|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
2000 |
$70.00 |
$180.58 |
$140000.00 |
09-29-2005 |
07-218504 |
1 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
1040 |
$21.00 |
$54.17 |
$21840.00 |
11-02-2005 |
04-263904 |
1 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
1040 |
$121.00 |
$312.15 |
$125840.00 |
11-02-2005 |
04-263904 |
2 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
1040 |
$72.00 |
$185.74 |
$74880.00 |
11-02-2005 |
04-263904 |
3 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
1040 |
$150.00 |
$386.96 |
$156000.00 |
11-02-2005 |
04-263904 |
4 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
50 |
$193.58 |
$499.39 |
$9679.00 |
11-10-2005 |
07-182604 |
1 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
50 |
$300.00 |
$773.93 |
$15000.00 |
11-10-2005 |
07-182604 |
2 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
30 |
$250.00 |
$644.94 |
$7500.00 |
11-15-2005 |
04-150924 |
1 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
30 |
$300.00 |
$773.93 |
$9000.00 |
11-15-2005 |
04-150924 |
2 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
30 |
$250.00 |
$644.94 |
$7500.00 |
11-15-2005 |
04-150924 |
3 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
30 |
$183.00 |
$472.09 |
$5490.00 |
11-15-2005 |
04-150924 |
4 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
30 |
$450.00 |
$1160.89 |
$13500.00 |
11-15-2005 |
04-150924 |
5 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
30 |
$270.00 |
$696.53 |
$8100.00 |
11-15-2005 |
04-150924 |
6 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
4500 |
$35.00 |
$90.29 |
$157500.00 |
12-07-2005 |
04-245414 |
1 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
4500 |
$50.00 |
$128.99 |
$225000.00 |
12-07-2005 |
04-245414 |
2 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
4500 |
$60.00 |
$154.79 |
$270000.00 |
12-07-2005 |
04-245414 |
3 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
12 |
2 |
$600.00 |
$1495.20 |
$1200.00 |
01-26-2006 |
12-075704 |
1 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
12 |
2 |
$600.00 |
$1495.20 |
$1200.00 |
01-26-2006 |
12-075704 |
2 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
730 |
$80.00 |
$199.36 |
$58400.00 |
02-09-2006 |
07-4K1004 |
1 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
730 |
$139.00 |
$346.39 |
$101470.00 |
02-09-2006 |
07-4K1004 |
2 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
120 |
$100.00 |
$249.20 |
$12000.00 |
06-01-2006 |
07-4K6604 |
1 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
90 |
$220.00 |
$548.24 |
$19800.00 |
10-26-2006 |
07-218304 |
1 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
90 |
$150.00 |
$373.80 |
$13500.00 |
10-26-2006 |
07-218304 |
2 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
90 |
$89.41 |
$222.81 |
$8046.90 |
10-26-2006 |
07-218304 |
3 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
90 |
$82.41 |
$205.37 |
$7416.90 |
10-26-2006 |
07-218304 |
4 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
90 |
$275.00 |
$685.30 |
$24750.00 |
10-26-2006 |
07-218304 |
5 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
3240 |
$25.00 |
$62.30 |
$81000.00 |
11-28-2006 |
04-264204 |
1 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
14300 |
$17.00 |
$42.58 |
$243100.00 |
01-25-2007 |
07-1294V4 |
1 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
14300 |
$26.00 |
$65.12 |
$371800.00 |
01-25-2007 |
07-1294V4 |
2 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
14300 |
$40.00 |
$100.19 |
$572000.00 |
01-25-2007 |
07-1294V4 |
3 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
14300 |
$36.00 |
$90.17 |
$514800.00 |
01-25-2007 |
07-1294V4 |
4 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
14300 |
$109.00 |
$273.02 |
$1558700.00 |
01-25-2007 |
07-1294V4 |
5 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
14300 |
$15.00 |
$37.57 |
$214500.00 |
01-25-2007 |
07-1294V4 |
6 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
14300 |
$25.00 |
$62.62 |
$357500.00 |
01-25-2007 |
07-1294V4 |
7 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
11 |
2890 |
$30.00 |
$75.14 |
$86700.00 |
01-25-2007 |
11-224314 |
1 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
11 |
2890 |
$16.00 |
$40.08 |
$46240.00 |
01-25-2007 |
11-224314 |
2 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
11 |
2890 |
$30.00 |
$75.14 |
$86700.00 |
01-25-2007 |
11-224314 |
3 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
11 |
2890 |
$12.10 |
$30.31 |
$34969.00 |
01-25-2007 |
11-224314 |
4 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
11 |
2890 |
$9.00 |
$22.54 |
$26010.00 |
01-25-2007 |
11-224314 |
5 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
11 |
2890 |
$15.00 |
$37.57 |
$43350.00 |
01-25-2007 |
11-224314 |
6 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
11 |
2890 |
$75.00 |
$187.86 |
$216750.00 |
01-25-2007 |
11-224314 |
7 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
11 |
2890 |
$20.00 |
$50.10 |
$57800.00 |
01-25-2007 |
11-224314 |
8 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
120 |
$140.00 |
$350.67 |
$16800.00 |
02-15-2007 |
07-4K6604 |
1 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
120 |
$100.00 |
$250.48 |
$12000.00 |
02-15-2007 |
07-4K6604 |
2 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
120 |
$250.00 |
$626.20 |
$30000.00 |
02-15-2007 |
07-4K6604 |
3 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
120 |
$250.00 |
$626.20 |
$30000.00 |
02-15-2007 |
07-4K6604 |
4 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
120 |
$250.00 |
$626.20 |
$30000.00 |
02-15-2007 |
07-4K6604 |
5 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
120 |
$400.00 |
$1001.91 |
$48000.00 |
02-15-2007 |
07-4K6604 |
6 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
120 |
$135.00 |
$338.15 |
$16200.00 |
02-15-2007 |
07-4K6604 |
7 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
120 |
$165.00 |
$413.29 |
$19800.00 |
02-15-2007 |
07-4K6604 |
8 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
11 |
880 |
$60.00 |
$150.29 |
$52800.00 |
03-01-2007 |
11-279604 |
1 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
11 |
880 |
$47.00 |
$117.72 |
$41360.00 |
03-01-2007 |
11-279604 |
2 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
11 |
880 |
$50.00 |
$125.24 |
$44000.00 |
03-01-2007 |
11-279604 |
3 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
11 |
880 |
$103.00 |
$257.99 |
$90640.00 |
03-01-2007 |
11-279604 |
4 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
11 |
880 |
$50.00 |
$125.24 |
$44000.00 |
03-01-2007 |
11-279604 |
5 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
2000 |
$40.00 |
$100.19 |
$80000.00 |
05-30-2007 |
04-226144 |
1 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
2000 |
$42.00 |
$105.20 |
$84000.00 |
05-30-2007 |
04-226144 |
2 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
2000 |
$100.00 |
$250.48 |
$200000.00 |
05-30-2007 |
04-226144 |
3 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
2000 |
$69.00 |
$172.83 |
$138000.00 |
05-30-2007 |
04-226144 |
4 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
12600 |
$28.00 |
$70.13 |
$352800.00 |
06-27-2007 |
04-016014 |
1 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
12600 |
$21.00 |
$52.60 |
$264600.00 |
06-27-2007 |
04-016014 |
2 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
12600 |
$35.00 |
$87.67 |
$441000.00 |
06-27-2007 |
04-016014 |
3 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
11 |
5290 |
$10.00 |
$25.05 |
$52900.00 |
06-28-2007 |
11-2358U4 |
1 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
11 |
5290 |
$12.00 |
$30.06 |
$63480.00 |
06-28-2007 |
11-2358U4 |
2 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
11 |
5290 |
$90.00 |
$225.43 |
$476100.00 |
06-28-2007 |
11-2358U4 |
3 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
11 |
5290 |
$21.00 |
$52.60 |
$111090.00 |
06-28-2007 |
11-2358U4 |
4 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
11 |
5290 |
$18.00 |
$45.09 |
$95220.00 |
06-28-2007 |
11-2358U4 |
5 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
11 |
5290 |
$30.00 |
$75.14 |
$158700.00 |
06-28-2007 |
11-2358U4 |
6 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
3000 |
$31.00 |
$77.65 |
$93000.00 |
11-27-2007 |
04-0T2404 |
1 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
3000 |
$50.00 |
$125.24 |
$150000.00 |
11-27-2007 |
04-0T2404 |
2 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
3000 |
$81.00 |
$202.89 |
$243000.00 |
11-27-2007 |
04-0T2404 |
3 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
3000 |
$40.00 |
$100.19 |
$120000.00 |
11-27-2007 |
04-0T2404 |
4 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
3000 |
$40.35 |
$101.07 |
$121050.00 |
11-27-2007 |
04-0T2404 |
5 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
3000 |
$36.00 |
$90.17 |
$108000.00 |
11-27-2007 |
04-0T2404 |
6 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
3000 |
$40.00 |
$100.19 |
$120000.00 |
11-27-2007 |
04-0T2404 |
7 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
3000 |
$45.00 |
$112.72 |
$135000.00 |
11-27-2007 |
04-0T2404 |
8 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
3000 |
$60.00 |
$150.29 |
$180000.00 |
11-27-2007 |
04-0T2404 |
9 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
3000 |
$60.00 |
$150.29 |
$180000.00 |
11-27-2007 |
04-0T2404 |
10 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
5420 |
$8.25 |
$22.06 |
$44715.00 |
04-29-2008 |
04-0A5314 |
1 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
5420 |
$5.70 |
$15.24 |
$30894.00 |
04-29-2008 |
04-0A5314 |
2 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
5420 |
$25.00 |
$66.85 |
$135500.00 |
04-29-2008 |
04-0A5314 |
3 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
5420 |
$20.85 |
$55.75 |
$113007.00 |
04-29-2008 |
04-0A5314 |
4 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
5420 |
$9.00 |
$24.07 |
$48780.00 |
04-29-2008 |
04-0A5314 |
5 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
5420 |
$20.00 |
$53.48 |
$108400.00 |
04-29-2008 |
04-0A5314 |
6 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
5420 |
$18.00 |
$48.13 |
$97560.00 |
04-29-2008 |
04-0A5314 |
7 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
5420 |
$45.00 |
$120.33 |
$243900.00 |
04-29-2008 |
04-0A5314 |
8 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
5420 |
$20.00 |
$53.48 |
$108400.00 |
04-29-2008 |
04-0A5314 |
9 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
5420 |
$20.00 |
$53.48 |
$108400.00 |
04-29-2008 |
04-0A5314 |
10 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
08 |
1260 |
$45.00 |
$120.33 |
$56700.00 |
05-02-2008 |
08-0K0404 |
1 |
|
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
08 |
1260 |
$30.00 |
$80.22 |
$37800.00 |
05-02-2008 |
08-0K0404 |
2 |
|
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
08 |
1260 |
$55.00 |
$147.06 |
$69300.00 |
05-02-2008 |
08-0K0404 |
3 |
|
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
08 |
1260 |
$55.00 |
$147.06 |
$69300.00 |
05-02-2008 |
08-0K0404 |
4 |
|
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
08 |
1260 |
$9.00 |
$24.07 |
$11340.00 |
05-02-2008 |
08-0K0404 |
5 |
|
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
08 |
1260 |
$150.00 |
$401.09 |
$189000.00 |
05-02-2008 |
08-0K0404 |
6 |
|
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
08 |
1260 |
$135.00 |
$360.98 |
$170100.00 |
05-02-2008 |
08-0K0404 |
7 |
|
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
34100 |
$0.10 |
$0.27 |
$3410.00 |
06-24-2008 |
04-290844 |
1 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
34100 |
$13.00 |
$34.76 |
$443300.00 |
06-24-2008 |
04-290844 |
2 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
34100 |
$18.20 |
$48.67 |
$620620.00 |
06-24-2008 |
04-290844 |
3 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
34100 |
$28.00 |
$74.87 |
$954800.00 |
06-24-2008 |
04-290844 |
4 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
34100 |
$17.00 |
$45.46 |
$579700.00 |
06-24-2008 |
04-290844 |
5 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
34100 |
$21.00 |
$56.15 |
$716100.00 |
06-24-2008 |
04-290844 |
6 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
34100 |
$12.00 |
$32.09 |
$409200.00 |
06-24-2008 |
04-290844 |
7 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
25500 |
$12.00 |
$38.23 |
$306000.00 |
03-19-2009 |
07-117074 |
1 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
25500 |
$10.00 |
$31.85 |
$255000.00 |
03-19-2009 |
07-117074 |
2 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
25500 |
$32.00 |
$101.93 |
$816000.00 |
03-19-2009 |
07-117074 |
3 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
25500 |
$29.00 |
$92.38 |
$739500.00 |
03-19-2009 |
07-117074 |
4 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
25500 |
$10.00 |
$31.85 |
$255000.00 |
03-19-2009 |
07-117074 |
5 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
25500 |
$37.00 |
$117.86 |
$943500.00 |
03-19-2009 |
07-117074 |
6 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
25500 |
$22.00 |
$70.08 |
$561000.00 |
03-19-2009 |
07-117074 |
7 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
25500 |
$15.00 |
$47.78 |
$382500.00 |
03-19-2009 |
07-117074 |
8 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
25500 |
$14.00 |
$44.60 |
$357000.00 |
03-19-2009 |
07-117074 |
9 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
1400 |
$7.00 |
$22.30 |
$9800.00 |
04-23-2009 |
07-235504 |
1 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
1400 |
$28.00 |
$89.19 |
$39200.00 |
04-23-2009 |
07-235504 |
2 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
1400 |
$17.00 |
$54.15 |
$23800.00 |
04-23-2009 |
07-235504 |
3 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
1400 |
$11.00 |
$35.04 |
$15400.00 |
04-23-2009 |
07-235504 |
4 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
1400 |
$35.00 |
$111.49 |
$49000.00 |
04-23-2009 |
07-235504 |
5 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
1400 |
$28.00 |
$89.19 |
$39200.00 |
04-23-2009 |
07-235504 |
6 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
1400 |
$12.00 |
$38.23 |
$16800.00 |
04-23-2009 |
07-235504 |
7 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
1400 |
$46.00 |
$146.53 |
$64400.00 |
04-23-2009 |
07-235504 |
8 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
1400 |
$50.00 |
$159.27 |
$70000.00 |
04-23-2009 |
07-235504 |
9 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
1400 |
$20.00 |
$63.71 |
$28000.00 |
04-23-2009 |
07-235504 |
10 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
1400 |
$72.30 |
$230.31 |
$101220.00 |
04-23-2009 |
07-235504 |
11 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
1400 |
$50.00 |
$159.27 |
$70000.00 |
04-23-2009 |
07-235504 |
12 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
1400 |
$40.00 |
$127.42 |
$56000.00 |
04-23-2009 |
07-235504 |
13 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
11 |
2570 |
$47.11 |
$150.07 |
$121072.70 |
05-07-2009 |
11-261714 |
1 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
11 |
2570 |
$35.00 |
$111.49 |
$89950.00 |
05-07-2009 |
11-261714 |
2 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
11 |
2570 |
$75.00 |
$238.91 |
$192750.00 |
05-07-2009 |
11-261714 |
3 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
11 |
2570 |
$37.00 |
$117.86 |
$95090.00 |
05-07-2009 |
11-261714 |
4 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
11 |
2570 |
$74.00 |
$235.72 |
$190180.00 |
05-07-2009 |
11-261714 |
5 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
11 |
2570 |
$55.70 |
$177.43 |
$143149.00 |
05-07-2009 |
11-261714 |
6 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
11 |
2570 |
$78.00 |
$248.46 |
$200460.00 |
05-07-2009 |
11-261714 |
7 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
11 |
2570 |
$40.00 |
$127.42 |
$102800.00 |
05-07-2009 |
11-261714 |
8 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
11 |
2570 |
$40.00 |
$127.42 |
$102800.00 |
05-07-2009 |
11-261714 |
9 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
11 |
2570 |
$32.00 |
$101.93 |
$82240.00 |
05-07-2009 |
11-261714 |
10 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
41000 |
$0.01 |
$0.03 |
$410.00 |
06-03-2009 |
04-290834 |
1 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
41000 |
$5.25 |
$16.72 |
$215250.00 |
06-03-2009 |
04-290834 |
2 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
41000 |
$5.20 |
$16.56 |
$213200.00 |
06-03-2009 |
04-290834 |
3 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
41000 |
$5.00 |
$15.93 |
$205000.00 |
06-03-2009 |
04-290834 |
4 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
41000 |
$0.10 |
$0.32 |
$4100.00 |
06-03-2009 |
04-290834 |
5 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
41000 |
$0.10 |
$0.32 |
$4100.00 |
06-03-2009 |
04-290834 |
6 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
41000 |
$1.00 |
$3.19 |
$41000.00 |
06-03-2009 |
04-290834 |
7 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
41000 |
$3.00 |
$9.56 |
$123000.00 |
06-03-2009 |
04-290834 |
8 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
41000 |
$1.00 |
$3.19 |
$41000.00 |
06-03-2009 |
04-290834 |
9 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
41000 |
$60.00 |
$191.13 |
$2460000.00 |
06-03-2009 |
04-290834 |
10 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
3450 |
$12.00 |
$38.23 |
$41400.00 |
06-09-2009 |
04-171334 |
1 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
3450 |
$12.00 |
$38.23 |
$41400.00 |
06-09-2009 |
04-171334 |
2 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
3450 |
$4.00 |
$12.74 |
$13800.00 |
06-09-2009 |
04-171334 |
3 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
3450 |
$15.00 |
$47.78 |
$51750.00 |
06-09-2009 |
04-171334 |
4 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
3450 |
$6.00 |
$19.11 |
$20700.00 |
06-09-2009 |
04-171334 |
5 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
3450 |
$12.00 |
$38.23 |
$41400.00 |
06-09-2009 |
04-171334 |
6 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
3450 |
$11.00 |
$35.04 |
$37950.00 |
06-09-2009 |
04-171334 |
7 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
3450 |
$20.00 |
$63.71 |
$69000.00 |
06-09-2009 |
04-171334 |
8 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
3450 |
$20.00 |
$63.71 |
$69000.00 |
06-09-2009 |
04-171334 |
9 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
3450 |
$6.00 |
$19.11 |
$20700.00 |
06-09-2009 |
04-171334 |
10 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
13900 |
$8.00 |
$25.48 |
$111200.00 |
07-30-2009 |
12-0G0404 |
1 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
13900 |
$8.00 |
$25.48 |
$111200.00 |
07-30-2009 |
12-0G0404 |
2 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
13900 |
$15.00 |
$47.78 |
$208500.00 |
07-30-2009 |
12-0G0404 |
3 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
13900 |
$16.00 |
$50.97 |
$222400.00 |
07-30-2009 |
12-0G0404 |
4 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
13900 |
$12.00 |
$38.23 |
$166800.00 |
07-30-2009 |
12-0G0404 |
5 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
13900 |
$10.00 |
$31.85 |
$139000.00 |
07-30-2009 |
12-0G0404 |
6 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
13900 |
$10.00 |
$31.85 |
$139000.00 |
07-30-2009 |
12-0G0404 |
7 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
13900 |
$18.50 |
$58.93 |
$257150.00 |
07-30-2009 |
12-0G0404 |
8 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
13900 |
$22.00 |
$70.08 |
$305800.00 |
07-30-2009 |
12-0G0404 |
9 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
08 |
12100 |
$10.00 |
$31.85 |
$121000.00 |
09-24-2009 |
08-4440U4 |
1 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
08 |
12100 |
$7.00 |
$22.30 |
$84700.00 |
09-24-2009 |
08-4440U4 |
2 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
08 |
12100 |
$14.00 |
$44.60 |
$169400.00 |
09-24-2009 |
08-4440U4 |
3 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
08 |
12100 |
$14.00 |
$44.60 |
$169400.00 |
09-24-2009 |
08-4440U4 |
4 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
08 |
12100 |
$12.00 |
$38.23 |
$145200.00 |
09-24-2009 |
08-4440U4 |
5 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
08 |
12100 |
$18.00 |
$57.34 |
$217800.00 |
09-24-2009 |
08-4440U4 |
6 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
08 |
12100 |
$6.00 |
$19.11 |
$72600.00 |
09-24-2009 |
08-4440U4 |
7 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
16900 |
$9.50 |
$30.26 |
$160550.00 |
10-14-2009 |
04-0A18U4 |
1 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
16900 |
$19.00 |
$60.52 |
$321100.00 |
10-14-2009 |
04-0A18U4 |
2 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
16900 |
$17.00 |
$54.15 |
$287300.00 |
10-14-2009 |
04-0A18U4 |
3 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
16900 |
$25.00 |
$79.64 |
$422500.00 |
10-14-2009 |
04-0A18U4 |
4 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
16900 |
$19.60 |
$62.43 |
$331240.00 |
10-14-2009 |
04-0A18U4 |
5 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
16900 |
$7.00 |
$22.30 |
$118300.00 |
10-14-2009 |
04-0A18U4 |
6 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
16900 |
$7.65 |
$24.37 |
$129285.00 |
10-14-2009 |
04-0A18U4 |
7 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
16900 |
$40.00 |
$127.42 |
$676000.00 |
10-14-2009 |
04-0A18U4 |
8 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
16900 |
$20.00 |
$63.71 |
$338000.00 |
10-14-2009 |
04-0A18U4 |
9 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
16900 |
$15.00 |
$47.78 |
$253500.00 |
10-14-2009 |
04-0A18U4 |
10 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
2710 |
$23.00 |
$73.27 |
$62330.00 |
02-18-2010 |
07-1219U4 |
1 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
2710 |
$19.65 |
$62.59 |
$53251.50 |
02-18-2010 |
07-1219U4 |
2 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
2710 |
$19.00 |
$60.52 |
$51490.00 |
02-18-2010 |
07-1219U4 |
3 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
2710 |
$9.00 |
$28.67 |
$24390.00 |
02-18-2010 |
07-1219U4 |
4 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
2710 |
$24.50 |
$78.04 |
$66395.00 |
02-18-2010 |
07-1219U4 |
5 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
2710 |
$42.00 |
$133.79 |
$113820.00 |
02-18-2010 |
07-1219U4 |
6 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
2710 |
$14.00 |
$44.60 |
$37940.00 |
02-18-2010 |
07-1219U4 |
7 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
2710 |
$15.00 |
$47.78 |
$40650.00 |
02-18-2010 |
07-1219U4 |
8 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
1710 |
$8.00 |
$25.48 |
$13680.00 |
04-15-2010 |
12-071624 |
1 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
1710 |
$23.00 |
$73.27 |
$39330.00 |
04-15-2010 |
12-071624 |
2 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
1710 |
$27.00 |
$86.01 |
$46170.00 |
04-15-2010 |
12-071624 |
3 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
1710 |
$20.00 |
$63.71 |
$34200.00 |
04-15-2010 |
12-071624 |
4 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
1710 |
$30.00 |
$95.56 |
$51300.00 |
04-15-2010 |
12-071624 |
5 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
1710 |
$12.00 |
$38.23 |
$20520.00 |
04-15-2010 |
12-071624 |
6 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
1710 |
$19.00 |
$60.52 |
$32490.00 |
04-15-2010 |
12-071624 |
7 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
1710 |
$19.00 |
$60.52 |
$32490.00 |
04-15-2010 |
12-071624 |
8 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
1710 |
$15.00 |
$47.78 |
$25650.00 |
04-15-2010 |
12-071624 |
9 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
1710 |
$7.70 |
$24.53 |
$13167.00 |
04-15-2010 |
12-071624 |
10 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
2430 |
$10.00 |
$31.85 |
$24300.00 |
05-13-2010 |
07-1786A4 |
1 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
2430 |
$20.00 |
$63.71 |
$48600.00 |
05-13-2010 |
07-1786A4 |
2 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
2430 |
$17.75 |
$56.54 |
$43132.50 |
05-13-2010 |
07-1786A4 |
3 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
2430 |
$35.00 |
$111.49 |
$85050.00 |
05-13-2010 |
07-1786A4 |
4 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
2430 |
$24.00 |
$76.45 |
$58320.00 |
05-13-2010 |
07-1786A4 |
5 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
2430 |
$100.00 |
$318.54 |
$243000.00 |
05-13-2010 |
07-1786A4 |
6 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
2430 |
$9.00 |
$28.67 |
$21870.00 |
05-13-2010 |
07-1786A4 |
7 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
2430 |
$41.00 |
$130.60 |
$99630.00 |
05-13-2010 |
07-1786A4 |
8 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
2430 |
$12.00 |
$38.23 |
$29160.00 |
05-13-2010 |
07-1786A4 |
9 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
2430 |
$100.00 |
$318.54 |
$243000.00 |
05-13-2010 |
07-1786A4 |
10 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
2430 |
$23.00 |
$73.27 |
$55890.00 |
05-13-2010 |
07-1786A4 |
11 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
2430 |
$12.00 |
$38.23 |
$29160.00 |
05-13-2010 |
07-1786A4 |
12 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
11 |
2270 |
$65.00 |
$207.05 |
$147550.00 |
07-01-2010 |
11-261704 |
1 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
11 |
2270 |
$42.00 |
$133.79 |
$95340.00 |
07-01-2010 |
11-261704 |
2 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
11 |
2270 |
$90.00 |
$286.69 |
$204300.00 |
07-01-2010 |
11-261704 |
3 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
2720 |
$6.00 |
$19.11 |
$16320.00 |
07-01-2010 |
12-071634 |
1 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
2720 |
$18.00 |
$57.34 |
$48960.00 |
07-01-2010 |
12-071634 |
2 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
2720 |
$13.50 |
$43.00 |
$36720.00 |
07-01-2010 |
12-071634 |
3 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
2720 |
$15.00 |
$47.78 |
$40800.00 |
07-01-2010 |
12-071634 |
4 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
2720 |
$7.50 |
$23.89 |
$20400.00 |
07-01-2010 |
12-071634 |
5 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
2720 |
$20.00 |
$63.71 |
$54400.00 |
07-01-2010 |
12-071634 |
6 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
9740 |
$22.00 |
$70.08 |
$214280.00 |
08-05-2010 |
07-121844 |
1 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
9740 |
$12.00 |
$38.23 |
$116880.00 |
08-05-2010 |
07-121844 |
2 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
9740 |
$30.00 |
$95.56 |
$292200.00 |
08-05-2010 |
07-121844 |
3 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
9740 |
$40.00 |
$127.42 |
$389600.00 |
08-05-2010 |
07-121844 |
4 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
9740 |
$21.00 |
$66.89 |
$204540.00 |
08-05-2010 |
07-121844 |
5 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
9740 |
$17.00 |
$54.15 |
$165580.00 |
08-05-2010 |
07-121844 |
6 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
9740 |
$8.00 |
$25.48 |
$77920.00 |
08-05-2010 |
07-121844 |
7 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
9740 |
$20.00 |
$63.71 |
$194800.00 |
08-05-2010 |
07-121844 |
8 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
03 |
140 |
$40.00 |
$113.59 |
$5600.00 |
05-10-2011 |
03-3A0424 |
1 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
03 |
140 |
$50.00 |
$141.99 |
$7000.00 |
05-10-2011 |
03-3A0424 |
2 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
03 |
140 |
$55.00 |
$156.19 |
$7700.00 |
05-10-2011 |
03-3A0424 |
3 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
03 |
140 |
$60.00 |
$170.38 |
$8400.00 |
05-10-2011 |
03-3A0424 |
4 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
03 |
140 |
$75.00 |
$212.98 |
$10500.00 |
05-10-2011 |
03-3A0424 |
5 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
9100 |
$11.00 |
$31.24 |
$100100.00 |
05-12-2011 |
07-2159C4 |
1 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
9100 |
$20.00 |
$56.79 |
$182000.00 |
05-12-2011 |
07-2159C4 |
2 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
9100 |
$23.00 |
$65.31 |
$209300.00 |
05-12-2011 |
07-2159C4 |
3 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
9100 |
$13.00 |
$36.92 |
$118300.00 |
05-12-2011 |
07-2159C4 |
4 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
9100 |
$11.00 |
$31.24 |
$100100.00 |
05-12-2011 |
07-2159C4 |
5 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
9100 |
$15.00 |
$42.60 |
$136500.00 |
05-12-2011 |
07-2159C4 |
6 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
9100 |
$14.20 |
$40.32 |
$129220.00 |
05-12-2011 |
07-2159C4 |
7 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
07 |
9100 |
$26.00 |
$73.83 |
$236600.00 |
05-12-2011 |
07-2159C4 |
8 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
830 |
$37.00 |
$105.07 |
$30710.00 |
10-05-2011 |
04-264044 |
1 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
830 |
$45.00 |
$127.79 |
$37350.00 |
10-05-2011 |
04-264044 |
2 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
830 |
$25.00 |
$70.99 |
$20750.00 |
10-05-2011 |
04-264044 |
3 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
830 |
$21.00 |
$59.63 |
$17430.00 |
10-05-2011 |
04-264044 |
4 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
830 |
$27.00 |
$76.67 |
$22410.00 |
10-05-2011 |
04-264044 |
5 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
830 |
$25.00 |
$70.99 |
$20750.00 |
10-05-2011 |
04-264044 |
6 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
M3 |
04 |
830 |
$19.00 |
$53.95 |
$15770.00 |
10-05-2011 |
04-264044 |
7 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
4930 |
$30.00 |
$85.19 |
$147900.00 |
12-01-2011 |
07-260704 |
1 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
4930 |
$14.70 |
$41.74 |
$72471.00 |
12-01-2011 |
07-260704 |
2 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
4930 |
$10.75 |
$30.53 |
$52997.50 |
12-01-2011 |
07-260704 |
3 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
4930 |
$30.00 |
$85.19 |
$147900.00 |
12-01-2011 |
07-260704 |
4 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
4930 |
$16.00 |
$45.44 |
$78880.00 |
12-01-2011 |
07-260704 |
5 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
4930 |
$15.00 |
$42.60 |
$73950.00 |
12-01-2011 |
07-260704 |
6 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
9600 |
$8.00 |
$25.88 |
$76800.00 |
07-26-2012 |
07-215934 |
1 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
9600 |
$10.00 |
$32.35 |
$96000.00 |
07-26-2012 |
07-215934 |
2 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
9600 |
$14.50 |
$46.90 |
$139200.00 |
07-26-2012 |
07-215934 |
3 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
9600 |
$11.00 |
$35.58 |
$105600.00 |
07-26-2012 |
07-215934 |
4 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
9600 |
$24.50 |
$79.25 |
$235200.00 |
07-26-2012 |
07-215934 |
5 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
9600 |
$20.00 |
$64.69 |
$192000.00 |
07-26-2012 |
07-215934 |
6 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
9600 |
$10.00 |
$32.35 |
$96000.00 |
07-26-2012 |
07-215934 |
7 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
860 |
$12.50 |
$40.43 |
$10750.00 |
08-09-2012 |
07-215944 |
1 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
860 |
$9.00 |
$29.11 |
$7740.00 |
08-09-2012 |
07-215944 |
2 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
860 |
$11.00 |
$35.58 |
$9460.00 |
08-09-2012 |
07-215944 |
3 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
860 |
$12.00 |
$38.82 |
$10320.00 |
08-09-2012 |
07-215944 |
4 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
2750 |
$19.40 |
$48.34 |
$53350.00 |
10-04-2012 |
07-1218W4 |
1 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
2750 |
$13.00 |
$32.40 |
$35750.00 |
10-04-2012 |
07-1218W4 |
2 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
2750 |
$15.00 |
$37.38 |
$41250.00 |
10-04-2012 |
07-1218W4 |
3 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
2750 |
$13.00 |
$32.40 |
$35750.00 |
10-04-2012 |
07-1218W4 |
4 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
2750 |
$10.00 |
$24.92 |
$27500.00 |
10-04-2012 |
07-1218W4 |
5 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
3120 |
$12.00 |
$29.90 |
$37440.00 |
10-05-2012 |
04-2908V4 |
1 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
3120 |
$25.00 |
$62.30 |
$78000.00 |
10-05-2012 |
04-2908V4 |
2 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
3120 |
$27.85 |
$69.40 |
$86892.00 |
10-05-2012 |
04-2908V4 |
3 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
3120 |
$8.50 |
$21.18 |
$26520.00 |
10-05-2012 |
04-2908V4 |
4 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
3120 |
$10.00 |
$24.92 |
$31200.00 |
10-05-2012 |
04-2908V4 |
5 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
3120 |
$18.00 |
$44.86 |
$56160.00 |
10-05-2012 |
04-2908V4 |
6 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
75 |
$70.00 |
$174.44 |
$5250.00 |
11-01-2012 |
07-285004 |
1 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
75 |
$50.00 |
$124.60 |
$3750.00 |
11-01-2012 |
07-285004 |
2 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
75 |
$46.54 |
$115.98 |
$3490.50 |
11-01-2012 |
07-285004 |
3 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
75 |
$45.00 |
$112.14 |
$3375.00 |
11-01-2012 |
07-285004 |
4 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
75 |
$25.00 |
$62.30 |
$1875.00 |
11-01-2012 |
07-285004 |
5 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
75 |
$125.00 |
$311.50 |
$9375.00 |
11-01-2012 |
07-285004 |
6 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
75 |
$100.00 |
$249.20 |
$7500.00 |
11-01-2012 |
07-285004 |
7 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
75 |
$380.00 |
$946.96 |
$28500.00 |
11-01-2012 |
07-285004 |
8 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
75 |
$110.00 |
$274.12 |
$8250.00 |
11-01-2012 |
07-285004 |
9 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
860 |
$20.00 |
$41.87 |
$17200.00 |
01-08-2013 |
04-0A1854 |
1 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
860 |
$2.00 |
$4.19 |
$1720.00 |
01-08-2013 |
04-0A1854 |
2 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
860 |
$30.00 |
$62.80 |
$25800.00 |
01-08-2013 |
04-0A1854 |
3 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
860 |
$25.00 |
$52.33 |
$21500.00 |
01-08-2013 |
04-0A1854 |
4 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
860 |
$22.00 |
$46.05 |
$18920.00 |
01-08-2013 |
04-0A1854 |
5 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
860 |
$15.00 |
$31.40 |
$12900.00 |
01-08-2013 |
04-0A1854 |
6 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
27800 |
$29.90 |
$53.29 |
$831220.00 |
01-09-2014 |
07-215954 |
1 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
27800 |
$10.00 |
$17.82 |
$278000.00 |
01-09-2014 |
07-215954 |
2 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
27800 |
$12.00 |
$21.39 |
$333600.00 |
01-09-2014 |
07-215954 |
3 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
27800 |
$11.00 |
$19.61 |
$305800.00 |
01-09-2014 |
07-215954 |
4 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
27800 |
$19.00 |
$33.87 |
$528200.00 |
01-09-2014 |
07-215954 |
5 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
11 |
3350 |
$25.00 |
$44.56 |
$83750.00 |
01-30-2014 |
11-002704 |
1 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
11 |
3350 |
$5.50 |
$9.80 |
$18425.00 |
01-30-2014 |
11-002704 |
2 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
11 |
3350 |
$25.00 |
$44.56 |
$83750.00 |
01-30-2014 |
11-002704 |
3 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
11 |
3350 |
$12.00 |
$21.39 |
$40200.00 |
01-30-2014 |
11-002704 |
4 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
20000 |
$13.00 |
$29.93 |
$260000.00 |
05-13-2014 |
04-235844 |
1 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
20000 |
$18.45 |
$42.47 |
$369000.00 |
05-13-2014 |
04-235844 |
2 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
20000 |
$10.00 |
$23.02 |
$200000.00 |
05-13-2014 |
04-235844 |
3 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
20000 |
$5.00 |
$11.51 |
$100000.00 |
05-13-2014 |
04-235844 |
4 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
20000 |
$16.00 |
$36.83 |
$320000.00 |
05-13-2014 |
04-235844 |
5 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
20000 |
$5.00 |
$11.51 |
$100000.00 |
05-13-2014 |
04-235844 |
6 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
20000 |
$12.00 |
$27.63 |
$240000.00 |
05-13-2014 |
04-235844 |
7 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
20000 |
$10.00 |
$23.02 |
$200000.00 |
05-13-2014 |
04-235844 |
8 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
20000 |
$30.00 |
$69.06 |
$600000.00 |
05-13-2014 |
04-235844 |
9 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
43 |
$240.00 |
$441.47 |
$10320.00 |
04-07-2016 |
12-0M4004 |
1 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
43 |
$120.00 |
$220.73 |
$5160.00 |
04-07-2016 |
12-0M4004 |
2 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
43 |
$55.00 |
$101.17 |
$2365.00 |
04-07-2016 |
12-0M4004 |
3 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
43 |
$200.00 |
$367.89 |
$8600.00 |
04-07-2016 |
12-0M4004 |
4 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
43 |
$250.00 |
$459.86 |
$10750.00 |
04-07-2016 |
12-0M4004 |
5 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
43 |
$375.00 |
$689.79 |
$16125.00 |
04-07-2016 |
12-0M4004 |
6 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
3430 |
$28.00 |
$51.50 |
$96040.00 |
04-27-2016 |
07-2159U4 |
1 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
3430 |
$29.00 |
$53.34 |
$99470.00 |
04-27-2016 |
07-2159U4 |
2 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
3430 |
$12.00 |
$22.07 |
$41160.00 |
04-27-2016 |
07-2159U4 |
3 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
3430 |
$8.00 |
$14.72 |
$27440.00 |
04-27-2016 |
07-2159U4 |
4 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
3430 |
$16.00 |
$29.43 |
$54880.00 |
04-27-2016 |
07-2159U4 |
5 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
3430 |
$20.00 |
$36.79 |
$68600.00 |
04-27-2016 |
07-2159U4 |
6 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
70 |
$424.00 |
$779.92 |
$29680.00 |
06-09-2016 |
12-0716U4 |
1 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
70 |
$350.00 |
$643.80 |
$24500.00 |
06-09-2016 |
12-0716U4 |
2 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
70 |
$200.00 |
$367.89 |
$14000.00 |
06-09-2016 |
12-0716U4 |
3 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
70 |
$400.00 |
$735.78 |
$28000.00 |
06-09-2016 |
12-0716U4 |
4 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
70 |
$450.00 |
$827.75 |
$31500.00 |
06-09-2016 |
12-0716U4 |
5 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
70 |
$350.00 |
$643.80 |
$24500.00 |
06-09-2016 |
12-0716U4 |
6 |
M |
|
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
11 |
15800 |
$11.20 |
$16.93 |
$176960.00 |
11-29-2016 |
11-085784 |
1 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
11 |
15800 |
$18.00 |
$27.22 |
$284400.00 |
11-29-2016 |
11-085784 |
2 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
11 |
15800 |
$39.00 |
$58.97 |
$616200.00 |
11-29-2016 |
11-085784 |
3 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
11 |
15800 |
$40.00 |
$60.48 |
$632000.00 |
11-29-2016 |
11-085784 |
4 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
11 |
15800 |
$26.01 |
$39.33 |
$410958.00 |
11-29-2016 |
11-085784 |
5 |
M |
TRO |
|
| 190108 - ROADWAY EXCAVATION (TYPE Y-2) (AERIALLY DEPOSITED LEAD) |
CY |
11 |
15800 |
$20.00 |
$30.24 |
$316000.00 |
11-29-2016 |
11-085784 |
6 |
M |
TRO |