| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
735 |
$179.00 |
$782.95 |
$131565.00 |
04-17-2001 |
04-261304 |
1 |
|
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
610 |
$737.00 |
$3223.66 |
$449570.00 |
06-07-2001 |
07-194804 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
57 |
$100.00 |
$437.40 |
$5700.00 |
06-13-2001 |
04-181624 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
105 |
$50.00 |
$218.70 |
$5250.00 |
06-28-2001 |
07-195324 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
1450 |
$255.74 |
$1118.61 |
$370823.00 |
07-12-2001 |
07-129944 |
1 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
330 |
$40.00 |
$174.96 |
$13200.00 |
08-23-2001 |
07-190204 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
1100 |
$95.00 |
$415.53 |
$104500.00 |
09-06-2001 |
07-020484 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
11 |
49 |
$37.00 |
$161.84 |
$1813.00 |
09-06-2001 |
11-069104 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
27 |
$95.00 |
$415.53 |
$2565.00 |
09-19-2001 |
04-162724 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
210 |
$175.00 |
$765.46 |
$36750.00 |
09-20-2001 |
07-490614 |
1 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
4710 |
$60.00 |
$262.44 |
$282600.00 |
11-01-2001 |
07-1069U4 |
1 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
1180 |
$130.00 |
$568.62 |
$153400.00 |
11-01-2001 |
07-201304 |
1 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
3540 |
$80.00 |
$349.92 |
$283200.00 |
11-15-2001 |
07-1760U4 |
1 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
270 |
$205.00 |
$896.68 |
$55350.00 |
11-28-2001 |
04-292844 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
440 |
$300.00 |
$1312.21 |
$132000.00 |
12-12-2001 |
04-226124 |
1 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
320 |
$200.00 |
$945.35 |
$64000.00 |
02-21-2002 |
07-191304 |
2 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
320 |
$140.00 |
$661.75 |
$44800.00 |
02-21-2002 |
07-191304 |
3 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
320 |
$190.00 |
$898.09 |
$60800.00 |
02-21-2002 |
07-191304 |
4 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
320 |
$78.00 |
$368.69 |
$24960.00 |
02-21-2002 |
07-191304 |
5 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
320 |
$145.00 |
$685.38 |
$46400.00 |
02-21-2002 |
07-191304 |
6 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
320 |
$185.00 |
$874.45 |
$59200.00 |
02-21-2002 |
07-191304 |
7 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
380 |
$200.00 |
$945.35 |
$76000.00 |
03-21-2002 |
07-4H5404 |
1 |
|
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
380 |
$200.00 |
$945.35 |
$76000.00 |
03-21-2002 |
07-4H5404 |
2 |
|
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
380 |
$205.00 |
$968.99 |
$77900.00 |
03-21-2002 |
07-4H5404 |
3 |
|
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
380 |
$85.00 |
$401.78 |
$32300.00 |
03-21-2002 |
07-4H5404 |
4 |
|
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
380 |
$200.00 |
$945.35 |
$76000.00 |
03-21-2002 |
07-4H5404 |
5 |
|
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
380 |
$300.00 |
$1418.03 |
$114000.00 |
03-21-2002 |
07-4H5404 |
6 |
|
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
380 |
$212.00 |
$1002.08 |
$80560.00 |
03-21-2002 |
07-4H5404 |
7 |
|
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
69 |
$255.00 |
$1205.33 |
$17595.00 |
04-23-2002 |
04-443204 |
1 |
|
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
69 |
$271.00 |
$1280.96 |
$18699.00 |
04-23-2002 |
04-443204 |
2 |
|
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
69 |
$100.00 |
$472.68 |
$6900.00 |
04-23-2002 |
04-443204 |
3 |
|
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
320 |
$140.00 |
$661.75 |
$44800.00 |
04-25-2002 |
07-191304 |
1 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
320 |
$137.00 |
$647.57 |
$43840.00 |
04-25-2002 |
07-191304 |
2 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
320 |
$120.00 |
$567.21 |
$38400.00 |
04-25-2002 |
07-191304 |
3 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
320 |
$78.00 |
$368.69 |
$24960.00 |
04-25-2002 |
07-191304 |
4 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
320 |
$165.00 |
$779.92 |
$52800.00 |
04-25-2002 |
07-191304 |
5 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
320 |
$140.00 |
$661.75 |
$44800.00 |
04-25-2002 |
07-191304 |
6 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
350 |
$152.00 |
$718.47 |
$53200.00 |
04-25-2002 |
07-4N2804 |
1 |
|
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
350 |
$200.00 |
$945.35 |
$70000.00 |
04-25-2002 |
07-4N2804 |
2 |
|
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
350 |
$224.00 |
$1058.80 |
$78400.00 |
04-25-2002 |
07-4N2804 |
3 |
|
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
350 |
$150.00 |
$709.02 |
$52500.00 |
04-25-2002 |
07-4N2804 |
4 |
|
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
350 |
$147.00 |
$694.84 |
$51450.00 |
04-25-2002 |
07-4N2804 |
5 |
|
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
350 |
$300.00 |
$1418.03 |
$105000.00 |
04-25-2002 |
07-4N2804 |
6 |
|
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
350 |
$680.00 |
$3214.21 |
$238000.00 |
04-25-2002 |
07-4N2804 |
7 |
|
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
150 |
$330.00 |
$1559.84 |
$49500.00 |
05-15-2002 |
04-237604 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
150 |
$95.00 |
$449.04 |
$14250.00 |
05-15-2002 |
04-237604 |
2 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
11 |
1650 |
$118.00 |
$557.76 |
$194700.00 |
05-16-2002 |
11-243704 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
11 |
1650 |
$150.00 |
$709.02 |
$247500.00 |
05-16-2002 |
11-243704 |
2 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
11 |
1650 |
$154.01 |
$727.97 |
$254116.50 |
05-16-2002 |
11-243704 |
3 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
11 |
1650 |
$165.00 |
$779.92 |
$272250.00 |
05-16-2002 |
11-243704 |
4 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
11 |
1650 |
$190.00 |
$898.09 |
$313500.00 |
05-16-2002 |
11-243704 |
5 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
11 |
1650 |
$145.00 |
$685.38 |
$239250.00 |
05-16-2002 |
11-243704 |
6 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
11 |
1650 |
$200.00 |
$945.35 |
$330000.00 |
05-16-2002 |
11-243704 |
7 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
11 |
1650 |
$118.00 |
$557.76 |
$194700.00 |
05-16-2002 |
11-243704 |
8 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
260 |
$250.00 |
$1181.69 |
$65000.00 |
05-29-2002 |
04-175904 |
1 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
260 |
$300.00 |
$1418.03 |
$78000.00 |
05-29-2002 |
04-175904 |
2 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
260 |
$260.00 |
$1228.96 |
$67600.00 |
05-29-2002 |
04-175904 |
3 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
260 |
$110.00 |
$519.95 |
$28600.00 |
05-29-2002 |
04-175904 |
4 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
260 |
$165.00 |
$779.92 |
$42900.00 |
05-29-2002 |
04-175904 |
5 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
260 |
$110.00 |
$519.95 |
$28600.00 |
05-29-2002 |
04-175904 |
6 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
12 |
79 |
$47.46 |
$224.33 |
$3750.00 |
06-20-2002 |
12-0C9424 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
12 |
79 |
$250.00 |
$1181.69 |
$19750.00 |
06-20-2002 |
12-0C9424 |
2 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
12 |
79 |
$200.00 |
$945.35 |
$15800.00 |
06-20-2002 |
12-0C9424 |
3 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
12 |
79 |
$279.00 |
$1318.77 |
$22041.00 |
06-20-2002 |
12-0C9424 |
4 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
12 |
79 |
$400.00 |
$1890.71 |
$31600.00 |
06-20-2002 |
12-0C9424 |
5 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
5740 |
$116.00 |
$548.31 |
$665840.00 |
07-11-2002 |
07-147804 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
5740 |
$50.00 |
$236.34 |
$287000.00 |
07-11-2002 |
07-147804 |
2 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
5740 |
$100.00 |
$472.68 |
$574000.00 |
07-11-2002 |
07-147804 |
3 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
5740 |
$145.00 |
$685.38 |
$832300.00 |
07-11-2002 |
07-147804 |
4 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
5740 |
$140.00 |
$661.75 |
$803600.00 |
07-11-2002 |
07-147804 |
5 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
05 |
1580 |
$124.00 |
$586.12 |
$195920.00 |
07-16-2002 |
05-430114 |
1 |
|
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
11 |
2030 |
$162.00 |
$765.74 |
$328860.00 |
07-25-2002 |
11-075804 |
1 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
11 |
2030 |
$175.00 |
$827.19 |
$355250.00 |
07-25-2002 |
11-075804 |
2 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
11 |
2030 |
$210.00 |
$992.62 |
$426300.00 |
07-25-2002 |
11-075804 |
3 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
11 |
2030 |
$200.00 |
$945.35 |
$406000.00 |
07-25-2002 |
11-075804 |
4 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
120 |
$200.00 |
$945.35 |
$24000.00 |
08-06-2002 |
04-134764 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
120 |
$225.00 |
$1063.52 |
$27000.00 |
08-06-2002 |
04-134764 |
2 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
120 |
$137.00 |
$647.57 |
$16440.00 |
08-06-2002 |
04-134764 |
3 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
120 |
$500.00 |
$2363.39 |
$60000.00 |
08-06-2002 |
04-134764 |
4 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
590 |
$75.00 |
$354.51 |
$44250.00 |
08-29-2002 |
07-002104 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
590 |
$260.00 |
$1228.96 |
$153400.00 |
08-29-2002 |
07-002104 |
2 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
590 |
$138.00 |
$652.29 |
$81420.00 |
08-29-2002 |
07-002104 |
3 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
590 |
$200.00 |
$945.35 |
$118000.00 |
08-29-2002 |
07-002104 |
4 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
590 |
$115.00 |
$543.58 |
$67850.00 |
08-29-2002 |
07-002104 |
5 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
590 |
$80.00 |
$378.14 |
$47200.00 |
08-29-2002 |
07-002104 |
6 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
100 |
$210.00 |
$992.62 |
$21000.00 |
09-05-2002 |
07-008704 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
100 |
$150.00 |
$709.02 |
$15000.00 |
09-05-2002 |
07-008704 |
2 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
260 |
$150.00 |
$709.02 |
$39000.00 |
09-05-2002 |
07-220404 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
260 |
$50.00 |
$236.34 |
$13000.00 |
09-05-2002 |
07-220404 |
2 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
260 |
$190.00 |
$898.09 |
$49400.00 |
09-05-2002 |
07-220404 |
3 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
260 |
$100.00 |
$472.68 |
$26000.00 |
09-05-2002 |
07-220404 |
4 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
260 |
$102.50 |
$484.49 |
$26650.00 |
09-05-2002 |
07-220404 |
5 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
260 |
$200.00 |
$945.35 |
$52000.00 |
09-05-2002 |
07-220404 |
6 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
1800 |
$75.00 |
$354.51 |
$135000.00 |
09-12-2002 |
07-002354 |
1 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
1800 |
$85.00 |
$401.78 |
$153000.00 |
09-12-2002 |
07-002354 |
2 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
1800 |
$140.00 |
$661.75 |
$252000.00 |
09-12-2002 |
07-002354 |
3 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
1480 |
$125.00 |
$590.85 |
$185000.00 |
09-12-2002 |
07-053354 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
1480 |
$100.00 |
$472.68 |
$148000.00 |
09-12-2002 |
07-053354 |
2 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
2910 |
$105.00 |
$496.31 |
$305550.00 |
09-19-2002 |
07-020744 |
1 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
880 |
$75.00 |
$354.51 |
$66000.00 |
09-19-2002 |
07-496104 |
1 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
3370 |
$115.00 |
$543.58 |
$387550.00 |
09-26-2002 |
07-002534 |
1 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
3370 |
$75.00 |
$354.51 |
$252750.00 |
09-26-2002 |
07-002534 |
2 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
3370 |
$150.00 |
$709.02 |
$505500.00 |
09-26-2002 |
07-002534 |
3 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
1870 |
$130.00 |
$614.48 |
$243100.00 |
09-26-2002 |
07-1198U4 |
1 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
1870 |
$115.00 |
$543.58 |
$215050.00 |
09-26-2002 |
07-1198U4 |
2 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
1870 |
$120.00 |
$567.21 |
$224400.00 |
09-26-2002 |
07-1198U4 |
3 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
100 |
$180.00 |
$850.82 |
$18000.00 |
10-02-2002 |
04-219854 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
100 |
$132.00 |
$623.93 |
$13200.00 |
10-02-2002 |
04-219854 |
2 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
100 |
$305.00 |
$1441.67 |
$30500.00 |
10-02-2002 |
04-219854 |
3 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
100 |
$140.00 |
$661.75 |
$14000.00 |
10-02-2002 |
04-219854 |
4 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
100 |
$260.00 |
$1228.96 |
$26000.00 |
10-02-2002 |
04-219854 |
5 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
100 |
$212.00 |
$1002.08 |
$21200.00 |
10-02-2002 |
04-219854 |
6 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
100 |
$50.00 |
$236.34 |
$5000.00 |
10-02-2002 |
04-219854 |
7 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
22 |
$125.00 |
$590.85 |
$2750.00 |
10-03-2002 |
07-0535C4 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
22 |
$350.00 |
$1654.37 |
$7700.00 |
10-03-2002 |
07-0535C4 |
2 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
22 |
$600.00 |
$2836.06 |
$13200.00 |
10-03-2002 |
07-0535C4 |
3 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
22 |
$160.00 |
$756.28 |
$3520.00 |
10-03-2002 |
07-0535C4 |
4 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
22 |
$400.00 |
$1890.71 |
$8800.00 |
10-03-2002 |
07-0535C4 |
5 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
3140 |
$90.00 |
$425.41 |
$282600.00 |
10-03-2002 |
07-061744 |
1 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
3140 |
$100.00 |
$472.68 |
$314000.00 |
10-03-2002 |
07-061744 |
2 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
3140 |
$110.00 |
$519.95 |
$345400.00 |
10-03-2002 |
07-061744 |
3 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
3140 |
$100.00 |
$472.68 |
$314000.00 |
10-03-2002 |
07-061744 |
4 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
05 |
390 |
$69.40 |
$328.04 |
$27066.00 |
10-22-2002 |
05-462104 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
05 |
390 |
$454.25 |
$2147.14 |
$177157.50 |
10-22-2002 |
05-462104 |
2 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
05 |
390 |
$200.00 |
$945.35 |
$78000.00 |
10-22-2002 |
05-462104 |
3 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
05 |
390 |
$300.00 |
$1418.03 |
$117000.00 |
10-22-2002 |
05-462104 |
4 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
520 |
$300.00 |
$1418.03 |
$156000.00 |
11-14-2002 |
07-147904 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
30 |
$250.00 |
$1120.26 |
$7500.00 |
01-08-2003 |
04-2285U4 |
1 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
05 |
45 |
$100.00 |
$448.10 |
$4500.00 |
01-08-2003 |
05-314204 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
950 |
$190.00 |
$851.40 |
$180500.00 |
01-09-2003 |
07-053514 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
3755 |
$45.00 |
$201.65 |
$168975.00 |
01-23-2003 |
07-023144 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
270 |
$150.00 |
$672.16 |
$40500.00 |
02-25-2003 |
04-274204 |
1 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
490 |
$300.00 |
$1344.31 |
$147000.00 |
05-15-2003 |
07-120974 |
1 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
200 |
$210.00 |
$941.02 |
$42000.00 |
05-29-2003 |
07-4G5004 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
7 |
$600.00 |
$2688.62 |
$4200.00 |
05-29-2003 |
07-4H8604 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
10 |
1770 |
$163.00 |
$730.41 |
$288510.00 |
06-04-2003 |
10-0J2504 |
1 |
|
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
2720 |
$125.65 |
$563.04 |
$341768.00 |
06-10-2003 |
04-272614 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
11 |
120 |
$200.00 |
$896.21 |
$24000.00 |
07-24-2003 |
11-245404 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
11 |
120 |
$200.00 |
$896.21 |
$24000.00 |
07-24-2003 |
11-245404 |
2 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
2150 |
$160.00 |
$716.97 |
$344000.00 |
08-28-2003 |
07-002304 |
1 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
2150 |
$100.00 |
$448.10 |
$215000.00 |
08-28-2003 |
07-002304 |
2 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
2150 |
$98.00 |
$439.14 |
$210700.00 |
08-28-2003 |
07-002304 |
3 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
2150 |
$130.00 |
$582.54 |
$279500.00 |
08-28-2003 |
07-002304 |
4 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
2150 |
$180.00 |
$806.59 |
$387000.00 |
08-28-2003 |
07-002304 |
5 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
2150 |
$258.00 |
$1156.11 |
$554700.00 |
08-28-2003 |
07-002304 |
6 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
2150 |
$120.00 |
$537.72 |
$258000.00 |
08-28-2003 |
07-002304 |
7 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
190 |
$130.00 |
$582.54 |
$24700.00 |
08-28-2003 |
07-101964 |
1 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
190 |
$152.00 |
$681.12 |
$28880.00 |
08-28-2003 |
07-101964 |
2 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
190 |
$130.00 |
$582.54 |
$24700.00 |
08-28-2003 |
07-101964 |
3 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
190 |
$96.20 |
$431.08 |
$18278.00 |
08-28-2003 |
07-101964 |
4 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
190 |
$30.00 |
$134.43 |
$5700.00 |
08-28-2003 |
07-101964 |
5 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
190 |
$100.00 |
$448.10 |
$19000.00 |
08-28-2003 |
07-101964 |
6 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
1530 |
$120.00 |
$537.72 |
$183600.00 |
09-04-2003 |
07-002594 |
1 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
1530 |
$92.00 |
$412.26 |
$140760.00 |
09-04-2003 |
07-002594 |
2 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
1530 |
$105.00 |
$470.51 |
$160650.00 |
09-04-2003 |
07-002594 |
3 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
1530 |
$200.00 |
$896.21 |
$306000.00 |
09-04-2003 |
07-002594 |
4 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
1530 |
$140.00 |
$627.35 |
$214200.00 |
09-04-2003 |
07-002594 |
5 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
390 |
$125.00 |
$560.13 |
$48750.00 |
10-09-2003 |
07-0510A4 |
1 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
390 |
$140.00 |
$627.35 |
$54600.00 |
10-09-2003 |
07-0510A4 |
2 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
390 |
$120.00 |
$537.72 |
$46800.00 |
10-09-2003 |
07-0510A4 |
3 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
390 |
$140.00 |
$627.35 |
$54600.00 |
10-09-2003 |
07-0510A4 |
4 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
390 |
$130.00 |
$582.54 |
$50700.00 |
10-09-2003 |
07-0510A4 |
5 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
390 |
$180.00 |
$806.59 |
$70200.00 |
10-09-2003 |
07-0510A4 |
6 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
10 |
280 |
$150.00 |
$672.16 |
$42000.00 |
11-18-2003 |
10-263414 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
10 |
280 |
$235.00 |
$1053.04 |
$65800.00 |
11-18-2003 |
10-263414 |
2 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
360 |
$150.00 |
$672.16 |
$54000.00 |
12-18-2003 |
07-0239A4 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
360 |
$61.00 |
$273.34 |
$21960.00 |
12-18-2003 |
07-0239A4 |
2 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
360 |
$140.00 |
$627.35 |
$50400.00 |
12-18-2003 |
07-0239A4 |
3 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
360 |
$170.00 |
$761.78 |
$61200.00 |
12-18-2003 |
07-0239A4 |
4 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
360 |
$125.00 |
$560.13 |
$45000.00 |
12-18-2003 |
07-0239A4 |
5 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
360 |
$185.00 |
$828.99 |
$66600.00 |
12-18-2003 |
07-0239A4 |
6 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
360 |
$200.00 |
$896.21 |
$72000.00 |
12-18-2003 |
07-0239A4 |
7 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
280 |
$235.00 |
$695.65 |
$65800.00 |
03-03-2004 |
04-239704 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
280 |
$180.00 |
$532.84 |
$50400.00 |
03-03-2004 |
04-239704 |
2 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
280 |
$175.00 |
$518.04 |
$49000.00 |
03-03-2004 |
04-239704 |
3 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
280 |
$200.00 |
$592.04 |
$56000.00 |
03-03-2004 |
04-239704 |
4 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
310 |
$150.00 |
$444.03 |
$46500.00 |
04-08-2004 |
07-023124 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
310 |
$135.00 |
$399.63 |
$41850.00 |
04-08-2004 |
07-023124 |
2 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
310 |
$111.00 |
$328.58 |
$34410.00 |
04-08-2004 |
07-023124 |
3 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
310 |
$123.00 |
$364.10 |
$38130.00 |
04-08-2004 |
07-023124 |
4 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
310 |
$140.00 |
$414.43 |
$43400.00 |
04-08-2004 |
07-023124 |
5 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
10 |
8 |
$1200.00 |
$3552.24 |
$9600.00 |
04-13-2004 |
10-0H0204 |
1 |
|
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
10 |
8 |
$400.00 |
$1184.08 |
$3200.00 |
04-13-2004 |
10-0H0204 |
2 |
|
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
10 |
8 |
$600.00 |
$1776.12 |
$4800.00 |
04-13-2004 |
10-0H0204 |
3 |
|
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
2.5 |
$800.00 |
$2368.16 |
$2000.00 |
04-29-2004 |
07-208034 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
2.5 |
$1000.00 |
$2960.20 |
$2500.00 |
04-29-2004 |
07-208034 |
2 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
2.5 |
$500.00 |
$1480.10 |
$1250.00 |
04-29-2004 |
07-208034 |
3 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
2.5 |
$1122.00 |
$3321.35 |
$2805.00 |
04-29-2004 |
07-208034 |
4 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
2.5 |
$1500.00 |
$4440.30 |
$3750.00 |
04-29-2004 |
07-208034 |
5 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
92 |
$130.00 |
$384.83 |
$11960.00 |
06-10-2004 |
07-187504 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
92 |
$200.00 |
$592.04 |
$18400.00 |
06-10-2004 |
07-187504 |
2 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
92 |
$185.00 |
$547.64 |
$17020.00 |
06-10-2004 |
07-187504 |
3 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
58 |
$850.00 |
$2516.17 |
$49300.00 |
06-10-2004 |
07-4J9704 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
1300 |
$225.00 |
$666.05 |
$292500.00 |
06-30-2004 |
04-270704 |
1 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
1300 |
$160.00 |
$473.63 |
$208000.00 |
06-30-2004 |
04-270704 |
2 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
1300 |
$190.00 |
$562.44 |
$247000.00 |
06-30-2004 |
04-270704 |
3 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
1300 |
$200.00 |
$592.04 |
$260000.00 |
06-30-2004 |
04-270704 |
4 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
1300 |
$100.00 |
$296.02 |
$130000.00 |
06-30-2004 |
04-270704 |
5 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
1300 |
$140.00 |
$414.43 |
$182000.00 |
06-30-2004 |
04-270704 |
6 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
1300 |
$181.00 |
$535.80 |
$235300.00 |
06-30-2004 |
04-270704 |
7 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
85 |
$60.00 |
$177.61 |
$5100.00 |
07-21-2004 |
04-253404 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
85 |
$300.00 |
$888.06 |
$25500.00 |
07-21-2004 |
04-253404 |
2 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
54 |
$495.90 |
$1467.96 |
$26778.60 |
07-22-2004 |
07-234904 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
310 |
$140.00 |
$414.43 |
$43400.00 |
07-29-2004 |
07-1199U4 |
1 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
310 |
$150.00 |
$444.03 |
$46500.00 |
07-29-2004 |
07-1199U4 |
2 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
310 |
$155.00 |
$458.83 |
$48050.00 |
07-29-2004 |
07-1199U4 |
3 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
1500 |
$150.00 |
$444.03 |
$225000.00 |
09-09-2004 |
07-135104 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
1500 |
$55.00 |
$162.81 |
$82500.00 |
09-09-2004 |
07-135104 |
2 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
1500 |
$110.00 |
$325.62 |
$165000.00 |
09-09-2004 |
07-135104 |
3 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
11 |
870 |
$415.00 |
$1228.48 |
$361050.00 |
10-14-2004 |
11-207914 |
1 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
11 |
870 |
$65.00 |
$192.41 |
$56550.00 |
10-14-2004 |
11-207914 |
2 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
05 |
130 |
$175.00 |
$518.04 |
$22750.00 |
11-16-2004 |
05-474804 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
740 |
$340.00 |
$1006.47 |
$251600.00 |
12-16-2004 |
07-1661A4 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
270 |
$150.00 |
$444.03 |
$40500.00 |
12-16-2004 |
07-1693A4 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
270 |
$140.00 |
$414.43 |
$37800.00 |
12-16-2004 |
07-1693A4 |
2 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
270 |
$325.00 |
$962.07 |
$87750.00 |
12-16-2004 |
07-1693A4 |
3 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
270 |
$1090.00 |
$3226.62 |
$294300.00 |
12-16-2004 |
07-1693A4 |
4 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
770 |
$125.00 |
$322.47 |
$96250.00 |
01-06-2005 |
07-122004 |
1 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
770 |
$150.00 |
$386.96 |
$115500.00 |
01-06-2005 |
07-122004 |
2 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
03 |
620 |
$250.00 |
$644.94 |
$155000.00 |
01-25-2005 |
03-2A8304 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
03 |
620 |
$190.00 |
$490.15 |
$117800.00 |
01-25-2005 |
03-2A8304 |
2 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
03 |
620 |
$210.00 |
$541.75 |
$130200.00 |
01-25-2005 |
03-2A8304 |
3 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
03 |
620 |
$288.00 |
$742.97 |
$178560.00 |
01-25-2005 |
03-2A8304 |
4 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
03 |
620 |
$200.00 |
$515.95 |
$124000.00 |
01-25-2005 |
03-2A8304 |
5 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
03 |
620 |
$375.00 |
$967.41 |
$232500.00 |
01-25-2005 |
03-2A8304 |
6 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
230 |
$125.00 |
$322.47 |
$28750.00 |
03-01-2005 |
04-299204 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
230 |
$115.00 |
$296.67 |
$26450.00 |
03-01-2005 |
04-299204 |
2 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
230 |
$130.00 |
$335.37 |
$29900.00 |
03-01-2005 |
04-299204 |
3 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
230 |
$130.00 |
$335.37 |
$29900.00 |
03-01-2005 |
04-299204 |
4 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
230 |
$170.00 |
$438.56 |
$39100.00 |
03-01-2005 |
04-299204 |
5 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
230 |
$200.00 |
$515.95 |
$46000.00 |
03-01-2005 |
04-299204 |
6 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
10 |
74 |
$166.90 |
$430.56 |
$12350.60 |
03-01-2005 |
10-0J5704 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
10 |
74 |
$150.00 |
$386.96 |
$11100.00 |
03-01-2005 |
10-0J5704 |
2 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
10 |
74 |
$310.00 |
$799.72 |
$22940.00 |
03-01-2005 |
10-0J5704 |
3 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
10 |
74 |
$45.00 |
$116.09 |
$3330.00 |
03-01-2005 |
10-0J5704 |
4 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
10 |
74 |
$240.00 |
$619.14 |
$17760.00 |
03-01-2005 |
10-0J5704 |
5 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
10 |
77 |
$300.00 |
$773.93 |
$23100.00 |
03-22-2005 |
10-0J8204 |
1 |
|
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
10 |
77 |
$716.00 |
$1847.10 |
$55132.00 |
03-22-2005 |
10-0J8204 |
2 |
|
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
10 |
77 |
$660.00 |
$1702.64 |
$50820.00 |
03-22-2005 |
10-0J8204 |
3 |
|
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
10 |
77 |
$650.00 |
$1676.84 |
$50050.00 |
03-22-2005 |
10-0J8204 |
4 |
|
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
10 |
77 |
$700.00 |
$1805.83 |
$53900.00 |
03-22-2005 |
10-0J8204 |
5 |
|
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
90 |
$451.11 |
$1163.75 |
$40599.90 |
04-07-2005 |
07-1Y8604 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
90 |
$451.11 |
$1163.75 |
$40599.90 |
04-07-2005 |
07-1Y8604 |
2 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
90 |
$250.00 |
$644.94 |
$22500.00 |
04-07-2005 |
07-1Y8604 |
3 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
90 |
$400.00 |
$1031.90 |
$36000.00 |
04-07-2005 |
07-1Y8604 |
4 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
90 |
$250.00 |
$644.94 |
$22500.00 |
04-07-2005 |
07-1Y8604 |
5 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
90 |
$300.00 |
$773.93 |
$27000.00 |
04-07-2005 |
07-1Y8604 |
6 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
12 |
520 |
$200.00 |
$515.95 |
$104000.00 |
05-26-2005 |
12-0A7614 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
12 |
520 |
$160.00 |
$412.76 |
$83200.00 |
05-26-2005 |
12-0A7614 |
2 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
12 |
520 |
$150.00 |
$386.96 |
$78000.00 |
05-26-2005 |
12-0A7614 |
3 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
12 |
520 |
$263.00 |
$678.48 |
$136760.00 |
05-26-2005 |
12-0A7614 |
4 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
10 |
4130 |
$120.00 |
$309.57 |
$495600.00 |
06-07-2005 |
10-3A4304 |
1 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
10 |
4130 |
$140.00 |
$361.17 |
$578200.00 |
06-07-2005 |
10-3A4304 |
2 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
10 |
4130 |
$105.00 |
$270.87 |
$433650.00 |
06-07-2005 |
10-3A4304 |
3 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
10 |
4130 |
$95.00 |
$245.08 |
$392350.00 |
06-07-2005 |
10-3A4304 |
4 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
10 |
4130 |
$120.00 |
$309.57 |
$495600.00 |
06-07-2005 |
10-3A4304 |
5 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
18 |
$1080.00 |
$2786.13 |
$19440.00 |
08-04-2005 |
07-4K6704 |
1 |
|
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
18 |
$525.00 |
$1354.37 |
$9450.00 |
08-04-2005 |
07-4K6704 |
2 |
|
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
18 |
$300.00 |
$773.93 |
$5400.00 |
08-04-2005 |
07-4K6704 |
3 |
|
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
18 |
$200.00 |
$515.95 |
$3600.00 |
08-04-2005 |
07-4K6704 |
4 |
|
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
320 |
$160.00 |
$412.76 |
$51200.00 |
08-25-2005 |
07-242004 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
320 |
$225.00 |
$580.44 |
$72000.00 |
08-25-2005 |
07-242004 |
2 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
320 |
$260.00 |
$670.74 |
$83200.00 |
08-25-2005 |
07-242004 |
3 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
320 |
$300.00 |
$773.93 |
$96000.00 |
08-25-2005 |
07-242004 |
4 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
12 |
230 |
$260.00 |
$670.74 |
$59800.00 |
09-15-2005 |
12-099424 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
12 |
230 |
$175.00 |
$451.46 |
$40250.00 |
09-15-2005 |
12-099424 |
2 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
12 |
230 |
$300.00 |
$773.93 |
$69000.00 |
09-15-2005 |
12-099424 |
3 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
480 |
$140.00 |
$361.17 |
$67200.00 |
09-27-2005 |
04-299304 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
480 |
$110.00 |
$283.77 |
$52800.00 |
09-27-2005 |
04-299304 |
2 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
480 |
$218.00 |
$562.39 |
$104640.00 |
09-27-2005 |
04-299304 |
3 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
480 |
$180.00 |
$464.36 |
$86400.00 |
09-27-2005 |
04-299304 |
4 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
480 |
$250.00 |
$644.94 |
$120000.00 |
09-27-2005 |
04-299304 |
5 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
480 |
$253.00 |
$652.68 |
$121440.00 |
09-27-2005 |
04-299304 |
6 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
480 |
$69.00 |
$178.00 |
$33120.00 |
09-27-2005 |
04-299304 |
7 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
65 |
$400.00 |
$1031.90 |
$26000.00 |
09-29-2005 |
07-244504 |
1 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
65 |
$800.00 |
$2063.80 |
$52000.00 |
09-29-2005 |
07-244504 |
2 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
11 |
26 |
$300.00 |
$773.93 |
$7800.00 |
10-06-2005 |
11-240304 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
11 |
26 |
$120.00 |
$309.57 |
$3120.00 |
10-06-2005 |
11-240304 |
2 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
11 |
26 |
$1400.00 |
$3611.65 |
$36400.00 |
10-06-2005 |
11-240304 |
3 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
11 |
26 |
$1000.00 |
$2579.75 |
$26000.00 |
10-06-2005 |
11-240304 |
4 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
400 |
$200.00 |
$515.95 |
$80000.00 |
10-12-2005 |
04-151294 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
400 |
$280.00 |
$722.33 |
$112000.00 |
10-12-2005 |
04-151294 |
2 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
120 |
$300.00 |
$773.93 |
$36000.00 |
10-13-2005 |
07-182204 |
1 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
120 |
$850.00 |
$2192.79 |
$102000.00 |
10-13-2005 |
07-182204 |
2 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
11 |
230 |
$350.00 |
$902.91 |
$80500.00 |
10-13-2005 |
11-2379U4 |
1 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
11 |
38 |
$300.00 |
$773.93 |
$11400.00 |
10-13-2005 |
11-265404 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
380 |
$450.00 |
$1160.89 |
$171000.00 |
10-27-2005 |
07-120884 |
1 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
380 |
$450.00 |
$1160.89 |
$171000.00 |
10-27-2005 |
07-120884 |
2 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
380 |
$500.00 |
$1289.88 |
$190000.00 |
10-27-2005 |
07-120884 |
3 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
83 |
$350.00 |
$902.91 |
$29050.00 |
10-27-2005 |
07-120934 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
83 |
$288.00 |
$742.97 |
$23904.00 |
10-27-2005 |
07-120934 |
2 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
83 |
$4.10 |
$10.58 |
$340.30 |
10-27-2005 |
07-120934 |
3 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
05 |
1100 |
$256.40 |
$661.45 |
$282040.00 |
11-02-2005 |
05-448104 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
05 |
1100 |
$255.00 |
$657.84 |
$280500.00 |
11-02-2005 |
05-448104 |
2 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
05 |
1100 |
$205.00 |
$528.85 |
$225500.00 |
11-02-2005 |
05-448104 |
3 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
05 |
1100 |
$287.50 |
$741.68 |
$316250.00 |
11-02-2005 |
05-448104 |
4 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
130 |
$300.00 |
$773.93 |
$39000.00 |
11-03-2005 |
07-218304 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
130 |
$225.00 |
$580.44 |
$29250.00 |
11-03-2005 |
07-218304 |
2 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
10 |
620 |
$300.00 |
$773.93 |
$186000.00 |
11-16-2005 |
10-0H2004 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
35 |
$285.00 |
$735.23 |
$9975.00 |
11-29-2005 |
04-165934 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
740 |
$70.00 |
$180.58 |
$51800.00 |
12-01-2005 |
07-242604 |
1 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
740 |
$165.00 |
$425.66 |
$122100.00 |
12-01-2005 |
07-242604 |
2 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
50 |
$240.00 |
$619.14 |
$12000.00 |
12-14-2005 |
04-130524 |
1 |
|
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
50 |
$400.00 |
$1031.90 |
$20000.00 |
12-14-2005 |
04-130524 |
2 |
|
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
50 |
$191.00 |
$492.73 |
$9550.00 |
12-14-2005 |
04-130524 |
3 |
|
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
380 |
$180.00 |
$448.56 |
$68400.00 |
01-05-2006 |
07-232604 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
380 |
$250.00 |
$623.00 |
$95000.00 |
01-05-2006 |
07-232604 |
2 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
380 |
$300.00 |
$747.60 |
$114000.00 |
01-05-2006 |
07-232604 |
3 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
380 |
$225.00 |
$560.70 |
$85500.00 |
01-05-2006 |
07-232604 |
4 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
05 |
650 |
$200.00 |
$498.40 |
$130000.00 |
01-24-2006 |
05-129104 |
1 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
05 |
650 |
$245.00 |
$610.54 |
$159250.00 |
01-24-2006 |
05-129104 |
2 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
05 |
650 |
$150.00 |
$373.80 |
$97500.00 |
01-24-2006 |
05-129104 |
3 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
05 |
650 |
$200.00 |
$498.40 |
$130000.00 |
01-24-2006 |
05-129104 |
4 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
05 |
650 |
$170.00 |
$423.64 |
$110500.00 |
01-24-2006 |
05-129104 |
5 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
66 |
$300.00 |
$747.60 |
$19800.00 |
01-31-2006 |
04-271604 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
66 |
$250.00 |
$623.00 |
$16500.00 |
01-31-2006 |
04-271604 |
2 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
66 |
$400.00 |
$996.80 |
$26400.00 |
01-31-2006 |
04-271604 |
3 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
225 |
$100.00 |
$249.20 |
$22500.00 |
02-07-2006 |
04-165944 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
225 |
$250.00 |
$623.00 |
$56250.00 |
02-07-2006 |
04-165944 |
2 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
225 |
$255.00 |
$635.46 |
$57375.00 |
02-07-2006 |
04-165944 |
3 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
225 |
$250.00 |
$623.00 |
$56250.00 |
02-07-2006 |
04-165944 |
4 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
2250 |
$165.00 |
$411.18 |
$371250.00 |
02-08-2006 |
04-246804 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
2250 |
$290.00 |
$722.68 |
$652500.00 |
02-08-2006 |
04-246804 |
2 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
2250 |
$250.00 |
$623.00 |
$562500.00 |
02-08-2006 |
04-246804 |
3 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
2250 |
$280.00 |
$697.76 |
$630000.00 |
02-08-2006 |
04-246804 |
4 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
2250 |
$325.00 |
$809.90 |
$731250.00 |
02-08-2006 |
04-246804 |
5 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
2250 |
$260.00 |
$647.92 |
$585000.00 |
02-08-2006 |
04-246804 |
6 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
12 |
11400 |
$150.00 |
$373.80 |
$1710000.00 |
02-09-2006 |
12-101674 |
1 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
12 |
11400 |
$143.00 |
$356.36 |
$1630200.00 |
02-09-2006 |
12-101674 |
2 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
12 |
11400 |
$140.00 |
$348.88 |
$1596000.00 |
02-09-2006 |
12-101674 |
3 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
250 |
$200.00 |
$498.40 |
$50000.00 |
02-15-2006 |
04-246934 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
250 |
$400.00 |
$996.80 |
$100000.00 |
02-15-2006 |
04-246934 |
2 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
250 |
$160.00 |
$398.72 |
$40000.00 |
02-15-2006 |
04-246934 |
3 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
250 |
$350.00 |
$872.20 |
$87500.00 |
02-15-2006 |
04-246934 |
4 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
250 |
$250.00 |
$623.00 |
$62500.00 |
02-15-2006 |
04-246934 |
5 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
11100 |
$135.00 |
$336.42 |
$1498500.00 |
03-02-2006 |
07-183114 |
1 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
1290 |
$140.00 |
$348.88 |
$180600.00 |
03-02-2006 |
07-224404 |
1 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
1290 |
$180.00 |
$448.56 |
$232200.00 |
03-02-2006 |
07-224404 |
2 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
1290 |
$150.00 |
$373.80 |
$193500.00 |
03-02-2006 |
07-224404 |
3 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
1290 |
$169.90 |
$423.39 |
$219171.00 |
03-02-2006 |
07-224404 |
4 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
1290 |
$138.00 |
$343.90 |
$178020.00 |
03-02-2006 |
07-224404 |
5 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
08 |
465 |
$196.00 |
$488.43 |
$91140.00 |
03-30-2006 |
08-474104 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
08 |
465 |
$70.00 |
$174.44 |
$32550.00 |
03-30-2006 |
08-474104 |
2 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
630 |
$650.00 |
$1619.80 |
$409500.00 |
04-26-2006 |
04-1A2404 |
1 |
|
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
330 |
$200.00 |
$498.40 |
$66000.00 |
05-04-2006 |
07-4J0704 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
330 |
$215.00 |
$535.78 |
$70950.00 |
05-04-2006 |
07-4J0704 |
2 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
330 |
$225.00 |
$560.70 |
$74250.00 |
05-04-2006 |
07-4J0704 |
3 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
08 |
3480 |
$106.00 |
$264.15 |
$368880.00 |
05-04-2006 |
08-0C1804 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
08 |
3480 |
$100.00 |
$249.20 |
$348000.00 |
05-04-2006 |
08-0C1804 |
2 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
08 |
3480 |
$115.00 |
$286.58 |
$400200.00 |
05-04-2006 |
08-0C1804 |
3 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
08 |
3480 |
$110.00 |
$274.12 |
$382800.00 |
05-04-2006 |
08-0C1804 |
4 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
08 |
3480 |
$100.00 |
$249.20 |
$348000.00 |
05-04-2006 |
08-0C1804 |
5 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
1740 |
$200.00 |
$498.40 |
$348000.00 |
05-10-2006 |
04-272014 |
1 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
1740 |
$200.00 |
$498.40 |
$348000.00 |
05-10-2006 |
04-272014 |
2 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
11 |
230 |
$555.00 |
$1383.06 |
$127650.00 |
05-11-2006 |
11-2379U4 |
1 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
11 |
230 |
$260.00 |
$647.92 |
$59800.00 |
05-11-2006 |
11-2379U4 |
2 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
11 |
230 |
$330.00 |
$822.36 |
$75900.00 |
05-11-2006 |
11-2379U4 |
3 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
11 |
230 |
$975.00 |
$2429.71 |
$224250.00 |
05-11-2006 |
11-2379U4 |
4 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
10 |
1260 |
$205.00 |
$510.86 |
$258300.00 |
05-31-2006 |
10-0K5604 |
1 |
|
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
10 |
1260 |
$240.00 |
$598.08 |
$302400.00 |
05-31-2006 |
10-0K5604 |
2 |
|
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
10 |
670 |
$272.00 |
$677.83 |
$182240.00 |
06-07-2006 |
10-0K8704 |
1 |
|
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
10 |
670 |
$290.00 |
$722.68 |
$194300.00 |
06-07-2006 |
10-0K8704 |
2 |
|
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
10 |
670 |
$350.00 |
$872.20 |
$234500.00 |
06-07-2006 |
10-0K8704 |
3 |
|
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
10 |
670 |
$275.00 |
$685.30 |
$184250.00 |
06-07-2006 |
10-0K8704 |
4 |
|
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
1840 |
$150.00 |
$373.80 |
$276000.00 |
06-14-2006 |
04-470804 |
1 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
1840 |
$160.00 |
$398.72 |
$294400.00 |
06-14-2006 |
04-470804 |
2 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
1840 |
$180.00 |
$448.56 |
$331200.00 |
06-14-2006 |
04-470804 |
3 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
1840 |
$135.00 |
$336.42 |
$248400.00 |
06-14-2006 |
04-470804 |
4 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
1840 |
$150.00 |
$373.80 |
$276000.00 |
06-14-2006 |
04-470804 |
5 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
10 |
1990 |
$200.00 |
$498.40 |
$398000.00 |
06-27-2006 |
10-0F3004 |
1 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
10 |
1990 |
$175.00 |
$436.10 |
$348250.00 |
06-27-2006 |
10-0F3004 |
2 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
10 |
1990 |
$259.00 |
$645.43 |
$515410.00 |
06-27-2006 |
10-0F3004 |
3 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
10 |
1990 |
$179.00 |
$446.07 |
$356210.00 |
06-27-2006 |
10-0F3004 |
4 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
50 |
$686.00 |
$1709.52 |
$34300.00 |
08-24-2006 |
07-1P5704 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
50 |
$400.00 |
$996.80 |
$20000.00 |
08-24-2006 |
07-1P5704 |
2 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
50 |
$1000.00 |
$2492.01 |
$50000.00 |
08-24-2006 |
07-1P5704 |
3 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
710 |
$189.00 |
$470.99 |
$134190.00 |
08-24-2006 |
07-232304 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
710 |
$235.00 |
$585.62 |
$166850.00 |
08-24-2006 |
07-232304 |
2 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
710 |
$260.00 |
$647.92 |
$184600.00 |
08-24-2006 |
07-232304 |
3 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
360 |
$300.00 |
$747.60 |
$108000.00 |
08-30-2006 |
04-0A1304 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
360 |
$1100.00 |
$2741.21 |
$396000.00 |
08-30-2006 |
04-0A1304 |
2 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
360 |
$265.00 |
$660.38 |
$95400.00 |
08-30-2006 |
04-0A1304 |
3 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
TONN |
01 |
7970 |
$130.00 |
$323.96 |
$1036100.00 |
09-19-2006 |
01-438404 |
1 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
TONN |
01 |
7970 |
$120.00 |
$299.04 |
$956400.00 |
09-19-2006 |
01-438404 |
2 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
70 |
$220.00 |
$548.24 |
$15400.00 |
10-26-2006 |
07-218304 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
70 |
$200.00 |
$498.40 |
$14000.00 |
10-26-2006 |
07-218304 |
2 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
70 |
$143.15 |
$356.73 |
$10020.50 |
10-26-2006 |
07-218304 |
3 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
70 |
$539.57 |
$1344.61 |
$37769.90 |
10-26-2006 |
07-218304 |
4 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
70 |
$300.00 |
$747.60 |
$21000.00 |
10-26-2006 |
07-218304 |
5 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
08 |
465 |
$326.00 |
$812.39 |
$151590.00 |
10-26-2006 |
08-474104 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
08 |
465 |
$212.00 |
$528.31 |
$98580.00 |
10-26-2006 |
08-474104 |
2 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
08 |
465 |
$200.00 |
$498.40 |
$93000.00 |
10-26-2006 |
08-474104 |
3 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
6590 |
$260.00 |
$647.92 |
$1713400.00 |
11-14-2006 |
04-270834 |
1 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
6590 |
$235.00 |
$585.62 |
$1548650.00 |
11-14-2006 |
04-270834 |
2 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
6590 |
$200.00 |
$498.40 |
$1318000.00 |
11-14-2006 |
04-270834 |
3 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
6590 |
$320.00 |
$797.44 |
$2108800.00 |
11-14-2006 |
04-270834 |
4 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
6590 |
$200.00 |
$498.40 |
$1318000.00 |
11-14-2006 |
04-270834 |
5 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
740 |
$275.00 |
$685.30 |
$203500.00 |
11-16-2006 |
07-1661A4 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
740 |
$340.00 |
$847.28 |
$251600.00 |
11-16-2006 |
07-1661A4 |
2 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
740 |
$180.00 |
$448.56 |
$133200.00 |
11-16-2006 |
07-1661A4 |
3 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
740 |
$220.00 |
$548.24 |
$162800.00 |
11-16-2006 |
07-1661A4 |
4 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
740 |
$200.00 |
$498.40 |
$148000.00 |
11-16-2006 |
07-1661A4 |
5 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
740 |
$215.00 |
$535.78 |
$159100.00 |
11-16-2006 |
07-1661A4 |
6 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
6790 |
$170.00 |
$423.64 |
$1154300.00 |
11-28-2006 |
04-264204 |
1 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
1500 |
$230.00 |
$573.16 |
$345000.00 |
11-29-2006 |
04-246804 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
1500 |
$335.00 |
$834.82 |
$502500.00 |
11-29-2006 |
04-246804 |
2 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
1500 |
$295.00 |
$735.14 |
$442500.00 |
11-29-2006 |
04-246804 |
3 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
1500 |
$275.00 |
$685.30 |
$412500.00 |
11-29-2006 |
04-246804 |
4 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
1500 |
$425.00 |
$1059.10 |
$637500.00 |
11-29-2006 |
04-246804 |
5 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
1250 |
$120.00 |
$300.57 |
$150000.00 |
01-03-2007 |
04-2937U4 |
1 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
1250 |
$185.00 |
$463.39 |
$231250.00 |
01-03-2007 |
04-2937U4 |
2 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
1250 |
$240.00 |
$601.15 |
$300000.00 |
01-03-2007 |
04-2937U4 |
3 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
1250 |
$180.00 |
$450.86 |
$225000.00 |
01-03-2007 |
04-2937U4 |
4 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
1250 |
$240.00 |
$601.15 |
$300000.00 |
01-03-2007 |
04-2937U4 |
5 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
1250 |
$175.00 |
$438.34 |
$218750.00 |
01-03-2007 |
04-2937U4 |
6 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
1250 |
$30.00 |
$75.14 |
$37500.00 |
01-03-2007 |
04-2937U4 |
7 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
1250 |
$300.00 |
$751.44 |
$375000.00 |
01-03-2007 |
04-2937U4 |
8 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
1250 |
$193.00 |
$483.42 |
$241250.00 |
01-03-2007 |
04-2937U4 |
9 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
1250 |
$275.00 |
$688.82 |
$343750.00 |
01-03-2007 |
04-2937U4 |
10 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
4400 |
$135.00 |
$338.15 |
$594000.00 |
01-11-2007 |
07-188504 |
1 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
4400 |
$100.00 |
$250.48 |
$440000.00 |
01-11-2007 |
07-188504 |
2 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
4400 |
$122.00 |
$305.58 |
$536800.00 |
01-11-2007 |
07-188504 |
3 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
4400 |
$100.00 |
$250.48 |
$440000.00 |
01-11-2007 |
07-188504 |
4 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
1900 |
$245.00 |
$613.67 |
$465500.00 |
01-24-2007 |
04-270524 |
1 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
1900 |
$350.00 |
$876.68 |
$665000.00 |
01-24-2007 |
04-270524 |
2 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
1900 |
$225.00 |
$563.58 |
$427500.00 |
01-24-2007 |
04-270524 |
3 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
1900 |
$260.00 |
$651.24 |
$494000.00 |
01-24-2007 |
04-270524 |
4 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
1200 |
$175.00 |
$438.34 |
$210000.00 |
02-28-2007 |
04-1A9904 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
1200 |
$175.00 |
$438.34 |
$210000.00 |
02-28-2007 |
04-1A9904 |
2 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
1200 |
$235.00 |
$588.62 |
$282000.00 |
02-28-2007 |
04-1A9904 |
3 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
1200 |
$245.00 |
$613.67 |
$294000.00 |
02-28-2007 |
04-1A9904 |
4 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
1200 |
$250.00 |
$626.20 |
$300000.00 |
02-28-2007 |
04-1A9904 |
5 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
1200 |
$245.00 |
$613.67 |
$294000.00 |
02-28-2007 |
04-1A9904 |
6 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
1200 |
$200.00 |
$500.96 |
$240000.00 |
02-28-2007 |
04-1A9904 |
7 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
1200 |
$365.00 |
$914.25 |
$438000.00 |
02-28-2007 |
04-1A9904 |
8 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
11 |
300 |
$285.00 |
$713.86 |
$85500.00 |
03-01-2007 |
11-271204 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
11 |
300 |
$220.00 |
$551.05 |
$66000.00 |
03-01-2007 |
11-271204 |
2 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
11 |
300 |
$385.00 |
$964.34 |
$115500.00 |
03-01-2007 |
11-271204 |
3 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
11 |
300 |
$272.00 |
$681.30 |
$81600.00 |
03-01-2007 |
11-271204 |
4 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
500 |
$202.00 |
$505.97 |
$101000.00 |
03-07-2007 |
04-269604 |
1 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
500 |
$250.00 |
$626.20 |
$125000.00 |
03-07-2007 |
04-269604 |
2 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
500 |
$400.00 |
$1001.91 |
$200000.00 |
03-07-2007 |
04-269604 |
3 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
500 |
$125.00 |
$313.10 |
$62500.00 |
03-07-2007 |
04-269604 |
4 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
500 |
$265.00 |
$663.77 |
$132500.00 |
03-07-2007 |
04-269604 |
5 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
500 |
$440.00 |
$1102.11 |
$220000.00 |
03-07-2007 |
04-269604 |
6 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
500 |
$250.00 |
$626.20 |
$125000.00 |
03-07-2007 |
04-269604 |
7 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
500 |
$400.00 |
$1001.91 |
$200000.00 |
03-07-2007 |
04-269604 |
8 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
7670 |
$150.00 |
$375.72 |
$1150500.00 |
05-10-2007 |
07-183114 |
1 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
7670 |
$150.00 |
$375.72 |
$1150500.00 |
05-10-2007 |
07-183114 |
2 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
34 |
$200.00 |
$500.96 |
$6800.00 |
05-10-2007 |
07-4K4704 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
34 |
$225.00 |
$563.58 |
$7650.00 |
05-10-2007 |
07-4K4704 |
2 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
34 |
$325.00 |
$814.06 |
$11050.00 |
05-10-2007 |
07-4K4704 |
3 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
34 |
$430.00 |
$1077.06 |
$14620.00 |
05-10-2007 |
07-4K4704 |
4 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
34 |
$176.00 |
$440.84 |
$5984.00 |
05-10-2007 |
07-4K4704 |
5 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
02 |
140 |
$325.00 |
$814.06 |
$45500.00 |
06-06-2007 |
02-1C4004 |
1 |
|
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
02 |
140 |
$340.00 |
$851.63 |
$47600.00 |
06-06-2007 |
02-1C4004 |
2 |
|
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
02 |
140 |
$440.00 |
$1102.11 |
$61600.00 |
06-06-2007 |
02-1C4004 |
3 |
|
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
02 |
140 |
$450.00 |
$1127.15 |
$63000.00 |
06-06-2007 |
02-1C4004 |
4 |
|
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
440 |
$275.00 |
$688.82 |
$121000.00 |
06-28-2007 |
07-129934 |
1 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
440 |
$332.50 |
$832.84 |
$146300.00 |
06-28-2007 |
07-129934 |
2 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
440 |
$320.00 |
$801.53 |
$140800.00 |
06-28-2007 |
07-129934 |
3 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
440 |
$400.00 |
$1001.91 |
$176000.00 |
06-28-2007 |
07-129934 |
4 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
440 |
$260.00 |
$651.24 |
$114400.00 |
06-28-2007 |
07-129934 |
5 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
440 |
$350.00 |
$876.68 |
$154000.00 |
06-28-2007 |
07-129934 |
6 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
440 |
$355.00 |
$889.20 |
$156200.00 |
06-28-2007 |
07-129934 |
7 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
05 |
1240 |
$165.00 |
$413.29 |
$204600.00 |
08-22-2007 |
05-402804 |
1 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
05 |
1240 |
$100.00 |
$250.48 |
$124000.00 |
08-22-2007 |
05-402804 |
2 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
05 |
1240 |
$120.00 |
$300.57 |
$148800.00 |
08-22-2007 |
05-402804 |
3 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
05 |
1240 |
$200.00 |
$500.96 |
$248000.00 |
08-22-2007 |
05-402804 |
4 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
240 |
$235.00 |
$588.62 |
$56400.00 |
08-23-2007 |
07-241404 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
240 |
$275.00 |
$688.82 |
$66000.00 |
08-23-2007 |
07-241404 |
2 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
240 |
$220.00 |
$551.05 |
$52800.00 |
08-23-2007 |
07-241404 |
3 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
240 |
$185.00 |
$463.39 |
$44400.00 |
08-23-2007 |
07-241404 |
4 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
240 |
$200.00 |
$500.96 |
$48000.00 |
08-23-2007 |
07-241404 |
5 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
240 |
$330.00 |
$826.58 |
$79200.00 |
08-23-2007 |
07-241404 |
6 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
240 |
$300.00 |
$751.44 |
$72000.00 |
08-23-2007 |
07-241404 |
7 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
240 |
$315.00 |
$789.01 |
$75600.00 |
08-23-2007 |
07-241404 |
8 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
240 |
$400.00 |
$1001.91 |
$96000.00 |
08-23-2007 |
07-241404 |
9 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
240 |
$183.00 |
$458.38 |
$43920.00 |
08-23-2007 |
07-241404 |
10 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
240 |
$200.00 |
$500.96 |
$48000.00 |
08-23-2007 |
07-241404 |
11 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
12 |
1660 |
$150.00 |
$375.72 |
$249000.00 |
08-30-2007 |
12-0A7624 |
1 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
12 |
1660 |
$157.00 |
$393.25 |
$260620.00 |
08-30-2007 |
12-0A7624 |
2 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
12 |
1660 |
$150.00 |
$375.72 |
$249000.00 |
08-30-2007 |
12-0A7624 |
3 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
12 |
1660 |
$180.00 |
$450.86 |
$298800.00 |
08-30-2007 |
12-0A7624 |
4 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
12 |
1660 |
$175.00 |
$438.34 |
$290500.00 |
08-30-2007 |
12-0A7624 |
5 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
12 |
1660 |
$100.00 |
$250.48 |
$166000.00 |
08-30-2007 |
12-0A7624 |
6 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
12 |
1660 |
$163.00 |
$408.28 |
$270580.00 |
08-30-2007 |
12-0A7624 |
7 |
M |
TRO |
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
12 |
2000 |
$230.00 |
$576.10 |
$460000.00 |
09-06-2007 |
12-078004 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
12 |
2000 |
$169.93 |
$425.64 |
$339860.00 |
09-06-2007 |
12-078004 |
2 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
12 |
2000 |
$170.00 |
$425.81 |
$340000.00 |
09-06-2007 |
12-078004 |
3 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
12 |
2000 |
$200.00 |
$500.96 |
$400000.00 |
09-06-2007 |
12-078004 |
4 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
12 |
2000 |
$170.00 |
$425.81 |
$340000.00 |
09-06-2007 |
12-078004 |
5 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
12 |
2000 |
$225.00 |
$563.58 |
$450000.00 |
09-06-2007 |
12-078004 |
6 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
12 |
2000 |
$178.00 |
$445.85 |
$356000.00 |
09-06-2007 |
12-078004 |
7 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
12 |
2000 |
$155.00 |
$388.24 |
$310000.00 |
09-06-2007 |
12-078004 |
8 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
12 |
2000 |
$300.90 |
$753.69 |
$601800.00 |
09-06-2007 |
12-078004 |
9 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
05 |
470 |
$85.00 |
$212.91 |
$39950.00 |
09-12-2007 |
05-460704 |
1 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
05 |
470 |
$150.00 |
$375.72 |
$70500.00 |
09-12-2007 |
05-460704 |
2 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
05 |
470 |
$240.00 |
$601.15 |
$112800.00 |
09-12-2007 |
05-460704 |
3 |
M |
|
|
| 190105 - ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
190 |
$170.00 |
$425.81 |
$32300.00 |
10-25-2007 |
07-231404 |
1 |
M |
TRO |
|
MORE THAN 500 RESULTS RETURNED. ONLY 500 ROWS SHOWN.
|