| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
05 |
5 |
$500.00 |
$1046.64 |
$2500.00 |
02-05-2013 |
05-330754 |
1 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
05 |
5 |
$150.00 |
$313.99 |
$750.00 |
02-05-2013 |
05-330754 |
2 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
05 |
5 |
$1000.00 |
$2093.29 |
$5000.00 |
02-05-2013 |
05-330754 |
3 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
05 |
5 |
$500.00 |
$1046.64 |
$2500.00 |
02-05-2013 |
05-330754 |
4 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
05 |
5 |
$800.00 |
$1674.63 |
$4000.00 |
02-05-2013 |
05-330754 |
5 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
05 |
5 |
$350.00 |
$732.65 |
$1750.00 |
02-05-2013 |
05-330754 |
6 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
05 |
5 |
$1349.00 |
$2823.84 |
$6745.00 |
02-05-2013 |
05-330754 |
7 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
05 |
5 |
$160.00 |
$334.93 |
$800.00 |
02-05-2013 |
05-330754 |
8 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
05 |
5 |
$1050.00 |
$2197.95 |
$5250.00 |
02-05-2013 |
05-330754 |
9 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
05 |
5 |
$150.00 |
$313.99 |
$750.00 |
02-05-2013 |
05-330754 |
10 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
05 |
5 |
$1100.00 |
$2302.61 |
$5500.00 |
02-05-2013 |
05-330754 |
11 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
05 |
5 |
$350.00 |
$732.65 |
$1750.00 |
02-05-2013 |
05-330754 |
12 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
05 |
5 |
$500.00 |
$1046.64 |
$2500.00 |
02-05-2013 |
05-330754 |
13 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
10 |
$1500.00 |
$3139.93 |
$15000.00 |
02-26-2013 |
03-3E6204 |
1 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
10 |
$700.00 |
$1465.30 |
$7000.00 |
02-26-2013 |
03-3E6204 |
2 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
10 |
$650.00 |
$1360.64 |
$6500.00 |
02-26-2013 |
03-3E6204 |
3 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
10 |
$700.00 |
$1465.30 |
$7000.00 |
02-26-2013 |
03-3E6204 |
4 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
10 |
$700.00 |
$1465.30 |
$7000.00 |
02-26-2013 |
03-3E6204 |
5 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
10 |
$700.00 |
$1465.30 |
$7000.00 |
02-26-2013 |
03-3E6204 |
6 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
10 |
$700.00 |
$1465.30 |
$7000.00 |
02-26-2013 |
03-3E6204 |
7 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
06 |
6 |
$600.00 |
$1255.97 |
$3600.00 |
03-26-2013 |
06-342524 |
1 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
06 |
6 |
$750.00 |
$1569.96 |
$4500.00 |
03-26-2013 |
06-342524 |
2 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
06 |
6 |
$600.00 |
$1255.97 |
$3600.00 |
03-26-2013 |
06-342524 |
3 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
06 |
6 |
$610.00 |
$1276.90 |
$3660.00 |
03-26-2013 |
06-342524 |
4 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
06 |
6 |
$600.00 |
$1255.97 |
$3600.00 |
03-26-2013 |
06-342524 |
5 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
06 |
6 |
$500.00 |
$1046.64 |
$3000.00 |
03-26-2013 |
06-342524 |
6 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
06 |
6 |
$600.00 |
$1255.97 |
$3600.00 |
03-26-2013 |
06-342524 |
7 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
06 |
6 |
$750.00 |
$1569.96 |
$4500.00 |
03-26-2013 |
06-342524 |
8 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
06 |
6 |
$1000.00 |
$2093.29 |
$6000.00 |
03-26-2013 |
06-342524 |
9 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
5 |
$277.13 |
$488.08 |
$1385.65 |
05-03-2013 |
11-2T1834 |
1 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
5 |
$287.50 |
$506.34 |
$1437.50 |
05-03-2013 |
11-2T1834 |
2 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
5 |
$300.00 |
$528.35 |
$1500.00 |
05-03-2013 |
11-2T1834 |
3 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
5 |
$330.00 |
$581.19 |
$1650.00 |
05-03-2013 |
11-2T1834 |
4 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
5 |
$300.00 |
$528.35 |
$1500.00 |
05-03-2013 |
11-2T1834 |
5 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
5 |
$250.00 |
$440.29 |
$1250.00 |
05-03-2013 |
11-2T1834 |
6 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
12 |
$1500.00 |
$2641.77 |
$18000.00 |
05-07-2013 |
03-1A8444 |
1 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
12 |
$600.00 |
$1056.71 |
$7200.00 |
05-07-2013 |
03-1A8444 |
2 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
12 |
$2000.00 |
$3522.36 |
$24000.00 |
05-07-2013 |
03-1A8444 |
3 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
12 |
$2000.00 |
$3522.36 |
$24000.00 |
05-07-2013 |
03-1A8444 |
4 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
6 |
$280.00 |
$493.13 |
$1680.00 |
05-08-2013 |
03-4E5904 |
1 |
|
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
6 |
$750.00 |
$1320.88 |
$4500.00 |
05-08-2013 |
03-4E5904 |
2 |
|
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
6 |
$1800.00 |
$3170.12 |
$10800.00 |
05-08-2013 |
03-4E5904 |
3 |
|
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
06 |
1 |
$470.00 |
$827.75 |
$470.00 |
05-29-2013 |
06-0L3904 |
1 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
06 |
1 |
$1000.00 |
$1761.18 |
$1000.00 |
05-29-2013 |
06-0L3904 |
2 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
06 |
1 |
$500.00 |
$880.59 |
$500.00 |
05-29-2013 |
06-0L3904 |
3 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
06 |
1 |
$1000.00 |
$1761.18 |
$1000.00 |
05-29-2013 |
06-0L3904 |
4 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
5 |
$998.00 |
$1757.66 |
$4990.00 |
06-25-2013 |
03-1A7314 |
1 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
5 |
$2345.00 |
$4129.96 |
$11725.00 |
06-25-2013 |
03-1A7314 |
2 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
5 |
$4000.00 |
$7044.71 |
$20000.00 |
06-25-2013 |
03-1A7314 |
3 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
5 |
$1000.00 |
$1761.18 |
$5000.00 |
06-25-2013 |
03-1A7314 |
4 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
5 |
$2000.00 |
$3522.36 |
$10000.00 |
06-25-2013 |
03-1A7314 |
5 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
5 |
$800.00 |
$1408.94 |
$4000.00 |
06-25-2013 |
03-1A7314 |
6 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
5 |
$330.00 |
$581.19 |
$1650.00 |
06-25-2013 |
03-1A7314 |
7 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
10 |
5 |
$830.00 |
$2672.96 |
$4150.00 |
07-16-2013 |
10-0G8004 |
1 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
10 |
5 |
$1000.00 |
$3220.44 |
$5000.00 |
07-16-2013 |
10-0G8004 |
2 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
10 |
5 |
$650.00 |
$2093.29 |
$3250.00 |
07-16-2013 |
10-0G8004 |
3 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
10 |
5 |
$800.00 |
$2576.35 |
$4000.00 |
07-16-2013 |
10-0G8004 |
4 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
10 |
5 |
$850.00 |
$2737.37 |
$4250.00 |
07-16-2013 |
10-0G8004 |
5 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
10 |
5 |
$871.50 |
$2806.61 |
$4357.50 |
07-16-2013 |
10-0G8004 |
6 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
10 |
5 |
$830.00 |
$2672.96 |
$4150.00 |
07-16-2013 |
10-0G8004 |
7 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
10 |
5 |
$830.00 |
$2672.96 |
$4150.00 |
07-16-2013 |
10-0G8004 |
8 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
10 |
5 |
$830.00 |
$2672.96 |
$4150.00 |
07-16-2013 |
10-0G8004 |
9 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
10 |
5 |
$2000.00 |
$6440.88 |
$10000.00 |
07-16-2013 |
10-0G8004 |
10 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
10 |
2 |
$800.00 |
$2576.35 |
$1600.00 |
07-23-2013 |
10-0T1604 |
1 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
10 |
2 |
$850.00 |
$2737.37 |
$1700.00 |
07-23-2013 |
10-0T1604 |
2 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
10 |
2 |
$1000.00 |
$3220.44 |
$2000.00 |
07-23-2013 |
10-0T1604 |
3 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
10 |
2 |
$1040.00 |
$3349.26 |
$2080.00 |
07-23-2013 |
10-0T1604 |
4 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
1 |
$1000.00 |
$3220.44 |
$1000.00 |
07-24-2013 |
04-2A1104 |
1 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
1 |
$661.00 |
$2128.71 |
$661.00 |
07-24-2013 |
04-2A1104 |
2 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
1 |
$1000.00 |
$3220.44 |
$1000.00 |
07-24-2013 |
04-2A1104 |
3 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
1 |
$500.00 |
$1610.22 |
$500.00 |
07-24-2013 |
04-2A1104 |
4 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
1 |
$500.00 |
$1610.22 |
$500.00 |
07-24-2013 |
04-2A1104 |
5 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
1 |
$600.00 |
$1932.26 |
$600.00 |
07-24-2013 |
04-2A1104 |
6 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
07 |
1 |
$500.00 |
$1610.22 |
$500.00 |
08-08-2013 |
07-2768U4 |
1 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
07 |
1 |
$1000.00 |
$3220.44 |
$1000.00 |
08-08-2013 |
07-2768U4 |
2 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
07 |
1 |
$500.00 |
$1610.22 |
$500.00 |
08-08-2013 |
07-2768U4 |
3 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
07 |
1 |
$7000.00 |
$22543.08 |
$7000.00 |
08-08-2013 |
07-2768U4 |
4 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
07 |
1 |
$650.00 |
$2093.29 |
$650.00 |
08-08-2013 |
07-2768U4 |
5 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
07 |
1 |
$200.00 |
$644.09 |
$200.00 |
08-08-2013 |
07-2768U4 |
6 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
07 |
1 |
$400.00 |
$1288.18 |
$400.00 |
08-08-2013 |
07-2768U4 |
7 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
6 |
$685.00 |
$2206.00 |
$4110.00 |
09-05-2013 |
11-056324 |
1 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
6 |
$510.00 |
$1642.42 |
$3060.00 |
09-05-2013 |
11-056324 |
2 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
6 |
$2000.00 |
$6440.88 |
$12000.00 |
09-05-2013 |
11-056324 |
3 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
6 |
$300.00 |
$966.13 |
$1800.00 |
09-05-2013 |
11-056324 |
4 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
6 |
$600.00 |
$1932.26 |
$3600.00 |
09-05-2013 |
11-056324 |
5 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
6 |
$2000.00 |
$6440.88 |
$12000.00 |
09-05-2013 |
11-056324 |
6 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
8 |
$400.00 |
$1288.18 |
$3200.00 |
09-12-2013 |
11-0223U4 |
1 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
8 |
$1000.00 |
$3220.44 |
$8000.00 |
09-12-2013 |
11-0223U4 |
2 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
8 |
$1100.00 |
$3542.48 |
$8800.00 |
09-12-2013 |
11-0223U4 |
3 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
8 |
$505.00 |
$1626.32 |
$4040.00 |
09-12-2013 |
11-0223U4 |
4 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
8 |
$400.00 |
$1288.18 |
$3200.00 |
09-12-2013 |
11-0223U4 |
5 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
8 |
$600.00 |
$1932.26 |
$4800.00 |
09-12-2013 |
11-0223U4 |
6 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
01 |
5 |
$1200.00 |
$3864.53 |
$6000.00 |
09-17-2013 |
01-450904 |
1 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
01 |
5 |
$1103.00 |
$3552.14 |
$5515.00 |
09-17-2013 |
01-450904 |
2 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
01 |
5 |
$5000.00 |
$16102.20 |
$25000.00 |
09-17-2013 |
01-450904 |
3 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
01 |
5 |
$2400.00 |
$7729.05 |
$12000.00 |
09-17-2013 |
01-450904 |
4 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
01 |
5 |
$1000.00 |
$3220.44 |
$5000.00 |
09-17-2013 |
01-450904 |
5 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
2 |
$1025.00 |
$3300.95 |
$2050.00 |
09-24-2013 |
04-2A4304 |
1 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
2 |
$750.00 |
$2415.33 |
$1500.00 |
09-24-2013 |
04-2A4304 |
2 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
2 |
$2000.00 |
$6440.88 |
$4000.00 |
09-24-2013 |
04-2A4304 |
3 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
2 |
$850.00 |
$2737.37 |
$1700.00 |
09-24-2013 |
04-2A4304 |
4 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
2 |
$1000.00 |
$3220.44 |
$2000.00 |
09-24-2013 |
04-2A4304 |
5 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
2 |
$1050.00 |
$3381.46 |
$2100.00 |
09-24-2013 |
04-2A4304 |
6 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
2 |
$1000.00 |
$3220.44 |
$2000.00 |
09-24-2013 |
04-2A4304 |
7 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
6 |
$100.00 |
$322.04 |
$600.00 |
09-25-2013 |
03-2F1504 |
1 |
|
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
6 |
$300.00 |
$966.13 |
$1800.00 |
09-25-2013 |
03-2F1504 |
2 |
|
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
6 |
$300.00 |
$966.13 |
$1800.00 |
09-25-2013 |
03-2F1504 |
3 |
|
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
6 |
$300.00 |
$966.13 |
$1800.00 |
09-25-2013 |
03-2F1504 |
4 |
|
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
6 |
$760.00 |
$2447.53 |
$4560.00 |
09-25-2013 |
03-2F1504 |
5 |
|
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
6 |
$788.00 |
$2537.71 |
$4728.00 |
09-25-2013 |
03-2F1504 |
6 |
|
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
6 |
$450.00 |
$1449.20 |
$2700.00 |
09-25-2013 |
03-2F1504 |
7 |
|
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
6 |
$500.00 |
$1610.22 |
$3000.00 |
09-25-2013 |
03-2F1504 |
8 |
|
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
6 |
$330.00 |
$1062.75 |
$1980.00 |
09-25-2013 |
03-2F1504 |
9 |
|
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
07 |
3 |
$660.00 |
$2125.49 |
$1980.00 |
09-26-2013 |
07-1952U4 |
1 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
07 |
3 |
$500.00 |
$1610.22 |
$1500.00 |
09-26-2013 |
07-1952U4 |
2 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
07 |
3 |
$500.00 |
$1610.22 |
$1500.00 |
09-26-2013 |
07-1952U4 |
3 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
07 |
3 |
$1000.00 |
$3220.44 |
$3000.00 |
09-26-2013 |
07-1952U4 |
4 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
07 |
3 |
$600.00 |
$1932.26 |
$1800.00 |
09-26-2013 |
07-1952U4 |
5 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
01 |
3 |
$500.00 |
$1111.76 |
$1500.00 |
10-01-2013 |
01-479404 |
1 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
01 |
3 |
$1500.00 |
$3335.28 |
$4500.00 |
10-01-2013 |
01-479404 |
2 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
01 |
3 |
$2500.00 |
$5558.80 |
$7500.00 |
10-01-2013 |
01-479404 |
3 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
01 |
3 |
$1000.00 |
$2223.52 |
$3000.00 |
10-01-2013 |
01-479404 |
4 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
01 |
3 |
$1000.00 |
$2223.52 |
$3000.00 |
10-01-2013 |
01-479404 |
5 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
6 |
$381.00 |
$847.16 |
$2286.00 |
10-01-2013 |
03-1F9104 |
1 |
|
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
6 |
$300.00 |
$667.06 |
$1800.00 |
10-01-2013 |
03-1F9104 |
2 |
|
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
6 |
$300.00 |
$667.06 |
$1800.00 |
10-01-2013 |
03-1F9104 |
3 |
|
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
6 |
$305.00 |
$678.17 |
$1830.00 |
10-01-2013 |
03-1F9104 |
4 |
|
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
6 |
$580.00 |
$1289.64 |
$3480.00 |
10-01-2013 |
03-1F9104 |
5 |
|
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
6 |
$320.00 |
$711.53 |
$1920.00 |
10-01-2013 |
03-1F9104 |
6 |
|
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
07 |
1 |
$500.00 |
$1111.76 |
$500.00 |
10-10-2013 |
07-2777U4 |
1 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
07 |
1 |
$553.00 |
$1229.61 |
$553.00 |
10-10-2013 |
07-2777U4 |
2 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
07 |
1 |
$500.00 |
$1111.76 |
$500.00 |
10-10-2013 |
07-2777U4 |
3 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
07 |
1 |
$1000.00 |
$2223.52 |
$1000.00 |
10-10-2013 |
07-2777U4 |
4 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
07 |
1 |
$500.00 |
$1111.76 |
$500.00 |
10-10-2013 |
07-2777U4 |
5 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
07 |
1 |
$10000.00 |
$22235.20 |
$10000.00 |
10-10-2013 |
07-2777U4 |
6 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
07 |
1 |
$500.00 |
$1111.76 |
$500.00 |
10-10-2013 |
07-2777U4 |
7 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
05 |
5 |
$105.00 |
$233.47 |
$525.00 |
10-15-2013 |
05-0G0704 |
1 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
05 |
5 |
$125.00 |
$277.94 |
$625.00 |
10-15-2013 |
05-0G0704 |
2 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
01 |
30 |
$2000.00 |
$4447.04 |
$60000.00 |
10-22-2013 |
01-262024 |
1 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
01 |
30 |
$4000.00 |
$8894.08 |
$120000.00 |
10-22-2013 |
01-262024 |
2 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
01 |
30 |
$3000.00 |
$6670.56 |
$90000.00 |
10-22-2013 |
01-262024 |
3 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
36 |
$200.00 |
$444.70 |
$7200.00 |
11-06-2013 |
03-3E1004 |
1 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
36 |
$200.00 |
$444.70 |
$7200.00 |
11-06-2013 |
03-3E1004 |
2 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
36 |
$205.00 |
$455.82 |
$7380.00 |
11-06-2013 |
03-3E1004 |
3 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
36 |
$200.00 |
$444.70 |
$7200.00 |
11-06-2013 |
03-3E1004 |
4 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
36 |
$200.00 |
$444.70 |
$7200.00 |
11-06-2013 |
03-3E1004 |
5 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
6 |
$500.00 |
$1111.76 |
$3000.00 |
11-06-2013 |
04-2A6204 |
1 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
6 |
$500.00 |
$1111.76 |
$3000.00 |
11-06-2013 |
04-2A6204 |
2 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
6 |
$875.00 |
$1945.58 |
$5250.00 |
11-06-2013 |
04-2A6204 |
3 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
6 |
$500.00 |
$1111.76 |
$3000.00 |
11-06-2013 |
04-2A6204 |
4 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
6 |
$840.00 |
$1867.76 |
$5040.00 |
11-06-2013 |
04-2A6204 |
5 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
6 |
$500.00 |
$1111.76 |
$3000.00 |
11-06-2013 |
04-2A6204 |
6 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
6 |
$500.00 |
$1111.76 |
$3000.00 |
11-06-2013 |
04-2A6204 |
7 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
6 |
$1000.00 |
$2223.52 |
$6000.00 |
11-06-2013 |
04-2A6204 |
8 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
6 |
$800.00 |
$1778.82 |
$4800.00 |
11-06-2013 |
04-2A6204 |
9 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
6 |
$550.00 |
$1222.94 |
$3300.00 |
11-06-2013 |
04-2A6204 |
10 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
1 |
$1161.68 |
$2583.02 |
$1161.68 |
11-14-2013 |
11-282404 |
1 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
1 |
$500.00 |
$1111.76 |
$500.00 |
11-14-2013 |
11-282404 |
2 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
1 |
$500.00 |
$1111.76 |
$500.00 |
11-14-2013 |
11-282404 |
3 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
1 |
$900.00 |
$2001.17 |
$900.00 |
11-14-2013 |
11-282404 |
4 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
1 |
$500.00 |
$1111.76 |
$500.00 |
11-14-2013 |
11-282404 |
5 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
1 |
$900.00 |
$2001.17 |
$900.00 |
11-14-2013 |
11-282404 |
6 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
1 |
$5000.00 |
$11117.60 |
$5000.00 |
11-14-2013 |
11-282404 |
7 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
1 |
$2800.00 |
$6225.86 |
$2800.00 |
11-14-2013 |
11-282404 |
8 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
10 |
$500.00 |
$1111.76 |
$5000.00 |
11-20-2013 |
04-0A5344 |
1 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
10 |
$600.00 |
$1334.11 |
$6000.00 |
11-20-2013 |
04-0A5344 |
2 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
10 |
$600.00 |
$1334.11 |
$6000.00 |
11-20-2013 |
04-0A5344 |
3 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
10 |
$500.00 |
$1111.76 |
$5000.00 |
11-20-2013 |
04-0A5344 |
4 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
10 |
$500.00 |
$1111.76 |
$5000.00 |
11-20-2013 |
04-0A5344 |
5 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
10 |
$550.00 |
$1222.94 |
$5500.00 |
11-20-2013 |
04-0A5344 |
6 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
10 |
$1500.00 |
$3335.28 |
$15000.00 |
11-20-2013 |
04-0A5344 |
7 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
10 |
12 |
$2500.00 |
$5558.80 |
$30000.00 |
11-20-2013 |
10-0S1104 |
1 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
10 |
12 |
$500.00 |
$1111.76 |
$6000.00 |
11-20-2013 |
10-0S1104 |
2 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
10 |
12 |
$500.00 |
$1111.76 |
$6000.00 |
11-20-2013 |
10-0S1104 |
3 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
10 |
12 |
$500.00 |
$1111.76 |
$6000.00 |
11-20-2013 |
10-0S1104 |
4 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
10 |
12 |
$550.00 |
$1222.94 |
$6600.00 |
11-20-2013 |
10-0S1104 |
5 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
10 |
12 |
$500.00 |
$1111.76 |
$6000.00 |
11-20-2013 |
10-0S1104 |
6 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
10 |
12 |
$600.00 |
$1334.11 |
$7200.00 |
11-20-2013 |
10-0S1104 |
7 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
10 |
12 |
$600.00 |
$1334.11 |
$7200.00 |
11-20-2013 |
10-0S1104 |
8 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
10 |
12 |
$600.00 |
$1334.11 |
$7200.00 |
11-20-2013 |
10-0S1104 |
9 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
10 |
4 |
$1050.00 |
$2334.70 |
$4200.00 |
12-18-2013 |
10-0W1204 |
1 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
10 |
4 |
$750.00 |
$1667.64 |
$3000.00 |
12-18-2013 |
10-0W1204 |
2 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
10 |
4 |
$850.00 |
$1889.99 |
$3400.00 |
12-18-2013 |
10-0W1204 |
3 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
10 |
4 |
$750.00 |
$1667.64 |
$3000.00 |
12-18-2013 |
10-0W1204 |
4 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
10 |
4 |
$750.00 |
$1667.64 |
$3000.00 |
12-18-2013 |
10-0W1204 |
5 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
10 |
4 |
$500.00 |
$1111.76 |
$2000.00 |
12-18-2013 |
10-0W1204 |
6 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
10 |
4 |
$525.00 |
$1167.35 |
$2100.00 |
12-18-2013 |
10-0W1204 |
7 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
10 |
4 |
$500.00 |
$1111.76 |
$2000.00 |
12-18-2013 |
10-0W1204 |
8 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
10 |
4 |
$1000.00 |
$2223.52 |
$4000.00 |
12-18-2013 |
10-0W1204 |
9 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
10 |
4 |
$510.00 |
$1134.00 |
$2040.00 |
12-18-2013 |
10-0W1204 |
10 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
10 |
4 |
$750.00 |
$1667.64 |
$3000.00 |
12-18-2013 |
10-0W1204 |
11 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
07 |
25 |
$400.00 |
$889.41 |
$10000.00 |
12-19-2013 |
07-1170U4 |
1 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
07 |
25 |
$240.00 |
$533.64 |
$6000.00 |
12-19-2013 |
07-1170U4 |
2 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
07 |
25 |
$400.00 |
$889.41 |
$10000.00 |
12-19-2013 |
07-1170U4 |
3 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
07 |
25 |
$250.00 |
$555.88 |
$6250.00 |
12-19-2013 |
07-1170U4 |
4 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
07 |
25 |
$200.00 |
$444.70 |
$5000.00 |
12-19-2013 |
07-1170U4 |
5 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
07 |
25 |
$600.00 |
$1334.11 |
$15000.00 |
12-19-2013 |
07-1170U4 |
6 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
07 |
24 |
$620.00 |
$1105.08 |
$14880.00 |
01-09-2014 |
07-215954 |
1 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
07 |
24 |
$800.00 |
$1425.91 |
$19200.00 |
01-09-2014 |
07-215954 |
2 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
07 |
24 |
$500.00 |
$891.19 |
$12000.00 |
01-09-2014 |
07-215954 |
3 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
07 |
24 |
$510.00 |
$909.02 |
$12240.00 |
01-09-2014 |
07-215954 |
4 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
07 |
24 |
$1250.00 |
$2227.98 |
$30000.00 |
01-09-2014 |
07-215954 |
5 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
1 |
$1000.00 |
$1782.39 |
$1000.00 |
02-04-2014 |
04-265604 |
1 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
1 |
$800.00 |
$1425.91 |
$800.00 |
02-04-2014 |
04-265604 |
2 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
1 |
$1000.00 |
$1782.39 |
$1000.00 |
02-04-2014 |
04-265604 |
3 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
1 |
$2000.00 |
$3564.77 |
$2000.00 |
02-04-2014 |
04-265604 |
4 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
1 |
$500.00 |
$891.19 |
$500.00 |
02-04-2014 |
04-265604 |
5 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
1 |
$1000.00 |
$1782.39 |
$1000.00 |
02-04-2014 |
04-265604 |
6 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
1 |
$2000.00 |
$3564.77 |
$2000.00 |
02-04-2014 |
04-265604 |
7 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
06 |
2 |
$830.00 |
$1479.38 |
$1660.00 |
03-26-2014 |
06-487504 |
1 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
06 |
2 |
$825.00 |
$1470.47 |
$1650.00 |
03-26-2014 |
06-487504 |
2 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
06 |
2 |
$250.00 |
$445.60 |
$500.00 |
03-26-2014 |
06-487504 |
3 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
06 |
2 |
$250.00 |
$445.60 |
$500.00 |
03-26-2014 |
06-487504 |
4 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
06 |
2 |
$650.00 |
$1158.55 |
$1300.00 |
03-26-2014 |
06-487504 |
5 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
06 |
2 |
$250.00 |
$445.60 |
$500.00 |
03-26-2014 |
06-487504 |
6 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
06 |
2 |
$750.00 |
$1336.79 |
$1500.00 |
03-26-2014 |
06-487504 |
7 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
06 |
2 |
$750.00 |
$1336.79 |
$1500.00 |
03-26-2014 |
06-487504 |
8 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
12 |
12 |
$600.00 |
$1381.27 |
$7200.00 |
04-17-2014 |
12-0F96C4 |
1 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
12 |
12 |
$500.00 |
$1151.06 |
$6000.00 |
04-17-2014 |
12-0F96C4 |
2 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
12 |
12 |
$400.00 |
$920.85 |
$4800.00 |
04-17-2014 |
12-0F96C4 |
3 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
12 |
12 |
$560.00 |
$1289.19 |
$6720.00 |
04-17-2014 |
12-0F96C4 |
4 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
12 |
12 |
$500.00 |
$1151.06 |
$6000.00 |
04-17-2014 |
12-0F96C4 |
5 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
12 |
12 |
$485.00 |
$1116.53 |
$5820.00 |
04-17-2014 |
12-0F96C4 |
6 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
12 |
12 |
$1000.00 |
$2302.12 |
$12000.00 |
04-17-2014 |
12-0F96C4 |
7 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
12 |
12 |
$500.00 |
$1151.06 |
$6000.00 |
04-17-2014 |
12-0F96C4 |
8 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
12 |
12 |
$500.00 |
$1151.06 |
$6000.00 |
04-17-2014 |
12-0F96C4 |
9 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
12 |
12 |
$550.00 |
$1266.17 |
$6600.00 |
04-17-2014 |
12-0F96C4 |
10 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
10 |
$420.00 |
$966.89 |
$4200.00 |
04-29-2014 |
04-2A2504 |
1 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
10 |
$520.00 |
$1197.10 |
$5200.00 |
04-29-2014 |
04-2A2504 |
2 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
10 |
$400.00 |
$920.85 |
$4000.00 |
04-29-2014 |
04-2A2504 |
3 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
10 |
$1500.00 |
$3453.18 |
$15000.00 |
04-29-2014 |
04-2A2504 |
4 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
2 |
$950.00 |
$2187.01 |
$1900.00 |
04-30-2014 |
03-1F8904 |
1 |
|
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
2 |
$770.00 |
$1772.63 |
$1540.00 |
04-30-2014 |
03-1F8904 |
2 |
|
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
2 |
$1202.00 |
$2767.15 |
$2404.00 |
04-30-2014 |
03-1F8904 |
3 |
|
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
2 |
$500.00 |
$1151.06 |
$1000.00 |
04-30-2014 |
03-1F8904 |
4 |
|
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
2 |
$510.00 |
$1174.08 |
$1020.00 |
04-30-2014 |
03-1F8904 |
5 |
|
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
01 |
4 |
$1000.00 |
$2302.12 |
$4000.00 |
05-07-2014 |
01-0A3604 |
1 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
01 |
4 |
$1000.00 |
$2302.12 |
$4000.00 |
05-07-2014 |
01-0A3604 |
2 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
01 |
4 |
$1000.00 |
$2302.12 |
$4000.00 |
05-07-2014 |
01-0A3604 |
3 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
01 |
1 |
$800.00 |
$1841.70 |
$800.00 |
05-07-2014 |
01-499104 |
1 |
|
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
01 |
1 |
$250.00 |
$575.53 |
$250.00 |
05-07-2014 |
01-499104 |
2 |
|
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
41 |
$400.00 |
$920.85 |
$16400.00 |
05-13-2014 |
04-235844 |
1 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
41 |
$787.50 |
$1812.92 |
$32287.50 |
05-13-2014 |
04-235844 |
2 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
41 |
$750.00 |
$1726.59 |
$30750.00 |
05-13-2014 |
04-235844 |
3 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
41 |
$750.00 |
$1726.59 |
$30750.00 |
05-13-2014 |
04-235844 |
4 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
41 |
$800.00 |
$1841.70 |
$32800.00 |
05-13-2014 |
04-235844 |
5 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
41 |
$562.00 |
$1293.79 |
$23042.00 |
05-13-2014 |
04-235844 |
6 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
41 |
$750.00 |
$1726.59 |
$30750.00 |
05-13-2014 |
04-235844 |
7 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
41 |
$750.00 |
$1726.59 |
$30750.00 |
05-13-2014 |
04-235844 |
8 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
41 |
$825.00 |
$1899.25 |
$33825.00 |
05-13-2014 |
04-235844 |
9 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
LS |
02 |
1 |
$3000.00 |
$6906.36 |
$3000.00 |
06-04-2014 |
02-3C0714 |
1 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
LS |
02 |
1 |
$2500.00 |
$5755.30 |
$2500.00 |
06-04-2014 |
02-3C0714 |
2 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
LS |
02 |
1 |
$7400.00 |
$17035.70 |
$7400.00 |
06-04-2014 |
02-3C0714 |
3 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
LS |
02 |
1 |
$3500.00 |
$8057.42 |
$3500.00 |
06-04-2014 |
02-3C0714 |
4 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
LS |
02 |
1 |
$4000.00 |
$9208.48 |
$4000.00 |
06-04-2014 |
02-3C0714 |
5 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
01 |
9 |
$1250.00 |
$2877.65 |
$11250.00 |
06-18-2014 |
01-474904 |
1 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
01 |
9 |
$750.00 |
$1726.59 |
$6750.00 |
06-18-2014 |
01-474904 |
2 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
01 |
9 |
$925.00 |
$2129.46 |
$8325.00 |
06-18-2014 |
01-474904 |
3 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
01 |
9 |
$900.00 |
$2071.91 |
$8100.00 |
06-18-2014 |
01-474904 |
4 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
01 |
9 |
$1300.00 |
$2992.76 |
$11700.00 |
06-18-2014 |
01-474904 |
5 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
01 |
9 |
$1080.00 |
$2486.29 |
$9720.00 |
06-18-2014 |
01-474904 |
6 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
01 |
9 |
$900.00 |
$2071.91 |
$8100.00 |
06-18-2014 |
01-474904 |
7 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
12 |
$500.00 |
$1151.06 |
$6000.00 |
06-19-2014 |
11-257154 |
1 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
12 |
$250.00 |
$575.53 |
$3000.00 |
06-19-2014 |
11-257154 |
2 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
12 |
$200.00 |
$460.42 |
$2400.00 |
06-19-2014 |
11-257154 |
3 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
12 |
$650.00 |
$1496.38 |
$7800.00 |
06-19-2014 |
11-257154 |
4 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
12 |
$700.00 |
$1611.48 |
$8400.00 |
06-19-2014 |
11-257154 |
5 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
12 |
$285.00 |
$656.10 |
$3420.00 |
06-19-2014 |
11-257154 |
6 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
12 |
$399.73 |
$920.23 |
$4796.76 |
06-19-2014 |
11-257154 |
7 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
2 |
$450.00 |
$1035.95 |
$900.00 |
06-26-2014 |
11-263304 |
1 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
2 |
$500.00 |
$1151.06 |
$1000.00 |
06-26-2014 |
11-263304 |
2 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
2 |
$900.00 |
$2071.91 |
$1800.00 |
06-26-2014 |
11-263304 |
3 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
2 |
$450.00 |
$1035.95 |
$900.00 |
06-26-2014 |
11-263304 |
4 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
2 |
$500.00 |
$1151.06 |
$1000.00 |
06-26-2014 |
11-263304 |
5 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
4 |
$930.00 |
$2067.56 |
$3720.00 |
07-08-2014 |
04-152724 |
1 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
4 |
$900.00 |
$2000.86 |
$3600.00 |
07-08-2014 |
04-152724 |
2 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
4 |
$600.00 |
$1333.91 |
$2400.00 |
07-08-2014 |
04-152724 |
3 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
4 |
$500.00 |
$1111.59 |
$2000.00 |
07-08-2014 |
04-152724 |
4 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
4 |
$500.00 |
$1111.59 |
$2000.00 |
07-08-2014 |
04-152724 |
5 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
4 |
$900.00 |
$2000.86 |
$3600.00 |
07-08-2014 |
04-152724 |
6 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
4 |
$700.00 |
$1556.23 |
$2800.00 |
07-08-2014 |
04-152724 |
7 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
4 |
$650.00 |
$1445.07 |
$2600.00 |
07-08-2014 |
04-294944 |
1 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
4 |
$1000.00 |
$2223.18 |
$4000.00 |
07-08-2014 |
04-294944 |
2 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
4 |
$1500.00 |
$3334.77 |
$6000.00 |
07-08-2014 |
04-294944 |
3 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
4 |
$500.00 |
$1111.59 |
$2000.00 |
07-08-2014 |
04-294944 |
4 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
4 |
$1000.00 |
$2223.18 |
$4000.00 |
07-08-2014 |
04-294944 |
5 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
1 |
$500.00 |
$1111.59 |
$500.00 |
07-24-2014 |
11-2T2504 |
1 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
1 |
$400.00 |
$889.27 |
$400.00 |
07-24-2014 |
11-2T2504 |
2 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
1 |
$400.00 |
$889.27 |
$400.00 |
07-24-2014 |
11-2T2504 |
3 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
1 |
$500.00 |
$1111.59 |
$500.00 |
07-24-2014 |
11-2T2504 |
4 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
1 |
$479.00 |
$1064.90 |
$479.00 |
07-24-2014 |
11-2T2504 |
5 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
6 |
$1200.00 |
$2667.82 |
$7200.00 |
08-06-2014 |
03-1A8424 |
1 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
6 |
$1000.00 |
$2223.18 |
$6000.00 |
08-06-2014 |
03-1A8424 |
2 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
6 |
$918.00 |
$2040.88 |
$5508.00 |
08-06-2014 |
03-1A8424 |
3 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
6 |
$500.00 |
$1111.59 |
$3000.00 |
09-24-2014 |
03-4F0704 |
1 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
6 |
$300.00 |
$666.95 |
$1800.00 |
09-24-2014 |
03-4F0704 |
2 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
6 |
$500.00 |
$1111.59 |
$3000.00 |
09-24-2014 |
03-4F0704 |
3 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
6 |
$300.00 |
$666.95 |
$1800.00 |
09-24-2014 |
03-4F0704 |
4 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
6 |
$500.00 |
$1111.59 |
$3000.00 |
09-24-2014 |
03-4F0704 |
5 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
6 |
$300.00 |
$666.95 |
$1800.00 |
09-24-2014 |
03-4F0704 |
6 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
6 |
$500.00 |
$1111.59 |
$3000.00 |
09-24-2014 |
03-4F0704 |
7 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
6 |
$770.00 |
$1711.85 |
$4620.00 |
09-24-2014 |
03-4F0704 |
8 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
8 |
$775.00 |
$1511.52 |
$6200.00 |
10-09-2014 |
11-0223U4 |
1 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
8 |
$600.00 |
$1170.21 |
$4800.00 |
10-09-2014 |
11-0223U4 |
2 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
8 |
$765.00 |
$1492.02 |
$6120.00 |
10-09-2014 |
11-0223U4 |
3 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
8 |
$400.00 |
$780.14 |
$3200.00 |
10-09-2014 |
11-0223U4 |
4 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
8 |
$830.00 |
$1618.79 |
$6640.00 |
10-09-2014 |
11-0223U4 |
5 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
07 |
12 |
$715.00 |
$1394.50 |
$8580.00 |
10-16-2014 |
07-2881U4 |
1 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
07 |
12 |
$750.00 |
$1462.76 |
$9000.00 |
10-16-2014 |
07-2881U4 |
2 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
07 |
12 |
$600.00 |
$1170.21 |
$7200.00 |
10-16-2014 |
07-2881U4 |
3 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
07 |
12 |
$819.00 |
$1597.34 |
$9828.00 |
10-16-2014 |
07-2881U4 |
4 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
07 |
12 |
$500.00 |
$975.18 |
$6000.00 |
10-16-2014 |
07-2881U4 |
5 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
07 |
12 |
$2000.00 |
$3900.71 |
$24000.00 |
10-16-2014 |
07-2881U4 |
6 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
1 |
$1000.00 |
$1950.35 |
$1000.00 |
10-21-2014 |
04-1SS024 |
1 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
1 |
$500.00 |
$975.18 |
$500.00 |
10-21-2014 |
04-1SS024 |
2 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
1 |
$750.00 |
$1462.76 |
$750.00 |
10-21-2014 |
04-1SS024 |
3 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
1 |
$550.00 |
$1072.69 |
$550.00 |
10-21-2014 |
04-1SS024 |
4 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
1 |
$650.00 |
$1267.73 |
$650.00 |
10-21-2014 |
04-1SS024 |
5 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
1 |
$1500.00 |
$2925.53 |
$1500.00 |
10-21-2014 |
04-1SS024 |
6 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
1 |
$1000.00 |
$1950.35 |
$1000.00 |
10-21-2014 |
04-1SS024 |
7 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
05 |
6 |
$650.00 |
$1267.73 |
$3900.00 |
10-21-2014 |
05-0T6404 |
1 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
05 |
6 |
$650.00 |
$1267.73 |
$3900.00 |
10-21-2014 |
05-0T6404 |
2 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
05 |
6 |
$650.00 |
$1267.73 |
$3900.00 |
10-21-2014 |
05-0T6404 |
3 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
05 |
6 |
$760.00 |
$1482.27 |
$4560.00 |
10-21-2014 |
05-0T6404 |
4 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
05 |
6 |
$650.00 |
$1267.73 |
$3900.00 |
10-21-2014 |
05-0T6404 |
5 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
05 |
6 |
$700.00 |
$1365.25 |
$4200.00 |
10-21-2014 |
05-0T6404 |
6 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
01 |
2 |
$400.00 |
$780.14 |
$800.00 |
10-22-2014 |
01-488604 |
1 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
01 |
2 |
$250.00 |
$487.59 |
$500.00 |
10-22-2014 |
01-488604 |
2 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
01 |
2 |
$500.00 |
$975.18 |
$1000.00 |
10-22-2014 |
01-488604 |
3 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
01 |
2 |
$750.00 |
$1462.76 |
$1500.00 |
10-22-2014 |
01-488604 |
4 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
01 |
2 |
$1000.00 |
$1950.35 |
$2000.00 |
10-22-2014 |
01-488604 |
5 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
01 |
2 |
$850.00 |
$1657.80 |
$1700.00 |
10-22-2014 |
01-488604 |
6 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
6 |
$1000.00 |
$1950.35 |
$6000.00 |
10-29-2014 |
03-1A8434 |
1 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
6 |
$250.00 |
$487.59 |
$1500.00 |
10-29-2014 |
03-1A8434 |
2 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
06 |
6 |
$750.00 |
$1462.76 |
$4500.00 |
11-05-2014 |
06-0P1404 |
1 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
06 |
6 |
$275.00 |
$536.35 |
$1650.00 |
11-05-2014 |
06-0P1404 |
2 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
06 |
6 |
$285.00 |
$555.85 |
$1710.00 |
11-05-2014 |
06-0P1404 |
3 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
06 |
6 |
$525.00 |
$1023.94 |
$3150.00 |
11-05-2014 |
06-0P1404 |
4 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
06 |
6 |
$750.00 |
$1462.76 |
$4500.00 |
11-05-2014 |
06-0P1404 |
5 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
06 |
6 |
$750.00 |
$1462.76 |
$4500.00 |
11-05-2014 |
06-0P1404 |
6 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
06 |
6 |
$275.00 |
$536.35 |
$1650.00 |
11-05-2014 |
06-0P1404 |
7 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
06 |
6 |
$700.00 |
$1365.25 |
$4200.00 |
11-05-2014 |
06-0P1404 |
8 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
02 |
30 |
$500.00 |
$975.18 |
$15000.00 |
11-19-2014 |
02-3E4104 |
1 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
02 |
30 |
$444.00 |
$865.96 |
$13320.00 |
11-19-2014 |
02-3E4104 |
2 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
02 |
30 |
$325.00 |
$633.86 |
$9750.00 |
11-19-2014 |
02-3E4104 |
3 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
02 |
30 |
$3500.00 |
$6826.23 |
$105000.00 |
11-19-2014 |
02-3E4104 |
4 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
02 |
30 |
$1000.00 |
$1950.35 |
$30000.00 |
11-19-2014 |
02-3E4104 |
5 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
1 |
$529.30 |
$1032.32 |
$529.30 |
11-19-2014 |
11-282504 |
1 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
1 |
$500.00 |
$975.18 |
$500.00 |
11-19-2014 |
11-282504 |
2 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
1 |
$500.00 |
$975.18 |
$500.00 |
11-19-2014 |
11-282504 |
3 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
1 |
$500.00 |
$975.18 |
$500.00 |
11-19-2014 |
11-282504 |
4 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
1 |
$300.00 |
$585.11 |
$300.00 |
11-19-2014 |
11-282504 |
5 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
08 |
10 |
$500.00 |
$975.18 |
$5000.00 |
12-04-2014 |
08-0M2004 |
1 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
08 |
10 |
$580.00 |
$1131.20 |
$5800.00 |
12-04-2014 |
08-0M2004 |
2 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
08 |
10 |
$630.00 |
$1228.72 |
$6300.00 |
12-04-2014 |
08-0M2004 |
3 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
08 |
10 |
$410.00 |
$799.64 |
$4100.00 |
12-04-2014 |
08-0M2004 |
4 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
08 |
10 |
$240.64 |
$469.33 |
$2406.40 |
12-04-2014 |
08-0M2004 |
5 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
08 |
10 |
$500.00 |
$975.18 |
$5000.00 |
12-04-2014 |
08-0M2004 |
6 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
2 |
$500.00 |
$975.18 |
$1000.00 |
12-11-2014 |
11-241514 |
1 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
2 |
$380.00 |
$741.13 |
$760.00 |
12-11-2014 |
11-241514 |
2 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
2 |
$700.00 |
$1365.25 |
$1400.00 |
12-11-2014 |
11-241514 |
3 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
2 |
$500.00 |
$975.18 |
$1000.00 |
12-11-2014 |
11-241514 |
4 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
2 |
$370.00 |
$721.63 |
$740.00 |
12-11-2014 |
11-241514 |
5 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
2 |
$604.27 |
$1178.54 |
$1208.54 |
12-11-2014 |
11-241514 |
6 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
6 |
$1300.00 |
$2535.46 |
$7800.00 |
12-17-2014 |
03-1A8454 |
1 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
6 |
$2530.00 |
$4934.39 |
$15180.00 |
12-17-2014 |
03-1A8454 |
2 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
6 |
$1000.00 |
$1950.35 |
$6000.00 |
12-17-2014 |
03-1A8454 |
3 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
6 |
$250.00 |
$487.59 |
$1500.00 |
12-17-2014 |
03-1A8454 |
4 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
4 |
$1000.00 |
$1526.04 |
$4000.00 |
01-21-2015 |
03-0F6904 |
1 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
4 |
$1000.00 |
$1526.04 |
$4000.00 |
01-21-2015 |
03-0F6904 |
2 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
4 |
$900.00 |
$1373.43 |
$3600.00 |
01-21-2015 |
03-0F6904 |
3 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
4 |
$575.00 |
$877.47 |
$2300.00 |
01-21-2015 |
03-0F6904 |
4 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
4 |
$750.00 |
$1144.53 |
$3000.00 |
01-21-2015 |
03-0F6904 |
5 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
4 |
$650.00 |
$991.92 |
$2600.00 |
01-21-2015 |
03-0F6904 |
6 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
4 |
$1020.00 |
$1556.56 |
$4080.00 |
01-21-2015 |
03-0F6904 |
7 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
4 |
$500.00 |
$763.02 |
$2000.00 |
01-21-2015 |
03-0F6904 |
8 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
4 |
$715.00 |
$1091.12 |
$2860.00 |
01-21-2015 |
03-0F6904 |
9 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
4 |
$500.00 |
$763.02 |
$2000.00 |
01-21-2015 |
03-0F6904 |
10 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
07 |
30 |
$300.00 |
$457.81 |
$9000.00 |
01-28-2015 |
07-2656U4 |
1 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
07 |
30 |
$900.00 |
$1373.43 |
$27000.00 |
01-28-2015 |
07-2656U4 |
2 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
07 |
30 |
$300.00 |
$457.81 |
$9000.00 |
01-28-2015 |
07-2656U4 |
3 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
07 |
30 |
$300.00 |
$457.81 |
$9000.00 |
01-28-2015 |
07-2656U4 |
4 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
07 |
30 |
$450.00 |
$686.72 |
$13500.00 |
01-28-2015 |
07-2656U4 |
5 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
07 |
30 |
$465.00 |
$709.61 |
$13950.00 |
01-28-2015 |
07-2656U4 |
6 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
07 |
30 |
$800.00 |
$1220.83 |
$24000.00 |
01-28-2015 |
07-2656U4 |
7 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
07 |
30 |
$500.00 |
$763.02 |
$15000.00 |
01-28-2015 |
07-2656U4 |
8 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
05 |
6 |
$750.00 |
$1144.53 |
$4500.00 |
01-29-2015 |
05-0C6404 |
1 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
05 |
6 |
$750.00 |
$1144.53 |
$4500.00 |
01-29-2015 |
05-0C6404 |
2 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
05 |
6 |
$750.00 |
$1144.53 |
$4500.00 |
01-29-2015 |
05-0C6404 |
3 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
12 |
$250.00 |
$381.51 |
$3000.00 |
02-12-2015 |
03-1F4204 |
1 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
12 |
$550.00 |
$839.32 |
$6600.00 |
02-12-2015 |
03-1F4204 |
2 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
12 |
$525.00 |
$801.17 |
$6300.00 |
02-12-2015 |
03-1F4204 |
3 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
12 |
$500.00 |
$763.02 |
$6000.00 |
02-12-2015 |
03-1F4204 |
4 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
12 |
$520.00 |
$793.54 |
$6240.00 |
02-12-2015 |
03-1F4204 |
5 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
12 |
$600.00 |
$915.62 |
$7200.00 |
02-12-2015 |
03-1F4204 |
6 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
12 |
$500.00 |
$763.02 |
$6000.00 |
02-12-2015 |
03-1F4204 |
7 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
2 |
$1000.00 |
$1526.04 |
$2000.00 |
03-04-2015 |
04-013524 |
1 |
|
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
2 |
$1000.00 |
$1526.04 |
$2000.00 |
03-04-2015 |
04-013524 |
2 |
|
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
2 |
$70000.00 |
$106822.54 |
$140000.00 |
03-04-2015 |
04-013524 |
3 |
|
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
2 |
$1000.00 |
$1526.04 |
$2000.00 |
03-04-2015 |
04-013524 |
4 |
|
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
01 |
11 |
$1535.16 |
$2342.71 |
$16886.76 |
03-12-2015 |
01-262054 |
1 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
01 |
11 |
$1300.00 |
$1983.85 |
$14300.00 |
03-12-2015 |
01-262054 |
2 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
01 |
11 |
$2426.00 |
$3702.16 |
$26686.00 |
03-12-2015 |
01-262054 |
3 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
01 |
11 |
$1130.00 |
$1724.42 |
$12430.00 |
03-12-2015 |
01-262054 |
4 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
01 |
11 |
$8250.00 |
$12589.80 |
$90750.00 |
03-12-2015 |
01-262054 |
5 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
05 |
28 |
$700.00 |
$1492.38 |
$19600.00 |
04-16-2015 |
05-492804 |
1 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
05 |
28 |
$500.00 |
$1065.98 |
$14000.00 |
04-16-2015 |
05-492804 |
2 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
05 |
28 |
$500.00 |
$1065.98 |
$14000.00 |
04-16-2015 |
05-492804 |
3 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
05 |
28 |
$1200.00 |
$2558.36 |
$33600.00 |
04-16-2015 |
05-492804 |
4 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
05 |
28 |
$500.00 |
$1065.98 |
$14000.00 |
04-16-2015 |
05-492804 |
5 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
01 |
30 |
$1050.00 |
$2238.56 |
$31500.00 |
04-28-2015 |
01-262064 |
1 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
01 |
30 |
$2000.00 |
$4263.93 |
$60000.00 |
04-28-2015 |
01-262064 |
2 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
01 |
30 |
$848.00 |
$1807.91 |
$25440.00 |
04-28-2015 |
01-262064 |
3 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
01 |
30 |
$1680.00 |
$3581.70 |
$50400.00 |
04-28-2015 |
01-262064 |
4 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
01 |
30 |
$1200.00 |
$2558.36 |
$36000.00 |
04-28-2015 |
01-262064 |
5 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
01 |
30 |
$1500.00 |
$3197.95 |
$45000.00 |
04-28-2015 |
01-262064 |
6 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
01 |
30 |
$1050.00 |
$2238.56 |
$31500.00 |
04-28-2015 |
01-262064 |
7 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
01 |
30 |
$1100.00 |
$2345.16 |
$33000.00 |
04-28-2015 |
01-262064 |
8 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
01 |
30 |
$1000.00 |
$2131.97 |
$30000.00 |
04-28-2015 |
01-262064 |
9 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
01 |
1 |
$400.00 |
$852.79 |
$400.00 |
05-20-2015 |
01-378144 |
1 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
01 |
1 |
$500.00 |
$1065.98 |
$500.00 |
05-20-2015 |
01-378144 |
2 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
01 |
1 |
$600.00 |
$1279.18 |
$600.00 |
05-20-2015 |
01-378144 |
3 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
01 |
1 |
$1000.00 |
$2131.97 |
$1000.00 |
05-20-2015 |
01-378144 |
4 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
01 |
1 |
$400.00 |
$852.79 |
$400.00 |
05-20-2015 |
01-378144 |
5 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
6 |
$450.00 |
$959.38 |
$2700.00 |
06-03-2015 |
03-3F1704 |
1 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
6 |
$450.00 |
$959.38 |
$2700.00 |
06-03-2015 |
03-3F1704 |
2 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
2 |
$765.31 |
$1631.61 |
$1530.62 |
06-11-2015 |
11-288814 |
1 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
2 |
$350.00 |
$746.19 |
$700.00 |
06-11-2015 |
11-288814 |
2 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
2 |
$450.00 |
$959.38 |
$900.00 |
06-11-2015 |
11-288814 |
3 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
2 |
$400.00 |
$852.79 |
$800.00 |
06-11-2015 |
11-288814 |
4 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
01 |
1 |
$2000.00 |
$4263.93 |
$2000.00 |
06-16-2015 |
01-0B4004 |
1 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
01 |
1 |
$1000.00 |
$2131.97 |
$1000.00 |
06-16-2015 |
01-0B4004 |
2 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
01 |
1 |
$700.00 |
$1492.38 |
$700.00 |
06-16-2015 |
01-0B4004 |
3 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
1 |
$350.00 |
$746.19 |
$350.00 |
06-23-2015 |
11-282304 |
1 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
1 |
$200.00 |
$426.39 |
$200.00 |
06-23-2015 |
11-282304 |
2 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
1 |
$182.24 |
$388.53 |
$182.24 |
06-23-2015 |
11-282304 |
3 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
1 |
$500.00 |
$1065.98 |
$500.00 |
06-23-2015 |
11-282304 |
4 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
22 |
$400.00 |
$852.79 |
$8800.00 |
06-25-2015 |
04-297624 |
1 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
22 |
$420.00 |
$895.43 |
$9240.00 |
06-25-2015 |
04-297624 |
2 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
22 |
$400.00 |
$852.79 |
$8800.00 |
06-25-2015 |
04-297624 |
3 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
22 |
$500.00 |
$1065.98 |
$11000.00 |
06-25-2015 |
04-297624 |
4 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
22 |
$450.00 |
$959.38 |
$9900.00 |
06-25-2015 |
04-297624 |
5 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
22 |
$400.00 |
$852.79 |
$8800.00 |
06-25-2015 |
04-297624 |
6 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
22 |
$649.75 |
$1385.24 |
$14294.50 |
06-25-2015 |
04-297624 |
7 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
22 |
$700.00 |
$1492.38 |
$15400.00 |
06-25-2015 |
04-297624 |
8 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
22 |
$1250.01 |
$2664.98 |
$27500.22 |
06-25-2015 |
04-297624 |
9 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
6 |
$1045.00 |
$2227.90 |
$6270.00 |
06-30-2015 |
03-1A8434 |
1 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
6 |
$1000.00 |
$2131.97 |
$6000.00 |
06-30-2015 |
03-1A8434 |
2 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
6 |
$877.00 |
$1869.73 |
$5262.00 |
06-30-2015 |
03-1A8434 |
3 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
6 |
$250.00 |
$532.99 |
$1500.00 |
06-30-2015 |
03-1A8434 |
4 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
05 |
6 |
$500.00 |
$1062.12 |
$3000.00 |
07-01-2015 |
05-0T5404 |
1 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
05 |
6 |
$500.00 |
$1062.12 |
$3000.00 |
07-01-2015 |
05-0T5404 |
2 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
06 |
6 |
$500.00 |
$1062.12 |
$3000.00 |
07-02-2015 |
06-0G9004 |
1 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
06 |
6 |
$600.00 |
$1274.54 |
$3600.00 |
07-02-2015 |
06-0G9004 |
2 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
06 |
6 |
$700.00 |
$1486.97 |
$4200.00 |
07-02-2015 |
06-0G9004 |
3 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
06 |
6 |
$600.00 |
$1274.54 |
$3600.00 |
07-02-2015 |
06-0G9004 |
4 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
01 |
4 |
$550.00 |
$1168.33 |
$2200.00 |
07-28-2015 |
01-0A3204 |
1 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
01 |
4 |
$700.00 |
$1486.97 |
$2800.00 |
07-28-2015 |
01-0A3204 |
2 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
01 |
4 |
$570.00 |
$1210.82 |
$2280.00 |
07-28-2015 |
01-0A3204 |
3 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
01 |
4 |
$500.00 |
$1062.12 |
$2000.00 |
07-28-2015 |
01-0A3204 |
4 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
01 |
4 |
$530.00 |
$1125.85 |
$2120.00 |
07-28-2015 |
01-0A3204 |
5 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
1 |
$1000.00 |
$2124.24 |
$1000.00 |
08-11-2015 |
04-2G8604 |
1 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
1 |
$650.00 |
$1380.76 |
$650.00 |
08-11-2015 |
04-2G8604 |
2 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
1 |
$1000.00 |
$2124.24 |
$1000.00 |
08-11-2015 |
04-2G8604 |
3 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
04 |
1 |
$500.00 |
$1062.12 |
$500.00 |
08-11-2015 |
04-2G8604 |
4 |
M |
|
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
12 |
$275.00 |
$584.17 |
$3300.00 |
08-13-2015 |
03-4E8604 |
1 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
12 |
$250.00 |
$531.06 |
$3000.00 |
08-13-2015 |
03-4E8604 |
2 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
12 |
$260.00 |
$552.30 |
$3120.00 |
08-13-2015 |
03-4E8604 |
3 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
12 |
$260.00 |
$552.30 |
$3120.00 |
08-13-2015 |
03-4E8604 |
4 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
12 |
$183.00 |
$388.74 |
$2196.00 |
08-13-2015 |
03-4E8604 |
5 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
12 |
$260.00 |
$552.30 |
$3120.00 |
08-13-2015 |
03-4E8604 |
6 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
08 |
20 |
$750.00 |
$1593.18 |
$15000.00 |
08-27-2015 |
08-3555V4 |
1 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
08 |
20 |
$780.00 |
$1656.91 |
$15600.00 |
08-27-2015 |
08-3555V4 |
2 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
08 |
20 |
$500.00 |
$1062.12 |
$10000.00 |
08-27-2015 |
08-3555V4 |
3 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
08 |
20 |
$525.00 |
$1115.23 |
$10500.00 |
08-27-2015 |
08-3555V4 |
4 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
08 |
20 |
$550.00 |
$1168.33 |
$11000.00 |
08-27-2015 |
08-3555V4 |
5 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
08 |
20 |
$550.00 |
$1168.33 |
$11000.00 |
08-27-2015 |
08-3555V4 |
6 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
08 |
20 |
$500.00 |
$1062.12 |
$10000.00 |
08-27-2015 |
08-3555V4 |
7 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
08 |
20 |
$500.00 |
$1062.12 |
$10000.00 |
08-27-2015 |
08-3555V4 |
8 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
08 |
20 |
$530.00 |
$1125.85 |
$10600.00 |
08-27-2015 |
08-3555V4 |
9 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
2 |
$320.00 |
$679.76 |
$640.00 |
09-03-2015 |
11-2T1904 |
1 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
2 |
$400.00 |
$849.70 |
$800.00 |
09-03-2015 |
11-2T1904 |
2 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
2 |
$450.00 |
$955.91 |
$900.00 |
09-03-2015 |
11-2T1904 |
3 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
2 |
$326.53 |
$693.63 |
$653.06 |
09-03-2015 |
11-2T1904 |
4 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
2 |
$1120.00 |
$2379.15 |
$2240.00 |
09-03-2015 |
11-2T1904 |
5 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
11 |
2 |
$500.00 |
$1062.12 |
$1000.00 |
09-03-2015 |
11-2T1904 |
6 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
06 |
3 |
$1224.00 |
$2600.07 |
$3672.00 |
09-09-2015 |
06-360234 |
1 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
06 |
3 |
$350.00 |
$743.48 |
$1050.00 |
09-09-2015 |
06-360234 |
2 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
06 |
3 |
$535.00 |
$1136.47 |
$1605.00 |
09-09-2015 |
06-360234 |
3 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
06 |
3 |
$1200.00 |
$2549.09 |
$3600.00 |
09-09-2015 |
06-360234 |
4 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
07 |
2 |
$1000.00 |
$1924.23 |
$2000.00 |
10-08-2015 |
07-3X7114 |
1 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
07 |
2 |
$600.00 |
$1154.54 |
$1200.00 |
10-08-2015 |
07-3X7114 |
2 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
07 |
2 |
$900.00 |
$1731.81 |
$1800.00 |
10-08-2015 |
07-3X7114 |
3 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
07 |
2 |
$700.00 |
$1346.96 |
$1400.00 |
10-08-2015 |
07-3X7114 |
4 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
07 |
2 |
$500.00 |
$962.11 |
$1000.00 |
10-08-2015 |
07-3X7114 |
5 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
07 |
2 |
$1500.00 |
$2886.34 |
$3000.00 |
10-08-2015 |
07-3X7114 |
6 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
07 |
2 |
$1500.00 |
$2886.34 |
$3000.00 |
10-08-2015 |
07-3X7114 |
7 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
6 |
$600.00 |
$1154.54 |
$3600.00 |
10-28-2015 |
03-0F3704 |
1 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
6 |
$600.00 |
$1154.54 |
$3600.00 |
10-28-2015 |
03-0F3704 |
2 |
M |
TRO |
|
| 130505 - MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL) |
EA |
03 |
6 |
$950.00 |
$1828.02 |
$5700.00 |
10-28-2015 |
03-0F3704 |
3 |
M |
TRO |
|
MORE THAN 500 RESULTS RETURNED. ONLY 500 ROWS SHOWN.
|