|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
460 |
$110.00 |
$134.30 |
$50600.00 |
03-17-2020 |
07-3096U4 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
460 |
$150.59 |
$183.85 |
$69271.40 |
03-17-2020 |
07-3096U4 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
460 |
$95.00 |
$115.98 |
$43700.00 |
03-17-2020 |
07-3096U4 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
460 |
$228.02 |
$278.39 |
$104889.20 |
03-17-2020 |
07-3096U4 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
460 |
$158.00 |
$192.90 |
$72680.00 |
03-17-2020 |
07-3096U4 |
5 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
820 |
$115.00 |
$183.22 |
$94300.00 |
04-14-2020 |
07-311004 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
820 |
$110.48 |
$176.02 |
$90593.60 |
04-14-2020 |
07-311004 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
820 |
$170.00 |
$270.85 |
$139400.00 |
04-14-2020 |
07-311004 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
820 |
$154.40 |
$246.00 |
$126608.00 |
04-14-2020 |
07-311004 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
820 |
$144.31 |
$229.92 |
$118334.20 |
04-14-2020 |
07-311004 |
5 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
820 |
$123.00 |
$195.97 |
$100860.00 |
04-14-2020 |
07-311004 |
6 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
820 |
$170.00 |
$270.85 |
$139400.00 |
04-14-2020 |
07-311004 |
7 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
820 |
$525.00 |
$836.45 |
$430500.00 |
04-14-2020 |
07-311004 |
8 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
820 |
$120.00 |
$191.19 |
$98400.00 |
04-14-2020 |
07-311004 |
9 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
820 |
$125.00 |
$199.15 |
$102500.00 |
04-14-2020 |
07-311004 |
10 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
820 |
$190.00 |
$302.72 |
$155800.00 |
04-14-2020 |
07-311004 |
11 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
820 |
$191.83 |
$305.63 |
$157300.60 |
04-14-2020 |
07-311004 |
12 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
820 |
$286.00 |
$455.67 |
$234520.00 |
04-14-2020 |
07-311004 |
13 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
820 |
$151.00 |
$240.58 |
$123820.00 |
04-14-2020 |
07-311004 |
14 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
820 |
$300.00 |
$477.97 |
$246000.00 |
04-14-2020 |
07-311004 |
15 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
820 |
$125.00 |
$199.15 |
$102500.00 |
04-14-2020 |
07-311004 |
16 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
0.2 |
$5000.00 |
$7966.18 |
$1000.00 |
05-28-2020 |
07-4V0104 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
0.2 |
$9000.00 |
$14339.13 |
$1800.00 |
05-28-2020 |
07-4V0104 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
0.2 |
$2000.00 |
$3186.47 |
$400.00 |
05-28-2020 |
07-4V0104 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
0.2 |
$11500.00 |
$18322.22 |
$2300.00 |
05-28-2020 |
07-4V0104 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
0.2 |
$7150.00 |
$11391.64 |
$1430.00 |
05-28-2020 |
07-4V0104 |
5 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
05 |
54 |
$41.60 |
$59.73 |
$2246.40 |
07-21-2020 |
05-1E0004 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
05 |
54 |
$95.00 |
$136.39 |
$5130.00 |
07-21-2020 |
05-1E0004 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
05 |
54 |
$171.00 |
$245.51 |
$9234.00 |
07-21-2020 |
05-1E0004 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
05 |
54 |
$195.00 |
$279.97 |
$10530.00 |
07-21-2020 |
05-1E0004 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
05 |
54 |
$300.00 |
$430.72 |
$16200.00 |
07-21-2020 |
05-1E0004 |
5 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
90 |
$100.00 |
$143.57 |
$9000.00 |
07-21-2020 |
07-311104 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
90 |
$150.48 |
$216.05 |
$13543.20 |
07-21-2020 |
07-311104 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
90 |
$195.00 |
$279.97 |
$17550.00 |
07-21-2020 |
07-311104 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
90 |
$208.73 |
$299.68 |
$18785.70 |
07-21-2020 |
07-311104 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
90 |
$55.00 |
$78.96 |
$4950.00 |
07-21-2020 |
07-311104 |
5 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
90 |
$550.00 |
$789.65 |
$49500.00 |
07-21-2020 |
07-311104 |
6 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
90 |
$122.55 |
$175.95 |
$11029.50 |
07-21-2020 |
07-311104 |
7 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
90 |
$220.00 |
$315.86 |
$19800.00 |
07-21-2020 |
07-311104 |
8 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
05 |
1150 |
$125.00 |
$179.47 |
$143750.00 |
09-02-2020 |
05-1F9004 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
05 |
1150 |
$245.00 |
$351.75 |
$281750.00 |
09-02-2020 |
05-1F9004 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
05 |
1150 |
$89.00 |
$127.78 |
$102350.00 |
09-02-2020 |
05-1F9004 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
05 |
1150 |
$198.00 |
$284.27 |
$227700.00 |
09-02-2020 |
05-1F9004 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
05 |
1150 |
$146.65 |
$210.55 |
$168647.50 |
09-02-2020 |
05-1F9004 |
5 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
05 |
1150 |
$195.00 |
$279.97 |
$224250.00 |
09-02-2020 |
05-1F9004 |
6 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
05 |
1150 |
$290.00 |
$416.36 |
$333500.00 |
09-02-2020 |
05-1F9004 |
7 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
05 |
5260 |
$50.00 |
$71.56 |
$263000.00 |
10-07-2020 |
05-1G9904 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
05 |
5260 |
$80.00 |
$114.50 |
$420800.00 |
10-07-2020 |
05-1G9904 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
05 |
5260 |
$44.00 |
$62.97 |
$231440.00 |
10-07-2020 |
05-1G9904 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
05 |
5260 |
$64.00 |
$91.60 |
$336640.00 |
10-07-2020 |
05-1G9904 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
3 |
$900.00 |
$1288.11 |
$2700.00 |
10-27-2020 |
07-302404 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
3 |
$500.00 |
$715.62 |
$1500.00 |
10-27-2020 |
07-302404 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
3 |
$500.00 |
$715.62 |
$1500.00 |
10-27-2020 |
07-302404 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
3 |
$3000.00 |
$4293.71 |
$9000.00 |
10-27-2020 |
07-302404 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
3 |
$475.00 |
$679.84 |
$1425.00 |
10-27-2020 |
07-302404 |
5 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
3 |
$1469.34 |
$2102.97 |
$4408.02 |
10-27-2020 |
07-302404 |
6 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
1600 |
$160.00 |
$275.40 |
$256000.00 |
01-12-2021 |
07-260804 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
1600 |
$125.20 |
$215.50 |
$200320.00 |
01-12-2021 |
07-260804 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
1600 |
$168.00 |
$289.17 |
$268800.00 |
01-12-2021 |
07-260804 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
1600 |
$150.00 |
$258.19 |
$240000.00 |
01-12-2021 |
07-260804 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
1600 |
$155.00 |
$266.79 |
$248000.00 |
01-12-2021 |
07-260804 |
5 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
1600 |
$188.00 |
$323.59 |
$300800.00 |
01-12-2021 |
07-260804 |
6 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
190 |
$10.00 |
$17.21 |
$1900.00 |
02-02-2021 |
12-0P94U4 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
190 |
$158.00 |
$271.96 |
$30020.00 |
02-02-2021 |
12-0P94U4 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
190 |
$200.00 |
$344.25 |
$38000.00 |
02-02-2021 |
12-0P94U4 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
190 |
$111.84 |
$192.50 |
$21249.60 |
02-02-2021 |
12-0P94U4 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
190 |
$103.38 |
$177.94 |
$19642.20 |
02-02-2021 |
12-0P94U4 |
5 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
190 |
$540.00 |
$929.47 |
$102600.00 |
02-02-2021 |
12-0P94U4 |
6 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
190 |
$80.00 |
$137.70 |
$15200.00 |
02-02-2021 |
12-0P94U4 |
7 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
270 |
$34.61 |
$59.57 |
$9344.70 |
02-03-2021 |
04-297634 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
270 |
$30.00 |
$51.64 |
$8100.00 |
02-03-2021 |
04-297634 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
270 |
$30.00 |
$51.64 |
$8100.00 |
02-03-2021 |
04-297634 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
270 |
$40.00 |
$68.85 |
$10800.00 |
02-03-2021 |
04-297634 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
270 |
$35.00 |
$60.24 |
$9450.00 |
02-03-2021 |
04-297634 |
5 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
270 |
$70.00 |
$120.49 |
$18900.00 |
02-03-2021 |
04-297634 |
6 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
0.2 |
$5000.00 |
$8606.25 |
$1000.00 |
03-23-2021 |
07-4V0104 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
0.2 |
$1000.00 |
$1721.25 |
$200.00 |
03-23-2021 |
07-4V0104 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
0.2 |
$660.00 |
$1136.02 |
$132.00 |
03-23-2021 |
07-4V0104 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
0.2 |
$1000.00 |
$1721.25 |
$200.00 |
03-23-2021 |
07-4V0104 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
0.2 |
$4500.00 |
$7745.62 |
$900.00 |
03-23-2021 |
07-4V0104 |
5 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
0.2 |
$6250.00 |
$10757.81 |
$1250.00 |
03-23-2021 |
07-4V0104 |
6 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
0.2 |
$720.00 |
$1239.30 |
$144.00 |
03-23-2021 |
07-4V0104 |
7 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
0.2 |
$11500.00 |
$19794.37 |
$2300.00 |
03-23-2021 |
07-4V0104 |
8 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
0.2 |
$630.00 |
$1084.39 |
$126.00 |
03-23-2021 |
07-4V0104 |
9 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
6 |
$420.00 |
$595.25 |
$2520.00 |
05-11-2021 |
12-0Q3104 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
6 |
$990.00 |
$1403.08 |
$5940.00 |
05-11-2021 |
12-0Q3104 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
6 |
$525.00 |
$744.06 |
$3150.00 |
05-11-2021 |
12-0Q3104 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
6 |
$300.00 |
$425.18 |
$1800.00 |
05-11-2021 |
12-0Q3104 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
6 |
$275.00 |
$389.75 |
$1650.00 |
05-11-2021 |
12-0Q3104 |
5 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
6 |
$450.00 |
$637.76 |
$2700.00 |
05-11-2021 |
12-0Q3104 |
6 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
6 |
$510.00 |
$722.80 |
$3060.00 |
05-11-2021 |
12-0Q3104 |
7 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
6 |
$350.00 |
$496.04 |
$2100.00 |
05-11-2021 |
12-0Q3104 |
8 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
6 |
$375.00 |
$531.47 |
$2250.00 |
05-11-2021 |
12-0Q3104 |
9 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
6 |
$393.00 |
$556.98 |
$2358.00 |
05-11-2021 |
12-0Q3104 |
10 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
11 |
31 |
$175.00 |
$248.02 |
$5425.00 |
06-09-2021 |
11-425104 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
11 |
31 |
$265.00 |
$375.57 |
$8215.00 |
06-09-2021 |
11-425104 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
11 |
31 |
$500.00 |
$708.63 |
$15500.00 |
06-09-2021 |
11-425104 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
11 |
31 |
$62.44 |
$88.49 |
$1935.64 |
06-09-2021 |
11-425104 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
11 |
31 |
$355.00 |
$503.13 |
$11005.00 |
06-09-2021 |
11-425104 |
5 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
11 |
31 |
$1100.00 |
$1558.98 |
$34100.00 |
06-09-2021 |
11-425104 |
6 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
01 |
3440 |
$47.00 |
$82.26 |
$161680.00 |
07-22-2021 |
01-366004 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
01 |
3440 |
$29.30 |
$51.28 |
$100792.00 |
07-22-2021 |
01-366004 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
01 |
3440 |
$8.00 |
$14.00 |
$27520.00 |
07-22-2021 |
01-366004 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
30 |
$500.00 |
$875.12 |
$15000.00 |
08-26-2021 |
07-319904 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
30 |
$350.00 |
$612.58 |
$10500.00 |
08-26-2021 |
07-319904 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
30 |
$400.00 |
$700.10 |
$12000.00 |
08-26-2021 |
07-319904 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
30 |
$250.00 |
$437.56 |
$7500.00 |
08-26-2021 |
07-319904 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
30 |
$389.00 |
$680.84 |
$11670.00 |
08-26-2021 |
07-319904 |
5 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
30 |
$250.00 |
$437.56 |
$7500.00 |
08-26-2021 |
07-319904 |
6 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
30 |
$120.00 |
$210.03 |
$3600.00 |
08-26-2021 |
07-319904 |
7 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
30 |
$155.00 |
$271.29 |
$4650.00 |
08-26-2021 |
07-319904 |
8 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
30 |
$311.92 |
$545.93 |
$9357.60 |
08-26-2021 |
07-319904 |
9 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
30 |
$450.00 |
$787.61 |
$13500.00 |
08-26-2021 |
07-319904 |
10 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
30 |
$118.00 |
$206.53 |
$3540.00 |
08-26-2021 |
07-319904 |
11 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
30 |
$1600.00 |
$2800.38 |
$48000.00 |
08-26-2021 |
07-319904 |
12 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
30 |
$188.00 |
$329.04 |
$5640.00 |
08-26-2021 |
07-319904 |
13 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
30 |
$500.00 |
$875.12 |
$15000.00 |
08-26-2021 |
07-319904 |
14 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
30 |
$575.00 |
$1006.39 |
$17250.00 |
08-26-2021 |
07-319904 |
15 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
30 |
$350.00 |
$612.58 |
$10500.00 |
08-26-2021 |
07-319904 |
16 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
30 |
$118.60 |
$207.58 |
$3558.00 |
08-26-2021 |
07-319904 |
17 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
31 |
$199.00 |
$348.30 |
$6169.00 |
09-01-2021 |
12-0Q3904 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
31 |
$365.00 |
$638.84 |
$11315.00 |
09-01-2021 |
12-0Q3904 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
31 |
$200.00 |
$350.05 |
$6200.00 |
09-01-2021 |
12-0Q3904 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
31 |
$260.00 |
$455.06 |
$8060.00 |
09-01-2021 |
12-0Q3904 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
31 |
$553.00 |
$967.88 |
$17143.00 |
09-01-2021 |
12-0Q3904 |
5 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
360 |
$250.00 |
$437.56 |
$90000.00 |
09-16-2021 |
07-319504 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
360 |
$220.00 |
$385.05 |
$79200.00 |
09-16-2021 |
07-319504 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
360 |
$92.80 |
$162.42 |
$33408.00 |
09-16-2021 |
07-319504 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
360 |
$200.00 |
$350.05 |
$72000.00 |
09-16-2021 |
07-319504 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
360 |
$75.00 |
$131.27 |
$27000.00 |
09-16-2021 |
07-319504 |
5 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
360 |
$270.00 |
$472.56 |
$97200.00 |
09-16-2021 |
07-319504 |
6 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
05 |
1880 |
$160.00 |
$280.04 |
$300800.00 |
09-28-2021 |
05-0L7224 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
05 |
1880 |
$125.00 |
$218.78 |
$235000.00 |
09-28-2021 |
05-0L7224 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
05 |
1880 |
$225.00 |
$393.80 |
$423000.00 |
09-28-2021 |
05-0L7224 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
05 |
1880 |
$115.00 |
$201.28 |
$216200.00 |
09-28-2021 |
05-0L7224 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
05 |
1880 |
$200.00 |
$350.05 |
$376000.00 |
09-28-2021 |
05-0L7224 |
5 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
05 |
1880 |
$175.00 |
$306.29 |
$329000.00 |
09-28-2021 |
05-0L7224 |
6 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
01 |
700 |
$200.00 |
$348.18 |
$140000.00 |
12-01-2021 |
01-0G5804 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
01 |
700 |
$422.00 |
$734.65 |
$295400.00 |
12-01-2021 |
01-0G5804 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
01 |
700 |
$420.00 |
$731.17 |
$294000.00 |
12-01-2021 |
01-0G5804 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
04 |
120 |
$250.00 |
$435.22 |
$30000.00 |
12-01-2021 |
04-0K6504 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
04 |
120 |
$225.00 |
$391.70 |
$27000.00 |
12-01-2021 |
04-0K6504 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
04 |
120 |
$420.00 |
$731.17 |
$50400.00 |
12-01-2021 |
04-0K6504 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
04 |
120 |
$240.00 |
$417.81 |
$28800.00 |
12-01-2021 |
04-0K6504 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
04 |
120 |
$370.00 |
$644.13 |
$44400.00 |
12-01-2021 |
04-0K6504 |
5 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
04 |
5110 |
$35.00 |
$60.93 |
$178850.00 |
12-07-2021 |
04-4G0804 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
04 |
5110 |
$49.84 |
$86.77 |
$254682.40 |
12-07-2021 |
04-4G0804 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
04 |
5110 |
$40.00 |
$69.64 |
$204400.00 |
12-07-2021 |
04-4G0804 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
04 |
5110 |
$31.00 |
$53.97 |
$158410.00 |
12-07-2021 |
04-4G0804 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
04 |
5110 |
$40.00 |
$69.64 |
$204400.00 |
12-07-2021 |
04-4G0804 |
5 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
04 |
5110 |
$60.00 |
$104.45 |
$306600.00 |
12-07-2021 |
04-4G0804 |
6 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
04 |
5110 |
$35.00 |
$60.93 |
$178850.00 |
12-07-2021 |
04-4G0804 |
7 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
52 |
$32.00 |
$55.71 |
$1664.00 |
12-07-2021 |
07-335304 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
52 |
$535.00 |
$931.37 |
$27820.00 |
12-07-2021 |
07-335304 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
52 |
$400.00 |
$696.35 |
$20800.00 |
12-07-2021 |
07-335304 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
52 |
$86.40 |
$150.41 |
$4492.80 |
12-07-2021 |
07-335304 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
52 |
$600.00 |
$1044.53 |
$31200.00 |
12-07-2021 |
07-335304 |
5 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
52 |
$800.00 |
$1392.71 |
$41600.00 |
12-07-2021 |
07-335304 |
6 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
52 |
$220.00 |
$382.99 |
$11440.00 |
12-07-2021 |
07-335304 |
7 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
5 |
$300.00 |
$522.26 |
$1500.00 |
12-09-2021 |
07-325304 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
5 |
$343.07 |
$597.24 |
$1715.35 |
12-09-2021 |
07-325304 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
5 |
$200.00 |
$348.18 |
$1000.00 |
12-09-2021 |
07-325304 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
5 |
$668.00 |
$1162.91 |
$3340.00 |
12-09-2021 |
07-325304 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
5 |
$1100.00 |
$1914.97 |
$5500.00 |
12-09-2021 |
07-325304 |
5 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
5 |
$610.00 |
$1061.94 |
$3050.00 |
12-09-2021 |
07-325304 |
6 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
5 |
$525.00 |
$913.96 |
$2625.00 |
12-09-2021 |
07-325304 |
7 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
5 |
$269.00 |
$468.30 |
$1345.00 |
12-09-2021 |
07-325304 |
8 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
5 |
$1100.00 |
$1914.97 |
$5500.00 |
12-09-2021 |
07-325304 |
9 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
5 |
$261.96 |
$456.04 |
$1309.80 |
12-09-2021 |
07-325304 |
10 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
5 |
$300.00 |
$522.26 |
$1500.00 |
12-09-2021 |
07-325304 |
11 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
5 |
$1000.00 |
$1740.88 |
$5000.00 |
12-09-2021 |
07-325304 |
12 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
32 |
$210.00 |
$314.19 |
$6720.00 |
01-20-2022 |
07-324404 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
32 |
$260.00 |
$388.99 |
$8320.00 |
01-20-2022 |
07-324404 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
32 |
$150.00 |
$224.42 |
$4800.00 |
01-20-2022 |
07-324404 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
32 |
$550.00 |
$822.87 |
$17600.00 |
01-20-2022 |
07-324404 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
32 |
$375.00 |
$561.05 |
$12000.00 |
01-20-2022 |
07-324404 |
5 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
04 |
65 |
$180.00 |
$269.30 |
$11700.00 |
01-25-2022 |
04-4J9604 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
04 |
65 |
$219.00 |
$327.65 |
$14235.00 |
01-25-2022 |
04-4J9604 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
04 |
65 |
$310.00 |
$463.80 |
$20150.00 |
01-25-2022 |
04-4J9604 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
04 |
65 |
$500.00 |
$748.06 |
$32500.00 |
01-25-2022 |
04-4J9604 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
430 |
$226.80 |
$339.32 |
$97524.00 |
02-01-2022 |
07-319704 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
430 |
$116.00 |
$173.55 |
$49880.00 |
02-01-2022 |
07-319704 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
430 |
$100.00 |
$149.61 |
$43000.00 |
02-01-2022 |
07-319704 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
430 |
$165.00 |
$246.86 |
$70950.00 |
02-01-2022 |
07-319704 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
430 |
$185.00 |
$276.78 |
$79550.00 |
02-01-2022 |
07-319704 |
5 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
430 |
$157.50 |
$235.64 |
$67725.00 |
02-01-2022 |
07-319704 |
6 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
430 |
$200.00 |
$299.22 |
$86000.00 |
02-01-2022 |
07-319704 |
7 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
04 |
660 |
$5.00 |
$7.48 |
$3300.00 |
02-15-2022 |
04-264724 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
04 |
660 |
$48.00 |
$71.81 |
$31680.00 |
02-15-2022 |
04-264724 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
04 |
660 |
$28.48 |
$42.61 |
$18796.80 |
02-15-2022 |
04-264724 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
04 |
660 |
$25.00 |
$37.40 |
$16500.00 |
02-15-2022 |
04-264724 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
04 |
660 |
$19.00 |
$28.43 |
$12540.00 |
02-15-2022 |
04-264724 |
5 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
14 |
$90.00 |
$134.65 |
$1260.00 |
02-16-2022 |
07-336504 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
14 |
$180.00 |
$269.30 |
$2520.00 |
02-16-2022 |
07-336504 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
14 |
$150.00 |
$224.42 |
$2100.00 |
02-16-2022 |
07-336504 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
14 |
$230.00 |
$344.11 |
$3220.00 |
02-16-2022 |
07-336504 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
14 |
$351.00 |
$525.14 |
$4914.00 |
02-16-2022 |
07-336504 |
5 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
14 |
$150.00 |
$224.42 |
$2100.00 |
02-16-2022 |
07-336504 |
6 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
14 |
$420.00 |
$628.37 |
$5880.00 |
02-16-2022 |
07-336504 |
7 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
14 |
$375.00 |
$561.05 |
$5250.00 |
02-16-2022 |
07-336504 |
8 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
2170 |
$110.00 |
$164.57 |
$238700.00 |
03-08-2022 |
07-307104 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
2170 |
$65.00 |
$97.25 |
$141050.00 |
03-08-2022 |
07-307104 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
2170 |
$132.00 |
$197.49 |
$286440.00 |
03-08-2022 |
07-307104 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
2170 |
$105.00 |
$157.09 |
$227850.00 |
03-08-2022 |
07-307104 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
2170 |
$20.00 |
$29.92 |
$43400.00 |
03-08-2022 |
07-307104 |
5 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
2170 |
$15.00 |
$22.44 |
$32550.00 |
03-08-2022 |
07-307104 |
6 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
2170 |
$100.00 |
$149.61 |
$217000.00 |
03-08-2022 |
07-307104 |
7 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
18 |
$294.00 |
$439.86 |
$5292.00 |
03-15-2022 |
07-328504 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
18 |
$100.00 |
$149.61 |
$1800.00 |
03-15-2022 |
07-328504 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
18 |
$500.00 |
$748.06 |
$9000.00 |
03-15-2022 |
07-328504 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
18 |
$84.23 |
$126.02 |
$1516.14 |
03-15-2022 |
07-328504 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
18 |
$400.00 |
$598.45 |
$7200.00 |
03-15-2022 |
07-328504 |
5 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
18 |
$520.00 |
$777.98 |
$9360.00 |
03-15-2022 |
07-328504 |
6 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
18 |
$276.00 |
$412.93 |
$4968.00 |
03-15-2022 |
07-328504 |
7 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
4 |
$500.00 |
$775.46 |
$2000.00 |
05-18-2022 |
07-3311U4 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
4 |
$380.00 |
$589.35 |
$1520.00 |
05-18-2022 |
07-3311U4 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
4 |
$277.50 |
$430.38 |
$1110.00 |
05-18-2022 |
07-3311U4 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
4 |
$315.55 |
$489.39 |
$1262.20 |
05-18-2022 |
07-3311U4 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
240 |
$125.00 |
$193.86 |
$30000.00 |
06-02-2022 |
07-321804 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
240 |
$270.00 |
$418.75 |
$64800.00 |
06-02-2022 |
07-321804 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
240 |
$250.00 |
$387.73 |
$60000.00 |
06-02-2022 |
07-321804 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
240 |
$152.00 |
$235.74 |
$36480.00 |
06-02-2022 |
07-321804 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
240 |
$500.00 |
$775.46 |
$120000.00 |
06-02-2022 |
07-321804 |
5 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
240 |
$367.50 |
$569.96 |
$88200.00 |
06-02-2022 |
07-321804 |
6 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
240 |
$165.00 |
$255.90 |
$39600.00 |
06-02-2022 |
07-321804 |
7 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
04 |
560 |
$100.00 |
$155.09 |
$56000.00 |
06-16-2022 |
04-4H0504 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
04 |
560 |
$100.00 |
$155.09 |
$56000.00 |
06-16-2022 |
04-4H0504 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
04 |
560 |
$280.00 |
$434.25 |
$156800.00 |
06-16-2022 |
04-4H0504 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
120 |
$33.10 |
$51.34 |
$3972.00 |
06-16-2022 |
07-330504 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
120 |
$155.30 |
$240.86 |
$18636.00 |
06-16-2022 |
07-330504 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
120 |
$150.00 |
$232.64 |
$18000.00 |
06-16-2022 |
07-330504 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
120 |
$365.00 |
$566.08 |
$43800.00 |
06-16-2022 |
07-330504 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
120 |
$393.75 |
$610.67 |
$47250.00 |
06-16-2022 |
07-330504 |
5 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
05 |
5190 |
$54.00 |
$57.27 |
$280260.00 |
07-26-2022 |
05-1H0504 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
05 |
5190 |
$182.50 |
$193.56 |
$947175.00 |
07-26-2022 |
05-1H0504 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
05 |
5190 |
$84.00 |
$89.09 |
$435960.00 |
07-26-2022 |
05-1H0504 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
05 |
5190 |
$95.00 |
$100.76 |
$493050.00 |
07-26-2022 |
05-1H0504 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
05 |
5190 |
$100.00 |
$106.06 |
$519000.00 |
07-26-2022 |
05-1H0504 |
5 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
04 |
4300 |
$57.64 |
$61.13 |
$247852.00 |
07-28-2022 |
04-0Q30U4 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
04 |
4300 |
$50.00 |
$53.03 |
$215000.00 |
07-28-2022 |
04-0Q30U4 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
04 |
4300 |
$55.00 |
$58.33 |
$236500.00 |
07-28-2022 |
04-0Q30U4 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
04 |
4300 |
$55.00 |
$58.33 |
$236500.00 |
07-28-2022 |
04-0Q30U4 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
04 |
4300 |
$50.00 |
$53.03 |
$215000.00 |
07-28-2022 |
04-0Q30U4 |
5 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
04 |
210 |
$85.00 |
$90.15 |
$17850.00 |
08-04-2022 |
04-2K8004 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
04 |
210 |
$286.00 |
$303.33 |
$60060.00 |
08-04-2022 |
04-2K8004 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
04 |
210 |
$194.00 |
$205.75 |
$40740.00 |
08-04-2022 |
04-2K8004 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
4 |
$1000.00 |
$1060.58 |
$4000.00 |
08-09-2022 |
07-337804 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
4 |
$1500.00 |
$1590.87 |
$6000.00 |
08-09-2022 |
07-337804 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
4 |
$325.00 |
$344.69 |
$1300.00 |
08-09-2022 |
07-337804 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
08 |
50 |
$100.00 |
$106.06 |
$5000.00 |
08-11-2022 |
08-0G6904 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
01 |
46 |
$155.00 |
$164.39 |
$7130.00 |
09-07-2022 |
01-434804 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
01 |
46 |
$200.00 |
$212.12 |
$9200.00 |
09-07-2022 |
01-434804 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
01 |
46 |
$325.00 |
$344.69 |
$14950.00 |
09-07-2022 |
01-434804 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
01 |
46 |
$348.00 |
$369.08 |
$16008.00 |
09-07-2022 |
01-434804 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
01 |
46 |
$700.00 |
$742.41 |
$32200.00 |
09-07-2022 |
01-434804 |
5 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
01 |
46 |
$100.00 |
$106.06 |
$4600.00 |
09-07-2022 |
01-434804 |
6 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
330 |
$446.25 |
$473.28 |
$147262.50 |
09-07-2022 |
07-320104 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
330 |
$93.10 |
$98.74 |
$30723.00 |
09-07-2022 |
07-320104 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
330 |
$215.00 |
$228.03 |
$70950.00 |
09-07-2022 |
07-320104 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
330 |
$120.00 |
$127.27 |
$39600.00 |
09-07-2022 |
07-320104 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
12 |
2 |
$1000.00 |
$1060.58 |
$2000.00 |
09-07-2022 |
12-0R4104 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
12 |
2 |
$1200.00 |
$1272.70 |
$2400.00 |
09-07-2022 |
12-0R4104 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
12 |
2 |
$1575.00 |
$1670.42 |
$3150.00 |
09-07-2022 |
12-0R4104 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
11 |
9600 |
$30.00 |
$31.82 |
$288000.00 |
09-13-2022 |
11-4C0044 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
11 |
9600 |
$45.00 |
$47.73 |
$432000.00 |
09-13-2022 |
11-4C0044 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
11 |
9600 |
$136.50 |
$144.77 |
$1310400.00 |
09-13-2022 |
11-4C0044 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
11 |
9600 |
$200.00 |
$212.12 |
$1920000.00 |
09-13-2022 |
11-4C0044 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
04 |
42 |
$1200.00 |
$1272.70 |
$50400.00 |
09-15-2022 |
04-2J9504 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
04 |
42 |
$550.00 |
$583.32 |
$23100.00 |
09-15-2022 |
04-2J9504 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
04 |
42 |
$302.00 |
$320.30 |
$12684.00 |
09-15-2022 |
04-2J9504 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
450 |
$400.00 |
$424.23 |
$180000.00 |
09-20-2022 |
07-329604 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
450 |
$420.00 |
$445.44 |
$189000.00 |
09-20-2022 |
07-329604 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
450 |
$132.00 |
$140.00 |
$59400.00 |
09-20-2022 |
07-329604 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
450 |
$215.00 |
$228.03 |
$96750.00 |
09-20-2022 |
07-329604 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
450 |
$196.00 |
$207.87 |
$88200.00 |
09-20-2022 |
07-329604 |
5 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
20 |
$523.00 |
$554.68 |
$10460.00 |
09-28-2022 |
07-306614 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
20 |
$350.00 |
$371.20 |
$7000.00 |
09-28-2022 |
07-306614 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
20 |
$3200.00 |
$3393.86 |
$64000.00 |
09-28-2022 |
07-306614 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
45 |
$260.00 |
$275.75 |
$11700.00 |
09-29-2022 |
07-333004 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
45 |
$198.99 |
$211.05 |
$8954.55 |
09-29-2022 |
07-333004 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
45 |
$350.00 |
$371.20 |
$15750.00 |
09-29-2022 |
07-333004 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
45 |
$310.00 |
$328.78 |
$13950.00 |
09-29-2022 |
07-333004 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
45 |
$248.52 |
$263.58 |
$11183.40 |
09-29-2022 |
07-333004 |
5 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
01 |
3440 |
$7.00 |
$7.79 |
$24080.00 |
10-04-2022 |
01-366004 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
01 |
3440 |
$30.00 |
$33.37 |
$103200.00 |
10-04-2022 |
01-366004 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
01 |
3440 |
$47.00 |
$52.28 |
$161680.00 |
10-04-2022 |
01-366004 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
01 |
3440 |
$45.00 |
$50.06 |
$154800.00 |
10-04-2022 |
01-366004 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
260 |
$142.00 |
$157.97 |
$36920.00 |
11-10-2022 |
07-316004 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
260 |
$29.80 |
$33.15 |
$7748.00 |
11-10-2022 |
07-316004 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
260 |
$120.00 |
$133.49 |
$31200.00 |
11-10-2022 |
07-316004 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
260 |
$84.70 |
$94.22 |
$22022.00 |
11-10-2022 |
07-316004 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
260 |
$35.00 |
$38.94 |
$9100.00 |
11-10-2022 |
07-316004 |
5 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
260 |
$280.00 |
$311.48 |
$72800.00 |
11-10-2022 |
07-316004 |
6 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
07 |
260 |
$195.00 |
$216.92 |
$50700.00 |
11-10-2022 |
07-316004 |
7 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
05 |
19 |
$235.00 |
$261.42 |
$4465.00 |
11-17-2022 |
05-1H4304 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
05 |
19 |
$450.00 |
$500.60 |
$8550.00 |
11-17-2022 |
05-1H4304 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) |
CY |
05 |
19 |
$534.10 |
$594.15 |
$10147.90 |
11-17-2022 |
05-1H4304 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
05 |
640 |
$163.00 |
$181.33 |
$104320.00 |
11-29-2022 |
05-1G9804 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
05 |
640 |
$95.00 |
$105.68 |
$60800.00 |
11-29-2022 |
05-1G9804 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
05 |
640 |
$345.00 |
$383.79 |
$220800.00 |
11-29-2022 |
05-1G9804 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
6 |
$1400.00 |
$1557.41 |
$8400.00 |
11-30-2022 |
12-0P69U4 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
6 |
$120.00 |
$133.49 |
$720.00 |
11-30-2022 |
12-0P69U4 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
6 |
$1000.00 |
$1112.44 |
$6000.00 |
11-30-2022 |
12-0P69U4 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
75 |
$120.00 |
$133.49 |
$9000.00 |
12-13-2022 |
07-322004 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
75 |
$250.00 |
$278.11 |
$18750.00 |
12-13-2022 |
07-322004 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
75 |
$79.97 |
$88.96 |
$5997.75 |
12-13-2022 |
07-322004 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
75 |
$670.00 |
$745.33 |
$50250.00 |
12-13-2022 |
07-322004 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
75 |
$211.82 |
$235.64 |
$15886.50 |
12-13-2022 |
07-322004 |
5 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
220 |
$214.00 |
$238.06 |
$47080.00 |
12-15-2022 |
12-0R5604 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
220 |
$237.00 |
$263.65 |
$52140.00 |
12-15-2022 |
12-0R5604 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
220 |
$420.00 |
$467.22 |
$92400.00 |
12-15-2022 |
12-0R5604 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
2 |
$1700.00 |
$1852.33 |
$3400.00 |
01-10-2023 |
07-323904 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
2 |
$5865.00 |
$6390.53 |
$11730.00 |
01-10-2023 |
07-323904 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
2 |
$2500.00 |
$2724.01 |
$5000.00 |
01-10-2023 |
07-323904 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
2 |
$2600.00 |
$2832.97 |
$5200.00 |
01-10-2023 |
07-323904 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
910 |
$99.54 |
$108.46 |
$90581.40 |
01-10-2023 |
07-3393U4 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
910 |
$150.00 |
$163.44 |
$136500.00 |
01-10-2023 |
07-3393U4 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
910 |
$30.00 |
$32.69 |
$27300.00 |
01-10-2023 |
07-3393U4 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
910 |
$140.00 |
$152.54 |
$127400.00 |
01-10-2023 |
07-3393U4 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
910 |
$100.00 |
$108.96 |
$91000.00 |
01-10-2023 |
07-3393U4 |
5 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
910 |
$250.00 |
$272.40 |
$227500.00 |
01-10-2023 |
07-3393U4 |
6 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
910 |
$175.00 |
$190.68 |
$159250.00 |
01-10-2023 |
07-3393U4 |
7 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
910 |
$179.00 |
$195.04 |
$162890.00 |
01-10-2023 |
07-3393U4 |
8 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
39 |
$150.00 |
$163.44 |
$5850.00 |
01-11-2023 |
07-322704 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
39 |
$140.00 |
$152.54 |
$5460.00 |
01-11-2023 |
07-322704 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
39 |
$400.00 |
$435.84 |
$15600.00 |
01-11-2023 |
07-322704 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
39 |
$250.00 |
$272.40 |
$9750.00 |
01-11-2023 |
07-322704 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
39 |
$377.00 |
$410.78 |
$14703.00 |
01-11-2023 |
07-322704 |
5 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
35 |
$130.00 |
$141.65 |
$4550.00 |
01-19-2023 |
07-338704 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
35 |
$150.00 |
$163.44 |
$5250.00 |
01-19-2023 |
07-338704 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
35 |
$50.00 |
$54.48 |
$1750.00 |
01-19-2023 |
07-338704 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
35 |
$165.00 |
$179.78 |
$5775.00 |
01-19-2023 |
07-338704 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
35 |
$200.00 |
$217.92 |
$7000.00 |
01-19-2023 |
07-338704 |
5 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
35 |
$180.00 |
$196.13 |
$6300.00 |
01-19-2023 |
07-338704 |
6 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
35 |
$400.00 |
$435.84 |
$14000.00 |
01-19-2023 |
07-338704 |
7 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
35 |
$371.00 |
$404.24 |
$12985.00 |
01-19-2023 |
07-338704 |
8 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
35 |
$575.00 |
$626.52 |
$20125.00 |
01-19-2023 |
07-338704 |
9 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
03 |
4530 |
$78.00 |
$84.99 |
$353340.00 |
01-26-2023 |
03-3F23U4 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
03 |
4530 |
$87.00 |
$94.80 |
$394110.00 |
01-26-2023 |
03-3F23U4 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
03 |
4530 |
$35.00 |
$38.14 |
$158550.00 |
01-26-2023 |
03-3F23U4 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
03 |
4530 |
$50.00 |
$54.48 |
$226500.00 |
01-26-2023 |
03-3F23U4 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
03 |
4530 |
$35.00 |
$38.14 |
$158550.00 |
01-26-2023 |
03-3F23U4 |
5 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
03 |
4530 |
$247.00 |
$269.13 |
$1118910.00 |
01-26-2023 |
03-3F23U4 |
6 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
8 |
$500.00 |
$544.80 |
$4000.00 |
02-14-2023 |
04-2K7204 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
8 |
$375.58 |
$409.23 |
$3004.64 |
02-14-2023 |
04-2K7204 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
8 |
$150.00 |
$163.44 |
$1200.00 |
02-14-2023 |
04-2K7204 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
8 |
$400.00 |
$435.84 |
$3200.00 |
02-14-2023 |
04-2K7204 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
8 |
$396.48 |
$432.01 |
$3171.84 |
02-14-2023 |
04-2K7204 |
5 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
08 |
50 |
$460.00 |
$501.22 |
$23000.00 |
03-01-2023 |
08-0G6904 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
08 |
50 |
$1100.00 |
$1198.56 |
$55000.00 |
03-01-2023 |
08-0G6904 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
08 |
50 |
$100.00 |
$108.96 |
$5000.00 |
03-01-2023 |
08-0G6904 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
08 |
50 |
$200.00 |
$217.92 |
$10000.00 |
03-01-2023 |
08-0G6904 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
05 |
11200 |
$118.29 |
$138.21 |
$1324848.00 |
04-27-2023 |
05-0C7334 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
05 |
11200 |
$110.00 |
$128.52 |
$1232000.00 |
04-27-2023 |
05-0C7334 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
3 |
$972.41 |
$1136.17 |
$2917.23 |
05-04-2023 |
04-2K7004 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
3 |
$1000.00 |
$1168.41 |
$3000.00 |
05-04-2023 |
04-2K7004 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
3 |
$400.00 |
$467.36 |
$1200.00 |
05-04-2023 |
04-2K7004 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
05 |
8430 |
$80.47 |
$94.02 |
$678362.10 |
06-09-2023 |
05-0N74U4 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
06 |
170 |
$285.00 |
$238.47 |
$48450.00 |
07-06-2023 |
06-0V1104 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
06 |
170 |
$275.00 |
$230.10 |
$46750.00 |
07-06-2023 |
06-0V1104 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
06 |
170 |
$275.00 |
$230.10 |
$46750.00 |
07-06-2023 |
06-0V1104 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
10 |
630 |
$125.00 |
$104.59 |
$78750.00 |
08-10-2023 |
10-1F1804 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
10 |
630 |
$265.00 |
$221.74 |
$166950.00 |
08-10-2023 |
10-1F1804 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
10 |
630 |
$235.00 |
$196.63 |
$148050.00 |
08-10-2023 |
10-1F1804 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
10 |
630 |
$330.00 |
$276.12 |
$207900.00 |
08-10-2023 |
10-1F1804 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
11 |
$664.77 |
$653.31 |
$7312.47 |
11-16-2023 |
07-338604 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
11 |
$3500.00 |
$3439.67 |
$38500.00 |
11-16-2023 |
07-338604 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
12 |
$550.00 |
$540.52 |
$6600.00 |
12-14-2023 |
04-0P9804 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
12 |
$825.00 |
$810.78 |
$9900.00 |
12-14-2023 |
04-0P9804 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
12 |
$600.00 |
$589.66 |
$7200.00 |
12-14-2023 |
04-0P9804 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
12 |
$950.00 |
$933.63 |
$11400.00 |
12-14-2023 |
04-0P9804 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
150 |
$210.00 |
$161.34 |
$31500.00 |
01-11-2024 |
04-1J9604 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
150 |
$450.00 |
$345.73 |
$67500.00 |
01-11-2024 |
04-1J9604 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
150 |
$480.00 |
$368.78 |
$72000.00 |
01-11-2024 |
04-1J9604 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
150 |
$260.00 |
$199.76 |
$39000.00 |
01-11-2024 |
04-1J9604 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
150 |
$450.00 |
$345.73 |
$67500.00 |
01-11-2024 |
04-1J9604 |
5 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
0.4 |
$7507.50 |
$5768.01 |
$3003.00 |
01-18-2024 |
07-348804 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
0.4 |
$11000.00 |
$8451.29 |
$4400.00 |
01-18-2024 |
07-348804 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
0.4 |
$9400.00 |
$7222.01 |
$3760.00 |
01-18-2024 |
07-348804 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
0.4 |
$12000.00 |
$9219.59 |
$4800.00 |
01-18-2024 |
07-348804 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
0.4 |
$5419.00 |
$4163.41 |
$2167.60 |
01-18-2024 |
07-348804 |
5 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
0.4 |
$56930.00 |
$43739.27 |
$22772.00 |
01-18-2024 |
07-348804 |
6 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
0.4 |
$9500.00 |
$7298.84 |
$3800.00 |
01-18-2024 |
07-348804 |
7 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
15 |
$539.93 |
$414.83 |
$8098.95 |
01-18-2024 |
07-349504 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
15 |
$3000.00 |
$2304.90 |
$45000.00 |
01-18-2024 |
07-349504 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
15 |
$3100.00 |
$2381.73 |
$46500.00 |
01-18-2024 |
07-349504 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
15 |
$4026.00 |
$3093.17 |
$60390.00 |
01-18-2024 |
07-349504 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
15 |
$550.00 |
$422.56 |
$8250.00 |
01-18-2024 |
07-349504 |
5 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
41 |
$300.00 |
$230.49 |
$12300.00 |
01-31-2024 |
07-344204 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
41 |
$380.00 |
$291.95 |
$15580.00 |
01-31-2024 |
07-344204 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
41 |
$480.00 |
$368.78 |
$19680.00 |
01-31-2024 |
07-344204 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
41 |
$400.00 |
$307.32 |
$16400.00 |
01-31-2024 |
07-344204 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
41 |
$520.00 |
$399.52 |
$21320.00 |
01-31-2024 |
07-344204 |
5 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
41 |
$467.50 |
$359.18 |
$19167.50 |
01-31-2024 |
07-344204 |
6 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
05 |
1430 |
$160.00 |
$122.93 |
$228800.00 |
03-01-2024 |
05-0N74V4 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
12 |
$225.00 |
$195.72 |
$2700.00 |
05-08-2024 |
07-346004 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
12 |
$900.00 |
$782.89 |
$10800.00 |
05-08-2024 |
07-346004 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
12 |
$2200.00 |
$1913.72 |
$26400.00 |
05-08-2024 |
07-346004 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
12 |
$370.00 |
$321.85 |
$4440.00 |
05-08-2024 |
07-346004 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
12 |
$800.00 |
$695.90 |
$9600.00 |
05-08-2024 |
07-346004 |
5 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
97 |
$270.00 |
$234.87 |
$26190.00 |
06-26-2024 |
07-333704 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
97 |
$250.00 |
$217.47 |
$24250.00 |
06-26-2024 |
07-333704 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
97 |
$200.00 |
$173.97 |
$19400.00 |
06-26-2024 |
07-333704 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
97 |
$420.00 |
$365.35 |
$40740.00 |
06-26-2024 |
07-333704 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
97 |
$155.00 |
$134.83 |
$15035.00 |
06-26-2024 |
07-333704 |
5 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
97 |
$320.00 |
$278.36 |
$31040.00 |
06-26-2024 |
07-333704 |
6 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
97 |
$398.98 |
$347.06 |
$38701.06 |
06-26-2024 |
07-333704 |
7 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
97 |
$385.00 |
$334.90 |
$37345.00 |
06-26-2024 |
07-333704 |
8 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
11 |
22 |
$350.00 |
$260.16 |
$7700.00 |
07-17-2024 |
11-430324 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
11 |
22 |
$133.00 |
$98.86 |
$2926.00 |
07-17-2024 |
11-430324 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
11 |
22 |
$400.00 |
$297.33 |
$8800.00 |
07-17-2024 |
11-430324 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
11 |
22 |
$610.00 |
$453.42 |
$13420.00 |
07-17-2024 |
11-430324 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
11 |
22 |
$157.00 |
$116.70 |
$3454.00 |
07-17-2024 |
11-430324 |
5 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
09 |
1740 |
$52.00 |
$38.65 |
$90480.00 |
08-01-2024 |
09-378804 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
09 |
1740 |
$140.00 |
$104.06 |
$243600.00 |
08-01-2024 |
09-378804 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
09 |
1740 |
$336.00 |
$249.75 |
$584640.00 |
08-01-2024 |
09-378804 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
09 |
1740 |
$110.00 |
$81.76 |
$191400.00 |
08-01-2024 |
09-378804 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
150 |
$300.00 |
$222.99 |
$45000.00 |
09-26-2024 |
12-0S1404 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
150 |
$270.00 |
$200.70 |
$40500.00 |
09-26-2024 |
12-0S1404 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
150 |
$360.00 |
$267.59 |
$54000.00 |
09-26-2024 |
12-0S1404 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
150 |
$420.00 |
$312.19 |
$63000.00 |
09-26-2024 |
12-0S1404 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
150 |
$160.00 |
$118.93 |
$24000.00 |
09-26-2024 |
12-0S1404 |
5 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
150 |
$250.00 |
$185.83 |
$37500.00 |
09-26-2024 |
12-0S1404 |
6 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
150 |
$120.00 |
$89.20 |
$18000.00 |
09-26-2024 |
12-0S1404 |
7 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
150 |
$356.00 |
$264.62 |
$53400.00 |
09-26-2024 |
12-0S1404 |
8 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
06 |
6000 |
$138.00 |
$143.08 |
$828000.00 |
10-29-2024 |
06-0W79U4 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
06 |
6000 |
$53.00 |
$54.95 |
$318000.00 |
10-29-2024 |
06-0W79U4 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
06 |
6000 |
$32.00 |
$33.18 |
$192000.00 |
10-29-2024 |
06-0W79U4 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
06 |
6000 |
$50.00 |
$51.84 |
$300000.00 |
10-29-2024 |
06-0W79U4 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
160 |
$135.00 |
$139.97 |
$21600.00 |
11-05-2024 |
04-3J2604 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
160 |
$162.94 |
$168.94 |
$26070.40 |
11-05-2024 |
04-3J2604 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
160 |
$190.00 |
$196.99 |
$30400.00 |
11-05-2024 |
04-3J2604 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
160 |
$169.00 |
$175.22 |
$27040.00 |
11-05-2024 |
04-3J2604 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
160 |
$700.00 |
$725.76 |
$112000.00 |
11-05-2024 |
04-3J2604 |
5 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
160 |
$370.00 |
$383.61 |
$59200.00 |
11-05-2024 |
04-3J2604 |
6 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
18 |
$398.03 |
$412.67 |
$7164.54 |
11-14-2024 |
04-2K7404 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
18 |
$320.00 |
$331.77 |
$5760.00 |
11-14-2024 |
04-2K7404 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
18 |
$350.00 |
$362.88 |
$6300.00 |
11-14-2024 |
04-2K7404 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
18 |
$350.00 |
$362.88 |
$6300.00 |
11-14-2024 |
04-2K7404 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
18 |
$340.00 |
$352.51 |
$6120.00 |
11-14-2024 |
04-2K7404 |
5 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
18 |
$705.00 |
$730.94 |
$12690.00 |
11-14-2024 |
04-2K7404 |
6 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
18 |
$550.00 |
$570.24 |
$9900.00 |
11-14-2024 |
04-2K7404 |
7 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
18 |
$555.00 |
$575.42 |
$9990.00 |
11-14-2024 |
04-2K7404 |
8 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
0.5 |
$770.00 |
$535.44 |
$385.00 |
01-15-2025 |
07-344504 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
0.5 |
$730.00 |
$507.63 |
$365.00 |
01-15-2025 |
07-344504 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
0.5 |
$1000.00 |
$695.38 |
$500.00 |
01-15-2025 |
07-344504 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
0.5 |
$3500.00 |
$2433.82 |
$1750.00 |
01-15-2025 |
07-344504 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
830 |
$55.00 |
$38.25 |
$45650.00 |
01-23-2025 |
12-0K8704 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
830 |
$37.00 |
$25.73 |
$30710.00 |
01-23-2025 |
12-0K8704 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
830 |
$61.00 |
$42.42 |
$50630.00 |
01-23-2025 |
12-0K8704 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
830 |
$326.88 |
$227.31 |
$271310.40 |
01-23-2025 |
12-0K8704 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
830 |
$113.42 |
$78.87 |
$94138.60 |
01-23-2025 |
12-0K8704 |
5 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
8 |
$410.64 |
$285.55 |
$3285.12 |
02-26-2025 |
04-2Q6504 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
8 |
$500.00 |
$347.69 |
$4000.00 |
02-26-2025 |
04-2Q6504 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
8 |
$550.00 |
$382.46 |
$4400.00 |
02-26-2025 |
04-2Q6504 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
8 |
$150.00 |
$104.31 |
$1200.00 |
02-26-2025 |
04-2Q6504 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
8 |
$700.00 |
$486.76 |
$5600.00 |
02-26-2025 |
04-2Q6504 |
5 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
8 |
$6250.00 |
$4346.11 |
$50000.00 |
02-26-2025 |
04-2Q6504 |
6 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
05 |
220 |
$235.00 |
$168.59 |
$51700.00 |
04-02-2025 |
05-1N3404 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
05 |
220 |
$500.00 |
$358.70 |
$110000.00 |
04-02-2025 |
05-1N3404 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
05 |
220 |
$250.00 |
$179.35 |
$55000.00 |
04-02-2025 |
05-1N3404 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
05 |
220 |
$290.00 |
$208.05 |
$63800.00 |
04-02-2025 |
05-1N3404 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
05 |
220 |
$676.00 |
$484.97 |
$148720.00 |
04-02-2025 |
05-1N3404 |
5 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
01 |
7 |
$1246.00 |
$893.89 |
$8722.00 |
04-22-2025 |
01-0J2104 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
01 |
7 |
$1435.00 |
$1029.48 |
$10045.00 |
04-22-2025 |
01-0J2104 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
01 |
7 |
$1550.00 |
$1111.98 |
$10850.00 |
04-22-2025 |
01-0J2104 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
01 |
7 |
$1245.80 |
$893.74 |
$8720.60 |
04-22-2025 |
01-0J2104 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
2130 |
$146.95 |
$105.42 |
$313003.50 |
06-17-2025 |
04-0G3604 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
2130 |
$100.00 |
$71.74 |
$213000.00 |
06-17-2025 |
04-0G3604 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
1140 |
$97.50 |
$85.74 |
$111150.00 |
07-30-2025 |
04-1Q7214 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
1140 |
$50.00 |
$43.97 |
$57000.00 |
07-30-2025 |
04-1Q7214 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
1140 |
$130.00 |
$114.32 |
$148200.00 |
07-30-2025 |
04-1Q7214 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
1140 |
$107.00 |
$94.09 |
$121980.00 |
07-30-2025 |
04-1Q7214 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
1140 |
$280.00 |
$246.22 |
$319200.00 |
07-30-2025 |
04-1Q7214 |
5 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
1140 |
$398.00 |
$349.99 |
$453720.00 |
07-30-2025 |
04-1Q7214 |
6 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
01 |
0.7 |
$3500.00 |
$3077.81 |
$2450.00 |
08-21-2025 |
01-0K9504 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
01 |
0.7 |
$100.00 |
$87.94 |
$70.00 |
08-21-2025 |
01-0K9504 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
01 |
0.7 |
$6200.00 |
$5452.12 |
$4340.00 |
08-21-2025 |
01-0K9504 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
01 |
0.7 |
$1400.00 |
$1231.12 |
$980.00 |
08-21-2025 |
01-0K9504 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
01 |
0.7 |
$250.00 |
$219.84 |
$175.00 |
08-21-2025 |
01-0K9504 |
5 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
01 |
0.7 |
$7200.00 |
$6331.49 |
$5040.00 |
08-21-2025 |
01-0K9504 |
6 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
11 |
1020 |
$140.00 |
$136.98 |
$142800.00 |
11-18-2025 |
11-431004 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
11 |
1020 |
$250.00 |
$244.61 |
$255000.00 |
11-18-2025 |
11-431004 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
11 |
1020 |
$134.02 |
$131.13 |
$136700.40 |
11-18-2025 |
11-431004 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
11 |
1020 |
$78.00 |
$76.32 |
$79560.00 |
11-18-2025 |
11-431004 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
11 |
1020 |
$245.00 |
$239.72 |
$249900.00 |
11-18-2025 |
11-431004 |
5 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
11 |
1020 |
$239.00 |
$233.85 |
$243780.00 |
11-18-2025 |
11-431004 |
6 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
11 |
1020 |
$242.87 |
$237.63 |
$247727.40 |
11-18-2025 |
11-431004 |
7 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
11 |
1020 |
$480.00 |
$469.65 |
$489600.00 |
11-18-2025 |
11-431004 |
8 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
11 |
1020 |
$350.00 |
$342.45 |
$357000.00 |
11-18-2025 |
11-431004 |
9 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
11 |
1020 |
$145.00 |
$141.87 |
$147900.00 |
11-18-2025 |
11-431004 |
10 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
01 |
620 |
$328.00 |
$320.93 |
$203360.00 |
12-09-2025 |
01-0H5704 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
01 |
620 |
$285.00 |
$278.85 |
$176700.00 |
12-09-2025 |
01-0H5704 |
2 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
01 |
620 |
$180.00 |
$176.12 |
$111600.00 |
12-09-2025 |
01-0H5704 |
3 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
01 |
620 |
$265.00 |
$259.28 |
$164300.00 |
12-09-2025 |
01-0H5704 |
4 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
01 |
620 |
$220.00 |
$215.26 |
$136400.00 |
12-09-2025 |
01-0H5704 |
5 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
01 |
620 |
$170.00 |
$166.33 |
$105400.00 |
12-09-2025 |
01-0H5704 |
6 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
01 |
620 |
$125.00 |
$122.30 |
$77500.00 |
12-09-2025 |
01-0H5704 |
7 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
01 |
87 |
$350.00 |
$404.62 |
$30450.00 |
01-06-2026 |
01-0B22U4 |
1 |
M |
TRO |
|
| 190159 - ROADWAY EXCAVATION (TYPE COM) (AERIALLY DEPOSITED LEAD) |
CY |
01 |
87 |
$342.00 |
$395.37 |
$29754.00 |
01-06-2026 |
01-0B22U4 |
2 |
M |
TRO |
|
MORE THAN 500 RESULTS RETURNED. ONLY 500 ROWS SHOWN.
|