190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) M3 01 210 $70.00 $175.34 $14700.00 09-11-2007 01-432704 1 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) M3 01 210 $340.00 $851.63 $71400.00 09-11-2007 01-432704 2 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) M3 01 210 $170.00 $425.81 $35700.00 09-11-2007 01-432704 3 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) M3 01 210 $100.00 $250.48 $21000.00 09-11-2007 01-432704 4 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) M3 01 210 $368.00 $921.76 $77280.00 09-11-2007 01-432704 5 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) M3 01 210 $375.00 $939.29 $78750.00 09-11-2007 01-432704 6 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 03 780 $23.00 $57.61 $17940.00 12-11-2007 03-3E1804 1    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 03 780 $17.75 $44.46 $13845.00 12-11-2007 03-3E1804 2    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 03 780 $50.00 $125.24 $39000.00 12-11-2007 03-3E1804 3    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 03 780 $58.30 $146.03 $45474.00 12-11-2007 03-3E1804 4    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 03 780 $69.00 $172.83 $53820.00 12-11-2007 03-3E1804 5    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 03 780 $72.00 $180.34 $56160.00 12-11-2007 03-3E1804 6    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 03 780 $31.00 $77.65 $24180.00 12-11-2007 03-3E1804 7    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 03 780 $55.00 $137.76 $42900.00 12-11-2007 03-3E1804 8    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 03 780 $69.00 $172.83 $53820.00 12-11-2007 03-3E1804 9    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 03 780 $75.00 $187.86 $58500.00 12-11-2007 03-3E1804 10    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 03 780 $95.00 $237.95 $74100.00 12-11-2007 03-3E1804 11    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 03 780 $138.00 $345.66 $107640.00 12-11-2007 03-3E1804 12    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 03 780 $95.00 $237.95 $74100.00 12-11-2007 03-3E1804 13    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 03 780 $80.00 $200.38 $62400.00 12-11-2007 03-3E1804 14    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 03 780 $85.70 $214.66 $66846.00 12-11-2007 03-3E1804 15    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 03 780 $120.00 $300.57 $93600.00 12-11-2007 03-3E1804 16    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 03 780 $176.10 $441.09 $137358.00 12-11-2007 03-3E1804 17    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 03 780 $185.00 $463.39 $144300.00 12-11-2007 03-3E1804 18    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 03 780 $118.00 $295.56 $92040.00 12-11-2007 03-3E1804 19    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 03 780 $210.00 $526.01 $163800.00 12-11-2007 03-3E1804 20    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 03 780 $196.00 $490.94 $152880.00 12-11-2007 03-3E1804 21    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 03 780 $0.04 $0.11 $35.02 12-11-2007 03-3E1804 22    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) M3 03 41 $204.88 $547.83 $8400.08 04-16-2008 03-4C7304 1    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) M3 03 41 $30.00 $80.22 $1230.00 04-16-2008 03-4C7304 2    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) M3 03 41 $223.00 $596.28 $9143.00 04-16-2008 03-4C7304 3    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) M3 03 41 $100.00 $267.39 $4100.00 04-16-2008 03-4C7304 4    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) M3 03 41 $325.25 $869.69 $13335.25 04-16-2008 03-4C7304 5    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) M3 03 41 $600.00 $1604.34 $24600.00 04-16-2008 03-4C7304 6    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) M3 03 41 $350.00 $935.87 $14350.00 04-16-2008 03-4C7304 7    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) M3 03 41 $200.00 $534.78 $8200.00 04-16-2008 03-4C7304 8    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) M3 03 41 $100.00 $267.39 $4100.00 04-16-2008 03-4C7304 9    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) M3 03 41 $500.00 $1336.95 $20500.00 04-16-2008 03-4C7304 10    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) M3 03 41 $100.00 $267.39 $4100.00 04-16-2008 03-4C7304 11    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) M3 03 41 $350.00 $935.87 $14350.00 04-16-2008 03-4C7304 12    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 03 550 $62.00 $165.78 $34100.00 05-06-2008 03-2E5304 1    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 03 550 $51.00 $136.37 $28050.00 05-06-2008 03-2E5304 2    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 03 550 $110.00 $294.13 $60500.00 05-06-2008 03-2E5304 3    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 03 550 $65.00 $173.80 $35750.00 05-06-2008 03-2E5304 4    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 03 550 $65.00 $173.80 $35750.00 05-06-2008 03-2E5304 5    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) M3 03 11600 $30.00 $80.22 $348000.00 05-20-2008 03-1C4904 1 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) M3 03 11600 $17.00 $45.46 $197200.00 05-20-2008 03-1C4904 2 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) M3 03 11600 $25.00 $66.85 $290000.00 05-20-2008 03-1C4904 3 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) M3 03 11600 $25.00 $66.85 $290000.00 05-20-2008 03-1C4904 4 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) M3 03 11600 $21.00 $56.15 $243600.00 05-20-2008 03-1C4904 5 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) M3 03 11600 $22.00 $58.83 $255200.00 05-20-2008 03-1C4904 6 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) M3 03 11600 $30.00 $80.22 $348000.00 05-20-2008 03-1C4904 7 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) M3 05 240 $117.00 $312.85 $28080.00 08-26-2008 05-0H1904 1 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) M3 05 240 $275.00 $735.32 $66000.00 08-26-2008 05-0H1904 2 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) M3 05 240 $35.00 $93.59 $8400.00 08-26-2008 05-0H1904 3 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 62400 $7.00 $22.30 $436800.00 03-24-2009 02-3C0804 1 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 62400 $6.75 $21.50 $421200.00 03-24-2009 02-3C0804 2 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 62400 $9.00 $28.67 $561600.00 03-24-2009 02-3C0804 3 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 62400 $20.00 $63.71 $1248000.00 03-24-2009 02-3C0804 4 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 62400 $8.50 $27.08 $530400.00 03-24-2009 02-3C0804 5 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 62400 $14.50 $46.19 $904800.00 03-24-2009 02-3C0804 6 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 62400 $10.00 $31.85 $624000.00 03-24-2009 02-3C0804 7 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 62400 $25.00 $79.64 $1560000.00 03-24-2009 02-3C0804 8 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 01 1.6 $1000.00 $3185.43 $1600.00 05-05-2009 01-431804 1 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 01 1.6 $300.00 $955.63 $480.00 05-05-2009 01-431804 2 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 01 1.6 $571.00 $1818.88 $913.60 05-05-2009 01-431804 3 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 01 1.6 $300.00 $955.63 $480.00 05-05-2009 01-431804 4 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 01 1.6 $620.00 $1974.97 $992.00 05-05-2009 01-431804 5 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 01 1.6 $38.75 $123.44 $62.00 05-05-2009 01-431804 6 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 01 1.6 $500.00 $1592.72 $800.00 05-05-2009 01-431804 7 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 01 4200 $39.00 $124.23 $163800.00 05-15-2009 01-478104 1 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 01 4200 $33.50 $106.71 $140700.00 05-15-2009 01-478104 2 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 01 4200 $16.00 $50.97 $67200.00 05-15-2009 01-478104 3 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 01 4200 $15.00 $47.78 $63000.00 05-15-2009 01-478104 4 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 01 4200 $57.00 $181.57 $239400.00 05-15-2009 01-478104 5 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 01 4200 $24.50 $78.04 $102900.00 05-15-2009 01-478104 6 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 01 4200 $55.00 $175.20 $231000.00 05-15-2009 01-478104 7 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 10 $500.00 $1592.72 $5000.00 05-19-2009 02-1E7904 1    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 10 $75.00 $238.91 $750.00 05-19-2009 02-1E7904 2    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 10 $203.00 $646.64 $2030.00 05-19-2009 02-1E7904 3    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 10 $60.00 $191.13 $600.00 05-19-2009 02-1E7904 4    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 10 $354.92 $1130.57 $3549.20 05-19-2009 02-1E7904 5    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 10 $180.00 $573.38 $1800.00 05-19-2009 02-1E7904 6    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 10 $200.00 $637.09 $2000.00 05-19-2009 02-1E7904 7    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 400 $15.00 $47.78 $6000.00 06-02-2009 04-272024 1 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 400 $62.00 $197.50 $24800.00 06-02-2009 04-272024 2 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 400 $30.00 $95.56 $12000.00 06-02-2009 04-272024 3 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 400 $90.00 $286.69 $36000.00 06-02-2009 04-272024 4 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 400 $140.00 $445.96 $56000.00 06-02-2009 04-272024 5 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 400 $120.00 $382.25 $48000.00 06-02-2009 04-272024 6 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 400 $95.00 $302.62 $38000.00 06-02-2009 04-272024 7 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 400 $70.00 $222.98 $28000.00 06-02-2009 04-272024 8 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 250 $50.00 $159.27 $12500.00 07-07-2009 04-0A9204 1    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 250 $192.50 $613.20 $48125.00 07-07-2009 04-0A9204 2    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 250 $74.00 $235.72 $18500.00 07-07-2009 04-0A9204 3    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 250 $40.00 $127.42 $10000.00 07-07-2009 04-0A9204 4    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 250 $125.00 $398.18 $31250.00 07-07-2009 04-0A9204 5    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 250 $175.00 $557.45 $43750.00 07-07-2009 04-0A9204 6    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 250 $143.00 $455.52 $35750.00 07-07-2009 04-0A9204 7    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 8800 $60.00 $191.13 $528000.00 10-07-2009 04-163734 1 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 8800 $54.00 $172.01 $475200.00 10-07-2009 04-163734 2 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 8800 $70.00 $222.98 $616000.00 10-07-2009 04-163734 3 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 8800 $61.00 $194.31 $536800.00 10-07-2009 04-163734 4 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 8800 $60.00 $191.13 $528000.00 10-07-2009 04-163734 5 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 8800 $55.00 $175.20 $484000.00 10-07-2009 04-163734 6 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 8800 $56.00 $178.38 $492800.00 10-07-2009 04-163734 7 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 8800 $83.40 $265.67 $733920.00 10-07-2009 04-163734 8 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 26500 $10.00 $31.85 $265000.00 07-27-2010 04-1A9804 1 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 26500 $10.00 $31.85 $265000.00 07-27-2010 04-1A9804 2 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 26500 $9.00 $28.67 $238500.00 07-27-2010 04-1A9804 3 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 26500 $9.00 $28.67 $238500.00 07-27-2010 04-1A9804 4 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 26500 $15.00 $47.78 $397500.00 07-27-2010 04-1A9804 5 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 26500 $23.00 $73.27 $609500.00 07-27-2010 04-1A9804 6 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 26500 $40.00 $127.42 $1060000.00 07-27-2010 04-1A9804 7 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 2970 $7.00 $22.30 $20790.00 11-02-2010 02-2E0004 1    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 2970 $20.00 $63.71 $59400.00 11-02-2010 02-2E0004 2    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 2970 $20.00 $63.71 $59400.00 11-02-2010 02-2E0004 3    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 2970 $15.00 $47.78 $44550.00 11-02-2010 02-2E0004 4    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 10 1500 $8.00 $25.48 $12000.00 11-17-2010 10-0A0104 1 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 10 1500 $20.00 $63.71 $30000.00 11-17-2010 10-0A0104 2 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 10 1500 $20.00 $63.71 $30000.00 11-17-2010 10-0A0104 3 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 10 1500 $8.00 $25.48 $12000.00 11-17-2010 10-0A0104 4 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 10 1500 $11.00 $35.04 $16500.00 11-17-2010 10-0A0104 5 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 10 1500 $30.00 $95.56 $45000.00 11-17-2010 10-0A0104 6 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 10 1500 $20.00 $63.71 $30000.00 11-17-2010 10-0A0104 7 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 170 $125.00 $354.97 $21250.00 02-08-2011 02-2C9904 1 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 170 $287.00 $815.00 $48790.00 02-08-2011 02-2C9904 2 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 170 $265.00 $752.53 $45050.00 02-08-2011 02-2C9904 3 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 170 $135.00 $383.36 $22950.00 02-08-2011 02-2C9904 4 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 03 2200 $88.00 $249.90 $193600.00 04-13-2011 03-2E0404 1    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 03 2200 $36.50 $103.65 $80300.00 04-13-2011 03-2E0404 2    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 03 320 $200.00 $567.95 $64000.00 04-27-2011 03-4M0104 1    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 03 320 $245.00 $695.73 $78400.00 04-27-2011 03-4M0104 2    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 03 350 $34.00 $96.55 $11900.00 05-24-2011 03-0F0504 1    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 03 350 $30.00 $85.19 $10500.00 05-24-2011 03-0F0504 2    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 03 350 $70.00 $198.78 $24500.00 05-24-2011 03-0F0504 3    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 03 350 $97.10 $275.74 $33985.00 05-24-2011 03-0F0504 4    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 7 $50.00 $141.99 $350.00 10-04-2011 02-2C9504 1 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 7 $100.00 $283.97 $700.00 10-04-2011 02-2C9504 2 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 7 $130.00 $369.16 $910.00 10-04-2011 02-2C9504 3 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 7 $200.00 $567.95 $1400.00 10-04-2011 02-2C9504 4 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 7 $100.00 $283.97 $700.00 10-04-2011 02-2C9504 5 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 7 $300.00 $851.92 $2100.00 10-04-2011 02-2C9504 6 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 7 $1000.00 $2839.73 $7000.00 10-04-2011 02-2C9504 7 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 7 $233.20 $662.22 $1632.40 10-04-2011 02-2C9504 8 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 03 320 $99.00 $285.00 $31680.00 02-28-2012 03-4M0104 1 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 03 320 $150.00 $431.82 $48000.00 02-28-2012 03-4M0104 2 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 03 320 $175.00 $503.79 $56000.00 02-28-2012 03-4M0104 3 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 03 320 $180.00 $518.18 $57600.00 02-28-2012 03-4M0104 4 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 100 $85.00 $274.95 $8500.00 09-05-2012 02-4F6404 1    
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 01 800 $60.00 $133.41 $48000.00 10-01-2013 01-479404 1 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 01 800 $126.00 $280.16 $100800.00 10-01-2013 01-479404 2 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 01 800 $292.35 $650.05 $233880.00 10-01-2013 01-479404 3 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 01 800 $200.00 $444.70 $160000.00 10-01-2013 01-479404 4 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 01 800 $185.00 $411.35 $148000.00 10-01-2013 01-479404 5 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 500 $77.00 $137.24 $38500.00 02-04-2014 04-153304 1 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 500 $55.00 $98.03 $27500.00 02-04-2014 04-153304 2 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 500 $24.00 $42.78 $12000.00 02-04-2014 04-153304 3 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 500 $70.00 $124.77 $35000.00 02-04-2014 04-153304 4 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 500 $80.00 $142.59 $40000.00 02-04-2014 04-153304 5 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 500 $32.00 $57.04 $16000.00 02-04-2014 04-153304 6 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 500 $80.00 $142.59 $40000.00 02-04-2014 04-153304 7 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 500 $30.00 $53.47 $15000.00 02-04-2014 04-153304 8 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 01 40 $57.50 $87.75 $2300.00 02-12-2015 01-0B4604 1 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 01 40 $325.00 $495.96 $13000.00 02-12-2015 01-0B4604 2 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 01 40 $375.00 $572.26 $15000.00 02-12-2015 01-0B4604 3 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 01 40 $200.00 $305.21 $8000.00 02-12-2015 01-0B4604 4 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 01 40 $175.00 $267.06 $7000.00 02-12-2015 01-0B4604 5 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 01 40 $264.00 $402.87 $10560.00 02-12-2015 01-0B4604 6 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 3580 $102.55 $156.50 $367129.00 03-26-2015 04-1SS524 1 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 3580 $80.00 $122.08 $286400.00 03-26-2015 04-1SS524 2 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 3580 $98.00 $149.55 $350840.00 03-26-2015 04-1SS524 3 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 3580 $103.00 $157.18 $368740.00 03-26-2015 04-1SS524 4 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 3580 $86.00 $131.24 $307880.00 03-26-2015 04-1SS524 5 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 3580 $100.00 $152.60 $358000.00 03-26-2015 04-1SS524 6 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 3580 $50.00 $76.30 $179000.00 03-26-2015 04-1SS524 7 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 380 $50.00 $106.21 $19000.00 07-01-2015 04-4S2204 1 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 380 $180.00 $382.36 $68400.00 07-01-2015 04-4S2204 2 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 380 $50.00 $106.21 $19000.00 07-01-2015 04-4S2204 3 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 380 $330.00 $701.00 $125400.00 07-01-2015 04-4S2204 4 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 380 $45.00 $95.59 $17100.00 07-01-2015 04-4S2204 5 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 634 $20.00 $42.48 $12680.00 09-16-2015 04-3G1704 1 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 634 $135.00 $286.77 $85590.00 09-16-2015 04-3G1704 2 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 634 $150.00 $318.64 $95100.00 09-16-2015 04-3G1704 3 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 01 150 $200.00 $384.85 $30000.00 11-04-2015 01-0B3104 1 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 01 150 $120.00 $230.91 $18000.00 11-04-2015 01-0B3104 2 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 01 150 $200.00 $384.85 $30000.00 11-04-2015 01-0B3104 3 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 01 150 $85.00 $163.56 $12750.00 11-04-2015 01-0B3104 4 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 01 150 $115.00 $221.29 $17250.00 11-04-2015 01-0B3104 5 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 05 460 $32.00 $58.86 $14720.00 05-17-2016 05-1G4604 1 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 05 460 $25.00 $45.99 $11500.00 05-17-2016 05-1G4604 2 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 2190 $220.00 $321.27 $481800.00 06-07-2017 04-4G9904 1 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 1940 $200.00 $333.33 $388000.00 09-26-2017 04-4H0004 1 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 1940 $150.00 $249.99 $291000.00 09-26-2017 04-4H0004 2 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 1940 $195.00 $324.99 $378300.00 09-26-2017 04-4H0004 3 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 1940 $152.00 $253.33 $294880.00 09-26-2017 04-4H0004 4 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 10 140 $90.00 $163.38 $12600.00 10-17-2017 10-3A7304 1 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 580 $135.00 $196.36 $78300.00 06-28-2018 02-4F7804 1 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 580 $70.00 $101.82 $40600.00 06-28-2018 02-4F7804 2 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 580 $150.00 $218.18 $87000.00 06-28-2018 02-4F7804 3 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 580 $155.00 $225.45 $89900.00 06-28-2018 02-4F7804 4 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 580 $130.00 $189.09 $75400.00 06-28-2018 02-4F7804 5 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 65900 $16.00 $22.65 $1054400.00 07-31-2018 02-4F8604 1 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 65900 $12.00 $16.99 $790800.00 07-31-2018 02-4F8604 2 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 65900 $20.00 $28.31 $1318000.00 07-31-2018 02-4F8604 3 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 65900 $19.00 $26.89 $1252100.00 07-31-2018 02-4F8604 4 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 03 3 $150.00 $212.32 $450.00 08-02-2018 03-3F1304 1 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 03 3 $2400.00 $3397.14 $7200.00 08-02-2018 03-3F1304 2 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 03 3 $1200.00 $1698.57 $3600.00 08-02-2018 03-3F1304 3 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 03 3 $1270.00 $1797.65 $3810.00 08-02-2018 03-3F1304 4 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 03 3 $655.00 $927.14 $1965.00 08-02-2018 03-3F1304 5 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 05 23 $175.00 $247.71 $4025.00 09-05-2018 05-1G1404 1 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 05 23 $550.00 $778.51 $12650.00 09-05-2018 05-1G1404 2 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 05 23 $475.00 $672.35 $10925.00 09-05-2018 05-1G1404 3 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 06 299000 $6.25 $8.85 $1868750.00 09-19-2018 06-394604 1 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 06 299000 $6.03 $8.54 $1802970.00 09-19-2018 06-394604 2 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 06 299000 $5.00 $7.08 $1495000.00 09-19-2018 06-394604 3 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 06 299000 $6.00 $8.49 $1794000.00 09-19-2018 06-394604 4 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 06 299000 $7.10 $10.05 $2122900.00 09-19-2018 06-394604 5 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 06 299000 $6.50 $9.20 $1943500.00 09-19-2018 06-394604 6 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 06 299000 $11.00 $15.57 $3289000.00 09-19-2018 06-394604 7 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 1500 $50.00 $87.02 $75000.00 01-09-2019 04-1G4304 1 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 1500 $91.08 $158.52 $136620.00 01-09-2019 04-1G4304 2 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 1500 $150.00 $261.07 $225000.00 01-09-2019 04-1G4304 3 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 1500 $475.00 $826.72 $712500.00 01-09-2019 04-1G4304 4 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 1500 $38.00 $66.14 $57000.00 01-09-2019 04-1G4304 5 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 1500 $53.00 $92.24 $79500.00 01-09-2019 04-1G4304 6 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 670 $65.00 $100.65 $43550.00 10-16-2019 02-4G6104 1 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 670 $69.00 $106.84 $46230.00 10-16-2019 02-4G6104 2 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 670 $50.00 $77.42 $33500.00 10-16-2019 02-4G6104 3 M  
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 152000 $14.50 $23.10 $2204000.00 05-07-2020 02-2H0504 1 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 152000 $17.00 $27.09 $2584000.00 05-07-2020 02-2H0504 2 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 152000 $15.25 $24.30 $2318000.00 05-07-2020 02-2H0504 3 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 152000 $17.75 $28.28 $2698000.00 05-07-2020 02-2H0504 4 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 152000 $26.50 $42.22 $4028000.00 05-07-2020 02-2H0504 5 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 152000 $25.00 $39.83 $3800000.00 05-07-2020 02-2H0504 6 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 152000 $22.00 $35.05 $3344000.00 05-07-2020 02-2H0504 7 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 01 150 $98.00 $140.26 $14700.00 11-04-2020 01-0F4704 1 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 01 150 $55.00 $78.72 $8250.00 11-04-2020 01-0F4704 2 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 01 150 $93.37 $133.63 $14005.50 11-04-2020 01-0F4704 3 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 11100 $68.00 $118.38 $754800.00 11-18-2021 02-4H4404 1 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 11100 $37.00 $64.41 $410700.00 11-18-2021 02-4H4404 2 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 11100 $85.00 $147.97 $943500.00 11-18-2021 02-4H4404 3 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 11100 $85.00 $147.97 $943500.00 11-18-2021 02-4H4404 4 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 11100 $55.00 $95.75 $610500.00 11-18-2021 02-4H4404 5 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 11100 $90.00 $156.68 $999000.00 11-18-2021 02-4H4404 6 M TRO
190109 - ROADWAY EXCAVATION CY 02 3970 $39.00 $60.49 $154830.00 06-01-2022 02-1H5004 1 M TRO
190109 - ROADWAY EXCAVATION CY 02 3970 $59.00 $91.50 $234230.00 06-01-2022 02-1H5004 2 M TRO
190109 - ROADWAY EXCAVATION CY 02 3970 $55.00 $85.30 $218350.00 06-01-2022 02-1H5004 3 M TRO
190109 - ROADWAY EXCAVATION CY 01 97 $170.00 $263.65 $16490.00 06-08-2022 01-0G1404 1 M TRO
190109 - ROADWAY EXCAVATION CY 01 97 $177.00 $274.51 $17169.00 06-08-2022 01-0G1404 2 M TRO
190109 - ROADWAY EXCAVATION CY 01 97 $85.00 $131.83 $8245.00 06-08-2022 01-0G1404 3 M TRO
190109 - ROADWAY EXCAVATION CY 01 870 $100.00 $106.06 $87000.00 08-30-2022 01-0H8104 1 M TRO
190109 - ROADWAY EXCAVATION CY 01 870 $60.00 $63.63 $52200.00 08-30-2022 01-0H8104 2 M TRO
190109 - ROADWAY EXCAVATION CY 01 870 $44.00 $46.67 $38280.00 08-30-2022 01-0H8104 3 M TRO
190109 - ROADWAY EXCAVATION CY 01 870 $66.00 $70.00 $57420.00 08-30-2022 01-0H8104 4 M TRO
190109 - ROADWAY EXCAVATION CY 01 870 $43.00 $45.61 $37410.00 08-30-2022 01-0H8104 5 M TRO
190109 - ROADWAY EXCAVATION CY 01 870 $100.00 $106.06 $87000.00 08-30-2022 01-0H8104 6 M TRO
190109 - ROADWAY EXCAVATION CY 01 870 $100.00 $106.06 $87000.00 08-30-2022 01-0H8104 7 M TRO
190109 - ROADWAY EXCAVATION CY 01 870 $57.00 $60.45 $49590.00 08-30-2022 01-0H8104 8 M TRO
190109 - ROADWAY EXCAVATION CY 01 870 $50.00 $53.03 $43500.00 08-30-2022 01-0H8104 9 M TRO
190109 - ROADWAY EXCAVATION CY 01 870 $50.00 $53.03 $43500.00 08-30-2022 01-0H8104 10 M TRO
190109 - ROADWAY EXCAVATION CY 01 870 $167.00 $177.12 $145290.00 08-30-2022 01-0H8104 11 M TRO
190109 - ROADWAY EXCAVATION CY 01 870 $58.00 $61.51 $50460.00 08-30-2022 01-0H8104 12 M TRO
190109 - ROADWAY EXCAVATION CY 02 3970 $39.00 $43.38 $154830.00 10-25-2022 02-1H5004 1 M TRO
190109 - ROADWAY EXCAVATION CY 02 3970 $59.00 $65.63 $234230.00 10-25-2022 02-1H5004 2 M TRO
190109 - ROADWAY EXCAVATION CY 02 3970 $35.40 $39.38 $140538.00 10-25-2022 02-1H5004 3 M TRO
190109 - ROADWAY EXCAVATION CY 02 3970 $55.00 $61.18 $218350.00 10-25-2022 02-1H5004 4 M TRO
190109 - ROADWAY EXCAVATION CY 01 360 $44.29 $49.27 $15944.40 11-03-2022 01-0J4104 1 M TRO
190109 - ROADWAY EXCAVATION CY 01 360 $79.00 $87.88 $28440.00 11-03-2022 01-0J4104 2 M TRO
190109 - ROADWAY EXCAVATION CY 01 360 $78.00 $86.77 $28080.00 11-03-2022 01-0J4104 3 M TRO
190109 - ROADWAY EXCAVATION CY 01 360 $85.00 $94.56 $30600.00 11-03-2022 01-0J4104 4 M TRO
190109 - ROADWAY EXCAVATION CY 01 360 $120.00 $133.49 $43200.00 11-03-2022 01-0J4104 5 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 05 22500 $4.42 $4.82 $99450.00 02-13-2023 05-3307C4 1 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 410 $135.00 $112.96 $55350.00 09-12-2023 02-4H6604 1 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 410 $175.00 $146.43 $71750.00 09-12-2023 02-4H6604 2 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 22100 $48.00 $36.88 $1060800.00 02-01-2024 02-1H3604 1 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 02 22100 $49.00 $37.65 $1082900.00 02-01-2024 02-1H3604 2 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 49 $210.00 $161.34 $10290.00 03-14-2024 04-1Q4604 1 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 49 $600.00 $460.98 $29400.00 03-14-2024 04-1Q4604 2 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 04 49 $600.00 $460.98 $29400.00 03-14-2024 04-1Q4604 3 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 01 800 $54.51 $53.33 $43608.00 12-09-2025 01-0N2904 1 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 01 800 $120.00 $117.41 $96000.00 12-09-2025 01-0N2904 2 M TRO
190109 - ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS) CY 01 800 $120.00 $117.41 $96000.00 12-09-2025 01-0N2904 3 M TRO
SUMMARY Unmodified Adjusted    
Average Price/Unit: $ Avg No. Units
Std Dev. (of Unit Price): ±$ Rows Selected
Weighted Avg.: $ Rows Returned
Minimum Price/Unit: $    
Maximum Price/Unit: $    

| Back | New Search |

PARAMETERS: Item = 190109; District=All; Year=All; Convert=No; Bidders=All Bidders
TIMESTAMP: 09/27/2026 00:01:40
CURRENT 12-MO INDEX (CHCCI (2020 Base)): 146.53