CALIFORNIA DEPARTMENT OF TRANSPORTATION - CONTRACT COST DATA

Select Item No. / Description Unit Dist Qty Unit
Price
Adj
Price
Total Bid Open
Date
Contract
No.
Bid M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 04 12000 $6.00 $35.74 $72000.00 10-26-1993 04-131124 1 M  
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 06 970 $32.00 $173.67 $31040.00 01-11-1994 06-297304 1 M  
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 04 50 $90.00 $517.16 $4500.00 08-08-1995 04-043434 1 M  
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 10 730 $15.00 $86.19 $10950.00 08-22-1995 10-487104 1    
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 06 2920 $6.00 $32.93 $17520.00 04-22-1997 06-342124 1 M  
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) M3 06 2900 $15.42 $80.70 $44718.00 06-16-1998 06-336004 1 M  
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) M3 08 840 $20.00 $97.69 $16800.00 03-25-1999 08-344704 1 M  
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) M3 06 48900 $8.50 $40.31 $415650.00 10-24-2000 06-243404 1 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) M3 08 1020 $15.00 $65.61 $15300.00 02-01-2001 08-406804 1 M  
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) M3 08 27900 $7.00 $33.09 $195300.00 05-23-2002 08-4047U4 1 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) M3 08 27900 $2.00 $9.45 $55800.00 05-23-2002 08-4047U4 2 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) M3 08 27900 $6.00 $28.36 $167400.00 05-23-2002 08-4047U4 3 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) M3 08 27900 $6.30 $29.78 $175770.00 05-23-2002 08-4047U4 4 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) M3 08 27900 $4.00 $18.91 $111600.00 05-23-2002 08-4047U4 5 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) M3 08 27900 $6.25 $29.54 $174375.00 05-23-2002 08-4047U4 6 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) M3 01 260 $35.00 $165.44 $9100.00 06-11-2002 01-293204 1 M  
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) M3 01 260 $20.00 $94.54 $5200.00 06-11-2002 01-293204 2 M  
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) M3 01 260 $50.00 $236.34 $13000.00 06-11-2002 01-293204 3 M  
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) M3 01 260 $40.00 $189.07 $10400.00 06-11-2002 01-293204 4 M  
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) M3 01 260 $60.00 $283.61 $15600.00 06-11-2002 01-293204 5 M  
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 04 4740 $37.00 $174.89 $175380.00 11-19-2002 04-0435V4 1 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 04 4740 $30.00 $141.80 $142200.00 11-19-2002 04-0435V4 2 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) M3 08 690 $10.00 $44.81 $6900.00 01-30-2003 08-483754 1 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) M3 01 340 $12.00 $53.77 $4080.00 04-02-2003 01-421704 1 M  
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) M3 08 1370 $20.00 $89.62 $27400.00 08-28-2003 08-483764 1 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) M3 08 1370 $4.00 $17.92 $5480.00 08-28-2003 08-483764 2 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) M3 08 1370 $30.00 $134.43 $41100.00 08-28-2003 08-483764 3 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) M3 08 1370 $15.00 $67.22 $20550.00 08-28-2003 08-483764 4 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) M3 08 1370 $28.00 $125.47 $38360.00 08-28-2003 08-483764 5 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) M3 06 18400 $14.00 $34.89 $257600.00 01-04-2006 06-408404 1 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) M3 06 18400 $8.00 $19.94 $147200.00 01-04-2006 06-408404 2 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) M3 06 18400 $10.00 $24.92 $184000.00 01-04-2006 06-408404 3 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 08 1440 $9.00 $28.67 $12960.00 09-03-2009 08-394704 1 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 08 1440 $10.00 $31.85 $14400.00 09-03-2009 08-394704 2 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 08 1440 $6.00 $19.11 $8640.00 09-03-2009 08-394704 3 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 08 1440 $20.00 $63.71 $28800.00 09-03-2009 08-394704 4 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 08 1440 $14.00 $44.60 $20160.00 09-03-2009 08-394704 5 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 08 1440 $10.25 $32.65 $14760.00 09-03-2009 08-394704 6 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 08 1440 $17.00 $54.15 $24480.00 09-03-2009 08-394704 7 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 08 1440 $38.00 $121.05 $54720.00 09-03-2009 08-394704 8 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 08 1440 $14.50 $46.19 $20880.00 09-03-2009 08-394704 9 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 08 1440 $6.70 $21.34 $9648.00 09-03-2009 08-394704 10 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 08 1440 $15.00 $47.78 $21600.00 09-03-2009 08-394704 11 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 08 1440 $15.00 $47.78 $21600.00 09-03-2009 08-394704 12 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 08 1440 $25.00 $79.64 $36000.00 09-03-2009 08-394704 13 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 08 1440 $5.90 $18.79 $8496.00 09-03-2009 08-394704 14 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) M3 08 1270 $8.40 $23.85 $10668.00 01-13-2011 08-449314 1 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) M3 08 1270 $12.50 $35.50 $15875.00 01-13-2011 08-449314 2 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) M3 08 1270 $20.00 $56.79 $25400.00 01-13-2011 08-449314 3 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) M3 08 1270 $11.00 $31.24 $13970.00 01-13-2011 08-449314 4 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) M3 08 1270 $10.00 $28.40 $12700.00 01-13-2011 08-449314 5 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) M3 08 1270 $30.00 $85.19 $38100.00 01-13-2011 08-449314 6 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) M3 08 1270 $8.00 $22.72 $10160.00 01-13-2011 08-449314 7 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) M3 08 1270 $8.50 $24.14 $10795.00 01-13-2011 08-449314 8 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) M3 08 1270 $15.75 $44.73 $20002.50 01-13-2011 08-449314 9 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) M3 08 1270 $20.00 $56.79 $25400.00 01-13-2011 08-449314 10 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) M3 08 1270 $13.00 $36.92 $16510.00 01-13-2011 08-449314 11 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 02 1080 $31.00 $55.25 $33480.00 01-29-2014 02-4E6304 1 M  
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 02 1080 $21.45 $38.23 $23166.00 01-29-2014 02-4E6304 2 M  
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 02 1080 $28.00 $49.91 $30240.00 01-29-2014 02-4E6304 3 M  
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 02 1080 $25.00 $44.56 $27000.00 01-29-2014 02-4E6304 4 M  
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 02 1080 $55.00 $98.03 $59400.00 01-29-2014 02-4E6304 5 M  
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 02 1080 $25.00 $44.56 $27000.00 01-29-2014 02-4E6304 6 M  
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 02 1080 $20.00 $35.65 $21600.00 01-29-2014 02-4E6304 7 M  
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 12 62 $150.00 $288.63 $9300.00 10-14-2015 12-0N1104 1 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 12 62 $95.00 $182.80 $5890.00 10-14-2015 12-0N1104 2 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 12 62 $125.00 $240.53 $7750.00 10-14-2015 12-0N1104 3 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 12 62 $75.00 $144.32 $4650.00 10-14-2015 12-0N1104 4 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 12 62 $52.00 $100.06 $3224.00 10-14-2015 12-0N1104 5 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 06 5730 $9.00 $13.22 $51570.00 02-07-2017 06-457114 1 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 06 5730 $4.20 $6.17 $24066.00 02-07-2017 06-457114 2 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 06 5730 $7.20 $10.58 $41256.00 02-07-2017 06-457114 3 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 06 5730 $12.00 $17.63 $68760.00 02-07-2017 06-457114 4 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 06 5730 $3.50 $5.14 $20055.00 02-07-2017 06-457114 5 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 06 5730 $18.00 $26.45 $103140.00 02-07-2017 06-457114 6 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 06 5730 $6.50 $9.55 $37245.00 02-07-2017 06-457114 7 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 06 5730 $19.00 $27.92 $108870.00 02-07-2017 06-457114 8 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 06 5730 $20.00 $29.39 $114600.00 02-07-2017 06-457114 9 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 02 1730 $28.00 $50.83 $48440.00 10-17-2017 02-4F5504 1 M  
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 02 1730 $27.00 $49.01 $46710.00 10-17-2017 02-4F5504 2 M  
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 02 1730 $25.00 $45.38 $43250.00 10-17-2017 02-4F5504 3 M  
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 02 1730 $50.00 $90.76 $86500.00 10-17-2017 02-4F5504 4 M  
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 02 1730 $24.00 $43.57 $41520.00 10-17-2017 02-4F5504 5 M  
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 02 1730 $30.00 $54.46 $51900.00 10-17-2017 02-4F5504 6 M  
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 02 1730 $25.00 $45.38 $43250.00 10-17-2017 02-4F5504 7 M  
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 02 840 $28.00 $48.73 $23520.00 01-08-2019 02-0H9004 1 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 02 840 $31.90 $55.52 $26796.00 01-08-2019 02-0H9004 2 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 02 840 $50.36 $87.65 $42302.40 01-08-2019 02-0H9004 3 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 02 840 $40.00 $69.62 $33600.00 01-08-2019 02-0H9004 4 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 02 840 $55.00 $95.73 $46200.00 01-08-2019 02-0H9004 5 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 02 840 $60.00 $104.43 $50400.00 01-08-2019 02-0H9004 6 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 03 2470 $30.00 $46.45 $74100.00 12-05-2019 03-0A5704 1 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 03 2470 $20.00 $30.97 $49400.00 12-05-2019 03-0A5704 2 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 03 2470 $25.00 $38.71 $61750.00 12-05-2019 03-0A5704 3 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 03 2470 $10.00 $15.48 $24700.00 12-05-2019 03-0A5704 4 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 03 2470 $30.00 $46.45 $74100.00 12-05-2019 03-0A5704 5 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 03 2470 $14.50 $22.45 $35815.00 12-05-2019 03-0A5704 6 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 08 2150 $37.75 $58.45 $81162.50 12-12-2019 08-1F1414 1 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 08 2150 $37.00 $57.29 $79550.00 12-12-2019 08-1F1414 2 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 08 2150 $30.00 $46.45 $64500.00 12-12-2019 08-1F1414 3 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 08 2150 $44.58 $69.03 $95847.00 12-12-2019 08-1F1414 4 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 08 2150 $50.00 $77.42 $107500.00 12-12-2019 08-1F1414 5 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 08 2150 $30.00 $46.45 $64500.00 12-12-2019 08-1F1414 6 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 04 410 $290.00 $354.06 $118900.00 01-09-2020 04-3G6204 1 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 04 410 $170.00 $207.55 $69700.00 01-09-2020 04-3G6204 2 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 04 410 $55.00 $67.15 $22550.00 01-09-2020 04-3G6204 3 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 04 410 $200.00 $244.18 $82000.00 01-09-2020 04-3G6204 4 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 02 810 $47.00 $57.38 $38070.00 02-25-2020 02-0H9004 1 M  
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 02 810 $40.00 $48.84 $32400.00 02-25-2020 02-0H9004 2 M  
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 02 810 $33.00 $40.29 $26730.00 02-25-2020 02-0H9004 3 M  
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 02 810 $59.00 $72.03 $47790.00 02-25-2020 02-0H9004 4 M  
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 02 810 $40.00 $48.84 $32400.00 02-25-2020 02-0H9004 5 M  
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 02 810 $40.60 $49.57 $32886.00 02-25-2020 02-0H9004 6 M  
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 09 3420 $10.50 $16.73 $35910.00 06-18-2020 09-367404 1 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 09 3420 $17.00 $27.09 $58140.00 06-18-2020 09-367404 2 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 09 3420 $25.00 $39.83 $85500.00 06-18-2020 09-367404 3 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 09 3420 $35.00 $55.76 $119700.00 06-18-2020 09-367404 4 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 09 3420 $46.00 $73.29 $157320.00 06-18-2020 09-367404 5 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 09 3420 $20.00 $31.86 $68400.00 06-18-2020 09-367404 6 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 09 3420 $35.00 $55.76 $119700.00 06-18-2020 09-367404 7 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 09 3420 $20.00 $31.86 $68400.00 06-18-2020 09-367404 8 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 04 19 $600.00 $861.43 $11400.00 08-26-2020 04-1A6614 1 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 04 19 $75.00 $107.68 $1425.00 08-26-2020 04-1A6614 2 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 04 19 $100.00 $143.57 $1900.00 08-26-2020 04-1A6614 3 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 04 19 $155.00 $222.54 $2945.00 08-26-2020 04-1A6614 4 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 04 19 $220.00 $315.86 $4180.00 08-26-2020 04-1A6614 5 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 04 19 $280.00 $402.00 $5320.00 08-26-2020 04-1A6614 6 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 04 19 $150.00 $215.36 $2850.00 08-26-2020 04-1A6614 7 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 04 19 $900.00 $1292.15 $17100.00 08-26-2020 04-1A6614 8 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 05 390 $37.00 $52.96 $14430.00 10-07-2020 05-1H0604 1 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 05 390 $84.20 $120.51 $32838.00 10-07-2020 05-1H0604 2 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 05 390 $60.00 $85.87 $23400.00 10-07-2020 05-1H0604 3 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 05 390 $70.00 $100.19 $27300.00 10-07-2020 05-1H0604 4 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 05 280 $125.00 $218.78 $35000.00 09-28-2021 05-0L7224 1 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 05 280 $140.00 $245.03 $39200.00 09-28-2021 05-0L7224 2 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 05 280 $108.00 $189.03 $30240.00 09-28-2021 05-0L7224 3 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 05 280 $85.00 $148.77 $23800.00 09-28-2021 05-0L7224 4 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 05 280 $45.00 $78.76 $12600.00 09-28-2021 05-0L7224 5 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 05 280 $150.00 $262.54 $42000.00 09-28-2021 05-0L7224 6 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 04 860 $35.00 $52.36 $30100.00 02-15-2022 04-264724 1 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 04 860 $75.00 $112.21 $64500.00 02-15-2022 04-264724 2 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 04 860 $69.97 $104.68 $60174.20 02-15-2022 04-264724 3 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 04 860 $40.00 $59.84 $34400.00 02-15-2022 04-264724 4 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 04 860 $50.00 $74.81 $43000.00 02-15-2022 04-264724 5 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 05 5020 $18.25 $27.30 $91615.00 03-09-2022 05-344904 1 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 05 5020 $5.00 $7.48 $25100.00 03-09-2022 05-344904 2 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 05 5020 $10.00 $14.96 $50200.00 03-09-2022 05-344904 3 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 05 5020 $23.99 $35.89 $120429.80 03-09-2022 05-344904 4 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 05 5020 $16.00 $23.94 $80320.00 03-09-2022 05-344904 5 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 05 5020 $30.00 $44.88 $150600.00 03-09-2022 05-344904 6 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 08 4110 $52.00 $39.95 $213720.00 03-12-2024 08-1G6704 1 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 08 4110 $45.00 $34.57 $184950.00 03-12-2024 08-1G6704 2 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 08 4110 $100.00 $76.83 $411000.00 03-12-2024 08-1G6704 3 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 08 4110 $70.00 $53.78 $287700.00 03-12-2024 08-1G6704 4 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 09 570 $95.00 $66.06 $54150.00 01-08-2025 09-379104 1 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 09 570 $129.00 $89.70 $73530.00 01-08-2025 09-379104 2 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 09 570 $100.00 $69.54 $57000.00 01-08-2025 09-379104 3 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 09 570 $100.00 $69.54 $57000.00 01-08-2025 09-379104 4 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 09 570 $157.00 $109.17 $89490.00 01-08-2025 09-379104 5 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 05 370 $144.00 $140.89 $53280.00 11-13-2025 05-1R1004 1 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 05 370 $150.00 $146.76 $55500.00 11-13-2025 05-1R1004 2 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 05 370 $125.00 $122.30 $46250.00 11-13-2025 05-1R1004 3 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 05 370 $379.00 $370.83 $140230.00 11-13-2025 05-1R1004 4 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 05 370 $210.00 $205.47 $77700.00 11-13-2025 05-1R1004 5 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 09 4600 $50.00 $48.92 $230000.00 12-02-2025 09-379004 1 M TRO
190138 - ROADWAY EXCAVATION (DETOUR REMOVAL) CY 09 4600 $35.00 $34.25 $161000.00 12-02-2025 09-379004 2 M TRO
SUMMARY Unmodified Adjusted    
Average Price/Unit: $ Avg No. Units
Std Dev. (of Unit Price): ±$ Rows Selected
Weighted Avg.: $ Rows Returned
Minimum Price/Unit: $    
Maximum Price/Unit: $    

| Back | New Search |

PARAMETERS: Item = 190138; District=All; Year=All; Convert=No; Bidders=All Bidders
TIMESTAMP: 09/27/2026 05:19:38
CURRENT 12-MO INDEX (CHCCI (2020 Base)): 146.53