192020 - STRUCTURE EXCAVATION (TYPE D) CY 07 6330 $70.00 $416.96 $443100.00 01-14-1993 07-067044 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 11 2680 $111.00 $661.17 $297480.00 01-14-1993 11-189154 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 07 90 $50.00 $297.83 $4500.00 02-04-1993 07-110204 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 02 420 $200.00 $1191.30 $84000.00 02-17-1993 02-224264 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 04 120 $325.00 $1935.86 $39000.00 03-09-1993 04-437654 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 02 3320 $30.00 $178.70 $99600.00 03-17-1993 02-251424 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 02 278 $150.00 $893.48 $41700.00 06-02-1993 02-134954 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 06 2880 $35.00 $208.48 $100800.00 06-23-1993 06-281104 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 07 1290 $39.00 $232.30 $50310.00 11-18-1993 07-110334 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 04 2168 $20.00 $119.13 $43360.00 12-01-1993 04-192224 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 07 2200 $31.00 $184.65 $68200.00 12-02-1993 07-107334 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 05 190 $46.00 $274.00 $8740.00 12-07-1993 05-390204 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 01 674 $100.00 $595.65 $67400.00 12-14-1993 01-228804 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 04 3597 $20.00 $119.13 $71940.00 12-15-1993 04-192284 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 02 547 $93.00 $504.71 $50871.00 01-12-1994 02-252004 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 07 3035 $8.00 $43.42 $24280.00 01-13-1994 07-103344 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 01 4500 $50.00 $271.35 $225000.00 01-19-1994 01-210514 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 05 391 $100.00 $542.70 $39100.00 01-26-1994 05-339204 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 06 2302 $26.50 $143.82 $61003.00 02-01-1994 06-339704 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 12 96 $20.00 $108.54 $1920.00 02-24-1994 12-036204 1    
192020 - STRUCTURE EXCAVATION (TYPE D) CY 03 360 $60.00 $325.62 $21600.00 03-01-1994 03-314904 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 03 790 $20.00 $108.54 $15800.00 03-16-1994 03-362004 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 04 80 $300.00 $1628.11 $24000.00 03-16-1994 04-130864 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 10 695 $29.20 $158.47 $20294.00 03-23-1994 10-336404 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 11 385 $50.60 $274.61 $19481.00 03-24-1994 11-094794 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 01 62 $400.00 $2170.81 $24800.00 03-29-1994 01-293804 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 01 328 $100.00 $542.70 $32800.00 04-05-1994 01-287304 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 12 17 $500.00 $2713.52 $8500.00 04-07-1994 12-107224 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 04 1479 $180.00 $976.87 $266220.00 05-18-1994 04-133054 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 07 566 $95.00 $515.57 $53770.00 05-26-1994 07-119824 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 03 240 $250.00 $1356.76 $60000.00 06-01-1994 03-314914 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 01 126 $300.00 $1628.11 $37800.00 06-15-1994 01-313904 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 10 180 $45.00 $244.22 $8100.00 06-15-1994 10-339404 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 04 117 $250.00 $1356.76 $29250.00 06-28-1994 04-134954 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 04 108 $300.00 $1628.11 $32400.00 06-29-1994 04-121774 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 12 680 $90.00 $488.43 $61200.00 07-07-1994 12-031814 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 12 180 $70.00 $379.89 $12600.00 07-14-1994 12-009704 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 07 900 $40.00 $217.08 $36000.00 07-28-1994 07-132704 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 04 750 $60.00 $325.62 $45000.00 08-23-1994 04-144504 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 10 624 $100.00 $542.70 $62400.00 08-30-1994 10-3169U4 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 10 1040 $50.00 $271.35 $52000.00 09-07-1994 10-373104 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 04 10220 $29.00 $157.38 $296380.00 10-04-1994 04-133354 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 04 117 $79.00 $428.74 $9243.00 10-25-1994 04-134954 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 06 8600 $5.00 $27.14 $43000.00 11-02-1994 06-301014 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 05 459 $50.00 $271.35 $22950.00 11-08-1994 05-351204 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 04 220 $200.00 $1085.41 $44000.00 12-07-1994 04-133314 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 04 5490 $72.00 $390.75 $395280.00 12-07-1994 04-145704 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 04 2620 $50.00 $271.35 $131000.00 12-12-1994 04-141104 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 04 6420 $30.00 $162.81 $192600.00 12-13-1994 04-192204 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 11 14570 $30.00 $162.81 $437100.00 12-15-1994 11-050024 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 02 859 $65.00 $373.51 $55835.00 02-07-1995 02-2242V4 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 04 19905 $130.00 $747.02 $2587650.00 02-08-1995 04-192234 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 09 810 $40.00 $229.85 $32400.00 02-15-1995 09-221504 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 07 1275 $18.00 $103.43 $22950.00 02-23-1995 07-110294 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 05 626 $400.00 $2298.51 $250400.00 04-01-1995 05-423614 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 04 210870 $1.50 $8.62 $316305.00 04-05-1995 04-192214 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 02 520 $140.00 $804.48 $72800.00 04-11-1995 02-260934 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 07 80 $147.00 $844.70 $11760.00 04-13-1995 07-143604 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 10 595 $43.00 $247.09 $25585.00 04-18-1995 10-351204 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 04 158 $100.00 $574.63 $15800.00 05-02-1995 04-1922M4 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 07 108 $37.00 $212.61 $3996.00 05-04-1995 07-149404 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 04 630 $80.00 $459.70 $50400.00 05-09-1995 04-437864 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 01 713 $97.00 $557.39 $69161.00 07-12-1995 01-302104 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 04 7180 $75.00 $430.97 $538500.00 07-12-1995 04-192244 1    
192020 - STRUCTURE EXCAVATION (TYPE D) CY 04 7180 $75.00 $430.97 $538500.00 07-12-1995 04-192244 1    
192020 - STRUCTURE EXCAVATION (TYPE D) CY 04 14690 $96.00 $551.64 $1410240.00 07-12-1995 04-192244 1    
192020 - STRUCTURE EXCAVATION (TYPE D) CY 04 14690 $96.00 $551.64 $1410240.00 07-12-1995 04-192244 1    
192020 - STRUCTURE EXCAVATION (TYPE D) CY 04 750 $180.00 $1034.33 $135000.00 07-25-1995 04-141024 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 04 3580 $100.00 $574.63 $358000.00 08-08-1995 04-043434 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 04 576 $30.00 $172.39 $17280.00 08-22-1995 04-377214 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 07 10145 $85.00 $488.43 $862325.00 11-02-1995 07-116204 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 04 398 $400.00 $2298.51 $159200.00 11-28-1995 04-131534 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 07 215 $45.00 $258.58 $9675.00 12-14-1995 07-163804 1    
192020 - STRUCTURE EXCAVATION (TYPE D) CY 06 32 $44.00 $251.85 $1408.00 01-03-1996 06-318424 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 09 22 $40.00 $228.95 $880.00 01-09-1996 09-271904 1    
192020 - STRUCTURE EXCAVATION (TYPE D) CY 01 310 $105.00 $601.00 $32550.00 01-30-1996 01-200474 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 06 440 $40.00 $228.95 $17600.00 02-06-1996 06-3595U4 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 04 1384 $30.00 $171.71 $41520.00 02-14-1996 04-192254 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 07 235 $32.45 $185.74 $7625.75 02-22-1996 07-066134 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 07 682 $100.00 $572.38 $68200.00 03-14-1996 07-149524 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 03 465 $250.00 $1430.96 $116250.00 04-02-1996 03-353204 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 04 627 $50.00 $286.19 $31350.00 04-30-1996 04-289714 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 02 860 $120.00 $686.86 $103200.00 05-07-1996 02-305614 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 04 257 $50.00 $286.19 $12850.00 05-08-1996 04-228294 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 11 1330 $20.70 $118.48 $27531.00 05-09-1996 11-010384 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 01 38 $62.00 $354.88 $2356.00 05-21-1996 01-329104 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 10 780 $32.80 $187.74 $25584.00 05-21-1996 10-478904 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 02 1100 $96.50 $552.35 $106150.00 06-04-1996 02-305504 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 10 1495 $30.00 $171.71 $44850.00 06-05-1996 10-438414 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 01 59 $550.00 $3148.11 $32450.00 06-11-1996 01-329804 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 04 100 $80.00 $457.91 $8000.00 06-11-1996 04-1492U4 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 07 532 $60.00 $343.43 $31920.00 06-13-1996 07-161704 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 01 45 $275.00 $1574.05 $12375.00 06-18-1996 01-329004 1    
192020 - STRUCTURE EXCAVATION (TYPE D) CY 01 16 $137.00 $784.16 $2192.00 07-02-1996 01-328704 1    
192020 - STRUCTURE EXCAVATION (TYPE D) CY 01 129 $100.00 $572.38 $12900.00 07-16-1996 01-328814 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 04 117 $150.00 $858.57 $17550.00 07-24-1996 04-134954 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 11 125 $25.00 $143.10 $3125.00 08-01-1996 11-206704 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 01 120 $70.00 $400.67 $8400.00 08-21-1996 01-297304 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 12 493 $140.00 $801.34 $69020.00 09-05-1996 12-0084U4 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 01 252 $82.00 $469.35 $20664.00 09-10-1996 01-328304 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 01 555 $200.00 $1144.77 $111000.00 09-18-1996 01-329824 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 08 68 $120.00 $686.86 $8160.00 09-19-1996 08-413804 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 08 1340 $18.00 $103.03 $24120.00 09-26-1996 08-200104 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 11 135 $587.00 $3359.89 $79245.00 09-26-1996 11-184954 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 04 395 $24.00 $137.37 $9480.00 10-01-1996 04-233334 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 03 1170 $180.00 $1030.29 $210600.00 10-02-1996 03-314404 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 11 508 $50.00 $286.19 $25400.00 10-10-1996 11-194834 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 11 280 $10.00 $57.24 $2800.00 10-17-1996 11-206904 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 04 5100 $145.00 $829.96 $739500.00 10-23-1996 04-133364 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 04 197 $30.00 $171.71 $5910.00 10-23-1996 04-149114 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 01 620 $80.00 $457.91 $49600.00 10-29-1996 01-305504 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 01 3060 $80.00 $457.91 $244800.00 10-30-1996 01-317804 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 10 6750 $50.00 $286.19 $337500.00 10-30-1996 10-446704 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 07 7 $200.00 $1144.77 $1400.00 11-14-1996 07-162404 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 04 43 $200.00 $1144.77 $8600.00 11-19-1996 04-149614 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 05 650 $65.00 $372.05 $42250.00 11-20-1996 05-414004 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 07 85 $65.00 $372.05 $5525.00 11-22-1996 07-164704 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 04 170 $308.00 $1762.94 $52360.00 12-03-1996 04-144904 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 05 243 $60.00 $343.43 $14580.00 12-10-1996 05-414804 1    
192020 - STRUCTURE EXCAVATION (TYPE D) CY 04 664 $50.00 $286.19 $33200.00 12-17-1996 04-149304 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 05 913 $57.00 $326.26 $52041.00 12-17-1996 05-413604 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 04 725 $85.00 $486.53 $61625.00 12-18-1996 04-133244 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 05 294 $220.00 $1259.24 $64680.00 12-18-1996 05-415004 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 10 1138 $170.00 $973.05 $193460.00 12-18-1996 10-478714 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 03 363 $75.00 $411.60 $27225.00 01-14-1997 03-428004 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 05 161 $140.00 $768.32 $22540.00 02-19-1997 05-413714 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 05 359 $90.00 $493.92 $32310.00 03-11-1997 05-413724 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 05 42 $60.00 $329.28 $2520.00 04-29-1997 05-453404 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 05 1345 $50.00 $274.40 $67250.00 04-30-1997 05-414204 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 02 40 $300.00 $1646.40 $12000.00 05-14-1997 02-334004 1    
192020 - STRUCTURE EXCAVATION (TYPE D) CY 05 3085 $55.00 $301.84 $169675.00 06-24-1997 05-444434 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 05 1495 $99.60 $546.61 $148902.00 07-08-1997 05-442014 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 05 1895 $52.00 $285.38 $98540.00 07-08-1997 05-444454 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 04 4190 $70.00 $384.16 $293300.00 10-15-1997 04-180154 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 04 10200 $100.00 $548.80 $1020000.00 11-04-1997 04-0436V4 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 10 7 $500.00 $2744.01 $3500.00 12-29-1997 10-1A9004 1    
192020 - STRUCTURE EXCAVATION (TYPE D) CY 05 1270 $40.00 $209.33 $50800.00 03-31-1998 05-391534 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 4630 $65.00 $340.16 $300950.00 05-20-1998 04-228354 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 04 19000 $35.00 $183.16 $665000.00 05-27-1998 04-233924 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 06 63 $132.62 $694.03 $8355.06 06-16-1998 06-336004 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 06 245 $60.00 $313.99 $14700.00 08-25-1998 06-359534 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 2170 $70.00 $366.32 $151900.00 09-02-1998 04-438614 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 08 530 $50.00 $261.66 $26500.00 09-17-1998 08-352704 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 07 110 $400.00 $2093.29 $44000.00 09-24-1998 07-171704 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 02 289 $125.00 $654.15 $36125.00 09-30-1998 02-277504 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 10 614 $70.00 $366.32 $42980.00 10-06-1998 10-0437U4 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 05 54 $500.00 $2616.61 $27000.00 12-01-1998 05-3090U4 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 460 $28.00 $146.53 $12880.00 12-15-1998 04-0T0604 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 11 30 $300.00 $1465.30 $9000.00 01-07-1999 11-050914 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 06 92 $350.00 $1709.52 $32200.00 01-27-1999 06-318314 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 02 131 $110.00 $537.28 $14410.00 04-06-1999 02-288524 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 06 80 $300.00 $1465.30 $24000.00 05-26-1999 06-359124 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 05 520 $15.00 $73.27 $7800.00 06-08-1999 05-478504 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 12 32 $80.00 $390.75 $2560.00 06-24-1999 12-0678U4 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 02 647 $200.00 $976.87 $129400.00 08-17-1999 02-251454 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 02 11 $6000.00 $29306.00 $66000.00 08-24-1999 02-295914 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 07 495 $55.00 $268.64 $27225.00 09-16-1999 07-120324 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 12 310 $52.00 $253.99 $16120.00 12-09-1999 12-0A6704 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 180 $100.00 $488.43 $18000.00 12-15-1999 04-0T04U4 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 345 $130.00 $616.47 $44850.00 01-11-2000 04-013014 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 5066 $100.00 $474.21 $506600.00 01-12-2000 04-4874Q4 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 1100 $50.00 $237.10 $55000.00 02-02-2000 04-129324 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 181 $100.00 $474.21 $18100.00 02-02-2000 04-228924 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 04 1050 $400.00 $1896.83 $420000.00 02-16-2000 04-4401U4 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 05 12 $300.00 $1422.62 $3600.00 04-12-2000 05-390404 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 06 5 $2000.00 $9484.14 $10000.00 04-12-2000 06-338624 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 07 274 $22.00 $104.33 $6028.00 04-20-2000 07-103354 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 06 165 $400.00 $1896.83 $66000.00 05-02-2000 06-353904 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 02 380 $100.00 $474.21 $38000.00 05-23-2000 02-270844 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 04 164 $57.00 $270.30 $9348.00 05-24-2000 04-440134 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 12 150 $75.00 $355.66 $11250.00 05-25-2000 12-071304 1    
192020 - STRUCTURE EXCAVATION (TYPE D) M3 08 720 $150.00 $711.31 $108000.00 06-08-2000 08-3564U4 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 585 $85.00 $403.08 $49725.00 06-13-2000 04-212004 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 01 12 $250.00 $1185.52 $3000.00 08-15-2000 01-380204 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 10 1310 $40.00 $189.68 $52400.00 08-29-2000 10-0A9604 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 12 232 $135.00 $640.18 $31320.00 10-20-2000 12-087704 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 10 4 $2800.00 $13277.80 $11200.00 10-24-2000 10-352404 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 8748 $35.00 $165.97 $306180.00 11-15-2000 04-013054 1 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 07 320 $30.00 $142.26 $9600.00 12-06-2000 07-117044 1 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 53 $1000.00 $4374.03 $53000.00 01-09-2001 04-235724 1 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 09 90 $300.00 $1312.21 $27000.00 01-09-2001 09-214114 1   TRO
192020 - STRUCTURE EXCAVATION (TYPE D) CY 05 105 $395.00 $1727.74 $41475.00 01-17-2001 05-444464 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 02 1650 $100.00 $437.40 $165000.00 01-23-2001 02-260124 1 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 127 $560.00 $2449.46 $71120.00 01-31-2001 04-2724U4 1 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 09 665 $56.89 $248.84 $37831.85 02-21-2001 09-279704 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 10 1640 $250.00 $1093.51 $410000.00 05-02-2001 10-3404U4 1 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 10 94 $140.00 $612.36 $13160.00 06-19-2001 10-2A2804 1    
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 1030 $600.00 $2624.42 $618000.00 09-26-2001 04-006034 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 113 $50.00 $218.70 $5650.00 10-16-2001 04-4C0204 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) CY 07 4740 $15.00 $65.61 $71100.00 11-01-2001 07-1069U4 1 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 07 130 $450.00 $1968.31 $58500.00 11-01-2001 07-201304 1 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 1480 $375.00 $1640.26 $555000.00 11-14-2001 04-006064 1 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 07 7 $600.00 $2624.42 $4200.00 11-15-2001 07-1760U4 1 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 3170 $400.00 $1749.61 $1268000.00 12-12-2001 04-120614 1 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 22 $100.00 $437.40 $2200.00 12-12-2001 04-226124 1 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 02 120 $150.00 $709.02 $18000.00 01-15-2002 02-351904 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 02 120 $600.00 $2836.06 $72000.00 01-15-2002 02-351904 2 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 02 120 $1130.00 $5341.25 $135600.00 01-15-2002 02-351904 3 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 02 120 $162.00 $765.74 $19440.00 01-15-2002 02-351904 4 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 02 120 $1500.00 $7090.16 $180000.00 01-15-2002 02-351904 5 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 02 120 $550.00 $2599.73 $66000.00 01-15-2002 02-351904 6 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 02 120 $600.00 $2836.06 $72000.00 01-15-2002 02-351904 7 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 02 120 $1500.00 $7090.16 $180000.00 01-15-2002 02-351904 8 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 11 108 $175.00 $827.19 $18900.00 01-24-2002 11-0301U4 1 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 11 108 $150.00 $709.02 $16200.00 01-24-2002 11-0301U4 2 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 11 108 $1300.00 $6144.81 $140400.00 01-24-2002 11-0301U4 3 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 11 108 $100.00 $472.68 $10800.00 01-24-2002 11-0301U4 4 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 11 108 $80.00 $378.14 $8640.00 01-24-2002 11-0301U4 5 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 11 108 $150.00 $709.02 $16200.00 01-24-2002 11-0301U4 6 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 08 200 $225.00 $1063.52 $45000.00 02-07-2002 08-439314 1 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 08 200 $18.50 $87.45 $3700.00 02-07-2002 08-439314 2 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 08 200 $40.00 $189.07 $8000.00 02-07-2002 08-439314 3 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 08 200 $50.00 $236.34 $10000.00 02-07-2002 08-439314 4 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 08 200 $100.00 $472.68 $20000.00 02-07-2002 08-439314 5 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 08 200 $65.00 $307.24 $13000.00 02-07-2002 08-439314 6 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) CY 04 111 $75.00 $354.51 $8325.00 02-26-2002 04-440144 1 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) CY 04 111 $9.65 $45.61 $1071.15 02-26-2002 04-440144 2 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) CY 04 111 $600.00 $2836.06 $66600.00 02-26-2002 04-440144 3 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 07 3030 $150.00 $709.02 $454500.00 03-28-2002 07-0607U4 1 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 07 3030 $200.00 $945.35 $606000.00 03-28-2002 07-0607U4 2 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 07 3030 $65.00 $307.24 $196950.00 03-28-2002 07-0607U4 3 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 07 3030 $81.00 $382.87 $245430.00 03-28-2002 07-0607U4 4 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 07 3030 $600.00 $2836.06 $1818000.00 03-28-2002 07-0607U4 5 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 07 3030 $69.00 $326.15 $209070.00 03-28-2002 07-0607U4 6 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 07 3030 $815.00 $3852.32 $2469450.00 03-28-2002 07-0607U4 7 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 07 3030 $235.00 $1110.79 $712050.00 03-28-2002 07-0607U4 8 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 02 68 $100.00 $472.68 $6800.00 04-17-2002 02-344204 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 02 45 $600.00 $2836.06 $27000.00 05-29-2002 02-3016U4 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 02 45 $1050.00 $4963.11 $47250.00 05-29-2002 02-3016U4 2 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 02 45 $500.00 $2363.39 $22500.00 05-29-2002 02-3016U4 3 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 02 45 $300.00 $1418.03 $13500.00 05-29-2002 02-3016U4 4 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 02 45 $600.00 $2836.06 $27000.00 05-29-2002 02-3016U4 5 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 11 3160 $9.00 $42.54 $28440.00 06-20-2002 11-172824 1 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 11 3160 $30.00 $141.80 $94800.00 06-20-2002 11-172824 2 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 11 3160 $55.00 $259.97 $173800.00 06-20-2002 11-172824 3 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 11 3160 $70.00 $330.87 $221200.00 06-20-2002 11-172824 4 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 11 3160 $35.00 $165.44 $110600.00 06-20-2002 11-172824 5 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 11 3160 $40.00 $189.07 $126400.00 06-20-2002 11-172824 6 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 11 3160 $6.00 $28.36 $18960.00 06-20-2002 11-172824 7 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 03 280 $1020.00 $4821.31 $285600.00 08-06-2002 03-402304 1 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 03 280 $650.00 $3072.40 $182000.00 08-06-2002 03-402304 2 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 03 280 $900.00 $4254.10 $252000.00 08-06-2002 03-402304 3 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 03 280 $1200.00 $5672.13 $336000.00 08-06-2002 03-402304 4 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 03 280 $960.00 $4537.70 $268800.00 08-06-2002 03-402304 5 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 06 89 $300.00 $1418.03 $26700.00 09-04-2002 06-343534 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 06 89 $564.20 $2666.85 $50213.80 09-04-2002 06-343534 2 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 06 89 $65.00 $307.24 $5785.00 09-04-2002 06-343534 3 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 06 89 $75.00 $354.51 $6675.00 09-04-2002 06-343534 4 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 06 89 $500.00 $2363.39 $44500.00 09-04-2002 06-343534 5 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 07 209 $57.42 $271.41 $12000.78 09-05-2002 07-1X1404 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 07 209 $97.00 $458.50 $20273.00 09-05-2002 07-1X1404 2 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 07 209 $175.00 $827.19 $36575.00 09-05-2002 07-1X1404 3 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 07 209 $100.00 $472.68 $20900.00 09-05-2002 07-1X1404 4 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 07 209 $1900.00 $8980.87 $397100.00 09-05-2002 07-1X1404 5 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 03 435 $110.00 $519.95 $47850.00 09-10-2002 03-367714 1 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 03 435 $93.00 $439.59 $40455.00 09-10-2002 03-367714 2 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 03 435 $100.00 $472.68 $43500.00 09-10-2002 03-367714 3 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 08 232 $20.00 $94.54 $4640.00 09-19-2002 08-428144 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 08 232 $86.25 $407.68 $20010.00 09-19-2002 08-428144 2 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 08 232 $474.14 $2241.15 $110000.48 09-19-2002 08-428144 3 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 08 232 $20.00 $94.54 $4640.00 09-19-2002 08-428144 4 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 12 176 $50.00 $236.34 $8800.00 11-07-2002 12-1072U4 1 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 12 176 $50.00 $236.34 $8800.00 11-07-2002 12-1072U4 2 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 12 176 $14.00 $66.17 $2464.00 11-07-2002 12-1072U4 3 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 12 176 $30.00 $141.80 $5280.00 11-07-2002 12-1072U4 4 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 12 176 $9.00 $42.54 $1584.00 11-07-2002 12-1072U4 5 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 12 176 $210.00 $992.62 $36960.00 11-07-2002 12-1072U4 6 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 12 176 $180.00 $850.82 $31680.00 11-07-2002 12-1072U4 7 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 4924 $80.00 $378.14 $393920.00 11-13-2002 04-0T1444 1 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 4924 $160.00 $756.28 $787840.00 11-13-2002 04-0T1444 2 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 4924 $300.00 $1418.03 $1477200.00 11-13-2002 04-0T1444 3 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 4924 $280.00 $1323.50 $1378720.00 11-13-2002 04-0T1444 4 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 4924 $140.00 $661.75 $689360.00 11-13-2002 04-0T1444 5 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 11 26 $150.00 $709.02 $3900.00 11-14-2002 11-2348U4 1 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 11 26 $400.00 $1890.71 $10400.00 11-14-2002 11-2348U4 2 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 11 26 $310.00 $1465.30 $8060.00 11-14-2002 11-2348U4 3 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 11 26 $150.00 $709.02 $3900.00 11-14-2002 11-2348U4 4 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 11 26 $580.00 $2741.53 $15080.00 11-14-2002 11-2348U4 5 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 11 26 $300.00 $1418.03 $7800.00 11-14-2002 11-2348U4 6 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 01 351 $300.00 $1418.03 $105300.00 12-03-2002 01-310504 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 01 351 $988.00 $4670.05 $346788.00 12-03-2002 01-310504 2 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 01 351 $750.00 $3545.08 $263250.00 12-03-2002 01-310504 3 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 01 351 $138.00 $652.29 $48438.00 12-03-2002 01-310504 4 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 01 351 $1700.00 $8035.52 $596700.00 12-03-2002 01-310504 5 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 06 32 $130.00 $614.48 $4160.00 12-03-2002 06-410104 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 06 32 $150.00 $709.02 $4800.00 12-03-2002 06-410104 2 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 06 32 $45.00 $212.70 $1440.00 12-03-2002 06-410104 3 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 06 32 $15.00 $70.90 $480.00 12-03-2002 06-410104 4 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 06 32 $73.00 $345.05 $2336.00 12-03-2002 06-410104 5 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 06 32 $43.00 $203.25 $1376.00 12-03-2002 06-410104 6 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 06 32 $50.00 $236.34 $1600.00 12-03-2002 06-410104 7 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 06 32 $90.00 $425.41 $2880.00 12-03-2002 06-410104 8 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 06 32 $140.00 $661.75 $4480.00 12-03-2002 06-410104 9 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 06 32 $80.00 $378.14 $2560.00 12-03-2002 06-410104 10 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 06 32 $40.00 $189.07 $1280.00 12-03-2002 06-410104 11 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 06 32 $82.00 $387.60 $2624.00 12-03-2002 06-410104 12 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 06 32 $215.00 $1016.26 $6880.00 12-03-2002 06-410104 13 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 06 32 $100.00 $472.68 $3200.00 12-03-2002 06-410104 14 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 06 32 $200.00 $945.35 $6400.00 12-03-2002 06-410104 15 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 06 32 $33.00 $155.98 $1056.00 12-03-2002 06-410104 16 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 06 32 $365.00 $1725.27 $11680.00 12-03-2002 06-410104 17 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 06 32 $300.00 $1418.03 $9600.00 12-03-2002 06-410104 18 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 06 32 $113.00 $534.13 $3616.00 12-03-2002 06-410104 19 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 06 32 $292.47 $1382.44 $9359.04 12-03-2002 06-410104 20 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 02 243 $250.00 $1120.26 $60750.00 01-07-2003 02-295934 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 5835 $25.00 $112.03 $145875.00 01-14-2003 04-253804 1 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 01 225 $225.00 $1008.23 $50625.00 01-22-2003 01-296704 1 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 08 325 $125.00 $560.13 $40625.00 01-30-2003 08-483754 1 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 945 $250.00 $1120.26 $236250.00 05-14-2003 04-146704 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 06 21 $150.00 $672.16 $3150.00 08-27-2003 06-398104 1 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 06 21 $25.00 $112.03 $525.00 08-27-2003 06-398104 2 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 06 21 $110.00 $492.91 $2310.00 08-27-2003 06-398104 3 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 06 21 $100.00 $448.10 $2100.00 08-27-2003 06-398104 4 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 07 111 $100.00 $448.10 $11100.00 09-04-2003 07-002594 1 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 07 111 $600.00 $2688.62 $66600.00 09-04-2003 07-002594 2 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 07 111 $100.00 $448.10 $11100.00 09-04-2003 07-002594 3 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 07 111 $75.00 $336.08 $8325.00 09-04-2003 07-002594 4 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 07 111 $410.00 $1837.23 $45510.00 09-04-2003 07-002594 5 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 197 $500.00 $2240.52 $98500.00 09-10-2003 04-487604 1 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 197 $700.00 $3136.73 $137900.00 09-10-2003 04-487604 2 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 197 $400.00 $1792.42 $78800.00 09-10-2003 04-487604 3 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 197 $300.00 $1344.31 $59100.00 09-10-2003 04-487604 4 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 197 $1800.00 $8065.87 $354600.00 09-10-2003 04-487604 5 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 197 $650.00 $2912.68 $128050.00 09-10-2003 04-487604 6 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 197 $200.00 $896.21 $39400.00 09-10-2003 04-487604 7 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 197 $700.00 $3136.73 $137900.00 09-10-2003 04-487604 8 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 95 $300.00 $1344.31 $28500.00 11-05-2003 04-0T16U4 1 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 95 $23.00 $103.06 $2185.00 11-05-2003 04-0T16U4 2 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 95 $306.00 $1371.20 $29070.00 11-05-2003 04-0T16U4 3 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 95 $400.00 $1792.42 $38000.00 11-05-2003 04-0T16U4 4 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 95 $300.00 $1344.31 $28500.00 11-05-2003 04-0T16U4 5 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 95 $300.00 $1344.31 $28500.00 11-05-2003 04-0T16U4 6 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 95 $100.00 $448.10 $9500.00 11-05-2003 04-0T16U4 7 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 95 $250.00 $1120.26 $23750.00 11-05-2003 04-0T16U4 8 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 95 $33.00 $147.87 $3135.00 11-05-2003 04-0T16U4 9 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 95 $300.00 $1344.31 $28500.00 11-05-2003 04-0T16U4 10 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 95 $500.00 $2240.52 $47500.00 11-05-2003 04-0T16U4 11 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 07 104 $250.00 $1120.26 $26000.00 11-06-2003 07-066334 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 07 104 $600.00 $2688.62 $62400.00 11-06-2003 07-066334 2 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 11 707 $20.00 $89.62 $14140.00 11-20-2003 11-068004 1 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 11 707 $30.00 $134.43 $21210.00 11-20-2003 11-068004 2 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 11 707 $62.00 $277.82 $43834.00 11-20-2003 11-068004 3 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 11 707 $200.00 $896.21 $141400.00 11-20-2003 11-068004 4 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 02 21 $1100.00 $4929.14 $23100.00 12-03-2003 02-327204 1 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 02 21 $3500.00 $15683.64 $73500.00 12-03-2003 02-327204 2 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 02 21 $3500.00 $15683.64 $73500.00 12-03-2003 02-327204 3 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 08 650 $15.00 $67.22 $9750.00 12-04-2003 08-334844 1 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 08 650 $31.00 $138.91 $20150.00 12-04-2003 08-334844 2 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 08 650 $50.00 $224.05 $32500.00 12-04-2003 08-334844 3 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 08 650 $20.00 $89.62 $13000.00 12-04-2003 08-334844 4 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 306 $135.00 $399.63 $41310.00 01-07-2004 04-226134 1 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 306 $2000.00 $5920.40 $612000.00 01-07-2004 04-226134 2 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 306 $1200.00 $3552.24 $367200.00 01-07-2004 04-226134 3 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 306 $1000.00 $2960.20 $306000.00 01-07-2004 04-226134 4 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 306 $200.00 $592.04 $61200.00 01-07-2004 04-226134 5 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 07 1970 $47.70 $141.20 $93969.00 02-19-2004 07-4E2404 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 07 1970 $35.00 $103.61 $68950.00 02-19-2004 07-4E2404 2 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 07 1970 $115.00 $340.42 $226550.00 02-19-2004 07-4E2404 3 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 07 1970 $60.00 $177.61 $118200.00 02-19-2004 07-4E2404 4 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 07 1970 $49.90 $147.71 $98303.00 02-19-2004 07-4E2404 5 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 07 1970 $70.00 $207.21 $137900.00 02-19-2004 07-4E2404 6 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 07 1970 $53.00 $156.89 $104410.00 02-19-2004 07-4E2404 7 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 07 1970 $126.50 $374.47 $249205.00 02-19-2004 07-4E2404 8 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 07 1970 $60.00 $177.61 $118200.00 02-19-2004 07-4E2404 9 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 07 1970 $103.00 $304.90 $202910.00 02-19-2004 07-4E2404 10 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 02 25 $450.00 $1332.09 $11250.00 05-05-2004 02-354804 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 02 25 $900.00 $2664.18 $22500.00 05-05-2004 02-354804 2 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 02 25 $1500.00 $4440.30 $37500.00 05-05-2004 02-354804 3 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 300 $60.00 $177.61 $18000.00 05-19-2004 04-276004 1 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 300 $74.50 $220.54 $22350.00 05-19-2004 04-276004 2 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 300 $130.00 $384.83 $39000.00 05-19-2004 04-276004 3 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 300 $125.00 $370.03 $37500.00 05-19-2004 04-276004 4 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 300 $110.00 $325.62 $33000.00 05-19-2004 04-276004 5 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 02 21 $1600.00 $4736.32 $33600.00 05-25-2004 02-364104 1 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 02 21 $200.00 $592.04 $4200.00 05-25-2004 02-364104 2 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 01 340 $500.00 $1480.10 $170000.00 06-02-2004 01-311714 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 01 340 $300.00 $888.06 $102000.00 06-02-2004 01-311714 2 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 01 340 $300.00 $888.06 $102000.00 06-02-2004 01-311714 3 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 01 34 $3850.00 $11396.78 $130900.00 06-09-2004 01-293134 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 01 34 $2100.00 $6216.42 $71400.00 06-09-2004 01-293134 2 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 12920 $38.00 $112.49 $490960.00 06-09-2004 04-2332U4 1 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 12920 $80.00 $236.82 $1033600.00 06-09-2004 04-2332U4 2 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 12920 $75.00 $222.02 $969000.00 06-09-2004 04-2332U4 3 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 12920 $400.00 $1184.08 $5168000.00 06-09-2004 04-2332U4 4 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 12920 $75.00 $222.02 $969000.00 06-09-2004 04-2332U4 5 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 11 3325 $115.00 $340.42 $382375.00 06-10-2004 11-080914 1 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 11 3325 $60.00 $177.61 $199500.00 06-10-2004 11-080914 2 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 11 3325 $50.00 $148.01 $166250.00 06-10-2004 11-080914 3 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 11 3325 $120.00 $355.22 $399000.00 06-10-2004 11-080914 4 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 11 3325 $30.00 $88.81 $99750.00 06-10-2004 11-080914 5 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 11 254 $280.00 $828.86 $71120.00 08-05-2004 11-080924 1 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 12920 $38.00 $112.49 $490960.00 10-13-2004 04-2332U4 1 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 12920 $295.00 $873.26 $3811400.00 10-13-2004 04-2332U4 2 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 12920 $70.00 $207.21 $904400.00 10-13-2004 04-2332U4 3 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 12920 $75.00 $222.02 $969000.00 10-13-2004 04-2332U4 4 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 12920 $65.00 $192.41 $839800.00 10-13-2004 04-2332U4 5 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 11 127 $110.00 $325.62 $13970.00 12-09-2004 11-257104 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 11 127 $47.00 $139.13 $5969.00 12-09-2004 11-257104 2 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 11 127 $152.00 $449.95 $19304.00 12-09-2004 11-257104 3 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 11 127 $40.00 $118.41 $5080.00 12-09-2004 11-257104 4 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 11 127 $500.00 $1480.10 $63500.00 12-09-2004 11-257104 5 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 11 127 $175.00 $518.04 $22225.00 12-09-2004 11-257104 6 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 07 540 $125.00 $322.47 $67500.00 01-27-2005 07-125204 1 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 07 540 $21.00 $54.17 $11340.00 01-27-2005 07-125204 2 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 07 540 $120.00 $309.57 $64800.00 01-27-2005 07-125204 3 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 07 540 $25.00 $64.49 $13500.00 01-27-2005 07-125204 4 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 07 540 $63.00 $162.52 $34020.00 01-27-2005 07-125204 5 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 07 540 $90.00 $232.18 $48600.00 01-27-2005 07-125204 6 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 08 190 $85.00 $219.28 $16150.00 02-24-2005 08-358424 2 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 08 190 $115.00 $296.67 $21850.00 02-24-2005 08-358424 3 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 11 910 $80.00 $206.38 $72800.00 03-03-2005 11-080934 1 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 11 910 $100.00 $257.98 $91000.00 03-03-2005 11-080934 2 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 11 910 $30.00 $77.39 $27300.00 03-03-2005 11-080934 3 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 11 910 $20.00 $51.60 $18200.00 03-03-2005 11-080934 4 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 10 380 $100.00 $257.98 $38000.00 03-08-2005 10-0A8504 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 10 380 $350.00 $902.91 $133000.00 03-08-2005 10-0A8504 2 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 10 380 $800.00 $2063.80 $304000.00 03-08-2005 10-0A8504 3 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 10 380 $350.00 $902.91 $133000.00 03-08-2005 10-0A8504 4 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 10 380 $300.00 $773.93 $114000.00 03-08-2005 10-0A8504 5 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 10 380 $950.00 $2450.77 $361000.00 03-08-2005 10-0A8504 6 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 01 34 $5000.00 $12898.77 $170000.00 05-03-2005 01-293134 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 02 200 $200.00 $515.95 $40000.00 05-24-2005 02-310404 1 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 02 200 $320.00 $825.52 $64000.00 05-24-2005 02-310404 2 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 02 200 $130.00 $335.37 $26000.00 05-24-2005 02-310404 3 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 08 305 $75.00 $193.48 $22875.00 07-07-2005 08-449704 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 08 305 $75.00 $193.48 $22875.00 07-07-2005 08-449704 2 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 08 305 $200.00 $515.95 $61000.00 07-07-2005 08-449704 3 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 08 305 $65.00 $167.68 $19825.00 07-07-2005 08-449704 4 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 11 65 $400.00 $1031.90 $26000.00 09-22-2005 11-066704 1 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 11 65 $600.00 $1547.85 $39000.00 09-22-2005 11-066704 2 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 10 306 $275.00 $709.43 $84150.00 10-05-2005 10-363114 1 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 10 306 $50.00 $128.99 $15300.00 10-05-2005 10-363114 2 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 11 90 $175.00 $451.46 $15750.00 10-27-2005 11-229024 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 11 90 $1000.00 $2579.75 $90000.00 10-27-2005 11-229024 2 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 02 1125 $77.00 $198.64 $86625.00 11-29-2005 02-347104 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 02 1125 $130.00 $335.37 $146250.00 11-29-2005 02-347104 2 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 02 1125 $70.00 $180.58 $78750.00 11-29-2005 02-347104 3 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 02 1125 $42.00 $108.35 $47250.00 11-29-2005 02-347104 4 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 2588 $33.00 $85.13 $85404.00 12-13-2005 04-2261V4 1 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 2588 $110.00 $283.77 $284680.00 12-13-2005 04-2261V4 2 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 2588 $175.00 $451.46 $452900.00 12-13-2005 04-2261V4 3 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 2588 $200.00 $515.95 $517600.00 12-13-2005 04-2261V4 4 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 2588 $33.00 $85.13 $85404.00 12-13-2005 04-2261V4 5 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 02 286 $350.00 $872.20 $100100.00 01-18-2006 02-251474 1 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 02 286 $110.00 $274.12 $31460.00 01-18-2006 02-251474 2 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 02 286 $200.00 $498.40 $57200.00 01-18-2006 02-251474 3 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 02 286 $150.00 $373.80 $42900.00 01-18-2006 02-251474 4 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 02 286 $95.00 $236.74 $27170.00 01-18-2006 02-251474 5 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 02 286 $200.00 $498.40 $57200.00 01-18-2006 02-251474 6 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 10 2 $3000.00 $7476.02 $6000.00 01-31-2006 10-300164 1 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 10 2 $1600.00 $3987.21 $3200.00 01-31-2006 10-300164 2 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 10 2 $300.00 $747.60 $600.00 01-31-2006 10-300164 3 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 10 2 $1000.00 $2492.01 $2000.00 01-31-2006 10-300164 4 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 10 2 $2500.00 $6230.02 $5000.00 01-31-2006 10-300164 5 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 7050 $200.00 $498.40 $1410000.00 02-07-2006 04-1123K4 1 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 7050 $300.00 $747.60 $2115000.00 02-07-2006 04-1123K4 2 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 7050 $480.00 $1196.16 $3384000.00 02-07-2006 04-1123K4 3 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 7050 $200.00 $498.40 $1410000.00 02-07-2006 04-1123K4 4 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 03 1310 $167.00 $416.17 $218770.00 02-08-2006 03-3555U4 1 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 03 1310 $100.00 $249.20 $131000.00 02-08-2006 03-3555U4 2 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 03 1310 $400.00 $996.80 $524000.00 02-08-2006 03-3555U4 3 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 03 1310 $125.00 $311.50 $163750.00 02-08-2006 03-3555U4 4 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 07 132 $1700.00 $4236.41 $224400.00 03-02-2006 07-183114 1 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 170 $400.00 $996.80 $68000.00 03-08-2006 04-228554 1 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 170 $210.00 $523.32 $35700.00 03-08-2006 04-228554 2 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 170 $150.00 $373.80 $25500.00 03-08-2006 04-228554 3 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 170 $250.00 $623.00 $42500.00 03-08-2006 04-228554 4 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 170 $600.00 $1495.20 $102000.00 03-08-2006 04-228554 5 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 170 $300.00 $747.60 $51000.00 03-08-2006 04-228554 6 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 170 $1000.00 $2492.01 $170000.00 03-08-2006 04-228554 7 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 08 186 $120.00 $299.04 $22320.00 03-16-2006 08-358424 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 08 186 $480.00 $1196.16 $89280.00 03-16-2006 08-358424 2 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 08 186 $250.00 $623.00 $46500.00 03-16-2006 08-358424 3 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 140 $75.00 $186.90 $10500.00 04-11-2006 04-2S9404 1 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 140 $550.00 $1370.60 $77000.00 04-11-2006 04-2S9404 2 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 140 $200.00 $498.40 $28000.00 04-11-2006 04-2S9404 3 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 140 $300.00 $747.60 $42000.00 04-11-2006 04-2S9404 4 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 140 $500.00 $1246.00 $70000.00 04-11-2006 04-2S9404 5 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 140 $775.00 $1931.31 $108500.00 04-11-2006 04-2S9404 6 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 140 $2000.00 $4984.01 $280000.00 04-11-2006 04-2S9404 7 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 03 1900 $150.00 $373.80 $285000.00 07-12-2006 03-1A5304 1 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 03 1900 $300.00 $747.60 $570000.00 07-12-2006 03-1A5304 2 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 03 1900 $600.00 $1495.20 $1140000.00 07-12-2006 03-1A5304 3 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 02 560 $400.00 $996.80 $224000.00 08-01-2006 02-311204 1 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 02 560 $155.00 $386.26 $86800.00 08-01-2006 02-311204 2 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 02 560 $220.00 $548.24 $123200.00 08-01-2006 02-311204 3 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 02 560 $366.00 $912.07 $204960.00 08-01-2006 02-311204 4 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 02 560 $400.00 $996.80 $224000.00 08-01-2006 02-311204 5 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 05 285 $200.00 $498.40 $57000.00 08-09-2006 05-0M8604 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 05 285 $320.00 $797.44 $91200.00 08-09-2006 05-0M8604 2 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 05 285 $414.00 $1031.69 $117990.00 08-09-2006 05-0M8604 3 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 10 220 $200.00 $498.40 $44000.00 10-31-2006 10-3A1204 1 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 10 220 $500.00 $1246.00 $110000.00 10-31-2006 10-3A1204 2 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 10 220 $650.00 $1619.80 $143000.00 10-31-2006 10-3A1204 3 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 10 220 $750.00 $1869.01 $165000.00 10-31-2006 10-3A1204 4 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 10 220 $750.00 $1869.01 $165000.00 10-31-2006 10-3A1204 5 M TRO
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 24 $800.00 $1993.61 $19200.00 11-07-2006 04-3A4704 1 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 24 $1500.00 $3738.01 $36000.00 11-07-2006 04-3A4704 2 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 24 $3000.00 $7476.02 $72000.00 11-07-2006 04-3A4704 3 M  
192020 - STRUCTURE EXCAVATION (TYPE D) M3 04 24 $1000.00 $2492.01 $24000.00 11-07-2006 04-3A4704 4 M  
MORE THAN 500 RESULTS RETURNED. ONLY 500 ROWS SHOWN.
SUMMARY Unmodified Adjusted    
Average Price/Unit: $ Avg No. Units
Std Dev. (of Unit Price): ±$ Rows Selected
Weighted Avg.: $ Rows Returned
Minimum Price/Unit: $    
Maximum Price/Unit: $    

| Back | New Search |

PARAMETERS: Item = 192020; District=All; Year=All; Convert=No; Bidders=All Bidders
TIMESTAMP: 11/13/2026 05:29:28
CURRENT 12-MO INDEX (CHCCI (2020 Base)): 146.53