|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
200 |
$25.00 |
$35.89 |
$5000.00 |
07-07-2020 |
12-0N5304 |
1 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
200 |
$160.00 |
$229.72 |
$32000.00 |
07-07-2020 |
12-0N5304 |
2 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
200 |
$100.00 |
$143.57 |
$20000.00 |
07-07-2020 |
12-0N5304 |
3 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
200 |
$220.00 |
$315.86 |
$44000.00 |
07-07-2020 |
12-0N5304 |
4 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
200 |
$250.00 |
$358.93 |
$50000.00 |
07-07-2020 |
12-0N5304 |
5 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
200 |
$88.56 |
$127.15 |
$17712.00 |
07-07-2020 |
12-0N5304 |
6 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
200 |
$200.00 |
$287.14 |
$40000.00 |
07-07-2020 |
12-0N5304 |
7 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
200 |
$145.38 |
$208.73 |
$29076.00 |
07-07-2020 |
12-0N5304 |
8 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
200 |
$200.00 |
$287.14 |
$40000.00 |
07-07-2020 |
12-0N5304 |
9 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
200 |
$250.00 |
$358.93 |
$50000.00 |
07-07-2020 |
12-0N5304 |
10 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
200 |
$200.00 |
$287.14 |
$40000.00 |
07-07-2020 |
12-0N5304 |
11 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
200 |
$150.00 |
$215.36 |
$30000.00 |
07-07-2020 |
12-0N5304 |
12 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
05 |
58 |
$177.60 |
$254.98 |
$10300.80 |
07-21-2020 |
05-1E0004 |
1 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
05 |
58 |
$120.00 |
$172.29 |
$6960.00 |
07-21-2020 |
05-1E0004 |
2 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
05 |
58 |
$171.00 |
$245.51 |
$9918.00 |
07-21-2020 |
05-1E0004 |
3 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
05 |
58 |
$164.00 |
$235.46 |
$9512.00 |
07-21-2020 |
05-1E0004 |
4 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
05 |
58 |
$400.00 |
$574.29 |
$23200.00 |
07-21-2020 |
05-1E0004 |
5 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
01 |
100 |
$50.00 |
$71.56 |
$5000.00 |
11-03-2020 |
01-0F6804 |
1 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
01 |
100 |
$325.00 |
$465.15 |
$32500.00 |
11-03-2020 |
01-0F6804 |
2 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
01 |
100 |
$250.00 |
$357.81 |
$25000.00 |
11-03-2020 |
01-0F6804 |
3 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
01 |
100 |
$180.00 |
$257.62 |
$18000.00 |
11-03-2020 |
01-0F6804 |
4 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
01 |
100 |
$450.00 |
$644.06 |
$45000.00 |
11-03-2020 |
01-0F6804 |
5 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
03 |
110 |
$225.00 |
$322.03 |
$24750.00 |
12-16-2020 |
03-3F5004 |
1 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
03 |
110 |
$100.00 |
$143.12 |
$11000.00 |
12-16-2020 |
03-3F5004 |
2 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
03 |
110 |
$115.00 |
$164.59 |
$12650.00 |
12-16-2020 |
03-3F5004 |
3 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
03 |
110 |
$250.00 |
$357.81 |
$27500.00 |
12-16-2020 |
03-3F5004 |
4 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
03 |
110 |
$175.00 |
$250.47 |
$19250.00 |
12-16-2020 |
03-3F5004 |
5 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
03 |
110 |
$95.00 |
$135.97 |
$10450.00 |
12-16-2020 |
03-3F5004 |
6 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
180 |
$275.00 |
$473.34 |
$49500.00 |
01-05-2021 |
12-0M82U4 |
1 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
180 |
$242.00 |
$416.54 |
$43560.00 |
01-05-2021 |
12-0M82U4 |
2 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
180 |
$160.00 |
$275.40 |
$28800.00 |
01-05-2021 |
12-0M82U4 |
3 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
180 |
$245.00 |
$421.71 |
$44100.00 |
01-05-2021 |
12-0M82U4 |
4 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
180 |
$78.00 |
$134.26 |
$14040.00 |
01-05-2021 |
12-0M82U4 |
5 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
180 |
$300.00 |
$516.37 |
$54000.00 |
01-05-2021 |
12-0M82U4 |
6 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
180 |
$265.00 |
$456.13 |
$47700.00 |
01-05-2021 |
12-0M82U4 |
7 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
180 |
$248.00 |
$426.87 |
$44640.00 |
01-05-2021 |
12-0M82U4 |
8 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
6030 |
$15.00 |
$21.26 |
$90450.00 |
04-22-2021 |
07-293604 |
1 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
6030 |
$55.00 |
$77.95 |
$331650.00 |
04-22-2021 |
07-293604 |
2 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
6030 |
$12.57 |
$17.81 |
$75797.10 |
04-22-2021 |
07-293604 |
3 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
6030 |
$15.00 |
$21.26 |
$90450.00 |
04-22-2021 |
07-293604 |
4 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
6030 |
$30.00 |
$42.52 |
$180900.00 |
04-22-2021 |
07-293604 |
5 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
07 |
6030 |
$74.85 |
$106.08 |
$451345.50 |
04-22-2021 |
07-293604 |
6 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
08 |
233 |
$215.00 |
$304.71 |
$50095.00 |
05-19-2021 |
08-1L5904 |
1 |
|
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
08 |
233 |
$337.00 |
$477.61 |
$78521.00 |
05-19-2021 |
08-1L5904 |
2 |
|
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
08 |
233 |
$310.00 |
$439.35 |
$72230.00 |
05-19-2021 |
08-1L5904 |
3 |
|
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
08 |
233 |
$429.50 |
$608.71 |
$100073.50 |
05-19-2021 |
08-1L5904 |
4 |
|
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
08 |
233 |
$233.00 |
$330.22 |
$54289.00 |
05-19-2021 |
08-1L5904 |
5 |
|
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
08 |
233 |
$215.00 |
$304.71 |
$50095.00 |
05-19-2021 |
08-1L5904 |
6 |
|
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
08 |
233 |
$85.00 |
$120.47 |
$19805.00 |
05-19-2021 |
08-1L5904 |
7 |
|
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
08 |
233 |
$270.00 |
$382.66 |
$62910.00 |
05-19-2021 |
08-1L5904 |
8 |
|
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
08 |
233 |
$347.00 |
$491.79 |
$80851.00 |
05-19-2021 |
08-1L5904 |
9 |
|
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
08 |
233 |
$350.00 |
$496.04 |
$81550.00 |
05-19-2021 |
08-1L5904 |
10 |
|
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
08 |
233 |
$300.00 |
$425.18 |
$69900.00 |
05-19-2021 |
08-1L5904 |
11 |
|
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
08 |
233 |
$315.00 |
$446.44 |
$73395.00 |
05-19-2021 |
08-1L5904 |
12 |
|
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
08 |
233 |
$348.00 |
$493.20 |
$81084.00 |
05-19-2021 |
08-1L5904 |
13 |
|
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
08 |
233 |
$68.00 |
$96.37 |
$15844.00 |
05-19-2021 |
08-1L5904 |
14 |
|
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
05 |
3 |
$900.00 |
$1566.79 |
$2700.00 |
10-13-2021 |
05-1H0004 |
1 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
05 |
3 |
$1150.00 |
$2002.01 |
$3450.00 |
10-13-2021 |
05-1H0004 |
2 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
05 |
3 |
$986.15 |
$1716.77 |
$2958.45 |
10-13-2021 |
05-1H0004 |
3 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) |
CY |
04 |
32800 |
$29.00 |
$50.49 |
$951200.00 |
12-07-2021 |
04-4G0804 |
1 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) |
CY |
04 |
32800 |
$53.39 |
$92.95 |
$1751192.00 |
12-07-2021 |
04-4G0804 |
2 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) |
CY |
04 |
32800 |
$33.00 |
$57.45 |
$1082400.00 |
12-07-2021 |
04-4G0804 |
3 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) |
CY |
04 |
32800 |
$39.00 |
$67.89 |
$1279200.00 |
12-07-2021 |
04-4G0804 |
4 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) |
CY |
04 |
32800 |
$40.00 |
$69.64 |
$1312000.00 |
12-07-2021 |
04-4G0804 |
5 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) |
CY |
04 |
32800 |
$45.00 |
$78.34 |
$1476000.00 |
12-07-2021 |
04-4G0804 |
6 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) |
CY |
04 |
32800 |
$35.00 |
$60.93 |
$1148000.00 |
12-07-2021 |
04-4G0804 |
7 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) |
CY |
04 |
50600 |
$9.00 |
$13.47 |
$455400.00 |
02-01-2022 |
04-281204 |
1 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) |
CY |
04 |
50600 |
$4.50 |
$6.73 |
$227700.00 |
02-01-2022 |
04-281204 |
2 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) |
CY |
04 |
50600 |
$5.60 |
$8.38 |
$283360.00 |
02-01-2022 |
04-281204 |
3 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) |
CY |
04 |
50600 |
$3.38 |
$5.06 |
$171028.00 |
02-01-2022 |
04-281204 |
4 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) |
CY |
04 |
50600 |
$4.00 |
$5.98 |
$202400.00 |
02-01-2022 |
04-281204 |
5 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) |
CY |
04 |
50600 |
$18.00 |
$26.93 |
$910800.00 |
02-01-2022 |
04-281204 |
6 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) |
CY |
04 |
50600 |
$9.00 |
$13.47 |
$455400.00 |
02-01-2022 |
04-281204 |
7 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) |
CY |
04 |
50600 |
$6.00 |
$8.98 |
$303600.00 |
02-01-2022 |
04-281204 |
8 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) |
CY |
04 |
50600 |
$15.00 |
$22.44 |
$759000.00 |
02-01-2022 |
04-281204 |
9 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) |
CY |
04 |
50600 |
$28.00 |
$41.89 |
$1416800.00 |
02-01-2022 |
04-281204 |
10 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) |
CY |
04 |
50600 |
$36.00 |
$53.86 |
$1821600.00 |
02-01-2022 |
04-281204 |
11 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) |
CY |
04 |
26000 |
$5.00 |
$7.48 |
$130000.00 |
02-15-2022 |
04-264724 |
1 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) |
CY |
04 |
26000 |
$30.00 |
$44.88 |
$780000.00 |
02-15-2022 |
04-264724 |
2 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) |
CY |
04 |
26000 |
$25.79 |
$38.58 |
$670540.00 |
02-15-2022 |
04-264724 |
3 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) |
CY |
04 |
26000 |
$20.00 |
$29.92 |
$520000.00 |
02-15-2022 |
04-264724 |
4 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) |
CY |
04 |
26000 |
$15.00 |
$22.44 |
$390000.00 |
02-15-2022 |
04-264724 |
5 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) |
CY |
03 |
660 |
$80.00 |
$124.07 |
$52800.00 |
05-17-2022 |
03-2J8204 |
1 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) |
CY |
03 |
660 |
$135.00 |
$209.37 |
$89100.00 |
05-17-2022 |
03-2J8204 |
2 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) |
CY |
03 |
660 |
$115.00 |
$178.35 |
$75900.00 |
05-17-2022 |
03-2J8204 |
3 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) |
CY |
05 |
1390 |
$31.00 |
$32.88 |
$43090.00 |
07-26-2022 |
05-1H0504 |
1 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) |
CY |
05 |
1390 |
$65.00 |
$68.94 |
$90350.00 |
07-26-2022 |
05-1H0504 |
2 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) |
CY |
05 |
1390 |
$84.00 |
$89.09 |
$116760.00 |
07-26-2022 |
05-1H0504 |
3 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) |
CY |
05 |
1390 |
$125.00 |
$132.57 |
$173750.00 |
07-26-2022 |
05-1H0504 |
4 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) |
CY |
05 |
1390 |
$45.00 |
$47.73 |
$62550.00 |
07-26-2022 |
05-1H0504 |
5 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) |
CY |
05 |
15300 |
$75.00 |
$79.54 |
$1147500.00 |
08-10-2022 |
05-0C7324 |
1 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) |
CY |
05 |
15300 |
$120.00 |
$127.27 |
$1836000.00 |
08-10-2022 |
05-0C7324 |
2 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) |
CY |
05 |
15300 |
$120.00 |
$127.27 |
$1836000.00 |
08-10-2022 |
05-0C7324 |
3 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) |
CY |
05 |
15300 |
$200.00 |
$212.12 |
$3060000.00 |
08-10-2022 |
05-0C7324 |
4 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) |
CY |
05 |
15300 |
$156.00 |
$165.45 |
$2386800.00 |
08-10-2022 |
05-0C7324 |
5 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) |
CY |
05 |
110 |
$400.00 |
$424.23 |
$44000.00 |
08-31-2022 |
05-1K0704 |
1 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) |
CY |
05 |
110 |
$300.00 |
$318.17 |
$33000.00 |
08-31-2022 |
05-1K0704 |
2 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) |
CY |
05 |
110 |
$504.00 |
$534.53 |
$55440.00 |
08-31-2022 |
05-1K0704 |
3 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
05 |
540 |
$163.00 |
$181.33 |
$88020.00 |
11-29-2022 |
05-1G9804 |
1 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
05 |
540 |
$95.00 |
$105.68 |
$51300.00 |
11-29-2022 |
05-1G9804 |
2 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
05 |
540 |
$345.00 |
$383.79 |
$186300.00 |
11-29-2022 |
05-1G9804 |
3 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
110 |
$100.00 |
$108.96 |
$11000.00 |
02-07-2023 |
12-0T3904 |
1 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
110 |
$109.29 |
$119.08 |
$12021.90 |
02-07-2023 |
12-0T3904 |
2 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
110 |
$100.00 |
$108.96 |
$11000.00 |
02-07-2023 |
12-0T3904 |
3 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
110 |
$270.00 |
$294.19 |
$29700.00 |
02-07-2023 |
12-0T3904 |
4 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
110 |
$395.00 |
$430.39 |
$43450.00 |
02-07-2023 |
12-0T3904 |
5 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
110 |
$400.00 |
$435.84 |
$44000.00 |
02-07-2023 |
12-0T3904 |
6 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
110 |
$315.00 |
$343.23 |
$34650.00 |
02-07-2023 |
12-0T3904 |
7 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
110 |
$890.00 |
$969.75 |
$97900.00 |
02-07-2023 |
12-0T3904 |
8 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
110 |
$320.00 |
$348.67 |
$35200.00 |
02-07-2023 |
12-0T3904 |
9 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
1500 |
$205.00 |
$239.52 |
$307500.00 |
05-25-2023 |
12-0T5904 |
1 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
1500 |
$65.00 |
$75.95 |
$97500.00 |
05-25-2023 |
12-0T5904 |
2 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
1500 |
$165.00 |
$192.79 |
$247500.00 |
05-25-2023 |
12-0T5904 |
3 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
1500 |
$130.00 |
$151.89 |
$195000.00 |
05-25-2023 |
12-0T5904 |
4 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
1500 |
$195.00 |
$227.84 |
$292500.00 |
05-25-2023 |
12-0T5904 |
5 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
1500 |
$275.00 |
$321.31 |
$412500.00 |
05-25-2023 |
12-0T5904 |
6 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
05 |
5140 |
$105.00 |
$122.68 |
$539700.00 |
06-09-2023 |
05-0N74U4 |
1 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
260 |
$50.00 |
$41.84 |
$13000.00 |
07-11-2023 |
04-3G9004 |
1 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
260 |
$50.00 |
$41.84 |
$13000.00 |
07-11-2023 |
04-3G9004 |
2 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
260 |
$130.00 |
$108.78 |
$33800.00 |
07-11-2023 |
04-3G9004 |
3 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
260 |
$134.00 |
$112.12 |
$34840.00 |
07-11-2023 |
04-3G9004 |
4 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
11 |
1980 |
$46.00 |
$38.49 |
$91080.00 |
08-17-2023 |
11-2T3434 |
1 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
11 |
1980 |
$14.00 |
$11.71 |
$27720.00 |
08-17-2023 |
11-2T3434 |
2 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
11 |
1980 |
$40.00 |
$33.47 |
$79200.00 |
08-17-2023 |
11-2T3434 |
3 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
11 |
1980 |
$40.75 |
$34.10 |
$80685.00 |
08-17-2023 |
11-2T3434 |
4 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
8230 |
$5.00 |
$4.91 |
$41150.00 |
10-04-2023 |
04-4A1304 |
1 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
8230 |
$21.00 |
$20.64 |
$172830.00 |
10-04-2023 |
04-4A1304 |
2 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
8230 |
$230.00 |
$226.04 |
$1892900.00 |
10-04-2023 |
04-4A1304 |
3 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
8230 |
$37.00 |
$36.36 |
$304510.00 |
10-04-2023 |
04-4A1304 |
4 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
8230 |
$27.00 |
$26.53 |
$222210.00 |
10-04-2023 |
04-4A1304 |
5 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
8230 |
$37.00 |
$36.36 |
$304510.00 |
10-04-2023 |
04-4A1304 |
6 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
8230 |
$75.00 |
$73.71 |
$617250.00 |
10-04-2023 |
04-4A1304 |
7 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
05 |
1230 |
$130.00 |
$99.88 |
$159900.00 |
03-01-2024 |
05-0N74V4 |
1 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
05 |
5585 |
$90.00 |
$69.15 |
$502650.00 |
03-05-2024 |
05-0N7054 |
1 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
33 |
$100.00 |
$74.33 |
$3300.00 |
08-08-2024 |
04-0P9704 |
1 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
33 |
$400.00 |
$297.33 |
$13200.00 |
08-08-2024 |
04-0P9704 |
2 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
33 |
$600.00 |
$445.99 |
$19800.00 |
08-08-2024 |
04-0P9704 |
3 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
33 |
$600.00 |
$445.99 |
$19800.00 |
08-08-2024 |
04-0P9704 |
4 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
33 |
$700.00 |
$520.32 |
$23100.00 |
08-08-2024 |
04-0P9704 |
5 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
04 |
33 |
$500.00 |
$371.66 |
$16500.00 |
08-08-2024 |
04-0P9704 |
6 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
170 |
$225.00 |
$233.28 |
$38250.00 |
10-17-2024 |
12-0R3134 |
1 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
170 |
$135.00 |
$139.97 |
$22950.00 |
10-17-2024 |
12-0R3134 |
2 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
170 |
$94.00 |
$97.46 |
$15980.00 |
10-17-2024 |
12-0R3134 |
3 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
170 |
$600.00 |
$622.08 |
$102000.00 |
10-17-2024 |
12-0R3134 |
4 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
170 |
$399.37 |
$414.06 |
$67892.90 |
10-17-2024 |
12-0R3134 |
5 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
170 |
$1250.00 |
$1295.99 |
$212500.00 |
10-17-2024 |
12-0R3134 |
6 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
08 |
40 |
$500.00 |
$347.69 |
$20000.00 |
01-07-2025 |
08-1J3204 |
1 |
|
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
08 |
40 |
$342.00 |
$237.82 |
$13680.00 |
01-07-2025 |
08-1J3204 |
2 |
|
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
08 |
40 |
$480.00 |
$333.78 |
$19200.00 |
01-07-2025 |
08-1J3204 |
3 |
|
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
08 |
40 |
$550.00 |
$382.46 |
$22000.00 |
01-07-2025 |
08-1J3204 |
4 |
|
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
4760 |
$9.00 |
$6.26 |
$42840.00 |
01-23-2025 |
12-0K8704 |
1 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
4760 |
$37.00 |
$25.73 |
$176120.00 |
01-23-2025 |
12-0K8704 |
2 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
4760 |
$153.00 |
$106.39 |
$728280.00 |
01-23-2025 |
12-0K8704 |
3 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
4760 |
$357.60 |
$248.67 |
$1702176.00 |
01-23-2025 |
12-0K8704 |
4 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
4760 |
$55.57 |
$38.64 |
$264513.20 |
01-23-2025 |
12-0K8704 |
5 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
9 |
$1630.00 |
$1169.37 |
$14670.00 |
06-04-2025 |
12-0S5304 |
1 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
9 |
$350.00 |
$251.09 |
$3150.00 |
06-04-2025 |
12-0S5304 |
2 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
9 |
$500.00 |
$358.70 |
$4500.00 |
06-04-2025 |
12-0S5304 |
3 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
9 |
$800.00 |
$573.92 |
$7200.00 |
06-04-2025 |
12-0S5304 |
4 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
9 |
$1200.00 |
$860.89 |
$10800.00 |
06-04-2025 |
12-0S5304 |
5 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
9 |
$859.44 |
$616.57 |
$7734.96 |
06-04-2025 |
12-0S5304 |
6 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
9 |
$525.00 |
$376.64 |
$4725.00 |
06-04-2025 |
12-0S5304 |
7 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
11 |
14400 |
$30.00 |
$26.38 |
$432000.00 |
08-14-2025 |
11-430234 |
1 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
11 |
14400 |
$51.25 |
$45.07 |
$738000.00 |
08-14-2025 |
11-430234 |
2 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
11 |
14400 |
$19.00 |
$16.71 |
$273600.00 |
08-14-2025 |
11-430234 |
3 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
1470 |
$85.00 |
$74.75 |
$124950.00 |
09-04-2025 |
12-0M9704 |
1 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
1470 |
$36.00 |
$31.66 |
$52920.00 |
09-04-2025 |
12-0M9704 |
2 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
1470 |
$95.00 |
$83.54 |
$139650.00 |
09-04-2025 |
12-0M9704 |
3 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
1470 |
$26.05 |
$22.91 |
$38293.50 |
09-04-2025 |
12-0M9704 |
4 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
1470 |
$50.00 |
$43.97 |
$73500.00 |
09-04-2025 |
12-0M9704 |
5 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
1470 |
$100.00 |
$87.94 |
$147000.00 |
09-04-2025 |
12-0M9704 |
6 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
1470 |
$33.17 |
$29.17 |
$48759.90 |
09-04-2025 |
12-0M9704 |
7 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
05 |
3980 |
$104.00 |
$101.76 |
$413920.00 |
12-17-2025 |
05-0N7064 |
1 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
06 |
3070 |
$13.00 |
$12.72 |
$39910.00 |
12-18-2025 |
06-0Y4104 |
1 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
06 |
3070 |
$30.00 |
$29.35 |
$92100.00 |
12-18-2025 |
06-0Y4104 |
2 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
06 |
3070 |
$14.00 |
$13.70 |
$42980.00 |
12-18-2025 |
06-0Y4104 |
3 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
06 |
3070 |
$10.00 |
$9.78 |
$30700.00 |
12-18-2025 |
06-0Y4104 |
4 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
06 |
3070 |
$35.00 |
$34.25 |
$107450.00 |
12-18-2025 |
06-0Y4104 |
5 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
6720 |
$59.00 |
$59.00 |
$396480.00 |
10-22-2026 |
12-0K9824 |
1 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
6720 |
$40.00 |
$40.00 |
$268800.00 |
10-22-2026 |
12-0K9824 |
2 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
6720 |
$21.60 |
$21.60 |
$145152.00 |
10-22-2026 |
12-0K9824 |
3 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
6720 |
$36.30 |
$36.30 |
$243936.00 |
10-22-2026 |
12-0K9824 |
4 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
6720 |
$55.00 |
$55.00 |
$369600.00 |
10-22-2026 |
12-0K9824 |
5 |
M |
TRO |
|
| 190163 - ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD) |
CY |
12 |
6720 |
$58.00 |
$58.00 |
$389760.00 |
10-22-2026 |
12-0K9824 |
6 |
M |
TRO |