0 |
ATPL-5083 (026)
|
SBd | Proposed improvements are situated on existing city roads. San Bernardino Avenue in northwest Redlands and Alabama Street in the County north to the San Bernardino and Highland city limits |
Installation of a class I bikeway across the Santa Ana River connecting to Highland and San Bernardino. Installation of Class IV Cycletrack on San Bernardino Avenue connecting DAC to extended destinations, existing trails and SART. Installation of Class II lanes along Alabama Street connecting shopping, employment, and SART. |
|
Redlands |
Leslie Avila |
No comments |
0 |
STPLX-5092 (009)
|
SBd | IN THE CITY OF ONTARIO ON MISSION BLVD AT CUCAMONGA WASH, AND AT TURNER AVENUE |
BRIDGE RAIL REPLACEMENT |
|
Ontario |
Osabuogbe Igbinedion |
No comments |
0 |
DPM-5092 (011)
|
SBd | Engineer to Update |
Engineer to Update |
|
Ontario |
Osabuogbe Igbinedion |
No comments |
0 |
STPLER-5092 (013)
|
SBd | East Ontario Metrolink Station |
Landscaping, rider amenities, & parking |
|
Ontario |
Osabuogbe Igbinedion |
No comments |
0 |
STPLHG-5092 (014)
|
SBd | Intersection of 4th Street and El Dorado Avenue |
Upgrade signals |
|
Ontario |
Osabuogbe Igbinedion |
07/20/2006: Mail Received (Copy of Final Expenditure Report
Traffic Signal Modifications at Fourth Street and El Dorado Avenue) -view comment history- |
0 |
TCRP01-5092 (016)
|
SBd | Alameda Corridor East on the Union Pacific Railroad (Alhambra Line) at Milliken Avenue |
Construct grade separation |
|
Ontario |
Jenny Chan |
04/28/2020: Local Agency Engagement call to City of Ontario. This project has been paid out and is complete. -view comment history- |
0 |
STPLHSR-5092 (017)
|
SBd | Vicinity of various elementary and middle schools in Ontario |
Striping, flashing beacons, markings and signs |
|
Ontario |
Osabuogbe Igbinedion |
No comments |
0 |
STPLHSR-5092 (018)
|
SBd | Benson Avenue from Phillips Street to Mission Boulevard |
Curb, gutter, sidewalk, and pavement markings |
|
Ontario |
Marcos Amancio |
No comments |
0 |
STPLH-5092 (019)
|
SBd | Intersection of Jurupa Avenue and Vintage Avenue |
New signals, striping, and signing |
|
Ontario |
Osabuogbe Igbinedion |
06/08/2006: Mail Received (Final Voucher) -view comment history- |
0 |
HP21L-5092 (020)
|
SBd | Mission Boulevard from Grove Avenue to Haven Avenue |
Roadway widening |
|
Ontario |
Marcos Amancio |
11/04/2016: Mail Received (HQ to Dist. 8, Finance Ltr, 1 copy) -view comment history- |
1 |
SR2SL-5092 (021)
|
SBd | Francis Street from Oaks Avenue to Palmetto Avenue. |
Curb, gutter, sidewalk, and ramps |
|
Ontario |
Marcos Amancio |
02/21/2017: 02/21/2017 Project archived in D8 Database, project file purged on 01/24/2017. -view comment history- |
0 |
HPLUL-5092 (022)
|
SBd | I-10 at Grove Avenue and I-10 at East 4th Street (PSR) |
New Interchange, reconstruct interchange and road widening |
|
Ontario |
Marcos Amancio |
01/10/2014: Mail Received (Received Final Voucher 05/21/2007 to 06/11/2013) -view comment history- |
2 |
HSIPL-5092 (023)
|
SBd | Intersection of Vineyard Avenue and Francis Street |
New Signals |
|
Ontario |
Marcos Amancio |
02/21/2017: 02/212017 Project archived in D8 Database, project file purged on 7/7/2015. -view comment history- |
1 |
HSIPL-5092 (024)
|
SBd | Intersection of Grove Avenue and Princeton Street |
New Signals |
|
Ontario |
Marcos Amancio |
02/21/2017: 02/21/2017 Project archived in D8 Database, project file purged on 01/24/2017. -view comment history- |
1 |
HSIP-5092 (025)
|
SBd | Intersection of Grove and Sixth Street. |
Upgrade signals and modify intersection. |
|
Ontario |
Marcos Amancio |
02/21/2017: 02/21/2017 Project archived in D8 Database, project file purged on 01/24/2017. -view comment history- |
1 |
SR2SL-5092 (026)
|
SBd | San Antonio Avenue from Cedar Street to Locust Street |
Sidewalk gap closures |
|
Ontario |
Marcos Amancio |
02/21/2013: Mail Received (Final Invoice (Resubmittal)) -view comment history- |
0 |
HPLUL-5092 (027)
|
SBd | I-10 at Grove Ave/4th St. Interchange and Grove Ave. Corridor |
Relocate I-10 & 4th Street Interchange to Grove Ave. and widen Grove Ave. between I-10 to Holt (4 to 6 lanes) |
|
Ontario |
Eduardo Moreno-Castaneda |
03/04/2022: Mail Received (approved FL; received on 2/28/2022.) -view comment history- |
7 |
SLPPL13-5092 (028)
|
SBd | North Vineyard Ave at Union Pacific Alhambra |
Construct a roadway-railroad grade separation (roadway underpass) |
|
Ontario |
Enrique Gonzalez |
06/03/2019: Mail Received (invoice 4 (final); 1 original, 0 copy.) -view comment history- |
0 |
SLPTCIFL-5092 (029)
|
SBd | South Milliken Avenue at Union Pacific Los Angeles (North of Mission Blvd) |
Construction of a roadway-railroad grade separation (roadway overpass) |
|
Ontario |
Omar Sanchez |
04/29/2020: The following message came from Caltrans Headquarters:
“The close-out package is complete.
We will add this project to the list of closed-out projects when the next annual TCRP report is presented to the CTC in January 2021. ” -view comment history- |
0 |
HSIPL-5092 (030)
|
SBd | Philadelphia Street at Cypress Avenue |
Install new traffic signal, left-turn lanes, and construct sidewalks |
|
Ontario |
Eduardo Moreno-Castaneda |
04/29/2022: Final Invoice No. 11c and FROE sent to LPA. -view comment history- |
3 |
HSIPL-5092 (031)
|
SBd | Mission Blvd/Mountain Ave and San Antonio Ave/Vine Ave. |
Install upgrade traffic signal mast arms, poles, and additional left-turn and through movement signal phases. |
|
Ontario |
Jenny Chan |
04/28/2020: Local Agency Engagement call to City of Ontario. This project has been paid out and is complete. -view comment history- |
1 |
HSIPL-5092 (032)
|
SBd | Intersection of Philadelphia Street and Campus Avenue |
Install a new traffic signal |
|
Ontario |
Esayas Hagos |
03/18/2019: DLAP signed Exhibit 17-A FROE and Exhibit 17-C Final Inspection Form. -view comment history- |
0 |
HSIPL-5092 (033)
|
SBd | Intersection of Sixth Street and Baker Avenue |
Install a new traffic signal |
|
Ontario |
Omar Sanchez |
09/30/2020: Omar Sanchez rotating into a new work assignment tomorrow. -view comment history- |
0 |
BPMPL-5092 (034)
|
SBd | Various bridges location within the City of Ontario. |
Development of City's Bridge Preventive Maintenance Plans (BPMP) for 43 bridges. |
|
Ontario |
Marcos Amancio |
03/22/2016: Mail Received (RFA (PE) 1 original, 0 copies. ) -view comment history- |
0 |
BRLS-5092 (035)
|
SBd | 0.4 mile west of Archibald Avenue, at Mission Boulevard west bound over Cucamonga Creek Channel (Br. No. 54C-0525L). |
Bridge rehabilitation and widen bridge to accommodate shoulders. |
|
Ontario |
Marcos Amancio |
09/06/2016: Mail Received (FHBPS Survey, 1 original, 0 copies) -view comment history- |
0 |
BRLS-5092 (036)
|
SBd | 0.4 mile west of Archibald Avenue, at Mission Boulevard east bound over Cucamonga Creek Channel (Br. No. 54C-0525R). |
Bridge rehabilitation and widen bridge to accommodate shoulders. |
|
Ontario |
Marcos Amancio |
09/06/2016: Mail Received (FHBPS Survey, 1 original, 0 copies) -view comment history- |
0 |
BRLS-5092 (037)
|
SBd | 0.6 mile east of Vineyard Avenue, at Holt Boulevard west bound over Cucamonga Creek Channel (Br. No. 54C-0540L). |
Bridge Rehabilitation. |
|
Ontario |
Marcos Amancio |
01/27/2016: Mail Received (HQ ti Dist.8 Finance Ltr. 1 copy, 0 copies) -view comment history- |
0 |
ATPL-5092 (038)
|
SBd | City of Ontario targeting four local elementary schools. |
CTC ID 0552. PPR dated 05-14-14. Project Title: SRTS Active Transportation-Bon View, Corona, Euclid and Vineyard Elementary Schools.
Adv. #0815000074
Total Project Cost: $1,164,000
Total Funding Request: $1,164,000 (PS&E $100,000; RW $50,000; CON $1,014,000)
Match Funds: $0.00
This project is located in the City of Ontario targeting four local elementary schools. The project will construct missing sidewalks, curb and gutter, street paving and acquiring right of way at two locations all within a short distance from each school in order to provide children who walk to school a safe, secure and clean route and to encourage others to walk as well. |
|
Ontario |
Esayas Hagos |
01/02/2019: Final Invoice sent to LPA. -view comment history- |
0 |
HPLUL-5092 (039)
|
SBd | Bound on the North by 4th st and on south side by State St./Airport Dr. in the city of Ontario. |
Widen Grove Ave. between 4th & Airport Dr.and Improvement Grove Ave/Holt Blvd intersection. |
|
Ontario |
Esayas Hagos |
03/26/2020: Mail Received (AQCA; 1 copy, 0 original.) -view comment history- |
30 |
BPMPL-5092 (040)
|
SBd | Various bridge locations throughout the City of Ontario |
Bridge preventive maintenance work for 14 bridges |
|
Ontario |
Karen Nguyen |
06/11/2021: Sent FROE package and final invoice to LPA -view comment history- |
3 |
ATP-5092 (041)
|
SBd | EL CAMINO ELEMENTARY SCHOOL |
TO DESIGN AND CONSTRUCT TWO INTERSECTION CHOKERS WITH RECTANGULAR RAPID FLASHING BEACONS (RRFB), RAISED MEDIAN WITH RRFB, DETECTABLE SURFACES, HANDICAP RAMPS, STRIPING, AND ADA COMPLIANT DRIVEWAYS. |
|
Ontario |
Esayas Hagos |
10/30/2018: Mail Received (Final Invoice (Con) 1 original, 2 copies) -view comment history- |
0 |
SSARPL-5092 (042)
|
SBd | Euclid Avenue (SR83) - |
Bicycle and Pedestrian Corridor Improvement Plan |
|
Ontario |
Karen Nguyen |
05/21/2021: Mail Received (final invoice 7; received on 5/19/2021.) -view comment history- |
0 |
ATPL-5092 (043)
|
SBd | RRFBs, pavement markings and signs at 6 pedestrian crossings near Sultana ES and De Anza Middle School and Bon View Park, ADA ramps, and curbs |
Pedestrian Safety Program |
|
Ontario |
Aaron Duque |
09/10/2021: Mail Received (FPER; received on 9/9/2021.) -view comment history- |
0 |
ATPSB1L-5092 (044)
|
SBd | throughout city. |
to be completed by staff. Sean, 2/11/2020. |
|
Ontario |
Eduardo Moreno-Castaneda |
03/27/2023: Progress Invoice No. 7a sent to CLPA -view comment history- |
0 |
ATPL-5092 (045)
|
SBd | Project location includes segments of B Street, Vine Avenue, Phillips Street, and Fern Avenue in the City of Ontario, CA |
Construction of bike boulevard, improvements include street lights, traffic circles, curb extensions, and a lane configuration to slow vehicle traffic and prioritize bike movementns, and a lane configuration to slow vehicle traffic and prioritize bike movement.
PPNO 1275 |
|
Ontario |
Eduardo Moreno-Castaneda |
09/29/2022: Mail Received (Approved FL; Received 09/28/2022) -view comment history- |
0 |
4444-5092 (444)
|
SBd | |
Ontario |
Steven Jaimes |
No comments |
0 |
STPL-5104 (005)
|
RIV | In the City of Corona on Olive St, Fullerton Ave, Border Ave |
Pavement Rehabilitation |
|
Corona |
Nivine K. Georges |
No comments |
0 |
STPLER-5104 (024)
|
RIV | Route 91 at Main Street interchange |
Interchange landscaping & beautification |
|
Corona |
Nivine K. Georges |
No comments |
0 |
STPLHSR-5104 (025)
|
RIV | Various streets in central Corona |
Sidewalks |
|
Corona |
Nivine K. Georges |
No comments |
0 |
STPLH-5104 (026)
|
RIV | 6th Street from Crawford Street to Howard Street |
In-pavement crosswalk lights |
|
Corona |
Marcos Amancio |
02/21/2017: 02/212017 Project archived in D8 Database, project file purged on 7/7/2015.
-view comment history- |
0 |
CMLG-5104 (027)
|
RIV | Intersection of 6th and Main Streets and on McKinley, Lincoln, Ontario, and Magnolia Avenues |
Advanced Traffic Management System Master Plan |
|
Corona |
Chigo Dike |
02/14/2006: Mail Received (Installation of Advanced Traffic Mgmt System Citywide Phase II) -view comment history- |
0 |
SR2SL-5104 (029)
|
RIV | Various streets in Old Town Corona |
In-pavement crosswalk lights and traffic signals |
|
Corona |
Nivine K. Georges |
06/04/2008: Mail Received (Final Invoice Backup Documents (Sent in an e-mail to Nivine)) -view comment history- |
0 |
STPL-5104 (030)
|
RIV | Railroad Street from Auto Center Drive to West Grand Boulevard and Auto Center Drive from SR 91 to Railroad Street |
Railroad Street Road Rehabilitation |
|
Corona |
Nivine K. Georges |
12/04/2007: Mail Received (final detail estimate summary) -view comment history- |
0 |
STPL-5104 (031)
|
RIV | Lincoln Avenue from 6th Street to Pomona Road and Pomona Road from Lincoln Street to State Route 91 ramps |
Roadway widening and channelization |
|
Corona |
Chigo Dike |
05/07/2009: Mail Received (Final Invoice ) -view comment history- |
0 |
STPLN-5104 (032)
|
RIV | I-15 at Magnolia Avenue interchange |
I15/Magnolia Reconstruct ramps |
|
Corona |
Chigo Dike |
01/28/2013: Mail Received (Final Voucher) -view comment history- |
0 |
PNRSL-5104 (033)
|
RIV | Auto Center Drive at the BNSF Railroad |
Auto Center Grade Separation |
|
Corona |
Matthew Sapp |
05/25/2018: Mail Received (Invoice #11A (RW) 1 original, 2 copies) -view comment history- |
0 |
PNRSL-5104 (034)
|
RIV | McKinley Street and BNSF RR crossing |
Mc Kinley Grade Separation |
|
Corona |
Matthew Sapp |
04/02/2021: Mail Received (CPUC 190 application; received on 4/2/2021.) -view comment history- |
0 |
RPSTPLE-5104 (035)
|
RIV | East 6th Street from El Sobrante Road to the east city limits |
Median island landscaping and beautification |
|
Corona |
Chigo Dike |
08/14/2013: Mail Received (Final Voucher) -view comment history- |
0 |
HSIPL-5104 (036)
|
RIV | Intersection of Rimpau Avenue and California Avenue |
Rimpau Avenue widening to accommodate a left turn pocket and installation of a new traffic signal. |
|
Corona |
Chigo Dike |
01/26/2015: Mail Received (Final Voucher) -view comment history- |
1 |
TLSPL-5104 (037)
|
RIV | Corridors throughout Corona, Norco, and Riverside County |
Advanced Traffic Management System (ATMS), Phase II |
|
Corona |
Chigo Dike |
05/13/2010: Mail Received (billing invoice) -view comment history- |
1 |
SR2SL-5104 (038)
|
RIV | Various locations in the vicinity of five schools within the Corona Norco Unified School District |
Install traffic lights, in-pavement lighted crosswalks, flashing beacons, bike lanes, and sidewalk |
|
Corona |
Chigo Dike |
06/17/2013: Mail Received (Final Detail Estimate and Final Invoice) -view comment history- |
0 |
HSIPL-5104 (039)
|
RIV | Intersection of East 6th Street and El Camino Avenue |
Traffic signal and turn lanes |
|
Corona |
Chigo Dike |
01/26/2015: Mail Received (Final Voucher) -view comment history- |
1 |
RPSTPLE-5104 (040)
|
RIV | Magnolia Avenue from El Camino Avenue to East 6th Street |
Stamped concrete raised medians and landscaping |
|
Corona |
Chigo Dike |
03/14/2012: Mail Received (Natural Environmental Study (4 copies)) -view comment history- |
2 |
HPLUL-5104 (041)
|
RIV | Cajalco/I-15 Interchange |
Design, reconstruct/realign and widening of Cajalco Rd from 2 to 6 through lanes from Temescal Canyon Rd to Bedlord Canyon Rd. Reconstruct/widen of SB entrance from 1 to 2 lanes, SB exit from 2 to 5 lanes, NB entrance from 1 to 2 lane ramp, NB exit from 2 to 4 lanes, and add aux lanes between NB entrance and NB exit to El Cerrito Rd and between SB entrance from El Cerrito Rd to SB exit. |
|
Corona |
Matthew Sapp |
08/27/2021: Mail Received (FROE; received on 8/26/2021.) -view comment history- |
0 |
SR2SL-5104 (042)
|
RIV | Intersection of Partridge Ave and Lincoln Ave |
Construct new sidewalks, curb ramps and crosswalks; bike racks/lockers; signalize 4 way stop
Cycle 8 State Safe Routes to School |
|
Corona |
Chigo Dike |
03/25/2015: Mail Received (Close out and Invoice (Final) #2, 1 original, 1 copy) -view comment history- |
0 |
SLPPL-5104 (043)
|
RIV | Foothill Parkway from Lincoln Ave to Paseo Grande |
Construct extension of Foothill Parkway as a 4-lane arterial roadway, signalized intersections, landscaped medians, bike lanes, shoulders, curb and gutter, sidewalk, multiplepurpose trail, and general landscaping. |
|
Corona |
Matthew Sapp |
03/30/2019: Mail Received (final invoice; 1 original, 2 copies.) -view comment history- |
0 |
SB1TCEP-5104 (044)
|
RIV | In Corona on existing Mckinley St from Griffin Way to Magnolia Ave |
In Corona on existing Mckinley St - construct a 4-lane grade separation overcrossing bridge over existing BNSF Railroad crossing and roadway improvements. Including but not limited to cons of structural walls, drainage facilities, bike & ped facilities, and utility work. ROW acquisition & relocation anticipated |
|
Corona |
Matthew Sapp |
02/24/2023: Mail Received (Award Information; Received 02/21/2023) -view comment history- |
0 |
STPL-5104 (045)
|
RIV | Ontario Avenue between California Ave.and Magnolia Ave. |
Road Rehabilitation |
|
Corona |
Matthew Sapp |
11/02/2021: Mail Received (FROE; received on 10/27/2021.) -view comment history- |
4 |
RSTPL-5104 (046)
|
RIV | Magnolia Avenue from El Camino to 1000' East of All American Way |
Widening of Magnolia Avenue bridge over the Temescal Wash |
|
Corona |
Matthew Sapp |
11/17/2022: Mail Received (AQR & ACQA; Received 11/16/22) -view comment history- |
0 |
LRSP-5104 (047)
|
RIV | Citywide |
The LRSP will identify stakeholders and local safety partners as the first step to prioritize known issues and deficiencies in our roadway
system. The LRSP will be developed through partnership and collaboration with residents, businesses, schools, community groups as
well as a wide range of stakeholders from the 4 E?s of Engineering (e.g. Caltrans, Riverside County Transportation Commission),
Enforcement (e.g. Corona Police Department), Education (e.g. Corona Norco Unified School District), and Emergency Services (e.g.
Corona Fire Department). Safety partners will meet during the development phase of the plan to identify emphasis areas and
establish safety goals and strategies as well as review and comment on the final LRSP. |
|
Corona |
Matthew Sapp |
No comments |
0 |
BPMPL-5104 (048)
|
RIV | Various locations identified for the study. |
Develop a BPMP Plan for the City-Wide Bridges.
PM00222 / PSTUDY002
56C0058
56C0137
56C0138
56C0152L
56C0152R
56C0182
56C0199
56C0207
56C0208
56C0247
56C0250
56C0294
56C0295
56C0302
56C0321
56C0331
56C0334
56C0358
56C0359
56C0360
56C0362
56C0411
56C0440
56C0441
56C0474
56C0483
56C0501
56C0608
56C0609
56C0635L
56C0635R |
|
Corona |
Matthew Sapp |
08/09/2022: Mail Received (Approved FL & PSA; Received 08/08/2022) -view comment history- |
0 |
ATPLLL-5104 (049)
|
RIV | |
Corona |
Matthew Sapp |
No comments |
0 |
STPLE-5147 (007)
|
SBd | In the City of Upland at Downtown Metrolink Depot. |
Lease Buy-Out/Rehabilitate Depot |
|
Upland |
Osabuogbe Igbinedion |
No comments |
0 |
STPLER-5147 (010)
|
SBd | Along the U.P.R.R. right-of-way from Euclid Avenue to the easterly city limits near Grove Avenue |
Pedestrian and bike path |
|
Upland |
Marcos Amancio |
02/07/2008: Mail Received (final voucher) -view comment history- |
0 |
CML-5147 (011)
|
SBd | Along the U.P.R.R. right-of-way from the Southwesterly City Limits at Monte Vista Avenue to Euclid Avenue |
Pedestrian and bike path |
|
Upland |
Osabuogbe Igbinedion |
06/04/2008: Mail Received (Final Voucher) -view comment history- |
0 |
SR2SL-5147 (012)
|
SBd | Various locations on local streets surrounding the following schools: Valencia Elementary, Pioneer Jr. High, Foothill Knolls Elementary, Sierra Vista Elementary, Citrus Elementary and Sycamore Elementary. |
Construct sidewalk gapclosure with curb, gutter and curb ramps |
|
Upland |
Carol Green |
02/21/2017: 02/212017 Project archived in D8 Database, project file purged on 7/7/2015.
-view comment history- |
0 |
SLPPLC11-5147 (013)
|
SBd | Foothill Blvd between Monte Vista Ave and Central Ave |
Widening, curb, gutter, sidewalk, median, street lights. |
|
Upland |
Carol Green |
10/07/2015: Files returned to D8. -view comment history- |
0 |
LRSPL-5147 (014)
|
SBd | Develop a Local Roadway Safety Plan (LRSP).
LRSP272 |
Develop a Local Roadway Safety Plan (LRSP).
LRSP272 |
|
Upland |
Eduardo Moreno-Castaneda |
05/19/2023: Mail Received (Final Invoice No.1; Received 05/16/2023) -view comment history- |
0 |
stpl-5186 (003)
|
RIV | State Street from Chambers Street to Ruby Avenue and from Fruitvale Avenue to Esplanade Avenue; Devonshire Avenue from Kirby Street to Lyon |
Road Rehab. |
|
Hemet |
Chigo Dike |
01/12/2010: Mail Received (RFA for Construction) -view comment history- |
0 |
STPLNH-5186 (003)
|
RIV | Sanderson Ave: Florida / Alacia |
Sanderson Ave: Florida / Alacia |
|
Hemet |
Eric Tang |
No comments |
0 |
STPLE-5186 (007)
|
RIV | hemet depot |
depot painting |
|
Hemet |
Chigo Dike |
No comments |
0 |
RPL-5186 (009)
|
RIV | State Street from Chambers Street to Domenigoni Parkway |
Roadway widening |
|
Hemet |
Chigo Dike |
05/29/2008: Mail Received (Final Report of Expenditures) -view comment history- |
0 |
CML-5186 (011)
|
RIV | Along Front Street from State Street to Harvard Street |
Park and ride lot |
|
Hemet |
Eric Tang |
07/09/2007: Mail Received (final voucher) -view comment history- |
0 |
STPL-5186 (012)
|
RIV | State Street from Chambers Road south for approximately 1,200 feet. |
Construct multi-use bicycle and pedestrian path. |
|
Hemet |
Chigo Dike |
10/07/2015: Files returned to D8. -view comment history- |
0 |
SR2SL-5186 (013)
|
RIV | At Cawston Elementary, Rancho Viejo Middle, and Tahquitz High Schools |
Install new traffic signals, associated pedestrian lights, crosswalks, intersection and drainage improvements, and new sidewalks. |
|
Hemet |
Chigo Dike |
12/17/2015: Mail Received (Final Invoice #4 (Con.)"Revised" 1 original, 0 copies) -view comment history- |
0 |
BRLS-5186 (014)
|
RIV | Stetson Avenue over Hemet channel Br. no. 56C0262 |
Replace 2-lane wooden bridge to a 2-lane Box Culvert |
|
Hemet |
Matthew Sapp |
08/09/2021: Mail Received (final invoice 1; received on 8/4/2021.) -view comment history- |
5 |
STPL-5186 (015)
|
RIV | Gilbert Street from Acacia Avenue to Stetson Ave |
Grind and replace 4 inches of asphalt pavement. Remove/replace curb, gutter, cross gutters, and squandrels. Install traffic loops and striping.
Related Proejcts:
City of Hemet letter dated 4/1/13 to RCTC
commitment to upgrade Gilbert St. based on other completed roadway rehab (SR 74 -Florida Ave to Acacia Ave),
Caltrans project signalization of SR 74 (Florida Ave) Gilbert and Gilbert St, and Gilbert St functional classification upgraded from local street to major collector making Gilbert St. a major north-south corridor in the City. |
|
Hemet |
Matthew Sapp |
12/09/2019: Mail Received (invoice 3 (final); 1 original, 2 copies.) -view comment history- |
5 |
SSARPL-5186 (016)
|
RIV | Safety projects' identification throughout the City of Hemet. |
Signalized & non-signalized intersections, roadway segments using a systematic approach. |
|
Hemet |
Matthew Sapp |
08/14/2019: Mail Received (FROE signed by Acting DLAE; 1 original, 1 copy.) -view comment history- |
0 |
HSIPL-5186 (017)
|
RIV | Various signalized intersections. Cawston Ave, Domenigoni Pkwy, Kirby st, Latham Ave, Lyon Ave, sanderson Ave, State St, and Stetson St, Mountain Ave& Soboba St, Warren Rd & Mustang Wy. |
Install LED luminaire safety lighting and pedestrian countdown signal heads
H8-08-005 |
|
Hemet |
Matthew Sapp |
01/20/2023: Mail Received (Progress Invoice No.1; Received 01/19/2023) -view comment history- |
1 |
ATPSB1L-5186 (018)
|
RIV | Hemet Valley Bikeway Connect - City of Hemet
Palm Ave from Esplanade to Johnston; Whitter & Johnston to Gilbert; Gilbert to Chambers; Chambers to State |
Install Class II and Class III bicycle facilities, bicycle detection, bike boxes, bike lockers, bike repair stations, sidewalk, curb, gutter, curb ramps, and transportation mobility station with bicycle staging area, complimenting neighboring projects. CRS Map: 16V51 and 16W11; functional classification include: Major Collector (5) and Local (7); The Project Planning Id are: 1212B; 1212A;
ATP Cycle 3A |
|
Hemet |
Matthew Sapp |
11/10/2022: Mail Received (Approved FL & PSA; Received 11/10/2022) -view comment history- |
1 |
HSIPSL-5186 (019)
|
RIV | Forty (40) signalized intersections throughout the City.
H10-08-008 |
Upgrade Signals (Replace the signal head backplates with backplates with retroreflective borders.) |
|
Hemet |
Matthew Sapp |
05/02/2023: Mail Received (Cost Change Request; Received 04/17/2023) -view comment history- |
0 |
ATPSB1L-5186 (020)
|
RIV | Class II and Class III bicycle facilities, bike detection, bike boxes, bike lockers, bike repair stations, sidewalk, curb, gutter, curb ramp (CON-NI) |
CON-NI
Install Class II and Class III bicycle facilities, bicycle detection, bike boxes, bike lockers, bike repair stations, sidewalk, curb, gutter, curb ramps, and transportation mobility station with bicycle staging area, complimenting neighboring projects.
PPNO:1212A
PPNO:1212B
A community outreach campaign is included to promote safety and healthy lifestyle goals. |
|
Hemet |
Matthew Sapp |
09/08/2022: Mail Received (Approved FL & PSA; Received 09/07/2022) -view comment history- |
0 |
STPLNG-5188 (002)
|
SBd | Riverside & Central |
Engineer to Update |
|
Chino (Chn) |
Osabuogbe Igbinedion |
No comments |
0 |
STPL-5188 (005)
|
SBd | Citywide Van Purchase & Rideshare |
Purchase of commuter vanpool vehicle |
|
Chino (Chn) |
Osabuogbe Igbinedion |
03/18/2008: Mail Received (Federal Report of Expenditures) -view comment history- |
0 |
MTP-5188 (014)
|
SBd | Chino - on Sixth Street between Chino Avenue and D Street - construction of a plaza for six local buses |
Miscellaneous - Other |
|
Chino (Chn) |
Osabuogbe Igbinedion |
No comments |
0 |
STPLER-5188 (015)
|
SBd | Chino/Chino Hills Bikeway Connector on Central Avenue and Chino Hills Parkway |
Bikeway |
|
Chino (Chn) |
Leslie Avila |
05/25/2017: Mail Received (LP2000 finance letter, 1 copy, 0 original.) -view comment history- |
0 |
STPLHSR-5188 (016)
|
SBd | Intersection of Pipe Line Avenue and Walnut Avenue |
New traffic signal system |
|
Chino (Chn) |
Osabuogbe Igbinedion |
06/08/2006: Mail Received (Final Voucher) -view comment history- |
0 |
CMLG-5188 (017)
|
SBd | Mountain Avenue from Edison Avenue in Chino through Ontario to 21st Street in Upland |
Signal timing coordination and interconnect signals |
|
Chino (Chn) |
Savat Khamphou |
11/06/2007: Mail Received (Billing Invoice 2) -view comment history- |
0 |
HPLUL-5188 (018)
|
SBd | Pine Avenue From State Route 71 to Euclid Avenue (State Route 83) |
Road Extension Widening |
|
Chino (Chn) |
Eduardo Moreno-Castaneda |
03/15/2023: Progress Invoice No. 21C sent to LPA -view comment history- |
0 |
SLPPCL13-5188 (019)
|
SBd | Interconnect Project
Fourteen Locations In The City of Chino |
Installation of fiber optic and/or cables, conduits, routers and all other associated equipment |
|
Chino (Chn) |
Leslie Avila |
08/21/2015: Mail Received (DBE Exhibit 15-G, 1 original, 3 copies) -view comment history- |
1 |
HSIPL-5188 (020)
|
SBd | Chino Ave at Ramona Ave. |
Upgrade Signals - Remove protected-permissive left turn phase and install protected left turn phase. |
|
Chino (Chn) |
Leslie Avila |
02/18/2021: Mail Received (progress invoice 1; received on 2/17/2021.) -view comment history- |
1 |
HSIPL-5188 (021)
|
SBd | Edison Ave/Ramona Ave; Edison Ave./Yorba Ave; Edison Ave/Monte Vista Ave |
Upgrade traffic signals; Install protected left-turn phasing. |
|
Chino (Chn) |
Leslie Avila |
09/20/2022: Mail Received (Approved FL; Received 09/20/2022) -view comment history- |
1 |
LRSPL-5188 (023)
|
SBd | Throughout the City of Chino |
LRSP166 | Adv ID
The City will develop a LRSP to support its efforts in improving safety for all road users.
- Will utilize its organized committee of safety partners to support a common goal of reducing severe and fatal collisions in a comprehensive manner by addressing the four E's of transportation safety (engineering, education, enforcement, and emergency services).
- Will be a data-driven safety plan, complemented with input from it's committee and feedback solicited through a
community engagement program.
- Will build a robust data set of contextual and roadway data to be merged with its collision database for the purpose of conducting a systemic collision analysis.
-Will identify the top collision profiles (i.e., emphasis areas) for which to focus safety improvements. For each collision profile, a suite of multi-disciplinary countermeasures will be identified. Each collision profile will be accompanied by a map of collision locations that match the corresponding profile to support the City in identifying locations to prioritize for safety improvements. |
|
Chino (Chn) |
Leslie Avila |
02/23/2022: Mail Received (approved PSA; received on 2/22/2022.) -view comment history- |
0 |
CMLG-5198 (006)
|
RIV | In the City of Perris at 4th Avenue and Redlands Avenue |
New Signals |
|
Perris |
Eric Tang |
No comments |
0 |
BRLO-5198 (008)
|
RIV | Case Road at San Jacinto River, Br. Nos. 56C0035 and 56C0036 |
Bridge replacement |
|
Perris |
Evita Premdas |
09/11/2013: Mail Received (HBP survey completed) -view comment history- |
0 |
STPLER-5198 (009)
|
RIV | Santa Fe Depot on 4th Street |
Historic restoration |
|
Perris |
Eric Tang |
11/06/2007: Mail Received (Progress Billing #5) -view comment history- |
0 |
RPL-5198 (010)
|
RIV | along Nuevo Road at Perris Plaza and at the intersection of Wilson Avenue |
to interconnect existing and new signals and intersection improvements |
|
Perris |
Eric Tang |
No comments |
0 |
CML-5198 (011)
|
RIV | 4th Street (SR 74), southbound I-215 offramp, and Redlands Avenue |
Construct 2-lane roundabout |
|
Perris |
Evita Premdas |
07/13/2016: 11/30/2015 To date, no FADS entry, no action from local agency as of yet. Last date updated on 01/25/2013 etp. -view comment history- |
0 |
STPL-5198 (012)
|
RIV | Murrieta Road from Ethanac Road to Case Road |
Road rehabilitation |
|
Perris |
Evita Premdas |
No comments |
0 |
RPSTPLE-5198 (013)
|
RIV | D Street and San Jacinto Avenue |
Landscaping, pedestrian plaza, walkways, and lighting |
|
Perris |
Evita Premdas |
01/10/2014: Mail Received (Received Final Voucher (01/15/2009 to 08/18/2012) -view comment history- |
0 |
STPL-5198 (014)
|
RIV | Ramona Expressway to Perris Valley |
Roadway Widening; Storm Drain-Lateral"b" (Approx 1 mile), including c,g,sw and raised median |
|
Perris |
Evita Premdas |
07/13/2016: 11/30/2015 For 12/09/15 OA Reporting: On 08/26/2010 Eddie Castaneda sent signed PES to agency. To date, no FADS entry, no action from local agency as of yet. Last date updated on 01/25/2013 etp. -view comment history- |
0 |
ATPL-5198 (015)
|
RIV | Perris' ATP (SOF) Project - Perris Valley Storm Drain Channel Trail |
Pedestrian and Bike Path: Multi-use trail |
|
Perris |
Eduardo Moreno-Castaneda |
12/03/2020: Final Progress Invoice 3 and FROE sent to LPA -view comment history- |
0 |
ATPL-5198 (016)
|
RIV | Perris' ATP (SOF) Project - Murrieta Road Improvement |
Pedestrian and Bike Path
|
|
Perris |
Evita Premdas |
02/16/2018: Mail Received (Final Invoice and FROE, 1 original 2 copies) -view comment history- |
0 |
STPL-5198 (017)
|
RIV | Redlands Avenue between Rider Street to San Jacinto Avenue |
Road Rehabilitation |
|
Perris |
Evita Premdas |
11/02/2017: Mail Received (Final Report of Expenditure) -view comment history- |
3 |
HSIPL-5198 (018)
|
RIV | Various intersections throughout the City (of Perris) |
Traffic Related - Other - Install pedestrian countdown heads |
|
Perris |
Evita Premdas |
11/26/2018: Progress Invoice No. 2 & FINAL/FROE - Received, Processed, and sent to HQ LPA -view comment history- |
2 |
ATPSB1L-5198 (019)
|
RIV | The Storm Drain route going south from Nuevo Rd with a bridge crossing the Metz channel, and at grade crossing at San Jacinto Ave, an underpass below the I-215 leading to the South Perris Metrolink Station at Case Road |
Perris Valley Storm Drain Channel Trail - Phase 2: Construct a new multi-use trail; includes landscape,irrigation, and interpretive signage to educate trail users.
Extending the 4.3 mi Phase I segment of multi-use trail, awarded in ATP Cycle 1. Landscaping,
irrigation and interpretive signage to educate users.
PPNO 1217 |
|
Perris |
Matthew Sapp |
04/14/2023: Mail Received (Allocation Letter(CON); Received 04/10/2023) -view comment history- |
0 |
LRSPL-5198 (020)
|
RIV | Throughout the City of Perris |
Local road safety plan (LRSP) |
|
Perris |
Albert Vergel de Dios |
09/03/2021: Mail Received (final report; received on 9/2/2021.) -view comment history- |
0 |
HSIPL-5198 (021)
|
RIV | Perris Blvd. Corridor Safety Improvements - Ramona Exp. to 4th Street |
CSSA safety improvements along Perris Blvd. including: LPI, Review signal & pedestrian crossing timing, audio detection, install louvers/PV lights, upgrade ramps & median per ADA, add a 2nd signal head on mast arm as needed. |
|
Perris |
Matthew Sapp |
04/18/2023: SEQ #2: This is a request to extend Project End Date (PED) from 04/08/2023 to 12/08/2024 to accept the Public Works Contract, file the Notice of Completion, release the retention held, and prepare / submit the Final Report of Expenditures... -view comment history- |
1 |
CMAQ-5198 (022)
|
RIV | |
Perris |
Kayali Nazek |
No comments |
0 |
ATPL-5198 (023)
|
RIV | City of Perris Bike and Pedestrian Network Project |
Class IV bike lanes with hardscape buffer and reflective delineators, high-visibility crosswalks, sidewalks, bike repair stations, signage, and public outreach campaign. |
|
Perris |
Matthew Sapp |
05/02/2023: Mail Received (Allocation Time Extension; Received 04/26/2023) -view comment history- |
0 |
ATPL-5198 (024)
|
RIV | Redlands Ave. btwn. Placentia Ave. & Tahoe St., & Citrus Ave. btwn. Redlands Ave & Perris Blvd. |
The Project Planning Id are: 1273B;
The locations are :Construct Class IV bike lanes with hardscape buffer, reflective delineators, high-visibility crosswalks, sidewalks, bike repair stations, signage & public outreach campaign.
CON-NI for information and education to inform community of infrastructure project.
Output/Outcome (Action taken/quantifiable benefits results) - 1.75 mi. of Class IV buffered bike lanes connecting to public transit, 3 high visibility crosswalks, 700 SF of sidewalk, 2 bike repair stations, signage & educational program. |
|
Perris |
Matthew Sapp |
04/07/2023: Mail Received (Time Extension Request; Received 03/28/2023) -view comment history- |
0 |
STPLEG-5205 (003)
|
SBd | IN RIALTO ON I-10 FROM CHERRY AVENUE TO RANCHO AVENUE |
LANDSCAPING-Waterline |
|
Rialto |
Ramiro Martinez |
No comments |
0 |
HP21LN-5205 (005)
|
SBd | Riverside Avenue / I-10 interchange |
Upgrade interchange |
|
Rialto |
Marcos Amancio |
04/05/2012: Mail Received (Final Voucher) -view comment history- |
0 |
MTP-5205 (006)
|
SBd | along Metrolink tracks from Palm Street to Riverside Avenue North to First Street - pedestrian and intermodal improvements |
Metrolink/Bus Stop Enhancements |
|
Rialto |
Carol Green |
No comments |
0 |
STPL-5205 (007)
|
SBd | Pepper Avenue from Shirley Bright Road to SR 210 approximately 2,500 feet north |
Road extension |
|
Rialto |
Ramiro Martinez |
No comments |
0 |
SR2SL-5205 (008)
|
SBd | Intersection of Riverside Avenue and Knollwood Avenue |
Pedestrian signal and raised crosswalk |
|
Rialto |
Carol Green |
No comments |
0 |
SR2SL-5205 (009)
|
SBd | Along Eucalyptus Avenue and Etiwanda Avenue |
Curb, gutter, ramp, sidewalk gap closures, in-pavement warning lights, & speed radar feedback sign. Minor change approved 1/3/05 removing raised sidewalk. |
|
Rialto |
Carol Green |
No comments |
0 |
SR2SL-5205 (009)
|
SBd | Eucalyptus Avenue and Etiwanda Avenue. |
Curb, gutter, ramps, sidewalk gap closures, in-pvement warning lights and speed feedback sign. |
|
Rialto |
Carol Green |
10/20/2008: Mail Received (Received final invoice) -view comment history- |
0 |
SR2SL-5205 (010)
|
SBd | 266 West Randall Avenue |
IN-pavement crosswalk light |
|
Rialto |
Carol Green |
04/01/2008: Mail Received (Final invoice) -view comment history- |
0 |
SR2SL-5205 (011)
|
SBd | 2630 North Linden Avenue |
In-pavement crosswalk lighting, warning lights, curb ramps, and median striping |
|
Rialto |
Marcos Amancio |
02/21/2017: 02/212017 Project archived in D8 Database, project file purged on 7/7/2015.
-view comment history- |
0 |
SR2S-5205 (012)
|
SBd | Eisenhower HS, NORTH LILAC AVE. NORTH OF WEST BASELINE RD.
|
INSTALL FLASHING BEACON AND RADAR SPEED FEEDBACK SIGNS; UPGRADE SCHOOL ZONE SIGNS
|
|
Rialto |
Marcos Amancio |
03/22/2012: Mail Received (Final Invoice) -view comment history- |
0 |
HSIPL-5205 (013)
|
SBd | Ayala Drive from north of Baseline Road to south of I-210 |
Widen roadway and shoulders; construct curb, gutters, sidewalks, curb ramps and bike lanes. |
|
Rialto |
Marcos Amancio |
10/20/2014: Mail Received (Noise Study, 3 copies, 0 original) -view comment history- |
1 |
SRTS-5205 (014)
|
SBd | Merle Casey Elem School - Eucalyptus Avenue, King Street, 2nd Street, Encina Avenue, and Pampas Avenue |
Install in-roadway warning light system at Eucalyptus and Mckinley. Construct sidewalk, curb, gutter, and ADA access along 2nd Street between Acacia Avenue and Eucalyptus Avenue, along Encina Ave. between King Street and 2nd St., along King St. between Encina and Eucalyptus Ave. |
|
Rialto |
Marcos Amancio |
01/12/2015: Mail Received (Final Voucher stamped by Local Programs Accounting on 9/22/2014) -view comment history- |
1 |
HPIMD05L-5205 (015)
|
SBd | I-10/Riverside |
Modify I-10 Interchange, reconstruct bridge, roadway improvements. |
|
Rialto |
Esayas Hagos |
01/10/2014: Mail Received (Received Final Voucher 09/3/2009 to 06/26/2013) -view comment history- |
0 |
BRLS-5205 (016)
|
SBd | Riverside Avenue. South of I-10 between 1-10 and Slover Avenue. - Railroad Bridge Modification from 4-8 lanes. |
Railroad Bridge Modification from 4-8 lanes. |
|
Rialto |
Enrique Gonzalez |
11/17/2022: Mail Received (FROE; Received 11/14/2022) -view comment history- |
2 |
HSIP-5205 (017)
|
SBd | Installation of countdown heads at 62 signalized intersections |
Upgrade and replacement of existing signal indicatiors with pedestrian countdown indicators at 62 intersections within a one-half-mile radius of 24 elementary and middle schools |
|
Rialto |
Marcos Amancio |
12/20/2019: Mail Received (HBP 6A package; 1 original, 0 copy.) -view comment history- |
2 |
SR2SL-5205 (018)
|
SBd | East side of Cedar St.; between Merrill and Rialto AvesEast side of Cedar St.; between Merrill and Rialto Aves |
Construct Missing Sidewalk and Ped Crossing @ Metrolink RR & Install Ped Countdown Heads @ 2 Signals |
|
Rialto |
Eduardo Moreno-Castaneda |
11/21/2022: Progress Invoice No. 4 review comments sent to agency -view comment history- |
0 |
RPSTPLE-5205 (019)
|
SBd | PE trail along the old RR alignment from Maple Ave to Cactus Ave. |
Construct Bike Trail W/ land scaping, lighting, drainage & associated improvments, lenght = 1.75 Mi |
|
Rialto |
Esayas Hagos |
04/24/2017: Mail Received (Final invoice 5R, 1 original, 0 copy.) -view comment history- |
8 |
HSIPL-5205 (020)
|
SBd | Intersection of E. Base Line Road and N. of Acacia Avenue in city of Rialto. |
To provide the protected left turn phase and to improve the signal hardware at the intersection of E. Base Line Road and N. of Acacia Avenue. |
|
Rialto |
Marcos Amancio |
11/14/2018: Mail Received (Final Invoice (electronic) ) -view comment history- |
1 |
ATPL-5205 (021)
|
SBd | City of Rialto Safe Route to School Program |
Develop a Safe Route to School Program for 29 Schools within the Rialto Unified School District to create the safe and encouraging environment for childern to walk or bicycle to school. PPNO 1164 |
|
Rialto |
Jesus Sandoval |
10/29/2020: Re-submitted final invoice #4R2 to LPA. -view comment history- |
0 |
HSIPL-5205 (022)
|
SBd | Ayala from Base line to Renaissance Parkway(Easton) |
Widen Ayala Drive to construct Curb, Gutter, Sidewalk, Shoulders and Bikelanes.
See also HSIP 5205(013) |
|
Rialto |
Esayas Hagos |
10/09/2018: Mail Received (Exhibit 17-F (electronic)) -view comment history- |
2 |
ATPL-5205 (023)
|
SBd | Etiwanda Ave and Baseline Rd (Maple Ave/Pepper Ave), Maple Ave, Riverside Ave, Pepper Ave (Baseline Rd/Foothill Bl), and Spruce Ave (Foothill Bl/Grove St) |
install bike lanes, bike detection, ped push buttons, high visibility crosswalk, striping, flashing beacon, sidewalk, curb ramps and repaint crosswalk. |
|
Rialto |
Evita Premdas |
05/04/2021: Progress Invoice No. 04 and FINAL - Received, Processed, and sent to HQ LPA -view comment history- |
0 |
HSIPL-5205 (024)
|
SBd | Merrill Avenue and S. Riverside Avenue |
Class II Bike Lanes
HSIP7-08-017 |
|
Rialto |
Eduardo Moreno-Castaneda |
11/21/2022: Mail Received (Approved FL; Received 11/21/2022) -view comment history- |
2 |
SSARPL-5205 (025)
|
SBd | Installation of Class II Bike Lanes on Merrill Ave. from East City Limits to West City Limits, and South Riverside Avenue from Slover Avenue to Aqua Mansa Road. |
Bike Lanes, Class II |
|
Rialto |
Eduardo Moreno-Castaneda |
03/18/2022: Mail Received (FPER; received on 3/15/2022.) -view comment history- |
0 |
HSIPL-5205 (026)
|
SBd | Various intersections throughout the City of Rialto. (Baseline Rd and Sycamore Ave, Baseline Rd and Eucalyptus Ave, Etiwanda Ave and Cedar Ave, Riverside Ave and Alder Ave) |
Traffic Signal Upgrade |
|
Rialto |
Eduardo Moreno-Castaneda |
12/01/2022: Mail Received (Progress Invoice No.7; Received 12/1/2022) -view comment history- |
1 |
HSIPL-5205 (027)
|
SBd | In the City of Rialto on Baseline Road, from Willow Avenue to Meridian Avenue |
Construction of a 12 foot wide raised center median and ADA curb ramps. |
|
Rialto |
Eduardo Moreno-Castaneda |
01/27/2023: Mail Received (Progress Invoice No.7; Received 01/23/2023) -view comment history- |
1 |
LPPSB1L-5205 (028)
|
SBd | Alder Avenue & Randall Avenue - Roadway Improvement Project
In the City of Rialto on N Alder Avenue between W Baseline Road and W Renaissance parkway and to W Randall Avenue between S Cactus Avenue |
N Alder Avenue & W Randall Avenue - Roadway Widening Project
- Add bike lanes; connect sidewalk gaps; add vehicle turn lanes; widen travel lanes; create new roadway medians; modify signal timings; add landscape median; modify traffic signal; curbside parking; and ADA compliant facility upgrades
PPNO: 1249 Adv*Draft Id: 0819000017 |
|
Rialto |
Eduardo Moreno-Castaneda |
04/05/2022: Final Invoice Review Comments sent to agency -view comment history- |
0 |
ATPSB1L-5205 (029)
|
SBd | Along Terra Vista Drive and neighboring streets
|
Speed feedback signs, RRFBs, crosswalks, ADA-compliant curb ramps, and bicycle facilities
PPNO 1265 |
|
Rialto |
Eduardo Moreno-Castaneda |
02/24/2023: Mail Received (ATP Funding Request; Received 02/17/2023) -view comment history- |
0 |
ATPLNI-5205 (030)
|
SBd | Throughout the City of Rialto. |
Implement the programs identified in the Rialto SRTS Plan. |
|
Rialto |
Eduardo Moreno-Castaneda |
05/02/2023: Mail Received (Time Extension Request; Received 05/01/2023) -view comment history- |
0 |
SB1ATPL-5205 (031)
|
SBd | Cactus Avenue from Baseline Road to Rialto Avenue, intersection of Maple Avenue and the Pacific Electric Trail, and on the Pacific Electric Trail between Cedar Avenue and Cactus Avenue. |
Upgrade existing bikeway to a multi-use path featuring a bi-directional bike path and buffered pedestrian path, reconstruct curb ramps to be ADA compliant, construct small parking lot, modify fencing to provide trail access, and installation of flashing beacon system with in-roadway warning lights for trail crossing. |
|
Rialto |
Eduardo Moreno-Castaneda |
03/06/2023: Mail Received (Progress Invoice No.2; Received 02/28/2023) -view comment history- |
0 |
STPL-5209 (001)
|
RIV | 6th Street from Veile Ave to Maple Ave |
Road Rehabilitation |
|
Beaumont |
Eric Tang |
No comments |
0 |
CMLG-5209 (002)
|
RIV | Beaumont Avenue--1st st. to 6th st. |
Interconnect Signals |
|
Beaumont |
Chigo Dike |
No comments |
0 |
RPL-5209 (003)
|
RIV | 6th Street from Palm Avenue to Highland Springs Avenue |
road rehabilitation |
|
Beaumont |
Sean Yeung |
No comments |
0 |
STPL-5209 (004)
|
RIV | Palm Avenue from 6th Street to Oak Valley Parkway |
Road rehabilitation |
|
Beaumont |
Albert Vergel de Dios |
No comments |
0 |
RPSTPLE-5209 (005)
|
RIV | San Timoteo Canyon Road and Oak Valley Parkway from El Casco Lake to Noble Creek Regional Park |
Pedestrian and bike lane |
|
Beaumont |
Sean Yeung |
04/13/2009: Mail Received (Revised Preliminary Environmental Studies) -view comment history- |
2 |
DEM05LN-5209 (007)
|
RIV | Oak Valley Parkway over Noble Creek, Br. No. 56C-0160 |
Bridge replacement |
|
Beaumont |
Chigo Dike |
02/21/2017: 02/212017 Project archived in D8 Database, project file purged on 7/7/2015. -view comment history- |
0 |
DEM10-5209 (008)
|
RIV | On SR60 between Jack Rabbit Trail & SR60/I-10 Jct: PM 28.03 to 30.44 |
DEMO ID 860Ph1-Const. New Potrero 6 Ln OC (3 Lns Each Dir) w/ Temp Connect to Western Knolls (Ea34141/34143).
Ph2: New IC On/Off Ramps. Const. WB/EB Exit & Entry Ramps (2 Lns) & WB/EB Loop Entry Ramps (2 Lns) (Entry Ramps Incl HOV Lane), Incl EB/WB Aux Lns at Exit Ramps, Realign Western Knolls Ave, and Remove Western Knolls Ave Connection to SR60 (EA34142/34143).
Project Manager is Jason Bennecke 909-556-8852 |
|
Beaumont |
Eduardo Moreno-Castaneda |
02/16/2022: Project closed -view comment history- |
0 |
STPL-5209 (009)
|
RIV | 8th Street between Pennsylvania Avenue to Xenia Avenue |
Resurfacing, Restoration and Rehabilitation. |
|
Beaumont |
Eduardo Moreno-Castaneda |
01/31/2019: Mail Received (invoice 1 (final); 1 original, 2 copies.) -view comment history- |
1 |
M-5214 (001)
|
RIV | |
Banning |
Eric Tang |
No comments |
0 |
CML-5214 (003)
|
RIV | In the City of Banning on Highland Springs Ave/ I-5 and Ramsey. |
Signals Interconnect |
|
Banning |
Eric Tang |
No comments |
0 |
STPL-5214 (008)
|
RIV | Wilson Street from Highland Home Road to Mountain Avenue |
Road reconstruction |
|
Banning |
Eric Tang |
06/29/1930: Mail Received (Billing Invoice/Reconstruction of Wilson Str from Highland Home Rd to Mountain Ave.) -view comment history- |
0 |
STPL-5214 (009)
|
RIV | City of Banning |
Rehab Wilson Street |
|
Banning |
Eric Tang |
10/18/2007: Mail Received (claim for reimbursement of state funds) -view comment history- |
0 |
HSIPL-5214 (010)
|
RIV | Ramsey St. between Hargrave St. and Sunset Avenue. |
Upgrade traffic signals, including controllers, ped push buttons, signal hardware, new mast arm, detection, and install Emergency Vehicle Pre-Emption Devices. |
|
Banning |
Eduardo Moreno-Castaneda |
04/20/2020: Mail Received (Progress FROE package, Electronic Copy) -view comment history- |
0 |
STPL-5214 (011)
|
RIV | Ramsey St. from Hargrave St. to East City limits |
Pavement Rehab. |
|
Banning |
Eduardo Moreno-Castaneda |
05/01/2020: Mail Received (FROE, Electronic Copy) -view comment history- |
5 |
ATPL-5214 (012)
|
RIV | Ramsey St., (between Highland Springs Ave & San Gorgonio Ave)Wilson St., (between 8th St. and Blanchard) and San Gorgonio Ave.(between Ramsey St and Indian School Ln) in City of Banning |
Construct new bicycle and SRTS improvements to provide new class II & III bike lanes & pedestrian facilities along Ramsey St., Wilson St., San Gorgonio Ave. in City of Banning |
|
Banning |
Eduardo Moreno-Castaneda |
04/29/2020: Mail Received (Progress FROE package, Electronic Copy) -view comment history- |
0 |
HSIPSL-5214 (013)
|
RIV | The intersection of Ramsey Street with Omar Street and 1,000 feet west of intersection along eastbound Ramsey St. |
Install sidewalk, curb and gutter, curb ramps, signage and striping, modify existing median to limit left turns from eastbound Ramsey Street only, install left-turn pocket, and improve sight distance.
H10-08-01 |
|
Banning |
Eduardo Moreno-Castaneda |
03/15/2023: Progress Invoice No. 2 sent to LPA -view comment history- |
0 |
HSIPSL-5214 (014)
|
RIV | Four non-signalized intersections on Ramsey St. at Martin St., 2nd St., 6th St., and 16th St. |
Install/upgrade pedestrian crossings at uncontrolled locations (NS21PB); Install Rectangular Rapid Flashing Beacon (RRFB) (NS22PB)
H10-08-002 |
|
Banning |
Eduardo Moreno-Castaneda |
03/20/2023: Mail Received (Approved FL; Received 03/20/2023) -view comment history- |
0 |
LRSPL-5214 (015)
|
RIV | Through out the City of Banning |
Develop Loacal Roadway Safety Plan
Advantage ID: 0822000133
LRSP ID: LRSP246
|
|
Banning |
Enrique Gonzalez |
06/01/2022: Mail Received (approved PSA & FL; received on 5/23/2022.) -view comment history- |
0 |
STPLR-5214 (288)
|
RIV | CITY OF BANNING, IN RIVERSIDE COUNTY, AT SAN GORGONIO AVE AND THE UNION PACIFIC RAILROAD GRADE CROSSING.
STPLR 7500 (288) |
GRADE CROSSING HAZARDS ELIMINATION AND SAFETY IMPROVEMENTS TO BE FUNDED UNDER THE RAILROAD-HIGHWAY GRADE CROSSING SECTION 130 PROGRAM (RHGCP), WITH FEDERAL MATCH PROVIDED THROUGH CA TOLL CREDITS TC |
|
Banning |
Enrique Gonzalez |
07/26/2021: Mail Received (PES; received on 7/26/2021.) -view comment history- |
0 |
MTP-5220 (002)
|
SBd | El Garces intermodal transfer station restoration of the interior of the building (Phase 2) |
Intermodel Facility (2 EA's 412274 & R866SA) |
|
Needles |
Pamela Wells |
05/24/2016: Mail Received (RFA (Con.) 1 original, 2 copies) -view comment history- |
0 |
NCPD02-5220 (003)
|
SBd | Along "J" Street from I-40 to West Broadway Street to Needles Highway to North "K" Street to AZ Route 95 |
Roadway Widening and Cooridor Improvements - National Corridor Preservation and Development (NCPD) funds |
|
Needles |
Pamela Wells |
07/30/2018: Mail Received (Invoice #24 (Con) 1 original, 2 copies) -view comment history- |
19 |
SR2SL-5220 (004)
|
SBd | Lillyhill Drive from north of the I-40 overpass to Cibola Street |
Curb, gutter, sidewalk, ADA ramps, and crosswalk markings |
|
Needles |
Pamela Wells |
04/13/2010: Mail Received (Invoice) -view comment history- |
0 |
ATPL-5220 (006)
|
SBd | In-fill Sidewalks, Curbs & Gutters Improvement Project |
In-fill Sidewalks, Curbs & Gutters Improvement Project |
|
Needles |
Enrique Gonzalez |
12/02/2019: Mail Received (Fechter & Company Auditors: Request for amounts owed and remitted to City for FY 18-19) -view comment history- |
0 |
BPMP-5220 (007)
|
SBd | K Street over Colorado River, 0.25 miles North of River Rd |
Bridge Deck overlay and replace bearings. |
|
Needles |
Esayas Hagos |
05/02/2023: Mail Received (Approved FL & PSA; Received 04/28/2023) -view comment history- |
0 |
LRSPL-5220 (008)
|
SBd | Throughout the City of Needles. |
Develop Local Roadway Safety Plan |
|
Needles |
Esayas Hagos |
11/17/2022: Mail Received (FPER; Received 11/16/22) -view comment history- |
0 |
STPLG-5233 (002)
|
RIV | In the City of Blythe on Lovekin Blvd/, I-10 Interchange |
Traffic Signals and minor road work |
|
Blythe |
Steven Nguyen |
No comments |
0 |
STPLHSR-5233 (005)
|
Riv | Intersection of Fifth Street and Murphy Street and along the south side of Barnard Street |
Curb, gutter, sidewalk, and passenger unloading zone |
|
Blythe |
Steven Nguyen |
No comments |
0 |
STPLER-5233 (006)
|
RIV | North side of East Hobson Way from 7th Street to Intake Boulevard |
Curb, gutter, and sidewalk |
|
Blythe |
Steven Nguyen |
05/04/2007: Mail Received (Final Voucher) -view comment history- |
0 |
SRTSLNI-5233 (007)
|
RIV | Ruth Brown ES, Margaret White ES, Felix J. Appleby ES, and Blythe MS |
Purchase pole-mounted radar speed feedback signs and a mobile radar trailer; train and equip crossing guards at all sites |
|
Blythe |
Albert Vergel de Dios |
07/01/2016: Submit final invoice and FROE to HQ LPA. -view comment history- |
0 |
STPL-5233 (008)
|
RIV | North Broadway from Juniper Trail to the south to 10th Avenue to the north |
Asphalt overlay includes grinding and overlaying of 3-inch conventional AC for the full width of the road (25 feet) including tack coat, adjust manhole and water valves, slurry sealer and temporary and permanent striping. |
|
Blythe |
Albert Vergel de Dios |
06/08/2018: DLAP signed Exhibit 17-A FROE and Exhibit 17-C -view comment history- |
3 |
STPLZ-5275 (001)
|
RIV | Seismic Retrofit Bridge 56C-0283. |
Seismic retrofit |
|
Indio |
Osabuogbe Igbinedion |
08/31/2006: Mail Received (CC of letter to Audits and Investigations
Seismic Retrofit of Bridges 001 & 006
Audit No. P1300-0837) -view comment history- |
0 |
STPLG-5275 (003)
|
RIV | In the City of Indio at the intersection of Clinton St and Mike Ave |
Install Traffic Signal |
|
Indio |
Albert Vergel de Dios |
03/17/2008: Mail Received (Federal Report of Expenditures) -view comment history- |
0 |
STPLZ-5275 (006)
|
RIV | Indio Boulevard over Whitewater River, Bridge No. 56C0292 |
Seismic retrofit. |
|
Indio |
Albert Vergel de Dios |
06/07/2016: Mail Received (Final Invoice (PS&E) 1 original, 2 copies) -view comment history- |
0 |
HP21L-5275 (009)
|
RIV | Jefferson Avenue I-10 |
New interchange |
|
Indio |
Albert Vergel de Dios |
06/27/2006: Mail Received (Jefferson & I10 Interchange
Request for subvention) -view comment history- |
0 |
STPLER-5275 (010)
|
RIV | Indio Boulevard from Jefferson Street to State Route 111 |
Landscaping and sidewalks |
|
Indio |
Steven Nguyen |
10/07/2005: Mail Received (Final Voucher) -view comment history- |
0 |
STPLH-5275 (011)
|
RIV | Intersection of Monroe Street and Oleander Avenue |
Interconnect new signals |
|
Indio |
Steven Nguyen |
No comments |
0 |
STPLZ-5275 (012)
|
RIV | Jackson Street over Whitewater River, Bridge No. 56C0084 |
Seismic Retrofit |
|
Indio |
Eduardo Moreno-Castaneda |
07/26/2021: Mail Received (FDR; received on 7/22/2021.) -view comment history- |
1 |
STPLZ-5275 (013)
|
RIV | SB Indio Boulevard Overhead at UPRR, etal, Bridge No. 56C0283 |
Seismic Retrofit |
|
Indio |
Matthew Sapp |
06/09/2022: Mail Received (progress invoice 22; received on 6/8/2022) -view comment history- |
2 |
STPLZ-5275 (014)
|
RIV | Jackson Street over Indio Boulevard, Bridge No. 56C0291 |
Seismic Retrofif |
|
Indio |
Albert Vergel de Dios |
07/03/2014: Mail Received (received Final Voucher) -view comment history- |
1 |
RPSTPLE-5275 (015)
|
RIV | Highway 111, From Jefferson Street to Madison Street |
Median Island Landscape and Irrigation |
|
Indio |
Albert Vergel de Dios |
06/15/2017: Mail Received (Progress invoice 15, 2 copies, 1 original.) -view comment history- |
0 |
STPL-5275 (016)
|
RIV | Avenue 46 from Monroe Street to Madison Street |
Pavement Rehabilitation of Avenue 46 from Monroe Street to Madison Street. |
|
Indio |
Sylvester Lin |
06/18/2008: Mail Received (Corrected Technical Memo for Construction Noise) -view comment history- |
0 |
BHLS-5275 (017)
|
RIV | Southbound Indio Boulevard over Whitewater River, Bridge No. 56C-0293 |
Bridge Scour repair and countermeasures. |
|
Indio |
Enrique Gonzalez |
05/02/2023: Mail Received (Progress Invoice No.12; Received 04/25/2023) -view comment history- |
1 |
CML-5275 (018)
|
RIV | Avenue 48 From Jefferson Street to Calhoun Street |
New Signals and Interconnect |
|
Indio |
Albert Vergel de Dios |
06/25/2013: Mail Received (Final Voucher (1 copy)) -view comment history- |
1 |
CML-5275 (019)
|
RIV | Various |
Non-infrastructure. Liquified Natural Gas (LNG) Replacement Vehicle. |
|
Indio |
Albert Vergel de Dios |
05/15/2013: Mail Received (Final Voucher (1 copy)) -view comment history- |
0 |
BHLSZ-5275 (021)
|
RIV | Northbound Indio Boulevard over Whitewater River Br. no. 56C-0292 |
LSSRP Seismic Retrofit and Scour Repair and Counter -Measure |
|
Indio |
Enrique Gonzalez |
12/21/2022: Mail Received (Progress Invoice No.24; Received 12/19/2022) -view comment history- |
1 |
CML-5275 (022)
|
RIV | Jackson Street Intersection |
New Signals. |
|
Indio |
Albert Vergel de Dios |
12/23/2015: Mail Received (HQ to Dist.8 Finance Ltr. 1 copy, 0 originals) -view comment history- |
2 |
SLPPL-5275 (023)
|
RIV | Monroe street from Avenue 49 to Avenue 52 |
Roadway Widening |
|
Indio |
Albert Vergel de Dios |
04/15/2014: Mail Received (Received Revised Invoice #3) -view comment history- |
0 |
BRLKS-5275 (024)
|
RIV | Avenue 44 low water crossing over Coachella Valley stormwater channel Br. No. 00L0056. |
Replace 2 lane LWC to a four lane bridge. Capacity increasing project. |
|
Indio |
Enrique Gonzalez |
05/23/2023: Mail Received (RFA(PED); Received 05/22/2023) -view comment history- |
12 |
SLPPCL13-5275 (025)
|
RIV | Varner Road at Jefferson St. |
Varner Road and Jefferson Street widening, install traffic signal and traffic signal modification. |
|
Indio |
Albert Vergel de Dios |
11/12/2015: Mail Received (Progress Invoice #1 (Con.) 1 original, 2 copies) -view comment history- |
2 |
STPL-5275 (026)
|
RIV | Highway 111 from Rubidoux to Oasis. |
Pavement Rehabilitation. |
|
Indio |
Albert Vergel de Dios |
05/24/2016: Send Final to LPA. -view comment history- |
0 |
STPLN-5275 (027)
|
RIV | Highway 111 from Rubidoux St. to Madison St. |
Reconstruct and improve Hwy 111 including updating all traffic signals and updating all sidewalks, ramps and driveways. Widening from 4 to 6 lanes. |
|
Indio |
Albert Vergel de Dios |
05/10/2019: Mail Received (progress invoice 5; 1 original, 2 copies.) -view comment history- |
21 |
ATPL-5275 (028)
|
RIV | Andrew Jackson Elementary |
Pedestrian Walkway |
|
Indio |
Albert Vergel de Dios |
08/30/2019: Mail Received (invoice (final) 10; 1 original, 2 copies.) -view comment history- |
2 |
HSIPL-5275 (029)
|
RIV | Intersection of Doctor Carreon Blvd. and Oasis Street and 11 intersections on Monroe Street |
Replace existing permissive left-turn phases and signal heads with protected left-turn phases and signal heads on existing poles with larger master arm. Improve signal timing. |
|
Indio |
Enrique Gonzalez |
10/08/2020: Mail Received (project closeout pictures; to staff and V-drive.) -view comment history- |
2 |
CML-5275 (030)
|
RIV | Rancho Los cerritos Drive, Primerose Lane, Galindo Court and Sabrina Court |
Fully pave about one mile of unpaved City roads (4) residential streets in Indio, north of I-10. |
|
Indio |
Albert Vergel de Dios |
03/19/2020: Mail Received (invoice 4 (final); 1 original, 2 copies.) -view comment history- |
3 |
HSIPL-5275 (031)
|
RIV | Riverside County, in the City of Indio, 11 various traffic signals along Monroe St - from Oleander Ave to Comet Lane |
To improve signal timing (coordination, phases, red, yellow, or operation) at 11 intersections on Monroe St.
FTIP #: SCAG015 (2015 FTIP, Amend 15) RTP ID: REG0701
Grouped Projects for safety improvements - HSIP program projects consistent with 40 CFR Part 93.126 Table 2&3 Categories -RR/Hwy Xing, safer non-federal-aid system roads, shoulder improves, traffic control devices & operating assistance other than signalization projects, intersectional signalization projects at individual intersections, pavement marking demo. Using toll credit. |
|
Indio |
Enrique Gonzalez |
06/29/2018: Mail Received (RFA (Con), ROW cert, NEPA reval, 1 original 2 copies) -view comment history- |
0 |
BPMP-5275 (032)
|
RIV | 32 bridges Citywide. |
Develop a list of bridges for preventive maintenance. |
|
Indio |
Albert Vergel de Dios |
08/08/2017: Mail Received (Progress invoice 1, 1 original, 1 copy.) -view comment history- |
0 |
HSIPL-5275 (033)
|
RIV | Twenty -one (21) Intersections Citywide |
Install signal timers and pedestrian countdown heads. |
|
Indio |
Solomon Frisco |
08/09/2021: Mail Received (FROE; received on 8/5/2021.) -view comment history- |
1 |
HSIPL-5275 (034)
|
RIV | Avenue 44 from Monroe Street to Palo Verde Avenue |
Construct Road diet ( from 4 to 2 w/ 2 left-turn, install bike lanes and parking. |
|
Indio |
Enrique Gonzalez |
09/03/2021: Mail Received (FROE; received on 9/3/2021.) -view comment history- |
1 |
ATPSB1L-5275 (035)
|
RIV | Educational outreach to over 500 students and their families. Sidewalks in the Miles Avenue Park community with connecting routes that allo |
Safe Routes to School |
|
Indio |
Enrique Gonzalez |
02/24/2023: Mail Received (Progress Invoice No.15; Received 02/22/2023) -view comment history- |
1 |
HSIPL-5275 (036)
|
RIV | Fifteen (15) signalized intersections throughout the City of Indio |
Install advanced dilemma zone detection at fifteen (15) intersections throughout the City of Indio
HSIP unique ID:H9-08-009 |
|
Indio |
Enrique Gonzalez |
04/14/2023: Mail Received (Award Package; Received 04/10/2023) -view comment history- |
0 |
LRSPL-5275 (037)
|
RIV | Throughout city of Indio |
Develop a Local Roadway Safety Plan to improve transportation safety and reduce fatalities and serious injuries occurring within the City's transportation system. The proposed plan will identify, analyze, and prioritize safety improvements to address unique highway safety needs in the City's local areas of concern (priority areas). City Project PL2003 |
|
Indio |
Enrique Gonzalez |
05/12/2022: Mail Received (FPER & final LRSP; received on 5/12/2022.) -view comment history- |
0 |
ER-5275 (072)
|
RIV | Avenue 44 at CV Stormwater Channel |
DAF# HWS-IND-001-2
FHWA Approval Date: 09/25/19
Current Cost Estimate: $396,050
Repair and grout road section |
|
Indio |
Matthew Sapp |
06/01/2022: Mail Received (ER; final invoice 1R; received on 5/31/2022.) -view comment history- |
1 |
BRLS-5275 (121)
|
RIV | VOID - DUPLICATE - REFER TO BRLS-5275(021) Northbound Indio Boulevard over Whitewater River, Br. No. 56C-292 |
Bridge Scour Repair and Counter Measure |
|
Indio |
Albert Vergel de Dios |
05/09/2013: Mail Received (Invoice 10 ( 1 original, 2 copies)) -view comment history- |
0 |
STPLZ-5275 (206)
|
RIV | Various bridges over the Whitewater River and Indio Boulevard. Br. Nos. 56C-0084, 0291 & 0292. |
Seismic retrofit |
|
Indio |
Albert Vergel de Dios |
11/14/2005: Mail Received (Updated Construction Estimattes for the Indio Bridge Retrofit Program) -view comment history- |
0 |
EEM-5275 (236)
|
RIV | Monroe Street Between Avenue 50 and 52. |
Construct multi purpose trail with decomposed granite, equestrian fencing and lighting. |
|
Indio |
Albert Vergel de Dios |
12/09/2013: Mail Received (Received Progress #1 EEM-2008(036)) -view comment history- |
0 |
BR-NBIL-5275 (527)
|
RIV | VOID-DUPLICATE- REFER TO BRLKS-5275(024) Avenue 44 over Coachella Valley Stormwater Channel - |
Replace 2 lane Low Water Crossing to 4 lane Bridge (Br. No. 00L0056) |
|
Indio |
Albert Vergel de Dios |
02/06/2013: Mail Received (RFA PE revised (1 original, 2 copies) RFA check list, 3A,3E,FTIP,3O,7B) -view comment history- |
0 |
CML-5282 (000)
|
RIV | Citywide Palm Springs with provision for expansion into neighboring cities as a regional Traffic Management Center. |
This project will advance the interconected signal timing to be unified citywide, coordinate the communications equipment bringing them all onto the same communications platform for the transmission of complete data and the dissemination of information to the public. |
|
Palm Springs |
Albert Vergel de Dios |
No comments |
0 |
STPLER-5282 (014)
|
RIV | IN THE CITY OF PALM SPRINGS ON GENE AUTRY TRAIL/RAMON ROAD |
Median island landscaping |
|
Palm Springs |
Steven Nguyen |
No comments |
0 |
STPLN-5282 (016)
|
RIV | Indian Canyon Drive from Garnet Avenue to one-half mile east of UPRR Overhead |
Roadway widening |
|
Palm Springs |
Albert Vergel de Dios |
09/13/2012: Mail Received (Right of Way certification) -view comment history- |
0 |
BRLO-5282 (017)
|
RIV | Indian Canyon Drive at U.P.R.R. Overhead (Br. No. 56C-0025) |
Bridge replacement |
|
Palm Springs |
Matthew Sapp |
05/19/2023: Mail Received (Progress Invoice No.23; Received 05/18/2023) -view comment history- |
5 |
RPSTPL-5282 (018)
|
RIV | On Gene Autry Trail from Whitewater River Wash to the Interstate 10 interchange |
Bridge and Roadway Connector Widening |
|
Palm Springs |
Albert Vergel de Dios |
05/31/2015: Mail Received (Final voucher, 1 copy, 0 original) -view comment history- |
0 |
RPL-5282 (019)
|
RIV | on Sunrise Way from East Palm Canyon Drive to Vista Chino (SR 111) |
interconnect signals |
|
Palm Springs |
Albert Vergel de Dios |
02/21/2017: 02/212017 Project archived in D8 Database, project file purged on 7/7/2015. -view comment history- |
0 |
PLHL-5282 (020)
|
RIV | Belardo Road from Ramon Road to East Palm Canyon Drive and Mesquite Avenue from Belardo Road to Cahuilla Indian Interpretive Center |
Road extension and new bridge |
|
Palm Springs |
Albert Vergel de Dios |
04/20/2016: Mail Received (Final Voucher 11/26/2013) -view comment history- |
0 |
STPLH-5282 (022)
|
Riv | Racquet Club Drive from Indian Canyon Drive to Avenida Caballeros |
Sidewalk, driveways, and ADA ramps |
|
Palm Springs |
Steven Nguyen |
01/14/2014: comments due yesterday -view comment history- |
0 |
RPSTPLN-5282 (023)
|
RIV | On Indian Canyon Drive from Tramview Road to the U.P.R.R. Overhead (Br.56C-0025) |
Roadway Widening from 2 to 4 lanes |
|
Palm Springs |
Albert Vergel de Dios |
02/21/2017: 02/212017 Project archived in D8 Database, project file purged on 7/7/2015. -view comment history- |
0 |
STPL-5282 (024)
|
RIV | Golf Club Dr., 34 Avenue and Indian Avenue |
Roadway Rehabilitation |
|
Palm Springs |
Steven Nguyen |
05/29/2007: Mail Received (Revised Finance Letter) -view comment history- |
0 |
CML-5282 (025)
|
RIV | Avenida Caballeros |
Avenida Caballeros Shoulder Paving |
|
Palm Springs |
Albert Vergel de Dios |
04/04/2008: Mail Received (Final Voucher) -view comment history- |
0 |
BHLO-5282 (026)
|
RIV | East Bogart Trail Bridge over Palm Canyon Wash Br. no. 56C0311 |
Bridge Rehab Program |
|
Palm Springs |
Albert Vergel de Dios |
02/02/2017: Mail Received (Progress invoice 16 (final), 2 copies, 1 original.) -view comment history- |
3 |
ESPLE-5282 (027)
|
RIV | Gene Autry Trail from Vista Chino to Via Escuela |
Median and property landscaping |
|
Palm Springs |
Albert Vergel de Dios |
04/16/2013: Mail Received (Final Voucher (1 copy)) -view comment history- |
0 |
HSIPL-5282 (028)
|
RIV | Intersection of Idian Canyon Drive and Tamarish Road |
New Traffic Signal |
|
Palm Springs |
Albert Vergel de Dios |
02/21/2017: 02/212017 Project archived in D8 Database, project file purged on 7/7/2015.
-view comment history- |
0 |
SR2SL-5282 (029)
|
RIV | Vicinity of Cahuilla, Cielo Vista, Katherine Finchy, and Vista Del Monte Elementary Schools |
Pedestrian-activated flashing beacons, in-pavement lighted crosswalks, signs and markings, sidewalk |
|
Palm Springs |
Albert Vergel de Dios |
02/21/2017: 02/212017 Project archived in D8 Database, project file purged on 7/7/2015.
-view comment history- |
0 |
CML-5282 (030)
|
RIV | East San Lorenzo Road from 140 feet West of S. Camino Real to S. Hermosa Drive. |
PM-10 shoulder paving and installation of asphalt concrete berms |
|
Palm Springs |
Albert Vergel de Dios |
01/03/2017: Project archived in D8 Database, project file purged prior to 12/27/2016. -view comment history- |
0 |
CML-5282 (031)
|
RIV | Citywide Palm Springs with provision for expansion into neighboring cities as a regional Traffic Management Center |
Interconnected Signal Timing |
|
Palm Springs |
Albert Vergel de Dios |
09/27/2018: Mail Received (Exhibit 17-F (electronic)) -view comment history- |
1 |
PLHDL06-5282 (032)
|
RIV | Agua Caliente Museum. Southeast corner of Tahquitz Canyon Way and Hermosa Drive in Palm Springs |
This project will provide planning and engineering of roadway, interpretive signage, drainage, vehicular parking areas, and appurtenant structures and facilities. |
|
Palm Springs |
Albert Vergel de Dios |
09/18/2018: Mail Received (Final Invoice #11R (Con) 1 original, 2 copies) -view comment history- |
2 |
HPP-5282 (033)
|
RIV | Southeast corner of Tahquitz Canyon Way and Hermosa Drive in Palm Springs. |
This project will provide planning and engineering for roadway and signage improvements at Agua Caliente Cultural Museum. |
|
Palm Springs |
Albert Vergel de Dios |
08/16/2018: Mail Received (Exhibit 3-O electronic) -view comment history- |
0 |
ESPLHPLU-5282 (034)
|
RIV | ON I-10 AT INDIAN CANYON AVE INTERCHANGE |
Roadway Widening(IC MODIFICATION) |
|
Palm Springs |
Albert Vergel de Dios |
03/30/2015: Mail Received (Final Report utilzation of DBE & As-builts on CD) -view comment history- |
0 |
HP21LN-5282 (035)
|
RIV | I-10/INDIAN CYN DR IC |
Roadway Widening(IC MODIFICATION) |
|
Palm Springs |
Albert Vergel de Dios |
03/13/2015: Mail Received (FROE, 1 original, 2 copies) -view comment history- |
0 |
SR2SL-5282 (036)
|
RIV | These projects are located at 35 locations along common routes to school. They will be placed at key locations near 4 elementary shools (Cielo Vista, Cahuilla, Katherine Finchy, and Vista del Monte) |
Installation of zebra-strip, crosswalks, signs, advanced stop bars, new sidewalks, raised crosswalks, crossing islands, countdown and audio signals, led rapid-flash beacons, curb ramps, and bike lanes. |
|
Palm Springs |
Albert Vergel de Dios |
03/07/2012: Mail Received (final invoice) -view comment history- |
0 |
CML-5282 (037)
|
RIV | In Coachella Valley in City of Palm Springs - Farrell Drive Right Turn Lane at Vista Chino. |
Construction of a separate right turn lane for northbound traffic at the intersection of Farrell Drive and Vista Chino, including relocation and upgrade of the traffic signal. |
|
Palm Springs |
Albert Vergel de Dios |
01/09/2017: DLAE re-signs Exhibit 17-A, Cover Letter and Final Report of Expenditures Checklist, and Exhibit 17-C, Final Inspections form. Original sign date is August 19, 2016. -view comment history- |
3 |
PLHL-5282 (038)
|
RIV | Belardo Road from Ramon Road to south Palm Canyon Drive and Mesquite Avenue from Belardo Road to Cahuilla Indian. |
Construct Belardo Bridge and Related Roadways. |
|
Palm Springs |
Enrique Gonzalez |
No comments |
0 |
SRTSL-5282 (039)
|
RIV | In the vicinity of Cahuilla ES, Cielo Vista ES, Katherine Finchy ES, Vista Del Monte ES, & Raymond Cree MS. |
construct pedestrian safety improvements and stripe bikelanes along school routes |
|
Palm Springs |
Albert Vergel de Dios |
07/12/2017: Mail Received (FROE, 1 original, 0 copy; Invoice #8 (final), 1 orginal, 1 copy.) -view comment history- |
2 |
BHLS-5282 (040)
|
RIV | Bridge No. 56C0287, Ramon Rd. over Whitewater River, 0.8 MI. E/O Gene Autry Tr. |
Bridge Rehabilitation |
|
Palm Springs |
Matthew Sapp |
02/24/2023: Mail Received (Progress Invoice No.22; Received 02/21/2023) -view comment history- |
9 |
BRLS-5282 (041)
|
RIV | E. Palm Canyon Drive over Palm Canyon Wash Br. no. 56C0409 |
Rehabilitate and widen existing 4-lane bridge from 52' to 64' curb to curb including two 5' shoulders and an 8' sidewalk (no additional lanes) |
|
Palm Springs |
Matthew Sapp |
02/24/2023: Mail Received (Progress Invoice No.19; Received 02/23/2023) -view comment history- |
15 |
BRLS-5282 (042)
|
RIV | S. Palm Canyon Drive over Tahquitz Creek Br. no. 56C0408 |
Replace 4-lane bridge with new 4-lane bridge. |
|
Palm Springs |
Enrique Gonzalez |
05/02/2023: Mail Received (RFA(CON&CE); Received 04/28/2023) -view comment history- |
24 |
STPLN-5282 (043)
|
RIV | Ramon Road from W. of Sunrise Way to E. of Compadre Rd. |
Pavement rehabilitation. |
|
Palm Springs |
Albert Vergel de Dios |
03/10/2017: Mail Received (Final invoice, 1 original, 0 copy.) -view comment history- |
1 |
CML-5282 (044)
|
RIV | Crossly Rd. from 34th Ave. to Ramon Rd; S. Palm Cyn Dr. from Murray yn. Dr. to Belardo Rd.; San Rafael Dr. from Indian Cyn. Dr. to Sunrise Wy.; Indian Cyn. Dr. from Racquet Club Dr. to Sunrise Pkwy.; & Via Escuela from unrise y. to Gene Autry Tr. |
Construct 9.8 miles Class II &Class III Bike Lanes. |
|
Palm Springs |
Albert Vergel de Dios |
06/13/2019: Mail Received (E-76:Request for Authorization (CON) - electronic submittal) -view comment history- |
1 |
CML-5282 (045)
|
RIV | N. Gene Autry Trail at Intersection of Gene Autry Trail and Vista Chino (Hwy 111). |
Construct second left turn lane (non-capacity increasing). |
|
Palm Springs |
Evan Vonranzow |
08/19/2020: Mail Received (Progress Invoice No. 4 Final; Electronic Submittal) -view comment history- |
10 |
HSIPL-5282 (046)
|
RIV | at 19 various locations throughout City of Palm Springs
scope reduction to 17 locations |
modify traffic signal and install advance dilemma zone detection.
HSIP7-08-015 |
|
Palm Springs |
Enrique Gonzalez |
02/24/2023: Mail Received (Progress Invoice No.17; Received 02/21/2023) -view comment history- |
2 |
HSIPLN-5282 (047)
|
RIV | 14 Intersections Citywide |
Modify traffic signal for improve visibility, install advanced dilemma zone detection, and add protected left-turn phasing.
H8-08-014 |
|
Palm Springs |
Enrique Gonzalez |
04/07/2023: Mail Received (Progress Invoice No.16; Received 04/04/2023) -view comment history- |
1 |
HSIPL-5282 (048)
|
RIV | Gene Autry Trail from Salvia Road to 1600’ south of Salvia Road |
Install flashing beacon and delineators
H8-08-015 |
|
Palm Springs |
Enrique Gonzalez |
02/24/2023: Mail Received (Progress Invoice No.15B; Received 02/21/2023) -view comment history- |
1 |
HSIPL-5282 (049)
|
RIV | Nine locations throughout the City of Palms Springs. |
Nine (9) signalized intersections throughout the City of Palm Springs. Install advanced dilemma zone detection, protected left turns and pedestrian countdown heads. Total Cost: $1,702,700 Programmed funds: $1,702,700 in total; $425,675 in FY 20/21; remainder in beyond |
|
Palm Springs |
Enrique Gonzalez |
03/16/2023: Mail Received (Progress Invoice No.7; Received 03/15/2023) -view comment history- |
0 |
LRSPL-5282 (050)
|
RIV | Throughout the city of Palm Springs |
Develop a Local Roadway Safety Plan |
|
Palm Springs |
Enrique Gonzalez |
09/10/2021: Mail Received (progress invoice 1; received on 9/9/2021.) -view comment history- |
0 |
LRSPL-5282 (052)
|
RIV | Project does not exist, created in error. Sean, 9/28/2021. |
Project does not exist. Sean, 9/28/2021. |
|
Palm Springs |
Sean Yeung |
No comments |
0 |
ER 40A0-5282 (054)
|
RIV | Gene Autry Trail at Whitewater Wash |
Removal of mud and debris covering the entire width of roadway for about 1/2 mile as part of Emergency Opening measures.
HWS-PSP-006-0
ER 40A0(054) |
|
Palm Springs |
Matthew Sapp |
07/19/2022: Mail Received (Link Only Final Invoice; Received 07/19/2022) -view comment history- |
0 |
ER40A0-5282 (055)
|
RIV | ER project, to be completed by staff. Sean 1/27/2021. |
to be completed by staff. Sean 1/27/2021. |
|
Palm Springs |
Sean Yeung |
06/24/2021: Submited RFA for EO CON to HQ -view comment history- |
0 |
ER 40A0-5282 (056)
|
RIV | Vista Chino at Whitewater Wash |
Removal of mud, sand and debris covering the entire width of roadway, for a larger portion of covered area as part of Emergency Opening measures.
HWS-PSP-013-0
ER 40A0(056) |
|
Palm Springs |
Matthew Sapp |
07/19/2022: Mail Received (Link Only Final Invoice; Received 07/19/2022) -view comment history- |
0 |
ER40A0-5282 (074)
|
RIV | ER project, to be completed by staff. Sean 1/27/2021. |
to be completed by staff. Sean 1/27/2021. |
|
Palm Springs |
Enrique Gonzalez |
07/22/2022: Mail Received (Approved FL & PSA; Received 07/22/2022) -view comment history- |
0 |
ER40A0-5282 (075)
|
RIV | ER project, to be completed by staff. Sean 1/27/2021. |
to be completed by staff. Sean 1/27/2021. |
|
Palm Springs |
Sean Yeung |
07/19/2022: Mail Received (Link Only Final Invoice; Received 07/19/2022) -view comment history- |
0 |
ER 40A0-5282 (076)
|
RIV | Farrell Drive at Tahquitz Creek Wash (TC/MCC Golf Course) |
Removal of mud, organic debris, pavement curb, gutter sidewalk, clean culverts under road (8 culverts) to allow 2-way travel within reduced roadway width by Emergency Opening measures. Repair pavement, curbe gutter, sidewalk on East and West sides of road, repair culverts under roadway and slope protection within City right of way.
HWS-PSP-005-1
ER 40A0(076) |
|
Palm Springs |
Enrique Gonzalez |
07/19/2022: Mail Received (Link Only Final Invoice; Received 07/19/2022) -view comment history- |
0 |
ER 40A0-5282 (077)
|
RIV | Golf Club Road at Tahquitz Creek Golf Course Crossing |
Removal of mud and debris, setup traffic control barricades and remove after repairs for Emergency Opening measures. Replacement and repair of pavement, median curb, culverts, and slope protection for a portion of roadway within City right-of-way.
HWS-PSP-007-1
ER 40A0(077) |
|
Palm Springs |
Matthew Sapp |
07/19/2022: Mail Received (Link Only Final Invoice; Received 07/19/2022) -view comment history- |
0 |
ER40A0-5282 (078)
|
RIV | ER project, to be completed by staff. Sean 1/27/2021. |
to be completed by staff. Sean 1/27/2021. |
|
Palm Springs |
Matthew Sapp |
07/19/2022: Mail Received (Link Only Final Invoice; Received 07/19/2022) -view comment history- |
0 |
BR-NBIL-5282 (502)
|
RIV | South Palm Canyon Drive at Arenas Canyon South Drainage Channel Low Water Crossing LW 00L0027 |
4-Lane Bridge over Low-Water |
|
Palm Springs |
Matthew Sapp |
02/24/2023: Mail Received (RFA (CON& CE); Received 02/16/2023) -view comment history- |
1 |
BR-NBIL-5282 (513)
|
RIV | Vista Chino at Whitewater River |
Replace 4-lane LWC with a new 4-lane bridge, 00L0052 |
|
Palm Springs |
Matthew Sapp |
02/24/2023: Mail Received (Progress Invoice No.24; Received 02/21/2023) -view comment history- |
6 |
BR-NBIL-5282 (521)
|
RIV | On Araby Drive from Anza Trail to Stagecoach Intersection LWC 00L0058 |
Replace the 2-lane low water crossing with a new 2-lane bridge |
|
Palm Springs |
Albert Vergel de Dios |
11/29/2012: Mail Received (Cancellation of City project letter (1 original)) -view comment history- |
0 |
BRNBIL-5282 (602)
|
RIV | VOID - DUPLICATE - REFER TO NBIL(502) syl to complete |
sly to complete |
|
Palm Springs |
Albert Vergel de Dios |
09/19/2016: Mail Received (Progress Invoice #14 (R/W) 1 original, 2 copies) -view comment history- |
1 |
STPL-5294 (003)
|
RIV | Tyler St From Avenue 52 to 0.18 Miles South of Avenue 50 |
Road way rehabilitation |
|
Coachella |
Albert Vergel de Dios |
03/10/2008: Mail Received (final voucher) -view comment history- |
0 |
STPL-5294 (004)
|
RIV | Dillon Road Between I-10 and SR-86 |
Roadway Widening to 4 Lanes with Median and Traffic Signals |
|
Coachella |
Albert Vergel de Dios |
04/10/2008: Mail Received (Award Package) -view comment history- |
0 |
CML-5294 (005)
|
RIV | Dillon Road /Avenue 48 Grade Separation |
Widen From 2 to 4 lanes |
|
Coachella |
Albert Vergel de Dios |
02/21/2017: 02/212017 Project archived in D8 Database, project file purged on 7/7/2015. -view comment history- |
0 |
HSIPL-5294 (006)
|
RIV | Various Locations Throughout the City |
Upgrade signals and signage |
|
Coachella |
Albert Vergel de Dios |
07/17/2015: Mail Received (Financial Statement Audit Request form the city of Coachella, 1 original, 0 copies) -view comment history- |
2 |
CML-5294 (007)
|
RIV | In the City of Coachella-Avenue 52 Grade Separation over Grapefruit Blvd/Hwy.111 from Shady Lane, approximately 2,000 LF W/O the railroad tracks along Avenue 52 to Industrial Way, approximately 900 L.F. E/O the railroad tracks. |
Construct a reinforced concrete bridge (approx. 340 L.F.) with a 4 lane (12' vehicular lanes) and a 2' shoulder adjacent to a 5' S/W on one side and a 6' shoulder on the opposite side. |
|
Coachella |
Albert Vergel de Dios |
10/31/2017: Mail Received (Expenditure Report) -view comment history- |
13 |
SR2SL-5294 (008)
|
RIV | Various locations throughout the City of Coachella |
Install zebra stripe crosswalks, signs, advanced stop/yield bars, bulbouts with double perpendicular curb ramps, tapered curb extensions, new sidewalks with curb and gutter, granite path, pavement markings, and countdown signals. |
|
Coachella |
Albert Vergel de Dios |
12/23/2013: Mail Received (Recieved Progress Invoice #4) -view comment history- |
0 |
SRTSL-5294 (009)
|
RIV | In the vicinity of Cesar Chavez Elementary School, Coral Mountain Academy, Palm View Elementary School, Peter Pendleton Elementary School, Valley View Elementary School, and Bobby Duke Middle School. |
Install zebra-stripe crosswalks, advanced stop-yield bar, signs, bulb-outs, crossing islands, tapered curb extensions, overhead crosswalk lighting, pedestrian-activated led flashing beacons, pedestrian countdown signal, and sidewalk. |
|
Coachella |
Albert Vergel de Dios |
05/15/2014: Mail Received (Received Progress invoice #4A (Final)) -view comment history- |
2 |
CML-5294 (010)
|
RIV | IN EASTERN RIVERSIDE COUNTY FOR THE CITY OF COACHELLA, Use Toll Credit |
INSTALL 8.2 MILES OF CLASS II BIKE LANES
ON CITY ARTERIALS TO FACILITATE RESIDENTIAL TO COMMERCIAL CONNECTIVITY |
|
Coachella |
Albert Vergel de Dios |
01/16/2020: Mail Received (FROE; 1 original, 0 copy.) -view comment history- |
3 |
HPLULN-5294 (011)
|
RIV | At SR86S/Avenue 50: Widen and Construct New 6 through lane IC from E/O Coachella Stormwater Channel Bridge to E/O Tyler St |
Improvements Include: Extended Ramp Acceleration/Deceleration Lanes, Relocate/Realign Ave 50 and Tyler St, Bike Lanes, Sidewalks, and Reconstruct Traffic Signals (SAFETEA LU 1702, CA583, #2543) (EA: 0C970) |
|
Coachella |
Enrique Gonzalez |
11/10/2022: Mail Received (Progress Invoice No.14; Received 11/8/2022) -view comment history- |
0 |
SRTSL-5294 (012)
|
RIV | Various locations throughout the City of Coachella:
Coral Mountain Academy, Palm View ES, Peter Pendleton ES, Valley View ES, Bobby Duke MS, Cesar Chavez ES |
Install zebra-stripe crosswalks, advanced stop-yield bar, signs, bulb-outs, crossing islands, tapered curb extensions, overhead crosswalk lighting, pedestrianactivated flashing beacons, pedestrian countdown signal, and sidewalk |
|
Coachella |
Albert Vergel de Dios |
01/16/2020: Mail Received (FROE; 1 original, 0 copy.) -view comment history- |
2 |
STPL-5294 (013)
|
RIV | PLEASE DO NOT LOG ANYTHING WITHOUT CONSULTING WITH EVITA - Thank you.
Grapefruit Blvd. between 3rd Street to 9th Street |
Pavement Rehabilitation/Reconstruction |
|
Coachella |
Evita Premdas |
11/19/2014: Mail Received (PES, 6 copies, 0 original, sent to Environmental) -view comment history- |
3 |
STPL-5294 (014)
|
RIV | In The City Of Coachella - On Avenue 48 From Jackson Rd To Van Buren St |
Road Rehabilitation |
|
Coachella |
Kayali Nazek |
01/08/2021: FROE and Final Invoice No. 6 sent to LPA -view comment history- |
17 |
ATPL-5294 (015)
|
RIV | In Eastern Riverside County for the City of Coachella - ATP Improvements Cycle 1 along Ave 50 & Ave 52 From Western City Limits to CV Link. |
Class II Bike Lanes & Class III Bikeways, Bike Path, Ped Xing,
Sidewalks & Landscape |
|
Coachella |
Kayali Nazek |
04/21/2021: Sent an email to LPA to follow up on the status of the FROE -view comment history- |
9 |
SR2S-5294 (016)
|
RIV | Valle del Sol ES, Cesar Chavez ES, Bobby Duke MS, Valley View ES, Coral Mountain Academy
|
Safe Route to Schools: Construct raised crosswalks, sidewalks, curb ramps, and bulb-outs; install crosswalks, safety lighting, bike lanes, signs and markings; safety education, encouragement, enforcement and evaluation program. |
|
Coachella |
Albert Vergel de Dios |
05/22/2018: Mail Received (Final Invoice revised, NOC, Award) -view comment history- |
0 |
STPLN-5294 (017)
|
RIV | Grapefruit Blvd. from Harrison St to Leoco Ln - NEW LIMITS |
Grapefruit Blvd. Pavement Rehabilitation/Reconstruction |
|
Coachella |
Albert Vergel de Dios |
10/20/2017: Mail Received (federalReport of expenditure) -view comment history- |
4 |
STPL-5294 (018)
|
RIV | Dillon Road Bridge over Coachella Stormwater Channel |
Widen Road and Bridge for Dillon Road over Coachella Stormwater Channel |
|
Coachella |
Matthew Sapp |
11/21/2022: Mail Received (AQCA, Received 11/18/2022) -view comment history- |
0 |
LRSPL-5294 (019)
|
RIV | City Wide |
Local Roadway Safety Plan |
|
Coachella |
Enrique Gonzalez |
10/21/2022: Mail Received (Approved FL & PSA & Master Agreement; Received 10/20/2022) -view comment history- |
0 |
BR-NBIL-5294 (536)
|
RIV | Avenue 50 over Coachella Stormwater Channel Br. no. 00L0055 |
New Bridge - Low Water Crossing
HBP funded for $2,701,500 PE FFY 12/13, $2,000,000 ROW Beyond and $25,214,000 CON Beyond at 88.53% maximum reim rate.
Functional Class Urban Principal Arterial on NHS.
CRS map 17W14, D8, 03/27/13. |
|
Coachella |
Matthew Sapp |
05/03/2023: Mail Received (Progress Invoice No.12; Received 05/03/2023) -view comment history- |
9 |
STPL-5298 (001)
|
SBd | Engineer to update |
Engineer to update |
|
Barstow |
Nivine K. Georges |
No comments |
0 |
STPLZ-5298 (005)
|
SBd | IN THE CITY OF BARSTOW AT VARIOUS BRIDGE LOCATIONS, BRD. #'S 54C-583 & 582. |
SEISMIC RETROFIT |
|
Barstow |
Pamela Wells |
03/23/2018: Mail Received (AQ Checklist (electronic copy)) -view comment history- |
0 |
FTACML-5298 (011)
|
SBd | City of Barstow |
Alternative fuels paratransit van |
|
Barstow |
Danette Silva |
No comments |
0 |
FTACML-5298 (014)
|
SBd | City of Barstow |
purchase 4 repalcement busses ca-18-x018 |
|
Barstow |
Danette Silva |
No comments |
0 |
HP21L-5298 (015)
|
SBd | IN THE CITY OF BARSTOW ON 1-15 @ SR 58 INTERCHANGE PM 76.8 |
reconstruct interchange |
|
Barstow |
Ramiro Martinez |
No comments |
0 |
HP21L-5298 (016)
|
SBd | Fort Irwin Road from I-15 to the Fort Irwin National Training Center boundary |
Road rehabilitation |
|
San Bernardino County 0071 |
Ramiro Martinez |
No comments |
0 |
CML-5298 (017)
|
SBd | 100 Sandstone Court at the northwest corner of West Main Street and Sandstone Court |
Install CNG/LNG refueling station |
|
Barstow |
Pamela Wells |
07/07/2005: Mail Received (Finance Letter) -view comment history- |
0 |
STPL-5298 (019)
|
SBd | Lenwood Road from Commerce Parkway to approximately 0.75 miles west |
Road reconstruction |
|
Barstow |
Nivine K. Georges |
No comments |
0 |
DARCML-5298 (020)
|
SBd | Intersection of North First Avenue and Irwin Road |
Road realignment |
|
Barstow |
Nivine K. Georges |
06/24/2005: Mail Received (City of Barstow-Finance Letter.) -view comment history- |
0 |
STPLER-5298 (021)
|
SBd | I-15 at Lenwood Road interchange |
Landscaping |
|
Barstow |
Pamela Wells |
03/24/2015: E-mailed and reminded City need to close the project. All funds had been expended as of 11/17/201. Project needs to be closed. Reminded Barstow projects needs to be closed out six (6) months after completion. Request to submit loseout... -view comment history- |
0 |
FTACML-5298 (022)
|
SBd | City of Barstow - FTA Grant CA-18-X020 |
Bus Purchase |
|
Barstow |
Ramiro Martinez |
No comments |
0 |
FTACML-5298 (023)
|
SBd | City of Barstow - FTA Grant CA-18-X020 |
Bus Purchase |
|
Barstow |
Ramiro Martinez |
No comments |
0 |
FTACML-5298 (024)
|
SBd | City of Barstow - FTA Grant CA-18-X021 |
Bus and van purchases |
|
Barstow |
Ramiro Martinez |
No comments |
0 |
HSIPL-5298 (028)
|
SBd | City of Barstow. Main St and Barstow Road including intersections of Main St at Ave. L, Ave H, Ave A, 1st Ave, 2nd Ave, Barstow Rd. 7th Ave, Muriel Dr., Yucca Ave, Mountain View. Cool water Lane and Barstow Rd at Mountain View and Virginia Way. |
Various signalized intersections improvements. Upgrade traffic signals. Install pedestrian countdown.
HSIP ID no. HSIP6-08-003. Cycle 6. Release date 11/14/2013. |
|
Barstow |
Esayas Hagos |
04/07/2023: Mail Received (Progress Invoice No.C2; Received 03/30/2023) -view comment history- |
3 |
BRLS-5298 (030)
|
SBd | In Barstow, North First Avenue bridge over BNSF Railway and UPRR Amtrak, 0.2 mile north of Main Street (Br. No. 54C-0088). |
Replace existing 2 lane bridge with 2 lane
bridge, existing bridge to be removed (Minor seismic retrofit funds). High Cost Project agreement required. |
|
Barstow |
Esayas Hagos |
04/07/2023: Mail Received (Progress Invoice No.4; Received 03/30/2023) -view comment history- |
22 |
BRLS-5298 (031)
|
SBd | In Barstow, North First Avenue bridge over the Mojave River, 1.4 mile north of Route 15 (Br. No. 54C0089). |
Replace existing 2 lane bridge with 2 lane bridge,
existing bridge to be removed. (minor seismic retrofit funds), High Cost Project agreement required. |
|
Barstow |
Esayas Hagos |
07/29/2022: Mail Received (HBP Advisory Committee Response; Received 07/28/2022) -view comment history- |
10 |
ATPLNI-5298 (032)
|
SBd | Within City of Barstow |
PPNO 1148 ID 0541; FTIP ID - ATPSCAG_RP2; RTIP ID- REG705. MPO Component. SCAG approval letter 11/18/2014.
City of Barstow's Active Transportation Plan. State Only Funding. FFY 2014/2015. CON phase.
Develop a plan in a Disadvantage Community for Bicycle, Safe Routes to School, Pedestrian and Active Transportation Plan. |
|
Barstow |
Pamela Wells |
03/22/2023: Mail Received (Progress Invoice No.27; Received 03/21/2023) -view comment history- |
0 |
HSIPLN-5298 (033)
|
SBd | SR-247(Barstow Rd) and E. Rimrock Rd |
Install protected left turn phase for all directions (8-phase signal).
Project located at SR-247(Barstow Rd) and E. Rimrock Rd. Install protected left turn phase for all directions (8-phase signal).
Project No. 150, HSIP6-08-004, B/C 3.3. Total Project cost $200,000. Federal funds $180,000. LS30, reimbursement ratio at 90%. CTIPS ID 20970001052. CRS Map 15T25. |
|
Barstow |
Esayas Hagos |
01/19/2023: Mail Received (Approved FL; Received 01/17/2023) -view comment history- |
3 |
BRLS-5298 (034)
|
SBd | Yucca Street Bridge (Br. No. 54C0583) over BNSF RY, AMTRAK, and UPRR, 0.3 mile north of Main Street |
Seismic Retrofit |
|
Barstow |
Karen Nguyen |
11/19/2020: Mail Received (Final Invoice 5 and PE FROE; Electronic Submittal) -view comment history- |
0 |
LRSPL-5298 (035)
|
SBd | Throughout the City of Barstow |
Local Road Safety Plan (LRSP) |
|
Barstow |
Esayas Hagos |
08/18/2022: Mail Received (Progress Invoice No.1; Received 08/17/2022) -view comment history- |
0 |
TBD-5307 (000)
|
SBd | CITRUS Ave on Interstate 10 between Cherry and Sierra Avenue.. |
Reconstruct Citrus Ave IC..Interchange Improvement |
|
Fontana |
Eric Tang |
No comments |
0 |
HP21STPL-5307 (005)
|
SBd | IN SAN BERNARDINO COUNTY, IN FONTANA ON I-10 FROM 0.2 MILE EAST OF SIERRA AVENUE O/C |
Road Reconstruction |
|
Fontana |
Jenny Chan |
07/09/2015: Project was closed and final vouchered per FMIS 12/10/2015 -view comment history- |
0 |
STPLHSR-5307 (006)
|
SBd | Various streets surrounding Citrus Elementary School |
Sidewalks |
|
Fontana |
Ramiro Martinez |
No comments |
0 |
STPL-5307 (007)
|
SBd | Baseline Avenue from Beech Avenue to the Easterly City Limits at Maple Avenue; Sierra Avenue from Baseline Avenue to Highland Avenue |
Roadway widening to six lanes |
|
Fontana |
Ramiro Martinez |
No comments |
0 |
STPL-5307 (008)
|
SBd | Foothill Boulevard (SR 66) from the Westerly City Limits at East Avenue to Hemlock Avenue |
Roadway widening to six lanes |
|
Fontana |
Ramiro Martinez |
No comments |
0 |
STPL-5307 (009)
|
SBd | Intersection of Jurupa Avenue and Mulberry Avenue |
Pavement widening and new signals |
|
Fontana |
Ramiro Martinez |
No comments |
0 |
SR2SL-5307 (010)
|
SBd | Cypress Avenue from Miller Ave. to Walnut St. and Oleander Avenue from Baseline Ave. to Walnut St. |
Sidewalk |
|
Fontana |
Ramiro Martinez |
No comments |
0 |
CML-5307 (011)
|
SBd | Sierra Avenue from Jurupa Avenue to Summit Avenue |
Advanced Traffic Management Information System (ATMIS) |
|
Fontana |
Ayda Homsi |
06/04/2008: Mail Received (final voucher) -view comment history- |
0 |
DEMO03L-5307 (012)
|
SBd | Cypress Avenue From valley Blvd. To Slover Avenue |
Cypress: Construct New Four Lanes Bridge Overcrossing Over I-10 with Traffic Signals & Safety Lighting |
|
Fontana |
Jenny Chan |
04/13/2010: Mail Received (Invoice ) -view comment history- |
0 |
RPSTPLE-5307 (013)
|
SBd | Inland Pacific Electric Trail on Old AP Abandoned RR between I-15 to Juniper Ave. |
Construct Class 1 Bike Trail Approx 7 miles long |
|
Fontana |
Jenny Chan |
12/13/2011: 12/13/2011 Final Voucher and Closed -view comment history- |
0 |
HES-5307 (014)
|
SBd | CITRUS AVE. BETWEEN ARROW BLVD. AND MERRILL AVE. |
Citrus Ave.RAISED MEDIAN ISLAND. |
|
Fontana |
Jenny Chan |
02/21/2017: 02/212017 Project archived in D8 Database, project file purged on 7/7/2015. -view comment history- |
0 |
SRTSL-5307 (015)
|
SBd | Intersection of Alder Ave. and Wabash Ave. |
Install a school pedestrian crossing traffic signal for Alder Middle school within the city of Fontana (Infra) |
|
Fontana |
Jenny Chan |
10/25/2012: Final Vouchered -view comment history- |
0 |
HSIPL-5307 (016)
|
SBd | Sierra Ave. from Valley Blvd. to San Bernardino Ave |
Widen roadway to the East and raised concrete median |
|
Fontana |
Albert Vergel de Dios |
05/15/2013: Mail Received (Final Voucher (1 copy)) -view comment history- |
1 |
DEM03L-5307 (017)
|
SBd | Cypress Ave. overcrossing |
See 5307(012) |
|
Fontana |
Jenny Chan |
04/13/2010: Mail Received (Progress Invoice) -view comment history- |
0 |
ESPLE-5307 (018)
|
SBd | LocationPacific Electric Railway-Segment 5b in the city of Fontana |
Construction of Seg 5b of the PE trail along the old RR alignment from city limits to Baseline Ave.
This project is part of the Lump Sum project ID 20081104 programmed in 2008 FTIP Amendment 15. Total est. project cost $1,483,500, $300,000 ARRA TE |
|
Fontana |
Armand Rubio |
03/25/2013: Mail Received (Final Voucher (1 copy)) -view comment history- |
0 |
RPSTPLE-5307 (019)
|
SBd | PE trail along the old RR alignment from Cherry Ave to Almeria Ave. |
Pacific Electric Trail seg. 3B & 4. complete the seg. & landscaping (inc landscaping for 3A) |
|
Fontana |
Jenny Chan |
08/06/2013: Mail Received (Final Voucher) -view comment history- |
0 |
HSIPL-5307 (020)
|
SBd | Foothill Blvd. between Sierra Ave. and Mango Ave. |
Construct raised median; resurface existing pavement; construct curb, gutter, sidewalk, commercial driveways and curb ramps; modify traffic signal; install traffic signs, stripes and pavement markings. |
|
Fontana |
Jenny Chan |
02/10/2016: Mail Received (Progress Invoice #4 (PE) 1 original, 2 copies) -view comment history- |
1 |
HSIPL-5307 (021)
|
SBd | Foothill Blvd. from Oleander Ave. to approximately 600' E of Cypress Ave. |
HSIP5-08-004; Install signals, signs, striping, reserface pavement, raised medians, sidewalks, curbs and gutters; : HSIP Lump Sum SCAG015; $900,000 Federal Funds: PE, CONS, RW |
|
Fontana |
Eduardo Moreno-Castaneda |
04/15/2022: Mail Received (progress invoice 5A; received on 4/13/2022.) -view comment history- |
17 |
SR2S-5307 (022)
|
SBd | Randall Ave and Palmetto Ave |
Install Signals, safety Education
SR2S10-08, Traffic Signal ans safety education. $254,200 of State funds for PE, Const, RW
Use Advantqge ID 0814000033 |
|
Fontana |
Jenny Chan |
01/13/2017: Document received by email, not US Mail. DLAE signs Exhibit 17-M, Final Project Expenditure Report, and Exhibit 17-C, Final Inspection Form. -view comment history- |
0 |
HSIPL-5307 (023)
|
SBd | Randall Avenue/Juiper Avenue |
Install Traffic Signal |
|
Fontana |
Enrique Gonzalez |
09/18/2018: Mail Received (Final invoice (PE) 1 original, 2 copies) -view comment history- |
5 |
ATPL-5307 (024)
|
SBd | Fontana Ave from Randall Avenue to Poplar Avenue and Arrow Blvd from Alder Avenue to Maple Avenue
SRTS Active Transportation-Bon View, Corona, Euclid and Vineyard Elementary Schools.
Advantage ID: 0815000174
Cycle 1
CTC ID 0547 |
Advantage ID 0815000174; Cycle 1 ATP MPO component on11/12/14. CTC ATP ID 0547 - cng 6/9/2015
Install 2.2 mile sidewalk and bicycle infrastructure including 1.25 miles of feet wide sidewalk, Class II bicylce lanes, 2.2 miles curb and gutter reconstructing ADA compliant driveways, installing 25 ADA curb ramps and 1.25 miles of signage and pavement srtiping.
|
|
Fontana |
Esayas Hagos |
09/18/2019: Mail Received (invoice 6 (final); 1 original, 2 copies.) -view comment history- |
5 |
HSIPL-5307 (025)
|
SBd | Ten signalized intersections along Sierra Avenue from Valley Boulevard to Arrow Boulevard |
Implementing adaptive traffic management system (ATMS) along ten (10) signalized intersection arterial |
|
Fontana |
Esayas Hagos |
04/20/2020: FROE Package submitted to LPA -view comment history- |
3 |
SSARP-5307 (026)
|
SBd | |
Fontana |
Esayas Hagos |
02/03/2020: Close out package with invoice (Final) 3 sent to LPA. -view comment history- |
0 |
ATPL-5307 (027)
|
SBd | ADA-compliant sidewalks on 4 segments of city streets, curb and gutter, ADA curb ramps, bike lanes, striping and signs. Safe Moves, ATP edu |
Safe Routes to School |
|
Fontana |
Eduardo Moreno-Castaneda |
04/14/2023: Mail Received (Allocation Letter(CON); Received 04/10/2023) -view comment history- |
1 |
FERPL16-5307 (028)
|
SBd | Various Locations |
Install fiber optic cable to bring back video and communications to the transportation management center |
|
Fontana |
Aaron Duque |
07/26/2021: Mail Received (FROE; received on 7/21/2021.) -view comment history- |
1 |
ATP-5307 (029)
|
SBd | Fontana, San Bernardino County: Multiple roadways bordered by San Bernardino Avenue, Catawba Avenue, Valley Boulevard, and Juniper Avenue. |
Install missing sidewalk segments, accessible ramps, high-visibility crosswalks, lighting, Class II & III bikeways, and striping/signage near three public schools. |
|
Fontana |
Eduardo Moreno-Castaneda |
05/02/2023: Mail Received (Progress Invoice No.4; Received 04/18/2023) -view comment history- |
0 |
LRSP-5307 (030)
|
SBd | City of Fontana |
Study. Align CA &Fed. Highway Safety Plan; include the recent data, analytics & potential countermeasures. |
|
Fontana |
Eduardo Moreno-Castaneda |
02/13/2023: Progress Invoice No. 4 review comments sent to agency. -view comment history- |
0 |
STPL-5307 (031)
|
SBd | On Foothill Boulevard from Hemlock Avenue to Almeria Avenue |
The project consists of widening the segment of Foothill Boulevard between Hemlock Avenue on the west and Almeria Avenue on the east to six lanes plus sidewalks and buffered bicycle lanes. The Malaga Bridge over Foothill Boulevard – which historically carried a Pacific Electric (PE) interurban railway line and now is a pedestrian and bicycle bridge – may be relocated within the project limits. Malaga Bridge would be replaced over the widened Foothill Boulevard by a new single-span steel truss bridge to accommodate the six-lane facility. |
|
Fontana |
Aaron Duque |
08/30/2021: Mail Received (PES; received on 8/30/2021.) -view comment history- |
0 |
ATPSB1L-5307 (032)
|
SBd | Fontana Avenue, between Athol Street and Merril Ave/Oleander Ave within the City of Fontana |
Install missing sidewalk segments, ADA compliant curb ramps, high-visibility crosswalks, and Class II bikeways within the vicinity of four (4) public schools. (INFRASTRUCTURE COMPONENT) PPNO 1284A |
|
Fontana |
Eduardo Moreno-Castaneda |
03/16/2023: Mail Received (Approved FL & Allocation Letter; Received 03/15/2023) -view comment history- |
0 |
ATPSB1L-5307 (033)
|
SBd | Fontana Avenue, between Athol Street and Merril Ave/Oleander Ave within the City of Fontana |
Install missing sidewalk segments, ADA compliant curb ramps, high-visibility crosswalks, and Class II bikeways within the vicinity of four (4) public schools. (NON-INFRASTRUCTURE COMPONENT)
PPNO 1284B |
|
Fontana |
Eduardo Moreno-Castaneda |
No comments |
0 |
STPLE-5326 (003)
|
SBd | IN THE CITY OF MONTCLAIR ON I-10 AT THE WESTERN GATEWAY: MILLS AVE TO THE SAN ANTONIO FLOOD CONTROL CHANNEL |
PUBLIC ART,LANDSCAPING & RETAINING WALLS |
|
Montclair |
Ayda Homsi |
09/08/2014: PPM Management Team,
... -view comment history- |
0 |
CML-5326 (006)
|
SBd | Ramona Avenue from Brooks Street to 0.16 miles south of State Street |
Ramona Ave. Grade Separation |
|
Montclair |
Sean Yeung |
02/21/2017: 02/212017 Project archived in D8 Database, project file purged on 7/7/2015. -view comment history- |
0 |
TCRP01-5326 (007)
|
SBd | Alameda Corridor East on the Union Pacific Railroad (Alhambra Line) at Monte Vista Avenue |
Construct grade separation |
|
Montclair |
Pamela Wells |
04/13/2010: Mail Received (invoice) -view comment history- |
0 |
TCRP01-5326 (008)
|
SBd | Alameda Corridor East on the Union Pacific Railroad (Alhambra Line) at Ramona Avenue |
Construct grade separation |
|
Montclair |
Pamela Wells |
No comments |
0 |
CMLG-5326 (009)
|
SBd | Monte Vista Avenue, Moreno Street, and Arrow Highway |
North Montclair Signal Interconnect & Synchronization |
|
Montclair |
Sean Yeung |
02/21/2017: 02/212017 Project archived in D8 Database, project file purged on 7/7/2015. -view comment history- |
0 |
PSPL-5326 (010)
|
SBd | Neighborhood bordered by Benito St. north, Kingsley St. south, Central Ave. west, and Benson Ave. east |
Sidewalks |
|
Montclair |
Eric Tang |
No comments |
0 |
SR2SL-5326 (011)
|
SBd | Neighborhood bordered by Benito St. north, Kingsley St. south, Central Ave. west, and Benson Ave. east |
Sidewalks |
|
Montclair |
Pamela Wells |
No comments |
0 |
HP21L-5326 (012)
|
SBd | Mission Boulevard from the LA county line to Benson Ave. |
Pavement Rehab & Curb and gutter; Landscape |
|
Montclair |
Harish Rastogi |
02/21/2017: 02/212017 Project archived in D8 Database, project file purged on 7/7/2015.
-view comment history- |
0 |
ESPLE-5326 (013)
|
SBd | Mission Blv corridor improvements (Mission Blvd. from Ada Ave. to Benson Ave.-phase 8) |
Mission Blv corridor improvements (AARA) |
|
Montclair |
Sean Yeung |
04/20/2016: Mail Received (Final Voucher 10/14/2011) -view comment history- |
0 |
SLPPCL13-5326 (014)
|
SBd | Monte Vista Avenue Widening |
Expand Monte Vista Avenue from three to four lane. Work includes utility relocations, clearing and grubbing, grading, construction of new sewer laterals, fencing, curb, gutter and sidewalk, street lighting, concrete asphalt pavement and traffic striping. |
|
Montclair |
Pamela Wells |
02/17/2015: Forward request from Sharon to City of Montclair - FDR completion -view comment history- |
1 |
RPSTPLE-5326 (015)
|
SBd | Mission Blv phase 9 Improvement from Los Angeles County Line to 1400 feet easterly limit |
Landscaping, improved lighting and sidewalk construction |
|
Montclair |
Sean Yeung |
02/21/2017: 02/212017 Project archived in D8 Database, project file purged on 7/7/2015. -view comment history- |
0 |
PNRSHPL-5326 (016)
|
SBd | Monte Vista Ave. @ Union Pacific Rail Road
Monte Vista Ave. @ Union Pacific Rail Road
Monte Vista Ave from Mission Blvd to 300ft North of Brooks St.
|
Construct a railroad grade separation at the Union Pacific Railroad crossing/State Street |
|
Montclair |
Vu Ngo |
08/08/2017: Mail Received (Progress invoice N/A, 2 copies, 1 original.) -view comment history- |
13 |
HSIP-5326 (017)
|
SBd | Intersection of Central Ave. at San Bernardino Street |
Upgrade Traffic Signals and Install Protected Left Turn Phasing
Advantage ID 0814000241 |
|
Montclair |
Sean Yeung |
11/04/2016: Mail Received (HQ to Dist. 8, Finance Ltr, 1 copy) -view comment history- |
1 |
BRLS-5326 (018)
|
SBd | Central Avenue OH (Br. No. 54C0112) over UPRR, Amtrak, Metrolink, 0.2 mile south of Holt Boulevard. |
Rehabilitate existing four lane bridge with six lane bridge with sidewalks. |
|
Montclair |
Karen Nguyen |
10/04/2022: Mail Received (Progress Invoice No.16; Received 10/3/2022) -view comment history- |
1 |
SSARPL-5326 (019)
|
SBd | Throughout the City of Montclair. |
Systematic evaluation of citywide crash data to determine appropriate countermeasures |
|
Montclair |
Omar Sanchez |
06/19/2020: Processed Final Invoice and sent to LPA. -view comment history- |
0 |
SSARPL-5326 (020)
|
SBd | Various Rd through out the city |
The proposed SSAR for the City of Montclair will be a proactive review of citywide crashes with a goal
of determining the high‐risk roadway characteristics that could be root causes of severe injury and
fatal crashes in the City’s roadway network. The 5.5‐square mile City of Montclair is situated in the
heart of Pomona Valley 18 miles northwest of the City of Riverside. Interstate 10 in the northern
part of the City provides primary access to the City’s regional shopping district and connection to the
regional freeway system. |
|
Montclair |
Pamela Wells |
09/30/2020: This project entry needs to be deleted and the FPN can be reused.
Omar Sanchez rotating into a new work assignment. -view comment history- |
0 |
LRSPL-5326 (022)
|
SBd | Local Roads Safety Plan (LRSP) |
Throughout the City of Montclair. |
|
Montclair |
Pamela Wells |
11/17/2022: Mail Received (Progress Invoice No.1R; Received 11/16/2022) -view comment history- |
0 |
HSIPSL-5326 (023)
|
SBd | The intersection of Ramona and Howard Street. |
Construct roundabout and refuge island; high visibility; ADA compliant curb ramps; and add/ upgrade lighting. |
|
Montclair |
Pamela Wells |
10/13/2021: Mail Received (approved MA, PSA & FL; received on 10/11/2021.) -view comment history- |
0 |
ER-5380 (001)
|
SBd | La Mesa Road in Victorville |
Restore existing road damaged by Jan 2010 storm disaster |
|
Victorville |
Harish Rastogi |
08/07/2014: Mail Received (Received 1st and Final) -view comment history- |
0 |
HSIPL-5380 (003)
|
SBd | Intersection of Nisquali Rd. and First Ave. |
Installation of new traffic signal |
|
Victorville |
Harish Rastogi |
No comments |
0 |
CML-5380 (004)
|
SBd | IN THE CITY OF VICTORVILLE AT THE VICTORVILLE TRANS CENTER BETWEEN "D" ST & ATSF RR AND BETWEEN 4TH ST & 6TH ST. |
CONSTRUCT TRANSIT CENTER FACILITY |
|
Victorville |
Ayda Homsi |
06/30/2006: Mail Received (Report of Completion of Right of Way Expenditures) -view comment history- |
0 |
STPLZ-5380 (007)
|
SBd | IN THE CITY OF VICTORVILLE AT VARIOUS BRIDGE LOCATIONS, BRD. #'S 54C-086 & 068. |
SEISMIC RETROFIT |
|
Victorville |
Eric Tang |
No comments |
0 |
DEMO4L-5380 (010)
|
SBd | I-15/La Mesa Rd & Nisquali Rd IC |
La Mesa & Nisquali; Construct IC |
|
Victorville |
Harish Rastogi |
03/20/2015: Mail Received (Invoice Checklist, 3 copies, 0 originald) -view comment history- |
0 |
STPLER-5380 (013)
|
SBd | Riverwalk Trail in Mojave Narrows Regional Park |
Riverwalk;Pedestrian and Bike Paths |
|
Victorville |
Eduardo Moreno-Castaneda |
07/22/2022: Mail Received (FROE; Received 07/21/2022) -view comment history- |
14 |
CML-5380 (014)
|
SBd | City Corporation Yard at 14177 McArt Road |
Install CNG refueling station |
|
Victorville |
Ayda Homsi |
No comments |
0 |
STPL-5380 (015)
|
SBd | Bear Valley Road from I-15 to Kiowa Road in Apple Valley |
Road reconstruction and traffic signal upgrades |
|
Victorville |
Ayda Homsi |
11/10/2005: Mail Received (Bear Valley Rd Enchancement Project I-15 to Kiowa Rd) -view comment history- |
0 |
CML-5380 (016)
|
SBd | Intersection of Amargosa Road, Bear Valley Road, and I-15 |
Expand park and ride lot |
|
Victorville |
Marcos Amancio |
08/22/2007: Mail Received (Request for Environmental re-evaluation) -view comment history- |
0 |
CML-5380 (017)
|
SBd | Intersection of Bear Valley Road and Fish Hatchery Road at Victor Valley College |
Park and ride lot VVCollege |
|
Victorville |
Harish Rastogi |
04/28/2010: Mail Received (3 copies of Air Quality Conformity Analysis) -view comment history- |
0 |
CML-5380 (018)
|
SBd | Various locations - street sweepers |
CNG Street Sweepers |
|
Victorville |
Ayda Homsi |
No comments |
0 |
HP21LN-5380 (020)
|
SBd | I-15/SR 18 interchange and new East-West High Desert corridor |
Corridor Study for new alignment> |
|
Victorville |
Harish Rastogi |
10/09/2013: NOT requesting for CWA Cycle 11 extension for 08/09 federal funds lapsing 06-30-2014. -view comment history- |
0 |
SB99-5380 (021)
|
SBd | PACOIMA RD: BEAR VALLEY RD TO LA MESA RD |
Delete; REHABILITATE PAVEMENT |
|
Victorville |
Steven Jaimes |
06/27/2007: Mail Received (STPLH 5380-021 Intersection of Bear Valley Rd and Topaz Rd) -view comment history- |
0 |
5380-5380 (021)
|
SBd | Bear Valley & Topaz |
Traffic Signal Installation (BVR sig)=
Install a new signal and safety lighting at the currently un-signalized intersection of Bear Valley & Topaz |
|
Victorville |
Harish Rastogi |
04/25/2017: Mail Received (Progress invoice 1, 2 copies, 1 original.) -view comment history- |
0 |
HPLUL-5380 (022)
|
SBd | I-15/La Mesa Rd/Nisqualli Rd. |
Construct a new interchange. |
|
Victorville |
Harish Rastogi |
06/19/2014: E-76 Seq 2 for Cost Adjustment/Lump Sum distribution submitted HQ -view comment history- |
0 |
CML-5380 (023)
|
SBd | On Bear Valley Road and Fish Hatcherry Road-Signal-Will be Tying Into Other Signals on Bear Valley (Part of Victor Valley College Park and Ride Project). |
On Bear Valley Road and Fish Hatcherry Road-Signal-Will be Tying Into Other Signals on Bear Valley (Part of Victor Valley College Park and Ride Project). |
|
Victorville |
Harish Rastogi |
06/30/2008: Mail Received (PES Submittal) -view comment history- |
0 |
CML-5380 (024)
|
SBd | Southeast corner of Amargosa Rd. and Bear Valley Rd. Intersection of Amargosa Road, Bear Valley Road and I-15. |
Park and Ride Expansion |
|
Victorville |
Harish Rastogi |
02/21/2017: 02/212017 Project archived in D8 Database, project file purged on 7/7/2015.
-view comment history- |
0 |
DPIL-5380 (025)
|
SBd | La Mesa/Nisquali Interchange |
CONSTRUCT BRIDGE |
|
Victorville |
Harish Rastogi |
05/25/2017: Mail Received (Progress invoice 7, 2 copies, 1 original.) -view comment history- |
0 |
DPSLN-5380 (025)
|
SBd | I-15 at La Mesa Road / Nisqualli Road |
Construct a new interchange.
DEMO ID# CA054. This ISTEA DEMO project is related to SAFETEA-LU DEMO project HPLUL-5380(022) and DEMO4L-5380(010), EA0A4508L using H170 Sec. 115 DEMO funds awarded under DEMO ID #230. Use EA 08-0A4508L2 for this project No. Cooperative Agreement #8-1323 A-2 must be amended to include additional Local Assistance funding for Right of Way. State-only funds for right of way in the amount of 11.53M were allocated by the CTC at its 1/10/08 meeting under EA 08-0A4501 and PPNO #0172T. This project is FHWA-authorized. Use 3620 ISTEA DEMO funds at a maximum reimbursement ratio of 80% up to $4,822,886. |
|
Victorville |
Harish Rastogi |
05/07/2014: Mail Received (Final R/W Invoice) -view comment history- |
0 |
BHLS-5380 (026)
|
SBd | Bear Valley Road over BNSF Railway, Amtrak & UP RR, 3.8 miles East of I-15, Bridge No. 54C0547 |
Bridge Rehabilitation |
|
Victorville |
Noor Nasla |
03/28/2023: Progress Invoice No. 14B sent to CLPA. -view comment history- |
0 |
CMAQ-5380 (027)
|
SBd | At the intersection of La Mesa Road/Delgado: La Mesa/El Evado: La Mesa/Pacoima |
Install three traffic signals along La Mesa Road |
|
Victorville |
Harish Rastogi |
04/09/2018: Mail Received (PES, 6 copies) -view comment history- |
1 |
DEM05UBL-5380 (028)
|
SBd | Green Tree Boulevard from Hesperia Road to Ridgecrest Boulevard |
Construct 4-lane Bridge to connect Hesperia Road to Ridgecrest Blvd along Green Tree Blvd. |
|
Victorville |
Eduardo Moreno-Castaneda |
02/03/2023: Mail Received (Progress Invoice No.14; Received 02/02/2023) -view comment history- |
8 |
HSIPL-5380 (029)
|
SBd | Amethyst Rd./Hook Blvd |
Install traffic signal, signs, striping, and pavement markings. Construct curb ramp |
|
Victorville |
David Lee |
09/24/2021: Mail Received (approved MA, PSA & FL; received on 9/21/2021.) -view comment history- |
2 |
HSIPL-5380 (030)
|
SBd | Mojave Dr. and E Trail |
Installation of new traffic signal at intersection |
|
Victorville |
Karen Nguyen |
01/17/2020: Mail Received (FROE; 1 original, 0 copy.) -view comment history- |
8 |
HSIPL-5380 (031)
|
SBd | Intersection of Nisquali Rd. and First Ave. |
Installation of new traffic signal |
|
Victorville |
David Lee |
02/21/2018: Submitted Final invoice#2 to LPA.
-view comment history- |
0 |
ATPL-5380 (032)
|
SBd | Various elementary and middle schools in the City of Adelanto and Victorville. |
Upgrade existing curb ramps, provide durable walking surface, promote safe walking to school.
Advantage ID No.: 0815000147
PPNO. 1158
ATPL: City of Victorville - Active Transportation Plan
City of Victorville's Interagency SRTS
2014 Active Transportation Program - MPO Component
2014 Active Transportation Program - Cycle 1 Adopted 2014 ATP MPO Component (November 12, 2014) project awarded by the CTC (Resolution X-##-##) on 12/12/14. CTC ATP ID 0565. Programmed for ATP funding in FY 14-15 ($ 505k) and FY 15-16 ($ 3.592k) as a non-infrastructure project for Construction.
PA&ED ($ 100k), PS&E ($ 375k), ROW ($ 30k), and CONS ($ 35.92k) = Total project cost is $ 4,097,000.
2015 RTIP Amendment 2 SCAG Approval date of 12/16/2014
FTIP Project ID: 20150106 for SRTS
01/26/2015 - etp/Sly
+++++++++++++++++++++++++++++++++++++++++++++++
|
|
Victorville |
Aaron Duque |
09/10/2021: Submit FROE/final invoice to LPA -view comment history- |
8 |
HSIPL-5380 (033)
|
SBd | ON El. Evado Road 460' north of Hook Blvd. and 800' S. of Mojave Drive. |
Widen and pave shoulder by 12' along the "S" Curve section (Approx. 1300' long) |
|
Victorville |
Enrique Gonzalez |
02/26/2020: Reviewing FROE package. -view comment history- |
9 |
ATPLNI-5380 (034)
|
SBd | MOJAVE RIVERWALK SHARED -USE BICYCLE FACILITY |
CONSTRUCT A 9.5 MILE(CLASS 1,11,111) BIKE AND PEDESTRIAN PATH CONNECTING THE VICTOR VALLEY TRANSPORTATION CENTER (6TH STREET) MOJAVE NARROWS REGIONAL PARK (YATES RD.) AND VICTOR VALLEYCOLLEGE (BEAR VALLEY Rd.) |
|
Victorville |
Karen Nguyen |
02/09/2021: Mail Received (FROE package; received on 2/9/2021) -view comment history- |
0 |
ATPL-5380 (035)
|
SBd | The north side of Bear Valley Road from Fish Hatchery Road bordering the City of Hesperia and Victorville west up the hill to Victor Valley College Upper Campus access at Jacaranda |
Construct 0.3 mile Class 1 bike path to fill the gap and create a contiguous regional trail between Victorville, Hesperia, and Apple Valley. |
|
Victorville |
Enrique Gonzalez |
04/02/2020: Mail Received (progress FROE Package; Electronically) -view comment history- |
0 |
ATPL-5380 (036)
|
SBd | Sidewalks, ADA curb ramps, bus turnouts, and Class II bike lanes connecting to proposed bike lanes on Green Tree Blvd and the bike lanes o |
Sidewalks,ADA curb ramps,bus turnouts, and Class 2 bike lanes connecting to proposed bike lanes.
PPNO:1237 |
|
Victorville |
Eduardo Moreno-Castaneda |
12/14/2022: Progress Invoice No. 1 sent to CLPA -view comment history- |
0 |
HSIPL-5380 (037)
|
SBd | The intersection of Mojave Dr and Condor Rd. |
Upgrade from 2-way STOP control to actuated Traffic Signals. |
|
Victorville |
Eduardo Moreno-Castaneda |
04/07/2023: Mail Received (RFA; Received 04/03/2023) -view comment history- |
1 |
HSIPL-5380 (038)
|
SBd | Various locations throughout the city along major roadways: National Trails Highway, Amargosa Rd, Hesperia Rd, Outer Bear Valley Rd, Petaluma Rd, and Amethyst Rd. |
The replacement of the existing guardrail along major roadways throughout the City and upgrade of terminal system end treatments to current standards.
HSIP ID: H9-08-028 |
|
Victorville |
Eduardo Moreno-Castaneda |
05/15/2023: Mail Received (Progress Invoice No.1; Received 05/15/2023) -view comment history- |
1 |
LRSPL-5380 (039)
|
SBd | Throughout the City of Victorville |
Local Road Safety Project (LRSP) |
|
Victorville |
Leslie Avila |
06/01/2021: Mail Received (allocation letter (PE); received on 5/28/2021.) -view comment history- |
0 |
HSIPSL-5380 (040)
|
SBd | Intersection of Village Drive and Tawney Ridge Lane |
Upgrade the intersection from 2-way stop control to actuated traffic signal at the Intersection of Village Drive and Tawney Ridge Lane.
H10-08-023 |
|
Victorville |
Eduardo Moreno-Castaneda |
03/24/2022: Mail Received (approved PSA & FL; received on 3/23/2022.) -view comment history- |
0 |
STPL-5384 (004)
|
RIV | Hacienda Avenue (Phase 1) from West Drive to Palm Drive |
Road Rehabilitation |
|
Desert Hot Springs |
Albert Vergel de Dios |
10/08/2012: Mail Received (Final Invoice revised (1 original & 3 copies)) -view comment history- |
0 |
RPSTPL-5384 (005)
|
RIV | On Pierson Boulevard from Palm Drive to Little Morongo Road |
Road rehabilitation |
|
Desert Hot Springs |
Steven Nguyen |
02/07/2008: Mail Received (Final Voucher) -view comment history- |
0 |
DEMO4L-5384 (006)
|
RIV | Desert Hot Springs |
Rehabilitation, sidewalks,curb and gutter,splash aprons,ADA ramps,drainage improvements |
|
Desert Hot Springs |
Albert Vergel de Dios |
06/28/2012: Mail Received (Final Voucher) -view comment history- |
0 |
SR2SL-5384 (007)
|
RIV | North side of Hacienda Ave from Calle Amapola to Deodar Ave |
Curb, gutter, sidewalk, and curb ramps |
|
Desert Hot Springs |
Marcos Amancio |
02/21/2017: Project archived in D8 Database, project file purged on 7/7/2015.
-view comment history- |
1 |
HPLUL-5384 (008)
|
RIV | Acoma, Buenta Vista, Cahuilla, & Desert View Aves. from West Dr. to Cactus Dr.; Estrella & Flora Aves. from East Arroyo Dr. to Cactus Dr.; Cactus Dr. from Pierson Blvd. to Hacienda |
Road reconstruction, curb, gutter, sidewalk, and ramps |
|
Desert Hot Springs |
Albert Vergel de Dios |
06/28/2012: Mail Received (Final Voucher) -view comment history- |
0 |
CML-5384 (009)
|
RIV | In the City of Desert Hot Springs - At the intersection of Palm Dr & Camino Campanero. |
Install new traffic signal at the intersection of Palm Dr./Camino Campanero, and the synchronization of five signalized intersections along Palm Drive (Camino Campanero to Pierson Blvd), with hard wire interconnect. |
|
Desert Hot Springs |
Albert Vergel de Dios |
No comments |
0 |
CML-5384 (010)
|
RIV | Western Ave-Scenic Dr., Pavement Construction |
Construct 30' of asphalt paving from Pierson Blvd to 600' N/O Scenic Dr., and from 200' W/O Western Ave. to 600' E/O Western Ave. on Scenic Dr. |
|
Desert Hot Springs |
Albert Vergel de Dios |
08/06/2013: Mail Received (Final Voucher) -view comment history- |
2 |
SR2SL-5384 (011)
|
RIV | West Drive at 4th Street intersection and on 4th Street |
Construct sidewalks, Bulb-outs, Install advanced stop bars, conduct safety education and outreach |
|
Desert Hot Springs |
Ron Akers |
10/18/2012: Mail Received (Construction contract award information for SR2S Project and revised Final Invoice) -view comment history- |
0 |
SR2SL-5384 (012)
|
RIV | On Pierson Blvd., Hacienda Dr., and Two Bunch Palms Dr. (Cycle 8) |
Construct bulb-outs and curb extensions with perpendicular curb ramps at 7 intersections. Construct crossing island, add rapid flash LED beacons, zebra stripe crosswalks, and advanced stop bars. |
|
Desert Hot Springs |
Albert Vergel de Dios |
04/16/2013: send final invoice and closeout package to HQ Accounting and CC Bill Mosby, John Pagano, Dawn Foster, Patrick Louie, Alicia Ulat, Sean Yeung, and David Lee. -view comment history- |
0 |
SRTSL-5384 (013)
|
RIV | Within two mile radius of three ES and one MS, within the City of Desert Hot Springs. (Corsini ES, Two Bunch ES, Wenzlaff ES, and Desert Springs MS. Cycle 2) |
Install pedestrian safety improvements and bikeways along school routes. |
|
Desert Hot Springs |
Albert Vergel de Dios |
03/20/2015: Mail Received (Final Voucher, 1 copy, 0 original) -view comment history- |
3 |
SSARPL-5384 (014)
|
RIV | Palm Drive Corridor from I-10 to Mission Lakes Boulevard |
Perform a collision analysis, identify safety issues, and develop a list of systemic low-cost countermeasures that can be used to prepare future HSIP and other safety program applications. |
|
Desert Hot Springs |
Albert Vergel de Dios |
10/09/2018: Mail Received (Exhibit 5-J forms, 1 original) -view comment history- |
0 |
STPL-5384 (015)
|
RIV | ESSENTIAL ROAD IMPROVEMENTS-PHASE III: ON ACOMA AVE, BUENA VISTA AVE, CAHUILLA AVE, DESERT VIEW AVE, ESTRELLA AVE, FLORA AVE, AND GRANADA AVE BETWEEN CACTUS DR. AND PALM DR. |
PAVEMENT REHAB, SIDEWALKS, CURB/GUTTERS, CROSS GUTTERS, ADA RAMPS & DRAINAGE IMPROVEMENTS |
|
Desert Hot Springs |
Ron Akers |
01/12/2015: Mail Received (Final Voucher stampled by Local Programs Accounting on 9/22/2014) -view comment history- |
4 |
SRTSL-5384 (016)
|
RIV | West side Cactus Dr. between 4th st. and 8th st.; 4th st. between West Dr. and Cactus Dr.; Cactus Dr./4th st. intersection. (SRTS Cycle 3 Inf) |
Construct sidewalks, curb and gutter, and bulb-outs; install crosswalks and advanced stop bars markings. |
|
Desert Hot Springs |
Albert Vergel de Dios |
10/13/2016: Mail Received (RFA (PE) 1 original, 2 copies) -view comment history- |
7 |
SRTSL-5384 (017)
|
RIV | Multiple school in the City of Desert Hot Springs (SRTS Cycle 3 NI) |
Hire a SRTS coordinator, provide safety education assemblies, bicycles and pedestrian rodeos, printed materials, SRTS workshops, increased law enforcement during school pick-up and drop-off times at multiple schools in the City of Desert Hot Springs. |
|
Desert Hot Springs |
Albert Vergel de Dios |
No comments |
0 |
STPL-5384 (018)
|
RIV | Hacienda Ave between Avenida La Vista and Long Canyon Rd, and between Palm Dr and Miracle Hill Rd; and Mission Lakes Blvd between Santa Cruz Rd to Verbena Dr. |
Street road surface rehabilitation using a rubberized slurry seal coat of entire roadway width section |
|
Desert Hot Springs |
Albert Vergel de Dios |
10/02/2017: Mail Received (FROE, Final invoice (Con) 1 original, 2 copies) -view comment history- |
2 |
ATPSB1L-5384 (020)
|
RIV | Ped and bike safety on Palm Drive in Desert Hot Springs between Camino Aventura and Two Bunch Palms Trail- sidewalks, widening bike lanes, r |
CONSTRUCT 2-MI CLASS II BIKE LANES & .65-MI SIDEWALK GAP CLOSURES ALONG PALM DR
B/W CAMINO AVENTURA TO TWO BUNCH PALMS TR; INCL BUFFERED BIKE LANE STRIPING, NARROWED TRAFFIC LANES, ADA RAMPS, BUS WARNING SIGNS AND LIGHTS, REDUCED SPEED LIMIT, STREET LIGHTS, & RAISED MEDIAN (ATP-3 AUGMENTATION-STATEWIDE))
PPNO:1210 |
|
Desert Hot Springs |
Enrique Gonzalez |
01/03/2023: Mail Received (Final Invoice 1; Received 12/28/2022) -view comment history- |
0 |
ATPL-5384 (021)
|
RIV | Palm Drive from Pierson Boulevard to Mission Lakes Boulevard |
Construction of buffered bike lanes, sidewalks, crosswalks, ADA curb ramps, street lighting, bus warning lights, RRFB signals, and re-pave/re-stripe roadway
PPNO:1282 |
|
Desert Hot Springs |
Enrique Gonzalez |
03/20/2023: Mail Received (Progress Invoice No.1; Received 03/17/2023) -view comment history- |
0 |
ATPL-5384 (022)
|
RIV | Hacienda Avenue from West Drive to Foxdale Avenue |
SRTS Improvement project including constructing new sidewalks, bike lanes, ADA ramps, and street lights.
PPNO 1251 |
|
Desert Hot Springs |
Enrique Gonzalez |
05/02/2023: Mail Received (Time Extension Request; Received 04/27/2023) -view comment history- |
0 |
HSIPL-5384 (023)
|
RIV | Palm Drive from Dillon Road to Pierson Boulevard |
Cycle 9 HSIP ID: H9-08-004
Upgrade standard pedestrian signal heads to countdown style pedestrian signal heads and pedestrian push buttons to accessible pedestrian signals (APS): construct continental style crosswalks with limit line |
|
Desert Hot Springs |
Enrique Gonzalez |
05/02/2023: Mail Received (RFA (CON); Received 04/24/2023) -view comment history- |
0 |
HSIPL-5384 (024)
|
RIV | Along Palm Drive at Buena Vista Avenue and just south of Hacienda Avenue |
Cycle 9 HSIP ID: H9-08-005
Install two mid-block pedestrian crossing with enhanced safety features (construct continental crosswalks with advance yield lines, LED flashing pedestrian crossings and improve street lighting). |
|
Desert Hot Springs |
Enrique Gonzalez |
05/18/2022: Mail Received (letter to cancel project; received on 5/16/2022.) -view comment history- |
0 |
HSIPL-5384 (025)
|
RIV | Intersection Palm Drive and 8th Street |
Cycle 9 HSIP ID: H9-08-006
Construct median refuges and curb bulb outs, upgrade stop signs to LED bordered stop signs, and upgrade existing crosswalks to continental crosswalks. |
|
Desert Hot Springs |
Enrique Gonzalez |
02/10/2023: Mail Received (Approved FL, MA, & PSA; Received 02/08/2023) -view comment history- |
0 |
LRSPL-5384 (026)
|
RIV | Throughout the city of Desert Hot Springs. |
Develop Local Roadway Safety Plan
LRSP ID: LRSP240 |
|
Desert Hot Springs |
Enrique Gonzalez |
01/11/2023: Mail Received (FROE; Received 01/09/2023) -view comment history- |
0 |
STPLE-5394 (001)
|
RIV | In the City of Norco on Bluff St @ River Rd and Corydon Ave |
Pedestrian Signal |
|
Norco (Nrco) |
Laura Zaninovich |
06/08/2006: Mail Received (Final Voucher) -view comment history- |
0 |
CML-5394 (005)
|
Riv | Hamner Avenue---Hidden Valley Pkwy to Santa Ana River |
Interconnect Signals |
|
Norco (Nrco) |
Laura Zaninovich |
08/14/2006: Mail Received (Hamner Ave Syncronization Project
Request for Obligation Extension) -view comment history- |
0 |
STPLG-5394 (006)
|
RIV | In the City of Norco on Hamner Ave & Market St. |
Install Traffic signals& minor related r |
|
Norco (Nrco) |
Laura Zaninovich |
No comments |
0 |
STPL-5394 (007)
|
RIV | Hamner Street from 1st. to 3rd. street |
Pavement rehabilitation |
|
Norco (Nrco) |
Laura Zaninovich |
04/26/2006: Mail Received (Federal Report of Expenditures
Local Agency Awarded Contract) -view comment history- |
0 |
STPL-5394 (008)
|
RIV | In the City of Norco on Hamner Ave from Third Street to the Santa Ana River bridge. |
Road Rehabilitation |
|
Norco (Nrco) |
Laura Zaninovich |
No comments |
0 |
STPL-5394 (009)
|
RIV | In the City of Norco on Parkridge Ave, First Str.,Second Str. and Third Street. |
Road Rehabilitation |
|
Norco (Nrco) |
Laura Zaninovich |
No comments |
0 |
STPL-5394 (010)
|
RIV | In the City of Norco on Fifth Str from Corydon to California Ave. and on Seventh St. from Valley to California AVe |
Road Rehabilitation |
|
Norco (Nrco) |
Laura Zaninovich |
No comments |
0 |
STPL-5394 (011)
|
RIV | Various |
Road Rehabilitation |
|
Norco |
Chigo Dike |
10/30/2007: Mail Received (Notification Letter of Funds which Expired on June 30, 2007) -view comment history- |
0 |
STPLER-5394 (012)
|
RIV | Coast to Crest Santa Ana River Trail-Old Hamner Ave to Pedley Ave. |
Trail Extension & Construct Missing Link |
|
Norco |
Chigo Dike |
02/01/2006: Mail Received (Billing Invoice Santa Ana River Missing Link Coast to Coast) -view comment history- |
0 |
RPSTPL-5401 (002)
|
RIV | Engineer to Update |
bridge replacement project |
|
Indian Wells (Ind W) |
Steven Nguyen |
08/08/2005: Mail Received (4 copies of the Final report of Expenditures Package) -view comment history- |
0 |
STPL-5401 (003)
|
RIV | On Cook Street from SR 111 to Fred Waring Drive |
Rubberized Pavement Overlay/Rehab |
|
Indian Wells |
Albert Vergel de Dios |
09/25/2019: Mail Received (progress invoice 1; 1 original, 0 copy.) -view comment history- |
2 |
STPL-5401 (005)
|
RIV | Highway 111 from Eldorado Drive to Eastern City Limits |
Widen from 4 to 6 thru lanes; install raised landscape median; right turn lane. |
|
Indian Wells |
Albert Vergel de Dios |
No comments |
0 |
STPL-5401 (006)
|
RIV | Highway 111 from Western City Limits to Eldorado Drive |
Widen from 4 to 6 thru lanes; install raised landscape median; left turn phases; right turn lanes. |
|
Indian Wells |
Albert Vergel de Dios |
No comments |
0 |
SLPPL-5401 (007)
|
RIV | Highway 111 from Hospitality Row to Cook Street. |
Widening of Highway 111 from 4 lanes to 6 lanes for a distance of approximately 3,000 feet. |
|
Indian Wells |
Enrique Gonzalez |
07/30/2015: Final Invoice and FROE to HQ (Sharon Ropp). -view comment history- |
0 |
BRLSN-5401 (008)
|
RIV | Fred Waring Drive over Whitewater River 0.1 mile W/O El Dorado Drive Br. no. 56C-0493 |
Replace a 6 lane bridge (culverts) with a 6 lane bridge for hydraulic adequacy. |
|
Indian Wells |
Matthew Sapp |
09/18/2018: Mail Received (Request to de-obligate funds) -view comment history- |
0 |
TBD-5407 (000)
|
SBd | Evans Street |
Re-alignment of Evans St. |
|
Loma Linda |
Carol Green |
06/30/2009: Mail Received (Request for functional classification) -view comment history- |
0 |
CML-5407 (002)
|
SBd | Anderson Street/Tippecanoe Avenue from University Avenue to Hospitality Lane |
Interconnect signals |
|
Loma Linda |
Ramiro Martinez |
No comments |
0 |
STPLH-5407 (003)
|
SBd | Intersection of Redlands Boulevard and Richardson Street |
New signals |
|
Loma Linda |
Carol Green |
08/11/2006: Mail Received (Local Agency Contract Award Checklist) -view comment history- |
0 |
STPLF-5407 (004)
|
SBd | On Mountain View Ave from Prosppect St. to Van Leuven St. |
Bridge widen to 4 lane |
|
Loma Linda |
Carol Green |
02/21/2017: Project archived in D8 Database, project file purged on 7/7/2015.
-view comment history- |
0 |
SR2SL-5407 (005)
|
SBd | Academy St. from Anderson St to Orange Grove Street and on Orange grove from Academy Street to Van Leuven Street |
Proposed street widening, installation of curb, gutter and sidewalk along the west side of Orange Grove Street and the south side of Academy Street and Van Leuven Street and Anderson Street. |
|
Loma Linda |
Carol Green |
04/14/2008: Mail Received (Final) -view comment history- |
0 |
STPLZ-5407 (006)
|
SBd | IN THE CITY OF LOMA LINDA AT ANDERSON ST, BRD. # 54C-0130. |
SEISMIC RETROFIT |
|
Loma Linda |
Sylvester Lin |
01/10/2014: Mail Received (Received Final Voucher 07/11/2011 to 09/30/2013) -view comment history- |
0 |
SR2SL-5407 (007)
|
SBd | In Loma Linda, Mission ES - Southwest corner of Redlands Blvd/California Ave. |
Construct sidewalks and curb ramps; install crosswalks |
|
Loma Linda |
Carol Green |
09/12/2013: Mail Received (Award Package) -view comment history- |
1 |
PREFIX-5408 (000)
|
SBd | Location |
Work Description |
|
Adelanto |
Evita Premdas |
09/14/2011: Evita Testing Journal Entry -view comment history- |
0 |
STPL-5408 (004)
|
SBd | El Mirage Road from the west city limits to US 395 |
Pave dirt segment and overlay paved roadway; NO ACTIVITY |
|
Adelanto |
Sylvester Lin |
No comments |
0 |
LRSP-5408 (007)
|
SBd | City wide |
Analyse safety issues, identify improvements and prioritize projects. Create a Big safety plan. |
|
Adelanto |
Esayas Hagos |
08/19/2022: Mail Received (Final Invoice No.1; Received 08/18/22) -view comment history- |
0 |
RPSTPL-5412 (002)
|
SBd | ON SOUTHWEST CORNER OF AT&SF AND MILLICAN AVENUE(METROLINK STATION) |
EXPAND EXISTING PARKING LOT AND EXTEND SOUTH PLATFO |
|
Rancho Cucamonga |
Marcos Amancio |
No comments |
0 |
STPL-5412 (003)
|
RIV | Ramon Road from Mission Hills Development 600 feet east of Da Vall Road to 1,000 feet east |
Road rehabilitation |
|
Rancho Mirage |
Albert Vergel de Dios |
02/21/2017: 02/212017 Project archived in D8 Database, project file purged on 7/7/2015. -view comment history- |
0 |
RPSTPL-5412 (005)
|
Riv | Ramon Road from 600 feet east of Da Vall Drive to the east city limits at Los Alamos Road |
roadway widening and improvements |
|
Rancho Mirage |
Steven Nguyen |
No comments |
0 |
SR2SL-5412 (006)
|
RIV | Ramon Road N and Da Vall Drive E, bisecting the border of Rancho Mirage and Riverside County. |
Construct curbs, gutters, sidewalks, ramps; install signals to provide traffic control and safe pedestrian access to two planned schools. |
|
Rancho Mirage |
Albert Vergel de Dios |
02/21/2017: 02/212017 Project archived in D8 Database, project file purged on 7/7/2015. -view comment history- |
0 |
CMAQ-5412 (007)
|
RIV | In Coachelle Valley in Rancho Mirage - Monterey Avenue sand fencing from Gerald Ford Dr. to Frank Sinatra Dr. |
Install sand fencing along the west side of Monterey Avenue |
|
Rancho Mirage |
Albert Vergel de Dios |
No comments |
0 |
SR2SL-5412 (008)
|
RIV | Rancho Mirage Road from Rancho Mirage Elementary School to State Route 111. |
Construct sidewalks, curb ramps, and retaining wall; install crosswalks, bicycle racks, and lockers. |
|
Rancho Mirage |
Albert Vergel de Dios |
06/10/2013: Proof payment to Rancho Mirage Elementary School and Refund to Caltrans from SR2S Cycle 9 Public Outreach funds -view comment history- |
0 |
LRSPL-5412 (009)
|
RIV | Throughout the city of Rancho Mirage |
Identify safety needs then develop and prioritize safety improvements |
|
Rancho Mirage |
Solomon Frisco |
12/22/2022: Mail Received (Final Invoice No.4; Received 12/21/22) -view comment history- |
0 |
HSIPL-5412 (010)
|
RIV | Frank Sinatra Drive and State Highway 111, Intersection |
Upgrade traffic signals and safety lighting; add turn lanes; construct curb and gutter. |
|
Rancho Mirage |
Albert Vergel de Dios |
03/22/2016: Mail Received (FINAL Invoice (Con.) 1 original, 2 copies) -view comment history- |
3 |
STPLN-5412 (011)
|
RIV | Monterey Avenue SB from Dinah Shore to Gerald Ford Dr. |
Widening of SB Monterey Ave. from 2 to 3 lanes from Dinah Shore Dr. to Gerald Ford Dr. |
|
Rancho Mirage |
Albert Vergel de Dios |
08/02/2018: Mail Received (Invoice #4 Final, revised cover letter) -view comment history- |
7 |
HSIPL-5412 (012)
|
RIV | Highway 111 from the North City Limits to Mirage Cove Drive, and from Paxton Road to the South City
Limits |
Install safety lighting |
|
Rancho Mirage |
Albert Vergel de Dios |
11/07/2017: DLAP signed cover letter for E-76 for PE de-obligation to cancel project per City's request. -view comment history- |
1 |
STPLN-5412 (013)
|
RIV | Old Highway 111 from Bob Hope Dr. to Park View Dr. |
Road Rehabilitation
|
|
Rancho Mirage |
Albert Vergel de Dios |
05/09/2018: Mail Received (Final Invoice (No.3), FROE) -view comment history- |
1 |
HSIPL-5412 (014)
|
RIV | 27 intersections throughout the City |
Upgrade signals (interconnect); install pedestrian countdown signal heads |
|
Rancho Mirage |
Enrique Gonzalez |
03/07/2022: 02/24/2022:
HQ SEQ Final Voucher and close
FL received from District8Agreemetns. has been saved in project agreement. -view comment history- |
6 |
HSIPL-5412 (015)
|
RIV | Monterey Avenue and Dinah Shore Drive |
Upgrade Signal (interconnect); install pedestrian countdown signal heads |
|
Rancho Mirage |
Solomon Frisco |
12/24/2021: Mail Received (detail estimate; received on 12/22/2021.) -view comment history- |
4 |
CML-5412 (016)
|
RIV | Ramon Road from Los Alamos Road to Bob Hope Drive |
Construct free right, porkchop island, Curb and gutter, relocate signal pole, replace signal loop, remove and relocate concret pavement, spandrel cross gutter, handiap ramp, bus turn out anstall 15,418' of 4' sand fencing. |
|
Rancho Mirage |
Enrique Gonzalez |
03/06/2023: Mail Received (Progress Invoice No.5; Received 03/1/2023) -view comment history- |
4 |
CML-5412 (017)
|
RIV | Bob Hope Drive from Agua Caliente to Dinah Shore Dr. (11,080 lf) and Dinah shore Dr. from Bob Hope Dr. to the West (1,320 lf) |
Installation of 4' high Sand Fencing. |
|
Rancho Mirage |
Albert Vergel de Dios |
12/06/2017: Notice of Project Cancellation Letter and City issued check for repayment in the amount of $2,828.95. -view comment history- |
1 |
ER40A0-5412 (053)
|
RIV | to be completed by staff. Sean, 7/12/2021. |
to be completed by staff. Sean, 7/12/2021. |
|
Rancho Mirage |
Eduardo Moreno-Castaneda |
07/20/2022: Mail Received (FROE; Received 07/20/2022) -view comment history- |
0 |
ER40A0-5412 (079)
|
RIV | to be completed by staff. Sean, 7/12/2021. |
to be completed by staff. Sean, 7/12/2021. |
|
Rancho Mirage |
Sean Yeung |
07/20/2022: Mail Received (FROE; Received 07/20/2022) -view comment history- |
0 |
BR-NBIL-5412 (514)
|
RIV | Frank Sinatra Dr. at Whitewater River, Br. no. 00L0046 |
Construct 4 lane bridge to replace low water crossing |
|
Rancho Mirage |
Elaine Rogers |
02/14/2022: Mail Received (Final Invoice and FROE; received on 1/28/2022) -view comment history- |
4 |
STPLE-5414 (001)
|
RIV | Palm Desert Ped/Bicycle Golf Cart |
Engineer to Update |
|
Palm Desert |
Steven Nguyen |
No comments |
0 |
STPL-5414 (005)
|
RIV | Country Club Drive From Eldorado Dr to Cook Street |
Pavement Rehabbilitation |
|
Palm Desert |
Albert Vergel de Dios |
02/21/2017: 02/212017 Project archived in D8 Database, project file purged on 7/7/2015. -view comment history- |
0 |
RPSTPLE-5414 (006)
|
RIV | Monterey Avenue from Dinah Shore to the Union Pacific Railroad tracks |
Landscape existing overcrossing slopes and center median along Monterey Ave. within project limits. |
|
Palm Desert |
Albert Vergel de Dios |
09/13/2007: Mail Received (Response to Comments from Caltrans Environmental Local Assistance) -view comment history- |
0 |
RPMSTPL-5414 (007)
|
Riv | Palm Valley Channel on Fred Waring Drive from Rte 111 to Town Center Way |
Bridge Widening |
|
Palm Desert |
Osabuogbe Igbinedion |
No comments |
0 |
CML-5414 (008)
|
RIV | Fred Waring Dr. WB onto State Route 111 NB. |
Modify existing dedicated right turn lanes to free turning Lane. |
|
Palm Desert |
Albert Vergel de Dios |
05/11/2017: Mail Received (Final invoice, 1 original, 0 copy.) -view comment history- |
2 |
CML-5414 (009)
|
RIV | Monterey Ave, Country Club dr, Cook St, and Highway 111. |
Install interconnect conduit and Fiber-Optic cable establishing communication links maintenance facility; and improve communication to local intersection controllers throughout the City. |
|
Palm Desert |
Albert Vergel de Dios |
06/04/2013: Mail Received (Final Voucher (1 copy)) -view comment history- |
1 |
CML-5414 (010)
|
RIV | Larkspur Lane North City limits |
Construction of various street improvements on Highway 111 including various signing and striping, traffic signal, and sidewalks plans further. |
|
Palm Desert |
Albert Vergel de Dios |
02/21/2017: 02/212017 Project archived in D8 Database, project file purged on 7/7/2015. -view comment history- |
0 |
HSIP-5414 (011)
|
RIV | Fred Waring Dr. and San Pascual Ave. |
Modify the existing pedestrian signal to a six phase fully actuated traffis signal installation providing protected left turn movements on Fred Waring Dr. and full access to Frad Waring Dr. for San Pascual Ave. traffic |
|
Palm Desert |
Albert Vergel de Dios |
08/06/2013: Mail Received (Final voucher) -view comment history- |
1 |
STPL-5414 (012)
|
RIV | Portola Avenue between Country Club Drive and 100 feet north of Desert Willow Court. |
Pavement Rehabilitation
Use Advantage ID# 08-1400-0082
Portola Avenue STP-Rehab Project, FTIP Id# RIV130402. Programmed on FTIP for FFY13/14; $336,000 of STPL funds at a 49.1% Reimb. Ratio
|
|
Palm Desert |
Albert Vergel de Dios |
08/22/2016: Mail Received (FROE/ Final Invoice (Con) 1 original 2 copies) -view comment history- |
1 |
HP21CML-5414 (013)
|
RIV | Monterey I-10 Interchange |
Reconfigure IC - Construct new WB entry ramp and realign/relocate WB exit ramp |
|
Palm Desert |
Albert Vergel de Dios |
11/29/2016: DLAE signs Exhibit 17-A, Cover Letter & Final Report of Expenditure Checklist, and Exhibit 17-C, Final Inspection Form. -view comment history- |
0 |
CML-5414 (014)
|
RIV | Washington Street, North of Monterey Ave |
Class I bike path between Washington Street and Nort of Monterey Avenue
FTIP projectID RIV071255 14/15 CMAQ funds $2,200,000 for Construction
Use Advantage ID. 0814000035 |
|
Palm Desert |
Enrique Gonzalez |
02/05/2021: Mail Received (progress invoice 43; received on 2/4/2021.) -view comment history- |
2 |
ATPSB1L-5414 (015)
|
RIV | On San Pablo Avenue between Fred Waring Drive and Magnesia Falls Drive |
New sidewalk for pedestrians, separate bike lanes for cyclist, class 4 paths, and new roundabouts |
|
Palm Desert |
Enrique Gonzalez |
05/02/2023: Mail Received (Progress Invoice No.4; Received 04/24/2023) -view comment history- |
1 |
LRSPL-5414 (016)
|
RIV | Throughout City of Palm Desert |
Assess transportation safety needs and prioritize and propose strategies for the community. |
|
Palm Desert |
Enrique Gonzalez |
05/12/2022: Mail Received (approved FL; received on 5/9/2022.) -view comment history- |
0 |
HSIPS-5414 (017)
|
RIV | Various locations throughout the city |
Enhance the visibility of crosswalks at intersections throughout the City. |
|
Palm Desert |
Enrique Gonzalez |
03/10/2022: Mail Received (approved PSA & FL; received on 3/7/2022.) -view comment history- |
0 |
HSIPS-5414 (018)
|
RIV | Signalized Intersections throughout the City. |
Installation of retroreflective backplates and replacement of pedestrian signal heads with pedestrian countdown signals heads at various signal locations throughout the City. |
|
Palm Desert |
Enrique Gonzalez |
03/10/2022: Mail Received (approved MA, PSA & FL; received on 3/7/2022.) -view comment history- |
0 |
00-5420 (000)
|
SBd | Reuse project no. |
Reuse project no |
|
Rancho Cucamonga |
David Lee |
No comments |
0 |
STPLHSR-5420 (007)
|
SBd | Various streets surrounding Jasper Elementary School |
In-pavement flashing crosswalk lights |
|
Rancho Cucamonga |
Osabuogbe Igbinedion |
No comments |
0 |
CML-5420 (009)
|
SBd | 16th Street (Base Line Road) in Upland and Base Line Road in Rancho Cucamonga from Benson Avenue to Etiwanda Avenue |
Interconnect signals |
|
Rancho Cucamonga |
Osabuogbe Igbinedion |
12/06/2006: Mail Received (final voucher) -view comment history- |
0 |
SR2SL-5420 (010)
|
SBd | Etiwanda Avenue from Victoria Avenue to 700 feet north |
Class 1 bike lane and sidewalk |
|
Rancho Cucamonga |
Marcos Amancio |
No comments |
0 |
STPLHSR-5420 (011)
|
SBd | Hermosa Avenue from 500 feet south of Feron Boulevard to 500 feet north |
Flashing beacons |
|
Rancho Cucamonga |
Osabuogbe Igbinedion |
02/11/2008: Mail Received (Federal Final Report of Expenditures) -view comment history- |
0 |
IMDLN-5420 (012)
|
SBd | I-15 at Baseline Road interchange |
Ramp widening, auxiliary lanes, and operational improvements |
|
Rancho Cucamonga |
Karen Nguyen |
02/09/2021: Submitted FROE and Final invoice No 21 to LPA. -view comment history- |
0 |
RPSTPLE-5420 (013)
|
SBd | Along the old Pacific Electric Railroad right of way from Haven Avenue to 1,200 feet east of Etiwanda Avenue |
Bike path |
|
Rancho Cucamonga |
Marcos Amancio |
01/03/2017: Project archived in D8 Database, project file purged prior to 12/27/2016. -view comment history- |
0 |
STPLEE-5420 (014)
|
SBd | Abandoned Pacific Electric Railroad right of way from Rochester Avenue to 1,200 feet east of Etiwanda Avenue |
Pedestrian and Bike Path |
|
Rancho Cucamonga |
David Lee |
01/03/2017: Project archived in D8 Database, project file purged prior to 12/27/2016. -view comment history- |
0 |
TLSPL-5420 (015)
|
SBd | Foothill Boulevard from San Bernardino Road to Etiwanda |
Upgrade traffic controllers and signal synchronization |
|
Rancho Cucamonga |
Marcos Amancio |
04/22/2013: Received copy of TSLP Over payment letter from HQ via e-mail -view comment history- |
0 |
SRTSL-5420 (016)
|
SBd | Deer Creek Channel from the Pacific Electric Trail north of Baseline Road to Highland Avenue |
Class 1 bicycle trail and upgrade maintenance road |
|
Rancho Cucamonga |
Marcos Amancio |
01/23/2019: Mail Received (DLAP signs CE) -view comment history- |
0 |
SR2SL-5420 (017)
|
SBd | East side of Valle Vista Drive from North of Camino Sur to South of Calle Feliz |
Sidewalk |
|
Rancho Cucamonga |
Marcos Amancio |
08/11/2009: Mail Received (Construction Contract Award Information) -view comment history- |
0 |
ESPLE-5420 (018)
|
SBd | Church Street From Rochester Avenue to Hyssop Drive |
Landscaping and Beautification |
|
Rancho Cucamonga |
Steven Nguyen |
No comments |
2 |
SRTSNIL-5420 (019)
|
SBd | Various: Cucamonga Middle School, Grapeland Elementary School, Etiwanda Intermediate, etc.. |
Provide education, and encouragement for parents and students to consider walking and bicycle riding. |
|
Rancho Cucamonga |
Marcos Amancio |
12/07/2015: Mail Received (FV 10/28/2015. Purge on 4/2019) -view comment history- |
0 |
SRTSNIL-5420 (020)
|
SBd | Multiple Schools in the City of Rancho Cucamonga
Vineyard MS, Alta Loma MS, Day Creek MS, Summit MS, Ruth Musser MS |
Bicycle & pedestrian safety education, promotional events like Walk to School Days |
|
Rancho Cucamonga |
Eduardo Moreno-Castaneda |
02/28/2020: Mail Received (progress invoice 9; 1 original, 0 copy.) -view comment history- |
1 |
SR2S-5420 (021)
|
SBd | Etiwanda Ave, between Fisher Dr & Base Line Rd |
Construct sidewalks, curb and gutter, and curb ramps; install flashing beacons |
|
Rancho Cucamonga |
Marcos Amancio |
11/13/2014: Mail Received (FROE and Final invoice cover page only, 2 pages total) -view comment history- |
0 |
SR2S-5420 (022)
|
SBd | 9th St, Hellman to Old Sput Track, & Baker Ave, 8th St to 9th St. |
Construct sidewalks, curb and butter, and and curb ramps; install flashing beacons |
|
Rancho Cucamonga |
Marcos Amancio |
07/10/2015: DLAE signs FROE. -view comment history- |
0 |
SRTSL-5420 (023)
|
SBd | 9th St., north side - 100' to 800' west of Vinerayd Ave. |
700' of sidewalk curb and gutter; furnish and install bicycle and skateboard racks at school |
|
Rancho Cucamonga |
Karen Nguyen |
09/18/2018: Mail Received (RFA (Con), 1 original) -view comment history- |
4 |
LRSPL-5420 (024)
|
SBd | Throughout the City of Rancho Cucamonga |
Local Road Safety PLan |
|
Rancho Cucamonga |
Karen Nguyen |
No comments |
0 |
HSIPSL-5420 (025)
|
SBd | Banyan St/East Ave, Base line Rd/Mountain View Dr S, Millennium Ct/Milliken Ave, Vintage Dr/Milliken Ave, Church St/Milliken Ave, Terra Vista Pkwy West/Church St, and Base Line Rd/Bery |
Upgrade seven (7) signalized intersections by replacing 34 five section signal heads (doghouse) with four section flashing yellow arrow (FYA) signal heads for protected/permissive left-turn controls and improving signal timing.
H10-08-017 Citywide Traffic Signal Safety Improvements |
|
Rancho Cucamonga |
Eduardo Moreno-Castaneda |
06/27/2022: Mail Received (Approved MA, PSA, FL; Received 06/26/2022) -view comment history- |
0 |
TBD-5421 (000)
|
SBd | Barton Road IC I-215 |
Interchange Widen Overcrossing from 2 to 4 Lane |
|
Grand Terrace |
Ramiro Martinez |
No comments |
0 |
STPLZ-5421 (002)
|
SBd | IN THE CITY OF GRAND TERRACE ON WEST BARTON RD AT WEST BARTON OH, BRD. NO. 54C-0379 |
BRIDGE REPLACEMENT(SEISMIC) |
|
Grand Terrace |
Leslie Avila |
09/19/2014: Mail Received (Received HBP Survey) -view comment history- |
0 |
STPLHSR-5421 (003)
|
SBd | Intersection of Mount Vernon Avenue and DeBerry Street |
New Signals |
|
Grand Terrace |
Ayda Homsi |
No comments |
0 |
STPLHSR-5421 (003)
|
SBd | Intersection of Mount Vernon Avenue and DeBerry Street |
New signals |
|
Grand Terrace |
Ayda Homsi |
11/18/2005: Mail Received (Federal Report of Expenditures Local Agency Awarded Contract) -view comment history- |
0 |
ATPLNI-5421 (004)
|
SBd | Conduct a feasibility study to create a connectivity for non-motorized transportation to schools, shopping & community centers, bike lanes. |
Conduct a feasibility study to create a connectivity for non-motorized transportation to schools, shopping & community centers, bike lanes. |
|
Grand Terrace |
Eduardo Moreno-Castaneda |
06/18/2019: Invoice #4 & Final sent to LPA -view comment history- |
0 |
HSIPL-5421 (005)
|
SBd | Five intersections of : Mount Vernon Ave and Canal Street/ Grand Terrace Rd, Mount Vernon and Barton Road, Mount Vernon Ave and De Berry St, Mount Vernon Ave and Van Buren St, Mount Vernon Ave and Pico St. |
Pavement Striping |
|
Grand Terrace |
Pamela Wells |
09/27/2022: Mail Received (FROE; Received 09/22/2022) -view comment history- |
1 |
HSIPL-5421 (006)
|
SBd | Various locations on Barton Road, Mount Vernon Avenue, Vista Grande Way, and Vivienda Avenue |
Cycle 9 HSIP guardrail project #149 awarded on 12/12/18. HSIP ID no. H9-08-007. Programmed for FY 18-19 in Amendment #14 approved on 11/18/19 to SCAG's 2019 FTIP and EPSP'd to FY 19-20. Use ZS30 HSIP funds at a maximum reimbursement ratio of 90% up to $648,300 for all phases of work. CRS Map 15V22 - various. PL |
|
Grand Terrace |
Pamela Wells |
07/20/2022: Mail Received (Approved FL; Received 07/19/2022) -view comment history- |
0 |
STPL-5426 (002)
|
SBd | Big Bear Blvd.(SR18) and Stanfield Cutoff |
Traffic Signal |
|
Big Bear Lake |
Sean Yeung |
01/25/2008: Mail Received (ER 4209-002) -view comment history- |
0 |
STPL-5426 (006)
|
SBd | Intersection of State Route 18 and Paine Road |
Traffic signals and intersection improvements |
|
Big Bear Lake |
Sean Yeung |
02/21/2017: 02/21/2017 Project archived in D8 Database, project file purged on 01/24/2017. -view comment history- |
0 |
SR2SL-5426 (007)
|
SBd | EAST SIDE OF KNICKERBOCK RD. BETWEEN PENNSYLVANIA AVE. AND STONE RD. |
CONSTRUCT SIDEWALK, CURBS AND GUTTERS, CURB RAMPS; INSTALL HIGH VISIBILITY YELLOW CROSSWALKS; UPGRADE EXISTING SCHOOL AREA SIGNS, INSTALL 2
RADAR SPEED FEEDBACK SIGNS |
|
Big Bear Lake |
Sean Yeung |
10/07/2015: Files returned to D8. -view comment history- |
0 |
HSIPLN-5426 (008)
|
SBd | Lakeview Dr./Big Bear Blvd. (SR 18) between Pine Knot Ave. and Paine R |
Widen roadway; install two-way left-turn lane and paved shoulder; replace/modify signs and pavement markings. FY 10/11 HSIP Safety Index project #84, HSIP3-08-009 Cycle 3. LS30 HSIP funds at a maximum reimbursement ratio of 90% up to $ 169,650. |
|
Big Bear Lake |
Sean Yeung |
02/12/2016: Mail Received (FROE, 1 original, 2 copies) -view comment history- |
7 |
HSIPLN-5426 (009)
|
SBd | Big Bear Blvd (SR18) between Edgemoor Rd and Talmaged Rd. |
Construct new sidewalk, curb, gutter and ADA compliant curb ramps
Use Advanteage Id. 0812000177
Programmed in lump sum listing (SCAG015) under SCAG's 2011 FTIP. HSIP4-08-009 |
|
Big Bear Lake |
Enrique Gonzalez |
02/27/2018: Submit final inspection invoice to LPA. -view comment history- |
6 |
SLPP-R -5426 (010)
|
SBd | Village Drive from Hwy 18 to Stoker; Along Pine Knot from Cameron Dr to Hwy 18. |
Remove and replace curb, gutter and sidewalk. Resurfacing and installation of new drainage structures and piping to prevent flooding. |
|
Big Bear Lake |
Sean Yeung |
10/07/2015: Files returned to D8. -view comment history- |
0 |
HSIPLN-5426 (011)
|
SBd | Big Bear Blvd between Division Dr. and 1,000 feet west of Division Dr. |
Widen roadway and pave shoulders, lengthen left turn lane and acceleration lanes; install two-way left turn.
Widen roadway and pave shoulders, lengthen left-turn and acceleration lanes;
Cycle 5 HSIP Benefit Cost project #152 awarded on 10/19/12. HSIP ID no. HSIP5-08-001. MS30 HSIP. Reimbursement ratio 90% up to $211,500. CRS Map 16U42 - principal arterial. |
|
Big Bear Lake |
Enrique Gonzalez |
05/25/2018: Mail Received (FROE, Final invoice (Con) 1 original, 2 copies) -view comment history- |
4 |
ATPL-5426 (012)
|
SBd | ON SEQUOIA STREET FROM HESPERIA ROAD TO APATITE AVENUE AND BEAR VALLEY ROAD OUTER HIGHWAYWITHIN THE EXISTING RIGHT OF WAY |
CONSTRUCT A MULTI-USE PATH, CURB AND GUTTER, CURB RAMPS, INSTALL CROSSWALKS, SIGNS AND PAVEMENT. |
|
Big Bear Lake |
Sean Yeung |
No comments |
0 |
ATPL-5426 (013)
|
SBd | State route 18 between Edgemore road and Cienega Rd-Sidewalk, curb and gutter on South side of Rt 18. No construction on n North of Hwy & state route 18 between Stanfield & Division rd.Construction of class 111 shoulder bike lanes on both sides of road. |
SIDEWALK AND GUTTER ON S SIDE OF 18 BET EDGEMORE RD & CIENEGA RD. BIKE LANES EACH WAYBETWEEN STANFIELD CUTOFF AND DIVISION RD. DRAINAGE IMPROVEMENTS STREET CROSSINGS, ADA RAMPS ETC AS NEEDED DURING CONSTRUCTION WITH SIDEWALK WORK. |
|
Big Bear Lake |
Leslie Avila |
05/06/2019: Received revised Exhibit 22-B: Time Extension Request for PS&E Expenditure Deadline -view comment history- |
1 |
ATPSB1L-5426 (014)
|
RIV | Big Bear Lake; adjacent to north west side of Big Bear Boulevard and SR18 from Stanfield Cutoff to Sandalwood Drive. Adjacent to north side of Sandalwood Drive from Big Bear Boulevard and SR18 to Rathbun Creek.
|
Construct asphalt paved Class I multi-use trail with appurtenant striping, markings, and signage, ADA ramp improvements, and curb extensions. Demo portions of existing CMU wall, construct retaining wall, and relocate bus stop to facilitate new trail.
PPNO 1209 |
|
Big Bear Lake |
Eduardo Moreno-Castaneda |
06/01/2022: Mail Received (FPER; received on 5/25/2022.) -view comment history- |
0 |
LRSPL-5426 (015)
|
SBd | City of Big Bear Lake |
Develop a Local Road Safety Plan (LRSP) to provide the City the framework and opportunity to address unique highway safety needs.
LRSP231
Total Cost: $50,000
LRSP Funds: $40,000
Local Funds: $10,000 |
|
Big Bear Lake |
Eduardo Moreno-Castaneda |
02/23/2022: Mail Received (approved MA, PSA & FL; received on 2/22/2022.) -view comment history- |
0 |
SB96-5430 (008)
|
Riv | DINAH SHORE BRIDGE AT WHITEWATER RIVER |
CONSTRUCT BRIDGE AND APPROACH |
|
Cathedral City (Cth C) |
Steven Nguyen |
No comments |
0 |
STPLX-5430 (011)
|
Riv | date palm drive @ cathedral canyon north channel br.no.56c-0195, perez road @ cathedral canyon channel br.no.56c-0375 |
barrier rail |
|
Cathedral City (Cth C) |
Steven Nguyen |
No comments |
0 |
STPLHG-5430 (012)
|
RIV | Intersections of Dinah Shore Drive at Via de Anza and Avenida Lalo Guerrero at Imax |
New traffic signals |
|
Cathedral City (Cth C) |
Albert Vergel de Dios |
02/21/2017: 02/21/2017 Project archived in D8 Database, project file purged on 01/24/2017. -view comment history- |
0 |
STPL-5430 (013)
|
RIV | Date Palm Drive from East Palm Canyon Drive to Vista Chino |
Road rehabilitation and alignment studies |
|
Cathedral City (Cth C) |
Albert Vergel de Dios |
03/30/2012: Mail Received (final invoice) -view comment history- |
0 |
SR2SL-5430 (015)
|
RIV | Victoria Drive from Date Palm Drive to Plumley Road |
Curb, gutter, sidewalk, signing, and striping |
|
Cathedral City (Cth C) |
Albert Vergel de Dios |
04/30/2007: Mail Received (Project Invoice) -view comment history- |
0 |
STPL-5430 (016)
|
RIV | Date Palm Drive bridge over the Whitewater River, Br. No. 56C-0189 |
Pavement rehabilitation |
|
Cathedral City (Cth C) |
Albert Vergel de Dios |
10/19/2007: Mail Received (Federal Report of Expenditures) -view comment history- |
0 |
STPLER-5430 (017)
|
RIV | Ramon Road from Landau Boulevvard to Date Palm Drive |
Landscaping, pavement rehabilitation, and upgrade traffic signal, drainage improvements |
|
Cathedral City (Cth C) |
Ron Akers |
05/06/2014: Mail Received (FINAL VOUCHER) -view comment history- |
1 |
RPSTPL-5430 (018)
|
RIV | Ramon Road Date Palm Drive to East City Limits |
Pavement rehabilitation, including sidewalks, signal interconnect,retaining walls and drainage improvements |
|
Cathedral City (Cth C) |
Albert Vergel de Dios |
05/06/2014: Mail Received (FINAL VOUCHER) -view comment history- |
0 |
STPL-5430 (019)
|
RIV | Perez Road from 0.3 miles East of Cathedral Canyon Drive to Date Palm Drive in the City of Cathedral City. |
Rehabilitation |
|
Cathedral City (Cth C) |
Albert Vergel de Dios |
02/21/2017: 02/21/2017 Project archived in D8 Database, project file purged on 01/24/2017. -view comment history- |
0 |
CML-5430 (020)
|
RIV | Morongo Creek Channel North from Vista Chino |
Blow Sand Abatement/PM-10 Mitigation
Wind Breaks and Stabilization |
|
Cathedral City (Cth C) |
Albert Vergel de Dios |
02/21/2017: 02/21/2017 Project archived in D8 Database, project file purged on 01/24/2017. -view comment history- |
0 |
CML-5430 (021)
|
RIV | Ramon Rd from Neuma Dr. to Duvall Dr.&NW corner of Date Palm Dr.&Vista Chino |
Install new wind fences in Cathedral City in two locations: (1) On the north side of Ramon Road from Neuma Drive to the east 600 feet. (2) On the northwest corner of Date Palm Drive and Vista Chino install 815 feet of new wind fence. |
|
Cathedral City (Cth C) |
Albert Vergel de Dios |
02/21/2017: 02/21/2017 Project archived in D8 Database, project file purged on 01/24/2017. -view comment history- |
0 |
CML-5430 (022)
|
RIV | In Cathedral City Near Date Palm Dr from I-10 to Varner Rd & Near Varner Rd from Date Palm Dr to West City Limits |
Install New Wind fences |
|
Cathedral City (Cth C) |
Albert Vergel de Dios |
02/08/2008: Mail Received (1 copy of Final HPSR) -view comment history- |
0 |
RPSTPLE-5430 (023)
|
RIV | Cathedral Canyon Drive from East Palm Canyon Drive to Terrace Road and Terrace Road from Chuperosa Lane to Paradise Way. |
Bikeway and Pedestrian Facilities. |
|
Cathedral City (Cth C) |
Albert Vergel de Dios |
03/07/2013: Mail Received (Final Voucher) -view comment history- |
1 |
CML-5430 (024)
|
RIV | North and South side of Varner Road (Mountain View to Palm Drive) and East and West side of Palm Drive(Varner Road to 1/4 Mile North of I-10) |
PM-10 Stabilization-Place Asphalt Grindings for Roadside Stabilization |
|
Cathedral City (Cth C) |
Albert Vergel de Dios |
No comments |
0 |
CML1-5430 (025)
|
RIV | East Palm Canyon Drive in the City of Cathedral City from East Buddy Rogers intersection to Allen Avenue intersection. |
Synchronize lights at four intersections where road way lane vary from a 6 lane arterial to a 4 lane arterial. |
|
Cathedral City (Cth C) |
Albert Vergel de Dios |
03/10/2014: Mail Received (Received Final Voucher) -view comment history- |
0 |
SR2SL-5430 (026)
|
RIV | Date Palm Drive from Converse Road to 30th Avenue and the intersection of San Eljay Avenue at 30 th Avenue and McCollum Way and Converse Road. |
In-pavement lighted crosswalks. |
|
Cathedral City (Cth C) |
Albert Vergel de Dios |
03/03/2015: Mail Received (Final invoice checklist only, 4 copies, 0 original) -view comment history- |
0 |
BHLS-5430 (027)
|
RIV | On Date Palm Drive approximately from the intersection at Via Estrada to the intersection at Perez Road Br. no. 56C0189 |
Widen and existing river crossing from 4 to 6 lanes; rehabilitate and seismically retrofit the existing structure; and construct channel improvements. |
|
Cathedral City (Cth C) |
Albert Vergel de Dios |
12/02/2019: Mail Received (Progress Invoice No. 21 (CON, CE)) -view comment history- |
8 |
CML-5430 (028)
|
RIV | Date Palm Drive from Ramon road to East Palm Canyon Drive |
Installation of synchronization equipment at ten intersections on Date Palm Drive from Ramon road to East Palm Canyon Drive utilizing existing interconnect. |
|
Cathedral City (Cth C) |
Albert Vergel de Dios |
04/01/2014: Mail Received (Received Final Voucher) -view comment history- |
1 |
BRLS-5430 (029)
|
RIV | Date Palm Drive over Long Canyon Creek Br. no. 00L0043 |
Replace existing 2-lane low flow box culvert Low Water Crossing with a 6-lane bridge. |
|
Cathedral City (Cth C) |
Albert Vergel de Dios |
03/05/2013: Mail Received (Exhibit 6-D (1 original)) -view comment history- |
0 |
HSIPL-5430 (030)
|
RIV | East Palm Canyon Drive between Canyon Plaza and Perez Road in Cathedral City |
Widen Roadway and add Bike Lane, Construct Curb Gutter and Sidewalks, Upgrade traffic signals, install signs and striping |
|
Cathedral City (Cth C) |
Albert Vergel de Dios |
07/08/2015: Mail Received (Exhibit 17-M, 1 original, 0 copies) -view comment history- |
7 |
STPLHSR-5430 (031)
|
RIV | Ortega Rd. from Date Palm Dr. to Campus Ln.; intersections of 30th Ave. and Avenida La Paz; Vista Chino and Landau Blvd. |
Construct sidewalk gap closures, curb ramps, and crosswalk improvements |
|
Cathedral City (Cth C) |
Albert Vergel de Dios |
05/26/2016: Mail Received (Invoice Final Revised (Con.) 1 original, 0 copies) -view comment history- |
0 |
STPL-5430 (032)
|
SBd | East Palm Canyon Drive, West City Limits to 550' west of Canyon Plaza & Melrose to East City Limits |
Pavement Rehabilitation: Slurry Seal Existing Pavement |
|
Cathedral City (Cth C) |
Albert Vergel de Dios |
05/24/2016: Send Final Invoice to LPA. -view comment history- |
0 |
HSIPLN-5430 (033)
|
RIV | Twenty (20) Intersections Citywide |
Install Advanced Dilemma Zone and Countdown Pedestrian Signal Heads
HSIP ID: H8-08-001 |
|
Cathedral City (Cth C) |
Enrique Gonzalez |
09/15/2022: Mail Received (Approved FL & PSA; Received 09/14/2022) -view comment history- |
1 |
HSIPL-5430 (034)
|
RIV | Ten (12) Intersections Throughout the City of Cathedral City. scope change approved 11/20/21
Ten (10) Intersections Throughout the City of Cathedral City. |
Install advanced dilemma zone detection, protected left turn phases, and pedestrian countdown heads.
H9-08-001 |
|
Cathedral City (Cth C) |
Enrique Gonzalez |
03/06/2023: Mail Received (Progress Invoice No.8; Received 03/02/2023) -view comment history- |
0 |
HSIPL-5430 (035)
|
RIV | Date Palm Drive and Varner Road |
Construct centerline and edgeline rumble strips, install flashing stop signs, and install guardrail.
H9-08-002 |
|
Cathedral City (Cth C) |
Enrique Gonzalez |
11/01/2022: Mail Received (HPSR) -view comment history- |
0 |
LRSPL-5430 (036)
|
RIV | Throughout the City of Cathedral City |
Develop Loacal Roadway Safety Plan |
|
Cathedral City (Cth C) |
Enrique Gonzalez |
03/04/2022: Mail Received (final invoice 4; received on 2/28/2022.) -view comment history- |
0 |
HSIPL-5430 (037)
|
RIV | Ramon Road and Avenida La Paloma Intersection |
Install a Pedestrian Hybrid Beacon (HAWK) signal
H10-08-003 |
|
Cathedral City (Cth C) |
Enrique Gonzalez |
05/02/2023: Mail Received (ROW Certification; Received 04/20/2023) -view comment history- |
0 |
ATPL-5430 (038)
|
RIV | Within Cathedral City and has three segments
Cathedral Canyon Drive: Dinah Shore Dr to Canyon Shore Dr
Date Palm Dr from Perez Rd to east palm canyon Dr
East Palm Canyon Dr from west city limits to Cathedral Canyon Dr. |
The project constructs bike lanes, missing sidewalk, high-visibility crosswalks, multi-use path, pedestrian hybrid beacon, mid-block crossing, ADA curb ramps, and widening.
PPNO:1283
FTIP ID: RIV210628
Advantage ID: 0822000156
Application ID: 8-Cathedral City, City of 1 |
|
Cathedral City (Cth C) |
Enrique Gonzalez |
05/02/2023: Mail Received (Allocation Request; Received 04/28/2023) -view comment history- |
0 |
ER-5430 (049)
|
RIV | Date Palm Drive at Whitewater River. |
Scour and displacement of top soil and slope protection under bridge along east side. Description of Work: Regrade and protect slope paving. Cover articulated block under bridge. DAF No. HWS-CTHC-004-0. Approved by FHWA on 05/30/2019. |
|
Cathedral City (Cth C) |
Matthew Sapp |
06/09/2022: Mail Received (ER Final Invoice 01 ; received on 6/9/2022) -view comment history- |
1 |
ER40A0-5430 (070)
|
RIV | to be completed by staff. Sean, 6/1/2021. |
to be completed by staff. Sean, 6/1/2021. |
|
Cathedral City (Cth C) |
Matthew Sapp |
04/28/2022: Mail Received (approved PSA & FL; received on 4/27/2022.) -view comment history- |
0 |
ER-5430 (071)
|
RIV | Date Palm Dr at Los Gatos Rd |
DAF# HWS-CTHC-003-1
FHWA Approval Date: 09/25/19
Current Cost Estimate: $10,656
Repair lanes and shoulder for temporary Opening |
|
Cathedral City (Cth C) |
Albert Vergel de Dios |
06/21/2022: Mail Received (Approved PSA; Received 06/20/2022) -view comment history- |
1 |
BR-NBIL-5430 (504)
|
RIV | Cathedral Canyon Drive over Whitewater River in Cathedral City. Br. no. 00L0029 |
Replace 4-lane low water crossing with 4-lane bridge |
|
Cathedral City (Cth C) |
Matthew Sapp |
09/14/2022: Mail Received (Progress Invoice No.28; Received 09/14/2022) -view comment history- |
6 |
STPLHSR-5433 (006)
|
RIV | Intersection of Dune Palms Road and Desert Crest Drive and on Miles Avenue |
Pedestrian-activated crosswalk and traffic signal |
|
La Quinta |
Albert Vergel de Dios |
03/30/2007: Mail Received (Final invoice) -view comment history- |
0 |
STPL-5433 (007)
|
RIV | Avenue 54 From Jefferson Street To Madison Street |
Road way rehab |
|
La Quinta |
Steven Nguyen |
11/06/2007: Mail Received (Final Voucher) -view comment history- |
0 |
RPSTPLE5433-5433 (008)
|
RIV | Jefferson Street, between Highway 111 and Indio Blvd |
The proposed improvements consist of landscaping the median islands on Jefferson Street between Highway 111 and Indio Blvd using decomposed granite, rock, irrigation, drought tolerant ground cover, plants,shrubs and trees. |
|
La Quinta |
Albert Vergel de Dios |
04/01/2008: Mail Received (Award Package) -view comment history- |
0 |
CML-5433 (009)
|
RIV | Former State Route 111 From Washington Street to Jefferson Street |
Replace Signal Controllers |
|
La Quinta |
Albert Vergel de Dios |
No comments |
0 |
CML-5433 (010)
|
RIV | In the City of La Quinta - Adams Street, Miles Avenue, and Dune Palms Road. |
Signal Interconnect. |
|
La Quinta |
Albert Vergel de Dios |
04/05/2012: Mail Received (Final Voucher) -view comment history- |
0 |
CML-5433 (011)
|
RIV | In the City of La Quinta - Eisenhower Drive. |
Signal Interconnect. |
|
La Quinta |
Albert Vergel de Dios |
06/28/2012: Final Voucher received and filed -view comment history- |
0 |
CML-5433 (012)
|
RIV | In the City of La Quinta - Madison Street at Avenue 54. |
Construct a new traffic signal. |
|
La Quinta |
Albert Vergel de Dios |
08/21/2013: Mail Received (Deobligation letter) -view comment history- |
0 |
SLPP-5433 (013)
|
RIV | Highway 111at Washington Street Intersection |
Intersection Improvements
Median modification and restriping ? adding right and left turn lanes and modifying median
Add right-turn lane (both directions) requiring reconstruction of curb and gutter, signal pole modification and removal and replacement of bus turnout
Signal modification for the proposed turn lane improvements including new mast arms and signal heads.
|
|
La Quinta |
Albert Vergel de Dios |
12/01/2014: Mail Received (Finance letter, 1 original, 0 copy) -view comment history- |
0 |
BR- NBIL-5433 (014)
|
RIV | Dune Palms Road over Coachella Valley channel Br. no. 00L0070 |
Low water Crossing, replace 3-lane LWC w/ 4-lane bridge |
|
La Quinta |
Enrique Gonzalez |
12/24/2021: Mail Received (final invoice 27; received on 12/22/2021.) -view comment history- |
33 |
HSIPL-5433 (015)
|
RIV | Citywide Intersections |
Upgrade all intersection safety lighting and street name signs to more visible LED type and upgrade the traffic signal cabinet at 8 ints. and cabinet controller at 15 ints. |
|
La Quinta |
Jacoub Hanna |
03/19/2020: Mail Received (invoice 10 (final); 1 original, 0 copy.) -view comment history- |
2 |
STPL-5433 (016)
|
RIV | Washington St., from Calle Tampico to Ave. 52 |
Pavement Restoration - grind and overlay existing pavement |
|
La Quinta |
Albert Vergel de Dios |
06/16/2016: DLAE signs Exhibit 17-A, cover letter and federal report of expenditure checklist, and Exhibit 17-C, Final Inspection Form. -view comment history- |
0 |
HSIPL-5433 (017)
|
RIV | Citywide Signal Interconnect |
Upgrade traffic signal interconnect network including the installation of new fiber optic interconnect, replacing existing wired interconnect with fiber optic cables and all contingent work to improve signal timing and coordination. |
|
La Quinta |
Solomon Frisco |
02/23/2021: FROE Package sent to LPA -view comment history- |
2 |
BPMPL-5433 (018)
|
RIV | Citywide 56C0076, 56C0266, 56C0377, 56C0378, 56C0498, 56C0577, 56C0595, 56C0617 |
Develop BPMP list |
|
La Quinta |
Albert Vergel de Dios |
08/30/2018: Mail Received (FROE) -view comment history- |
0 |
SSARPL-5433 (019)
|
RIV | Citywide |
Provide Systemic Safety Analysis Report throughout major corridors and intersections Citywide. |
|
La Quinta |
Albert Vergel de Dios |
10/17/2019: Mail Received (invoice (final) 2; 1 original, 2 copies.) -view comment history- |
0 |
ATPLSB1L-5433 (020)
|
RIV | La Quinta Village Complete Streets - A Road Diet
• Calle Tampico from Eisenhower Drive to Washington Street.
• Eisenhower Drive from Calle Tampico to Calle Sinaloa.
• Calle Sinaloa/Avenue 52 from Eisenhower Drive to Washington Street. |
PPNO: 1214 ATP ID: ATP03-08-024S
Create a Complete Streets atmosphere throughout the Village by installing pedestrian and bicycle facilities by reducing the number of traveled lanes from four lanes to two. Install roundabouts at intersections including shared use paths. |
|
La Quinta |
Frisco Soloman |
05/07/2021: Sent the Final project expenditure report to Albert for signature -view comment history- |
0 |
BR-NBIL-5433 (503)
|
RIV | Adams Street over the Whitewater River Br. no. 00L0032 |
4-lane bridge over low water crossing |
|
La Quinta |
Eduardo Moreno-Castaneda |
01/07/2016: Mail Received (HQ to Dist. 8 Finance Ltr. 1 copy, 0 originals) -view comment history- |
1 |
BR-NBIL-5433 (537)
|
RIV | Dune Palms Road over Coachella Valley Stormwater (Whitewater River) |
Replace 3-lane low water crossing with 4-lane bridge. |
|
La Quinta |
Matthew Sapp |
05/19/2023: Mail Received (Progress Invoice No.7; Received 05/18/2023) -view comment history- |
2 |
NBIL-5433 (547)
|
RIV | Br. # 00L0091 AVENUE 50 OVER LA QUINTA EVACUATION CHANNEL. |
Replace 3-lane low water crossing with 4-lane bridge |
|
La Quinta |
Elaine Rogers |
04/07/2023: Mail Received (DBE Goal; Received 03/31/2023) -view comment history- |
0 |
BR-NBIL-5433 (901)
|
RIV | VOID - DUPLICATE- REFER TO BRLKS 5433(014)- Dune Palms Road over Coachella Valley Channel (Whitewater Channel) |
Replacement Low Water Crossing |
|
La Quinta |
Albert Vergel de Dios |
10/29/2012: Mail Received (HBP Application Replace Dune Palms road LWC over Whitewater channel HQ SLA Responses to Comments) -view comment history- |
0 |
TCEPL -5441 (000)
|
RIV | Sr 60/ Moreno Beach Drive Interchange Project (Phase II)-- EA 32303 (No FPN issued yet) |
Interchange Phase II |
|
Moreno Valley |
Sean Yeung |
No comments |
0 |
STPLN-5441 (021)
|
RIV | NASON/ FREEWAY Route I-60 |
Interchange Improvements |
|
Moreno Valley (MorV) |
Eric Tang |
No comments |
0 |
CML-5441 (025)
|
RIV | Cactus Ave. between I-215 and Lasselle Street |
Interconnect Signals |
|
Moreno Valley (MorV) |
Eric Tang |
No comments |
0 |
HP21STPL-5441 (028)
|
RIV | IN MORENO VALLEY ON SR 60 AT NASON STREET |
IMPROVE INTERCHANGE |
|
Moreno Valley (MorV) |
Eric Tang |
No comments |
0 |
STPLF-5441 (032)
|
RIV | Redlands Boulevard at Storm Channel Line "F" south of Alessandro Boulevard, LWC 00L0010. |
Reinforced concrete culvert (cancelled) |
|
Moreno Valley (MorV) |
Osabuogbe Igbinedion |
12/06/2006: Mail Received (final voucher) -view comment history- |
0 |
BRKLS-5441 (033)
|
RIV | Redlands Boulevard at Storm Channel Line "F" south of Alessandro Boulevard, LWC 00L0010. |
Reinforced concrete box culvert |
|
Moreno Valley (MorV) |
Osabuogbe Igbinedion |
No comments |
0 |
STPLER-5441 (036)
|
RIV | Along the California Aqueduct pipeline southeasterly from Pan-Am Boulevard to Graham Street and from Heacock Street to John F. Kennedy Drive |
Bike path and landscaping |
|
Moreno Valley (MorV) |
Eric Tang |
01/27/2006: Mail Received (Submission of Required Documents
Aqueduct Bike Trail and Landscaping Improvements) -view comment history- |
0 |
STPLH-5441 (038)
|
RIV | Indian Street from Delphinium Avenue to Cactus Avenue |
Drainage improvements |
|
Moreno Valley |
Albert Vergel de Dios |
04/13/2010: Mail Received (final voucher) -view comment history- |
0 |
BRLS-5441 (039)
|
RIV | Heacock Street at the Perris Valley Storm Drain 2.65 miles north of Ramona Expressway, Br. No. 56C-0233 |
Bridge Rehabilitation |
|
Moreno Valley |
Chigo Dike |
09/04/2014: Mail Received (PSA approved) -view comment history- |
0 |
SR2SL-5441 (040)
|
RIV | Hidden Springs Drive, Wordsworth Road, Kitching Street, Sunnymead Ranch Parkway, and Heacock Street |
Solar-powered flashing beacons and speed radar signs |
|
Moreno Valley |
Chigo Dike |
02/21/2017: 02/212017 Project archived in D8 Database, project file purged on 7/7/2015. -view comment history- |
0 |
STPL-5441 (041)
|
RIV | City of Moreno Valley, Ironwwod |
Rehab Ironwood |
|
Moreno Valley (MorV) |
Eric Tang |
08/13/2007: Mail Received (Notice of Award Package) -view comment history- |
0 |
RPSTPLE-5441 (042)
|
RIV | Sunnymead Blvd. from Frederick Street to Perris Blvd. |
Median landscaping and decorative color-patterned concrete |
|
Moreno Valley |
Chigo Dike |
03/10/2014: Mail Received (Received Final Voucher) -view comment history- |
0 |
STPL-5441 (043)
|
RIV | Heacock Street from Gentian Avenue to Poppystone Drive anf Frederick Street/Pigeon Pass Road from Sunnymead Boulevard to Hemlock Avenue |
Road Rehabilitation |
|
Moreno Valley |
Chigo Dike |
02/21/2017: 02/212017 Project archived in D8 Database, project file purged on 7/7/2015. -view comment history- |
0 |
SR2SL-5441 (044)
|
RIV | Alessandro Boulevard and Indian Street |
Sidewalk gap closure |
|
Moreno Valley |
Chigo Dike |
05/07/2012: Mail Received (Final Invoice. revision 1.) -view comment history- |
0 |
STPL-5441 (045)
|
RIV | Reche Vista Drive from the intersection of Perris Boulevard and Heacock Street to Country Road |
Realignment and traffic signals |
|
Moreno Valley |
Chigo Dike |
05/27/2010: Mail Received (Letter of Invitation to observe Field Investigation) -view comment history- |
0 |
HSIPL-5441 (046)
|
RIV | Various |
Installing / retrofitting 117 existing signalized intersection with emergency vehicle pre-emption system. |
|
Moreno Valley |
Chigo Dike |
11/12/2015: Mail Received (Final Invoice, 8 copies, 0 originals) -view comment history- |
2 |
SR2SL-5441 (047)
|
RIV | Dracaea Ave.(north) between Morrison St. and Mascot Ln. |
Install gap closure to missing curb rmps and gutter, improve sidewalks. |
|
Moreno Valley |
Chigo Dike |
04/20/2010: Mail Received (program supplement agreement) -view comment history- |
1 |
SLPPCL10-5441 (049)
|
RIV | Cactus Avenue from Lasselle St. and Nason St. |
Road Reconstruction and Widening |
|
Moreno Valley |
Chigo Dike |
10/31/2013: Mail Received (Received Final Delivery Report) -view comment history- |
0 |
HSIPL-5441 (050)
|
RIV | Alessandro Blvd. from 500' East Perris Blvd. to Indian St. |
Construcst raised median w/ lt lanes and modify traffic signal and install new traffic signal |
|
Moreno Valley |
Albert Vergel de Dios |
11/16/2018: Mail Received (PE only closeout with final invoice, 1 original, 0 copy.) -view comment history- |
1 |
STPLN-5441 (051)
|
RIV | Nason Street and SR60, Bridge 56 0485 |
Widen Nason Street from 2 to 4 through lanes; add sound walls, complete aux lanes;replace bridge;landscaping and irrigation
Advantage ID. 0812000229 |
|
Moreno Valley |
Matthew Sapp |
04/02/2019: Mail Received (FROE; 1 original, 0 copy; Report of Completion of Structures; 1 original, 1 copy.) -view comment history- |
0 |
SR2SL-5441 (052)
|
RIV | Delphinium Avenue from 590' E. of Perris Blvd. to 650' W. of Perris Blvd. |
Construct sidewalks, curb and gutter, install speed feedback signs and safety lighting |
|
Moreno Valley |
Chigo Dike |
06/29/2015: Mail Received (Invoice Final (Con) 1 original, 2 copies ) -view comment history- |
0 |
SLPPCL13-5441 (053)
|
RIV | Cactus Ave. from I-215 to Veteran Way |
Re-alignment, widening, turn lane, shoulders, curb and gutter, drainage and modify traffic signals |
|
Moreno Valley |
Chigo Dike |
03/16/2015: Mail Received (SLPP Final Delivery Report, 1 original, 0 copy) -view comment history- |
1 |
SLPPCL13-5441 (054)
|
RIV | Perris Blvd. from Ironwood to Manzanita |
Widen from 2-lane to 4-lane, curb and gutter, sidewalks,parkways,raised medians, minor storm drain, new traffic signal and traffic signal modification. |
|
Moreno Valley |
Chigo Dike |
10/19/2016: DLAE signs Exhibit 17-M, Final Project Expenditure Report, and Exhibit 17-C, Final Inspection Form. -view comment history- |
2 |
HSIPL-5441 (055)
|
RIV | Sunnymead Blvd./SR 60 EB on-ramp from Perris Blvd. |
Construct roundabout or Install Traffic Signal, to be determined in the PA &ED phase.
Advantage ID 0814000029 |
|
Moreno Valley |
Chigo Dike |
04/06/2016: Mail Received (March 15th Project Decision,(HSIP (Cycle 5) 1 copy, 0 originals) -view comment history- |
0 |
HSIPL-5441 (056)
|
RIV | Elsworth St./Alessandro Blvd. |
Convert signal to mast arm, remove cross gutter, "dilemma zone" protection, upgrading ADA access
Advantage ID 0814000030 |
|
Moreno Valley |
Albert Vergel de Dios |
12/19/2018: FROE & Final Inspection Form signed by DLAP. Final invoice and FROE sent to LPA. -view comment history- |
1 |
STPL-5441 (057)
|
RIV | Frederick St. from Sunnymead to Alessandro and Elsworth St. from Cactus to Business Center. |
Pavement Rehabilitation. |
|
Moreno Valley |
Chigo Dike |
11/01/2016: Mail Received (Final Invoice #3 Revised (con), 1 copy, 0 originals) -view comment history- |
0 |
BPMP-5441 (058)
|
RIV | Various Location. 22 bridges.
|
Bridge Preventive Maintenance Program |
|
Moreno Valley |
Chigo Dike |
11/23/2015: Mail Received (FROE, 1 original, 0 copies) -view comment history- |
0 |
STPLN-5441 (059)
|
RIV | SR-60/ Theodore Street IC |
Widen OC from 2 to 6 lanes, widen WB exit/entry ramps from 1 lane to 2 lanes at exit/entry, 3 lanes at art. w/ HOV at entry, widen EB exit ramp from 1 lane to 2 lanes at exit and 3 lanes at art., widen EB entry ramp from 1 lane to 2 lanes w/ HOV add E loop entry with 2 lanes at art. and 1 lane at entry, add aux lanes 1700' each direction west of IC and 2200' WB east of IC - RTP 3M0801. |
|
Moreno Valley |
Albert Vergel de Dios |
12/26/2018: Mail Received (PE only close out package, 1 original, 0 copy.) -view comment history- |
0 |
CML-5441 (060)
|
RIV | Aqueduct Trail, Eucalyptus Avenue to Lake Perris State Recreational Area. |
Develop Plans for missing sements of the Aqueduct Trail for continuos trail. |
|
Moreno Valley |
Albert Vergel de Dios |
12/05/2018: Mail Received (DLAP signs Reval for Right of Way) -view comment history- |
4 |
HSIPL-5441 (061)
|
RIV | Various Location Citywide |
Upgrade Signals; Install pedestrian countdown heads; ADA pedestrian pushbuttons |
|
Moreno Valley |
Matthew Sapp |
11/08/2019: Mail Received (FROE) -view comment history- |
0 |
HSIPL-5441 (062)
|
RIV | ALesandro BLvd. / Chagall Ct. and Alessndro Blvd. / Graham St. |
Upgrade raised median and ramp, install "dilemm zone" detection. |
|
Moreno Valley |
Matthew Sapp |
11/08/2019: Mail Received (FROE) -view comment history- |
4 |
CML-5441 (063)
|
RIV | Alessandro/Eucalyptus/Cactus Ave and Delphinium Ave. Arterial routes approching I-215 and SR-60. |
Install 3 Dynamic Message Signs |
|
Moreno Valley |
Karen Nguyen |
09/30/2020: Mail Received (Resubmittal of Final Invoice, Electronic Submittal) -view comment history- |
6 |
ATPL-5441 (064)
|
RIV | Citywide |
Sidewalks, curb, gutters,street lights, ADA ramps,street widening.
NI elements: promo campaign, bicycle safety. |
|
Moreno Valley |
Eduardo Moreno-Castaneda |
02/02/2021: Final Progress Invoice No. 12 and FROE sent to LPA -view comment history- |
1 |
CML-5441 (065)
|
RIV | 43 Intersections, Eucalyptus/Ironwood/Heacock/Alessandro/Perris/Cactus/Lasselle |
Design and Construct ITS. |
|
Moreno Valley |
Karen Nguyen |
09/30/2020: Mail Received (Resubmittal of Final Invoice, Electronic Submittal) -view comment history- |
5 |
HSIPL-5441 (066)
|
RIV | Ironwood Ave Road Safety Audit |
Road Safety Audit and implement recommended improvements |
|
Moreno Valley |
Matthew Sapp |
01/27/2023: Mail Received (Progress Invoice No.12; Received 01/24/2023) -view comment history- |
1 |
HSIP-5441 (067)
|
RIV | Kitching Street Rd Safety Audit & Improvements |
Conduct Road Safety Audit and Implement eligible recommended improvements |
|
Moreno Valley |
Matthew Sapp |
01/27/2023: Mail Received (Progress Invoice No.11; Received 01/24/2023) -view comment history- |
1 |
HSIPL-5441 (068)
|
RIV | Advanced Dilemma Zone Detect System--65 signalized intersections citywide |
Install advanced dilemma zone detection systems at 65 signalized intersections citywide |
|
Moreno Valley |
Matthew Sapp |
01/27/2023: Mail Received (FROE; Received 01/24/2023) -view comment history- |
1 |
ATPL-5441 (069)
|
RIV | Juan Bautista De Anza Multi-Use Trail Iris Avenue to El Potrero Park |
The project will construct a multi-use trail and ADA compliant pedestrian path generally along the Juan Bautista De Anza Historic Corridor. It will connect residential neighborhoods directly to 3 parks, 3 schools, and existing bicycle facilities. |
|
Moreno Valley |
Matthew Sapp |
01/27/2023: Mail Received (Progress Invoice No.12; Received 01/24/2023) -view comment history- |
2 |
HSIPL-5441 (070)
|
RIV | 22 locations throughout the City of Moreno Valley |
Upgrade existing guardrail installations to conform to current standards, generally guardrail height and end treatment type. |
|
Moreno Valley |
Eduardo Moreno-Castaneda |
03/18/2021: Progress Invoice No. 13 & FROE sent to LPA -view comment history- |
1 |
HSIPL-5441 (071)
|
RIV | Marked crosswalk upgrades |
Upgrade existing marked crosswalks on arterials to provide either rectangular rapid flashing beacon, or hybrid pedestrian beacons. |
|
Moreno Valley |
Matthew Sapp |
01/27/2023: Mail Received (Final Invoice 11; Received 01/24/2023) -view comment history- |
0 |
HSIPL-5441 (072)
|
RIV | High friction surface treatment. |
Provide high-friction surface treatment for approximately 750ft length of Lasselle St. to reduce run-off-road crashes; upgrade 7 signalized intersections to provide intelligent rest-in-red operation to reduce speeding at off peak times. |
|
Moreno Valley |
Matthew Sapp |
01/27/2023: Mail Received (Final Invoice 15; Received 01/24/2023) -view comment history- |
1 |
SSARPL-5441 (073)
|
RIV | Various locations throughout the city |
Pedestrian & Bike Path |
|
Moreno Valley |
Karen Nguyen |
09/10/2020: Final Report of Expenditure(Invoice 6) Submitted to LPA. -view comment history- |
0 |
ATPL-5441 (074)
|
RIV | Juan Bautista de Anza Trail Gap Closure
2 mile long bike and pedestrian path segment of the Juan Bautista De Anza Trail that connects to an existing trails, Lake Perris State Park. |
Pedestrian and Bike Path |
|
Moreno Valley |
Matthew Sapp |
05/02/2023: Mail Received (Progress Invoice No.11; Received 04/21/2023) -view comment history- |
0 |
BPMPL-5441 (075)
|
RIV | Citywide (10 bridges) 56C0397, 56C0418, 56C0464, 56C0395, 56C0407, 56C0511, 56C0333, 56C0332, 56C0396, 56C0417 |
Preventive Maintenance |
|
Moreno Valley |
Matthew Sapp |
09/10/2020: Mail Received (PE RFA; electronic submittal) -view comment history- |
0 |
ATPL-5441 (076)
|
RIV | In the City of Moreno Valley in Riverside County, from Moreno Valley Mall (Eucalytpus Ave.) to Iris Ave. |
State-Only Funding - Allows for the design, engineering and construction of more than 4 miles of multi-use trail for bicyclist and pedestrians and leverages prev; Construction of 4 miles of multi-use trail for bicyclists and pedestrians including Class I bike path and pedestrian path, street crossing, and conection to existing trails. Programmed funds: PS&E: $350K FY19/20; ROW: $660 FY 19/20; CON: $7,393K FY20/21 |
|
Moreno Valley |
Matthew Sapp |
05/02/2023: Mail Received (Progress Invoice No.10; Received 04/21/2023) -view comment history- |
0 |
LRSPL-5441 (077)
|
RIV | City Wide |
Local Roadway Safety Plan |
|
Moreno Valley |
Matthew Sapp |
09/27/2022: Mail Received (LRSP Final Report; Received 09/22/2022) -view comment history- |
0 |
SR2SL-5448 (004)
|
SBd | El Paseo Drive, Mesquite Springs Road, Split Rock Avenue, and Baseline Road |
Curb, gutter, Sidewalk, bike path, Flashing Beacons and upgrade signs and crosswalks. |
|
Twentynine Palms |
Pamela Wells |
10/31/2012: Phone conversation: informed Richard Warren (City Manager) that the final invoice went to the SCO on 10/18/12 for payment -view comment history- |
0 |
STPLER-5448 (005)
|
SBd | National Park Drive from SR 62 to Cottonwood Drive |
Landscaping |
|
Twentynine Palms |
Osabuogbe Igbinedion |
07/09/2007: Mail Received (final voucher) -view comment history- |
0 |
SLPP-5448 (006)
|
SBd | National Park Drive, SR-62 to Visitor Center |
Construct curbs, gutter, sidewalks and bike path |
|
Twentynine Palms |
Pamela Wells |
11/18/2019: Mail Received (FROE, SSARP Analysis) -view comment history- |
0 |
SSARPL-5448 (007)
|
RIV | Various Locations in the City |
Citywide evaluation of crash data and traffic volumes to help the City determine the most effective countermeasures to reduce collisions citywide. |
|
Twentynine Palms |
Melaine Hall |
04/07/2020: Mail Received (progress invoice 5; 1 original, 0 copy.) -view comment history- |
0 |
HSIPL-5448 (008)
|
SBd | State Route 62 between Encelia Ave and Larea Ave (approximately 0.6mile) |
Install sidewalk infrastructure on the south side of the highway and across a culvert. Pedestrian crossing signage and high visibility crosswalk pavement markings will be installed at Encelia and Larrea Avenues. |
|
Twentynine Palms |
Jesus Sandoval |
12/01/2020: Mail Received (Final invoice No.3 ; electronic Submittal.) -view comment history- |
1 |
HSIPL-5448 (009)
|
SBd | Residential area (high speed rural residential/local area) south of Two Mile Rd, North of Baseline Rd, East of Encelia Ave, and west of Elm Ave. |
Upgrade intersection pavement markings and installing advance flashing beacons for advance warning. |
|
Twentynine Palms |
Pamela Wells |
01/19/2023: Mail Received (Progress Invoice No.4; Received 01/18/2023) -view comment history- |
1 |
ATPL-5448 (010)
|
SBd | Surrounding four Morongo USD schools: Oasis Elem., Twentynine Palms Elem., Twentynine Palms JHS, and Twentynine Palms HS; along portions of El Paseo Drive and Two Mile Road |
Construction of sidewalk and asphalt paths, curb ramps, high vis crosswalks, pedestrian hybrid beacons, speed feedback units, and school signage, and tree/shrubbery relocation |
|
Twentynine Palms |
Pamela Wells |
09/27/2022: Mail Received (RFA (CON) adj; Received 09/27/2022) -view comment history- |
1 |
HSIPSL-5448 (011)
|
SBd | Two Mile Rd & Lear Ave, Two Mile Road & Mesquite Springs Road, Adobe Road & Sullivan Road, Adobe Road & Smith Ranch Road, Utah Trail & Amboy Road, and Utah Trail & Baseline Road |
Install flashing beacons at stop controlled intersections and upgrade intersection pavement markings. |
|
Twentynine Palms |
Pamela Wells |
12/21/2022: Mail Received (Progress Invoice No.5; Received 12/20/2022) -view comment history- |
0 |
BR-NBIL-5448 (533)
|
SBd | Split Rock Avenue over Twentynine Palms Flood Control Channel, LWC #00L0084. |
Replace 2-lane low water crossing with 2-lane bridge. |
|
Twentynine Palms |
Steven Stockman |
04/14/2023: Mail Received (Approved FL & PSA; Received 04/10/2023) -view comment history- |
13 |
BTA-5449 (000)
|
SBd | 5th St from Palm Ave to Village Lakes DR |
Bicylce lane |
|
Highland |
Roberto Ortiz |
No comments |
0 |
BTA-5449 (000)
|
SBd | 5th Street - Palm to Boulder BTA 01260
|
Construct Bike Trail |
|
Highland |
Carol Green |
No comments |
0 |
STPLH-5449 (005)
|
SBd | Intersection of Base Line and Victoria Avenue |
Reconstruct signals |
|
Highland |
Sean Yeung |
02/21/2017: 02/21/2017 Project archived in D8 Database, project file purged on 01/24/2017. -view comment history- |
0 |
STPLH-5449 (006)
|
SBd | Intersection of Base Line and Sterling Avenue |
Reconstruct signals |
|
Highland |
Sean Yeung |
02/21/2017: 02/21/2017 Project archived in D8 Database, project file purged on 01/24/2017. -view comment history- |
0 |
CML-5449 (008)
|
SBd | Base Line from Palm Avenue to Boulder Avenue |
Interconnect signals |
|
Highland |
Carol Green |
12/05/2005: Mail Received (Final Invoices for CML 5449-008 STPLH 5449-005 STPLH 5449-006) -view comment history- |
0 |
STPL-5449 (009)
|
SBd | 5th Street from SR 30 to Boulder Avenue |
Roadway widening |
|
Highland |
Sean Yeung |
07/07/2009: Mail Received (Corrected final invoice Final-2A) -view comment history- |
0 |
CML-5449 (010)
|
SBd | Palm Avenue from 3rd Street to Baseline and 5th Street from Palm Avenue to Boulder Avenue |
Interconnect signals |
|
Highland |
Albert Vergel de Dios |
02/21/2017: Project archived in D8 Database, project file purged on 7/7/2015.
-view comment history- |
0 |
CML-5449 (011)
|
SBd | 5th Street from Palm Avenue to Boulder Avenue |
Interconnect signals |
|
Highland |
David Lee |
No comments |
0 |
HSIPL-5449 (011)
|
SBd | Baseline St. Between SR 210 and Boulder |
Construction of raised median at Baseline St. Between SR 210 and Boulder for $976,400. |
|
Highland |
Sean Yeung |
06/14/2021: Mail Received (approved FL, PSA & MA; received on 6/14/2021.) -view comment history- |
0 |
STPLHG-5449 (012)
|
SBd | Intersection of Boulder Avenue and Webster Street |
New signals |
|
Highland |
Carol Green |
12/28/2005: Mail Received (Award {pakcage fpr the Boulder Ave at Webster Str) -view comment history- |
0 |
STPLH-5449 (013)
|
SBd | Orange Street from BOulder Avenue to 5th Street |
Eliminate Connectionand realign road. |
|
Highland |
Sean Yeung |
06/11/2009: Mail Received (Final Invoice) -view comment history- |
0 |
BRLO-5449 (014)
|
SBd | Boulder Avenue south of Base Line at City Creek, Br. No. 54C-0648 |
Bridge replacement |
|
Highland |
Karen Nguyen |
10/07/2015: Agency is NOT requesting for CWA Cycle 13 Extension. -view comment history- |
0 |
BRLO-5449 (015)
|
SBd | Greenspot Road over the Santa Ana River, Br. No. 54C-0368 |
Bridge replacement |
|
Highland |
Karen Nguyen |
08/26/2021: Final invoice/FROE sent to LPA -view comment history- |
0 |
SR2SL-5449 (016)
|
SBd | Orange Street - Pacific Street to Nona Ave. |
Curb, Gutter & Sidewalks - State Funds Used |
|
Highland |
Albert Vergel de Dios |
02/21/2017: Project archived in D8 Database, project file purged on 7/7/2015.
-view comment history- |
0 |
STPLH-5449 (017)
|
SBd | Greenspot Road .1 mile e/o Santa Paula Street to .65 east of Santa Paula |
Roadway realignment |
|
Highland |
Sean Yeung |
10/17/2016: Mail Received (CWA, 1 original, 0 Copies) -view comment history- |
0 |
SR2SL-5449 (018)
|
SBd | Intersections of Church Street with Flenheather Drive and 9th Street with Cunningham Street |
Curb, gutter, sidewalk, ramps, and in-pavement cross lights |
|
Highland |
Albert Vergel de Dios |
02/21/2017: Project archived in D8 Database, project file purged on 7/7/2015.
-view comment history- |
0 |
SR2SL-5449 (019)
|
SBd | Southside of 9th Street from the west city limits at Elmwood Road To Sterling Avenue. |
Curb, gutter, sidewalk, and ramps |
|
Highland |
Sean Yeung |
11/12/2009: Mail Received (Revised first and final) -view comment history- |
0 |
SR2S-5449 (020)
|
SBd | 9th St. (south) between Mckinley St. and Eucalyptus Drive |
Construct curb, gutter, sidewalk with related street improvements. |
|
Highland |
Sean Yeung |
No comments |
0 |
SR2SL-5449 (021)
|
SBd | Church St. from Greenspot Rd. to Highland Ave.; Highland Ave. from Church St. to Baseline; Weaver St. from Baseline to Greenspot Rd.; Baseline from Weaver St. to Alta Vista |
Bike lane, lighted crosswalks and implementation of a Suggested School Walking Route Program |
|
Highland |
Sean Yeung |
01/13/2016: Mail Received (HQ to Dist. 8. Finance Ltr.) -view comment history- |
0 |
HSIPRLE-5449 (022)
|
SBd | Base Line Beautification from Cole to SR 210. |
Curb and gutter, raised medians, and street lights |
|
Highland |
Eduardo Moreno-Castaneda |
07/18/2022: Final Invoice No. 7 and FROE sent to LPA -view comment history- |
0 |
RPSTPLE-5449 (023)
|
SBd | Baseline Avenue |
Baseline Beautification |
|
Highland |
Enrique Gonzalez |
No comments |
0 |
ESPL-5449 (024)
|
SBd | 5th Street from Del Rosa to SR210 and del Rosa from 3rd Street to 5th street |
Widen 5th Street, construct new traffic signal, widen freeway undercrossing, modify ramp |
|
Highland |
Sean Yeung |
No comments |
0 |
HSIPL-5449 (025)
|
SBd | 9th Street between Delrosa Dr. and Palm Ave. |
Restripe for bike lanes and two-way left-turn lane; install in-pavement crosswalk lights, advance warning lights and signs, and pedestrian countdown heads; construct curb ramps
|
|
Highland |
Sean Yeung |
07/28/2016: DLAE signs Exhibit 17-A, Cover Letter & Federal Report of Expenditures Checklist, and Exhibit 17-C, Final Inspection Form. -view comment history- |
1 |
SRTS-5449 (026)
|
SBd | McKinley St. between 9th St. and Base Line; Base Line/Valaria Dr. |
Construct sidewalk,curb,gutter, ramps, in pavement crosswalk lights, flashing beacons |
|
Highland |
Eduardo Moreno-Castaneda |
08/08/2022: Final Invoice No. 14 and FROE sent to LPA. -view comment history- |
3 |
SRTSL-5449 (027)
|
SBd | 9th St. between Cunningham St. and Palm Ave.; Church Ave./Norwood St. |
Construct sidewalk,curb,gutter, ramps, in pavement crosswalk lights, flashing beacons |
|
Highland |
Eduardo Moreno-Castaneda |
08/09/2022: Final Invoice No. 14 and FROE sent to LPA. -view comment history- |
3 |
SLPPCL13-5449 (028)
|
SBd | 5th St Corridor Improvements FRom Victoria Avenue to Palm Avenue |
Work Description (TO BE VERIFIED): The proposed improvements include construction of pavement rehabilitation, pavement widening from 2-lanes to 4-lanes, new turn lanes, new class II bike lanes, new traffic signal, new traffic signal synchronization system, new emergency vehicle pre-emption system and new handicap accessible transit stops. |
|
Highland |
Enrique Gonzalez |
01/23/2019: Mail Received (Final Package (final delivery report, final report of expenditures, final invoice, final inspection form, finance letter)) -view comment history- |
1 |
SR2SL-5449 (029)
|
SBd | 6th St. between Del Rosa Dr. and Sterling Ave.; Elm St. between 6th St. and 9th St., Bike parking at Warm Springs ES |
Construct sidewalk and curb ramps, install in-pavement croswalk lighting and bike racks. Safety education, encouragement, enforcement and evaluation program. |
|
Highland |
Eduardo Moreno-Castaneda |
09/06/2022: Mail Received (FROE; Received 09/01/2022) -view comment history- |
0 |
SR2SL-5449 (030)
|
SBd | 10th St. between Central Ave. and Drummond Av.;Drummond Ave. between 9th St. and Norwood St.; Cole Ave. between 10th St. and 14th ; 14th St. between Central Ave. and Cole Ave.; Cole Ave./Messina; bike parking at Cole ES |
Construct sidewalks and curb ramps; install in-pavement crosswalk ligthing and bike racks; safety education, encouragement, enforcement and evaluation program |
|
Highland |
Jesus Sandoval |
08/26/2015: Mail Received (Progress Invoice #3 (PE) 1 original, 2 copies) -view comment history- |
0 |
SLPPCL13-5449 (031)
|
SBd | Baseline (Webster to Chruch) and Greenspot (Chruch to Alta Vista) |
Install 2 new traffic signals, modify 4 existing traffic signals, street widening, dedicated turn lanes, bicycle activation detectors, push buttons, ped countdown head, community trail, bikeway finding signs, speed feedback sign, in-roadway warning lights and dvance warning becons. |
|
Highland |
Enrique Gonzalez |
01/23/2019: Mail Received (Final Package (final delivery report, final report of expenditures, final invoice, final inspection form, finance letter)) -view comment history- |
1 |
BRLS-5449 (032)
|
SBd | Previously, BR-NBIL-5449(505), low water crossing. Now, a regular bridge.
Baseline Bridge over City Creek, #54C0035 |
Bridge replacement: existing 4-lane bridge with new 4-lane bridge. |
|
Highland |
Enrique Gonzalez |
02/03/2023: Mail Received (RFA(RW) adj.: Received 02/02/2023) -view comment history- |
0 |
PNRSL-5449 (033)
|
SBd | Boulder Avenue from 525' S. Highland Avenue to Greenspot Road |
Construct sidewalk, ramps, bus stop access, raised median, landscaping, irrigation, soud wall, bridge anti-graffiti coating. Pavement rehabilitation and slurry seal. Traffic signal Interconnect. |
|
Highland |
Eduardo Moreno-Castaneda |
08/08/2022: Mail Received (Progress Invoice No.15; Received 08/05/2022) -view comment history- |
0 |
BRLNS-5449 (034)
|
SBd | Orange Street over Plunge Creek Overflow, 1.5 mile north of Pioneer Avenue (Br. No. 54C0592). |
This is a bridge replacement project to replace the existing two lane bridge with four lane bridge. Project is programmed under FTIP ID 20130401 in SCAG's 2013 FTIP. |
|
Highland |
Karen Nguyen |
01/27/2023: Mail Received (Progress Invoice No.13; Received 01/25/2023) -view comment history- |
1 |
ATPL-5449 (035)
|
SBd | Along 1.75 miles of Orange Street and 2.95 miles of seven other streets or easements in the City of Highland/Redlands. |
Construct Class I, II, and IV bicycle/pedestrian paths, bicycle/pedestrian bridge, bike signals & detection, pedestrian heads, sharrows, safety beacons, wayfinding signs, lighting, speed feedback signs, and SRTS Implementation.
PPNO 1181A |
|
Highland |
Eduardo Moreno-Castaneda |
02/01/2021: CON Allocation Time Extension Submitted to HQ -view comment history- |
0 |
HSIPLN-5449 (036)
|
SBd | Intersection of Palm Avenue and Cypress Street. |
This is a Cycle 8 Highway Safety Improvement Program project with an ID: H8-08-006. |
|
Highland |
Jesus Sandoval |
01/25/2021: Mail Received (final invoice 6(f); to staff and V-drive; received on 1/15/2021.) -view comment history- |
1 |
ATPL-5449 (037)
|
SBd | West Levee of City Creek from Base Line to Alabama street; Within Highland and San Bernardino- along both sides of Alabama Street from 3rd street to the south limits of both cities. |
Design and construction of Class I and Class II bikeways, freeway under crossing , and other bikeway/walkway enhancements including way-finding signs, bicycle parking facilities, in- roadway bicycle detection systems, bikeway/walkway lights, pedestrian signal countdown heads, user rest area, crosswalks and curb ramps. |
|
Highland |
Eduardo Moreno-Castaneda |
05/23/2023: Mail Received (Approved FL & PSA; Received 05/22/2023) -view comment history- |
0 |
LPPSB1L-5449 (038)
|
SBd | In the City of Highland on 5th Street from Victoria to Palm Avenue, 3rd Street from Palm Avenue to 5th Street, Central Avenue from 3rd Street (Corridor Improvements) |
Road Reconstruction |
|
Highland |
Eduardo Moreno-Castaneda |
03/24/2022: Mail Received (approved MA, PSA & FL; received on 3/23/2022.) -view comment history- |
0 |
LRSPL-5449 (039)
|
SBd | Citywide. |
Development of a Local Roadway Safety Plan for the City of Highland. |
|
Highland |
Eduardo Moreno-Castaneda |
10/25/2022: Final Invoice No. 3 and FROE sent to LPA -view comment history- |
0 |
HSIPSL-5449 (040)
|
SBd | Install pedestrian countdown signal heads at 26 intersections within the City of Highland |
Install pedestrian countdown signal heads at 26 intersections within the City of Highland |
|
Highland |
Eduardo Moreno-Castaneda |
02/01/2023: Mail Received (Progress Invoice No.1; Received 01/30/2023) -view comment history- |
0 |
RPL-5449 (041)
|
SBd | n Highland, along Victoria Ave from 3rd St to 6th St, and 5th St/Victoria Ave intersection. Storm drain improvements from 3rd to 9th St w/ connection to existing drainage channel |
In Highland, along Victoria Ave from 3rd St to 6th St, including reconstruction of the 5th St/Victoria Ave intersection, additional turn lanes, shoulder improvements, traffic signal mod, no add'l thru lanes. Storm drain improvements from 3rd to 9th St w/ connection to existing drainage channel on the south side of 3rd St.
FSTIP ID: 2011104
RTP ID: 40M0701 |
|
Highland |
Eduardo Moreno-Castaneda |
02/28/2023: FPN issued -view comment history- |
0 |
BR-5449 (505)
|
SBd | Baseline Over City Creek. Bridge 54C-0035 |
4-lane bridge over low water crossing |
|
Highland |
Karen Nguyen |
09/17/2020: Mail Received (HBP survey; to staff and V-drive.) -view comment history- |
8 |
BR NBIL-5449 (505)
|
SBd | Baseline Street over City Creek, Br. No. 54C-0035 |
This is a bridge to replace a low water crossing, LWC #00L0029, on the federal-aid system road. The assigned bridge number is 54C-0035 |
|
Highland |
Vu Ngo |
03/22/2019: Mail Received (DLAP signs CE) -view comment history- |
2 |
TBD-5452 (000)
|
SBd | MAIN ST. AND PHELAN RD.
APPROACHING U.S. 395. |
INSTALL TWO SOLAR-POWERED FLASHING
BEACONS |
|
Hesperia |
Savat Khamphou |
No comments |
0 |
4809-5452 (002)
|
SBd | Sultana Street between Maple Avenue and Pinon Avenue (This is an ER program project)
|
Advantage ID No.0800020470
Collapse of roadway along Sultana Street due to erosion, debris clean-up and reconstruction of shoulder and roadway |
|
Hesperia |
Sean Yeung |
No comments |
0 |
NCPDL03-5452 (009)
|
SBd | Ranchero Road Realignment and Undercrossing
Ranchero Road extension at Burlington Northern Railroad |
Ranchero Rd New RR undercrossing and Road Realignment |
|
Hesperia |
Sean Yeung |
01/12/2015: Mail Received (Final Voucher stamped by Caltrans Accounts Payable on 10/9/2014) -view comment history- |
0 |
HPLUL-5452 (010)
|
SBd | Ranchero road 7th Avenue to Danbury road |
Widen from 2-4 lanes and construct railroad undercrossing |
|
Hesperia |
Sean Yeung |
01/26/2015: Mail Received (Final Voucher) -view comment history- |
0 |
LPPSB1L-5452 (011)
|
SBd | Roadway Widening: Ranchero Road: From Topaz Avenue to 7th Street. Widen from 2 to 5 lanes (6 miles) |
Ranchero Rd widening: construct a new bridge over DWR aqueduct, widening of a UPRR at-grade crossing & signalization of 3 intersections. |
|
Hesperia |
Esayas Hagos |
11/15/2022: Received revised progress invoice No.1. -view comment history- |
0 |
SR2SL-5452 (014)
|
SBd | 8th Avenue from Willow Street to Smoketree Street. |
Construct curb and gutter and 20 ft wide multi-use Paseo
Cycle 9 SR2S, 09-08-018. |
|
Hesperia |
Sean Yeung |
12/03/2013: Mail Received (Revised Final Invoice (email)) -view comment history- |
0 |
TLSP13L-5452 (015)
|
SBd | Main street |
Install traffic signal controls |
|
Hesperia |
Pamela Wells |
04/22/2013: Mail Received (TLSP Allocation request (1 original, 1 copy)) -view comment history- |
0 |
SRTS-5452 (016)
|
SBd | Willow Street between Third Avenue and Eigth Avenue. CRS 15U22 |
Pedestrian and Bike Path
SRTS3-08-007Cycle 3 SRTS Infrastructure programmed federal funds of $834,900 FFY 15/16, $ 114,809 PS&E, $ 689,390 CON and $76,000 Non-infracstructure.
MPO project ID SCAG016.
Functional Classification Minor Arterial
Use Advantage Id 0814000012
|
|
Hesperia |
Pamela Wells |
07/13/2022: Mail Received (Final Invoice No.7; Received 07/12/2022) -view comment history- |
1 |
CML-5452 (017)
|
SBd | Joshua Street at Highway 395 Park and Ride |
Park and Ride Expansion. |
|
Hesperia |
Esayas Hagos |
01/31/2023: Project Final Invoice and Close-Out Package submitted to CLPA. -view comment history- |
8 |
ATP-5452 (018)
|
SBd | WILLOW STREET PASEO BETWEEN 8TH AVENUE AND CYPRESS AVENUE. |
CONSTRUCT MULTI USE PATH, CURB AND GUTTER, CURB RAMPS, INSTALL CROSSWALKS, SIGNS AND PAVEMENT |
|
Hesperia |
Pamela Wells |
05/02/2018: Mail Received (Request for Funding Allocation (PS&E)) -view comment history- |
0 |
ATPL-5452 (019)
|
SBd | ON SEQUOIA STREET FROM HESPERIA TO APATITE AND BIG BEAR VALLEY ROAD OUTER HIGHWAY WITHIN THE EXISTING ROW |
CONSTRUCT A MULTIE-USE PATH, CURB AND GUTTER, CURB RAMPS, INSTALL CROSSWALKS, SIGNS AND PAVEMENT |
|
Hesperia |
Pamela Wells |
07/18/2016: Mail Received (RF Allocation & Time Extension, 1 original, 2 copies) -view comment history- |
0 |
HSIP-5452 (020)
|
SBd | The intersection of Main Street and Timberlane Avenue/Sultana Street. |
Install a traffic signal; widen roadway to accommodate left turn pockets; install curb, gutter, sidewalk, curb ramps, crosswalks, and lighting; provide pedestrian phasing and countdown timers. |
|
Hesperia |
Pamela Wells |
08/19/2022: Mail Received (APE Map; Received 08/19/2022) -view comment history- |
0 |
BRLSZD-5453 (004)
|
SBd | In the Town Apple Valley on Bear Valley Rd @ Mojave River, Brd. No. 54C-0086 |
Seismic Retrofit |
|
Apple Valley |
Eric Tang |
No comments |
0 |
STPLER-5453 (007)
|
SBd | Dale Evans Parkway at SR 18 |
Median and landscaping |
|
Apple Valley |
Osabuogbe Igbinedion |
No comments |
0 |
STPLHG-5453 (008)
|
SBd | 14 signalized intersections on and near SR 18 |
Priority control systems |
|
Apple Valley |
Pamela Wells |
No comments |
0 |
CML-5453 (009)
|
SBd | Joshua Road from Standing Rock Avenue to Cahuilla Road |
Pave dirt road |
|
Apple Valley |
Pamela Wells |
02/21/2017: 02/212017 Project archived in D8 Database, project file purged on 7/7/2015. -view comment history- |
0 |
SR2SL-5453 (010)
|
SBd | Symeron Rd, Between Apple Valley Rd and Tuscola Rd |
Construct Curb, Gutter, Sidewalks, and Curb Ramps; Install Signs and Striping |
|
Apple Valley |
Osabuogbe Igbinedion |
08/07/2009: Mail Received (Final Grant Reimbursement & Supporting Documents) -view comment history- |
0 |
STPL-5453 (011)
|
SBd | Yucca Loma Road over the Mojave River, Westerly Extension |
New Bridge |
|
Apple Valley |
Pamela Wells |
02/06/2018: Mail Received (Yucca Loma Bridge Restoration Area CD) -view comment history- |
11 |
HSIPL-5453 (012)
|
SBd | Intersection of Bear Valley Road and Mohawk Road |
New Signals |
|
Apple Valley |
Pamela Wells |
11/08/2016: Mail Received (Final invoice, 17O, and Billing Summary) -view comment history- |
1 |
SLPPCL11-5453 (013)
|
SBd | Bear Valley Rd/Deep Creek Rd Intersection |
New Traffic Signal |
|
Apple Valley |
Pamela Wells |
07/31/2013: E-mail: asked City for copy of plans and special provisions and also asked to revisit the 12-D -view comment history- |
0 |
RPSTPLE-5453 (014)
|
SBd | Apple Valley SR-18 Landscape |
Construction of a landscape median island within an existing unimproved median along State Route 18 between Navajo Road and Center Road in the Town of Apple Valley. |
|
Apple Valley |
Pamela Wells |
01/14/2013: The project has been dropped in LP2000
... -view comment history- |
0 |
SRTSL-5453 (015)
|
SBd | Yucca Loma Road between Mohawk Road and Rancherias Road and along Rancherias Road between Yucca Loma Road and Powhatan Road. |
Construct concrete curb, gutter and sidewalk along the school's entire street frontage. Widen Yucca Loma Road and Rancherias Road and join at existing curb, gutter and sidewalk. Construct an ADA wheelchair ramp and restripe the existing crosswalk. Construct two commercial driveway approaches at the main entrance to the school. |
|
Apple Valley |
Pamela Wells |
10/05/2017: FROE and Final Invoice submitted to LPA -view comment history- |
3 |
SLPP-5453 (016)
|
SBd | Kiowa Road, Del Oro Road to Tussing Ranch road |
Widening Project: Add a center continuous turn lane and bike lanes |
|
Apple Valley |
Pamela Wells |
05/19/2014: Mail Received (Received Final Report of Expenditures) -view comment history- |
0 |
SR2SL-5453 (017)
|
SBd | Pioneer Rd, Ramona Rd to Rancho Verde Elementary School southern property line |
Construct new concrete sidewalk, curb and gutter on both sides of Pioneer Raod
4 commercial driveway approches on school property
6 residential driveway approaches
4 A. D. A. ramps
Update all existing shcool signs to current standards
|
|
Apple Valley |
Pamela Wells |
10/20/2017: Agency is not requesting CWA Cycle 15 time extension request -view comment history- |
0 |
BHLS-5453 (018)
|
SBd | Bear Valley Road Bridge over Mojave River, 5 miles east of Route I-15, between Mojave Fish Hatchery Road and Jess Ranch Parkway. |
Bridge Rehabilitation. |
|
Apple Valley |
Esayas Hagos |
03/16/2023: Mail Received (Progress Invoice No.29; Received 03/14/2023) -view comment history- |
16 |
ATPL-5453 (019)
|
SBd | Mojave Riverwalk South |
This project is located in Apple Valley along the Mojave River between Bear Valley Road on the north and Tussing Ranch Road on the south. The scope of work includes concrete sidewalk construction, trailhead facility construction - north and south terminus, signage, and striping installation on the 2.18 mile multi-use trail along the Mojave River. The trail will be a 12' wide paved mutli-use (bicycle, walking, jogging trail). |
|
Apple Valley |
Pamela Wells |
11/29/2017: Mail Received (Billing # 2 (Final Billing)) -view comment history- |
0 |
DEMO10ATPL-5453 (020)
|
SBd | Yucca Loma Road from western terminus of Yucca Loma Road to Apple Valley Road; widen 2-4 lanes. Includes Apple Valley SRTS ATP Cycle 1 project, CTC ID 0540. 2015 FTIP, ID:20150003 |
The project (ATP) is located in Apple Valley along Yucca Loma Road between Kasanka Trail (Mojave River) on the west and Apple Valley Road on the east. The scope of work includes constructing sidewalks on the north side and a paved, multi-use trail on the south side of Yucca Loma Road, installing a new signal and intersection improvements at Havasu Road and Cochise Road at Yucca Loma Road, and modifying the signal and restriping the crosswalk at Apple Valley Road. Improvements include pedestrian, school, and bike signage for Rio Vista School. |
|
Apple Valley |
Pamela Wells |
03/06/2018: received revised 15M, and 17G and F. and sent them over to LPA. -view comment history- |
1 |
HSIPL-5453 (021)
|
SBd | Various locations throughout the Town of Apple Valley. |
Upgrade bike lanes, striping and paint various locations in the town of Apple Valley. |
|
Apple Valley |
Pamela Wells |
02/23/2021: Paid to SCO on 1/20/21 -view comment history- |
3 |
ATPL-5453 (022)
|
SBd | In the town of Apple Valley, Navajo Road at Apple Valley High School from Bear Valley Road south to Tussing Ranch Road, continuing east on Tussing Ranch Road to Conchiti Road |
Design and construct new sidewalk, replace 9,500' of pavement to create a Class 1 bike path, add cub and gutter, signs, and striping, ADA ramps, and high visibility crosswalks |
|
Apple Valley |
Pamela Wells |
10/21/2021: Sent FROE and Final invoice 9 to LPA -view comment history- |
0 |
LRSPL-5453 (023)
|
SBd | Throughout the Town of Apple Valley Unified School District |
Local road safety plan (LRSP) |
|
Apple Valley |
Esayas Hagos |
12/20/2022: Final Invoice Package sent to CLPA on 12/20/2022. -view comment history- |
0 |
ATPL-5453 (024)
|
SBd | Rancherias Road 565 feet south of Yucca Loma Road to Powhatan Road. Powhatan Road from Navajo Road to 233 feet west of Mohawk Road in the Town of Apple Valley. |
Install new sidewalk at school neighborhood; install curb and gutter; Signage and striping; New ADA ramps; Install high visibility crosswalk |
|
Apple Valley |
Esayas Hagos |
01/13/2023: Mail Received (Progress Invoice No.1; Received 01/13/2023) -view comment history- |
0 |
STPLE-5457 (003)
|
SBd | I-10 FROM YUCAIPA BL EAST TO LIVE OAK CANYON RD |
FREEWAY LANDSCAPING & ART |
|
Yucaipa |
Ramiro Martinez |
No comments |
0 |
BRLKS-5457 (006)
|
SBd | In the City of Yucaipa on Avenue E at Wilson Creek, Br. No. 54C-0679. |
New bridge |
|
Yucaipa |
Enrique Gonzalez |
03/30/2010: Mail Received (Exhibit 3A Request for Authorization) -view comment history- |
0 |
BRNBIL -5457 (007)
|
SBd | albert to complete |
albert to complete |
|
Yucaipa |
Eric Tang |
03/30/2010: Mail Received (Exhibit 3a Request for Auth) -view comment history- |
0 |
BRLKS-5457 (007)
|
SBd | Bryant Street at Wildwood Creek, Br. No. 54C-0678 |
New bridge |
|
Yucaipa |
Eric Tang |
No comments |
0 |
BRLKS-5457 (008)
|
SBd | 3rd Street at Wildwood Creek |
New bridge to remove low water crossing |
|
Yucaipa |
Karen Nguyen |
10/26/2017: Left message for Fermin Preciado to discuss CWA 15 form -view comment history- |
1 |
BRLKS-5457 (009)
|
SBd | Avenue "D" at Wilson Creek |
New bridge to remove low water crossing |
|
Yucaipa |
Karen Nguyen |
09/23/2016: Mail Received (2016 Federal HBP Survey) -view comment history- |
0 |
BRLKS-5457 (010)
|
SBd | 10th Street at Wilson Creek |
New bridge to remove low water crossing |
|
Yucaipa |
Karen Nguyen |
07/10/2012: Mail Received (Final Voucher) -view comment history- |
0 |
BRLKS-5457 (011)
|
SBd | 13th Street at Wilson Creek |
New bridge to remove low water crossing |
|
Yucaipa |
Enrique Gonzalez |
09/23/2016: Mail Received (2016 Federal HBP Survey) -view comment history- |
0 |
STPL-5457 (014)
|
SBd | Intersection of Yucaipa Boulevard and 13th Street |
New signals |
|
Yucaipa |
Osabuogbe Igbinedion |
11/12/2008: Mail Received (Final Voucher for Payment Under 23U.S.C. 117) -view comment history- |
0 |
STPL-5457 (015)
|
SBd | Oak Glen Road Interconnect between Calimesa Blvd. And Bryant |
Signal Interconnect |
|
Yucaipa |
Osabuogbe Igbinedion |
03/11/2010: Mail Received (Final Voucher) -view comment history- |
0 |
SRTSL-5457 (016)
|
SBd | Oak Glen Road from 5th Street to Sunnyside Drive |
Installation of new traffic signal, construction of infill portions of sidewalk, curb and gutter, curb ramps, pavement markers, existing traffic signal modifications and the installation of bike lanes, crosswalks and traffic signs. |
|
Yucaipa |
Pamela Wells |
02/21/2017: 02/212017 Project archived in D8 Database, project file purged on 7/7/2015.
-view comment history- |
0 |
SR2SL-5457 (017)
|
SBd | Yucaipa Boulevard from 5th Street to 12th Street |
Curb, gutter,sidewalk gap closures, ADA ramps and pavement markings. |
|
Yucaipa |
Carol Green |
09/24/2014: Mail Received (Received FROE) -view comment history- |
0 |
SR2SL-5457 (018)
|
SBd | Dunlap ES - Along both 12th St. and 13th St. between Yucaipa Blvd. and Ave. E |
Construct curb, gutter, sidewalks, and curb ramps; install signage, pavement markings, and radar speed feedback signs |
|
Yucaipa |
Pamela Wells |
10/07/2015: Files returned to D8. -view comment history- |
0 |
SRTSL-5457 (019)
|
SBd | 12TH St between Ave E & Kentucky; 13th St between Ave E and Oak Glen Rd; Oak Glen Rd bet 13th and Wilson Creek Trail. |
Cycle 3 Infrastructure; Project ID SRTS3-08-018 approved 10/14/2011.
Construct missing sidewalk links, ADA access ramps, section of multi-use trail linking to existing improved trail, school zone signing and pavement markings. |
|
Yucaipa |
Pamela Wells |
05/02/2023: Mail Received ( Inactive Justification Form; Received 05/01/23) -view comment history- |
9 |
HSIPL-5457 (020)
|
SBd | Yucaipa Blvd between 15th St. and 16th St. Intersection of Yucaipa Blvd and 16th Street/Tennessee Street. |
Advantage ID 0814000083.
Project intends to install raised concretet median including: concrete curb, landscape, and irrigation. Restriping of the roadway to reflect adjustment to lande configuration. Installation of traffic signal, and improve horizontal alignment of Yucaipa Blvd. |
|
Yucaipa |
Aaron Duque |
09/13/2021: Send FROE and re-dated final invoice to LPA -view comment history- |
10 |
SR2SL-5457 (021)
|
SBd | North side of Avenue 'E' between 13th St and 14th St . Along the north and south side of Avenue 'E' from 14th Street to the Dunlap Channel multi-purpose trail. |
Project to install curb/gutter sidewal, ADA curb ramps, bike lane signing/striping and associated school zone advisory signage and striping. |
|
Yucaipa |
Pamela Wells |
10/26/2017: Called Fermin Preciado and left a message. -view comment history- |
0 |
ATPL-5457 (022)
|
SBd | County line road 3rd to California St; Ave H from 3rd to Holmes.
Safe Routes to Calimesa and Wildwood Elementary Schools. |
CTC ID 0566. Adv. ID: 0815000070
The project is located in the City of Yucaipa and has two locations as follows: 1) County Line Road from 3rd St. to California St. and 2) Avenue H from 3rd St to Holmes St. Both locations include curb, gutter and sidewalks. County Line Road also includes bike lanes. - CNG 10/6/2014 |
|
Yucaipa |
Vu Ngo |
03/17/2020: Mail Received (invoice 3 (final); 1 original, 0 copy.) -view comment history- |
4 |
HSIPL-5457 (025)
|
SBd | Intersection of Oak Glen Road and 2nd street |
installation of a traffic signal, pavement striping/markers and re-construction of ADA ramps.
HSIP Unique Project ID: H9-08-029, Cycle 9, Max Federal Reimbursement Ratio 100%. |
|
Yucaipa |
Eduardo Moreno-Castaneda |
05/02/2023: Mail Received ( Inactive Justification Form; Received 05/01/23) -view comment history- |
1 |
SB1ATPL-5457 (026)
|
SBd | On both sides of Avenue "E" between Dunlap Channel and 15th Street and along the east side of 15th Street from Avenue E to Yucaipa Bouelvard, in the City of Yucaipa. |
Installation of curb, gutter, sidewalk, ADA curb ramps and minor drainage improvements.
Summary of Project Scope: There are currently no sidewalks on either side of Avenue "E" between Dunlap Channel and 15th Street and along the east side of 15th Street from Avenue E to Yucaipa Boulevard. This project will provide connectivity from the Multi-purpose trail along Dunlap Channel to the Dunlap area to the west and also compliment the sr2s project on Avenue E from the Dunlap Channel to the east, ultimately connecting to Dunlap Elementary School. The project will also provide connectivity between the Crafton Hills College Village area and Dunlap Elementary School, as well as encouraging use of transit services (Omnitrans/OmniGo Route) proposed on Avenue E between Oak Glen Road to 16th Street, the Interstate 10 Freeway access point, and 14th Street/Sand Canyon Road, leading to Crafton Hills College. All Omnitrans/OmniGo transits are equipped with the capacity to transport bicycles.
|
|
Yucaipa |
Pamela Wells |
04/18/2022: Final Invoice No.01 and FROE sent to CLPA on 04/18/2022 -view comment history- |
0 |
HSIPSL-5457 (028)
|
SBd | Various Intersections in Yucaipa: Yucaipa Blvd/5th St, Avenue E/Oak Glen Road, Yucaipa Blvd/10th St, and Oak Glen Road/Chapman Heights Road. |
Convert left-turn movements to protected left-turns |
|
Yucaipa |
Eduardo Moreno-Castaneda |
02/24/2023: Mail Received (Progress Invoice No.1; Received 02/14/2023) -view comment history- |
0 |
LRSPL-5457 (029)
|
RIV | Through out the City of Yucaipa |
Develop a Local Roadway Safety Plan (LRSP)
LRSP ID: LRSP243 |
|
Yucaipa |
Pamela Wells |
07/27/2022: Mail Received (Approved FL & PSA; Received 07/27/2022) -view comment history- |
0 |
ER40A0-5457 (062)
|
SBd | to be completed by staff. Sean, 4/13/2022. |
to be completed by staff. Sean, 4/13/2022. |
|
Yucaipa |
Karen Nguyen |
10/11/2022: Mail Received (FROE; Received 10/11/2022) -view comment history- |
0 |
BR-NBIL-5457 (506)
|
SBd | Pendleton Avenue over Oak Glen Creek, LWC #00L0034 |
Low water crossing |
|
Yucaipa |
Enrique Gonzalez |
05/02/2023: Mail Received ( Inactive Justification Form; Received 05/01/23) -view comment history- |
11 |
BR-NBIL-5457 (507)
|
SBd | 6th Place over Wildwood Creek (Also known as Yucaipa Creek), Between Wildwood Canyon Road and Avenue G, LWC # 00L0033. |
Replace 2-lane low water crossing with 2-lane bridge. |
|
Yucaipa |
Armand Rubio |
01/16/2019: Mail Received (progress invoice 12; 1 original, 2 copies.) -view comment history- |
5 |
BR-NBIL-5457 (508)
|
SBd | Fremont Street over Wilson Creek, between Oak Glen Road and Vista Drive. LWC # 00L0035. |
Replace 2-lane low water crossing with 2-lane bridge. |
|
Yucaipa |
Karen Nguyen |
06/03/2021: Mail Received (FROE and final invoice; received 6/3/2021) -view comment history- |
9 |
BR-NBIL-5457 (534)
|
SBd | Live Oak Canyon Road over Wildwood Creek, LWC #00L0081. |
Replace 2-lane low water crossing with 2-lane bridge. |
|
Yucaipa |
Karen Nguyen |
02/24/2023: Mail Received (RFA (PE)adj.; Received 02/17/2023) -view comment history- |
0 |
BR-NBIL-5457 (538)
|
SBd | Avenue "D" at Wilson Creek, between 10th Street and 11th Street, Bridge No. 00L0015. |
This is a new bridge to eliminate low water crossing at Avenue "D" over Wilson Creek. Preliminary Engineering funding for this project was previously obligated under FPN BRLKS-5457(009) with Advantage ID 0800000803 will be discontinued and was closed out by FHWA on 12/27/12 due to lapsing funds. |
|
Yucaipa |
Armand Rubio |
12/20/2018: Mail Received (invoice 4 (final), 1 original, 2 copies.) -view comment history- |
0 |
BR-NBIL-5457 (539)
|
SBd | 13TH Street at Wilson Creek, between Oak Glen Road and Kentucky Street, Bridge No. 00L0017. |
This is a new bridge to eliminate low water crossing at 13TH Street over Wilson Creek. Preliminary Engineering funding for this project was previously obligated under FPN BRLKS-5457(011) with Advantage ID 0800000805 will be discontinued and was closed out by FHWA on 12/27/12 due to lapsing funds. |
|
Yucaipa |
Eduardo Moreno-Castaneda |
05/02/2023: Mail Received (Inactive Justification Form; Received 05/01/23) -view comment history- |
0 |
BR-NBIL-5457 (546)
|
SBd | Fremont Street over Wilson Creek from Oak Glen Road to Vista Drive LWC #00L0035 |
Replace 2-lane low water crossing with 2-lane bridge. |
|
Yucaipa |
Karen Nguyen |
03/10/2021: Mail Received (approved FL; received on 3/10/2021.) -view comment history- |
1 |
BRLS-5459 (003)
|
RIV | IN THE CITY OF TEMECULA, PALA RD @ TEMECULA CREEK BRIDGE. BR. NO. 56C0165 |
REPLACE BRIDGE (PE Only) |
|
Temecula |
Osabuogbe Igbinedion |
No comments |
0 |
ITS99-5459 (010)
|
RIV | CITY OF TEMECULA ALONG I-15/ I-215 & SAN DIEGO COUNTY LINE |
Traffic Related - Other |
|
Temecula |
Eric Tang |
06/04/2008: Mail Received (Prog Supp) -view comment history- |
0 |
RPL-5459 (011)
|
RIV | on Jefferson Avenue/Front Street |
pavement rehabilitation |
|
Temecula |
Eric Tang |
No comments |
0 |
STPLX-5459 (012)
|
RIV | Rainbow Canyon Road Bridge at Pechanga Creek (Br. No. 56C-0284) |
Bridge rail replacement |
|
Temecula |
Harish Rastogi |
07/29/2009: Mail Received (Federal Report of Expenditures) -view comment history- |
0 |
STPLX-5459 (013)
|
RIV | Del Rio Road Bridge at Empire Creek (Br. No. 56C-0385) |
Bridge rail replacement |
|
Temecula |
Eric Tang |
07/29/2009: Mail Received (Federal Report of Expenditures) -view comment history- |
0 |
PLHL-5459 (014)
|
RIV | Pechanga Parkway Improvements |
Roadway widening and signals |
|
Temecula |
Sylvester Lin |
08/21/2008: Mail Received (award package) -view comment history- |
0 |
STPLER-5459 (015)
|
RIV | Southwest side of Murrieta Creek from the southerly I-15/SR 79 interchange to Cherry Street |
Pedestrian and bike path |
|
Temecula |
Harish Rastogi |
No comments |
0 |
STPLHG-5459 (016)
|
RIV | Rainbow Canyon Road from the southerly city limits to the Temecula Creek Inn Golf Course entrance road |
Replace and add guardrail |
|
Temecula |
Eric Tang |
09/07/2007: Mail Received (Fifth and Final) -view comment history- |
0 |
STPL-5459 (017)
|
RIV | DePortola Road from Jedediah Smith Road to Margarita Road |
Pavement Rehabilitation |
|
Temecula |
Sylvester Lin |
04/27/2010: Mail Received (progress billing) -view comment history- |
0 |
RPSTPLE-5459 (018)
|
RIV | Winchester Road/State Route 79 North Corridor between Ynez Road and Willow Avenue in the City of Temecula |
Construct landscape improvements |
|
Temecula |
Steven Jaimes |
11/25/2014: Mail Received (Finance letter HQ approved) -view comment history- |
0 |
STPL-5459 (019)
|
RIV | Road rehabilitation |
Rancho California Road from Ynez Road to Butterfield Stage Road |
|
Temecula |
Sylvester Lin |
04/27/2010: Mail Received (progress billing) -view comment history- |
0 |
STPLHSR-5459 (020)
|
RIV | Across Santa Gertrudis Creek from the intersection of Margarita Road and Harveston Way to Roripaugh Road |
Pedestrian / bicycle trail and bridge |
|
Temecula |
Harish Rastogi |
01/15/2014: Mail Received (RECEIVED FINAL VOUCHER) -view comment history- |
0 |
TLSPL-5459 (021)
|
RIV | Citywide Traffic Signal Synchronization |
Install and adaptive traffic signal sychronization system along six corridors: Winchester Rd, Rancho California Rd, Temecula Parkway, Margarita Rd, Jefferson Ave, & Ynez Rd with project limits as indicated in the Baseline Agreement. |
|
Temecula |
Carol Green |
02/26/2015: Request clarification from City of Final Project Expediture Report -view comment history- |
0 |
BRLO-5459 (022)
|
RIV | Main Street from Pujol Street over Murrieta Creek to Old Town Front Street, Br. No. 56C0227 |
Bridge Replacement |
|
Temecula |
Matthew Sapp |
09/29/2022: Mail Received (Cost Change Request; Received 09/28/2022) -view comment history- |
1 |
CML-5459 (023)
|
RIV | East of La Paz St, from Temecual Pwy to Vallejo Ave near I-15 |
Park and Ride facility; 157 spaces, bicycle lockers & passenger load/unload zone |
|
Temecula |
Matthew Sapp |
08/05/2022: Mail Received (Progress Invoice No.6; Received 08/03/2022) -view comment history- |
2 |
STPL-5459 (024)
|
RIV | Winchester Road - Jefferson to I-15 and I-15 to Ynez. Pavment Rehabilitation, Striping and replacement of any damaged loops |
Pavment Rehabilitation, Striping and replacement of any damaged loops |
|
Temecula |
Matthew Sapp |
03/06/2023: Mail Received (Final Invoice; Received 3/03/2023) -view comment history- |
1 |
STPLULN-5459 (025)
|
RIV | I-15/SR79 Interchange improvements south of I/C between Santiago Rd OC (Br. No. 56-0654) to Temecula Creek Bridge (Br. No. 0047) in the City of Temecula. |
I-15/SR79S improvements.
Southbound I-15 Ramps: Eliminate SB ramp to SR79S . Reconfigure southbound exit to provide two (2) lane exit with 1,300 ft of auxiliary lane preceding exit.
Northbound I-15 Ramps: Widen NB exit ramp to provide 4 lanes at ramp intersection. Widen NB entrance ramp to provided three(3) lans at ramp intersection and three-lane ramp meter to I-15.
SR 79 South: Eliminate sidewalk, curb and gutter, and parkway on southside of SR-79S through IC area and paving/restriping to provide three (3) through lanes and two (2) left-turn lanes each direction.
|
|
Temecula |
Matthew Sapp |
02/03/2023: Mail Received (FROE; Received 02/02/2023) -view comment history- |
0 |
HSIPL-5459 (026)
|
RIV | Signalized intersections along the following corridors within the City Limits: Winchester Road, Rancho California Road, and Temecula Parkway |
Install fiber optic communication system upgrades including: conduit, cable, controllers and related communication equipment to improve safety and operations via optimized traffic signal timing coordination
CRS Map No.: 15W, 15W34, 15W44
HSIP7-08-020 |
|
Temecula |
Matthew Sapp |
03/06/2023: Mail Received (Progress Invoice No.2; Received 03/03/2023) -view comment history- |
1 |
ATPL-5459 (027)
|
RIV | The Class I trail interconnect facility is located along the Santa Gertrudis Creek from Ynez Road, westerly to Diaz Road to connect to the existing Class I trail adjacent to Murrieta Creek. |
To construct a Class I two-way pedestrian and bicycle trail interconnect facility along the Santa Gertrudis Creek between the existing Class I trail facilities connecting Murrieta Creek and Santa Gertrudis Creek, to include an undercrossing at Interstate 15 and Caltrans right-of-way. |
|
Temecula |
Matthew Sapp |
03/24/2022: Mail Received (PPNO 1254B; time extension request (CON-NI); received on 3/21/2022.) -view comment history- |
0 |
HSIPL-5459 (028)
|
RIV | Signalized intersections of Margarita Road and Verdes Lane, Ynez Road and Town Center North, Ynez Road and Town Center South, Redhawk Parkway and Paseo Parallon/Overland Trail, and Winchester Road and Enterprise Circle. |
Upgrade existing permissive left-turn phases and signal heads with protected left-turn phases on existing and/or new traffic signal poles and mast arms.
HSIPID: H9-08-025 |
|
Temecula |
Mohammad Majali |
03/22/2023: Mail Received (Approved FL & PSA; Received 03/21/2023) -view comment history- |
0 |
HSIPL-5459 (029)
|
RIV | Signalized locations on corridors, including Butterfield Stage Rd, Jefferson Ave, Margarita Rd, Pechanga Pkwy, Ranchito California Rd, Redhawk Pkwy, Temecula Pkwy, and Inez Rd |
Install Pedestrian countdown heads, ADAcompliant pedestrian push buttons, upgrade signal Controllers
H9-08-024 |
|
Temecula |
Matthew Sapp |
02/10/2023: Mail Received (Progress Invoice No.1; Received 02/07/2023) -view comment history- |
1 |
LRSPL-5459 (030)
|
RIV | Local Road Safety Plan Throughout the City of Temecula |
Local Road Safety Plan Throughout the City of Temecula |
|
Temecula |
Matthew Sapp |
06/08/2022: Mail Received (FROE (PE only); received on 6/7/2022.) -view comment history- |
0 |
INFRALUL-5459 (031)
|
RIV | French Valley Pkwy IC/Arterial Phases: Phase 2 |
Construct New Lane Collector/Distributor system |
|
Temecula |
Evita Premdas |
06/16/2023: Progress Invoice No. 02 (ROW n CON) - Received, Processed, and sent to CLPA -view comment history- |
0 |
ATPL-5459 (032)
|
RIV | Santa Gertrudis Creek Trail Undercrossing, Lighting, Signage, and Public Outreach Campaign. |
The Project Planning Id are: 1254A;
ATP4-08-026S
The locations are :Santa Gertrudis Creek Trail Undercrossing, Lighting, Signage, and Public Outreach Campaign.; |
|
Temecula |
Matthew Sapp |
No comments |
0 |
ATPL-5459 (033)
|
RIV | Santa Gertrudis Creek Trail Undercrossing, Lighting, Signage, and Public Outreach Campaign. CON-NI |
The Project Planning Id are: 1254B;
The locations are :Santa Gertrudis Creek Trail Undercrossing, Lighting, Signage, and Public Outreach Campaign.; CON-NI Work Plan |
|
Temecula |
Matthew Sapp |
No comments |
0 |
ER18D3-5459 (042)
|
RIV | Ynez road-from Vallejo Rd to Flores Drive, in Temecula. DAF# JWA-TMCA-001-0 |
Emergency opening |
|
Temecula |
Chigo Dike |
08/28/2017: Mail Received (Final Invoice and FROE, 1 original 1 copy) -view comment history- |
0 |
BR-NBIL-5459 (543)
|
RIV | Avenida Alvarado over Murrieta Creek 00L0087 |
Replace 2 lane low water crossing with 4 lane bridge. |
|
Temecula |
Matthew Sapp |
08/17/2022: Mail Received (AQCA Review; Received 08/16/2022) -view comment history- |
0 |
T-5460 (001)
|
RIV | Calimesa Blvd. |
Pedestrian Xing |
|
Calimesa |
Eric Tang |
No comments |
0 |
TCSP06-5460 (004)
|
RIV | Segment 1, on 3rd Street from Avenue "L" to County Line Road |
Calimesa School Pedestrian Walkway |
|
Calimesa |
Chigo Dike |
01/21/2015: Mail Received (Invoice (final) 8, 1 original, 2 copies) -view comment history- |
0 |
STPLER-5460 (005)
|
RIV | Calimesa Boulevard from Avenue "L" to Sandalwood Drive |
Landscape improvements |
|
Calimesa |
Chigo Dike |
11/28/2017: City responded to email stating that they propose to incorporate the items form this project to 5460(006) and not 5460(009). Notified FHWA of this proposal to verify its feasibility. -view comment history- |
0 |
HPLUL-5460 (006)
|
RIV | At County Line Road |
Roadway Rehab |
|
Calimesa |
Eduardo Moreno-Castaneda |
05/19/2023: Mail Received (PED Extension Request; Received 05/18/2023) -view comment history- |
4 |
SR2SL-5460 (007)
|
RIV | On West Avenue L from 2nd to 3rd Street and on 2nd Street from West Avenue L to Avenue H. |
Construct sidewalk to close gaps; install curbs and gutters, and ramps at intersections; stripe crosswalks and pedestrian crossing. |
|
Calimesa |
Chigo Dike |
04/19/2018: Notified city that further revisions to FROE need to made prior to final approval. -view comment history- |
0 |
CMLN-5460 (008)
|
RIV | I-10/Cherry Valley Blvd IC - City of Calimesa, RivCo |
2015 FTIP, Project ID: RIV060116. CMAQ FFY14/15: $443,000. Replacement of existing curved overcrossing with two 90 ft. radius on/off ramps roundabouts and will extend 1800 linear feet from Roberts Rd. (south) to approximately 500 ft E/O Calimesa Blvd. Associated project improvements include realignment of Calimesa Blvd. and ramp realignment for all four ramps with minor ramp widening (CMAQ PM2.5 benefits project). South Coast Air Basin. Adv. ID: 0815000210 |
|
Calimesa |
Armand Rubio |
08/06/2015: Submit RFA PE to HQ -view comment history- |
0 |
STPL-5460 (009)
|
RIV | Calimesa Blvd. and Avenue L |
Pavement Rehabilitation: Calimesa Blvd. from Sandalwood to Avenue L and Avenue L from Calimesa Blvd. to Calimesa and Avenue L. (RIV130401) |
|
Calimesa |
Eduardo Moreno-Castaneda |
12/02/2019: Mail Received (Final Invoice (LAPM No. 1a)) -view comment history- |
4 |
LPPSB1L-5460 (010)
|
RIV | In the Cities of Calimesa and Yucaipa on County Line Road, between Park Avenue and Bryant Street, the project proposes to construct four (4) |
Pedestrian and Bike Path |
|
Calimesa |
Eduardo Moreno-Castaneda |
03/20/2023: Mail Received (Progress Invoice No.8; Received 03/16/2023) -view comment history- |
0 |
STPLHG-5464 (002)
|
RIV | Citywide Signing & Striping |
Citywide Signing & Striping |
|
Murrieta |
Nivine K. Georges |
No comments |
0 |
STPL-5464 (005)
|
RIV | JEFFERSON AVE GAP |
JEFFERSON AVE GAP |
|
Murrieta |
Nivine K. Georges |
No comments |
0 |
CML-5464 (008)
|
RIV | IN THE CITY OF MURRIETA AT I-215 AND LOS ALOMOS ROAD |
Interconnect Signals |
|
Murrieta |
Nivine K. Georges |
No comments |
0 |
STPLMA-5464 (012)
|
RIV | IN THE CITY OF MURRIETA ON MURRIETA HOT SPRINGS RD @ I-15/I-215 INTERCHANGE |
CONSTRUCT INTERCHANGE |
|
Murrieta |
Nivine K. Georges |
No comments |
0 |
CMLG-5464 (015)
|
RIV | JEFFERSON AVE @ KALMIA ST; AND KALMIA ST @ ADAMS AVE |
New Signals |
|
Murrieta |
Nivine K. Georges |
12/29/2005: Mail Received (Local Agency Awarded Contract) -view comment history- |
0 |
CMLG-5464 (016)
|
RIV | JEFFERSON AVE @ MURRIETA HOT SPRINGS RD |
New Signals |
|
Murrieta |
Nivine K. Georges |
12/14/2005: Mail Received (Signed Invoice
Signed Final Estimate Summary
Contract Award Package
Final Report and Invoice
Final Report and Invoice) -view comment history- |
0 |
STPLHSR-5464 (018)
|
RIV | Various streets surrounding Murrieta Elementary School |
Sidewalks and bicycle lanes |
|
Murrieta |
Nivine K. Georges |
No comments |
0 |
STPLER-5464 (019)
|
RIV | Murrieta Hot Springs Road from Madison Avenue to the I-215 interchange. |
Slope paving and median landscaping |
|
Murrieta |
Nivine K. Georges |
05/02/2006: Mail Received (State Grant Reimbursements
Murrieta Hot Springs Rd) -view comment history- |
0 |
BRLKS-5464 (020)
|
RIV | Ivy Street at Murrieta Creek. |
New bridge to remove low water crossing |
|
Murrieta |
Enrique Gonzalez |
07/15/2014: Mail Received (Received Final Voucher) -view comment history- |
0 |
CML-5464 (021)
|
RIV | Intersection of California Oaks Road and Hancock Avenue |
Install and interconnect Signals |
|
Murrieta |
Nivine K. Georges |
No comments |
0 |
STPLH-5464 (022)
|
RIV | Intersection of Los Alamos Road and Whitewood Road |
New signals and interconnect |
|
Murrieta |
Nivine K. Georges |
12/27/2005: Mail Received (Award Package, DBE Final Utilization Report,
Final Detail Estimate Summary,
Notice of Completion) -view comment history- |
0 |
BRLS-5464 (023)
|
RIV | Guava Street bridge over Murrieta Creek |
Bridge replacement |
|
Murrieta |
Enrique Gonzalez |
10/08/2020: Final Invoice sent to LPA. -view comment history- |
0 |
SR2SL-5464 (024)
|
RIV | Whitewood Road from Alta Murrieta Drive to Highbury Drive and Alta Murrieta Drive from Rockcrest Drive to Whitewood Drive |
Whitewood Road Curb, gutter, sidewalk, and curb ramps |
|
Murrieta |
Nivine K. Georges |
04/29/2008: Mail Received (SR2SL-5464(024) City of Murrieta Supporting documents for a Final Invoice) -view comment history- |
0 |
STPL-5464 (025)
|
RIV | Clinton-Keith Road from Calle Del Oso Oro to Grand Avenue |
Road Rehabilitation |
|
Murrieta |
Enrique Gonzalez |
09/08/2008: Mail Received (Final Voucher) -view comment history- |
0 |
HSIP-5464 (026)
|
RIV | Murrieta Hot Springs Road from Alta Murrieta Drive to Margarita Road |
Raised landscaped median |
|
Murrieta |
Enrique Gonzalez |
01/02/2018: Awaiting Exhibit 5-J checklist from Agency. -view comment history- |
0 |
TLSPL-5464 (027)
|
RIV | Murrieta Hot Springs Road from Jefferson Avenue to Winchester Road (SR 79) |
Signal synchronization |
|
Murrieta |
Enrique Gonzalez |
07/27/2016: Mail Received (Progress Invoice# 7 (Con.) 1 original, 2 copies) -view comment history- |
0 |
HPLULN-5464 (028)
|
RIV | On I-215 at Los Alamos Road IC |
Install landscaping and irrigation improvements to the I-215/Los Alamos Rd Interchange |
|
Murrieta |
Enrique Gonzalez |
01/16/2018: Final Invoice/FROE reviewed and sent to Accounting HQ on 1/12/18 -view comment history- |
0 |
ESPLN-5464 (029)
|
RIV | I-215 / Clinton-Keith Road interchange |
Reconstruct interchange |
|
Murrieta |
Enrique Gonzalez |
06/02/2015: Murrieta: E-mail indicating that they had sent everything needed to close out the project. -view comment history- |
0 |
ToBeReused-5464 (030)
|
RIV | to be reused |
to be reused |
|
Murrieta |
Enrique Gonzalez |
01/05/2021: Mail Received (approved FL and PSA, 10/14/2020; to staff.) -view comment history- |
0 |
STPL-5464 (031)
|
RIV | Jefferson Ave from Date St. to Murrieta Hot Springs Rd. |
Pavement Rehabilitation using cold plane milling and hot mix asphalt overlay |
|
Murrieta |
Enrique Gonzalez |
07/26/2018: Mail Received (Pre-Construction Photos, 1 CD) -view comment history- |
0 |
FERPL16-5464 (032)
|
RIV | 1.5 miles North of the Clinton Keith Rd/I-215 & 1 mile south of the
Scott Rd/I-215 Interchange in the City of Murrieta |
Replace existing 2 lane I-215/Keller Road underpass with a 4 lane interchange including off and on ramps and two traffic circles at ramp termini.
EA: 0Q220
Project ID: 0800020339 |
|
Murrieta |
Enrique Gonzalez |
05/23/2023: Mail Received (Progress Invoice No.6; Received 05/22/2023) -view comment history- |
0 |
HSIPL-5464 (033)
|
RIV | Five uncontrolled mid-block crosswalk locations near four school sites. |
Install in-pavement LED lighted crosswalks and curb ramps.
HSIP ID: H9-08-013 |
|
Murrieta |
Enrique Gonzalez |
12/15/2021: Mail Received (time extension request (PE); received on 12/13/2021.) -view comment history- |
0 |
HSIPL-5464 (034)
|
RIV | Various locations citywide. |
HSIP ID: H10-08-012
Install adaptive timing program at all City signalized intersections, including new traffic signal controllers and loops, as well as the required software and hardware at City Hall Traffic Management Center. |
|
Murrieta |
Enrique Gonzalez |
No comments |
0 |
SR2SL-5466 (014)
|
SBd | Various locations on Onaga Trail from Hopi Trail to Balsa Avenue and on La Contenta Avenue |
Flashing beacons, pavement markings, and sidewalk |
|
Yucca Valley (YucV) |
Ayda Homsi |
No comments |
0 |
PLHL-5466 (015)
|
SBd | State Route 62 from Apache Trail to Palm Avenue. Use 4130 Public Lands Highway funds at 100% when re-authorized. Need encroachment permit for construction. |
Curb and gutter, raised medians, and street lights |
|
Yucca Valley |
Pamela Wells |
09/22/2016: Mail Received (FROE Exhibit 17-M, 1 original, 0 copies) -view comment history- |
0 |
SRTSLNI-5466 (016)
|
SBd | throughout the town of Yucca Valley |
School safety & outreach program |
|
Yucca Valley |
Pamela Wells |
10/02/2015: Project file to district. -view comment history- |
0 |
HSIPL-5466 (017)
|
SBd | SR-62 between La Honda Way to Dumosa Avenue in the Town of Yucca Valley |
Install raised median. HSIP Cycle 3 2009/2010 FFY. Project ID HSIP3-08-008. |
|
Yucca Valley |
Pamela Wells |
10/07/2015: Files returned to D8. -view comment history- |
2 |
HSIPLN-5466 (018)
|
SBd | Project limits are Intersection of SR 62 and SR 247; 0.1 mile west on SR 62 and 0.1 mile north on SR 247. |
Install 1,425' of raised median island |
|
Yucca Valley |
Pamela Wells |
04/20/2016: Mail Received (Final Voucher 6/26/2013) -view comment history- |
0 |
CMLN-5466 (019)
|
SBd | SR62 -TRAFFIC CONTROL SYCNRONIZATION OF 4 TRAFFIC SIGNALS FROM CAMINO DEL CIELO/SR62 TRAFFIC SIGNAL THROUGH ACOMA TRAIL SR 62 TRAFFIC SIGNAL PROGRAM |
The project was programmed in 2008 SCAG FTIP Amendment No. 41, under San Bernardino County - State Highway Listing.
Use Project ID Number 20084103. Use L400 CMAQ funds up to $50K for Preliminary Engineering and $ 176K for Construction. -etp
|
|
Yucca Valley |
Pamela Wells |
04/21/2015: D8: SEQ 4 Deleted per HQ instruction. See entry below for reason. -view comment history- |
5 |
SR2SL-5466 (020)
|
SBd | Sage Ave between Onaga Trail and Yucca Trai; Onaga Trail between Hilton Ave and Balsa Ave; Onaga Trail between Inca Trail and Fox Trail; La Contenta Rd between Palisade Dr and Alta Loma Rd |
Safe Route to School. Construct sidewalks, curb and gutter, and curb ramps, install speed feedback signs. SR2S 10-08-Yuccca Valley-1 |
|
Yucca Valley |
Pamela Wells |
05/06/2016: Mail Received (Final Invoice/FROE, 1 original, 2 copies) -view comment history- |
0 |
CMLN-5466 (021)
|
SBd | SR 62 from Sage Avenue to Yucca Mesa-La Contenta Road |
Traffic Light Synchronization for 10 traffic Signals
Adv ID. 0800020276. CTIPS 209500004480 |
|
Yucca Valley |
Vu Ngo |
12/09/2019: Mail Received (RFA CON; 1 original, 0 copy.) -view comment history- |
1 |
ATPL-5466 (022)
|
SBd | Yucca Valley Elementary School Sidewalks
Pueblo Trail from Hopi Trail to Bannock Trail |
Construct curb/gutter, sidewalks, driveway approaches and handicapped ramps |
|
Yucca Valley |
Pamela Wells |
09/21/2020: Final Invoice and supporting material sent to LPA. -view comment history- |
3 |
HSIPL-5466 (023)
|
SBd | Yucca Trail Safety Improvement |
Widen Yucca Trail to construct left turn lane along the roadway segment; and widen Warren Vista to construct left turn lanes at the intersection of Yucca Trail |
|
Yucca Valley |
Pamela Wells |
01/05/2022: Project closed 12/30/2021 -view comment history- |
0 |
ATPL-5466 (024)
|
SBd | Little League Drive between Palm Avenue and Sage Avenue
|
Construction of sidewalk, handicap ramps, driveway approaches, crosswalk, and installations of bike route signs. All improvements will be designed and build to the latest ADA requirements. |
|
Yucca Valley |
Pamela Wells |
03/24/2023: Mail Received ( Engineers Estimate; Received 03/22/2023) -view comment history- |
0 |
ATPL-5466 (025)
|
SBd | On Onaga Trail between Acoma Trail and Sage Avenue. |
Construction of sidewalks, curb and gutter, handicapped ramps, and driveway approaches. |
|
Yucca Valley |
Esayas Hagos |
03/24/2023: Mail Received (Engineers Estimate; Received 03/22/2023) -view comment history- |
0 |
LRSPL-5466 (026)
|
SBd | Throughout the town of Yucca Valley. |
Local road safety plan(LRSP) |
|
Yucca Valley |
Pamela Wells |
08/12/2022: Mail Received (Local Road Safety Plan; Received 08/11/2022) -view comment history- |
0 |
CML-5467 (002)
|
SBd | Along Grand Avenue, Chino Hills Parkway, Chino Avenue, and Peyton Drive |
Signal synchronization and traffic operations center |
|
Chino Hills |
Osabuogbe Igbinedion |
No comments |
0 |
SR2SL-5467 (003)
|
SBd | Village Center Drive near Country Springs Elementary School and Valle Vista Drive near Oak Ridge Elementary School |
Active driver feedback speed signs |
|
Chino Hills |
David Lee |
02/21/2017: 02/212017 Project archived in D8 Database, project file purged on 7/7/2015.
-view comment history- |
0 |
TCSP08-5467 (003)
|
SBd | Fairfield Ranch Road extension from approximately 4,300 north of Pine Street to Pine Street. |
Extend Fairfield Ranch Roadfrom 950 ft south of intersection of Ranch Road to 5000 ft parallel to SR 71 to Pine intersection - Construct New 2-Lane Rd. with Bike Lanes. |
|
Chino Hills |
Pamela Wells |
07/12/2021: Mail Received (letter to cancel project; 1 original, 0 copy.) -view comment history- |
0 |
STPL-5467 (004)
|
SBd | Peyton Drive from Grand Avenue to Chino Hills Parkway (SR 142) and Eucalyptus Avenue from Peyton Drive to Galloping Hills Parkway |
Roadway widening and extension |
|
Chino Hills |
Pamela Wells |
06/23/2009: Mail Received (Notice of Completion & Environmental Document Transmittal, etc) -view comment history- |
0 |
CML-5467 (005)
|
SBd | Chino Hills City Hall and City Yard
2001 Grand Avenue and 15091 La Palma Avenue |
Install 2 CNG Time Fill refueling Appliances |
|
Chino Hills |
Osabuogbe Igbinedion |
06/04/2008: Mail Received (Final Voucher) -view comment history- |
0 |
SR2SF-5467 (006)
|
SBd | Los Serranos Neighborhood of Chino Hills |
Install Curb, gutter, sidewalks, ramps, retaining wall bicycle racks and street lights. |
|
Chino Hills |
Pamela Wells |
01/15/2014: Mail Received (received final voucher) -view comment history- |
1 |
SRTSL-5467 (007)
|
SBd | Los Serranos Neighborhood II - Country Club Drive from Merced Avenue to North of Sierra Vista Drive |
Sidewalk |
|
Chino Hills |
Pamela Wells |
08/09/2016: DLAE signs Exhibit 17-A, Cover Letter and Federal Report of Expenditures Checklist, and Exhibit 17-C, Final Inspection Form. -view comment history- |
3 |
HPLUL-5467 (008)
|
SBd | Peyton Drive From English to Eucalytus Ave. ( Phase 2) |
Widen from 4 to 6 lanes with marked bike lanes in both directions |
|
Chino Hills |
Pamela Wells |
03/07/2013: Mail Received (Final Voucher) -view comment history- |
0 |
SRTSL-5467 (009)
|
SBd | Chaparral ES, Glenmeade ES
Yorba Ave. between Fairway Blvd. and Bird Farm Rd.; south side Los Serranos Blvd. between Pipeline Ave. and Bird Farm Rd.; Pomona-Rincon Rd. (Bird Farm Rd.) between Banbury Ct. and Fairway Blvd.
|
Construct sidewalk, curb and gutter, and curb ramps; minor safety lighting and drainage
|
|
Chino Hills |
Pamela Wells |
03/09/2018: Mail Received (Invoice #21 (CON) 1 original, 2 copies) -view comment history- |
3 |
HPLUL-5467 (010)
|
SBd | Peyton Dr. from Eucalyptus Avenue to SR 142 |
Widen from 2 to 4 lanes with bike lanes in both directions, storm channel modifications
|
|
Chino Hills |
Pamela Wells |
02/17/2017: Mail Received (LP2000 finance letter, 1 copy, 0 original.) -view comment history- |
14 |
HSIPL-5467 (011)
|
SBd | Pipe Line Avenue between 190' to 1,810' North of Chino Hills Parkway |
Install Raised median over the Pipe Line avenue. |
|
Chino Hills |
Enrique Gonzalez |
12/18/2018: Mail Received (final invoice, 1 original, 2 copies.) -view comment history- |
4 |
ATPL-5467 (012)
|
SBd | Los Serranos Infrastructure |
The City of Chino Hills is pursuing a comprehensive sidewalk project to install sidewalks in the
Los Serranos neighborhood. The neighborhood of approximately 1,000 homes and 4,500 residents
was developed over 80 years ago with poor pedestrian conditions. The proposed project will
construct 4.2-miles of sidewalks, 32 access ramps, and 5.3-miles of curb and gutters, and 1.3-miles
of PCC cross gutter per Standard 111 on the following roadways:
Carmelita Avenue: between Fairway Blvd. and Bird Farm Road
Mariposa Avenue: between Fairway Blvd. and Bird Farm Road
Murray Avenue: from the northern end of Murray Avenue to Bird Farm Road
Fairway Boulevard: between Mariposa Avenue and Carmelita Avenue
Yorba Avenue: between Mesa Boulevard and Bird Farm Road
Esther Street: between Fairway Boulevard and Williams Avenue
Ethel Street: between Fairway Boulevard and Williams Avenue
Cecelia Street: between Fairway Boulevard and Avery Street
Avery Street: between Cecilia Street and Los Serranos Road
Pheasant Street: between Fairway Boulevard and Los Serranos Road
Quail Street: between Fairway Boulevard and Los Serranos Road
Country Club Drive: between Pipeline Avenue and Los Serranos Blvd. |
|
Chino Hills |
Enrique Gonzalez |
01/16/2019: Mail Received (progress invoice 7; 1 orignal, 2 copies.) -view comment history- |
3 |
HSIPL-5467 (013)
|
SBd | Various intersections throughout the City of Chino Hills |
Installation of countdown heads at 45 signalized intersections |
|
Chino Hills |
Enrique Gonzalez |
05/03/2019: Mail Received (FROE; 1 original, 0 copy.) -view comment history- |
2 |
LRSPL-5467 (014)
|
SBd | Citywide LRSP |
Identify safety issues within the City's transportation systems and recommend safety improvements that iwll mitigate the number of collisions the City experiences. The LRSP tool will be used to create an effective plan that priorities improvements and takes a proactive approach to respond to all safety challenges. The proposed plan will align with the California State Highway Safety Plan and Federal Highway Safety Plan, and will serve as a living document that can be updated to reflect changing needs and priorities in the City. The City will utilize funding to procure a qualified consultant to complete the following scope of work: (1)Identify and Engage Stakeholders, (2) Roadway Data Review, (3) Identify Priority Projects and Countermeasures, (4) Development of Final LRSP
|
|
Chino Hills |
Esayas Hagos |
12/08/2022: Mail Received (Final Invoice No.3; Received 12/7/22) -view comment history- |
0 |
HSIPSL-5467 (015)
|
SBd | Chino Hills Parkway at Walnut Creek and at Eucalyptus Ave: Peyton at Rock Springs Drive and Beverly Glen Drive: Soquel Canyon at Butterfield Ranch Road, Pomona Rincon Ave, and Pinehurst Drive: Butterfield Ranch Road at Pine Ave and at Brookwood Lane |
Improve traffic signals with backplates that include retroflective borders. |
|
Chino Hills |
Pamela Wells |
05/10/2023: Mail Received (Progress Invoice No.2; Received 05/10/2023) -view comment history- |
1 |
SR2SL-5483 (001)
|
RIV | SR 215 (east) North of SR 74 |
Construct 10,000 sq. ft. of 5' sidewalk, Install 10 ADA ramps, storage and striping, curb and gutter systems, relocate mailboxes. |
|
Menifee |
Evita Premdas |
06/29/2016: HQ Accounting received, processed and sent to SCO for payment on 06/29/2016. -view comment history- |
0 |
STPL-5483 (002)
|
RIV | Newport Road from Bradley Road to Murrieta Road |
Pavement Rehabilitation |
|
Menifee |
Pamela Wells |
07/29/2021: Mail Received (progress invoice 4; received on 7/28/2021.) -view comment history- |
3 |
HSIPL-5483 (003)
|
RIV | Signalized intersections on the following corridors on the WEST SIDE of Menifee |
Interconnect Signals |
|
Menifee |
Solomon Frisco |
10/11/2021: Mail Received (detail estimate; received on 10/6/2021.) -view comment history- |
2 |
HSIPL-5483 (004)
|
RIV | Interconnect Signals |
Signalized intersections on the following corridors on the EAST SIDE of Menifee |
|
Menifee |
Solomon Frisco |
03/10/2021: Mail Received (FROE; received on 3/8/2021.) -view comment history- |
3 |
HSIPL-5483 (005)
|
RIV | "Citywide ADA and Pedestrian Safety Improvements" |
Install pedestrian countdown signal heads, APS push button,
ADA curb ramps and crosswalk striping |
|
Menifee |
Solomon Frisco |
04/22/2021: Received approved Finance Letter -view comment history- |
1 |
SSARPL-5483 (006)
|
RIV | Safety projects for signalized intersections, non-signalized intersections, and roadway segments throughout the City from a systemic approach. |
Systemic Safety Analysis Report (SSAR) funding is for design |
|
Menifee |
Evita Premdas |
06/06/2019: Mail Received (invoice 2 (final); 1 original, 2 copies.) -view comment history- |
0 |
HSIP-5483 (007)
|
RIV | Antelope Road between Sunstream Drive and La Piedra Road. |
Install raised median.
H9-08-012
|
|
Menifee |
Pamela Wells |
10/20/2021: Mail Received (progress invoice 4; received on 10/19/2021.) -view comment history- |
1 |
LRSPL-5483 (008)
|
RIV | City Wide |
Local Roadway Safety Plan |
|
Menifee |
Eduardo Moreno-Castaneda |
11/03/2022: Mail Received (LRSP for Final Invoice No.3; Received 11/2/2022) -view comment history- |
0 |
PERISK-5483 (009)
|
RIV | Scott Road/ Bundy Canyon Road Widening |
IN WESTERN RIV CO IN THE CITY OF MENIFEE- SCOTT RD/BUNDY CANYON RD WIDENING FROM 2 TO 4 LANES FRO HAUN RD TO SUNSET WAY 9(APPROX 3-MILES), RELOCATE EXISTING POWER POLES, ACQUIRE ADDITIONAL RIGHT-OF-WAY, CONSTRUCT DRAINAGE IMPROVEMENTS. |
|
Menifee |
Pamela Wells |
02/24/2023: Mail Received (APE Map; Received 02/15/2023) -view comment history- |
0 |
DEM22L-5483 (011)
|
RIV | City of Menifee between Rio Vista and Potomac Drive. Bradley Road Bridge over Salt Creek Channel |
DEMO CA 872
The project will replace the existing 2-lane at grade road crossing with a 4-lane bridge over the salt creek.
Federally Funded Earmarks-Congressionally Directed Spending (CPFCDS)
|
|
Menifee |
Eduardo Moreno-Castaneda |
11/03/2022: Mail Received (PES Submittal; Received 11/03/2022) -view comment history- |
0 |
SR2SL-5484 (001)
|
RIV | On George Ave. from La Estrella/Boylan Springs Rd. to Doheny Circle. On Palomar Ave. from Central St. to S. Pasadena St.. On Central St. from Palomar Ave. to Grand Ave., and on Illinois St. from Central St to Penrose St. |
Installation of curb, gutter, and sidewalk |
|
Wildomar |
Harish Rastogi |
03/11/2016: Mail Received (Invoice FINAL #03A (Con) 1 original, 2 copies) -view comment history- |
0 |
SR2SL-5484 (002)
|
RIV | Wildomar Sidewalk for Elsinore HS and Reagan ES.
Bundy Canyon Road from Orange to Almond. Canyon Drive from Mission to Orchard. Prielipp from Kevin to Inland Valley Rd.
|
Install curb, gutter and sidewalk; install/place mobile radar speed feedback trailer.
Cycle 9 State Safe Route to School PE and CONS, preliminary R/W
Adv. Id: 0812000128 |
|
Wildomar |
Harish Rastogi |
04/27/2015: Mail Received (FROE (Revised) 5-C, 3 copies, 0 originals ) -view comment history- |
0 |
HSIPL-5484 (003)
|
RIV | Clinton Keith Rd. and Hidden Springs Rd. |
Install protected left turn phasing and pedestrian improvements |
|
Wildomar |
Harish Rastogi |
12/12/2018: Mail Received (DLAP signs Reeval for Construction) -view comment history- |
3 |
SR2SL-5484 (004)
|
RIV | Grand Avenue from Central Ave to South Pasadena Street |
Construct 1350 feet of new sidewalk on Grand Ave from Central Ave to South Pasadena St.
Cycle 10. Adv. ID 0813000102 |
|
Wildomar |
Harish Rastogi |
12/12/2018: Mail Received (DLAP signs Reeval for Construction) -view comment history- |
0 |
SRTSL-5484 (005)
|
RIV | Collier Elementary Sidewalk and Accessibility Improvement. Union St from Trailwood Court to Corydon St; Trailwood Court from Aldrebrook Rd to Mayhall Dr; Alderbrook Rd from Mayhall Dr to Mapleleaf Ct |
Construct sidewalks and curb ramps, install cross walks, upgrade signs and pavement markings.
Cycle 3. Adv. ID 0813000103 |
|
Wildomar |
Albert Vergel de Dios |
10/09/2018: Mail Received (17-D, 1 copy) -view comment history- |
0 |
STPL-5484 (006)
|
RIV | Clinton Keith Road from Stable Lanes Rd to I-15 and George Ave to I-15 |
Slurry Seal Treatment over project area with isolated areas of base repair and traffic striping |
|
Wildomar |
Chigo Dike |
09/30/2016: DLAE signs Exhibit 17-A, Cover Letter & Federal Report of Expenditures Checklist, and Exhibit 17-C, Final Inspection Form. -view comment history- |
1 |
CML-5484 (007)
|
RIV | Grand Ave from Clinton Keith to David Brown MS/Clinton Keith from Grand Ave to George Ave. |
Class II bike lane (Grand)/ Class II/III (Clinton Keith) |
|
Wildomar |
Matthew Sapp |
06/03/2019: Mail Received (invoice 3 (final); 1 original, 2 copies.) -view comment history- |
8 |
CML-5484 (008)
|
RIV | Grand Avenue widening, new bike lanes |
In western Riverside County in the City of Wildomar - widening of Grand Ave (Corydon Rd to David Brown Middle School) to include a Class II Bike Lanes. Improvments include a total of 12,000 linear feet of new bike lanes. |
|
Wildomar |
Albert Vergel de Dios |
06/03/2019: Mail Received (invoice 3 (final); 1 original, 2 copies.) -view comment history- |
8 |
LRSPL-5484 (009)
|
RIV | Through the city of Wildomar
to be completed by staff. Sean, 3/3/2021. |
Develop Local Roadway Safety Plan
to be completed by staff. Sean, 3/3/2021. |
|
Wildomar |
Matthew Sapp |
06/30/2022: Mail Received (Progress Invoice No.1; Received 06/30/2022) -view comment history- |
0 |
HSIPL-5484 (010)
|
RIV | Bundy Canyon Road between Canyon Ranch Road and Sunset Avenue. |
The project will install 4' wide paved shoulder on both side of the street from Pulip lane to Chicko Hills Rd., install 4 solar powered speed feedback signs and 25 regulatory speed warning signs. |
|
Wildomar |
Chigo Dike |
05/04/2017: Mail Received (Progress invoice 3, 2 copies, 1 original.) -view comment history- |
2 |
ATPL-5484 (011)
|
RIV | Grand Avenue Multi-Use Trail Improvement Project |
Bike path |
|
Wildomar |
Matthew Sapp |
05/13/2019: Mail Received (Final Project Expenditure Report; DLAP signed) -view comment history- |
0 |
HSIPL-5484 (012)
|
RIV | Various locations throughout the City of Wildomar |
Install pedestrian countdown heads, ADA compliant push buttons, and crosswalk striping and markings |
|
Wildomar |
Matthew Sapp |
10/26/2021: 10/26/2021 FINAL - Received, Processed, and sent to HQ LPA -view comment history- |
1 |
HSIPL-5484 (013)
|
RIV | GUARDRAIL UPGRADES PROJECT - CITY OF WILDOMAR - HSIPL-5484(013) |
Unique ID: H8-08-024 2017 FTIP: #17-02 VAR_SCAG015_HSIP
The City of Wildomar was awarded HSIP grant funds to provide highway safety improvements focused on upgrading and repairing existing guardrail at various locations throughout the City. Locations were identified with varying length of guardrails for improvements. The improvements would repair/replace existing guardrails that have been previously damaged by vehicles or others. New guardrails would be installed based on the latest Caltrans/County standards to provide the most effective structure to minimize vehicle, people and property damage on the highway. All improvements are within the City’s right of way. Project work will be limited to areas adjacent to the roadway, generally along the shoulders or right next to the roadway.
The improvements are located at 10 areas within the City of Wildomar. They include:
1. Mission Trail, South of Olive St
2. Bundy Canyon Rd, East of Oak Canyon Dr
3. Grape St
4. Palomar St at Mission Trail
5. Goldfield St
6. Nutmeg St
7. Palomar St, North of Frederick St
8. Clinton Keith Rd, West of Salida del Sol
9. Palomar St, South of Harwood Ln
10. Clinton Keith Rd at Murrieta Creek |
|
Wildomar |
Evita Premdas |
07/04/2021: 5484(013) Progress Invoice No.02 and FINAL sent to HQ LPA -view comment history- |
1 |
SSARPL-5484 (014)
|
RIV | Throughout the City of Wildomar |
Review and study the City's entire roadway system to determine systemic issues from past traffic collisions using TIMS database. The scope would include a comprehensive review of the highest crash types to determine areas in need of safety improvements, identify the best countermeasures and provide a cost estimate for 2-4 safety improvement projects. Proposed project improvements will be prioritized by their safety impact, i.e. minimizing traffic collisions. |
|
Wildomar |
Chigo Dike |
05/13/2021: Mail Received (FPER; received on 5/10/2021.) -view comment history- |
0 |
HSIPSL-5484 (015)
|
RIV | Four signalized intersections in the City of Wildomar: (1) Bundy Canyon Road & Orange Street, (2) Corydon Road & Mission Trail, (3) Gruwell Street & Palomar Street, (4) Corydon Road & Grand Avenue |
Replace existing vehicle heads with LED vehicle heads with retro-reflective backing plates, provide advanced dilemma zone detection, and add a protected left-turn phase at two intersections.
H10-08-025 |
|
Wildomar |
Matthew Sapp |
05/02/2022: Mail Received (approved MA, PSA & FL; received on 4/29/2022.) -view comment history- |
0 |
ATPL-5484 (016)
|
RIV | City of Wildomar - Bundy Canyon Road |
Wildomar will construct a 2.2-mile ADA compliant 15-foot wide Class I Shared Bike/Pedestrian Path along Bundy Canyon Road with lighting |
|
Wildomar |
Matthew Sapp |
No comments |
0 |
SR2SL-5486 (001)
|
RIV | Orange Street from Calina Lane to Scholar Way |
Safe Route to Schools - Sidewalk |
|
Eastvale |
Evita Premdas |
08/22/2016: Mail Received (Final Invoice (CC) 1 original 2 copies) -view comment history- |
0 |
STPL-5486 (002)
|
RIV | Schleisman Avenue pavement Rehabilitation: Schleisman Ave from to Sumner Ave. to W/O Harrison Ave. |
Road Rehabilitation |
|
Eastvale |
Evita Premdas |
05/31/2016: FROE (2A) was Received, Processed, and sent to HQ LPA -view comment history- |
2 |
CML-5486 (003)
|
RIV | In Western Riverside County In The City Of Eastvale - Traffic Sychronization Of Six Traffic Signalized Intersections Along Hamner Avenue From Schleisman Road To Eastvale Gateway |
Traffic Sychronization Of Six Traffic Signalized Intersections |
|
Eastvale |
Matthew Sapp |
02/22/2017: REVISED Progress Invoice No. 2A and FINAL - Received, Processed, and sent to HQ LPA -view comment history- |
1 |
SSARPL-5486 (004)
|
RIV | Waiting to be process - no SSARP Application included in the Allocation Request. |
Systemic Safety Analysis Report Program (SSARP) STUDY ONLY |
|
Eastvale |
Eduardo Moreno-Castaneda |
01/26/2021: Mail Received (final invoice 3; to staff and V-drive; received on 1/22/2021.) -view comment history- |
0 |
HSIPL-5486 (005)
|
RIV | Forty-six (46) intersections throughout the City of Eastvale. |
Pedestrian Countdown Signals and Audible APS Controller
Units |
|
Eastvale |
Matthew Sapp |
09/01/2021: Final Voucher & Closed. -view comment history- |
0 |
ATPSB1L-5486 (006)
|
RIV | Scholar Way and Harrison Avenue from the Riverside County Line to the Santa Ana River Trail |
Cycle 4 ATP Statewide project awarded by the CTC on 1/30/19. ATP ID ATP4-08-040S. PPNO 08-1256A. Programmed as an infra-structure project for $6,171,000 of combined State and State SB1 Augmentation ATP funding. See also ATPSB1NI-5496(007), PPNO 08-1256B, for the non-infrastructure portion of this project. $114,000 of FY 19-20 State SB1 Augmentation ATP funding was allocated at the 10/09/19 CTC meeting for PA&ED. CRS Map 14V35 - local. PL |
|
Eastvale |
Matthew Sapp |
05/10/2023: Mail Received (Progress Invoice No.5; Received 05/10/2023) -view comment history- |
0 |
ATPSB1L-5486 (007)
|
RIV | Scholar Way and Harrison Avenue from the Riverside County Line to the Santa Ana River Trail |
Cycle 4 ATP Statewide project awarded by the CTC on 1/30/19. ATP ID ATP4-08-040S. PPNO 08-1256B. Programmed as a non-infrastructure project for $300,000 of State SB1 Augmentation ATP funding. See also ATPSB1L-5496(006), PPNO 08-1256A, for the infrastructure portion of this project. $300,000 of State SB1 Augmentation ATP funding to be allocated at the x/xx/20 CTC meeting for non-infrastructure. CRS Map 14V35 - local. PL |
|
Eastvale |
Matthew Sapp |
05/02/2023: Mail Received (Progress Invoice No.2; Received 04/24/2023) -view comment history- |
0 |
LRSPL-5486 (008)
|
RIV | Develop a Local Roadway Safety Plan (LRSP). LRSP ID LRSP167 |
Develop a Local Roadway Safety Plan (LRSP). LRSP ID LRSP167
Total Cost $56,500
LRSP Funds $50,850
Local Funds $5,650 |
|
Eastvale |
Matthew Sapp |
04/07/2023: Mail Received (Progress Invoice No.4; Received 03/29/2023) -view comment history- |
0 |
HSIPS-5486 (009)
|
RIV | 39 signalized intersections along major corridors: Limonite Ave, Schelisman Rd, Hammer Ave and Archibald Ave.
to be completed by staff. Sean, 5/5/2021. |
Install retroreflective borders along the backplates of traffic signla indicators.
HSIP unique ID: H10-08-007
to be completed by staff. Sean, 5/5/2021. |
|
Eastvale |
Matthew Sapp |
05/02/2023: Mail Received (Progress Invoice No.1; Received 04/24/2023) -view comment history- |
0 |
HSIPS-5486 (010)
|
RIV | to be completed by staff. Sean, 5/5/2021. |
to be completed by staff. Sean, 5/5/2021. |
|
Eastvale |
Matthew Sapp |
03/16/2023: Mail Received (Progress Invoice No.3; Received 03/14/2023) -view comment history- |
0 |
ATPL-5486 (011)
|
RIV | Eastvale: Along Orange St. from Sumner Ave. to Scholar Way; along Class 1 path crossings at Copper Sky, Estrella St., Schleisman Rd., and Stratus St.; Schleisman Rd. & Scholar Way. |
Construct: 1 lane mile of Class II bikeway; a pedestrian signal with bulb-outs & pedestrian refuge island; 3 additional crossing improvements for existing Class 1 path; 4 bulb-outs.
ADV ID: 0821000147
PPNO: 1281 |
|
Eastvale |
Matthew Sapp |
10/13/2022: Mail Received (Progress Invoice No.2; Received 10/13/2022) -view comment history- |
0 |
SB1LPP-5486 (012)
|
RIV | In Riverside County, in City of Eastvale on Limonite Avenue from Archibald Avenue to Hellman Avenue. Construct a divided four-lane facility |
The Project Planning Id are: 1271;
The locations are :In Riverside County, in City of Eastvale on Limonite Avenue from Archibald Avenue to Hellman Avenue. Construct a divided four-lane facility ; |
|
Eastvale |
Matthew Sapp |
No comments |
0 |
temp-5487 (000)
|
RIV | For logging purposes only for now . . . |
For logging purposes only for now . . . |
|
Jurupa Valley |
Evita Premdas |
07/18/2016: Received Fully Executed Jurupa Valley-Caltrans MASTER AGREEMENT -view comment history- |
0 |
ATPL-5487 (001)
|
RIV | Proposed improvements to Martin Street (Bellgrave to 50th Street), Troth (Bellgrave to 48th Street), and 48th (Martin to Troth), all adjacent to Jurupa Valley High School. |
Providing curb, gutter, sidewalk, and dirt trails along Martin Street, 48th Street, and Troth Street along with LED crosswalk flashers at the Martin/Bellegrave intersection and curb bump outs at the Martin Street intersections. |
|
Jurupa Valley |
Eduardo Moreno-Castaneda |
03/18/2020: FROE sent to LPA -view comment history- |
0 |
HSIPL-5487 (002)
|
RIV | Intersections in a 1.41 mile segment of Pedley Road from Jurupa Road on the north to 60th Street on the south. |
Add left-turn lanes to 7 unsignalized intersection along Pedley Road and modify storm drain undercrossings by relocating headwalls away from the travel lanes and adding guardrails at the headwall abutments. |
|
Jurupa Valley |
Matthew Sapp |
08/03/2022: Mail Received (FROE; Received 08/01/2022) -view comment history- |
3 |
ATPSB1L-5487 (003)
|
RIV | Various streets in the vicinity of Sunnyslope Elementary School. 37th St., 38th St., Mears Ave., 36th St. from Mears Ave.to Valley Way, and Novak St. from 36th St. to 34th St. |
Sidewalk, ADA-compliant curb ramps, RRFB-controlled crosswalk, et al
Data Migrated from CTIPS :
The Project Planning Id are: 1255;
The locations are :9,715 linear ft of new sidewalk, 15 crosswalks, 19 ADA ramps and RRFB controlled X-walk in the vicinity of Sunnyslope Elementary School loca; |
|
Jurupa Valley |
Matthew Sapp |
11/17/2022: Mail Received (Time Extension Request; Received 11/14/2022) -view comment history- |
0 |
ATPL-5487 (004)
|
RIV | Sidewalk on west side of Pacific Ave from Mission Blvd and 45th St- sidewalk on east side from Mission and 45th. Also bike lanes, bulbouts, |
The Project Planning Id are: 1228;
The locations are :Sidewalk on west side of Pacific Ave from Mission Blvd and 45th St- sidewalk on east side from Mission and 45th. Also bike lanes, bulbouts, ; |
|
Jurupa Valley |
Karen Nguyen |
05/08/2020: Mail Received (letter to rescind fund; 1 original, 0 copy.) -view comment history- |
0 |
LRSPL-5487 (005)
|
RIV | Local Roadway Safety Plan |
The LRSP will have both short-term and long-range objectives and visions that can address current issues that can be addressed with integrated capital and safety projects, programs, and materials along with focused enforcement methods and strategies and support for efficient emergency services |
|
Jurupa Valley |
Matthew Sapp |
07/22/2022: Mail Received (Progress Invoice No.2; Received 07/21/2022) -view comment history- |
0 |
HSIPL-5487 (006)
|
RIV | Various locations throughout the City of Jurupa Valley |
Upgrade existing metal guardrails to current Caltrans Midwest Guardrail System (MGS) standards, including new end treatments and beam sections, and relocate guardrails to correct locations. The project will include nineteen (19) locations throughout the City totaling twenty-eight (28) guardrail segments |
|
Jurupa Valley |
Matthew Sapp |
05/02/2023: Mail Received (RFA(PED); Received 04/28/2023) -view comment history- |
1 |
HSIPL-5487 (007)
|
RIV | Eighty-nine (89) signalized intersections throughout the City. |
The installation of a signal master controller with fiber interconnectivity to all possible signals or via radio if fiber is not possible as well as the installation of retroreflective signal head backplates at all signals within the City.
Application Category: BCR
Project Costs: $4,707,600
HSIP Funds: $2,353,800
Unique Project ID: H10-08-010 |
|
Jurupa Valley |
Matthew Sapp |
04/08/2022: Mail Received (approved MA, PSA & FL; received on 4/5/2022.) -view comment history- |
0 |
ER32L0-5487 (035)
|
RIV | VAN BUREN, 2100 FT S. OF JURUPA RD. |
PLACEMENT OF EROSION CONTROL MEASURES, SHOULDER BACKING ON SLOPES, TRAFFIC CONTROL. GEOTECHNICAL OBSERVATIONS; AND EXCAVATION RELATED OPERATIONS ON VAN BUREN BLVD; SLOPE RE-ESTABLISHMENT; BACKFILLING FOR ROAD TO RESTORE TRAFFIC. |
|
Jurupa Valley |
Eduardo Moreno-Castaneda |
06/10/2020: Final Voucher and closed on 01/22/2020. -view comment history- |
0 |
ER32L0-5487 (039)
|
RIV | Lytle Creek Rd: 50 ft N of Southfork Road to 220 ft N of Southfork Rd. |
Removal and hauling away of 650 tons of dirt and road debris. |
|
Jurupa Valley |
Chigo Dike |
No comments |
0 |
ER-32A0-5954 (001)
|
SBd | Cajon Blvd. PM 124.338 to 124.528 |
Removal and re-installation of damaged guardrail, striping, and other work appurtenant thereto. |
|
San Bern. County (CR-SBdCo) |
Omar Sanchez |
09/21/2020: Project is Final Vouchered. -view comment history- |
0 |
X01-5954 (002)
|
SBd | State Match Exchange 2000/01 for San Bernandino |
No activity; State Match Exchange 00-01 |
|
San Bern. County (CR-SBdCo) |
Sylvester Lin |
No comments |
0 |
ER-5954 (006)
|
SBd | Lenwood Road Bridge over Mojave River |
Repair the washed out road |
|
San Bern. County (CR-SBdCo) |
David Lee |
04/06/2015: Mail Received (FROE, 1 original, 2 copies) -view comment history- |
0 |
BRLS-5954 (030)
|
SBd | Beaumont Avenue over the San Timoteo Wash 0.5 miles west of San Timeteo Canyon Road near Loma Linda, Br. No. 54C-0370 |
Bridge replacement |
|
San Bern. County (CR-SBdCo) |
Karen Nguyen |
No comments |
0 |
ER-5954 (039)
|
SBd | Lytle Creek Road |
Restoration |
|
San Bern. County (CR-SBdCo) |
Esayas Hagos |
No comments |
0 |
STPLHG-5954 (060)
|
SBd | VALLEY BLVD AT HEMLOCK AVENUE. |
New Signals |
|
San Bernardino County 0071 |
Ramiro Martinez |
06/06/2007: Mail Received (Final Voucer) -view comment history- |
0 |
STPLHG-5954 (062)
|
SBd | CHERRY AVE AND WHITTRAM AVE |
New Signals |
|
San Bernardino County 0071 |
Ramiro Martinez |
No comments |
0 |
A-AD-772-5954 (063)
|
SBd | Fort Irwin Road from I-15 to Fort Irwin National Training Center |
Roadway widening and rehabilitation |
|
San Bern. County (CR-SBdCo) |
Sylvester Lin |
06/26/2008: Mail Received (revised finance Letter) -view comment history- |
0 |
ER40AO-5954 (064)
|
SBd | SEVEN OAKS ROAD, BRIDGE AT MIDDLE CONTROL ROAD EAST TO 0.34 MILES EAST OF RADFORD CAMP ROAD |
DEBRIS REMOVAL, ROAD CLOSURE PROTECTION ESTABLISHMENT, SHOULDER REPAIR, ROADSIDE DRAINAGE REPAIR ETC. RECONSTRUCTION REPAIR OF APPROX. 1,000 FEET OF ROADWAY AT VARIOUS LOCATIONS. INSTALLATION OF DRAINAGE PIPE AND AC CUTOFF WALLS. |
|
San Bern. County (CR-SBdCo) |
Karen Nguyen |
05/23/2022: Submit final invoice and FROE to LPA -view comment history- |
0 |
STPLER-5954 (066)
|
SBd | Santa Ana River Trail Phase 2 from La Cadena Drive to Waterman Avenue |
Pedestrian pathway |
|
San Bern. County (CR-SBdCo) |
Sylvester Lin |
02/21/2017: 02/21/2017 Project archived in D8 Database, project file purged on 7/7/2015. -view comment history- |
0 |
CML-5954 (067)
|
SBd | Mesquite Near the southwestern portion of Hesperia on Mesquite Street from Escondido Avenue to Maple Avenue |
Paving of dirt road |
|
San Bern. County (CR-SBdCo) |
Sylvester Lin |
01/03/2017: Project archived in D8 Database, project file purged prior to 12/27/2016. -view comment history- |
0 |
STPLHG-5954 (069)
|
SBd | Central Avenue at Arrow Route |
Upgrade signals for left turn phasing |
|
San Bernardino County 0071 |
Ramiro Martinez |
No comments |
0 |
STPLH-5954 (070)
|
SBd | Intersection of Ridegcrest Road and Pebble Beach Drive in Spring Valley Lake near Victorville. On 2/13/2002 San Bernardino County requested this project be dropped. |
Traffic signals |
|
San Bernardino County 0071 |
Ramiro Martinez |
No comments |
0 |
CML-5954 (071)
|
SBd | SR 38 and Wabash Avenue Intersection |
Signals and interconnect |
|
San Bern. County (CR-SBdCo) |
Sylvester Lin |
02/21/2017: 02/212017 Project archived in D8 Database, project file purged on 7/7/2015.
-view comment history- |
0 |
STPLER-5954 (072)
|
SBd | Green Valley Lake Area |
Lakeside trail improvements |
|
San Bernardino County 0071 |
Ramiro Martinez |
No comments |
0 |
CML-5954 (073)
|
SBd | Larrea Road Near Johnson Valley on from 0.6 miles south of Quail Bush Road to SR 247 |
Paving of a dirt road |
|
San Bernardino County 0071 |
Ramiro Martinez |
07/09/2007: Mail Received (final voucher) -view comment history- |
0 |
STPLHG-5954 (076)
|
SBd | Mission Boulevard and Roswell Avenue Near Montclair at the intersection |
Install left-turn signal phase |
|
San Bernardino County 0071 |
Ramiro Martinez |
03/13/2006: Mail Received (Final package for the Mission Blvd Project.) -view comment history- |
0 |
STPLHG-5954 (077)
|
SBd | Arrow Route and Locust Avenue Near Fontana at the intersection |
Install left turn lane and turn phase |
|
San Bern. County (CR-SBdCo) |
Sylvester Lin |
04/13/2010: Mail Received (final voucher) -view comment history- |
0 |
STPLER-5954 (080)
|
SBd | Around Lake Gregory near Crestline |
Scenic pedestrian walkway |
|
San Bern. County (CR-SBdCo) |
Sylvester Lin |
01/03/2017: Project archived in D8 Database, project file purged prior to 12/27/2016. -view comment history- |
0 |
IPSTPL-5954 (081)
|
SBd | I-10 interchange at Etiwanda Avenue |
Reconstruct interchange and ramps |
|
San Bern. County (CR-SBdCo) |
Sylvester Lin |
04/04/2008: Mail Received (Final Package for the I 10 Etiwanda Interchange) -view comment history- |
0 |
STPLER-5954 (083)
|
SBd | Santa Ana River Trail from Waterman Avenue in San Bernardino to California Street in Redlands |
Pedestrian pathway |
|
San Bern. County (CR-SBdCo) |
Enrique Gonzalez |
05/02/2023: Mail Received (Progress Invoice No.10; Received 04/20/2023) -view comment history- |
3 |
STPLHSR-5954 (084)
|
SBd | Monterey Avenue from Pedley Road to Whitlock Avenue |
Sidewalk |
|
San Bern. County (CR-SBdCo) |
Enrique Gonzalez |
No comments |
0 |
STPL-5954 (085)
|
SBd | Needles Highway from "N" Street to the Nevada State Line |
Realignment, rehabilitation, channelization, acceleration lanes, and passing lanes |
|
San Bern. County (CR-SBdCo) |
Esayas Hagos |
08/27/2021: Mail Received (FROE (PE only); received on 8/26/2021.) -view comment history- |
1 |
CML-5954 (087)
|
SBd | 24001 Lake Drive in Crestline |
Park and Ride lot |
|
San Bern. County (CR-SBdCo) |
Sylvester Lin |
02/21/2017: 02/212017 Project archived in D8 Database, project file purged on 7/7/2015.
-view comment history- |
0 |
CML-5954 (088)
|
SBd | San Bernardino Avenue -between Cherry and Cedar |
Signal synchronization |
|
San Bern. County (CR-SBdCo) |
Sylvester Lin |
01/05/2007: Mail Received (Progress invoice) -view comment history- |
0 |
STPL-5954 (089)
|
SBd | National Trails Highway 0.75 miles north of Oro Grande |
Passing lanes |
|
San Bernardino County 0071 |
Ramiro Martinez |
No comments |
0 |
STPLHSR-5954 (090)
|
SBd | Pepper Street in Crestmore from 6th Street to 9th Street |
Curb, gutter, and sidewalk |
|
San Bernardino County 0071 |
Ramiro Martinez |
No comments |
0 |
STPLHSR-5954 (092)
|
SBd | Pamela Drive near Chino from Cozzens Avenue to 0.12 mile east of Roswell Avenue |
Sidewalk |
|
San Bernardino County 0071 |
Ramiro Martinez |
05/04/2006: Mail Received (Pamela Dr Cozzens Ave to 0/12 Mile East to Roswell Ave) -view comment history- |
0 |
BRLS-5954 (093)
|
SBd | National Trails Highway at Dola Ditch 2.1 miles east of Kelbaker Road near Chambless |
Bridge replacement (Br. No. 54C-0285) |
|
San Bern. County (CR-SBdCo) |
Karen Nguyen |
08/23/2022: Mail Received (Approved FL; Received 08/22/2022) -view comment history- |
8 |
BRLS-5954 (094)
|
SBd | National Trails Highway at Lanzit Ditch 2.8 miles east of Kelbaker Road near Chambless |
Bridge replacement (Br. No. 54C-0286) |
|
San Bern. County (CR-SBdCo) |
Karen Nguyen |
08/31/2022: Mail Received (Approved FL; Received 08/30/2022) -view comment history- |
9 |
BRLO-5954 (095)
|
SBd | Garnet Street at Mill Creek 0.5 miles north of SR 38 near Mentone (Br. No. 54C-0420) |
Bridge replacement |
|
San Bern. County (CR-SBdCo) |
Karen Nguyen |
06/08/2022: progress invoice 27 sent to LPA -view comment history- |
3 |
STPLH-5954 (096)
|
SBd | Central Road & Ocotillo Way |
Reprofiling and turn lane channelization |
|
San Bern. County (CR-SBdCo) |
Sylvester Lin |
04/04/2008: Mail Received (bids on Central Rd Ocotillo Way) -view comment history- |
0 |
STPL-5954 (097)
|
SBd | Amboy Road 1.02 mile E/O Irongage Road to 12.4 miles E/O Ironage Road |
Asphalt Concrete Overlay |
|
San Bernardino County 0071 |
Ramiro Martinez |
06/06/2007: Mail Received (Final Voucher) -view comment history- |
0 |
STPLHSR-5954 (098)
|
SBd | Monterey Avenue from Palm Drive to Pedley Road |
Curb, gutter, sidewalk, and ramps |
|
San Bern. County (CR-SBdCo) |
Sylvester Lin |
01/03/2017: Project archived in D8 Database, project file purged prior to 12/27/2016. -view comment history- |
0 |
X05-5954 (100)
|
SBd | San Bernardino County match exchange |
FY 04-05 Match Exchange |
|
San Bernardino County 0071 |
Ramiro Martinez |
No comments |
0 |
PLHL04-5954 (101)
|
SBd | Summit Valley Road from SR 138 to the Hesperia City Limits |
Roadway Widening |
|
San Bern. County (CR-SBdCo) |
Sylvester Lin |
07/16/2015: Mail Received (CE/CE Determination Form) -view comment history- |
0 |
STPL-5954 (102)
|
SBd | National Trails REVISED Limits-Bryman Road s/o Morning Glory St. to Bryman Road n/o Marigold Street - Helendale |
Widen Existing 2 Lane road for Passing Lanes-1 in each direction including transitions |
|
San Bernardino County 0071 |
Sylvester Lin |
03/17/2008: Mail Received (three copies of APE map for National Trails Highway Widening Project) -view comment history- |
1 |
X06--5954 (103)
|
SBd | 2005/2006 Exchange and Sate Match Program |
County's can exchange Federal Funds for State Funds |
|
San Bernardino County 0071 |
Ramiro Martinez |
No comments |
0 |
SR2SL-5954 (105)
|
SBd | Linden Avenue From Bohnert Avenue north to the Rialto City Limits near Wildflower Street |
Curb, gutter, sidewalk and ADA ramps |
|
San Bern. County (CR-SBdCo) |
Sylvester Lin |
02/21/2017: 02/21/2017 Project archived in D8 Database, project file purged on 7/7/2015. -view comment history- |
0 |
SR2SL-5954 (106)
|
SBd | Athol Street in Trona from the Trona Elementary School entrance to Trona Road |
Curb, gutter, sidewalk, and ADA ramps |
|
San Bern. County (CR-SBdCo) |
Sylvester Lin |
06/19/2008: Mail Received (Billing invoice) -view comment history- |
0 |
BRLS-5954 (108)
|
SBd | Glen Helen Parkway over Cajon Wash, Br. No. 54C-0025 |
Bridge replacement |
|
San Bern. County (CR-SBdCo) |
Enrique Gonzalez |
04/07/2023: Mail Received (Progress Invoice No.20; Received 03/31/2023) -view comment history- |
1 |
SR2SF-5954 (109)
|
SBd | Various Locations in San Bernardino County |
Provide safety education, information and encouragement to initiate safe route to school programs throughout the school district of the San Bernardino County. |
|
San Bern. County (CR-SBdCo) |
Sylvester Lin |
05/13/2013: Mail Received (Final voucher for payment from FHWA) -view comment history- |
0 |
SR2SL-5954 (111)
|
SBd | Sequoia Avenue near Fontana from Hemlock Avenue to 400 feet east. |
Installation of curb, gutter, sidewalk and ramps. |
|
San Bern. County (CR-SBdCo) |
Sylvester Lin |
No comments |
0 |
BRLO-5954 (112)
|
SBd | Yermo Road over Manix Wash, 1.2 miles northeast of Alvord Mountain Road near Field, Br. No. 54C0107 |
Bridge replacement |
|
San Bern. County (CR-SBdCo) |
Karen Nguyen |
12/16/2019: Mail Received (Consultant Selection Committee; 1 original, 0 copy.) -view comment history- |
0 |
STPL-5954 (113)
|
SBd | Flamingo Heights Landers Road |
Widen Shoulders for turn pockets at four intersections. |
|
San Bern. County (CR-SBdCo) |
Sylvester Lin |
05/14/2015: Mail Received (Lapsing Fund Req. 3 copies, 0 originals) -view comment history- |
0 |
ESPL-5954 (115)
|
SBd | Amboy Rd. |
Resurfacing Amboy Road. |
|
San Bernardino County 0071 |
Sylvester Lin |
04/28/2010: Mail Received (Proof of legal advertisement) -view comment history- |
0 |
HSIPL-5954 (117)
|
SBd | Valley Blvd. between Linden Ave. and Spruce Ave. - Construct Raised Median |
Traffic Related - Other |
|
San Bern. County (CR-SBdCo) |
Sylvester Lin |
05/31/2015: Mail Received (Final voucher, 1 copy, 0 original) -view comment history- |
0 |
HSIPL-5954 (118)
|
SBd | Cedar Ave. between Jurupa Ave. and El Rivino Rd. - Construct Raised Median |
Traffic Related - Other |
|
San Bern. County (CR-SBdCo) |
Sylvester Lin |
05/31/2015: Mail Received (Final voucher, 1 copy, 0 original) -view comment history- |
0 |
SRTSL-5954 (119)
|
SBd | On Almond Avenue approximately 40 feet south of Owen Street north to the Fontana City Limit. |
Construct 180 linear foot of curb, gutter, and sidewalk gap closure on the east side of Almond Avenue. |
|
San Bern. County (CR-SBdCo) |
Sylvester Lin |
03/05/2015: Mail Received (Final invoice, 1 original, 2 copies) -view comment history- |
1 |
SRTSL-5954 (120)
|
SBd | On Grandview Road near Grandview Elementary School. |
Construct 670 linear foot of concrete sidewalk. |
|
San Bern. County (CR-SBdCo) |
Sylvester Lin |
05/31/2015: Mail Received (Final voucher, 1 copy, 0 original) -view comment history- |
0 |
SRTSL-5954 (121)
|
SBd | On Ridgecrest Road from Pah-Ute Road to Pebble Beach Drive and on Pah-Ute Road from Ridgecrest Road to Tamarisk Road. |
Construct 3760 linear foot of sidewalk. |
|
San Bern. County (CR-SBdCo) |
Sylvester Lin |
05/09/2016: Mail Received (Finale Invoice/FROE (Con) 1 original, 2 copies) -view comment history- |
0 |
BRLS-5954 (122)
|
SBd | Baker Boulevard Bridge over Mojave River, 0.2 mile southwest of Death Valley Road |
Replace 2 lanes bridge with 4 lanes (Bridge No. 54C0127) |
|
San Bern. County (CR-SBdCo) |
Karen Nguyen |
03/27/2017: Mail Received (LP2000 finanace letter, 1 copy, 0 original.) -view comment history- |
2 |
SRTSLNI-5954 (123)
|
SBd | At schools in the cities of Victorville, Apple Valley, Hesperia, Adelanto, and Barstow. |
Launch a program to provide safety education as well as information and encouragement to initiate Safe Routes to School Programs in twelve K-8 schools. |
|
San Bern. County (CR-SBdCo) |
Sylvester Lin |
06/09/2016: DLAE signs Exhibit 17-A, Cover Letter and Federal Report of Expenditure Checklist, and Exhibit 17-C, Final Inspection Form. -view comment history- |
0 |
HSIPL-5954 (125)
|
SBd | Beech Ave., near Beech Ave. Elementary School
|
Install in-pavement crosswalk lights
|
|
San Bern. County (CR-SBdCo) |
Sylvester Lin |
07/28/2015: Mail Received (FROE, 1 original, 2 copies) -view comment history- |
0 |
HSIPL-5954 (126)
|
SBd | Valley Blvd. between Locust Ave. and Linden Ave.
|
Construct raised median
|
|
San Bern. County (CR-SBdCo) |
Sylvester Lin |
08/12/2015: Mail Received (Final Invoice Revised (PE & Con.) 1 original, 2 copies) -view comment history- |
0 |
BPMPL-5954 (127)
|
SBd | Avalon Wash Bridge and Kalmia Ditch Bridge |
Grouped projects for Bridge rehabilitation and reconstruction HBP program
Consultant design and contract repair 2 bridges; Develop 12/13 Bridge Preventive Maintenance Plan |
|
San Bern. County (CR-SBdCo) |
Esayas Hagos |
12/16/2019: Mail Received (PE closeout and final invoice; 1 original, 2 copies.) -view comment history- |
0 |
SR2SL-5954 (129)
|
SBd | Pacific St. between Perris Hill Park Rd. and Glasgow Ave. |
Install in-pavement crosswalk lighting and paint curb; construct curb ramps; upgrade crosswalks |
|
San Bern. County (CR-SBdCo) |
Sylvester Lin |
09/08/2015: Mail Received (FROE, 1 original, 2 copies) -view comment history- |
0 |
TCIFL-5954 (130)
|
SBd | Glen Helen Parkway Railroad Grade Separation at UPRR and BNSF |
Construct Grade Separation |
|
San Bern. County (CR-SBdCo) |
Sylvester Lin |
03/07/2016: Mail Received (Final Invoice (Revised) (Con.) 1 original, 2 copies) -view comment history- |
0 |
SLPPL-5954 (131)
|
SBd | On Maple Lane,0.27 mile north of Baldwin Lane to State Route 38. |
Drainage improvements: Install storm drain, protecting side slope, and construct sidewalks |
|
San Bern. County (CR-SBdCo) |
Sylvester Lin |
11/16/2015: Mail Received (Final Invoice (Con.), 1 original, 2 copies) -view comment history- |
0 |
HSIPL-5954 (134)
|
SBd | On Cedar Avenue, between Bloomington Avenue and Randall Avenue. |
Construct raised median. |
|
San Bern. County (CR-SBdCo) |
Sylvester Lin |
05/24/2016: Mail Received (Commitment forms & Updates 1 original, 2 copies) -view comment history- |
0 |
RSTPL-5954 (135)
|
SBd | Rock Springs Road from 0.25 mile east of Glendale Avenue to 0.3 mile east of Deep Creek Road. |
Widen existing roadway from 2-lane to 4-lane including Rock Springs Road bridge (Br. No. 54C0670). |
|
San Bern. County (CR-SBdCo) |
Karen Nguyen |
02/24/2023: Mail Received (Progress Invoice No.2; Received 02/22/2023) -view comment history- |
1 |
PLHD-5954 (136)
|
SBd | Segment 1 of Needles Highway from 600 feet north of Balboa Place to N Street. |
Roadway rehabilitation |
|
San Bern. County (CR-SBdCo) |
Leslie Avila |
10/07/2021: Mail Received (approved FL; received on 10/6/2021.) -view comment history- |
0 |
HSIPL-5954 (137)
|
SBd | On National Trails Highway (SR-66) between Amboy Road and 17 miles east. |
Install striping and pavement markers. |
|
San Bern. County (CR-SBdCo) |
Vu Ngo |
05/30/2018: Funds have been de-obligated the funds prior to final voucher based on the current cost estimate. -view comment history- |
1 |
X15-5954 (138)
|
SBd | San Bernardino County match exchange |
FY 14-15 Match Exchange |
|
San Bern. County (CR-SBdCo) |
Sylvester Lin |
No comments |
0 |
RSTPL-5954 (139)
|
SBd | Morongo Basin-Joshua Tree area roads: Yucca Trail, Alta Loma Drive, Quail Spring Road, Aberdeen Drive. |
Pavement preservation / rehabilitation of Morongo Basin-Joshua Tree area roads. |
|
San Bern. County (CR-SBdCo) |
Vu Ngo |
11/05/2020: Mail Received (final invoice 6; to staff and V-drive.) -view comment history- |
6 |
STPL-5954 (140)
|
SBd | Shadow Mountain Road from Helendale Road East to National Trails Highway. |
Construct and extend Shadow Mt. Road from 2 to 4 lanes including a 4-lane bridge over Mojave River. |
|
San Bern. County (CR-SBdCo) |
Sylvester Lin |
06/23/2016: DLAE signs PES. -view comment history- |
1 |
X16-5954 (141)
|
SBd | San Bernardino County State Match Exchange Program |
FY 15-16 Match Exchange |
|
San Bern. County (CR-SBdCo) |
Sylvester Lin |
05/25/2017: Mail Received (Progress invoice 2, 2 copies, 1 original.) -view comment history- |
0 |
BRLS-5954 (142)
|
SBd | NATIONAL TRAILS HIGHWAY OVER ADENA DITCH BRIDGE, 21.9 MILES EAST OF KELBAKER ROAD |
Replace 2-lane bridge with a new 2-lane bridge |
|
San Bern. County (CR-SBdCo) |
Karen Nguyen |
02/24/2023: Mail Received (Progress Invoice No.13; Received 02/21/2023) -view comment history- |
3 |
STPL-5954 (143)
|
SBd | On Historic Route 66 from City of Barstow to Mountain Springs Road |
Replace 31 bridges that are ineligible for the Highway Bridge Program. |
|
San Bern. County (CR-SBdCo) |
Sylvester Lin |
05/10/2018: Mail Received (Hard copies of Revised Programmatic Agreement for National Trails Highway) -view comment history- |
7 |
PLHD-5954 (144)
|
SBd | Segment 1A of Needles Highway from 250 feet north of National Trails Highway to 400 feet south of Terrance Drive |
Realign, rehabilitate, widen of existing Needles Highway |
|
San Bern. County (CR-SBdCo) |
Karen Nguyen |
10/20/2021: final voucher & closed -view comment history- |
0 |
PLHDL08-5954 (145)
|
SBd | Needles Highway Segment 1B: 500' south of Park Road to 1 mile north |
Road Improvements
(Child Project to 5954(085))
|
|
San Bern. County (CR-SBdCo) |
Enrique Gonzalez |
05/02/2023: Mail Received (Progress Invoice No.3; Received 04/26/2023) -view comment history- |
1 |
ATPL-5954 (146)
|
SBd | Santa Ana River Trail Phase IV, Reaches B and C, from Orange Street in Redlands to Opal Street in Mentone. |
Design and construct Class I and III bike paths and pedestrian trails |
|
San Bern. County (CR-SBdCo) |
Esayas Hagos |
12/31/2019: Mail Received (progress invoice 3; 1 original, 2 copies.) -view comment history- |
0 |
BRLS-5954 (147)
|
SBd | National Trails Highway over Bristol Ditch (Br. No. 54C0272), 26.7 Miles East of Crucero Road. |
Replace existing 2-lane bridge with a new 2-lane bridge. |
|
San Bern. County (CR-SBdCo) |
Enrique Gonzalez |
05/19/2023: Mail Received ( RFA (PE)adj. ; Received 05/18/2023) -view comment history- |
0 |
X17-5954 (148)
|
SBd | Throughout San Bernardino County |
2016/2017 Exchange and State Match Program. Sean 5/4/2017. |
|
San Bern. County (CR-SBdCo) |
Enrique Gonzalez |
10/24/2017: Mail Received (Match Exchange Agreement) -view comment history- |
0 |
BRLS-5954 (149)
|
SBd | National Trails Highway over Cerro Ditch (Br. No. 54C0275), 1.3 mile east of Amboy Road. |
Replace existing 2-lane bridge with 2-lane bridge |
|
San Bern. County (CR-SBdCo) |
Karen Nguyen |
05/19/2023: Mail Received (RFA (PE)adj. ; Received 05/18/2023) -view comment history- |
0 |
BRLS-5954 (150)
|
SBd | National Trails Highway over Gordo Ditch (Br. No. 54C0276), 1.8 mile east of Amboy Road. |
Replace existing 2-lane bridge with 2-lane bridge |
|
San Bern. County (CR-SBdCo) |
Karen Nguyen |
02/24/2023: Mail Received (Progress Invoice No.10; Received 02/21/2023) -view comment history- |
0 |
BRLS-5954 (151)
|
SBd | National Trails Highway over Cerulia Ditch (Br. No. 54C0277), 2.2 miles east of Amboy Road. |
Replace existing 2-lane bridge with 2-lane bridge |
|
San Bern. County (CR-SBdCo) |
Karen Nguyen |
05/19/2023: Mail Received (RFA (PE)adj. ; Received 05/18/2023) -view comment history- |
0 |
BRLS-5954 (152)
|
SBd | National Trails Highway over Leith Ditch (Br. No. 54C0279), 3.1 miles east of Amboy Road. |
Replace existing 2-lane bridge with 2-lane bridge |
|
San Bern. County (CR-SBdCo) |
Karen Nguyen |
05/19/2023: Mail Received (RFA (PE)adj. ; Received 05/18/2023) -view comment history- |
0 |
BRLS-5954 (153)
|
SBd | National Trails Highway over Terra Ditch (Br. No. 54C0280), 3.6 miles east of Amboy Road. |
Replace existing 2-lane bridge with 2-lane bridge |
|
San Bern. County (CR-SBdCo) |
Enrique Gonzalez |
05/19/2023: Mail Received (RFA (PE)adj. ; Received 05/18/2023) -view comment history- |
0 |
BRLS-5954 (154)
|
SBd | National Trails Highway over Sombra Ditch (Br. No. 54C0281), 4.1 miles east of Amboy Road. |
Replace existing 2-lane bridge with 2-lane bridge |
|
San Bern. County (CR-SBdCo) |
Karen Nguyen |
05/19/2023: Mail Received (RFA (PE)adj. ; Received 05/18/2023) -view comment history- |
0 |
BRLS-5954 (155)
|
SBd | National Trails Highway over Beacon Ditch (Br. No. 54C0282), 6.2 miles east of Amboy Road. |
Replace existing 2-lane bridge with 2-lane bridge |
|
San Bern. County (CR-SBdCo) |
Karen Nguyen |
05/19/2023: Mail Received (RFA (PE)adj. ; Received 05/18/2023) -view comment history- |
0 |
BRLS-5954 (156)
|
SBd | National Trails Highway over Larissa Ditch (Br. No. 54C0284), 1.1 mile east of Kelbaker Road. |
Replace existing 2-lane bridge with 2-lane bridge |
|
San Bern. County (CR-SBdCo) |
Karen Nguyen |
05/19/2023: Mail Received (RFA (PE)adj. ; Received 05/18/2023) -view comment history- |
0 |
BRLS-5954 (157)
|
SBd | Baker Bl over Mojave River (Br. No. 54C0127), 0.2 mile SW Death Valley |
Replacing 2 lane timber bridge with 4 lane bridge. |
|
San Bern. County (CR-SBdCo) |
Karen Nguyen |
01/16/2018: DLAP signed Exhibit 3-G for PE -view comment history- |
0 |
ATPSB1L-5954 (159)
|
SBd | Sunburst Avenue from the terminus of the Class I bike path to north approximately 1.5 miles to Calle Los Amigos, in the unincorporated community Joshua Tree. |
Install bike Lanes on Sunburst Avenue from the terminus of the Class I bike path, widening and stripping travel lanes. |
|
San Bern. County (CR-SBdCo) |
Karen Nguyen |
06/01/2022: Mail Received (FPER; received on 5/25/2022.) -view comment history- |
0 |
HSIPL-5954 (160)
|
SBd | The intersections of Phelan Road with Arrowhead Rd, Sunny Vista Rd, Tumbleweed Rd and Sonora Rd, in the unincorporated community of Phelan. |
Install left-turn and right-turn lanes with acceleration lanes
Highway Safety and Improvement Program (HSIP) funds awarded on 12/12/2018 as a HSIP Cycle 9 project and programmed for FY 21/22 in Amendment #2 approved on 12/20/18 to SCAG's 2019 FTIP and EPSP'd to FY 18-19 on 3/18/19. Federal funding is capped at $1,125,360 for all phases of work with a maximum reimbursement ratio of 90% for countermeasures. Reimburse with ZS30 HSIP funds at 90% on a lump sum reimbursement basis up to the federal amount shown for preliminary engineering. HSIP Cycle 9, HSIP ID #H9-08-022. |
|
San Bern. County (CR-SBdCo) |
Karen Nguyen |
02/24/2023: Mail Received (Progress Invoice No.6; Received 02/21/2023) -view comment history- |
0 |
X19-5954 (161)
|
SBd | San Bernardino County |
FTA transfer 2018/2019 |
|
San Bern. County (CR-SBdCo) |
Esayas Hagos |
No comments |
0 |
X20-5954 (167)
|
SBd | to be completed by staff. Sean 12/10/2020. |
to be completed by staff. Sean 12/10/2020. |
|
San Bern. County (CR-SBdCo) |
Karen Nguyen |
01/06/2021: Mail Received (executed X-Match Agreement, 11/17/2020; to staff.) -view comment history- |
0 |
BRLS-5954 (168)
|
SBd | National Trails Highway at Kalmia Ditch (Br. No. 54C-0242), 11.8 miles east of Crucero Road |
Replace existing 2-lane bridge with 2-lane bridge
|
|
San Bern. County (CR-SBdCo) |
Karen Nguyen |
05/19/2023: Mail Received ( RFA (PE); Received 05/18/2023) -view comment history- |
0 |
BRLS-5954 (169)
|
SBd | National Trails Highway at Baroda Ditch (Br. No. 54C-0269), 24.8 miles east of Crucero Road |
Replace existing 2-lane bridge with 2-lane bridge
|
|
San Bern. County (CR-SBdCo) |
Karen Nguyen |
05/19/2023: Mail Received ( RFA (PE); Received 05/18/2023) -view comment history- |
0 |
BRLS-5954 (170)
|
SBd | National Trails Highway at Terzilla Ditch (Br. No. 54C-0296), 10.2 miles east of KelbakerRoad, |
Replace existing 2-lane bridge with 2-lane bridge
|
|
San Bern. County (CR-SBdCo) |
Karen Nguyen |
05/19/2023: Mail Received ( RFA (PE); Received 05/18/2023) -view comment history- |
0 |
BRLS-5954 (171)
|
SBd | National Trails Highway at Edloft Ditch (Br. No. 54C-0300), 12.7 miles east of KelbakerRoad |
Replace existing 2-lane bridge with 2-lane bridge
|
|
San Bern. County (CR-SBdCo) |
Karen Nguyen |
05/19/2023: Mail Received ( RFA (PE); Received 05/18/2023) -view comment history- |
0 |
BRLS-5954 (172)
|
SBd | National Trails Highway at Atajo Ditch (Br. No. 54C-0303), 14.3 miles east of KelbakerRoad |
Replace existing 2-lane bridge with 2-lane bridge |
|
San Bern. County (CR-SBdCo) |
Karen Nguyen |
05/19/2023: Mail Received ( RFA (PE); Received 05/18/2023) -view comment history- |
0 |
BRLS-5954 (173)
|
SBd | National Trails Highway at Ellita Ditch (Br. No. 54C-0304), 15.3 miles east of KelbakerRoad
|
Replace existing 2-lane bridge with 2-lane bridge
|
|
San Bern. County (CR-SBdCo) |
Karen Nguyen |
05/19/2023: Mail Received ( RFA (PE); Received 05/18/2023) -view comment history- |
0 |
BRLS-5954 (174)
|
SBd | National Trails Highway at Tenino Ditch (Br. No. 54C-0305), 16 miles east of KelbakerRoad |
Replace existing 2-lane bridge with 2-lane bridge
|
|
San Bern. County (CR-SBdCo) |
Karen Nguyen |
05/19/2023: Mail Received ( RFA (PE); Received 05/18/2023) -view comment history- |
0 |
BRLS-5954 (175)
|
SBd | National Trails Highway at Cota Ditch (Br. No. 54C-0306), 16.7 miles east of KelbakerRoad
|
Replace existing 2-lane bridge with 2-lane bridge |
|
San Bern. County (CR-SBdCo) |
Karen Nguyen |
05/19/2023: Mail Received ( RFA (PE); Received 05/18/2023) -view comment history- |
0 |
BRLS-5954 (176)
|
SBd | National Trails Highway at Danby Ditch (Br. No. 54C-0307), 17.2 miles east of KelbakerRoad |
Replace existing 2-lane bridge with 2-lane bridge
|
|
San Bern. County (CR-SBdCo) |
Karen Nguyen |
05/19/2023: Mail Received ( RFA (PE); Received 05/18/2023) -view comment history- |
0 |
BRLS-5954 (177)
|
SBd | National Trails Highway at Dalmatia Ditch (Br. No. 54C-0308), 17.8 miles east of KelbakerRoad
|
Replace existing 2-lane bridge with 2-lane bridge |
|
San Bern. County (CR-SBdCo) |
Karen Nguyen |
05/19/2023: Mail Received ( RFA (PE); Received 05/18/2023) -view comment history- |
0 |
BRLS-5954 (178)
|
SBd | National Trails Highway at Tareco Ditch (Br. No. 54C-0311), 19.2 miles east of KelbakerRoad |
Replace existing 2-lane bridge with 2-lane bridge |
|
San Bern. County (CR-SBdCo) |
Karen Nguyen |
05/19/2023: Mail Received ( RFA (PE); Received 05/18/2023) -view comment history- |
0 |
BRLS-5954 (179)
|
SBd | National Trails Highway at Ava Ditch (Br. No. 54C-0312), 19.6 miles east of Kelbaker Road |
Replace existing 2-lane bridge with 2-lane bridge
|
|
San Bern. County (CR-SBdCo) |
Karen Nguyen |
05/19/2023: Mail Received ( RFA (PE); Received 05/18/2023) -view comment history- |
0 |
BRLS-5954 (180)
|
SBd | National Trails Highway at Nicola Ditch (Br. No. 54C-0313), 20.6 miles east of Kelbaker Road |
Replace existing 2-lane bridge with 2-lane bridge |
|
San Bern. County (CR-SBdCo) |
Karen Nguyen |
05/19/2023: Mail Received ( RFA (PE); Received 05/18/2023) -view comment history- |
0 |
BRLS-5954 (181)
|
SBd | National Trails Highway at Califa Ditch (Br. No. 54C-0314), 21.2 miles east of Kelbaker Road |
Replace existing 2-lane bridge with 2-lane bridge |
|
San Bern. County (CR-SBdCo) |
Karen Nguyen |
05/19/2023: Mail Received ( RFA (PE); Received 05/18/2023) -view comment history- |
0 |
BRLS-5954 (182)
|
SBd | National Trails Highway at Clipper Ditch (Br. No. 54C-0318), 23.6 miles east of Kelbaker Road |
Replace existing 2-lane bridge with 2-lane bridge |
|
San Bern. County (CR-SBdCo) |
Karen Nguyen |
05/19/2023: Mail Received ( RFA (PE); Received 05/18/2023) -view comment history- |
0 |
BRLS-5954 (183)
|
SBd | National Trails Highway at Izzy Ditch (Br. No. 54C-0319), 24.2 miles east of Kelbaker Road |
Replace existing 2-lane bridge with 2-lane bridge |
|
San Bern. County (CR-SBdCo) |
Karen Nguyen |
05/19/2023: Mail Received ( RFA (PE); Received 05/18/2023) -view comment history- |
0 |
BRLS-5954 (184)
|
SBd | National Trails Highway at Elrita Ditch (Br. No. 54C-0320), 24.6 miles east of Kelbaker Road |
Replace existing 2-lane bridge with 2-lane bridge |
|
San Bern. County (CR-SBdCo) |
Karen Nguyen |
05/19/2023: Mail Received ( RFA (PE); Received 05/18/2023) -view comment history- |
0 |
BRLS-5954 (185)
|
SBd | National Trails Highway at Axton Ditch (Br. No. 54C-0322), 26 miles east of Kelbaker Road |
Replace existing 2-lane bridge with 2-lane bridge |
|
San Bern. County (CR-SBdCo) |
Karen Nguyen |
05/19/2023: Mail Received ( RFA (PE); Received 05/18/2023) -view comment history- |
0 |
BRLS-5954 (186)
|
SBd | National Trails Highway at Bandera Wash (Br. No. 54C-0323), 26.1 miles east of Kelbaker Road |
Replace existing 2-lane bridge with 2-lane bridge |
|
San Bern. County (CR-SBdCo) |
Karen Nguyen |
05/19/2023: Mail Received ( RFA (PE); Received 05/18/2023) -view comment history- |
0 |
X21-5954 (187)
|
SBd | to be completed by staff. Sean, 7/20/2021. |
to be completed by staff. Sean, 7/20/2021. |
|
San Bern. County (CR-SBdCo) |
Evita Premdas |
07/29/2021: Mail Received (final invoice 1; received on 7/27/2021.) -view comment history- |
0 |
ATPSB1L-5954 (188)
|
SBd | In the unincorporated San Bernardino community of Muscoy, in the areas immediately surrounding both campuses of the Vermont and Muscoy Elementary Schools |
Safe Routes to School Pedestrian Improvements in the Muscoy Area
PPNO 1274A Infrastructure component
PPNO 1274B NI |
|
San Bern. County (CR-SBdCo) |
Karen Nguyen |
05/02/2023: Mail Received (ATP Grant Application Correspondence; Received 04/19/2023) -view comment history- |
0 |
STPL-5954 (189)
|
SBd | State Route 138 to Los Banos Avenue in the Phelan area. |
Widening from two lanes to five lanes; pavement rehabilitation/reconstruction; realigning the intersection of Phelan Road and State Route 138 to provide for a perpendicular intersection; evaluation and possible widening or reconstruction of bridge at Sheep Creek and culvert at Horse Canyon Channel; rehabilitation/replacement of existing drainage structures at various locations as well as various other improvements as a result of the road widening. |
|
San Bern. County (CR-SBdCo) |
Karen Nguyen |
No comments |
0 |
LRSPL-5954 (190)
|
SBd | Unincorporated San Bernardino County |
Improving safetyfor all road users in Unincorporated San Bernardino County.
FY 20-21 LRSP Project ID LRSP263. County of San Bernardino Study. |
|
San Bern. County (CR-SBdCo) |
Karen Nguyen |
03/16/2023: Mail Received (LRSP; Received 03/15/23) -view comment history- |
0 |
X22-5954 (191)
|
SBd | to be completed by staff. Sean, 6/8/2022. |
to be completed by staff. Sean, 6/8/2022. |
|
San Bern. County (CR-SBdCo) |
Karen Nguyen |
06/28/2022: Mail Received (Final Invoice 1; Received 06/27/2022) -view comment history- |
0 |
ER32A0-5954 (902)
|
SBd | (902) is a dummy, actual sequence is (002).
Lone Pine Canyon Road, from State Hwy 138 to PM Marker #3, in Wrightwood Area |
(902) is a dummy, actual sequence is (002).
Removal and re-installation of damaged guardrail, striping and other work on Lone Pine Canyon Rd |
|
San Bern. County (CR-SBdCo) |
Karen Nguyen |
03/04/2022: Mail Received (approved FL; received on 3/4/2022.) -view comment history- |
0 |
ER38R0-5954 (903)
|
SBd | Needles Highway - Emergency Opening |
(903) is a dummy, actual sequence is (003).
Repair Asphalt Down Drain |
|
San Bern. County (CR-SBdCo) |
Karen Nguyen |
02/25/2022: Mail Received (ER; approved FL; received on 2/24/2022.) -view comment history- |
0 |
ER38R0-5954 (991)
|
SBd | (991) is a dummy, actual sequence is (001).
ER project, to be completed by staff. Sean 6/22/2021. |
(992) is a dummy, actual sequence is (001).
ER project, to be completed by staff. Sean 6/22/2021. |
|
San Bern. County (CR-SBdCo) |
Karen Nguyen |
06/22/2021: Mail Received (RFA CON; received on 6/22/2021.) -view comment history- |
0 |
ER38R0-5954 (992)
|
SBd | (992) is a dummy, actual sequence is (002).
ER project, to be completed by staff. Sean 6/11/2021. |
(992) is a dummy, actual sequence is (002).
ER project, to be completed by staff. Sean 6/11/2021. |
|
San Bern. County (CR-SBdCo) |
Karen Nguyen |
08/30/2021: Final Invoice#2 and FROE sent to LPA -view comment history- |
0 |
ER38A0-5954 (994)
|
SBd | (994) is a dummy, actual sequence is (004).
ER project, to be completed by staff. Sean 5/12/2021. |
(994) is a dummy, actual sequence is (004).
ER project, to be completed by staff. Sean 5/12/2021. |
|
San Bern. County (CR-SBdCo) |
Karen Nguyen |
08/04/2022: Final invoice & FROE revised sent to LPA -view comment history- |
0 |
STPLNG-5956 (002)
|
RIV | San Jacinto @ Stetson |
No folder available |
|
Riverside County 0065 |
Harish Rastogi |
No comments |
0 |
STPL-5956 (009)
|
RIV | Rancho Calif - Butterfield Stage to Buck |
Engineer to Update |
|
Riverside County 0065 |
Harish Rastogi |
No comments |
0 |
STPLNZP-5956 (013)
|
RIV | Seismic Retrofit/Painting Market Street Bridge over Santa Ana River |
Seismic retrofit |
|
Riverside County 0065 |
Harish Rastogi |
12/21/2005: Mail Received (Billing Final for Market Street over Santa Ana River) -view comment history- |
0 |
STPLH-5956 (022)
|
RIV | In Riverside County on Grand Ave:Bonnielea Dr to Corydon. |
Widening and Left Turn Lane |
|
Riverside County 0065 |
Harish Rastogi |
No comments |
0 |
STPLH-5956 (023)
|
Riv | Grand Ave/Stoneman - Corydon |
Engineer to Update |
|
Riverside County 0065 |
Laura Zaninovich |
No comments |
0 |
STPLH-5956 (024)
|
Riv | Grand Ave/Turner - Stoneman |
Engineer to Update |
|
Riverside County 0065 |
Laura Zaninovich |
No comments |
0 |
STPL-5956 (025)
|
Riv | Grand Ave: Garner/Adelfa |
Engineer to Update |
|
Riverside County 0065 |
Laura Zaninovich |
No comments |
0 |
CMLN-5956 (028)
|
RIV | In Riverside County on Mission Blvd- Crestmore Rd to Opal St. |
Traffic Detection |
|
Riverside County 0065 |
Harish Rastogi |
04/10/2008: Mail Received (Progress Final) -view comment history- |
0 |
STPL-5956 (039)
|
RIV | Mt Vernon Ave Center st-Palmyrita |
No folder available - no information in LP2000 |
|
Riverside County 0065 |
Harish Rastogi |
No comments |
0 |
STPLN-5956 (061)
|
RIV | Van Buren / Riverside City Limits to Limonite |
No folder available - no information in LP2000 |
|
Riverside County 0065 |
Harish Rastogi |
No comments |
0 |
ER 40A0-5956 (063)
|
RIV | Mt. Baldy Road |
DEBRIS REMOVAL, SHOULDER REPAIR, PAVEMENT REPAIR, SWEEPING AND OTHER RELATED WORK |
|
Riv. County (CR-RivCo) |
Albert Vergel de Dios |
No comments |
0 |
STPL-5956 (064)
|
RIV | Cherry Hills /Blvd Bradley to Murrieta |
No file available - no information in LP2000 |
|
Riverside County 0065 |
Harish Rastogi |
No comments |
0 |
STPL-5956 (065)
|
RIV | Mission Blvd /Pedley to Riverside |
No folder available - no information in LP2000 |
|
Riverside County 0065 |
Harish Rastogi |
No comments |
0 |
PPM11-5956 (069)
|
RIV | Throughout Riverside County |
Planning,Programming and Monitoring |
|
Riv. County (CR-RivCo) |
Evita Premdas |
12/15/2005: Mail Received (Final Billing Invoice) -view comment history- |
0 |
STPLNG-5956 (071)
|
RIV | LIMONITE/BEACH |
Project cancelled |
|
Riverside County 0065 |
Harish Rastogi |
No comments |
0 |
STPLF-5956 (074)
|
RIV | IN RIVERSIDE COUNTY ON 62ND AVENUE BRIDGE AT WHITEWATER RIVER BRD NO. 56C-454 |
BRIDGE REPALCEMENT - SPECIAL BRIDGE 56C-0454 |
|
Riverside County 0065 |
Osabuogbe Igbinedion |
No comments |
0 |
BRLS-5956 (078)
|
RIV | In Riverside County on River Road Bridge at the Santa Ana River, Br. #56C-0017. |
Bridge Replacement |
|
Riv. County (CR-RivCo) |
Albert Vergel de Dios |
05/18/2015: Mail Received (Progress Invoice # 25 (R/W), A&I, 1 original, 2 copies) -view comment history- |
0 |
STPLN-5956 (085)
|
RIV | In Riverside County on I-15 at Galena Street Interchange. |
Interchange configuration |
|
Riv. County (CR-RivCo) |
Evita Premdas |
10/23/2007: Mail Received (Draft Arch and HPSR Reports) -view comment history- |
0 |
STPLN-5956 (088)
|
RIV | I-215 @ Newport Road |
Interchange |
|
Riverside County 0065 |
Harish Rastogi |
No comments |
0 |
X96-5956 (091)
|
RIV | IN RIVERSIDE COUNTY |
1995/96 STATE MATCH/EXCHANGE PROGRAM |
|
Riv. County (CR-RivCo) |
Harish Rastogi |
No comments |
0 |
STPL-5956 (097)
|
RIV | Gilman Springs Road between Jack Rabbit Trail and Bridge Street |
Road reconstruction |
|
Riv. County (CR-RivCo) |
Evita Premdas |
03/17/2008: Mail Received (Report of Expenditures) -view comment history- |
0 |
STPLX-5956 (099)
|
RIV | van buren blvd @ santa ana river n/s bound |
barrier rail |
|
Riverside County 0065 |
Harish Rastogi |
No comments |
0 |
RPL-5956 (115)
|
Riv | on Washington St./ SR-111 and Country Club Drive |
Road rehabilitation and drainage |
|
Riverside County 0065 |
Laura Zaninovich |
No comments |
0 |
STPL-5956 (118)
|
RIV | In Riverside County on Newport Rd @ RTE-215 Interchange |
Reconstruct Interchange |
|
Riverside County 0065 |
Harish Rastogi |
No comments |
0 |
BRLSZD-5956 (124)
|
RIV | In Riverside Co on Van Buren Blvd over Santa Ana River, Brd. # 56C0001L/R |
Seismic Retrofit/Replacement |
|
Riv. County (CR-RivCo) |
Albert Vergel de Dios |
05/31/2015: Mail Received (Final voucher, 1 copy, 0 original) -view comment history- |
0 |
STPLHG-5956 (125)
|
RIV | IN RIVERSIDE COUNTY AT MISSION BLVD AND GOLDEN WEST |
New Signals |
|
Riverside County 0065 |
Harish Rastogi |
No comments |
0 |
CMLN-5956 (126)
|
RIV | IN RIVERSIDE COUNTY ON SR 60 AT VALLEY WAY INTERCHANGE |
Ramp modifications |
|
Riv. County (CR-RivCo) |
Evita Premdas |
08/08/2012: Mail Received (INACTIVE PROJECT - Progress Invoice # 21 (1 original, 2 copies)) -view comment history- |
0 |
STPLHG-5956 (127)
|
RIV | RIVERSIDE COUNTY---VARIOUS LOCATIONS |
Miscellaneous - Other |
|
WRCOG |
Harish Rastogi |
No comments |
0 |
STPLR-5956 (129)
|
RIV | SR 74 and Sherman Road near the Town of Perris |
RR Grade -Install gates/signals & surfacing |
|
Riverside County 0065 |
Harish Rastogi |
No comments |
0 |
STPL-5956 (131)
|
RIV | Simpson Road near Winchester from Briggs Road to Winchester Road |
Road rehabilitation |
|
Riverside County 0065 |
Harish Rastogi |
06/08/2006: Mail Received (Final Voucher) -view comment history- |
0 |
STPLER-5956 (135)
|
RIV | Various interchanges on Route 60 from Etiwanda Avenue to Pyrite Road |
Landscaping and beautification |
|
Riverside County 0065 |
Harish Rastogi |
No comments |
0 |
RPL-5956 (139)
|
RIV | near Sunnymead on Reche Canyon Road from the San Bernardino County Line to Reche Vista Drive |
road rehabilitation |
|
Riv. County (CR-RivCo) |
Evita Premdas |
10/20/2005: Mail Received (Billing Progress for Reche Canyon Raod) -view comment history- |
0 |
STPL-5956 (141)
|
RIV | Scott Road south of Menifee from Murrieta Road to I-215. |
Road reconstruction |
|
Riv. County (CR-RivCo) |
Evita Premdas |
07/12/2016: Mail Received (HQ to Dist 8. Agreement for 15/16 Exchange & State Match Agreement# X16-5954(141) ) -view comment history- |
1 |
STPL-5956 (143)
|
RIV | Varner Rd. - Ramon Rd. to 500 ft. east of Harry Oliver Trail; Monterey Ave. - Broadmoor Dr. to Ramon Rd.; and Ramon Rd. - Varner Rd. to I-10 |
Road reconstruction |
|
Riv. County (CR-RivCo) |
Savat Khamphou |
03/29/2007: Mail Received (Ramon Road) -view comment history- |
0 |
RPL-5956 (144)
|
Riv | near Blythe at the intersection of Lovekin Boulevard and Seeley Avenue |
construct turning lanes |
|
Riverside County 0065 |
Laura Zaninovich |
No comments |
0 |
STPLHSR-5956 (145)
|
RIV | Intersection of Clinton Street and Palmyra Avenue near Indio |
New signals |
|
Riverside County 0065 |
Harish Rastogi |
No comments |
0 |
STPLNER-5956 (146)
|
RIV | Interchanges of I-10 at Monterey Avenue and at Washington Street near Palm Desert |
Landscaping and scenic beautification |
|
Riverside County 0065 |
Harish Rastogi |
09/22/2006: Mail Received (Progress Invoice for I 10 Monterey Ave and Washington Street) -view comment history- |
0 |
STPLH-5956 (147)
|
RIV | Limonite Avenue from Etiwanda Avenue to Bain Street near Norco |
Continuous left turn lane and channelization |
|
Riverside County 0065 |
Harish Rastogi |
No comments |
0 |
STPL-5956 (148)
|
RIV | Limonite Avenue from Pedley Road in Pedley to Mission Boulevard in Rubidoux |
Road rehabilitation |
|
Riverside County 0065 |
Harish Rastogi |
11/21/2005: Mail Received (Final Invoice -
Lomonite Ave - $132,982.09) -view comment history- |
0 |
STPLH-5956 (149)
|
RIV | Intersection of Dillon Road and Little Morongo Road. |
Intersection channelization |
|
Riverside County 0065 |
Harish Rastogi |
No comments |
0 |
STPLHG-5956 (152)
|
RIV | Intersection of Van Buren Boulevard and Bellgrave Avenue near Mira Loma |
Modify and upgrade signals |
|
Riverside County 0065 |
Harish Rastogi |
11/06/2007: Mail Received (Final Voucher) -view comment history- |
0 |
SR2SL-5956 (153)
|
Riv | Hudson Street from Limonite Avenue to 58th Street in Pedley |
Curb, gutter, and sidewalk |
|
Riverside County 0065 |
Eric Tang |
No comments |
0 |
STPLEE-5956 (154)
|
RIV | Alberhill Scenic Viewshed north of Lake Elsinore |
Scenic viewshed acquisition |
|
Riv. County (CR-RivCo) |
Evita Premdas |
02/21/2017: 02/212017 Project archived in D8 Database, project file purged on 7/7/2015.
-view comment history- |
1 |
SR2SL-5956 (156)
|
RIV | Almond Street from Walnut Street to Canyon Drive in Wildomar |
Curb, gutter, and sidewalk |
|
Riv. County (CR-RivCo) |
Savat Khamphou |
04/10/2008: Mail Received (Progress Final) -view comment history- |
0 |
STPLH-5956 (157)
|
RIV | Intersection of Mountain View Road and Dillon Road near Desert Hot Springs |
Left-turn lane and upgrade signals |
|
Riverside County 0065 |
Harish Rastogi |
11/27/2007: Mail Received (progress invoice) -view comment history- |
0 |
STPLH-5956 (158)
|
RIV | Intersection of El Sobrante Road and Mockingbird Canyon Road near Lake Mathews |
Pavement widening and turn lanes |
|
Riverside County 0065 |
Harish Rastogi |
11/27/2007: Mail Received (progress invoice) -view comment history- |
0 |
X05-5956 (159)
|
Riv | Riverside County match exchange |
FY 04-05 Match Exchange |
|
Riverside County 0065 |
Eric Tang |
No comments |
0 |
STPLG-5956 (160)
|
RIV | Intersection of SR 74 and Sherman Road at the Ethanac siding in Romoland |
New signals |
|
Riv. County (CR-RivCo) |
Evita Premdas |
No comments |
0 |
SR2SL-5956 (161)
|
RIV | Conning Street From Mission Blvd to Ben Nevis Blvd. |
Engineer to Update |
|
Riverside County 0065 |
Harish Rastogi |
05/31/2007: Mail Received (Progress final) -view comment history- |
0 |
STPL-5956 (162)
|
RIV | Van Buren Boulevard form Washington Street to Wood Road in Woodcrest |
Pavement Rehabilitation |
|
Riverside County 0065 |
Harish Rastogi |
01/02/2008: Mail Received (progress invoice) -view comment history- |
0 |
CML-5956 (164)
|
RIV | 54Th street, Pierce street to All American Canal |
Various st. improvements. |
|
Riverside County 0065 |
Harish Rastogi |
No comments |
0 |
STPL-5956 (165)
|
RIV | Cajalco Road from La Sierra Avenue to Lake Mathews Road |
Pavement rehabilitation and guardrails |
|
Riv. County (CR-RivCo) |
Enrique Gonzalez |
02/28/2008: Mail Received (Progress Invoice) -view comment history- |
0 |
STPL-5956 (166)
|
RIV | Cajalco Road from Lake Mathews Road to Kirkpatrick Road |
Road rehabilitation |
|
Riv. County (CR-RivCo) |
Evita Premdas |
12/04/2007: Mail Received (progress invoice) -view comment history- |
0 |
SR2SL-5956 (167)
|
RIV | Intersection of Mission Trail and Conyon Drive near Lake Elsinore |
Install traffic signal, pavemtn markings, and crosswalks. |
|
Riv. County (CR-RivCo) |
Evita Premdas |
07/05/2007: Mail Received (Status Report) -view comment history- |
0 |
STPL-5956 (168)
|
RIV | Old Elsinore Road at San Jacinto Avenue and from north of Aloha Road to south of Rider Street |
Road rehabilition |
|
Riv. County (CR-RivCo) |
Evita Premdas |
08/20/2007: Mail Received (Program Supplement) -view comment history- |
0 |
STPL-5956 (169)
|
RIV | Redlands Blvd. between San Timoteo Canyon Road to 55 feet south of Limits of city of Moreno Valley |
Road Rehabilitation |
|
Riv. County (CR-RivCo) |
Savat Khamphou |
08/20/2007: Mail Received (STPL 5956 169) -view comment history- |
0 |
STPL-5956 (170)
|
RIV | Ramon Road from San Miguelito Ave to One Thousand Palms Canyon Trails |
Ramon Road Rehabilitation Project |
|
Riv. County (CR-RivCo) |
Savat Khamphou |
No comments |
0 |
STPLH-5956 (172)
|
RIV | Gilman Springs Road from Sublette Road to 0.5miles west |
Shoulder widening and Guardrail installation |
|
Riverside County 0065 |
Harish Rastogi |
09/20/2007: Mail Received (Program Supplement) -view comment history- |
0 |
STPL-5956 (173)
|
RIV | Etiwanda Ave./Mission Blvd-Van Buren Blvd Pavement rehabilitation project |
Pavement rehabilitation project |
|
Riv. County (CR-RivCo) |
Evita Premdas |
09/03/2013: Mail Received (FINAL VOUCHER) -view comment history- |
0 |
HSIP-5956 (174)
|
RIV | Mountain VIew road from 0.85miles north of Dillon Road to the Desert hot springs city limits |
Guard rail and asphalt concrete dike |
|
Riverside County 0065 |
Savat Khamphou |
05/02/2008: Mail Received (Received revised PES and tech. studies from RCTD 7 copies) -view comment history- |
0 |
HSIPL-5956 (175)
|
RIV | Intersection of Bundy Road and the Farm Road |
Construct new traffic signal, new signing and striping, install new curb ramps per ADA requirements and construct 17'x4' retaining wall |
|
Riverside County 0065 |
Savat Khamphou |
No comments |
0 |
SR2SF-5956 (176)
|
RIV | Riverside county DOPH Injury Prevention Services in five elementry schools in Riverside city |
Safe route to school (SRTS) Education and Encouragement Program. Education activities include bicycle and pedestrian safety workshops for students and parents to and from home to school. |
|
Riv. County (CR-RivCo) |
Evita Premdas |
08/21/2012: Mail Received (FHWA's Final Voucher) -view comment history- |
0 |
PNRSTCIL-5956 (178)
|
RIV | Clay street grade separation project. |
Replace existing four lanes (2-in each direction) at grade R/R X-ing with a 4-Lane under X-ing (UPRR) |
|
Riv. County (CR-RivCo) |
Evita Premdas |
11/22/2017: Mail Received (Report of completion and Report of Expenditures for Local Agency Right of way) -view comment history- |
9 |
HPLUESPL-5956 (179)
|
RIV | I-10 Interchange @ Gene Autry Trail/Palm Drive |
Palm Drive/Gene Autry Trail interchange Widening |
|
Riv. County (CR-RivCo) |
Evita Premdas |
11/19/2014: Mail Received (Invoice (final) 12 and FROE, 1 original, 3 copies) -view comment history- |
0 |
SR2SL-5956 (181)
|
RIV | Garfield Ave. from Spring Street to south of Center street in Highgrove. |
Asphalt concrete and Portland cement concrete side walk, curb and gutter. |
|
Riverside County 0065 |
Harish Rastogi |
No comments |
0 |
HRRRL-5956 (182)
|
RIV | El. Sobrante Road- Segment 1, Mc Allister St. 1mile easterly;and Segment 3, Mockingbird to cjalco rd |
Widen or improve shoulder, roadway illumination where no lighting exist. |
|
Riv. County (CR-RivCo) |
Evita Premdas |
09/05/2012: Mail Received (Progress Invoice No. 3 and FINAL (3 copies only)) -view comment history- |
0 |
SRTSLNI-5956 (184)
|
RIV | Alcott, Magnolia, Emerson, Madison and Jefferson Schols i Riverside county |
Bi-cycle/pedestrian safety education and encouragement program. |
|
Riv. County (CR-RivCo) |
Evita Premdas |
06/03/2013: Mail Received (Final Voucher for Payment) -view comment history- |
0 |
SRTSLNI-5956 (185)
|
RIV | Desert Hot Springs, Palm Springs and Coachella in Riverside ocunty |
Bicycle/Pedestrian safety education and encouragement program. |
|
Riv. County (CR-RivCo) |
Evita Premdas |
01/10/2014: Mail Received (Received Final Voucher 04/26/2010 to 09/23/2013) -view comment history- |
0 |
HRRRL-5956 (186)
|
RIV | Mountain view road from Varner road to 500' N/O club house drive. |
Widen or imprive shoulder, New left turn lane at non-signalised intersection |
|
Riv. County (CR-RivCo) |
Evita Premdas |
05/21/2013: Mail Received (Final Voucher Payment - Completed 03/29/2013) -view comment history- |
0 |
CMESPLN-5956 (187)
|
RIV | State Route 60 and Valley Way interchange in Sunnyslope |
Ramp modifications and new hook ramps |
|
Riv. County (CR-RivCo) |
Evita Premdas |
05/30/2013: Mail Received (Riverside County's Board of Supervisors - Notice of Completion) -view comment history- |
0 |
CML-5956 (188)
|
RIV | Mecca Roundabout - Hammond Road and 4th st. between 5th and 3rd street. |
Construct a roundabout entry to the unincorporated MECCA Community |
|
Riv. County (CR-RivCo) |
Evita Premdas |
09/23/2016: Progress Invoice No. 9 and Final (FROE) was received, processed and sent to HQ Acctg and Implementation. -view comment history- |
2 |
HSIPL-5956 (189)
|
RIV | Intersection of Rubidoux Blvd. and 28th street. |
Install Traffic signal, left turn lanes, signs, stripes and Markings. |
|
Riv. County (CR-RivCo) |
Evita Premdas |
09/19/2014: Mail Received (Received Final Voucher) -view comment history- |
2 |
HSIPL-5956 (190)
|
RIV | Intersection of Agua Mansa road and Market street |
New Traffic signal, raised median, pavement markings and Signs |
|
Riv. County (CR-RivCo) |
Evita Premdas |
03/10/2017: DLAE signs Exhibit 3-G, Federal Project Log Sheet, for project completion, Exhibit 17-A, Federal Report of Expenditures cover letter and checklist, and Exhibit 17-C, Final Inspection Form. -view comment history- |
5 |
HSIPL-5956 (191)
|
RIV | Leon Rd from Scott Rd to Keller Rd |
Revise the vertical alignment (roadway reconstruction - no added capacity) |
|
Riv. County (CR-RivCo) |
Evita Premdas |
10/12/2015: Mail Received (Final Invoice (Con.) 1 original, 2 copies) -view comment history- |
8 |
BRLSZ-5956 (192)
|
RIV | MSSN BL/BUENA VST. Over Santa Ana River, 1.47MI W/O SH 91ON 7th, Br. no. 56C0071 |
Bridge Replacement |
|
Riv. County (CR-RivCo) |
Matthew Sapp |
06/30/2023: UPDATED WPS -view comment history- |
16 |
CMTCIFLN-5956 (193)
|
RIV | Magnolia Ave. /Burlington Northern Santa Fe Railroad Grade Separation project |
Replace existing 4 lanes R/R X-ing with a 4 lane (2lanes in each direction) O.C grade separation on Magnolia avenue between Buchannan avenue (on east) and Lincoln Street on the west |
|
Riv. County (CR-RivCo) |
Evita Premdas |
12/13/2019: Projects Closed on 11/05/2019 -view comment history- |
0 |
STPL-5956 (195)
|
RIV | Cajalco Road from Temescal Canyon Road to I-215. |
Roadway widening from two to four lanes. |
|
Riv. County (CR-RivCo) |
Evita Premdas |
06/30/2023: UPDATED WPS -view comment history- |
19 |
STPLN-5956 (196)
|
RIV | On I-10 in Cathedral City at Date Palm Dr. IC |
Modify IC/Widen OC & Arterial including UPRR Bridge and Ramps |
|
Riv. County (CR-RivCo) |
Evita Premdas |
03/29/2018: Mail Received (Progress Invoice No. 21 (PE) 1 Original, 2 Copies) -view comment history- |
1 |
STPLN -5956 (197)
|
RIV | IN WESTERN RIVERSIDE COUNTY ON STATE ROUTE 79 - WIDEN FROM 2 TO 4 THROUGH LANES FROM THOMPSON RD TO DOMENIGONI PKWY Phase 1 |
Roadway Widening |
|
Riv. County (CR-RivCo) |
Evita Premdas |
11/18/2016: Progress Invoice No. 22 and FROE/FINAL INVOICE - Received, Processed, and sent to HQ LPA and Patrick Louie -view comment history- |
0 |
SLPPCL10-5956 (199)
|
RIV | Magnolia Ave / Neece St Intersection |
New Traffic Signal & left-turn pockets on Magnolia St |
|
Riv. County (CR-RivCo) |
Evita Premdas |
05/19/2017: Mail Received (Progress invoice 13, 2 copies, 1 original.) -view comment history- |
0 |
BRLS-5956 (200)
|
RIV | Jurupa Valley-Market Street over the Santa Ana River 0.4 miles northwest of the SR60. Br. no. 56C0024 |
Replace the existing 2-lane bridge with a 4-lane bridge |
|
Riv. County (CR-RivCo) |
Matthew Sapp |
10/16/2023: in WPS -view comment history- |
1 |
STPL-5956 (201)
|
RIV | I-215 Van Buren Blvd. I/C Reconstruct/Widen I/C |
Reconstruct/widen IC from 2 to 4 lanes. Add new NB entry ramp (3 lanes) and widen ramps including HOV entry ramps. Add N/B and S/B auxiliary lane between Van Buren Blvd I/C and Cactus Ave IC. |
|
Riv. County (CR-RivCo) |
Evita Premdas |
05/18/2017: Progress Invoice No. 22 and FINAL (FROE) - Received, Processed, and sent to HQ LPA -view comment history- |
3 |
HSIPL-5956 (202)
|
RIV | Sierra Avenue between Karen Ln. and the Riverside/San Bernardino County line. |
Install two solar powered radar speed feedback signs, centerline and edgeline rumble strips, anti-skid pavement overlay, signs, stripes and pavement markings |
|
Riv. County (CR-RivCo) |
Evita Premdas |
01/12/2015: Mail Received (Final Voucher stamped by Local Programs Accounting on 9/22/2014) -view comment history- |
5 |
HSIPL-5956 (203)
|
RIV | Cajalco Rd./Alexander St. |
Install traffic signals, signs, striping, and pavement markings; construct left-turn lanes |
|
Riv. County (CR-RivCo) |
Evita Premdas |
05/31/2015: Mail Received (Final voucher, 1 copy, 0 original) -view comment history- |
7 |
HSIPL-5956 (204)
|
RIV | Gillman Springs Rd., from 4030' NW of Allesandro Blvd to 8430 ' SE of Allesandro Blvd. |
Widen Shoulder; install centerline and edgeline rumble strips; realing horizontal curves.
Combined HSIP3-08-030 and HSIP4-08-014 projects. Delivery schedule shall be based on the Cycle 3 project with CON Authorization by 10/6/2012. No PE funding is requested for this project. |
|
Riv. County (CR-RivCo) |
Evita Premdas |
07/07/2015: Mail Received (Updated FROE Checklist and Revised Invoice due to CHP refund. - etp (email)) -view comment history- |
12 |
SR2SL-5956 (205)
|
RIV | Krameria Ave from Garder Ave to Gamble Ave |
Construct sidewalks and crub ramps; install signage and pavement markings. |
|
Riv. County (CR-RivCo) |
Evita Premdas |
05/02/2014: Mail Received (Received Progress invoice 4th and Final ) -view comment history- |
0 |
SRTSLNI-5956 (206)
|
RIV | Multiple Schools in Mecca, Thermal, Thousand Palms and Cathedral City |
SRTS Safety education activities |
|
Riv. County (CR-RivCo) |
Evita Premdas |
12/07/2015: Mail Received (Final Invoice #11 (Con.) 1 original, 0 copies. No Checklist) -view comment history- |
1 |
SRTSLNI-5956 (207)
|
RIV | Multiple Schools in the City of Riverside |
Workshops: implementing pedestrian safety measures; educating parents and students |
|
Riv. County (CR-RivCo) |
Evita Premdas |
04/20/2015: Mail Received (HQ to Dist 8, Final Voucher, 1 copy, 0 originals) -view comment history- |
1 |
SRTSLNI-5956 (208)
|
RIV | Multiple Schools in the Cities of Lake Elsinore, Wildomar, and Menifee |
Conduct SRTS workshops; provide pedestrian and bicycle safety; community outreach events. |
|
Riv. County (CR-RivCo) |
Evita Premdas |
12/07/2015: Mail Received (Final Invoice #11 (Con.) 1 original, 0 copies. No Checklist) -view comment history- |
1 |
STPLN-5956 (209)
|
RIV | In Western Riverside County On State Route 79 - Widen From 2 To 4 Through Lanes From Thompson Rd To Domenigoni Pkwy Phase 2: Thompson Rd to Scott Rd |
Roadway Widening |
|
Riv. County (CR-RivCo) |
Evita Premdas |
11/17/2016: Progress Invoice No. 16 and FROE/FINAL INVOICE - Received, Processed, and sent to HQ LPA and Patrick Louie -view comment history- |
0 |
DEMO03L-5956 (210)
|
RIV | I-10 Bypass, 0.5 miles south of I-10 between the eastern end of the City of Banning and Apache Trail in Cabazon |
Construct roadway to provide a by-pass/network facility for the I-10 (formerly Ramsey Street Extension)
2003 Demo ID 213(Ramsey Street Extension) |
|
Riv. County (CR-RivCo) |
Evita Premdas |
10/18/2023: in WPS -view comment history- |
27 |
X12-5956 (211)
|
RIV | Riverside County match exchange |
FY 11-12 Match Exchange |
|
Riv. County (CR-RivCo) |
Evita Premdas |
06/28/2012: Mail Received (Progress Invoice TL0000008921 - Payment of Federal Exchange Funds) -view comment history- |
0 |
SRTSL-5956 (212)
|
RIV | Whittier Ave. between Yale St. and Cornell St. |
Widen roadway; construct sidewalks and curb
ramps; install signs and pavement markings |
|
Riv. County (CR-RivCo) |
Evita Premdas |
02/25/2016: Exhibit 3-G, Federal Project Log Sheet, for FROE, FROE cover page, Exhibit 17-A, and Exhibit 17-C, Local Agency Final Inspection Form. Processed and sent to HQ (PL and JP) In the INACTIVE PROJECT LISTING. -view comment history- |
10 |
SR2SL-5956 (213)
|
RIV | Good Hope ES: Ellis Ave. between Marshall St. and Cowie Ave. |
Safe Route to Schools |
|
Riv. County (CR-RivCo) |
Evita Premdas |
12/30/2015: Mail Received (Final Project Expend. Rpt cover page (Only) 1 copy, 0 originals) -view comment history- |
1 |
SR2SL-5956 (214)
|
RIV | Lakeside HS: Machado St. between Tiller Ln. and Le Harve Ave. |
Safe Route to Schools |
|
Riv. County (CR-RivCo) |
Evita Premdas |
11/30/2015: Mail Received (Invoice Final #2 (Con.) 1 original, 2 copies) -view comment history- |
1 |
SR2SL-5956 (215)
|
RIV | Mecca ES: Coahuilla St from 5th St to 200 feet north of 7th St |
Construct sidewalk, curb & gutter, curb ramps, driveway
approaches, signs, and markings |
|
Riv. County (CR-RivCo) |
Evita Premdas |
08/05/2016: Mail Received (HPSR/ASR, 2 copies, 0 original.) -view comment history- |
0 |
TCIFL-5956 (216)
|
RIV | South of the City of Coachella on Ave. 56 (Airport Blvd) - From Polk St to the West to Orange St. to the East of the R/R X-Ing |
Grade Separation |
|
Riv. County (CR-RivCo) |
Evita Premdas |
12/14/2017: Mail Received (Final Project Expenditure Report ) -view comment history- |
1 |
TCIFL-5956 (217)
|
RIV | Sunset Ave at I-10 From S/O Ramsey St to S/O Lincoln St: Lower Sunset Ave |
Grade Separation |
|
Riv. County (CR-RivCo) |
Evita Premdas |
12/13/2019: Projects Closed on 11/05/2019 -view comment history- |
0 |
HSIPL-5956 (218)
|
RIV | El Sobrante Rd NO Cajalco Rd/Cajalco Rd WO Hollis Ln/San Timoteo Canyon Rd bet Live Oak Canyon Rd & Redlands Blvd/Soboba Rd WO City limits/Van Buren Blvd SO Mockingbird Canyon Rd |
Install solar-powered speed feedback signs |
|
Riv. County (CR-RivCo) |
Evita Premdas |
01/13/2017: DLAE signs Exhibit 3-G, Federal Project Log Sheet, for project completion, Exhibit 17-A, Cover Letter & Final Report of Expenditures Checklist, and Exhibit 17-C, Final Inspection Form. -view comment history- |
4 |
HRRRL-5956 (219)
|
RIV | Thousand Palms Canyon Rd. from approximately 1.5 miles N of Ramon Rd. to approximately 2.5 miles S of Dillon Rd. |
Widen roadway; Install Left-turn Lane; Resurface Roadway |
|
Riv. County (CR-RivCo) |
Evita Premdas |
12/13/2019: Projects Closed on 10/09/2019 -view comment history- |
9 |
SLPPL-5956 (220)
|
RIV | In La Quinta, Fred Waring Drive between Adams Street and Port Maria Road |
Road Reconstruction: The proposed improvements include widening from 4 to 6 lanes and construction of median. |
|
Riv. County (CR-RivCo) |
Evita Premdas |
05/24/2016: DLAE signs Exhibit 3-G, Federal Project Log Sheet, for project completion and Exhibit 17-M, Final Project Expenditure Report. -view comment history- |
0 |
STPTCIFL-5956 (221)
|
RIV | In Eastern Riverside County in The Coachella Valley - 66th Ave Grade Separation: From Westerly of Lincoln St to Johnson St on The East in the Community Of Mecca. |
Construct A Two-LN (1-LN in ea dir) 66th Ave Elevated Structure Over The UPRR, Hammond Rd., and Sh-111., Add. Improvements will be constructed to tie back into the Existing Alignment |
|
Riv. County (CR-RivCo) |
Evita Premdas |
10/16/2023: in WPS -view comment history- |
13 |
X13-5956 (222)
|
RIV | Riverside County match exchange |
FY 12-13 match exchange for $410,476. 3-1/2% MPO-Co. E/M (N) agreement.
AdV. ID 0813000203
|
|
Riv. County (CR-RivCo) |
Evita Premdas |
08/21/2013: Mail Received (Dated 07/22/2013 Fully Executed 2012/2013 Excahnge and State Match Program ) -view comment history- |
1 |
X14-5956 (223)
|
RIV | Riverside County match exchange |
FY 13-14 Match Exchange |
|
Riv. County (CR-RivCo) |
Evita Premdas |
11/02/2014: Mail Received (Federal Exhange State Match, 1 original, 2 copies) -view comment history- |
0 |
BPMPL-5956 (224)
|
RIV | VARIOUS LOCATION IN RIVERSIDE COUNTY
Br. no. PM00076 |
PREVENTIVE MAINTENANCE
|
|
Riv. County (CR-RivCo) |
Matthew Sapp |
10/16/2023: in WPS -view comment history- |
0 |
BRLO-5956 (225)
|
RIV | CHUCKWALLA VALLEY ROAD OVER ACARI DITCH Br. no. 56C0108
|
REPLACE EXISTING 2-LANE BRIDGE W/ 2-LANE BRIDGE TC
|
|
Riv. County (CR-RivCo) |
Matthew Sapp |
10/16/2023: in WPS -view comment history- |
0 |
BRLO-5956 (226)
|
RIV | CHUCKWALLA VALLEY ROAD OVER SUTRO DITCH BR. NO. 56C0104
|
REPLACE 2-LANE BRIDGE W NEW 2-LANE BRIDGE TC
|
|
Riv. County (CR-RivCo) |
Matthew Sapp |
10/16/2023: in WPS -view comment history- |
0 |
BRLO-5956 (227)
|
RIV | CHUCKWALLA VALLEY ROAD OVER TARANTULA DITCH BR.NO. 56C0103
|
REPLACE 2-LANE BRIDGE W/ NEW 2-LANE BRIDGE TC
|
|
Riv. County (CR-RivCo) |
Matthew Sapp |
10/16/2023: in WPS -view comment history- |
0 |
BRLO-5956 (228)
|
RIV | RAILROAD AVENUE OVER FORNAT WASH BR. NO. 56C0099
|
REPLACE 2-LANE BRDIGE W/ NEW 2-LANE BRIDGE TC |
|
Riv. County (CR-RivCo) |
Matthew Sapp |
10/16/2023: in WPS -view comment history- |
0 |
BRLO-5956 (229)
|
RIV | RAILROAD AVENUE OVER E. STUBBE WASH BR. NO. 56C0101
|
REPLACE 2-LANE BRIDGE W/ NEW 2-LANE BRIDGE TC
|
|
Riv. County (CR-RivCo) |
Matthew Sapp |
10/18/2023: in WPS -view comment history- |
0 |
BRLS-5956 (230)
|
RIV | HAMNER AVENUE OVER SANTA ANA RIVER BR. NO. 56C0446
|
REPLACE 2-LANE BRIDGE W/ NEW 6-LANE BRIDGE
|
|
Riv. County (CR-RivCo) |
Matthew Sapp |
10/18/2023: in WPS -view comment history- |
1 |
BRLS-5956 (231)
|
RIV | AIRPORT BLVD. OVER WHITEWATER RIVER BR. NO. 56C0020
|
REPLACE 2-LANE BRIDGE W/ NEW 4-LANE BRIDGE
|
|
Riv. County (CR-RivCo) |
Matthew Sapp |
10/18/2023: in WPS -view comment history- |
0 |
STPL-5956 (232)
|
RIV | 62nd Street Pavement Rehab from Jackson Street to Harrison Street |
Road Rehabilitation |
|
Riv. County (CR-RivCo) |
Evita Premdas |
09/25/2015: Mail Received (Invoice 3, final, 1 original, 2 copies.) -view comment history- |
1 |
STPL-5956 (233)
|
RIV | Rancho California Road Pavement Rehab from De Luz Rd. to Temecula City Limits |
Road Rehabilitation |
|
Riv. County (CR-RivCo) |
Evita Premdas |
09/02/2016: HQ Accounting received Final Invoice Package, processed and sent to SCO for payment on 06/03/2016. -view comment history- |
1 |
STPLN-5956 (234)
|
RIV | At I-215/Newport Rd IC - in the City of Menifee: Widen Newport Rd OC; Reconstruct IC Ramps to Modified Partial Cloverleaf IC (EA: 0J440) |
At I-215/Newport Rd IC: Reconstruct/Widen From 4 To 6 Through Lanes between Haun Rd and Antelope Rd, Relocate NB and SB Exit Ramps (3 Lanes), Reconfigure NB & SB Entry Ramps To Include HOV Lane, Add New NB and SB Loop Entry Ramps (2 Lanes), Include Extended Ramp Acceleration/Deceleration Lanes, Add Extended Dedicated Right-Turn Lanes (EA: 0J440) |
|
Riv. County (CR-RivCo) |
Evita Premdas |
09/20/2021: Progress Invoice No. 24 and FINAL - Received, Processed, and sent to HQ LPA -view comment history- |
0 |
RSTPLN-5956 (235)
|
RIV | At I-10/Jefferson St IC |
Reconstruct, Realign, & Widen Existing IC (EA: 47520)
USE LOCAL ASSISTANCE Adv Project ID: 0814000210
CTIPS ID: 109-0000-1780 (PM 51.7 to PM 53.1)
Refer to CAPITAL Adv Project ID: 0800000755
Refer to CAPITAL EA 47520
|
|
Riv. County (CR-RivCo) |
Evita Premdas |
10/21/2021: Progress Invoice No. 20 and FINAL - Received, Processed, and sent to HQ LPA -view comment history- |
0 |
HSIPL-5956 (236)
|
RIV | Grapefruit Blvd (SR111)/62nd Ave |
Roadway Widening
Advantage Project ID No: 0814000238
Originally Cycle 6 HSIP Work Type Project No. 6581 awarded on 11/14/13. Federal Funds currently Programmed in SCAG's FTIP 2012/13 Amendment #17 approved 04/30/14. RTIP Project ID SCAG015. CTIPS No. ####???.
Unique Project ID is HSIP6-08-019.
This is Programmed to use LS30 HSIP fund code at a maximum reimbursement ratio of 90% up to $ 1,221,800.
Federal Funds Programmed in 2015/16 $ 305,500.
Federal Funds Programmed under "Beyond" is $ 916,300.
Major ITS. SERF needed.
No Encroachment Permit needed per Riv Co.
Cycle 6 HSIP Application provided by Riv Co.
CRS Map 17W24
Major Collector (Grapefruit Blvd) and Major Collector (62nd Ave).
|
|
Riv. County (CR-RivCo) |
Evita Premdas |
03/11/2023: Final Invoice No.21 - FROE submitted to CLPA -view comment history- |
16 |
HSIPL-5956 (237)
|
RIV | Gilman Springs Rd-State St bet. approx. 1,000' NW and 4,000' NW of Gilman Springs Rd-State St/ Soboba Rd |
Road Reconstruction |
|
Riv. County (CR-RivCo) |
Evita Premdas |
05/10/2018: Mail Received (FROE, Final Invoice ) -view comment history- |
6 |
BRLS-5956 (238)
|
RIV | Gilamn Springs Road over Potrero Creek Br. no. 56C0523 |
Replace 2 lane to new 2 lane new alignment. |
|
Riv. County (CR-RivCo) |
Matthew Sapp |
10/18/2023: in WPS -view comment history- |
0 |
BRLO-5956 (239)
|
RIV | Chuchwalla Valley Road over Aztec Ditch Br. no. 56C0102 |
Replace 2 lane bridge with new 2 lane bridge. |
|
Riv. County (CR-RivCo) |
Matthew Sapp |
10/18/2023: in WPS -view comment history- |
0 |
RSTPLN-5956 (240)
|
RIV | On I-10 In The City Of Blythe - New W/B On And W/B Off Ramps To Hobson Way To Riviera Dr |
Road Reconstruction |
|
Riv. County (CR-RivCo) |
Evita Premdas |
09/21/2017: Progress Invoice No. 7 and FINAL - Received, Processed, and sent to HQ LPA -view comment history- |
0 |
CML-5956 (241)
|
RIV | Along The Salt Creek Flood Control Channel Between The Communities Of Hemet, Menifee And Canyon Lake Multi-Modal Trail |
Bike Path |
|
Riv. County (CR-RivCo) |
Evita Premdas |
11/07/2022: Progress Invoice No. 9B and FINAL were Received, Processed, and sent to CLPA -view comment history- |
10 |
ATPLNI-5956 (242)
|
RIV | ATPNI (SOF):RC Public Health - PERRIS: Ten Schools in the City of Perris within the Perris Elem. School District and Perris Union High School District. |
Safe Route to Schools - ATP NI (SOF) |
|
Riv. County (CR-RivCo) |
Evita Premdas |
11/30/2018: Progress Invoice No. 11 and FINAL - Received, Processed, and sent to HQ LPA -view comment history- |
0 |
ATPLNI-5956 (243)
|
RIV | ATPNI (SOF):RC Public Health - JURUPA VALLEY: Fifteen Schools in the City of Jurupa Valley within the Jurupa Unified School District. |
Safe Route to Schools: ATP-NI (SOF) |
|
Riv. County (CR-RivCo) |
Evita Premdas |
11/30/2018: Progress Invoice No. 11 and Final - Received, Processed, and sent to HQ LPA -view comment history- |
0 |
ATPLNI-5956 (244)
|
RIV | ATPNI (SOF):RC Public Health - INDIO: Fifteen Schools in the City of Indio within the Dessert Sand Unified School District. |
Safe Route to Schools - ATP NI (SOF) |
|
Riv. County (CR-RivCo) |
Evita Premdas |
11/30/2018: Progress Invoice No. 11 and Final - Received, Processed, and sent to HQ LPA -view comment history- |
0 |
ATPL-5956 (245)
|
RIV | ATP (SOF):RC Transpo Dept - Avenida Rambla: In Eastern Riverside Co. For The County Of Riverside Near DHS Avenida Rambla |
S/W Safety Improvements: On Avenida Rambla B/W Bubbling Wells Elem School And Camino Aventura And Northside Of Camino Campesino B/W Avenida Rambla And Bubbling Wells Rd, Construct Approx. 3,200 L.F. Of Sidewalk, Curb & Gutter Improvements, Curb Ramps, Driveway Approaches, Signs, Markings, & Other Incidental Items. |
|
Riv. County (CR-RivCo) |
Evita Premdas |
01/13/2017: DLAE signs Exhibit 3-G, Federal Project Log Sheet, for project completion, and Exhibit 17-M, Final Project Expenditure Report. -view comment history- |
0 |
ATPL-5956 (246)
|
RIV | ATP (SOF):RC Transpo Dept - Clark St: In Western Riverside Co. For The County Of Riverside In Mead Valley-Clark St |
S/W & Intersection Safety Improvements: On Eastside Of Clark St B/W Rider St And Cajalco Rd, Construct Approx. 2,000 L.F. Of Concrete Sidewalk, Curb & Gutter,Pavement Improvements, New Curb Ramps Meeting Latest Ada Reqs, Driveway Approaches, Signs, Markings, & Other Incidental Items To Improve Pedestrian Safety. |
|
Riv. County (CR-RivCo) |
Evita Premdas |
07/07/2021: Final Vouchered on 06/03/21 -view comment history- |
0 |
ATPL-5956 (247)
|
RIV | ATP (FED):RC Transpo Dept - Grapefruit Blvd/14th St: In Eastern Riverside Co. For The County Of Riverside In Mecca-Grapefruit Blvd/4th St |
Ped & Rdwy Safety Improvements: On W/S Of Grapefruit Blvd B/W 4th St & 3,000 Ft South Of 66th Ave, Construct Approx. 3,500 L.F. Of Asphalt Concrete Walkway & 250 L.F. Of Concrete S/W, Curb & Gutter, Ada Curb Upgrades & Widening, Traffic Signal Improvements. |
|
Riv. County (CR-RivCo) |
Evita Premdas |
11/21/2018: Progress Invoice No. 11 - Received, Processed, and sent to HQ LPA -view comment history- |
5 |
ATPL-5956 (248)
|
RIV | Troth Street from 58th Street to Jurupa Road in Jurupa Valley |
Sidewalk, curb and gutter, ADA-compliant ramps, and solar-powered LED flashers |
|
Riv. County (CR-RivCo) |
Evita Premdas |
01/25/2019: Mail Received (progress invoice 5; 1 original, 3 copies.) -view comment history- |
0 |
ATPL-5956 (249)
|
RIV | Pyrite Street from Galena Street to Mission Boulevard in Jurupa Valley |
Sidewalk, curb and gutter, ADA-compliant ramps, and solar-powered LED flashers |
|
Riv. County (CR-RivCo) |
Evita Premdas |
04/02/2018: Mail Received (FROE, Final Progress Invoice) -view comment history- |
0 |
X15-5956 (250)
|
RIV | Riverside County |
Federal Exchange & State Match |
|
Riv. County (CR-RivCo) |
Evita Premdas |
06/05/2015: Mail Received (FED Exchange & State Matching, Invoice#TL0000011537, 1 original, 0 copies) -view comment history- |
0 |
ATPLNI-5956 (251)
|
RIV | Eastside Riverside County Safe Routes to School |
Safe Route to Schools - Non Infrastructure |
|
Riv. County (CR-RivCo) |
Evita Premdas |
12/13/2019: Projects Closed on 08/30/2019 -view comment history- |
0 |
BHLS-5956 (252)
|
RIV | Nuevo Road over San Jacinto River, Br. no. 56C0004 |
Bridge Rehabilitation and widen bridge from 2 to 4 lane bridge. |
|
Riv. County (CR-RivCo) |
Matthew Sapp |
10/18/2023: in WPS -view comment history- |
0 |
HSIPL-5956 (253)
|
RIV | On Cajalco Road, between a point approx. 1,000' west of Brown Street and an approx. point 1,000' east of Day Street, in the Perris area of Unincorporated Riverside County |
Roadway improvements to accommodate a two-way left-turn lane, traffic signal modifications |
|
Riv. County (CR-RivCo) |
Evita Premdas |
07/27/2022: 5956(253) FROE was submitted 2/3/22 and the final payment was received 3/15/22. -view comment history- |
12 |
X16-5956 (254)
|
RIV | HQ to D8,5956(254)Exchange and State Match Agreement |
HQ to D8,5956(254)Exchange and State Match Agreement |
|
Riv. County (CR-RivCo) |
Evita Premdas |
09/02/2016: Federal Exchange & State Match.
Final Voucher Package Received by HQ Acct.
Final Invoice Paid / Sent to LRFV. -view comment history- |
0 |
STPL-5956 (255)
|
RIV | Van Buren Blvd. Pavement Rehab from Van Buren Blvd., from Limonite Ave. to 56th St. |
Road Rehabilitation - Cold plane existing asphalt surface & overlay with rubberized hot mix asphalt |
|
Riv. County (CR-RivCo) |
Evita Premdas |
02/02/2018: DLAP signed final invoice/FROE -view comment history- |
3 |
ATPL-5956 (256)
|
RIV | 3rd Place Sidewalk and Roadway Safety Improvements |
Sidewalk and Roadway Safety Improvements |
|
Riv. County (CR-RivCo) |
Evita Premdas |
08/20/2020: FROE and Invoice No. 10 - Received, Processed, and sent to HQ LPA -view comment history- |
0 |
ATPL-5956 (257)
|
RIV | Thousand Palms Sidewalk Safety Improvements |
Sidewalk Safety Improvements |
|
Riv. County (CR-RivCo) |
Evita Premdas |
10/16/2019: Mail Received (progress invoice 6; 1 original, 2 copies.) -view comment history- |
0 |
ATPL-5956 (258)
|
RIV | Mecca Sidewalk and Roadway Safety Improvements |
Sidewalk and Roadway Safety Improvements |
|
Riv. County (CR-RivCo) |
Evita Premdas |
04/24/2020: Mail Received (invoice 8 (final); 1 original, 2 copies.) -view comment history- |
0 |
ATPL-5956 (259)
|
RIV | Camino Aventura Sidewalk Safety Improvements |
Sidewalk Safety Improvements |
|
Riv. County (CR-RivCo) |
Evita Premdas |
10/16/2019: Mail Received (progress invoice 7; 1 original, 2 copies.) -view comment history- |
0 |
HSIPL-5956 (260)
|
RIV | Project is located at 2 separate locations; Harrison St between 54th Ave and 81st Ave (Thermal area), and San Timoteo Canyon Rd between Redlands Blvd and the City of Beaumont limits (Moreno Valley area). |
Conduct a Roadway Safety Audit, install centerline rumble stripe, upgrade painted edgeline with thermoplastic striping, and install/upgrade signs with new fluorescent sheeting (regulatory or warning) |
|
Riv. County (CR-RivCo) |
Evita Premdas |
07/27/2022: 5956(260) FROE was submitted 2/18/22 and the final payment as received 4/8/21. -view comment history- |
3 |
SSARPL-5956 (261)
|
RIV | Road audits of four roadway segments and analyzing ten high-collison intersections |
Portions of Van Buren Boulevard, Cajalco Road, Stetson Avenue, and Old Elsinore Road |
|
Riv. County (CR-RivCo) |
Evita Premdas |
03/13/2019: Progress Invoice No. 4 (PE) - Received, Processed, and sent to HQ LPA -view comment history- |
0 |
STPLN-5956 (262)
|
RIV | At I-215/Scott Rd I/C: between Antelope Rd & Haun Rd |
Reconstruct/Widen between Reconstruct/Widen Ramps; NB/SB Entry Lns; Add NB and SB Exit Loop Ramp; Entry Ramps Include HOV Ln; Ramps Include Extended Acceleration/Deceleration Lanes, Add Extended Right-Turn Lns |
|
Riv. County (CR-RivCo) |
Evita Premdas |
07/08/2022: Mail Received (FROE; Received 07/08/2022) -view comment history- |
0 |
HSIPL-5956 (263)
|
RIV | Gilman Springs Road between approx. 8,900 ft S/O Alessandro Blvd and approx. 5,100 ft S/O Bridge St, in the Moreno Valley area. |
Construct eight (8) ft paved shoulders, centerline/edgeline rumble stripes and other incidental work. |
|
Riv. County (CR-RivCo) |
Evita Premdas |
10/16/2023: in WPS -view comment history- |
0 |
HSIPL-5956 (264)
|
RIV | Reche Vista Dr between City of Moreno Valley & Reche Canyon Rd, Reche Canyon Rd between Reche Vista Dr & approx. 500 ft north of Woodson Rd, and La Sierra Ave between El Sobrante Rd & Orchard View Ln. |
Upgrade existing guardrail/end treatments. |
|
Riv. County (CR-RivCo) |
Evita Premdas |
12/16/2019: Mail Received (progress invoice 8; 1 original, 2 copies.) -view comment history- |
1 |
X17-5956 (265)
|
RIV | Throughout Riverside County. |
2016/2017 Exchange and State Match Program. Sean 5/4/2017 |
|
Riv. County (CR-RivCo) |
Evita Premdas |
12/05/2017: Closed date in Local Final Vouchering North and South Sections is 11/20/2017. -view comment history- |
0 |
ATPSB1L-5956 (266)
|
RIV | Cabazon Safe Routes to School Sidewalk Safety Improvements |
Construct approx. 3,000 LF of sidewalk; New ADA ramps: 12 |
|
Riv. County (CR-RivCo) |
Evita Premdas |
03/16/2023: Final Invoice No. 14 - Received, Processed, and sent to CLPA -view comment history- |
0 |
LPPSB1L-5956 (267)
|
RIV | Temescal Canyon Road Gap Closure (widen to 4 lanes) |
Roadway Widening |
|
Riv. County (CR-RivCo) |
Evita Premdas |
05/13/2021: Mail Received (FPER; received on 5/10/2021.) -view comment history- |
0 |
ATPSB1LNI-5956 (268)
|
RIV | Riverside County Safe Routes to Schools Program, Lake Elsinore |
Safe Route to Schools |
|
Riv. County (CR-RivCo) |
Evita Premdas |
02/18/2022: Revised Progress Invoice No. 12A and FINAL - Received, Processed, and sent to CLPA -view comment history- |
0 |
ATPSB1LNI-5956 (269)
|
RIV | Riverside County SRTS Program (Banning/Cabazon/Eastern Coachella Valley) |
Safe Route to Schools |
|
Riv. County (CR-RivCo) |
Evita Premdas |
02/18/2022: Revised Progress Invoice No. 12A and FINAL - Received, Processed, and sent to CLPA -view comment history- |
0 |
X18-5956 (270)
|
RIV | Riverside County 2017/2018 |
Federal Exchange & State Match |
|
Riv. County (CR-RivCo) |
Evita Premdas |
No comments |
0 |
X19-5956 (271)
|
RIV | Riverside County 2018/2019 |
Federal Exchange & State Match |
|
Riv. County (CR-RivCo) |
Evita Premdas |
12/13/2019: Projects Closed on 10/31/2019 -view comment history- |
0 |
HSIPL-5956 (272)
|
RIV | Cajalco Road between La Sierra Avenue and Temescal Canyon Road. |
Upgrade existing guardrail/end treatments to meet current standards. |
|
Riv. County (CR-RivCo) |
Evita Premdas |
12/06/2022: PROJECT CLOSED on 11/10/22 -view comment history- |
1 |
ATPL-5956 (273)
|
RIV | Unincorporated communities of Thermal and Oasis in Riverside County |
The locations are :Install multi-modal trails (10 foot wide path) and pedestrian infrastructure (5 foot concrete sidewalk with curb and gutter and paved pathway) within Thermal and Oasis |
|
Riv. County (CR-RivCo) |
Evita Premdas |
10/18/2023: in WPS -view comment history- |
0 |
HSIPL-5956 (274)
|
RIV | Various high profile roadway corridors, including Cajalco Rd between Wood Rd and Temescal Canyon Rd, Gavilan Rd between Cajalco Rd and Lake Mathews Rd, and Sage Rd between Cactus Valley Rd and SH-79. |
Review and upgrade horizontal alignment warning signs per the CA MUTCD mandate. |
|
Riv. County (CR-RivCo) |
Evita Premdas |
10/16/2023: in WPS -view comment history- |
0 |
ATPSB1L-5956 (275)
|
RIV | El Toro Road/Dexter Avenue from 630 feet north of Central Avenue (SR 74) to Carmela Court near the City of Lake Elsinore |
Sidewalk, curb and gutter, ADA-compliant curb ramps, crosswalk, and flashing beacons |
|
Riv. County (CR-RivCo) |
Evita Premdas |
10/18/2023: in WPS -view comment history- |
0 |
ATPLNI-5956 (276)
|
RIV | ATP Cycle 4, Riverside County Safe Route to Schools (SRTS)
- Corona |
Implementation of comprehensive Safe Routes to School Program at five schools in Corona, including ped/bike safety events, encouragement campaigns, and walkability workshops. |
|
Riv. County (CR-RivCo) |
Evita Premdas |
06/07/2023: RUHS – Public Health is on track to complete ATP NI project areas Riverside County Safe Routes to School Program: Corona PPNO 1260 5956(276) and DHS PPNO 1263 5956 (277) and does not require a time extension.
... -view comment history- |
0 |
ATPLNI-5956 (277)
|
RIV | ATP Cycle 4, Riverside County Safe Route to Schools (SRTS) - Desert Hot Springs |
Implementation of comprehensive Safe Routes to School Program in 8 Desert Hot Springs schools,
including ped/bike safety events, encouragement campaigns, and walkability workshops. |
|
Riv. County (CR-RivCo) |
Evita Premdas |
06/07/2023: RUHS – Public Health is on track to complete ATP NI project areas Riverside County Safe Routes to School Program: Corona PPNO 1260 5956(276) and DHS PPNO 1263 5956 (277) and does not require a time extension.
... -view comment history- |
0 |
X20-5956 (278)
|
RIV | Riverside County 2019/2020 |
Federal Exchange & State Match |
|
Riv. County (CR-RivCo) |
Evita Premdas |
No comments |
0 |
ATPNIL-5956 (279)
|
RIV | San Jacinto is located in western Riverside County 80 miles east of Los Angeles, 25 miles north of Temecula, and 90 miles north of San Diego accessible by CA Highways 79 and 74 |
San Jacinto is located in western Riverside County 80 miles east of Los Angeles, 25 miles north of Temecula, and 90 miles north of San Diego accessible by CA Highways 79 and 74 |
|
Riv. County (CR-RivCo) |
Evita Premdas |
02/17/2023: Award Information for ATP-NI Project was sent to CLPA -view comment history- |
0 |
X21-5956 (280)
|
RIV | Riverside County 2020/2021
to be completed by staff. Sean, 4/5/2021. |
Federal Exchange & State Match
to be completed by staff. Sean, 4/5/2021. |
|
Riv. County (CR-RivCo) |
Evita Premdas |
04/29/2021: Invoice Received, Processed, and sent to HQ LPA -view comment history- |
0 |
HSIPSL-5956 (281)
|
RIV | Cajalco Road between La Sierra Avenue and Kirkpatrick Road and between Harley John Road and Wood Rood; and Lake Mathews Drive between Capello Drive and Malta Place. |
Upgrade existing guardrail / end treatments to meet current Caltrans standards - SA Guardrail |
|
Riv. County (CR-RivCo) |
Evita Premdas |
10/16/2023: in WPS -view comment history- |
0 |
HSIPSL-5956 (282)
|
RIV | Highway 74 from 7th Street to Crumpton Road in the County of Riverside, including 5 traffic signals and 18 unsignalized intersections. H10-08-027 |
Install raised median along 6.15 miles of Highway 74 between 7th Street and Crumpton Road, with left turn pockets at select intersections. Install advanced detection for high-speed approaches and upgrade existing equipment at 5 signalized intersections. |
|
Riv. County (CR-RivCo) |
Evita Premdas |
10/16/2023: in WPS -view comment history- |
0 |
X22-5956 (283)
|
RIV | Riverside County 2021/2022 |
Federal Exchange & State Match |
|
Riv. County (CR-RivCo) |
Evita Premdas |
04/21/2022: Federal Exchange funds and State Matching funds:
X22-5956 (283) Invoice No. TL0000016293 sent to CLPA -view comment history- |
0 |
BRLS-5956 (284)
|
RIV | Hamner Avenue over the Santa Ana River near Norco, Br. No. 56C-0446 |
Environmental Mitigation Project for Hamner Ave Bridge replacement from two to six lanes over Santa Ana River near Norco Bridge No. 56C0446
Revegetation of the Santa Ana River Channel adjacent to both sides of the BRLS 5956 (230) Hamner Ave Bridge Replacement Project.
Programmed in Amendment #8 approved on 4/25/13 to SCAG's 2013 FTIP.
Functional Classification Urban Minor Arterial. On Federal Aid System. Off NHS.
CRS Map 14V35, E7, 04/23/13.
|
|
Riv. County (CR-RivCo) |
Matthew Sapp |
10/18/2023: in WPS -view comment history- |
0 |
ATPNIL-5956 (286)
|
RIV | to be completed by staff. Sean 5/12/2021. |
to be completed by staff. Sean 5/12/2021. |
|
Riv. County (CR-RivCo) |
Evita Premdas |
02/17/2023: Award Information for ATP-NI Project was sent to CLPA -view comment history- |
0 |
ATPNIL-5956 (287)
|
RIV | RC Public Health. To be completed by staff. Sean, 5/5/2022. |
RC Public Health. To be completed by staff. Sean, 5/5/2022. |
|
Riv. County (CR-RivCo) |
Evita Premdas |
02/17/2023: Award Information for ATP-NI Project was sent to CLPA -view comment history- |
0 |
ATPSB1L-5956 (288)
|
RIV | El Toro/Dexter from Carmella Ct to 630 N of Central Ave. |
Construct 5,748 ft of sidewalk, curb and gutter on El Toro/Dexter from Carmella Ct to 630 N of Central Ave. including 7 new curb ramps and a new crosswalk and 2 flashing beacons |
|
Riv. County (CR-RivCo) |
Evita Premdas |
10/18/2023: in WPS -view comment history- |
0 |
X23-5956 (291)
|
RIV | Riverside County 2022/2023 |
Federal Exchange & State Match |
|
Riv. County (CR-RivCo) |
Evita Premdas |
06/27/2023: Progress Invoice No. 1 - Received, Processed, and sent to CLPA -view comment history- |
0 |
test-5956 (500)
|
RIV | test - nbil |
low water crossing
|
|
Riv. County (CR-RivCo) |
Evita As User |
No comments |
0 |
CRP-STPL-5956 (784)
|
RIV | Engineer to Update |
Engineer to Update |
|
Riv. County (CR-RivCo) |
Savat Khamphou |
No comments |
0 |
FTACML-6046 (001)
|
SBd | San Bernardino County |
Purchase of replacement buses |
|
Omnitrans |
Danette Silva |
No comments |
0 |
FTACML-6046 (002)
|
SBd | Purchase of 14 40-foot buses and 5 replacement CNG buses for Colton Joint Unified School District |
Bus Purchase |
|
Omnitrans |
Danette Silva |
No comments |
0 |
FTACML-6046 (003)
|
SBd | San Bernardino County |
Operating assistance and purchase of CNG replacement buses |
|
Omnitrans |
Danette Silva |
No comments |
0 |
FTACML-6046 (004)
|
SBd | Throughout San Bernardino County |
Purchase of 26 40 ft CNG replacement buses, FTA grant # is CA-95-X055. |
|
Omnitrans |
Danette Silva |
No comments |
0 |
FTACML-6046 (005)
|
SBd | E Street Transit |
Public Transit |
|
Omnitrans |
Danette Silva |
No comments |
0 |
FTACML-6046 (006)
|
SBd | Throughout San Bernardino County |
Replacement of 15 forty foot CNG vehicles. FTA transfer grant #CA-95-X156, FY 10/11. Sec 5307 grant for $9,900 of CMAQ funds. Project is 100% funded with CMAQ funds. Adv. ID# 08-1200-0016. |
|
Omnitrans |
David Lee |
No comments |
0 |
FTACML-6046 (007)
|
SBd | Purchase 9 new 40 ft. compressed natural gas vehicles - replacement for older vehicles |
FTA transfer Grant #CA-95-X156, 2011 SCAG FTIP Project ID SBD90105, Amendments #11-08
5307 Grant to Omnitrans for $4,900,000 for the purchase of 9 40 foot compressed natural bas buses as replacment for older vehicles with a delivery dates on November and December 2012. There is no local or state funding for the purchase of the rolling stock. |
|
Omnitrans |
David Lee |
05/01/2012: FTA transfer packet to HQ -view comment history- |
0 |
FTACML-6046 (008)
|
SBd | Omnitrans 40ft. CNG Coaches |
BUS SYSTEM-BUSES BUS REPLACEMENTS ALT. FUEL, 2010-15 and 15 coaches per year after 2010 |
|
Omnitrans |
David Lee |
02/19/2013: Approved by FHWA -view comment history- |
0 |
FTACML-6046 (009)
|
SBd | SBd Co |
CMAQ FTA Transfer - Bus replacement alternative fuel. 2013 FTIP Project ID SBD90105, CMAQ funds FY13/14 - $5,197,506. FTA Grant No. CA-95-X257. (Toll credits are being used as match for CMAQ in FY12/13 $1,275, FY 13/14 $1,299).
This will also include FTA CMAQ Transfer request; Grant No. CA-95-X257 $10,306,000 for downtown San Bernardino rail extension from SB metrolink station to approx. 1 mile east to a new transit station at Rialto Ave. and E St. in downtown SB.
Adv. ID - 0814000126 |
|
Omnitrans |
David Lee |
04/07/2014: FMIS approved -view comment history- |
0 |
FTASTPL-6046 (010)
|
SBd | Downtown San Bernardino Transit Center. |
FTA Transfer Grant #CA-90-Z121. Two different FTIPs was provided. (1) in first submittal- Grouped Project for TEA programmed as STP Enhance-RIP TEA with $992,000 for FY12-13 under FTIP ID 20040830 per SBd Co LOCAL HIGHWA, SANBAG is LEAD. (2) in revised submittal received 03-07-14- Bus System Passenger Facilities developemtn of San Bernardino Terminal Located on Rialto and E Street; TE Funds refered back to FTIP ID 20040830 - this FTIP in listed under FTIP ID 200101 per SBd Co TRANSIT, Omnitrans is LEAD. Emailed SANBAG 03-10-14 for clarification and which FTIP should be used; respond from Carrie Schindler, use both FTIP sheets. Local Match Prop 1B Pulbic Transportation Modernization, Improvement, and Service Enhancement Account (PTMISEA) changed from $248,000 to $128,524; 20% to 11.47% respectively, confirmed by Carries Schindler.
Use L24E as transfer funds.
Adv ID - Pending |
|
Omnitrans |
David Lee |
05/15/2014: FMIS approval. Notified SANBAG. -view comment history- |
0 |
ATPL-6046 (011)
|
SBd | West Valley Connector Corridor |
Cities of Pomona (LA County), Fontana, Montclair, Ontario, and Rancho Cucamonga (San Bernardino Cty). Termini at Pomona Downtown Metrolink Station and Kaiser Medical Center Fontana, following Holt Ave/Blvd, Archibald Ave, Milliken Ave, Foothill Blvd, and Sierra Ave. Pedestrian and bicycle access improvements within 1/2 mile of rapid transit stations, including sidewalk and curb ramp replacement and bike parking at stations. |
|
Omnitrans |
Leslie Avila |
02/09/2021: Mail Received (Draft Scope Change Request (Exhibit 22-D)) -view comment history- |
3 |
FTACML-6046 (012)
|
SBd | San Bernardino County
Adv. ID: 0815000190 |
2015 FTIP - Proj ID SBD90105 CMAQ FFY 14/15 = $5,512,215; Toll Credits are being used as match for CMAQ.
Bus System- Bus Replacements Alt. Fuel: The Agency's goal is to replace 15 vehicles a year. This funding will allow the agency to replace seven 40 ft. CNG vehicles in FY2015. The New vehicles will replace vehicles that have hit their FTA requirement of age and miles. |
|
Omnitrans |
David Lee |
04/17/2015: Request submitted to FHWA -view comment history- |
0 |
FTACML-6046 (013)
|
SBd | San Bernardino County Adv. ID: 0816000159 FAIN: 1681-2016-2 (P1) |
2015 FTIP - Proj ID SBD90105 CMAQ FFY 15/16 = $19,522,000; Toll Credits are being used as match for CMAQ.
Bus System- Bus Replacements Alt. Fuel: The Agency's goal is to replace 15 vehicles a year after 2010.
|
|
Omnitrans |
David Lee |
06/20/2016: The following transfer request has been approved by FHWA HQ (DC).
Project No: 6046(013)
State Project No: 0816000159L-N
Agency notified
-view comment history- |
0 |
FTACML-6046 (014)
|
SBd | San Bernardino County Adv. ID: 0816000160 FAIN: 1681-2016-2 (P2) |
2015 FTIP - Proj ID 20150307 CMAQ FFY 15/16 = $4,000,000; Toll Credits are being used as match for CMAQ.
County-wide vanpool project. |
|
Omnitrans |
David Lee |
07/21/2016: The following transfer request has been approved by FHWA HQ (DC).
Project No: 6046(014)
State Project No: 0816000160L-N
-view comment history- |
0 |
FTACML-6046 (015)
|
SBd | Redlands Passenger Rail Project - FTA FAIN 1681-2018-3
New passanger rail service from Rialto to E Street in San Bernardino to Redlands |
FTA Federal Award Identification Number (FAIN) 1681-2018-3. Section 5307-3 FTA transfer for $17,818,000 to develop a new passenger rail service from Rialto/E Street to Redlands. Programmed under FTIP ID 20151301 for FY 17-18 in Amendment #13 approved on 09/13/17 to the SCAG's 2017 FTIP. Use $17,818,000 of Z400 CMAQ funds as transfer funds. Air Basin is South Coast. |
|
Omnitrans |
Leslie Avila |
06/28/2018: Mail Received (Revised: FTA Transfer Request (3-J), Grant Application, Finance Letter) -view comment history- |
0 |
FTACML-6046 (016)
|
SBd | Throughout the City of San Bernardino - FTA FAIN #1681-2018-7
|
Bus System-Bus Replacements Alternative Fuel CMAQ FY19
Federal Award Identification Number (FAIN): 1681-2018-4
Section 5307-3 FTA transfer of $16,358,672 to to purchase 25 replacement 40-foot CNG revenue vehicles that have an expected useful life of 12 years or $500,000 miles. The replacement of the CNG vehicles will help proved service in the Valley portion of San Bernardino County, California. Programmed under the FTIP ID SBD90105 (CTIPS ID 209-5000-1044) for FY18/19 in Amendment Number #6 approved on XX/XX/XX to the SCAG's 2019 FTIP. Use $16,358,000 of Z400 CMAQ funds as transfer funds with $2,119,439 in toll credits applied in lieu of non-federal matching funds.
|
|
Omnitrans |
Leslie Avila |
03/07/2019: Mail Received (FTA Transfer Request (Resubmittal): Revised Grant Application, Finance Letter) -view comment history- |
0 |
FTACML-6046 (017)
|
SBd | San Bernardino Transit Center; Tippecanoe Avenue Station; New York Street Station; Downtown Redlands Station; University Station |
Redlands Passenger Rail Project (RPRP) CMAQ FY19
Federal Award Identification Number (FAIN): 1681-2019-4
Section 5307-2A FTA transfer of $17,032,000 to fund the maintenance facility component of the overall project that constructs the Redlands Passenger Rail Project (RPRP). Programmed under the FTIP ID 50151301 (CTIPS ID 209-5000-4509) for FY18/19 in Amendment Number #3 approved on 03/19/19 to the SCAG's 2019 FTIP. Omnitrans will be the direct recipient of FHWA transferred funds to SBCTA for the construction of the RPRP. SBCTA is sub-recipient of FTA funds and is the actual project Lead Agency. See also companion FTA Grant FAIN #1681-2018-3 under FTACML-6046(015), Adv. ID 0818000190, for the transfer of CMAQ funds to construct passanger stations and to reconstruct and upgrade a 9-mle section of rail line from the San Bernardino Transit Center to the University Station at the University of Redlands. Use $17,032,000 of Z400 CMAQ funds as transfer funds with $1,953,571 in toll credits applied in lieu of non-federal matching funds. |
|
Omnitrans |
Leslie Avila |
04/08/2019: Mail Received (FTA Transfer Request: Exhibit 3-0, 3-J, FTA Grant Application, 2019 FTIP Amendment 3 (electronic submittal)) -view comment history- |
0 |
ITS99-6049 (007)
|
RIV | THROUGHOUT THE TRANSIT SYSTEM IN RIVERSIDE COUNTY |
DEVELOPMENT AND INTREGATION OF ADVANCED TECHNOLOGY |
|
Southern California Association of Governments |
Sean Yeung |
10/30/2007: Mail Received (Notification Letter for Funds which expired on June 30, 2007) -view comment history- |
0 |
TCSE001-6049 (008)
|
RIV | In Riverside County |
Miscellaneous - Other |
|
Southern California Association of Governments |
Ayda Homsi |
No comments |
0 |
TCSP01-6049 (009)
|
RIV | Riverside County |
Community & environmental planning |
|
Southern California Association of Governments |
Sean Yeung |
No comments |
0 |
FTA-6052 (000)
|
RIV | In Coachella Valley - Transfer Hub location at Sunline's head office in Thousand Palms |
In Coachella Valley - Transfer Hub location at Sunline's head office in Thousand Palms, develop & construct a Park & Ride Facility and construct a Transit hub.
Grant# CA-95-X076 |
|
Sunline Transit Agency |
Savat Khamphou |
12/18/2008: Mail Received (FTA Request from Sunline Transit Agency) -view comment history- |
0 |
CML-6052 (001)
|
RIV | Engineer to Update |
Engineer to Update |
|
Sunline |
Nivine K. Georges |
No comments |
0 |
CML-6052 (003)
|
RIV | Riverside Co., Eastern Portion |
Engineer to Update |
|
Sunline |
Nivine K. Georges |
No comments |
0 |
CML-6052 (005)
|
RIV | SUNLINE TRANSIT IN RIVERSIDE COUNTY FTA X-90-X864 |
Van Purchase |
|
Sunline |
Nivine K. Georges |
No comments |
0 |
CML-6052 (006)
|
RIV | SUNLINE TRANSIT IN RIVERSIDE COUNTY |
Van Purchase |
|
Sunline |
Nivine K. Georges |
No comments |
0 |
FTA-6052 (007)
|
RIV | In Coachella Valley - Fred Waring Corridor Express Service Demonstratation project |
In Coachella Valley - Fred Waring Corridor Express Service Demonstratation project. To provide express service from the Indio transfer location to the transfer location on Town Center Way.
Grant# CA-95-X076 |
|
Sunline Transit Agency |
David Lee |
12/18/2008: Mail Received (FTA Request from Sunline Transit Agency) -view comment history- |
0 |
FTACML-6052 (008)
|
RIV | Coachella Valley |
FTA Transfer Grant #CA-95-X327. Section 5307-3 FTA grant for $3,297,278 to a) establish a pilot program that will target eastern Coachella Valley, purchase of 50 vans; the program will also provide a three year start-up project for a brokerage service and first year subsidies for up to 70 vans. b) purchase of two new buses and operations of new bus service that will directly link Desert Hot Springs and Palm Desert. Programmed under FTIP ID RIV140821 and RIV140822 for FY 14-15, respectively, in Amendment #1 approved on 12/15/14 to the SCAG's 2015 FTIP. Adv. ID 0815000198 Use $3,297,278 of M400 CMAQ funds as transfer funds; local match $427,198. Salton Sea Air Basin. |
|
Sunline Transit Agency |
David Lee |
05/15/2015: The following transfer request has been approved by FHWA HQ (DC) -view comment history- |
0 |
FTACML-6052 (009)
|
RIV | CMAQ Quick Bus-Line 111
Servicing: Palm Springs, Plam Desert, Coachella |
Federal Award Identification Number (FAIN): 5057-2019-1
Section 5307-3 FTA transfer of $1,700,000 to fund the operating costs for the Quick Bus limited stop service. Programmed under the FTIP ID 190606 (CTIPS ID 209-4000-4609) for FY19/20 in Amendment Number #5 approved on 03/21/19 to the SCAG's 2019 FTIP; SCAG (MPO) concurred with RCTC (RTPA) to use the EPSP for Sunline's project (RIV190606) and $1,700,000 will be obligated in FY 18/19. Use $1,700,000 of Z400 CMAQ funds as transfer funds with $425,000 in local match.
Agency Contact: Sheila Hruby (Grants Analyst); (760)343-3456x1514; shruby@sunline.org
|
|
Sunline Transit Agency |
Leslie Avila |
No comments |
0 |
cmln-6053 (000)
|
SBd | In San Bernardino County Valley Region- Various signals, Tier 3 and 4 |
Upgrade and synchronize traffic signal interconnect of approximately 500 signals along approximately 175 miles of arterial roadway throughout the San Bernardino Valley. |
|
SANBAG |
Carol Green |
No comments |
0 |
PALM-6053 (000)
|
SBd | I-215 Palm Avenue/Little League interchange |
Grade separation |
|
San Bern. Associated Government (SBA) |
Carol Green |
No comments |
0 |
STPL-6053 (001)
|
SBd | Project inactive. No location specified in LP 2000. |
Between Club Drive and West Commerical Road |
|
SANBAG |
Carol Green |
No comments |
0 |
SB97-6053 (002)
|
SBd | STATE ROUTE 10 FROM L.A. CO. LINE TO GROVE AVE |
ADD HOV LANE IN EACH DIRECTION |
|
SANBAG |
Evita Premdas |
No comments |
0 |
STPL-6053 (003)
|
SBd | SBD Countywide Trans. Demand Mgmt. |
Trans. Demand Mgmt. |
|
SANBAG |
Carol Green |
No comments |
0 |
STPLE-6053 (006)
|
SBd | Historic SBD Santa Fe Depot |
Engineer to Update |
|
SANBAG |
Evita Premdas |
No comments |
0 |
STPLE-6053 (007)
|
SBd | IN SAN BERNARDINO COUNTY ALONG STATE ROUTE 71 FROM POST MILE 1.0 TO 8.4 |
LANDSCAPING |
|
San Bern. Associated Government (SBA) |
Carol Green |
02/21/2017: 02/21/2017 Project archived in D8 Database, project file purged on 7/7/2015. -view comment history- |
0 |
STPL-6053 (008)
|
SBd | SBD Countywide RIDESHARE (WITH CTS) SBD/RIV 3069 |
Rideshare |
|
SANBAG |
Carol Green |
No comments |
0 |
STPL-6053 (009)
|
SBd | SBD Countywide Rideshare Prog. (With CTS) LA/LB 3041 |
Rideshare |
|
SANBAG |
Carol Green |
No comments |
0 |
CML-6053 (019)
|
SBd | IN SAN BERNARDINO COUNTY ON I-10 FROM 0.1 MILE WEST OF GROVE AVENUE UNDERCROSSING TO ROUTE 10/15 SEPARATION |
HOV Lane |
|
SANBAG |
Evita Premdas |
No comments |
0 |
CML-6053 (020)
|
SBd | IN SAN BERNARDINO COUNTY ON I-10 FROM L.A. COUNTY LINE TO GROVE AVENUE |
HOV Lane |
|
San Bern. Associated Government (SBA) |
Evita Premdas |
02/21/2017: 02/21/2017 Project archived in D8 Database, project file purged on 7/7/2015. -view comment history- |
0 |
PPM-6053 (034)
|
SBd | Throughout San Bernardino County |
Planning, programming, and monitoring program |
|
SANBAG |
Carol Green |
08/06/2007: Mail Received (Final Invoice) -view comment history- |
0 |
RPSTPL-6053 (035)
|
SBd | IN THE CITY OF MONTCLAIR AT THE METROLINK STATION |
CONSTRUCT SECOND PLATFORM |
|
SANBAG |
Carol Green |
No comments |
0 |
STPLN-6053 (037)
|
SBd | In San Bernardino County on I-10 from 0.2 miles east of Ford Street in the City of Redlands to 16th Street in the City of Yucaipa |
Construct truck climbing and auxilary lane |
|
San Bern. Associated Government (SBA) |
Carol Green |
02/21/2017: 02/21/2017 Project archived in D8 Database, project file purged on 7/7/2015. -view comment history- |
0 |
PPM00-6053 (039)
|
SBd | San Bernardino Associated Governments - Plan, program and monitor |
Planning,Programming and Monitoring |
|
SANBAG |
Evita Premdas |
No comments |
0 |
RPSTPL-6053 (041)
|
SBd | Route 30 in Upland from LA/SBD COUNTY LINE TO MOUNTAIN AVENUE |
New freeway |
|
SANBAG |
Carol Green |
No comments |
0 |
RPSTPL-6053 (042)
|
SBd | Route 30 FROM MOUNTAIN AVE. TO 0.1 MILE WEST OF CUCAMONGA CANYON WASH |
New freeway |
|
SANBAG |
Carol Green |
No comments |
0 |
CML-6053 (043)
|
SBd | IN SAN BERNARDINO SOUTH COAST AIR BASIN |
Rideshare 00/01- 03/04 |
|
San Bern. Associated Government (SBA) |
Carol Green |
02/21/2017: 02/21/2017 Project archived in D8 Database, project file purged on 7/7/2015. -view comment history- |
0 |
CML-6053 (044)
|
SBd | IN SAN BERNARDINO COUNTY - MOJAVE DESERT AIR BASIN |
Rideshare FY 00/01-03/04 |
|
San Bern. Associated Government (SBA) |
Carol Green |
02/21/2017: 02/21/2017 Project archived in D8 Database, project file purged on 7/7/2015. -view comment history- |
0 |
STPCML-6053 (045)
|
SBd | IN THE CITY OF UPLAND ON SR 30/210 FROM MOUNTAIN AVE AND CUCAMONGA CANYON WASH |
CONSTRUCT ROADWAY AND UNDERCROSSING |
|
SANBAG |
Evita Premdas |
No comments |
0 |
STPCML-6053 (046)
|
SBd | IN SAN BERNARDINO ON SR 30 FROM EAST OF LA COUNTY TO MOUNTAIN ROAD |
New Road |
|
SANBAG |
Evita Premdas |
No comments |
0 |
RPSTPL-6053 (047)
|
SBd | on Route 30 (Segment 4) in Rancho Cucamonga from Hermosa Avenue to Milliken Avenue |
to construct 6-lanes and 2 HOV lanes |
|
San Bern. Associated Government (SBA) |
Evita Premdas |
11/10/2005: Mail Received (Resubmittal of Final Invoice, Final Setail Estimate, CCO Log, and CCO Explanation - November 10, 2005) -view comment history- |
0 |
RPSTPL-6053 (048)
|
SBd | On Route 30 (Segment 3) in Rancho Cucamonga from Cucamonga Canyon Wash to Hermosa Avenue |
To construct 6-lanes and 2 HOV lanes |
|
SANBAG |
Evita Premdas |
11/10/2005: Mail Received (Resubmittal of Final Invoice, Final Setail Estimate, CCO Log, and CCO Explanation - November 10, 2005) -view comment history- |
0 |
CMLG-6053 (049)
|
SBd | Tier 1 Traffic signal interconnection along I-10 and SR 60 and 83 corridors from the Los Angeles County line to Redlands |
Interconnect signals |
|
San Bern. Associated Government (SBA) |
Sean Yeung |
02/21/2017: 02/21/2017 Project archived in D8 Database, project file purged on 01/24/2017. -view comment history- |
0 |
TCRP01-6053 (051)
|
SBd | Alameda Corridor East on the Union Pacific Railroad at South Hunts Lane and on the BNSF Railroad at University Parkway/State Street |
Construct grade separations |
|
San Bern. Associated Government (SBA) |
Evita Premdas |
12/17/2018: Mail Received (invoice 65 (final), 1 original, 2 copies.) -view comment history- |
0 |
CMLG-6053 (054)
|
SBd | Tier 2 Traffic Signal Interconnect Various arterial roadways in San Bernardino Valley I-10,15, 215, SR-18, 30, 66, 83, 330 |
Coordinated Traffic Signal System - Tier 2 |
|
San Bern. Associated Government (SBA) |
Carol Green |
04/20/2016: Mail Received (Final Voucher 11/25/2013) -view comment history- |
0 |
TCRP01-6053 (055)
|
SBd | 14th Street over Wilson Creek in Yucaipa |
Road realignment and new bridge |
|
San Bern. Associated Government (SBA) |
Carol Green |
No comments |
0 |
PPM04-6053 (056)
|
SBd | Throughout San Bernardino County |
Planning, programming and monitoring. |
|
SANBAG |
Nivine K. Georges |
No comments |
0 |
HP21LN-6053 (057)
|
SBd | I-10 at Tippecanoe Avenue in San Bernardino |
Reconstruct interchange |
|
San Bern. Associated Government (SBA) |
Carol Green |
12/29/2015: FROE to Accounting. Copy to implementation. -view comment history- |
0 |
PPM05-6053 (058)
|
SBd | Throughout San Bernardino County 04/05 |
Planning, programming, and monitoring program 04/05 |
|
SANBAG |
Evita Premdas |
07/21/2005: Mail Received (Final invoice - Reimbursement for state stip planning prog and monitoring funds) -view comment history- |
0 |
CMLN-6053 (059)
|
SBd | I-215 Seg 3 from Orange Show Road to Rialto Avenue |
Land acquisition and clearing for HOV lanes |
|
San Bern. Associated Government (SBA) |
Carol Green |
10/08/2015: Updated Final Voucher of the status. Inform Final Voucher not an implementation issue. Issue was due an agreement between Caltrans R/W and SANBAG that Caltrans R/W would perform a DIRECT CMAQ deduction. Caltrans inadvertently forgot to take... -view comment history- |
0 |
CMLN-6053 (060)
|
SBd | I-215 Seg. 1 from Rialto Avenue to 9th Street |
Segment 1 Land acquisition and clearing for HOV lanes |
|
San Bern. Associated Government (SBA) |
Carol Green |
10/07/2015: Files returned to D8. -view comment history- |
0 |
STPCMLN-6053 (061)
|
SBd | I-210 Seg. 9, 10 & 11 - from Linden Avenue in Rialto to "H" Street in San Bernardino |
New freeway with HOV lanes |
|
San Bern. Associated Government (SBA) |
Carol Green |
04/20/2016: Mail Received (Final Voucher 4/29/2013) -view comment history- |
0 |
STPCMLN-6053 (062)
|
SBd | I-210 from Macy Street to Miranonte Drive in San Bernardino |
***New Bridges, Retaining Walls and Loops |
|
San Bern. Associated Government (SBA) |
Evita Premdas |
06/15/2017: Mail Received (Finance Letter, 1 orignal, 0 copy.) -view comment history- |
0 |
STPLN-6053 (063)
|
SBd | I-10 IN REDLANDS FROM ORANGE STREET TO FORD STREET |
MIXED-FLOW LANES |
|
San Bern. Associated Government (SBA) |
Carol Green |
04/07/2015: D8 Local Assistance: Request to Capital (Anthony Liao) to forward final voucher to Accounting in order to close the project. Form is required because project was multi-funded (sub-vention). Local Assistance partly filled out form. Forwarded... -view comment history- |
0 |
PPMO-6053 (064)
|
SBd | Area Wide |
Planning, Programming and Monitoring |
|
SANBAG |
Carol Green |
No comments |
0 |
CML-6053 (065)
|
SBd | Southcoast Air Basin 04/07 |
Rideshare Program - Southcoast Air Basin |
|
San Bern. Associated Government (SBA) |
Carol Green |
02/21/2017: 02/21/2017 Project archived in D8 Database, project file purged on 7/7/2015. -view comment history- |
0 |
STPLNER-6053 (066)
|
SBd | I-210 Seg 1 - Los Angeles County Line to San Antonio Ave. in Upland |
Landscaping and Irrigation |
|
San Bern. Associated Government (SBA) |
Carol Green |
02/21/2017: 02/21/2017 Project archived in D8 Database, project file purged on 7/7/2015. -view comment history- |
0 |
STPLNER-6053 (067)
|
SBd | I210 Seg. 2 - San Antonio Avenue to Cucamonga Creek Channel |
Landscaping and Irrigation |
|
San Bern. Associated Government (SBA) |
Carol Green |
02/21/2017: 02/21/2017 Project archived in D8 Database, project file purged on 7/7/2015. -view comment history- |
0 |
FSP06-6053 (068)
|
SBd | Tow Service Various Locations |
Freeway Service Patrol 05/06 |
|
SANBAG |
Carol Green |
No comments |
0 |
RPSTPLE-6053 (069)
|
SBd | Seg. 3 I-210 Cucamonga Creek Channel to Hermosa Ave. O/C |
Landscaping - TEA |
|
San Bern. Associated Government (SBA) |
Carol Green |
04/20/2016: Mail Received (Final Voucher 11/21/2013) -view comment history- |
0 |
RPSTPLE-6053 (070)
|
SBd | Seg. 4 I-210 Hermosa Ave. O/C to Milliken Ave. O/C |
Landscaping TEA |
|
San Bern. Associated Government (SBA) |
Carol Green |
04/20/2016: Mail Received (Final Voucher 11/21/2013) -view comment history- |
0 |
CMLN-6053 (071)
|
SBd | Mojave Desert Air District |
Rideshare Program 05/06 & 06/07 |
|
San Bern. Associated Government (SBA) |
Carol Green |
02/21/2017: 02/21/2017 Project archived in D8 Database, project file purged on 7/7/2015. -view comment history- |
0 |
CMLN-6053 (072)
|
SBd | Seg. 2 - I-215 Right of Way- P.M. 7.6 to 8.9 (S/0 9th Street to S/O Massachusetts Street) |
HOV Lanes |
|
San Bern. Associated Government (SBA) |
Carol Green |
10/07/2015: Files returned to D8. -view comment history- |
0 |
FSP07-6053 (073)
|
SBd | 10,15,60, and 215 in San Bernardino County |
Freeway Service Patrol FY 2006-2007 |
|
San Bern. Associated Government (SBA) |
Carol Green |
No comments |
0 |
PPM-6053 (074)
|
SBd | Throughout San Bernardino county |
Planning, programming, & monitoring program |
|
San Bern. Associated Government (SBA) |
Carol Green |
02/21/2017: 02/212017 Project archived in D8 Database, project file purged on 7/7/2015.
-view comment history- |
0 |
FSP08-6053 (075)
|
SBd | ROUTES 10, 15, 60, AND 215 in San Bernardino County |
Freeway Service Patrol for FY 2007-2008 |
|
San Bern. Associated Government (SBA) |
Carol Green |
No comments |
0 |
CMTLSPL-6053 (077)
|
SBd | In San Bernardino County Valley Region- Various signals, Tier 3 and 4. San Bernardino Valley various locations. |
Tier 3 & 4 San Bernardino Valley coordinated traffic signal system program . Traffic Signal interconnect of approximately 500 signals along approximately 175 miles of arterial roadways. |
|
San Bern. Associated Government (SBA) |
Sylvester Lin |
12/07/2015: Mail Received (FV 10/29/2015. Purge on 4/2019) -view comment history- |
0 |
CMLG-6053 (078)
|
SBd | Various RIDESHARE |
Rideshare activities for southcoast air basin. |
|
San Bern. Associated Government (SBA) |
Carol Green |
03/25/2015: Sent copy of final voucher to SANBAG. -view comment history- |
0 |
ESPLN-6053 (080)
|
SBd | I-215 From 0.2km S/O Redlands Loop OH to 0.7 km N/O 16th Street OC in the City of San Bernardino |
Construct one HOV and one fixed flow land in each direction. |
|
San Bern. Associated Government (SBA) |
Evita Premdas |
10/31/2017: FROE sent to LPA -view comment history- |
0 |
PNRSCML-6053 (081)
|
SBd | 0.2 Km south of the Redlands Look Overhead (OH) to 0.3 Km south of the 16th Street undercrossing (Segment 1 and 2) |
Add 2 HOV and mixed flow lanes. |
|
San Bern. Associated Government (SBA) |
Marcos Amancio |
10/31/2017: Mail Received (Revised Final Close out Documents) -view comment history- |
0 |
PPM10-6053 (082)
|
SBd | SANBAG |
Planning, Programming, and Monitoring |
|
San Bern. Associated Government (SBA) |
Carol Green |
No comments |
0 |
HPLULN-6053 (083)
|
SBd | I-10 Tippecanoe Avenue in Loma Linda (Phase II) |
Reconstruct I-10/Tippecanoe interchange |
|
San Bern. Associated Government (SBA) |
Evita Premdas |
02/07/2019: Mail Received (FROE Package) -view comment history- |
0 |
HP21LN-6053 (084)
|
SBd | RECYCLED FPN:
NOW: I-215 Segment 3 Landscape in the City of San Bernardino from Orange Show Road to Lytle Creek.
----------
WAS: I-10 Tippecanoe Avenue in Loma Linda |
NOW: Landscape
--------------
WAS: Reconstruct I-10/Tippecanoe intechange |
|
San Bern. Associated Government (SBA) |
Marcos Amancio |
12/29/2016: Mail Received (Revised RFA package rec'd) -view comment history- |
0 |
FSP10-6053 (085)
|
SBd | Routes 10, 15, 60, and 215 in San Bernardino County |
Freeway Service Patrol fro FY 2009-2010 for $1,296,165 State Funds. |
|
San Bern. Associated Government (SBA) |
Carol Green |
No comments |
0 |
TCIFSTPL-6053 (086)
|
SBd | Lenwood Grade Separation - North of West Main St. Approx. 400 ft N/O to 600 ft S/O BNSF and Santa Fe RR Right-Of-Way-4 Travel Lane
Project 64, Lenwood Road Grade Separation (PPNO 1135), in San Bernardino County. |
***Grade Separation |
|
San Bern. Associated Government (SBA) |
Evita Premdas |
03/10/2020: Mail Received (RW closeout; 1 original, 2 copies.) -view comment history- |
0 |
CMTCIFL-6053 (087)
|
SBd | Project is located along Palm Ave., approx. 0.28 miles south of the I-215 Palm Ave./Little League Interchange; improvements begin approx. 530 ft south of interchange
Project 63, Palm Avenue Grade Separation (PPNO 1134), in San Bernardino County. |
Palm Avenue Grade Separation at BNSF / UP Cajon |
|
San Bern. Associated Government (SBA) |
Sidhartha Chowdhury |
03/09/2017: Mail Received (Report of Completion and Report of Expenditures) -view comment history- |
0 |
TCIF-6053 (087)
|
SBd | Palm ave. grade separation, Palm ave. approx 530' s/o I-215 palm ave. IC to approx 1450' S/O Cajon Blvd. |
construct at grade RR separation-build bridge over-crossing separation traffic from RR crossing 2-2 lanes |
|
San Bern. Associated Government (SBA) |
Sylvester Lin |
12/14/2016: Mail Received (close out Package (Con) 1 original, 0 copies) -view comment history- |
0 |
STPLN-6053 (088)
|
SBd | On I-10 in Redlands & Yucaipa from Ford St. O/C to Live Oak Canyon |
Construct 10 W/B mixed-flow lane |
|
San Bern. Associated Government (SBA) |
Sylvester Lin |
12/10/2015: Mail Received (FROE, 1 original, 2 copies) -view comment history- |
0 |
PPM111-6053 (089)
|
SBd | San Bernardino County |
Planning, Programming, and Monitoring |
|
San Bern. Associated Government (SBA) |
Carol Green |
No comments |
0 |
IMDTCIF-6053 (090)
|
SBd | I-10/Cherry Avenue Interchange improvements. Cherry Avenue at I-10 from Slover Avenue to Valley Boulevard. (Project number 0800000744). |
Widen Cherry Avenue/I-10 over crossing. Widen Cherry Avenue from Slover Avenue to Valley Blouleard. Re-align the I-10 WB on- and off- ramps, widen EB on- and off- ramps, widen Cherry Avenue to include additional through lane and dual left-turn lanes each direction. Modify traffic signals on Cherry Avenue at Valley Blvd. |
|
San Bern. Associated Government (SBA) |
Marcos Amancio |
10/13/2017: The agency Does not require CWA 15 Fund Extension. -view comment history- |
0 |
PNRS-6053 (091)
|
SBd | Segment 3 Utility |
I-215 Seg 3 from Orange Show Road to Rialto Avenue |
|
San Bern. Associated Government (SBA) |
Carol Green |
10/02/2015: Final Close out to HQ Accounting. Project completion is a non-traditional close-out, i.e., Project completion report and exhibits were not filled out. There is NO invoice for this project but have expenditures. The expenditures was created... -view comment history- |
0 |
RP1BL-6053 (092)
|
SBd | In Ontario, at North Milliken Avenue/UPRR at grade crossing between Guasti Rd & Airport Dr. |
Construct grade separation. |
|
San Bern. Associated Government (SBA) |
Vu Ngo |
02/02/2016: Mail Received (Re-assigned to Sly, originally came into LA 5/31/2015) -view comment history- |
0 |
STPLN-6053 (094)
|
SBd | `SR-210 from Locust Avenue overcrossing to 0.31mile west of Riverside Avenue overcrossing in the city of Rialto. |
SR-210 Segment 9 Landscaping and irrigation installation |
|
San Bern. Associated Government (SBA) |
Evita Premdas |
06/23/2022: Comments to STPLN-6053(094) FROE Submittal: SR210 SEG 9 Landscape Project emailed to SBCTA - DISPUTED! FORMS OUTDATED -view comment history- |
0 |
PNRSCMLN-6053 (095)
|
SBd | On Hunts Lane from Heritage Lane to Redlands Blvd./Steel Road |
Grade Separate Hunts Lane over existing UPRR tracks |
|
San Bern. Associated Government (SBA) |
Harish Rastogi |
12/02/2016: Mail Received (Request for Allocation, Construction, 1 original, 0 copy.) -view comment history- |
0 |
STPLN-6053 (096)
|
SBd | I-10 Tippecanoe/Interchange (PM 25.5 to 26.3). From 1.01 Mile west of Tippecanoe Avenue to 1.02 miles east of Tippecanoe Avenue.
Phase I
---------------
FPN re-used for I-10 Tippecanoe: On Hunts Lane from Heritage Lane to Redlands Blvd./Steel Road |
Widen San Timoteo Creek Bridge. Replace existing trapezoidal channel with underground RCB culvert. Widen 1-10 EB mainline. Re-align EB I-10 off ramp.
--------------------
Prior description. FPN re-used for I-10 Tippecanoe. Previous prefix HPLUL
Grade Separate Hunts Lane over existing UPRR tracks Obsolete - Prior to re-used of FPN |
|
San Bern. Associated Government (SBA) |
Marcos Amancio |
04/12/2016: Submit FINAL INVOICE/FROE to LPA. -view comment history- |
0 |
STPCML-6053 (097)
|
SBd | I-10/Citrus Avenue, from Slover Avenue across I-10 to Valley Blvd., within the city of Fontana |
I-10/Citrus Ave. Interchange Construction |
|
San Bern. Associated Government (SBA) |
Harish Rastogi |
05/06/2016: Mail Received (Final Invoice (Con) 1 original, 2 copies) -view comment history- |
0 |
CML-6053 (098)
|
SBd | Within the Mojave Desert Air Basin in San Bernardino County. |
Rideshare Activities. |
|
San Bern. Associated Government (SBA) |
Sylvester Lin |
04/28/2016: Mail Received (Exhiit 17-G, 1 original, 2 copies) -view comment history- |
0 |
CML-6053 (099)
|
SBd | Within the South Coast Air Basin in San Bernardino County. |
Rideshare activities. |
|
San Bern. Associated Government (SBA) |
Sylvester Lin |
01/04/2016: Mail Received (FROE, 1 original, 2 copies (Con)) -view comment history- |
0 |
PPM 12-6053 (100)
|
SBd | Planning, Programming, and Monitoring throughout San Bernardino County |
Planning, Programming, and Monitoring |
|
San Bern. Associated Government (SBA) |
Carol Green |
12/10/2012: Meeting with SANBAG discussed status. -view comment history- |
0 |
CMLN-6053 (101)
|
SBd | On Route 91 and Route 215 in Riverside County and San Bernardino County from Spruce St on Riverside 91 to Orange Show Road. |
This is for R/W only. RW acquisition done by SANBAG.
PE phase was done by CALTRANS 6208(018). CON is AAA by Caltrans under 6208(018).
I-215 Bi-County HOV lane gap closure project. Add one (1) HOV in each direction of I-215 from Spruce Street in Riverside Count to I-215/Orange Show Road I/C in San Bernardino. |
|
San Bern. Associated Government (SBA) |
Evita Premdas |
03/11/2023: FROE/Final Invoice No.17 - Received, Processed, and sent to CLPA -view comment history- |
0 |
CMLG-6053 (102)
|
SBd | West San Bernardino Valley (691) intersections |
Coordinate Traffic Signal Maintenance/Monitoring, |
|
San Bern. Associated Government (SBA) |
Esayas Hagos |
01/03/2023: Provided SBCTA Cover letter and E-76 for PED Extension. -view comment history- |
1 |
IMDLN-6053 (104)
|
SBd | I-15 Ranchero Road IC in Hesperia |
Construct 6 lane IC with left and right turn lanes including a1300' aux lane prior to NB off and 3200' aux lane from SB loop on ramp. |
|
San Bern. Associated Government (SBA) |
Vu Ngo |
03/27/2017: Mail Received (FROE, 1 original; final invoice, 2 copies, 1 original.) -view comment history- |
0 |
STPLN-6053 (105)
|
SBd | SR 210 Seg 11 fr 0.5 km west of State St. U/C to Little Mountain Dr U/C (PM 20.3/21.9), City of San Bernardino - Segment 11 |
Landscape and planting |
|
San Bern. Associated Government (SBA) |
Carol Green |
08/29/2016: Final Report of Expenditure and Final Invoice submitted to HQ LPA. -view comment history- |
0 |
PPM13-6053 (106)
|
SBd | San Bernardino County |
Planning, Programming, and Monitoring |
|
San Bern. Associated Government (SBA) |
Carol Green |
07/03/2013: Final to HQ -view comment history- |
0 |
FSP13-6053 (107)
|
SBd | State Routes 60, I-10, I-210, and I-215 in San Bernardino County |
Freeway Service Patrol |
|
San Bern. Associated Government (SBA) |
Carol Green |
08/21/2015: Mail Received (Fund Xfer Agreement (FSP) 1 copy, 0 originals) -view comment history- |
0 |
TCIFL/SLPPL-6053 (108)
|
SBd | Along Laurel Street begins approximately 420 ft east of Pennsylvania Avenue and 195 ft west of 9th Street. |
***Construct new railroad grade separated crossing between Laurel Street and BNSF railroad. |
|
San Bern. Associated Government (SBA) |
Evita Premdas |
01/29/2020: Mail Received (FROE; 1 original, 2 copies) -view comment history- |
0 |
RSTPLE -6053 (109)
|
SBd | 1170 West 3rd Street to a new Metrolink commuter rail terminus near the intersection of Rialto Ave and E Streetm, City of San Bernardino. |
Construct second track, rail terminus, crew house, parking lots and pedestrian pathways, overpass at the Depot, Omnitrans Bus facility, grade crossing improvements, railroad signalization, and roadway closures. |
|
San Bern. Associated Government (SBA) |
Carol Green |
11/07/2013: Informed SANGBAG CTC will only go for 4 months extension. -view comment history- |
0 |
FTA-6053 (110)
|
SBd | San Bernardino transit station |
FTA Transfer |
|
San Bern. Associated Government (SBA) |
Marcos Amancio |
07/07/2017: Mail Received (FSP, fully executed, 1 copy, 0 original.) -view comment history- |
0 |
PPM14-6053 (111)
|
SBd | San Bernardino County- PPM |
Planning, Programming, and Monitoring |
|
San Bern. Associated Government (SBA) |
Carol Green |
09/18/2014: Final Invoice + FROE to accounting for final payment. -view comment history- |
0 |
PPM15-6053 (112)
|
SBd | Throughout San Bernardino County.
-----------
RECYCLED FPN
----
I-15 Baseline
WAS: I-15 Baseline Interchange
|
NOW: Planning, Programming, and Monitoring
----------
WAS:
Widen Bridges, Baseline Rd and East Ave. Realign & Widen NB Diamond Ramps & SB Loop on Ramp.
Add I-15 Acceleration/Deceleration Lanes and operational improvements.
Preliminary Engineering is being done by the City of Rancho Cucamonga as project IMDLN 5420(012) funded by Bridge Discretionary-Replacement/Rehabilitation. SANBAG and the City of Rancho Cucamonga have a Construction Cooperative Agreement number R13028 for this project. |
|
San Bern. Associated Government (SBA) |
Sylvester Lin |
10/19/2015: Mail Received (Final Invoice, 1 original, 2 copy) -view comment history- |
0 |
STPL-6053 (113)
|
SBd | Project Incorrectly classified as SANBAG project. Has been corrected to show CT as lead agency. (STPL - 6208(027)
US-395 (Hesperia, Victorville & Adelanto) From SR-18 to Chamberlaine Way |
Project Incorrectly classified as SANBAG project. Has been corrected to show CT as lead agency. (STPL - 6208(027)
Interm widening - widen from 2-4 lanes and add left turn channelization at intersections |
|
San Bern. Associated Government (SBA) |
Marcos Amancio |
No comments |
0 |
HPLULN-6053 (115)
|
SBd | I-215 Interchange at Barton Road from Iowa Avenue to Washington Street in Grand Terrace. |
Programmed under FTIP ID SBD31850 for FY 14-15 in Amendment #1 approved on 12/15/140 to SCAG's 2015 FTIP for right of way utility relocation only. See also ACNHPI-2151(233), PPNO 0243K, for a companion Capital right of way project for support and acquisition. Use LY10 DEMO funds at a maximum reimbursement ratio of 100% up to $2,293,830 for right of way utility relocation using toll credits in lieu of non-federal matching funds. CRS Map 15V22 - Interstate and principal arterial. PL
Refering to Capital Advantage ID of 0800000282
CTIPS ID. 109-0000-2489
Per CT Coop Agreement 08-1537 C12212; CALTRANS is Implementing Agency for PS&E.
SANBAG is the Implementing Agency for ROW.
Funding Summary of Coop 1537 for ROW Capital's STATE STIP/RIP = $ 17,400,000 is NOT 2013 RTIP?s STIP ADV CON-RIP.
Funding Summary of Coop 1537 for ROW Capital's FEDERAL DEMO = $ 1,500,000 SHOULD BE 2013 RTIP?s STIP LOCAL.
Funding Summary of Coop 1537 for ROW Capital's LOCAL Measure = $ 1,839,000 plus $ 1,597,000 MATCH the 2013 RTIP of $ 3,436,000 SBD CO Measure I and the Field Review Form.
2013 RTIP and Field Review Fundings for ROW are consistent; but not with the COOP Funding Summary.
Therefore, COOP Funding Summary needs to be amended to show the split of STIP and RIP.
The following DEMO Funds were entirely used for PS&E under 6208(023).
DEMO ID 225 2004 Sect 115 $500k.
DEMO ID 227 2004 Sect 115 and Repurposed ???
DEMO ID 770 2006 Sect 112 and Re-Purposed ???
-etp 12/30/2013 1/28/2014
Per SANBAG COOP Agreement 08-1537 Funding Summary Number 3, DEMO ID 524 in the amount of $1,500,000 will be used for R/W Capital and will be obligated by District 8 DLA.
-sl 06/12/14.
|
|
San Bern. Associated Government (SBA) |
Evita Premdas |
07/17/2022: INACTIVE: Progress Invoice No. 23 Received, Processed, and sent to CLPA -view comment history- |
0 |
ATPL-6053 (116)
|
SBd | Phase 1. Six Metrolink Stations on the San Bernadino Line. Cities of (1) Montclair (2) Upland (3) Rancho Cucamonga (4) Fontana (5) Rialto (6) San Bernardino. County of San Bernardino. |
***This is RECYCLED/REUSED FPN. Was RSTP is Now ATP.
PPNO: 1166 . ATP project. CTC ID 0561. FTIP ID 2015108. CTIPS 209-5000-4461. Project known as SANBAG Metrolink Station Accessibility Improvement Project. Within half-mile radius for pedestrian access and 1-1/2 mile radius for bicycle access.
FPN issued using PPR dated 5/16/2014. Projected construction completion per per PPR is 12/1/2017. This is Phase 1 per Project Sheet 20150108- cng 10/6/2014.
FYI:
Previous Comments prior to re-use.
FTA CMAQ Transfer request; Grant No. CA-95-X257 $10,306,000 for downtown San Bernardino rail extension.
Adv. Draft ID #0814000124. Funds transferred under FTACML-6046(009). |
|
San Bern. Associated Government (SBA) |
Evita Premdas |
03/04/2021: FINAL VOUCHERED, CLOSED DATE 01/19/2021 -view comment history- |
6 |
CML-6053 (117)
|
SBd | Within Mojave Desert in San Bernardino County |
Administer, promote, and implement trip reduction/rideshare programs |
|
San Bern. Associated Government (SBA) |
Evita Premdas |
05/03/2019: Mail Received (invoice 13 (final); 1 original, 2 copies.) -view comment history- |
1 |
CML-6053 (118)
|
SBd | Thorough South Coast Air Basin |
Administer, promote, and implement trip/reduction rideshare programs. |
|
San Bern. Associated Government (SBA) |
Marcos Amancio |
11/13/2017: Mail Received (Invoice #9 Final (PE) 1 original, 2 copies) -view comment history- |
1 |
ATPLNI-6053 (119)
|
SBd | San Bernardino County |
PPNO. 1145. CTC ID 0537. PPR dated 5/18/2014. Project Title is SANBAG SRTS Plan. Adv 0815000069
SANBAG proposes to develop a student travel data collection strategy and incorporate priority Safe Routes to School projects into the existing SANBAG maintained Non-Motorized Transportation Plan (NMTP). The data collection strategy will inventory existing school data sources and propose a methodology for regularly collecting data on student travel trends. The Safe Routes to School Plan will inventory needed infrastructure improvements for approximately ten percent (10%) of San Bernardino County's schools. |
|
San Bern. Associated Government (SBA) |
Evita Premdas |
05/17/2018: Mail Received (Final Invoice, FROE, 22-T) -view comment history- |
0 |
ATPLNI-6053 (120)
|
SBd | Throughout San Bernardino County |
Develop a countywide points of interest pedestrian plan. |
|
San Bern. Associated Government (SBA) |
Marcos Amancio |
03/07/2018: Mail Received (Closing supporting documents and ATP Final Project Report) -view comment history- |
0 |
HP2IMDLN-6053 (121)
|
SBd | Pepper Avenue Bridge over I-10 |
Replace bridge |
|
San Bern. Associated Government (SBA) |
Evita Premdas |
06/20/2016: Mail Received (HQ to Dist. 8, FSP Agreement FY 15/16) -view comment history- |
0 |
RSTPLN-6053 (122)
|
SBd | US-395 from SR-18 to Chamberlain Way |
***Interim widening - Widen from 2-4 lanes and added left turn channelization at intersection. |
|
San Bern. Associated Government (SBA) |
Evita Premdas |
06/09/2023: Progress Invoice No. 21 were Received, Processed, and sent to CLPA -view comment history- |
0 |
PPM16-6053 (123)
|
SBd | Throughout San Bernardino County |
Planning, Programming, Monitoring.
Advantage ID: 0815000224 |
|
San Bern. Associated Government (SBA) |
Sylvester Lin |
09/08/2016: DLAE signs Exhibit 3-G, Federal Project Log Sheet, for project completion. -view comment history- |
0 |
ATPLNI-6053 (124)
|
SBd | Rim of the World Recreation and Park District |
Develop ROTW Active Transportation Pedestrian Bicycle and Equestrian Master Plan |
|
San Bern. Associated Government (SBA) |
Vu Ngo |
08/08/2018: Mail Received (Invoice #6 (Con) 1 original, 2 copies) -view comment history- |
0 |
DEM08STP-6053 (125)
|
SBd | I-215/University Parkway Interchange. This project is located approximately 1.6 miles north of the I-215/SR-210 Interchange and 2.5 miles south of the I-215/Palm Avenue Interchange. |
Reconstruct Interchange: Reconfigure the existing interchange to improve traffic operations, reduce congestion, and improve freeway access. The freeway serves as the main access for the California State University San Bernardino Campus. |
|
San Bern. Associated Government (SBA) |
Esayas Hagos |
04/07/2023: Mail Received (Progress Invoice No.16; Received 03/29/2023) -view comment history- |
0 |
PRNSL-6053 (126)
|
SBd | Monte Vista Avenue at UPPR Grade Separation part of Alameda Corridor Grade Separation Projects funded with TCRP #55.1 (CA 552) |
Grade Separation - City of Montclair was the lead agency and administered the environmental and design phases of this project. Their FPN is PNRSHPL 5326(016). SANBAG will advertise, award and administer this project. |
|
San Bern. Associated Government (SBA) |
Evita Premdas |
04/29/2021: REVISED Progress Invoice No. 8 and FINAL - Received, Processed, and sent to HQ LPA -view comment history- |
0 |
STPLN-6053 (127)
|
SBd | I-210 and Pepper Ave. in the City if Rialto |
Construct new full interchange with diamond configuration I-210 and Pepper Ave. in the City of Rialto. Add WB and EB acceleration and deceleration lanes and widen Pepper Ave. from 2-4 lanes from Highland Ave. to existing 4-lane section s/o Interchange. TC FY15-16 STPL $1,507. |
|
San Bern. Associated Government (SBA) |
Esayas Hagos |
05/19/2023: Mail Received (PED Extension Request; Received 05/18/2023) -view comment history- |
0 |
PPM17-6053 (128)
|
SBd | Throughout San Bernardino County |
Regional transportation planning, programming, and monitoring of project implementation |
|
San Bern. Associated Government (SBA) |
Vu Ngo |
08/28/2017: Mail Received (Final Invoice and FROE, 1 original 2 copies) -view comment history- |
0 |
BRLS-6053 (129)
|
SBd | Mount Vernon Avenue Overhead at the Burlington Northern Santa Fe Railroad yard from 2nd Street to 5th Street, Br. No. 54C-0066 |
Replace 4-lane bridge with 4-lane bridge |
|
San Bern. Associated Government (SBA) |
Karen Nguyen |
02/09/2017: THIS PROJECT, BRLS-6053(129) IS NOW BRLS-6507(003). -view comment history- |
0 |
CMSTPLN-6053 (130)
|
SBd | I-10 from San Antonio Ave. to I-10/I-15 Interchange |
***I-10 Corridor Express Lane Widening (Contract 1): San Antonio Ave. to I-10/I-15 IC; implement 2 express lanes in each direction for a total of 4 general purpose and 2 express lanes in each direction and aux lane widening, undercrossing, overcrossing, reconstruction of ramps and lane transitions where needed. |
|
San Bern. Associated Government (SBA) |
Esayas Hagos |
02/14/2023: Progress Invoice No. 23 was Processed and sent to CLPA. -view comment history- |
1 |
PNRSLN-6053 (132)
|
SBd | I-215 Landscaping Seg.1SBDO Lytlecreek to .05miles North of 5th street Overcrossing |
provide irrigation system insert materials (gravel and boulders) and planting for I-215 in the City of San Bernardino. |
|
San Bern. Associated Government (SBA) |
Marcos Amancio |
11/30/2016: Mail Received (RFA (CON) hand delivered from Caltrans PM Jane Tien) -view comment history- |
0 |
CML-6054 (004)
|
RIV | In Riverside County on the San Jacinto Rail Line between the City of Riverside and the City of Perris. |
RR Related - Other |
|
RCTC |
Evita Premdas |
No comments |
0 |
CML-6054 (005)
|
RIV | Western Riverside County |
Miscellaneous - Other |
|
Riv. Co. Trans. Comm |
Evita Premdas |
No comments |
0 |
CML-6054 (012)
|
RIV | In the City of Riverside and Corona at existing La Sierra and West Corona Rail Station |
Pedestrian Walkway |
|
RCTC |
Evita Premdas |
No comments |
0 |
PPM00-6054 (014)
|
RIV | Riverside County Transportation Commission |
Planning,Programming and Monitoring |
|
Riv. Co. Trans. Comm |
Evita Premdas |
No comments |
0 |
HP21L-6054 (015)
|
RIV | State Route 79 in the vicinity of Hemet and San Jacinto from Ramona Expressway to Domenigoni Parkway |
Realignment and environmental studies |
|
Riv. Co. Trans. Comm |
Evita Premdas |
05/16/2006: Mail Received (Route 79-Request for Authorization) -view comment history- |
0 |
HP21L-6054 (015)
|
RIV | State Route 79 in the vicinity of Hemet and San Jacinto from south of Domenigoni Parkway to Gilman Springs Road |
Realignment and environmental studies |
|
RCTC |
Savat Khamphou |
08/21/2012: Mail Received (FHWA's Final Voucher) -view comment history- |
0 |
CMLN-6054 (016)
|
RIV | In Riverside County on SR 60 from I-215 to Redlands Blvd and Perris Blvd @ SR 60 |
HOV lanes |
|
RCTC |
Evita Premdas |
12/20/2007: Mail Received (CWA) -view comment history- |
0 |
RPSTPL-6054 (018)
|
RIV | VARIOUS---MONITOR CALL BOX TRAFFIC |
Traffic Related - Other |
|
RCTC |
Evita Premdas |
No comments |
0 |
FSP01-6054 (019)
|
RIV | IN RIVERSIDE COUNTY ON VARIOUS STATE ROUTES |
Freeway Service Patrol |
|
RCTC |
Evita Premdas |
No comments |
0 |
FSP01-6054 (019)
|
RIV | IN RIVERSIDE COUNTY ON VARIOUS STATE ROUTES |
Freeway Service Patrol |
|
RCTC |
Evita Premdas |
No comments |
0 |
FTACML-6054 (020)
|
RIV | San Jacinto Branch Line from Riverside to Perris |
Preliminary engineering |
|
Riv. Co. Trans. Comm |
Evita Premdas |
No comments |
0 |
FTACML-6054 (020)
|
RIV | San Jacinto Branch Line from Riverside to Perris |
Preliminary engineering |
|
Riv. Co. Trans. Comm |
Evita Premdas |
No comments |
0 |
STPL-6054 (022)
|
RIV | IN WESTERN RIVERSIDE COUNTY AT PEDLEY METROLINK STATION |
CONSTRUCT PLATFORM EXTENSION |
|
RCTC |
Evita Premdas |
No comments |
0 |
CML-6054 (024)
|
RIV | IN WESTERN RIVERSIDE COUNTY AT PEDLEY STATION |
CONSTRUCT SECURITY ENHANCEMENTS |
|
RCTC |
Evita Premdas |
06/22/2007: Mail Received (Eight and Final Invoice) -view comment history- |
0 |
X01-6054 (026)
|
RIV | State Match Exchange 2000/01 for Riverside County Transportation |
State Match Exchange 00-01 |
|
Riv. Co. Trans. Comm |
Evita Premdas |
No comments |
0 |
X01-6054 (026)
|
RIV | State Match Exchange 2000/01 for Riverside County Transportation |
State Match Exchange 00-01 |
|
Riv. Co. Trans. Comm |
Evita Premdas |
No comments |
0 |
PPM02-6054 (028)
|
RIV | Riverside County Transportation Commission |
Planning,Programming and Monitoring |
|
RCTC |
Evita Premdas |
No comments |
0 |
FSP-6054 (029)
|
RIV | State Routes 60, 91 & 215 in Riverside County |
Freeway Service Patrol FY - 2001/2002 |
|
RCTC |
Evita Premdas |
No comments |
0 |
PPM03-6054 (030)
|
RIV | Riverside County Transportation Commission |
Planning, programming and monitoring |
|
RCTC |
Evita Premdas |
No comments |
0 |
RPL-6054 (031)
|
RIV | Regional rideshare program for FY 2001-2002 |
Rideshare |
|
Riv. Co. Trans. Comm |
Evita Premdas |
No comments |
0 |
RPL-6054 (031)
|
RIV | Regional rideshare program for FY 2001-2002 |
Rideshare |
|
Riv. Co. Trans. Comm |
Evita Premdas |
No comments |
0 |
FSP03-6054 (032)
|
RIV | State Routes 60, 91, & 215 in Riverside County |
Freeway Service Patrol FY 2002-2003 |
|
RCTC |
Evita Premdas |
No comments |
0 |
RPL-6054 (033)
|
RIV | State Route 79 in the vicinity of Hemet and San Jacinto from Ramona Expressway to Domenigoni Parkway |
Realignment and environmental studies |
|
Riv. Co. Trans. Comm |
Savat Khamphou |
No comments |
0 |
RPL-6054 (035)
|
RIV | Regional rideshare program for FY 2002-2003 |
Rideshare |
|
Riv. Co. Trans. Comm |
Evita Premdas |
No comments |
0 |
PPM04-6054 (036)
|
RIV | Riverside County Transportation Commission |
Planning, programming, and monitoring |
|
Riv. Co. Trans. Comm |
Evita Premdas |
No comments |
0 |
CETAP03-6054 (037)
|
RIV | Cajalco Road-Ramona Expressway corridor |
Community & Environmental Transportation Acceptability Process |
|
RCTC |
Evita Premdas |
No comments |
0 |
FSP04-6054 (038)
|
RIV | State Routes 60, 91, & 215 in Riverside County |
Freeway Service Patrol FY 2003-2004 |
|
RCTC |
Evita Premdas |
11/14/2005: Mail Received (Final Invoice) -view comment history- |
0 |
STPL-6054 (039)
|
RIV | Riverside County region south of SR 91, west of I-15, and north of SR 74 |
Major Investment Studies |
|
RCTC |
Evita Premdas |
09/22/2006: Mail Received (Final Invoice for SR91 west of I-15 and north of SR74) -view comment history- |
0 |
PPM05-6054 (040)
|
RIV | throughout Riverside County |
planning, programming, and monitoring program |
|
RCTC |
Evita Premdas |
07/20/2005: Mail Received (Progress invoice for the amount of $ 46,451.27.) -view comment history- |
0 |
FSP05-6054 (041)
|
RIV | State Routes 60, 91, and 215 in Riverside County |
Freeway Service Patrol FY 2004-2005 |
|
RCTC |
Evita Premdas |
No comments |
0 |
PPM06-6054 (042)
|
RIV | Throughout Riverside County |
Planning, programming, and monitoring program |
|
RCTC |
Evita Premdas |
08/11/2005: Mail Received (Program Supplement for 20005/06 PPM Program) -view comment history- |
0 |
FSP06-6054 (043)
|
RIV | Routes 60, 91, and 215 in Riverside County |
Freeway Service Patrol for FY 2005-2006 |
|
RCTC |
Evita Premdas |
No comments |
0 |
PPM07-6054 (044)
|
RIV | Throughout Riverside County |
Planning, programming, and monitoring program |
|
Riv. Co. Trans. Comm |
Savat Khamphou |
08/07/2006: Mail Received (Fund allocation letter) -view comment history- |
0 |
CMLN-6054 (045)
|
RIV | Junction of I-215 and SR 60 from Fair Isle Drive to Day Street |
Reconstruct interchange and new HOV lane direct connectors |
|
Riv. Co. Trans. Comm |
Evita Premdas |
09/25/2015: Mail Received (Invoice 17, final, 1 original, 2 copies.) -view comment history- |
1 |
DEM05L-6054 (046)
|
RIV | Various highway alignments between Orange and Riverside Counties |
Highway alternatives studies |
|
RCTC |
Evita Premdas |
08/21/2012: Mail Received (FHWA's Final Voucher) -view comment history- |
0 |
HPLUL-6054 (047)
|
RIV | Various highway alignments between Orange and Riverside Counties |
Highway alternatives studies |
|
RCTC |
Evita Premdas |
08/21/2012: Mail Received (FHWA's Final Voucher) -view comment history- |
0 |
HPLUL-6054 (048)
|
RIV | Various highway alignments between Orange and Riverside Counties |
Highway alternatives studies |
|
RCTC |
Evita Premdas |
08/23/2012: Mail Received (FHWA's Final Voucher) -view comment history- |
0 |
HP21L-6054 (049)
|
RIV | State Route 91 and Green River Road interchange |
Reconstruct interchange |
|
RCTC |
Evita Premdas |
No comments |
0 |
FSP07-6054 (050)
|
RIV | State Routes 60, 91, and I-215 in Riverside County |
Freeway Service Patrol for FY 2006-2007 |
|
Riv. Co. Trans. Comm |
Evita Premdas |
No comments |
0 |
STPL-6054 (051)
|
RIV | WESTERN RIVERSIDE COUNTY |
PROMOTE REGIONAL RIDESHARING AND TRIP REDUCTION PROGRAMS |
|
Riv. Co. Trans. Comm |
Evita Premdas |
06/05/2018: Progress Invoice No. 43 and FINAL (FROE) - Received, Processed, and sent to HQ LPA -view comment history- |
2 |
FTACML-6054 (052)
|
RIV | FTA Transfer: Construct Parking structure at North Main Corona Metrolink Station |
North Main St/East Grand Blvd at Corona North Main Metrolink
FTA GRANT CA-95-X031
Construct a new 1,000 parking structure and CCTV/Security Enhancement |
|
Riv. Co. Trans. Comm |
Evita Premdas |
05/29/2012: Mail Received (Request for deobligation CMAQ funds) -view comment history- |
0 |
FSP08-6054 (053)
|
RIV | State Routes 60, 91, and I-215 in Riverside County |
Freeway Service Patrol for FY 2007-2008 |
|
Riv. Co. Trans. Comm |
Evita Premdas |
No comments |
0 |
HPLUL-6054 (054)
|
RIV | State Route 79 in the vicinity of Hemet and San Jacinto from south of Domenigoni Parkway to Gilman Springs Road |
Realignment and environmental studies |
|
Riv. Co. Trans. Comm |
Evita Premdas |
12/16/2019: Mail Received (aka 6054(055); PE>10 Status Report; 1 original, 0 copy.) -view comment history- |
0 |
HPLUL-6054 (055)
|
RIV | State Route 79 in the vicinity of Hemet and San Jacinto from south of Domenigoni Parkway to Gilman Springs Road |
Realignment and environmental studies |
|
Riv. Co. Trans. Comm |
Evita Premdas |
01/26/2018: In the PE>10 projects list.
Keta submitted time extension requests to FHWA. Still waiting for their reply. -view comment history- |
0 |
FTASTPLE-6054 (056)
|
RIV | Perris Multimodal Transit Center Phase 1 |
Transit Center |
|
Riv. Co. Trans. Comm |
Evita Premdas |
No comments |
0 |
PPM08-6054 (057)
|
RIV | Throughout Riverside County |
Planning, programming, and monitoring |
|
Riv. Co. Trans. Comm |
Evita Premdas |
No comments |
0 |
CMLN-6054 (058)
|
RIV | State Route 91 from Adams Street to the SR 60/91/215 interchange |
HOV lanes |
|
Riv. Co. Trans. Comm |
Evita Premdas |
04/06/2022: Spreadsheet which represents 70 Local Federal and State Projects including 6054(058) were final vouchered and sent to FHWA during the month of March 2022.
Local Final Vouchering South Section closed this project on March 8, 2022. -view comment history- |
1 |
FTASTPL-6054 (059)
|
RIV | San Jacinto Branch Line from Riverside to Perris |
Preliminary engineering to rehabilitate 19 miles of rail line for passenger service |
|
Riv. Co. Trans. Comm |
Evita Premdas |
No comments |
0 |
FSP09-6054 (060)
|
RIV | State Routes 60, 91, and I-215 in Riverside County |
Freeway Service Patrol for FY 2008-2009 |
|
Riv. Co. Trans. Comm |
Evita Premdas |
04/21/2010: Mail Received (Progress billing) -view comment history- |
0 |
PPM09-6054 (061)
|
RIV | Throughout Riverside County |
Planning, programming, and monitoring |
|
Riv. Co. Trans. Comm |
Evita Premdas |
10/06/2011: Invoice #7 to HQ -view comment history- |
1 |
FSP10-6054 (062)
|
RIV | State Routes 60, 91, and I-215 in Riverside County |
Freeway Service Patrol for FY 2009-2010 |
|
Riv. Co. Trans. Comm |
Evita Premdas |
No comments |
0 |
STPESPLN-6054 (063)
|
RIV | RIV-215/74 INTERCHANGE MODIFICATION
IN THE CITY OF PERRIS IN RIVERSIDE COUNTY |
Modify I-215/SR74 Interchange |
|
Riv. Co. Trans. Comm |
Evita Premdas |
09/02/2016: HQ Accounting received Final Invoice Package, processed and sent to SCO for payment on 05/27/2016. -view comment history- |
0 |
HP21LN-6054 (066)
|
RIV | At SR91/71 JCT: Replace EB 91 to NB 71 Connector w/ direct fly-over connector, and reconstruct the Green River road EB on-ramp
(EA: 0F541) DEMO CA063, TEA21 ID#1105 & 95 APP ACT |
Refer to CAPITAL EA 08-0F541.
Use Advantage Project ID# 0800000137L1-N. DEMO ID #063, TEA21 ID #1105 and 95 APP ACT.
Road Reconstruction |
|
Riv. Co. Trans. Comm |
Evita Premdas |
08/11/2023: in the new WPS -view comment history- |
2 |
FSP14-6054 (067)
|
RIV | State Routes 60, 91, I-15, and I-215 in Riverside County |
Freeway Service Patrol for FY 13-14 |
|
Riv. Co. Trans. Comm |
Evita Premdas |
No comments |
0 |
FSP15-6054 (068)
|
RIV | State Routes 60, 91, I-15, and I-215 in Riverside County |
Freeway Service Patrol for FY 2014-2015 |
|
Riv. Co. Trans. Comm |
Evita Premdas |
08/11/2023: in the new WPS -view comment history- |
0 |
PPM11-6054 (069)
|
RIV | Throughout Riverside County |
Planning,Programming and Monitoring |
|
Riv. Co. Trans. Comm |
Evita Premdas |
09/20/2013: Mail Received (Final Invoice, NOTE: Addressed to Patrick Hally, NO Mail Station ) -view comment history- |
0 |
FSP12-6054 (070)
|
RIV | State Routes 60, 91, I-15, and I-215 in Riverside County |
Freeway Service Patrol for FY 11-12 |
|
Riv. Co. Trans. Comm |
Evita Premdas |
No comments |
0 |
PPM15-6054 (071)
|
RIV | Throughout Riverside County |
Planning, programming, and monitoring |
|
Riv. Co. Trans. Comm |
Evita Premdas |
12/05/2017: Closed date in Local Final Vouchering North and South Sections is 11/07/2017. -view comment history- |
0 |
STPLN-6054 (072)
|
RIV | On I-215, from Blaine St SB off-ramp to 0.3 miles south of Martin Luther King Blvd Undercrossing |
Extend the southbound number 4 lane from SB Blaine Street exit ramp to 0.3 mile south of Martin Luther King Blvd undercrossing in the City of Riverside. This project is on State Highway with EA 0N890 and project ID080002, and CTIPS ID 20940003800. This project will follow streamlined oversight process (SOP). It will use $230,000 Toll Credit to match STP Local funds in construction |
|
Riv. Co. Trans. Comm |
Evita Premdas |
04/20/2015: Mail Received (HQ to Dist 8, Final Voucher, 1 copy, 0 originals) -view comment history- |
0 |
FTACML-6054 (073)
|
RIV | Perris Valley Line Commuter Rail Extension from Riv to Perris |
Reconstruct & upgrade San Jacinto Branch line for rail passenger service (Riverside to Perris) (Perris Valley Line) (FY 07 5307) (UZA: Riv-San) ($330 toll credits to match CMAQ in cons FY 12/13; $865 toll credits to partially match CMAQ ($7,543) in cons FY 13/14; and $6,076 toll credits to match STP-RIP in cons FY12/13)). |
|
Riv. Co. Trans. Comm |
Leslie Avila |
03/23/2015: Mail Received (Progress Invoice 1, 1 original, 2 copies) -view comment history- |
0 |
STPL-6054 (074)
|
RIV | Downtown Riverside and Pedley Transit Station Improvements |
TEA - Other
The STIP-TE is in the amount of $ 1,113 and $ 128 Toll Credit will be utilized to satisfy the local match requirement in FY
2012/2013. |
|
Riv. Co. Trans. Comm |
Evita Premdas |
12/02/2019: Mail Received (Inactive Project: FROE, Final Invoice (No. 6; CON & CE)) -view comment history- |
4 |
PPM13-6054 (075)
|
RIV | Throughout Riverside County |
Planning, programming, and monitoring |
|
Riv. Co. Trans. Comm |
Evita Premdas |
09/25/2015: Mail Received (Invoice 13, final invoice, 1 original, 2 copies.) -view comment history- |
0 |
PPM14-6054 (076)
|
RIV | Throughout Riverside County |
Throughout Riverside County |
|
Riv. Co. Trans. Comm |
Evita Premdas |
09/02/2016: HQ Accounting received, processed and sent to SCO for payment on 05/28/2016. -view comment history- |
0 |
FTACML-6054 (077)
|
RIV | In Western Riverside County - Perrris Valley Line |
FTA Transfer #CA-95-X339. Sec. 5307-3 FTA grant programmed for FY 14-15 under SCAG FTIP RIV150601 in Amendment #9 approved on 8/04/15 to SCAG's 2015 FTIP to the Riverside County Transportation Commission (RCTC) under FTACML-6054(077), Advantage ID 0816000017, for five years of operating assistance for the Perris Valley commuter passenger service from the City of Riverside to the City of Perris. No CTIPS ID assigned yet. Use $11,300,000 of M400 and $8,700,000 of M40E CMAQ funds as transfer funds and applying $2,294,000 in toll credits in lieu of non-federal matching funds to achieve 100% federal reimbursement. Air basin is South Coast. |
|
Riv. Co. Trans. Comm |
Leslie Avila |
08/11/2023: in the new WPS -view comment history- |
0 |
FSP16-6054 (078)
|
RIV | State Routes 60, 91, I-15, and I-215 in Riverside County |
Freeway Service Patrol for FY 2015-2016 |
|
Riv. Co. Trans. Comm |
Evita Premdas |
09/02/2016: Fully Executed Freeway Service Patrol Agreement for FY 2015/2016. -view comment history- |
0 |
PPM16-6054 (079)
|
RIV | Throughout Riverside County |
Planning, programming, and monitoring |
|
Riv. Co. Trans. Comm |
Evita Premdas |
06/07/2018: Mail Received (Progress Invoice No. 2 (PE) 1 Original, 2 Copies) -view comment history- |
0 |
FSP17-6054 (080)
|
RIV | staff will input. Sean 4/27/2017 |
staff will input. Sean 4/27/2017 |
|
Riv. Co. Trans. Comm |
Evita Premdas |
04/27/2017: Mail Received (PSA, fully executed, 1 copy, 0 original.) -view comment history- |
0 |
CMSTPLN-6054 (081)
|
RIV | I-15 from Cajalco Road to State Route 60 |
Construct toll express lanes in each direction |
|
Riv. Co. Trans. Comm |
Evita Premdas |
08/11/2023: in the new WPS -view comment history- |
0 |
HP21STPL-6054 (082)
|
RIV | In the City of Riverside - SR 91 HOV remnant work: complete the remaining work from the SR91 HOV associated to the UPRR line along Pachappa Underpass |
In the City of Riverside - SR 91 HOV remnant work: complete the remaining work from the SR91 HOV associated to the UPRR line along Pachappa Underpass, pave the full structure section of WB 91 Aux. Lns and shoulder from Sta 340+32 to Sta 342+50 (218 ft) & CONS full structure section for the 2nd right turn lane of Mission Inn WB Exit Ramp (EA 44843) - TC Utiliz $1,554 to match Con in FY 17. |
|
Riv. Co. Trans. Comm |
Evita Premdas |
08/11/2023: in the new WPS -view comment history- |
0 |
PPM17-6054 (083)
|
RIV | Throughout Riverside County |
Planning, Programming and Monitoring |
|
Riv. Co. Trans. Comm |
Evita Premdas |
01/29/2019: Mail Received (FROE; 1 original, 2 copies.) -view comment history- |
0 |
FSP18-6054 (084)
|
RIV | throughout Riverside County |
Freeway Service Patrol for FY 2017/2018 |
|
Riv. Co. Trans. Comm |
Evita Premdas |
01/16/2019: FROE per Jessica Change was incomplete. Note no mail log entry was entered = NO MAIL RECEIVED.
Evita advised Jessica to reject ALL invoices sent directly to HQ LPA without the District's review, signature, and recommendation for payment. -view comment history- |
0 |
SB132L-6054 (085)
|
RIV | SB132: Hamner Avenue over the Santa Ana River near Norco, Br. No. 56C-0446 |
Bridge replacement from two to six lanes |
|
Riv. Co. Trans. Comm |
Albert Vergel de Dios |
08/11/2023: in the new WPS -view comment history- |
0 |
SB132L-6054 (086)
|
RIV | SB132: Jurupa Road over Van Buren Boulevard and the Union Pacific Railroad tracks in the City of Jurupa Valley |
New overhead |
|
Riv. Co. Trans. Comm |
Evita Premdas |
08/11/2023: in the new WPS -view comment history- |
0 |
PPM18-6054 (087)
|
RIV | Throughout Riverside County |
planning, programming, and monitoring |
|
Riv. Co. Trans. Comm |
Evita Premdas |
10/11/2019: Mail Received (invoice 4 (final); 1 orignal, 2 copies.) -view comment history- |
0 |
LPPSB1L-6054 (088)
|
RIV | SR 91/ SR 71 Interchange (NB Rt 71 to EB Rt 91) |
Reconstruct Interchange - PA&ED Revalidation; |
|
Riv. Co. Trans. Comm |
Evita Premdas |
03/23/2018: Mail Received (Exhibit 23-0 Request for Funding Allocation LPP Project (Environmental Studies & Permits= $2,000,000)) -view comment history- |
0 |
CMLN-6054 (090)
|
RIV | State Route 60 from Gilman Springs Road to 1.37 miles west of Jack Rabbit Trail |
Eastbound truck-climbing and westbound truck-descending lanes |
|
Riv. Co. Trans. Comm |
Evita Premdas |
08/11/2023: in the new WPS -view comment history- |
0 |
PPM19-6054 (092)
|
RIV | Throughout Riverside County |
Planning,Programming and Monitoring |
|
Riv. Co. Trans. Comm |
Evita Premdas |
08/11/2023: in the new WPS -view comment history- |
0 |
SB132L-6054 (093)
|
RIV | SB132: McKinley Grade Separation |
McKinley Grade Separation |
|
Riv. Co. Trans. Comm |
Evita Premdas |
08/11/2023: in the new WPS -view comment history- |
0 |
CMLN-6054 (094)
|
RIV | I-15 EXPRESS LANES SOUTHERN EXTENSION FROM CAJALCO RD. (CORONA) TO APPROXIMATELY SR-74 (PM 22.3) (LAKE ELSINORE) (PPNO 3009X). TC TO MATCH CMAQ. |
HOT LANE(S) IMPROVEMENTS/EXPANSION - RS |
|
Riv. Co. Trans. Comm |
Evita Premdas |
08/11/2023: in the new WPS -view comment history- |
0 |
STPLN-6054 (098)
|
RIV | FROM 1.0 MI E/O GYPSUM CANYON ROAD IN ORANGE COUNTY TO 0.4 MI W/O GREEN RIVER ROAD IN RIVERSIDE COUNTY |
ADD A WESTBOUND LANE TO SR-91 BETWEEN GREEN RIVER ROAD AND SR-241 |
|
Riv. Co. Trans. Comm |
Evita Premdas |
08/11/2023: in the new WPS -view comment history- |
0 |
PPM21-6054 (099)
|
RIV | Throughout Riverside County |
Planning,Programming and Monitoring |
|
Riv. Co. Trans. Comm |
Evita Premdas |
08/11/2023: in the new WPS -view comment history- |
1 |
FSP21-6054 (100)
|
RIV | to be completed by staff. Sean 1/6/2021. |
to be completed by staff. Sean 1/6/2021. |
|
Riv. Co. Trans. Comm |
Evita Premdas |
08/11/2023: in the new WPS -view comment history- |
0 |
STBGL-6054 (101)
|
RIV | Project Limits At Future MCP Alignment Redlands Ave to Evans Road |
Mid County Parkway (MCP) Phase 2 - In the City of Perris and portions of unincorporated Riverside County: Construct 3-4 lanes (1-2 WB lns &2 EB lns) on future MCP alignment btwn Redlands Ave & future Antelope Rd (TC Utilization for 20/21 STBG). |
|
Riv. Co. Trans. Comm |
Evita Premdas |
08/11/2023: 1in the new WPS -view comment history- |
0 |
FSP21SB1-6054 (102)
|
RIV | to be completed by staff. Sean, 1/6/2021. |
to be completed by staff. Sean, 1/6/2021. |
|
Riv. Co. Trans. Comm |
Evita Premdas |
08/11/2023: in the new WPS -view comment history- |
0 |
CMLN-6054 (103)
|
RIV | Smart Freeways Demonstration Project |
City of Temecula on I-15 NB from San Diego County line to I-15/I-215 split on Rancho California Road,
Temecula Parkway, and Winchester Road ramps |
|
Riv. Co. Trans. Comm |
Evita Premdas |
08/11/2023: in the new WPS -view comment history- |
0 |
FSP22-6054 (105)
|
RIV | to be completed by staff. Sean, 10/15/2021. |
to be completed by staff. Sean, 10/15/2021. |
|
Riv. Co. Trans. Comm |
Evita Premdas |
08/11/2023: in the new WPS -view comment history- |
0 |
PPM22-6054 (106)
|
RIV | Throughout Riverside County |
Planning,Programming and Monitoring |
|
Riv. Co. Trans. Comm |
Evita Premdas |
08/11/2023: in the new WPS -view comment history- |
0 |
FSP22SB1-6054 (107)
|
RIV | Freeway Service Patrol |
Freeway Service Patrol: Riverside County Transportation Commission 2021/2022 |
|
Riv. Co. Trans. Comm |
Evita Premdas |
08/11/2023: in the new WPS -view comment history- |
0 |
PPM23-6054 (108)
|
RIV | The location is throughout Riverside County for countywide planning, programming, and monitoring |
Planning, Programming and Monitoring FY 22/23 STIP |
|
Riv. Co. Trans. Comm |
Evita Premdas |
08/11/2023: in the new WPS -view comment history- |
0 |
PPMCRR23-6054 (109)
|
RIV | The location is throughout Riverside County for countywide planning, programming, and monitoring |
planning, programming, and monitoring |
|
Riv. Co. Trans. Comm |
Evita Premdas |
08/11/2023: in the new WPS -view comment history- |
0 |
PPM24-6054 (113)
|
RIV | Planning, Programming and Monitoring FY 23/24 STIP |
Planning, Programming and Monitoring |
|
Riv. Co. Trans. Comm |
Evita Premdas |
08/11/2023: in the new WPS -view comment history- |
0 |
DELETE THIS-6054 (999)
|
RIV | |
Riv. Co. Trans. Comm |
Evita Premdas |
No comments |
0 |
SB99-6070 (001)
|
RIV | |
Adelanto (Adel) |
Ayda Homsi |
No comments |
0 |
ATPLNI-6078 (011)
|
VAR | Santa Ana River Trail and Parkway, in Orange, Riverside, and San Bernardino Counties. |
Increasing Active Transportation Use of the Santa Ana River
Trail and Parkway |
|
California Coastal Conservancy |
Evita Premdas |
09/06/2016: Mail Received (Deprogramming of ATP Grant 1 original) -view comment history- |
0 |
STPL-6107 (001)
|
RIV | Regional Mobility Plan |
Regional Mobility Plan |
|
WRCOG |
Eric Tang |
No comments |
0 |
CML-6107 (007)
|
RIV | Air Quality Implementation Strategies |
Air Quality Implementation Strategies |
|
Western Riv. Council of Gov't |
Marcos Amancio |
No comments |
0 |
CML-6107 (011)
|
RIV | In Riverside County |
Develop Clean Air Cities Coalition |
|
Western Riv. Council of Gov't |
Marcos Amancio |
10/19/2005: Mail Received (Federal Report of Expenditures
Clean Cities Program) -view comment history- |
0 |
ATPLNI-6107 (012)
|
RIV | Western Riverside County Sub Regional Active Transportation Plan |
Active Transportation Plan |
|
Western Riv. Council of Gov't |
Evita Premdas |
11/28/2018: Mail Received (Final Invoice 1 original, 2 copies; and Active Transpo PLAN (2 copies) -hand delivered) -view comment history- |
0 |
STPL-6164 (002)
|
RIV | PM-10, Street Mgt 94/95 |
Engineer to Update |
|
CVAG - Coachella Valley Association of Governments |
Evita Premdas |
07/19/2005: Mail Received (Morongo Creek Blowsand Reduction Impromements letter) -view comment history- |
0 |
STPL-6164 (007)
|
RIV | IN COACHELLA VALLEY REGION OF RIVERSIDE COUNTY |
2020 PLANNING STUDY |
|
CVAG |
Henry Lam |
12/06/2006: Mail Received (final voucher) -view comment history- |
0 |
CML-6164 (009)
|
RIV | In Riverside County in the Coachella Valley Area (valley wide) at various locations |
PM-10 soil stabilization |
|
CVAG - Coachella Valley Association of Governments |
Evita Premdas |
06/26/2006: Mail Received (Federal Aid Final Invoice) -view comment history- |
0 |
CML-6164 (010)
|
RIV | In Riverside County in the Coachella Valley Region |
PM-10 Control Measures (97-98-TEA 21) |
|
CVAG - Coachella Valley Association of Governments |
Evita Premdas |
No comments |
0 |
CML-6164 (011)
|
RIV | Coachella Valley Region of Riverside County |
Miscellaneous - Other |
|
CVAG - Coachella Valley Association of Governments |
Evita Premdas |
06/28/2006: Mail Received (Federal Report of Expenditures
Awarded Project) -view comment history- |
0 |
CML-6164 (012)
|
RIV | In Riverside County in the Coachella Valley Region |
Road Related - Other |
|
CVAG |
Henry Lam |
06/02/2008: Mail Received (Report of Expenditures) -view comment history- |
0 |
CML-6164 (013)
|
RIV | Coachella Valley----"Preserve System" |
PM-10 Windbreaks |
|
CVAG - Coachella Valley Association of Governments |
Evita Premdas |
No comments |
0 |
CML-6164 (014)
|
RIV | Coachella Valley Region |
PM-10 paving and R/W mitigation measures |
|
CVAG - Coachella Valley Association of Governments |
Evita Premdas |
No comments |
0 |
CML-6164 (016)
|
RIV | Coachella Valley Region |
PM-10 Clean Streets Management |
|
CVAG - Coachella Valley Association of Governments |
Evita Premdas |
04/13/2010: Mail Received (final voucher) -view comment history- |
0 |
CML-6164 (017)
|
RIV | Coachella Valley Region |
Windbreaks and windfences |
|
CVAG - Coachella Valley Association of Governments |
Evita Premdas |
02/21/2017: 02/21/2017 Project archived in D8 Database, project file purged on 7/7/2015. -view comment history- |
0 |
CML-6164 (018)
|
RIV | Coachella Valley Region |
PM-10 paving |
|
CVAG |
Henry Lam |
10/31/2007: Mail Received (Federal Aid Invoice) -view comment history- |
0 |
CML-6164 (020)
|
RIV | Various locations within the Coachella Valley Fringe Lizard Preserve |
Installation of wind fencing,dewatering and other incidental work |
|
CVAG - Coachella Valley Association of Governments |
Evita Premdas |
04/04/2008: Mail Received (Final Voucher) -view comment history- |
0 |
CML-6164 (021)
|
RIV | In Eastern Riverside County (3 Corridors): Highway 111, Washington Street, Ramon Road |
Signal Synchronization (including signal upgrades, communication systems, hardware and software). |
|
CVAG - Coachella Valley Association of Governments |
Evita Premdas |
02/10/2023: Mail Received (Progress Invoice No.10B; Received 02/06/2023) -view comment history- |
1 |
ATPL-6164 (022)
|
RIV | CV LINK: From City of Palm Springs to City of Coachella: In Eastern Riverside County for CVAG (PA&ED only - per 02/03/2014 etp) |
Construct New 52 Mile Bicycle, Pedestrian And Low Speed Electrical Vehicle Path |
|
CVAG - Coachella Valley Association of Governments |
Evita Premdas |
01/27/2023: Mail Received (Financial Plan Annual Update; Received 01/24/2023) -view comment history- |
38 |
RPSTPL-6164 (023)
|
RIV | n Eastern Riverside Co. in the Coachella Valley along the Whitewater River Storm Drain Channel from Palm Springs to Coachella. |
PPNO 1226 | ADV ID 0820000078
Construct in phases a new bicycle, Ped. and Low Speed Electrical Vehicle path. Ph. 1 will construct a 44.11 mile link from Palm Springs to
Coachella. Funding requested under this authorization is for Segment 1, a 13.47 mi. bike/pedestrian/low speed electric vehicle path along the
Whitewater River Storm Drain Channel from the City of Palm Springs to Coachella (Segment 1 of Phase 1). |
|
CVAG - Coachella Valley Association of Governments |
Leslie Avila |
05/02/2023: Mail Received (Progress Invoice No.8; Received 04/26/2023) -view comment history- |
0 |
CML-6164 (024)
|
RIV | Eastern Riverside County (18 Corridors): Monterey, Cook, Palm Dr, Bob Hope, Fred Waring, Dinah Shore, Gene Autry, Date Palm, Indio Blvd, Jefferson, Palm Canyon, Vista Chino, Country Club, Monroe, Ave 48, Sunrise, Indian Cyn, and Jackson. |
Include signal upgrades, communication systems, hardware and software. |
|
CVAG - Coachella Valley Association of Governments |
Leslie Avila |
01/03/2023: Mail Received (Award Package; Received 1/3/2023) -view comment history- |
1 |
FTASTPLE-6165 (010)
|
RIV | Fueling station in Hemet at 700 Sacramella Circle |
CNG fueling station |
|
RTA |
Danette Silva |
No comments |
0 |
FTACML-6165 (011)
|
RIV | Transit facility at 1825 Third Street, Riverside, California |
CNG fueling station upgrade |
|
RTA |
Danette Silva |
No comments |
0 |
FTACML-6165 (012)
|
RIV | Throughout Riverside County - FTA Grant #CA-95-X269 |
FTA CMAQ Transfer request from Riverside Transit Agency (RTA). Adv. Draft ID: 0814000230
FTA Transfer Grant #CA-95-X269; Section 5307 with $4,125,000 of CMAQ funds, FTIP ID Riv151212 - Purchase and installation of Intelligent Transportation System (ITS) for Transit.
The system will provide tools for improved fleet management to promote operations efficiency, enhance service planning and evaluation and provide real-time vehicle location and departure information to the public.
SCAG concurs with the request from RTA to use the EPSP for $4,125,000 in CMAQ funds programmed in FY15/16 for FTIP Project Riv151212 for early obligation in FY13/14. This project is in approved 2013 FTIP, amendment #13-17.
Use M400 funds as transfer funds. |
|
Riv. Transit Authority |
David Lee |
06/19/2014: Request approved by FHWA HQ (DC), June 16, 2014. -view comment history- |
0 |
FTACML-6165 (013)
|
RIV | In Western Riverside County for RTA |
Implementation of limited stop service along Route 1; purchase of 14 new buses (40ft).
FTA CMAQ Transfer, Pending FTA Grant Number CA-95-X296, Section 5307; CMAQ Funds $9,211,800 FFY15/16, 2013 FTIP Amendments 1-9 Project ID RIV151211. Use of EPSP is approved.
Adv. Draft ID: 0815000021 |
|
Riv. Transit Authority |
David Lee |
08/21/2014: Transfer request was approved by FHWA (DC) -view comment history- |
0 |
FTACML-6187 (008)
|
LA | |
Southern California Regional Rail Authority |
Leslie Avila |
No comments |
0 |
STPLER-6190 (009)
|
SBd | Hiking trail construction at various locations between Rouse House Road and SR 138 - Phase 2 |
Hiking trail construction |
|
United States Forest Service |
Ramiro Martinez |
04/28/2006: Mail Received (Construct of 44 miles of non-motorized multiple use trail between Big Bear Lake and Lake Silverwoood, San Bernardino National Forest.) -view comment history- |
0 |
CASB07-6190 (023)
|
SBd | Palms to Pines Scenic Byway along State Routes 74 and 243 from Interstate 10 to State Route 111 |
Corridor Management Plan |
|
U. S. Forest Service, Pacific SW Region |
Sean Yeung |
01/12/2015: Mail Received (Final Voucher stamped by Local Programs Accounting on 9/22/2014) -view comment history- |
0 |
CML-6199 (002)
|
SBd | Various locations in the Mojave Desert Air Basin |
Cleaner heavy-duty engines incentives |
|
MDAQMD |
Ayda Homsi |
01/05/2007: Mail Received (final voucher) -view comment history- |
0 |
ER-6199 (085)
|
SBd | In the City of San Bernardino, at (3) locations. DAF#'s SKM-SBD-001-0, SKM-SBD-002-0 & SKM-SBD-003-0 |
Restoration/Contract |
|
Riverside |
Harish Rastogi |
No comments |
0 |
AAAAA-6208 (000)
|
SBd | On I-15 from 2.3 miles south to 2.6 miles north of I-15/I-215 Junction and on I-215 from 1.8 mike south to I-15/I-215 Junction. |
I-15/I-215 Interchange improvements-Devore Interchange s/o Glen Helen Parkway I/C, add 1M/F lane in each direction to existing 3 M/F lanes including truck by-pass lanes. |
|
Caltrans |
Carol Green |
No comments |
0 |
STPLEGR-6208 (001)
|
SBd | I-10 Corridor landscaping near Rialto |
Landscaping |
|
Caltrans |
Carol Green |
No comments |
0 |
STPLNER-6208 (003)
|
SBd | I-15 from East Etiwanda Creek Bridge to Cherry Avenue and SR 210 from Etiwanda Avenue to 0.2 kilometers east of Hemlock Avenue |
Landscaping |
|
Caltrans |
Carol Green |
No comments |
0 |
STPLN-6208 (004)
|
SBd | State Route 210 Seg. 5-7 from west of Rochester Avenue to east of Sierra Avenue in Rancho Cucamonga |
Landscaping |
|
Caltrans |
Carol Green |
No comments |
0 |
HP21L-6208 (005)
|
SBd | Along I-10 and SR 60 in Ontario |
Relocate and install airport signing |
|
Caltrans |
Evita Premdas |
No comments |
0 |
CMSTPL-6208 (006)
|
RIV | Routes 60/90/215 interchange and I-215 corridor |
Reconstruct interchange and new HOV lanes and truck climbing lane |
|
Caltrans |
Evita Premdas |
No comments |
0 |
HP21L-6208 (007)
|
RIV | State Route 71 from the San Bernardino County Line to State Route 91 |
Roadway widening |
|
Caltrans |
Evita Premdas |
No comments |
0 |
CMLN-6208 (008)
|
RIV | SR 60 from I-15 to Valley Way in Sunnyslope |
HOV and mixed-flow lanes |
|
Caltrans |
Evita Premdas |
04/22/2013: Mail Received (Final Voucher) -view comment history- |
0 |
CMLN-6208 (009)
|
RIV | SR 91 from Adams Street to the SR 60/91/215 interchange |
HOV lanes |
|
Caltrans |
Evita Premdas |
08/21/2023: in the new WPS -view comment history- |
0 |
CMLN-6208 (010)
|
SBd | I-210 /Beech Avenue Build Park and Ride |
Build Park and Ride Facility-Vine & Beech in Fontana |
|
Caltrans |
Evita Premdas |
07/11/2012: Mail Received (Final Voucher) -view comment history- |
0 |
STPLN-6208 (011)
|
SBd | US-395 - I-15 TO DESERT FLOWER RD |
Widening for 2 to 4 lanes w/2 way left turn lanes |
|
Caltrans |
Evita Premdas |
No comments |
0 |
CMLN-6208 (012)
|
SBd | I-10/I-215 - I-10 P.M. 23.0/34.6 & I-215 0.0/4.03 |
Fiber Optic, Changeable Message Signs, Ramp Metering etc |
|
Caltrans |
Evita Premdas |
08/06/2013: Mail Received (Final Voucher) -view comment history- |
0 |
PNRSCML-6208 (013)
|
SBd | I-215 from the Orange Show Road overcrossing to the Rialto Avenue undercrossing (Segment #3) |
***I-215 CONSTRUCT HOV AND MIXED FLOW LANE |
|
Caltrans |
Evita Premdas |
08/21/2023: in the new WPS -view comment history- |
0 |
CMLN-6208 (014)
|
SBd | SE quadrant of the I-15 / State Route 210 interchange - Civil Work |
Park and ride facility |
|
Caltrans |
Evita Premdas |
06/04/2012: Mail Received (Final Voucher) -view comment history- |
0 |
CML-6208 (015)
|
SBd | SE quadrant of the I-115/State Route 210 Interchange - IETMC |
IETMC |
|
Caltrans |
Evita Premdas |
05/06/2014: Mail Received (FINAL VOUCHER) -view comment history- |
0 |
STPLN-6208 (016)
|
SBd | I-15/I-215 I/C Improvements. Devore IC S/O Glen Helen Parkway to Kenwood & from S/O Devore Road. |
Reconfigure I-15/I-215. Add 1 M/F lane in each direction to existing 3 M/F Lanes. Re-align Route 15 and reconfigure connectors on Route 215. |
|
Caltrans |
Evita Premdas |
08/21/2023: in the new WPS -view comment history- |
0 |
CMLN-6208 (017)
|
RIV | I-215/SR-60 I/C from Box Springs Rd OC to Day St UC |
Construct two HOV lanes at the I-215/SR-60 Interchange |
|
Caltrans |
Evita Premdas |
08/21/2023: in the new WPS -view comment history- |
0 |
CMSTPLN-6208 (018)
|
SBd | Bi-County on Route 91 and Route 215 in Riverside County and San Bernardino County From 0.3 miles south of I-215 /SR-91/SR-60 Grade Separation to 1.1 miles north of I-215/I-10 Grade Separation |
***This FPN (6208 locode) is for PE ONLY. R/W is done by SANBAG under 6053(101).
Construction of a High Occupancy Vehicle (HOV) lane in each direction on Interstate 215 (I-215)/State Route 60 (SR-60)/State Route 91 (SR-91) Grade Separation approximately 7.5 miles of HOV lanes in the existing median with minimal outside widening and barrier replacement. Replacement of underpass for BNSF and UPRR between Iowa Avenue/La Cadena Ave and Barton Interchanges. I-215 bridge widening over UPRR tracks south of I-10. |
|
Caltrans |
Evita Premdas |
08/21/2023: in the new WPS -view comment history- |
0 |
DEM05LN-6208 (019)
|
SBd | ID CA 117: I-10 Tippecanoe from Waterman on-ramp to Tippecanoe off-ramp, |
***Reconfigure I/C & add eastbound off-ramp auxiliary Ln from Waterman on-ramp to Tippecanoe off-ramp, widen bridge (non-capacity), & local rd imp/mod (HP1366) |
|
Caltrans |
Evita Premdas |
07/01/2021: This 6208(019) is among a number of projects for I-10 Tippecanoe.
... -view comment history- |
0 |
HP21LN-6208 (020)
|
SBd | Tippecanoe from Waterman on-ramp to Tippecanoe off-ramp, |
***Reconfigure I/C & add eastbound off-ramp auxiliary Ln. Widen bridge (non-capacity), & local rd imp/mod. CA 180, 2003 section 330. |
|
Caltrans |
Evita Premdas |
10/28/2020: I-Tippecanoe's Deobligation of Excess Earmark has been has been authorized on 10/28/20 -view comment history- |
0 |
HP21LN-6208 (021)
|
SBd | Tippecanoe from Waterman on-ramp to Tippecanoe off-ramp, |
***Reconfigure I/C & add eastbound off-ramp auxiliary Ln. Widen bridge (non-capacity), & local rd imp/mod CA 180 (HPP1336). |
|
Caltrans |
Evita Premdas |
11/16/2021: Mail Received (ROW Adj to include Toll Credit) -view comment history- |
0 |
HP21LN-6208 (022)
|
SBd | Tippecanoe from Waterman on-ramp to Tippecanoe off-ramp, widen bridge (non-capacity), & local rd imp/mod (HP1366) |
***Reconfigure I/C & add eastbound off-ramp auxiliary lane. Local rd imp/mod. (CA 227, 2003 Sect 115). |
|
Caltrans |
Evita Premdas |
12/14/2020: INACTIVE PROJECT: Deobligation of the Excess Earmark was on 10/28/2020 with 6208(020).
6208(020) and 6208(022) will still be in the inactive list.
They need to be Final Vouchered/Closed Out with 6208(019) and (021). -view comment history- |
0 |
DEMO4LN-6208 (023)
|
SBd | City of Grand Terrace. I-215 Barton Road I/C between Iowa I/C and Washington I/C. |
Reconstruct OC and Ramps with partial cloverleaf config NW I-215. Includes add of NB aux lane. Local st widening of Barton Rd. Removal of La Crosse Ave. bet Vivenda and Barton. Realign Commercial Wy. |
|
Caltrans |
Evita Premdas |
09/07/2021: RFA for Cost Adj to add RW Support/Engineering was authorized on 09/02/2021 -view comment history- |
0 |
DEM06UBL-6208 (024)
|
RIV | State Route 60 from Gilman Springs Road to 1.6 miles west of Jack Rabbit Trail |
Eastbound and westbound truck-climbing lanes |
|
Caltrans |
Evita Premdas |
08/23/2023: in the new WPS -view comment history- |
0 |
STPLN-6208 (025)
|
RIV | RIV I-15 Toll Express Lanes (TEL). In Corona from Cajalco Rd to State Route 60 |
Construct 1 or 2 Express Lanes in Each Direction & Install Median Barrier |
|
Caltrans |
Evita Premdas |
05/04/2023: Sequence #5:
... -view comment history- |
0 |
STPL-6208 (027)
|
SBd | US-395 (Hesperia, Victorville & Adelanto) From SR-18 to Chamberlaine Way |
***Interm widening - widen from 2-4 lanes and add left turn channelization at intersections
EA: 0F630
Adv: 0800000144 |
|
Caltrans |
Evita Premdas |
08/16/2019: Sequence #4 was authorized on 08/16/2019. $ 200k 2016 Repurposed Earmark has been authorized. -view comment history- |
0 |
RSTPL-6208 (028)
|
SBd | I-10 at Cedar Avenue Interchange between Slover Avenue and Valley Boulevard. |
Widen Interchange from 4-6 lanes and add auxiliary lane on eastbound entrance and exit ramps. |
|
Caltrans |
Evita Premdas |
03/16/2023: Mail Received (RFA(CE); Received 03/14/23) -view comment history- |
0 |
STPLN-6208 (029)
|
SBd | I-15, "D", "E" St & Stoddard Wells Road Interchanges PM 41.9 to 46.0
EA 3555V = (EA 35556 + 35558) |
Reconstruct D/E/Stoddard Wells Interchanges, widen Victorville seratation overhead, construct new NB collector distibutor bridge over "D", "E" st, & BNSF railroad, widen Mojave River Bridge & construct new west frontage road bridge over Mojave River, upgrade 4.1 mi of the mainline to current roadway standards realign east frontage road, construct new west frontage roadd & add an auxiliary lane & deceleration lane & gateway enhancments and the incorporation of a rock blanket and creative aesthetic retaining walls.
EA |
|
Caltrans |
Harish Rastogi |
04/30/2015: Mail Received ( From Dist.8 PPM, Exhibit 3-H, 1 original, 0 copies) -view comment history- |
0 |
PNRSN-6208 (030)
|
SBd | Segment 1: In San Bernardino County, in the City of San Bernardino from Lytle Creek Channel to 5th Street on I-215. |
Landscape. |
|
Caltrans |
Evita Premdas |
04/20/2017: E-76 rejected. District provided comments to agency for resubmittal. -view comment history- |
0 |
PNRSN-6208 (031)
|
SBd | Segment 3: In San Bernardino County, in the City of San Bernardino from Orange Show Rd overcrossing to Lytle Creek Channel UC. |
Landscape, Segment 3 |
|
Caltrans |
Evita Premdas |
04/06/2017: DLAE signs Exhibit 3-G, Federal Project Log Sheet, DLA OB 11-13, Administering Local Federal-Funded Projects on the State Highway System, and Exhibit 3-H, Request for Capital Subvention Reimbursement Allocation/De-Allocation, for construction... -view comment history- |
0 |
STPN-6208 (032)
|
SBd | I-10 from San Antonio Ave. to I-10/I-15 interchange."I-10 Express" |
I-10 Corridor Express Lane Widening (Contract 1): San Antonio Ave. to I-10/I-15 IC; implement 2 express lanes in each direction for a total of 4 general purpose and 2 express lanes in each direction and aux lane widening, undercrossing, overcrossing, reconstruction of ramps and lane transitions where needed. AMS advantage ID: 0800000040. SANBAG component project: 6053(130). |
|
Caltrans |
Evita Premdas |
10/12/2022: Per Vanessa in a Sept 30 email: "Do we mind holding off on the deobligation of funds in PE for 6208(032)? See below.
Sounds like there are some unknowns now, regarding costs, so may be better to hold off at the moment. "
-view comment history- |
0 |
PNRSLN-6208 (033)
|
SBd | I-215 segment 1: Lytle Creek to 0.05 miles North of 5th St. Overcrossing. |
provide irrigation system insert materials (gravel and boulders) and planting for I-215 in the City of San Bernardino. |
|
Caltrans |
Evita Premdas |
03/21/2023: PED Extension Request - Received, Processed, and authorized in FMIS by FHWA on 03/15/2023 -view comment history- |
0 |
STPLN-6208 (034)
|
RIV | In the City of Riverside on SR91 (PM 18.4 - 20.7) along Pachappa Underpass, the full structure section of WB91 auxiliary lanes and shoulder (218 feet), and full structure section for the second right turn lane of Mission Inn Ave WB exit ramp. |
SR91 HOV Remnant Work: Complete the remaining work from the 91 HOV associated to the Union Pacific Railroad line along Pachappa Underpass, pave the full section of WB91 auxiliary lanes and shoulder from Station 340+32 to 342+50 (218 feet), and construct full structure section for the second right turn lane of Mission Inn Ave WB exit ramp.
|
|
Caltrans |
Evita Premdas |
04/17/2023: 04.17.2023, EPremdas: Sequence 4 is requesting the de-obligation of $3,815,506.15 STBG federal funds in CON to re-obligate the federal funds into project 6054(081) per LAPM 3-A dated 04/03/2023. See reduced Railroad work in the Cost Estimate.... -view comment history- |
0 |
STPLN-6208 (035)
|
SBd | I-10 just east of I-15 to Pepper Avenue in Colton, connecting to the I-10 Corridor Contract 1 express lanes
currently under construction. |
I-10 Corridor Contract 2: Add one Corridor Express Lane in each direction |
|
Caltrans |
Evita Premdas |
07/13/2022: Mail Received (RFA (PE); Received 07/12/2022) -view comment history- |
0 |
FTACML-6235 (006)
|
SBd | IN SAN BERNARDINO COUNTY IN MORONGO VALLEY |
PURCHASE ONE(1) PARATRANSIT VEHICLE CA-1 |
|
MBTA |
Danette Silva |
No comments |
0 |
FTACML-6235 (007)
|
SBd | IN SAN BERNARDINO COUNTY IN MORONGO VALLEY |
PURCHASE ONE(1) PARATRANSIT VEHICLE CA-1 |
|
MBTA |
Danette Silva |
No comments |
0 |
FTACML-6235 (008)
|
SBd | IN SAN BERNARDINO COUNTY IN MORONGO VALLEY |
PURCHASE (3)35FOOT TRANSIT BUSES CA-18-X |
|
MBTA |
Danette Silva |
No comments |
0 |
FTACML-6235 (009)
|
SBd | Morongo Valley and Basin region |
Purchase of three CNG paratransit buses |
|
MBTA |
Danette Silva |
No comments |
0 |
FTACML-6235 (010)
|
SBd | Maintenance facility at Joshua Tree |
Maintenance facility |
|
MBTA |
Danette Silva |
No comments |
0 |
FTACML-6235 (011)
|
RIV | Morongo Valley and Basin region |
Bus Purchase |
|
MBTA |
Danette Silva |
No comments |
0 |
FTACML-6235 (012)
|
RIV | Morongo Valley and Basin region - FTA Grant CA-18-X021 |
Van purchase |
|
MBTA |
Danette Silva |
No comments |
0 |
FTACML-6235 (016)
|
SBd | Morongo Valley and Basin region - FTA Grant CA-85-X004 |
Purchase of 3 31FT CNG Class H Vehicles |
|
Morongo Basin Transit Authority |
David Lee |
No comments |
0 |
FTACML-6235 (017)
|
SBd | Morongo Valley and Basin Region |
Vehicle Replacement: Purchase of one 30 passenger, 33ft CNG Class E bus
FTA Trasfer Grant CA-85-X005 FTP 2011/2012 year Project ID 20040812 the grant is for $134,516 of CMAQ funds |
|
Morongo Basin Transit Authority |
David Lee |
05/07/2012: FTA Transfer to HQ -view comment history- |
0 |
FTACML-6235 (018)
|
SBd | MBTA FTA Grant Number CA-85-X006 |
Replacement Buses: 6 Type 3 Class C, 18 Passenger CNG
Advantage ID #0813000212 |
|
Morongo Basin Transit Authority |
David Lee |
07/15/2013: Transfer approved by FHWA -view comment history- |
0 |
FTACML-6235 (019)
|
SBd | Morongo Basin |
CMAQ FTA Transfer Grant Number CA-85-X010 (FTA Section 5311 (49 U.S.C) Non-Urbanized Formula Assistance Program Fiscal Year 2014-2015). Programmed under #20130601 2015 FTIP Amendment No. 0 Approved December 15, 2014. Replacement (3) CNG Buses Class E (Note: Type C as described in FTIP) Air Basin is Mojave Air Basin. Advantage ID #0815000246 |
|
Morongo Basin Transit Authority |
David Lee |
07/27/2015: The following transfer request was approved for submittal to FHWA HQ (DC) for processing . -view comment history- |
0 |
FTACML-6235 (020)
|
SBd | Morongo Valley and Basin region - FAIN 1622-2016-2 |
Purchase of 2-Class C CNG Buses and 2-Class E CNG Buses. Use $409,479 of M40E CMAQ funds and $188,416 of non-federal matching funds. Air Basin is Mojave Desert. |
|
Morongo Basin Transit Authority |
David Lee |
08/05/2016: The following transfer request was approved for submittal to FHWA HQ (DC) for processing on 08/05/2016 -view comment history- |
0 |
FTACML-6235 (021)
|
SBd | San Bernardino County, Morongo Basin |
Purchase of (2) Class H Vehicles
FAIN:1622-20217 |
|
Morongo Basin Transit Authority |
Leslie Avila |
No comments |
0 |
BHLSZ-6248 (006)
|
SBd | Ranchero Street over the California Aqueduct in Hesperia, Br. No. 54C-0449 |
Seismic Retrofit |
|
Dept. of Water Resources |
Armand Rubio |
10/02/2017: City does not require CWA 15 fund extension. -view comment history- |
0 |
BHLSZ-6248 (007)
|
SBd | Mesquite Street over the California Aqueduct in Hesperia, Br. No. 54C-0451 |
Seismic Retrofit |
|
Dept. of Water Resources |
Armand Rubio |
10/02/2017: City does not require CWA 15 fund extension. -view comment history- |
0 |
BHLSZ-6248 (008)
|
SBd | Maple Avenue over the California Aqueduct in Hesperia, Br. No. 54C-0452 |
Seismic Retrofit |
|
Dept. of Water Resources |
Armand Rubio |
10/02/2017: City does not require CWA 15 fund extension. -view comment history- |
0 |
BHLSZ-6248 (009)
|
SBd | Goodwin Drive / Goss Road over the California Aqueduct near Victorville, Br. No. 54C-0495 |
Seismic Retrofit |
|
Dept. of Water Resources |
Armand Rubio |
10/02/2017: City does not require CWA 15 fund extension. -view comment history- |
0 |
BHLSZ-6248 (010)
|
SBd | Duncan Road over the California Aqueduct near Victorville, Br. No. 54C-0496 |
Seismic Retrofit |
|
Dept. of Water Resources |
Armand Rubio |
10/02/2017: City does not require CWA 15 fund extension. -view comment history- |
0 |
CML-6261 (004)
|
SBd | CITYWIDE--FTA TRANSFER--CA-90-X935 |
Bus Purchase |
|
Victor Valley Transit Authority |
David Lee |
No comments |
0 |
FTACML-6261 (005)
|
SBd | FTA Grant # CA-90-X935 |
Bus Purchase |
|
Victor Valley Transit Authority |
Danette Silva |
No comments |
0 |
FTACML-6261 (006)
|
SBd | Victor Valley Transit System |
Purchase one-35 ft transit bus ca-18-01 |
|
Victor Valley Transit Authority |
Danette Silva |
07/10/2007: Mail Received (temp 7/9/7) -view comment history- |
0 |
FTACML-6261 (007)
|
SBd | High Desert region of San Bernardino County |
Alternative fuels paratransit buses |
|
Victor Valley Transit Authority |
Danette Silva |
No comments |
0 |
FTACML-6261 (008)
|
SBd | High Desert region of San Bernardino County |
Purchase of transit vehicles |
|
Victor Valley Transit Authority |
Danette Silva |
No comments |
0 |
FTACML-6261 (009)
|
SBd | High Desert region of San Bernardino County |
Purchase of transit vehicles |
|
Victor Valley Transit Authority |
Marcos Amancio |
02/21/2017: 02/21/2017 Project archived in D8 Database, project file purged on 01/24/2017. -view comment history- |
0 |
FTACML-6261 (010)
|
SBd | High Desert region of San Bernardino County |
Purchase of CNG paratransit replacement buses |
|
Victor Valley Transit Authority |
Danette Silva |
No comments |
0 |
FTACML-6261 (014)
|
SBd | San Bernardino County |
Purchase six CNG fueled 40-Ft replacement buses |
|
Victor Valley Transit Authority |
Danette Silva |
No comments |
0 |
FTACML-6261 (015)
|
SBd | Hesperia, CA |
6 replacement ALt fuel (CNG) Paratransit vehicles, and CMAQ demonstration Project for Bus Service between Barstow & Victorville. |
|
Victor Valley Transit Authority |
Danette Silva |
No comments |
0 |
FTACML-6261 (016)
|
SBd | Victor Valley area, |
FTA Grant # CA-95-X132, $307,057. Funding for 2011 FSTIP ID #SBD41114 covers three years; 2011, 2012 and 2013. Vehicle eplacement, 3 alternate fuel (CNG) paratransit vehicles vehicles |
|
Victor Valley Transit Authority |
David Lee |
No comments |
0 |
CMLFTA-6261 (017)
|
SBd | In San Bernardino County between Victor Valley and San Bernardino Valley |
FTA Grant CA-95-X182, Section 5307
3 yrs of Bus System Operating Assistance- Lifeline Connectivity Bus Service |
|
Victor Valley Transit Authority |
David Lee |
No comments |
0 |
FTACML-6261 (018)
|
SBd | Replace 2 fixed routed CNG coaches and 3 paratransit CNG vehicles |
FTA grant CA-95-x194, $1,345,115.00 2011 FTIP Amendment 18, page 15, Project ID SBD41084 in the amount of $854,00 and Project ID SBD41114 in the amount of $491,000. |
|
Victor Valley Transit Authority |
David Lee |
02/23/2012: FTA Letter sent from HQ to FHWA on 02/21/12 -view comment history- |
0 |
FTACML-6261 (019)
|
SBd | Victor Valley Transit Authority - 5 Commuter Bus Replacement FFY13/14. |
San Bernardino County Transit Listing from adopted 2013 FTIP Amendment 11, Project ID 20131102, FTA Grant # CA-95-X258. Adv. ID #0814000099
CMAQ FTA Transfer Request $162,098 for 5 commuter bus replacement. |
|
Victor Valley Transit Authority |
David Lee |
02/13/2014: The transfer request was approved for submittal to FHWA HQ (DC) for processing on 02/13/2014
Project No: 6261(019)
State Project No: 0814000099L-N
-view comment history- |
0 |
FTACML-6261 (020)
|
SBd | High Desert region of San Bernardino County - FTA Grant #CA-95-X330 |
FTA Transfer Grant #CA-95-X330. 2015 SCAG FTIP Project ID: SBD41084 and SBD41114 approved in amendments #5 on 3/9/15 and #4 on 4/8/15, respectively. FY 14/15 Section 5307-3 grant for $1,471,000 to purchase five replacement fixed route coaches: three standard 40-foot CNG buses and two 35-foot CNG high floor buses (SBD41084); $696,000 to purchase eight paratransit vehicles (SBD41114), this also includes toll credit of $79,831. Use $2,167,000 of L40E CMAQ funds as transfer funds. |
|
Victor Valley Transit Authority |
David Lee |
07/30/2015: E-mail local agency Transfer is complete and approved. -view comment history- |
0 |
FTACML-6261 (021)
|
SBd | High Desert region of San Bernardino County - FAIN #5538-2017-1 |
Replacement buses (5) for the Barstow Division, Class H 40' CNG $2,434,575 CMAQ and local share of $315,425. Replacement buses (5) for the Hesperia Division, Class H 40' CNG $2,200,000 Section 5307 from FY 16 carry over and $550,000 local match. 2017 FTIP Amendment #2, approved on 02-21-2017. |
|
Victor Valley Transit Authority |
David Lee |
07/14/2017: The following transfer request has been approved by FHWA HQ (DC) 07/14/2017
Project No: 6261(021)
State Project No: 0817000206L-N
-view comment history- |
0 |
FTACML-6261 (022)
|
SBd | High Desert region of San Bernardino County - FTA FAIN 5538-2018-2 |
FTA Federal Award Identification Number (FAIN) 5538-2018-2. Section 5307-3 FTA transfer for $2,713,000 to purchase of six Class "H" 35-foot CNG replacement buses. Programmed under SCAG FTIP ID SBD41084 in Amendment #17 approved on 2/22/18 to SCAG's 2017 FTIP. Advantage ID 0818000188. Air basin is Mojave Desert. |
|
Victor Valley Transit Authority |
David Lee |
06/22/2018: The following transfer request has been approved by FHWA HQ (DC) 06/21/2018
Project No: 6261(022)
State Project No: 0818000188L-N
-view comment history- |
0 |
FTACML-6261 (023)
|
SBd | VVTA'S adminstrative,operations and maintenance facility is centrally located to the victor Valley (High Desert) service area in the City of Hesperia, CA. |
FTA Federal Award Identification Number (FAIN) 5538-2019-2. Section 5307-3 FTA transfer of $555,000.00 to purchase one (1) Class H 40' Battery Electric Bus that has an extended useful life of 12 years and/or 500,000 miles. Programmed under FTIP ID SBD41084 (CTIPS ID 209-5000-1212) for FY 18-19 in Amendment #4 approved on 02/19/2019 to the SCAG's 2019 FTIP. Use $555,000.00 of Z400 CMAQ funds as transfer funds with STA fund $64,326 and California SB1/SGR funds of $135,000 as a local match to bus replacement. |
|
Victor Valley Transit Authority |
Mina Habib |
04/18/2019: Mail Received (FTA Transfer request (electronic submittal) ) -view comment history- |
0 |
FTACML-6261 (024)
|
SBd | Victorville-Hesperia-Apple Valley
(The paratransit busess will operate in the existing service area) |
FTA Federal Award Identification Number (FAIN) 5538-2020-1-P2. FTA #11.12.02. Section 5307-3 FTA transfer for Victor Valley Transit Agency (VVTA) for the purchase three (3) Class H 40' Battery Electric Bus that have an expected useful life of 12 years and/or 500,000 miles and will be disposed of in accordance to Federal requirements. Programmed for CMAQ funding under SCAG FTIP ID SBD41084 (CTIPS ID 20950001212) for FY 19-20 in Amendment #16 approved on 12/31/19 to SCAG's 2019 FTIP. Transfer includes $186,733 of non-federal matching funds. Air basin is Mojave Desert. |
|
Victor Valley Transit Authority |
Leslie Avila |
04/22/2020: Mail Received (Transfer Request of CMAQ funds to FTA) -view comment history- |
0 |
FTACML-6261 (025)
|
SBd | VVTA's service area is located in the Victor Valley, known as the High Desert, and North Desert regions of San Bernardino County. |
Purchase of Regional Replacement Bus (1), Regional Replacement Buses (3), Commuter Bus Replacement (3) |
|
Victor Valley Transit Authority |
Leslie Avila |
08/04/2021: Mail Received (FTA transfer letter; received on 8/4/2021.) -view comment history- |
0 |
FTACML-6292 (003)
|
SBd | San Bernardino Mountains region |
Bus Purchase |
|
MART (Mountain Area) |
Danette Silva |
No comments |
0 |
FTACML-6292 (004)
|
SBd | San Bernardino Mountains region |
Miscellaneous - Other |
|
MART (Mountain Area) |
Danette Silva |
No comments |
0 |
FTACML-6292 (005)
|
SBd | San Bernardino Mountains region - FTA Grant CA-18-X021 |
Trolley purchase and operating assistance |
|
MART (Mountain Area) |
Danette Silva |
No comments |
0 |
FTACML-6292 (010)
|
SBd | MARTA FTA Grant Number CA-85-X006 |
Paratransit vehicles replacement; 3 vehicles gas/diesel. CMAQ FTA Transfer Grant Number CA-85-X006 (FTA Section 5311 (49 U.S.C) Non-Urbanized Formula Assistance Program Fiscal Year 2012-2013). 2013 FTIP Amendment No. 9 Approved June 27, 2013.
Advantage ID#0814000002 |
|
Mtn. Area RTA |
David Lee |
07/22/2013: Transfer approved by FHWA -view comment history- |
0 |
FTACML-6292 (011)
|
SBd | San Bernardino County Mountain Area |
Vehicles Replacement - FTA CMAQ Transfer, Pending FTA Grant No. CA-85-X009, Section 5311 Non-Urbanized Formula Assistance Program. CMAQ in the amount of $366,215, FFY13/14; 2013 FTIP Project ID 200423. EPSP approved. Toll Credit Usage: $42,005
Adv. Draft ID: 0815000022 |
|
Mtn. Area RTA |
David Lee |
08/21/2014: Transfer request was approved by FHWA (DC) -view comment history- |
0 |
FTACML-6292 (012)
|
SBd | San Bernardino County Mountain Area |
Vehicles Replacement - FTA CMAQ Transfer, Pending FTA Grant No. CA-85-X010, Section 5311 Non-Urbanized Formula Assistance Program. CMAQ in the amount of $380,304, FFY14/15; 2015 FTIP Project ID 200423. Toll Credit Usage: $43,621
Adv. Draft ID: 0815000239
Note: Toll credit amount on approved FTIP description is incorrect at $42K - should be $44K. This will be corrected as part of the next amendment/administrative modification; transfer request will be process at this time.
|
|
Mtn. Area RTA |
David Lee |
07/27/2015: Approved by FHWA (DC) -view comment history- |
0 |
FTACML-6292 (013)
|
SBd | San Bernardino Mountains region - FAIN 1622-2016-2 |
Use $402,327 of M40E CMAQ funds and applying $52,126 in toll credits in lieu of non-federal matching funds. Air Basin is Mojave Desert.
Current approved FTIP Amendments 1-18 shows CMAQ funds of $560k and TC of $65k; changes will be made in Amendment 20.
Adv. ID 0816000201
|
|
Mtn. Area RTA |
David Lee |
09/07/2016: The following transfer request has been approved by FHWA HQ (DC) 09/07/2016
Project No: 6292(013)
State Project No: 0816000201L-N
-view comment history- |
0 |
FTACML-6292 (014)
|
SBd | San Bernardino Mountains region - FAIN 1622-2017-2 |
Vehicles replacement |
|
Mtn. Area RTA |
David Lee |
07/14/2017: FTA Transfer request submitted to HQ -view comment history- |
0 |
FTACML-6292 (015)
|
SBd | Serving Big Bear City, Big Bear Lake, Sugarloaf, Erwin Lake, Crestline, Lake Arrowhead, Blue Jay, Twin Peaks, Rimforest, and Skyforest |
FTA Federal Award Identification Number (FAIN) 1622-2020-1. Section 5311 FTA transfer for Mountain Area Region Transit Agency (MARTA) for the purchase of four(4) Ford E-450 replacement buses that have an expected useful life of 7 years and/or 200,000 miles.Programmed under SCAG FTIP ID 200423 (CTIPS ID 209-5000-4657) for FY 19-20 in Amendment #18 approved on 04/06/20 to SCAG's 2019 FTIP. Use $560,000 of Z400 CMAQ funds as transfer funds at a maximum reimbursement ratio of 100% with toll credit usage as non-federal matching funds. Air basin is Mojave Desert. |
|
Mtn. Area RTA |
Leslie Avila |
06/02/2020: Mail Received (Transfer Request of CMAQ funds to FTA (final submittal)) -view comment history- |
0 |
FTACML-6292 (016)
|
SBd | San Bernardino County |
Purchase of 2 trolley buses for expansion.
FAIN 1622-2021-7
Transfer Grant #CA-85-X006. |
|
Mtn. Area RTA |
Leslie Avila |
02/07/2022: Mail Received (CA-85-X006; FTA Transfer; received on 2/1/2022.) -view comment history- |
0 |
FTACML-6292 (017)
|
SBd | San Bernardino County (Mountain Area Region) |
Purchase of (4) Replacement Class T Trolleys
FTA Federal Award Identification Number (FAIN) 1622-2022-5. Section 5311 FTA Non-Urbanized Formula Assistance Program grant |
|
Mtn. Area RTA |
Leslie Avila |
06/08/2022: Mail Received (MARTA Trolleys- Air Quality Analysis Report; received 6/8/2022) -view comment history- |
0 |
FTACML-6314 (001)
|
SBd | IN SAN BERNARDINO COUNTY |
PURCHASE 4 PARATRANSIT VEHECLES |
|
MART (Mountain Area) |
Danette Silva |
No comments |
0 |
CML-6344 (001)
|
RIV | University of California at Riverside's Parking Lots 1 and 6 |
Electric vehicle recharging stations |
|
UCR |
Nivine K. Georges |
No comments |
0 |
CML-6344 (002)
|
RIV | University of California at Riverside |
Pilot demonstration project on using biodiesel fuels in medium-duty trucks |
|
UCR |
Sylvester Lin |
No comments |
0 |
CML-6344 (003)
|
RIV | Metrolink station for UCR |
Implement UCR Intellishare System at 2 designated parking spaces |
|
Univ. of CA-Riverside |
Sylvester Lin |
03/26/2012: Mail Received (Final Invoice (Resubmitted)) -view comment history- |
0 |
VPPL-6344 (004)
|
RIV | University of California at Riverside Center for Environmental Research and Technology |
PierPass Goods Movement Assessment research |
|
Univ. of CA-Riverside |
Sylvester Lin |
02/21/2008: Mail Received (6344 (004) Riverside.UCR for Env Research and Technology/program Supplement) -view comment history- |
0 |
EEM-(2011)-6486 (028)
|
RIV | Willow Hole Blowsand Exosytem Conservation |
Acquire 114.88 acres in theWillow Hole Conservation Area. |
|
CVCC - Coachella Valley Conservation Commission |
Sean Yeung |
No comments |
0 |
PNRSLN-6507 (001)
|
SBd | Segment 1: In San Bernardino County, in the City of San Bernardino from Lytle Creek Channel to 5th Street on I-215. |
Landscape on I-215. |
|
San Bernardino County Transportation Authority |
Evita Premdas |
10/12/2022: 2022.10.06 EP: Final Vouchered and Projects Closed on 09/09/2022 -view comment history- |
0 |
PNRSLN-6507 (002)
|
SBd | Segment 3: In San Bernardino County, in the City of San Bernardino from Orange Show Rd overcrossing to Lytle Creek Channel UC. |
Landscape on I-215. |
|
San Bernardino County Transportation Authority |
Evita Premdas |
10/12/2022: 2022.10.06 EP: Final Vouchered and Projects Closed on 09/20/2022 -view comment history- |
0 |
BRLS-6507 (003)
|
SBd | Mount Vernon Avenue Overhead at the Burlington Northern Santa Fe Railroad yard from 2nd Street to 5th Street, Br. No. 54C-0066 |
City of San Bernadino has relinquisted this project to SANBAG to continue with the PE phase of work. The originally assigned FPN is BRLS-5033(042). NEPA document has been approved under this FPN. |
|
San Bernardino County Transportation Authority |
Esayas Hagos |
07/16/2023: Progress Invoice No. 19 - Received, Processed, and sent to CLPA -view comment history- |
6 |
CML-6507 (004)
|
SBd | Within the South Coast Air Basin in San Bernardino County |
***Rideshare program |
|
San Bernardino County Transportation Authority |
Evita Premdas |
04/07/2021: Final Vouchered on 02/18/2021 -view comment history- |
2 |
CML-6507 (005)
|
SBd | Within the Mojave Desert Air Basin in San Bernardino County |
Rideshare program |
|
San Bernardino County Transportation Authority |
Evita Premdas |
02/18/2022: Progress Invoice No. 11 and FINAL - Received, Processed, and sent to CLPA -view comment history- |
1 |
PRNSLN-6507 (006)
|
SBd | CIty of San Bernardino from 0.05 miles North of 5th Street Overcrossing to MuscupiabeDrive Overcrossing and SR 259 to Highland Ave. |
Landscape |
|
San Bernardino County Transportation Authority |
Evita Premdas |
No comments |
0 |
PPM17-6507 (007)
|
SBd | staff will complete. Sean 4/24/2017 |
staff will complete. Sean 4/24/2017 |
|
San Bernardino County Transportation Authority |
Vu Ngo |
09/06/2018: Mail Received ( Invoice #Final 1 original, 2 copies) -view comment history- |
0 |
FSP17-6507 (008)
|
SBd | Freeway Service Patrol |
throughout San Bernardino County |
|
San Bernardino County Transportation Authority |
Vu Ngo |
02/16/2018: Mail Received (PSA, fully executed, 1 copy) -view comment history- |
0 |
FSP18-6507 (009)
|
SBd | throughout San Bernardino County |
Freeway Service Patrol for FY 2017/2018 |
|
San Bernardino County Transportation Authority |
Vu Ngo |
03/08/2018: Mail Received (Executed copy of the agreement for the FY 17/18 Freeway Service Patrol (FSP) Program ) -view comment history- |
0 |
STPL-6507 (011)
|
SBd | I-10 from San Antonio Ave. to I-10/I-15 Interchange |
***I-10 Corrdior (Contract 1) Express Lane - Toll Service Provider (TSP): from San Antonio Ave. to I-10/I-15 IC; Design, construct, and implementation of Express Lane Toll System (non-capacity split project from SCAG FTIP ID Project 20159902). Toll Credits to match STP. Caltrans Project ID for TSP: 0816000076, EA 0C251. Related Project 6053(130). |
|
San Bernardino County Transportation Authority |
Esayas Hagos |
03/10/2023: Mail Received (Progress Invoice No.13; Received 03/09/2023) -view comment history- |
0 |
PPM19-6507 (012)
|
SBd | Throughout San Bernardino County |
Planning,Programming and Monitoring |
|
San Bernardino County Transportation Authority |
Evita Premdas |
08/20/2019: Mail Received (invoice 12F (finall); 1 original, 2 copies.) -view comment history- |
0 |
PNRSLN-6507 (013)
|
SBd | On interstate 215 from 0.2 miles south of 9th street overcrossing to 0.1 miles south of Massachusettes Avenue overcrossing in the city of San Bernardino, San Bernardino county |
To provide irrigation systems, inert materials and planting for I-215 |
|
San Bernardino County Transportation Authority |
Esayas Hagos |
02/24/2023: Mail Received (RFA (CON& CE) adj; Received 02/21/2023) -view comment history- |
0 |
FSP19-6507 (015)
|
SBd | San Bernardino County Transportation Authority 2018/2019 |
Freeway Service Patrol |
|
San Bernardino County Transportation Authority |
Evita Premdas |
08/06/2021: PSA executed on 07/18/2019 -view comment history- |
0 |
PPM20-6507 (016)
|
SBd | Throughout San Bernardino County |
Planning,Programming and Monitoring |
|
San Bernardino County Transportation Authority |
Evita Premdas |
08/20/2020: Invoice No. 3 and FINAL - Received, Processed, and sent to HQ LPA -view comment history- |
0 |
CML-6507 (017)
|
SBd | Throughout the South Coast Air Basin within San Bernardino County |
***Develop, promote, and implement a 3-year rideshare program |
|
San Bernardino County Transportation Authority |
Esayas Hagos |
02/28/2023: Progress Invoice No. 8 sent to CLPA. -view comment history- |
0 |
FSP20SB!-6507 (020)
|
SBd | to be completed by staff. Sean, 3/18/2022. |
to be completed by staff. Sean, 3/18/2022. |
|
San Bernardino County Transportation Authority |
Evita Premdas |
03/18/2022: Mail Received (approved FSP amendment; received on 3/18/2022.) -view comment history- |
0 |
ATPLNI-6507 (021)
|
SBd | SBCTA is partnering with SBC DPH to extend the county-wide SRTS Education, Encouragement, Evaluation and Enforcement Program |
SBCTA is partnering with SBC DPH to extend the county-wide SRTS Education, Encouragement, Evaluation and Enforcement Program |
|
San Bernardino County Transportation Authority |
Esayas Hagos |
10/18/2022: Award Extension CON-NI sent to HQ at the December 2022 CTC Meeting. -view comment history- |
0 |
CML-6507 (022)
|
SBd | MOJAVE DESERT AIR BASIN RIDESHARE PROGRAM (Toll Credits to match: CMAQ)(Ongoing) |
Rideshare |
|
San Bernardino County Transportation Authority |
Esayas Hagos |
03/16/2023: Mail Received (Final Invoice No.7; Received 03/15/2023) -view comment history- |
0 |
PPM21-6507 (023)
|
SBd | Throughout San Bernardino County |
Planning,Programming and Monitoring for FY 20/21 |
|
San Bernardino County Transportation Authority |
Evita Premdas |
09/20/2021: Progress Invoice No. 4 and FINAL - Received, Processed, and sent to HQ LPA -view comment history- |
0 |
FSP21-6507 (024)
|
SBd | to be completed by staff. Sean, 6/11/2021. |
to be completed by staff. Sean, 6/11/2021. |
|
San Bernardino County Transportation Authority |
Evita Premdas |
06/11/2021: Mail Received (approved FTA; received on 6/10/2021.) -view comment history- |
0 |
ATPL-6507 (025)
|
SBd | Bicycle and pedestrian accessibility improvements near five Metrolink transit stations in the cities of Montclair, Upland, Rancho Cucamonga, Fontana, San Beranbbrdino - Phase 2 |
Pedestrian and Bike Path |
|
San Bernardino County Transportation Authority |
Esayas Hagos |
01/19/2023: Mail Received (ROW Certification; Received 01/13/2023) -view comment history- |
0 |
FSP21SB1-6507 (026)
|
SBd | to be completed by staff. Sean, 6/11/2021. |
to be completed by staff. Sean, 6/11/2021. |
|
San Bernardino County Transportation Authority |
Evita Premdas |
02/10/2023: Mail Received (Executed FSP; Received 02/09/23) -view comment history- |
0 |
BRLS-6507 (027)
|
SBd | North First Avenue bridge over the BNSF Railroad, from 0.2 miles north of Main Street to Crooks Street, Br. No. 54C-0088 |
Bridge Replacement |
|
San Bernardino County Transportation Authority |
Esayas Hagos |
11/10/2022: Mail Received (Contract Award Package; Received 11/9/2022) -view comment history- |
0 |
PPM22-6507 (028)
|
SBd | Throughout San Bernardino County |
Planning, Programming and Monitoring for FFY 21/22 |
|
San Bernardino County Transportation Authority |
Evita Premdas |
09/20/2022: STIP District Quarterly Heads-Up Report as of August 2022: already Allocated on June 24, 2021, and FROE was sent to CLPA on September 12, 2022. -view comment history- |
0 |
CML-6507 (029)
|
SBd | Throughout the South Coast Air Basin within San Bernardino County |
Develop, promote, and implement a 3-year rideshare program |
|
San Bernardino County Transportation Authority |
Esayas Hagos |
02/28/2023: Progress Invoice No. 5 sent to CLPA. -view comment history- |
0 |
CML-6507 (031)
|
SBd | Throughout the Mojave Desert Air Basin within San Bernardino County
(Toll Credits to match: CMAQ)(Ongoing) |
Rideshare Program |
|
San Bernardino County Transportation Authority |
Esayas Hagos |
05/23/2023: Mail Received (Progress Invoice No.1; Received 05/17/2023) -view comment history- |
1 |
PPM23-6507 (033)
|
SBd | Throughout San Bernardino County |
Planning, Programming and Monitoring |
|
San Bernardino County Transportation Authority |
Evita Premdas |
01/27/2023: Mail Received (Progress Invoice No.1; Received 01/25/2023) -view comment history- |
0 |
STPCRSSL-6507 (034)
|
RIV | US-395 (HESPERIA, VICTORVILLE, & ADELANTO) FROM 0.16 MI N/O INTERSTATE ROUTE 15
JUNCTION TO SR18
|
WIDEN FROM 2-4 LANES AND ADD LEFT TURN CHANNELIZATION AT INTERSECTIONS (EA 0F633)
(TOLL CREDITS TO MATCH CRRSAA AND STP) |
|
San Bernardino County Transportation Authority |
Esayas Hagos |
12/08/2022: Mail Received (Approved FL & PSA; Received 12/7/2022) -view comment history- |
0 |
STPCRRLN-6507 (035)
|
SBd | I-10 just east of I-15 to Pepper Avenue in Colton, connecting to the I-10 Corridor Contract 1 express lanes currently under construction |
I-10 Corridor Contract 2: Add one Corridor Express Lane in each direction |
|
San Bernardino County Transportation Authority |
Evita Premdas |
12/08/2022: Mail Received (Approved FL & PSA; Received 12/5/2022) -view comment history- |
0 |
CMLNI-6507 (037)
|
SBd | Rideshare program in the South Coast Air Basin.
|
SOUTH COAST AIR BASIN RIDESHARE PROGRAM
(Ongoing)(Toll Credits are being used as match for CMAQ) |
|
San Bernardino County Transportation Authority |
Esayas Hagos |
06/30/2023: Progress Invoice No. 01 - Received, Processed, and sent to CLPA -view comment history- |
0 |
DEML-9402 (001)
|
SBd | IN SAN BERNARDINO COUNTY ON I-15 FROM VICTORVILLE TO BARSTOW |
WIDENING-PE-Environmental Only |
|
San Bernardino County 0071 |
Ramiro Martinez |
06/29/2006: Mail Received (I -15 Widening Study project
Final package fro the I-15 from Victorville to Barstow) -view comment history- |
0 |
1752 result(s) returned.