| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
11 |
4350 |
$4.10 |
$24.42 |
$17835.00 |
01-14-1993 |
11-189154 |
1 |
M |
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
03 |
58 |
$30.00 |
$178.70 |
$1740.00 |
01-20-1993 |
03-315504 |
1 |
M |
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
04 |
1350 |
$5.00 |
$29.78 |
$6750.00 |
01-20-1993 |
04-127304 |
1 |
|
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
06 |
40 |
$86.00 |
$512.26 |
$3440.00 |
02-03-1993 |
06-245704 |
1 |
M |
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
03 |
95 |
$25.00 |
$148.91 |
$2375.00 |
02-17-1993 |
03-364604 |
1 |
|
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
08 |
590 |
$3.17 |
$18.88 |
$1870.30 |
02-25-1993 |
08-203604 |
1 |
M |
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
11 |
234 |
$10.00 |
$59.57 |
$2340.00 |
02-25-1993 |
11-046164 |
1 |
M |
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
12 |
115 |
$35.00 |
$208.48 |
$4025.00 |
04-22-1993 |
12-027314 |
1 |
M |
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
04 |
2800 |
$18.00 |
$107.22 |
$50400.00 |
05-12-1993 |
04-115984 |
1 |
M |
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
08 |
12 |
$35.00 |
$208.48 |
$420.00 |
08-05-1993 |
08-348304 |
1 |
M |
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
06 |
1250 |
$4.50 |
$24.42 |
$5625.00 |
03-01-1994 |
06-312604 |
1 |
M |
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
01 |
10700 |
$2.50 |
$14.37 |
$26750.00 |
04-12-1995 |
01-334204 |
1 |
|
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
03 |
11000 |
$4.00 |
$22.99 |
$44000.00 |
08-30-1995 |
03-430904 |
1 |
|
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
05 |
10 |
$40.00 |
$228.95 |
$400.00 |
01-17-1996 |
05-366904 |
1 |
|
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
03 |
120 |
$25.00 |
$143.10 |
$3000.00 |
04-02-1996 |
03-353204 |
1 |
M |
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
04 |
9750 |
$10.00 |
$57.24 |
$97500.00 |
04-23-1996 |
04-203204 |
1 |
M |
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
03 |
1120 |
$90.00 |
$515.14 |
$100800.00 |
12-10-1996 |
03-423604 |
1 |
M |
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
M3 |
02 |
5160 |
$12.00 |
$65.86 |
$61920.00 |
08-26-1997 |
02-339904 |
1 |
|
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
M3 |
02 |
1420 |
$26.00 |
$142.69 |
$36920.00 |
10-02-1997 |
02-335704 |
1 |
|
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
M3 |
04 |
290 |
$23.00 |
$126.22 |
$6670.00 |
10-08-1997 |
04-0S2304 |
1 |
M |
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
M3 |
02 |
750 |
$20.00 |
$109.76 |
$15000.00 |
10-29-1997 |
02-332414 |
1 |
|
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
M3 |
02 |
130 |
$20.00 |
$104.66 |
$2600.00 |
06-23-1998 |
02-335804 |
1 |
|
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
M3 |
01 |
61 |
$24.00 |
$125.60 |
$1464.00 |
08-12-1998 |
01-375114 |
1 |
|
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
M3 |
04 |
150 |
$10.00 |
$48.84 |
$1500.00 |
07-14-1999 |
04-0S0504 |
1 |
M |
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
M3 |
07 |
100 |
$50.00 |
$237.10 |
$5000.00 |
07-20-2000 |
07-1X0604 |
1 |
|
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
M3 |
01 |
310 |
$15.00 |
$71.13 |
$4650.00 |
09-06-2000 |
01-395204 |
1 |
|
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
M3 |
02 |
390 |
$120.00 |
$309.57 |
$46800.00 |
05-25-2005 |
02-373904 |
1 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
M3 |
05 |
210 |
$85.00 |
$211.82 |
$17850.00 |
08-23-2006 |
05-0N8004 |
1 |
|
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
M3 |
05 |
210 |
$106.50 |
$265.40 |
$22365.00 |
08-23-2006 |
05-0N8004 |
2 |
|
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
M3 |
05 |
210 |
$169.00 |
$421.15 |
$35490.00 |
08-23-2006 |
05-0N8004 |
3 |
|
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
M3 |
05 |
210 |
$62.00 |
$154.50 |
$13020.00 |
08-23-2006 |
05-0N8004 |
4 |
|
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
M3 |
05 |
210 |
$195.00 |
$485.94 |
$40950.00 |
08-23-2006 |
05-0N8004 |
5 |
|
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
M3 |
05 |
210 |
$172.18 |
$429.07 |
$36157.80 |
08-23-2006 |
05-0N8004 |
6 |
|
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
M3 |
05 |
210 |
$63.00 |
$157.00 |
$13230.00 |
08-23-2006 |
05-0N8004 |
7 |
|
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
M3 |
05 |
210 |
$302.00 |
$752.59 |
$63420.00 |
08-23-2006 |
05-0N8004 |
8 |
|
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
M3 |
05 |
210 |
$200.00 |
$498.40 |
$42000.00 |
08-23-2006 |
05-0N8004 |
9 |
|
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
M3 |
05 |
210 |
$95.00 |
$236.74 |
$19950.00 |
08-23-2006 |
05-0N8004 |
10 |
|
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
07 |
200 |
$13.00 |
$41.41 |
$2600.00 |
08-13-2009 |
07-1X6504 |
1 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
07 |
200 |
$45.00 |
$143.34 |
$9000.00 |
08-13-2009 |
07-1X6504 |
2 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
07 |
200 |
$100.00 |
$318.54 |
$20000.00 |
08-13-2009 |
07-1X6504 |
3 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
07 |
200 |
$27.00 |
$86.01 |
$5400.00 |
08-13-2009 |
07-1X6504 |
4 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
07 |
200 |
$5.00 |
$15.93 |
$1000.00 |
08-13-2009 |
07-1X6504 |
5 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
07 |
200 |
$13.00 |
$41.41 |
$2600.00 |
08-13-2009 |
07-1X6504 |
6 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
07 |
200 |
$85.00 |
$270.76 |
$17000.00 |
08-13-2009 |
07-1X6504 |
7 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
07 |
200 |
$80.00 |
$254.83 |
$16000.00 |
08-13-2009 |
07-1X6504 |
8 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
07 |
200 |
$10.00 |
$31.85 |
$2000.00 |
08-13-2009 |
07-1X6504 |
9 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
M3 |
04 |
2100 |
$17.00 |
$54.15 |
$35700.00 |
10-27-2010 |
04-174414 |
1 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
M3 |
04 |
2100 |
$30.00 |
$95.56 |
$63000.00 |
10-27-2010 |
04-174414 |
2 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
M3 |
04 |
2100 |
$35.00 |
$111.49 |
$73500.00 |
10-27-2010 |
04-174414 |
3 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
M3 |
04 |
2100 |
$39.85 |
$126.94 |
$83685.00 |
10-27-2010 |
04-174414 |
4 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
M3 |
04 |
2100 |
$100.00 |
$318.54 |
$210000.00 |
10-27-2010 |
04-174414 |
5 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
M3 |
04 |
2100 |
$28.00 |
$89.19 |
$58800.00 |
10-27-2010 |
04-174414 |
6 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
M3 |
04 |
2100 |
$24.75 |
$78.84 |
$51975.00 |
10-27-2010 |
04-174414 |
7 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
M3 |
04 |
2100 |
$1.00 |
$3.19 |
$2100.00 |
10-27-2010 |
04-174414 |
8 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
07 |
280 |
$17.00 |
$48.28 |
$4760.00 |
03-03-2011 |
07-174804 |
1 |
M |
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
07 |
280 |
$31.00 |
$88.03 |
$8680.00 |
03-03-2011 |
07-174804 |
2 |
M |
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
07 |
280 |
$22.00 |
$62.47 |
$6160.00 |
03-03-2011 |
07-174804 |
3 |
M |
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
07 |
280 |
$61.91 |
$175.81 |
$17334.80 |
03-03-2011 |
07-174804 |
4 |
M |
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
07 |
280 |
$26.00 |
$73.83 |
$7280.00 |
03-03-2011 |
07-174804 |
5 |
M |
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
07 |
280 |
$32.00 |
$90.87 |
$8960.00 |
03-03-2011 |
07-174804 |
6 |
M |
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
07 |
280 |
$33.00 |
$93.71 |
$9240.00 |
03-03-2011 |
07-174804 |
7 |
M |
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
07 |
280 |
$14.70 |
$41.74 |
$4116.00 |
03-03-2011 |
07-174804 |
8 |
M |
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
07 |
280 |
$40.00 |
$113.59 |
$11200.00 |
03-03-2011 |
07-174804 |
9 |
M |
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
07 |
280 |
$20.00 |
$56.79 |
$5600.00 |
03-03-2011 |
07-174804 |
10 |
M |
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
07 |
11968 |
$66.00 |
$128.72 |
$789888.00 |
12-18-2014 |
07-3X4504 |
1 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
07 |
11968 |
$35.00 |
$68.26 |
$418880.00 |
12-18-2014 |
07-3X4504 |
2 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
07 |
11968 |
$41.00 |
$79.96 |
$490688.00 |
12-18-2014 |
07-3X4504 |
3 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
07 |
11968 |
$80.00 |
$156.03 |
$957440.00 |
12-18-2014 |
07-3X4504 |
4 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
07 |
11968 |
$40.00 |
$78.01 |
$478720.00 |
12-18-2014 |
07-3X4504 |
5 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
03 |
235 |
$100.00 |
$152.60 |
$23500.00 |
03-10-2015 |
03-0F2704 |
1 |
|
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
03 |
235 |
$50.00 |
$76.30 |
$11750.00 |
03-10-2015 |
03-0F2704 |
2 |
|
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
03 |
235 |
$33.00 |
$50.36 |
$7755.00 |
03-10-2015 |
03-0F2704 |
3 |
|
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
07 |
9710 |
$55.00 |
$116.83 |
$534050.00 |
09-24-2015 |
07-316604 |
1 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
07 |
9710 |
$56.00 |
$118.96 |
$543760.00 |
09-24-2015 |
07-316604 |
2 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
07 |
9710 |
$65.00 |
$138.08 |
$631150.00 |
09-24-2015 |
07-316604 |
3 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
07 |
9710 |
$84.00 |
$178.44 |
$815640.00 |
09-24-2015 |
07-316604 |
4 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
08 |
2167 |
$96.00 |
$184.73 |
$208032.00 |
10-15-2015 |
08-0Q2004 |
1 |
M |
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
08 |
2167 |
$25.00 |
$48.11 |
$54175.00 |
10-15-2015 |
08-0Q2004 |
2 |
M |
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
08 |
2167 |
$66.00 |
$127.00 |
$143022.00 |
10-15-2015 |
08-0Q2004 |
3 |
M |
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
08 |
2167 |
$184.99 |
$355.96 |
$400873.33 |
10-15-2015 |
08-0Q2004 |
4 |
M |
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
04 |
7 |
$165.00 |
$256.99 |
$1155.00 |
09-07-2016 |
04-3G0604 |
1 |
M |
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
04 |
7 |
$235.00 |
$366.01 |
$1645.00 |
09-07-2016 |
04-3G0604 |
2 |
M |
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
04 |
7 |
$250.00 |
$389.38 |
$1750.00 |
09-07-2016 |
04-3G0604 |
3 |
M |
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
04 |
7 |
$292.00 |
$454.79 |
$2044.00 |
09-07-2016 |
04-3G0604 |
4 |
M |
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
07 |
91 |
$39.00 |
$58.97 |
$3549.00 |
10-20-2016 |
07-305204 |
1 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
07 |
91 |
$76.87 |
$116.23 |
$6995.17 |
10-20-2016 |
07-305204 |
2 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
08 |
1375 |
$57.19 |
$103.82 |
$78636.25 |
10-11-2017 |
08-1F2804 |
1 |
|
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
08 |
1375 |
$45.00 |
$81.69 |
$61875.00 |
10-11-2017 |
08-1F2804 |
2 |
|
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
08 |
1375 |
$50.00 |
$90.76 |
$68750.00 |
10-11-2017 |
08-1F2804 |
3 |
|
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
08 |
1375 |
$25.00 |
$45.38 |
$34375.00 |
10-11-2017 |
08-1F2804 |
4 |
|
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
08 |
1375 |
$165.00 |
$299.52 |
$226875.00 |
10-11-2017 |
08-1F2804 |
5 |
|
|
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
08 |
70 |
$31.06 |
$56.38 |
$2174.20 |
12-08-2017 |
08-347704 |
1 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
08 |
16104 |
$14.00 |
$21.68 |
$225456.00 |
11-20-2019 |
08-1E5704 |
1 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
08 |
16104 |
$40.00 |
$61.94 |
$644160.00 |
11-20-2019 |
08-1E5704 |
2 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
08 |
16104 |
$11.00 |
$17.03 |
$177144.00 |
11-20-2019 |
08-1E5704 |
3 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
08 |
16104 |
$25.00 |
$38.71 |
$402600.00 |
11-20-2019 |
08-1E5704 |
4 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
08 |
16104 |
$18.00 |
$27.87 |
$289872.00 |
11-20-2019 |
08-1E5704 |
5 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
08 |
16104 |
$43.00 |
$66.58 |
$692472.00 |
11-20-2019 |
08-1E5704 |
6 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
08 |
16104 |
$65.00 |
$100.65 |
$1046760.00 |
11-20-2019 |
08-1E5704 |
7 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
08 |
16104 |
$82.28 |
$127.41 |
$1325037.12 |
11-20-2019 |
08-1E5704 |
8 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
12 |
2778 |
$59.00 |
$94.00 |
$163902.00 |
06-30-2020 |
12-0K0234 |
1 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
12 |
2778 |
$30.00 |
$47.80 |
$83340.00 |
06-30-2020 |
12-0K0234 |
2 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
12 |
2778 |
$55.00 |
$87.63 |
$152790.00 |
06-30-2020 |
12-0K0234 |
3 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
12 |
2778 |
$31.00 |
$49.39 |
$86118.00 |
06-30-2020 |
12-0K0234 |
4 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
12 |
2778 |
$32.00 |
$50.98 |
$88896.00 |
06-30-2020 |
12-0K0234 |
5 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
12 |
2778 |
$37.00 |
$58.95 |
$102786.00 |
06-30-2020 |
12-0K0234 |
6 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
08 |
65 |
$73.00 |
$104.81 |
$4745.00 |
07-28-2020 |
08-1H4004 |
1 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
08 |
65 |
$230.25 |
$330.58 |
$14966.25 |
07-28-2020 |
08-1H4004 |
2 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
08 |
65 |
$350.00 |
$502.50 |
$22750.00 |
07-28-2020 |
08-1H4004 |
3 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
08 |
65 |
$500.00 |
$717.86 |
$32500.00 |
07-28-2020 |
08-1H4004 |
4 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
08 |
65 |
$40.00 |
$57.43 |
$2600.00 |
07-28-2020 |
08-1H4004 |
5 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
08 |
133000 |
$15.00 |
$25.82 |
$1995000.00 |
03-09-2021 |
08-1C0824 |
1 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
08 |
133000 |
$11.30 |
$19.45 |
$1502900.00 |
03-09-2021 |
08-1C0824 |
2 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
08 |
133000 |
$9.60 |
$16.52 |
$1276800.00 |
03-09-2021 |
08-1C0824 |
3 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
08 |
133000 |
$11.10 |
$19.11 |
$1476300.00 |
03-09-2021 |
08-1C0824 |
4 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
08 |
133000 |
$6.50 |
$11.19 |
$864500.00 |
03-09-2021 |
08-1C0824 |
5 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
08 |
133000 |
$23.00 |
$39.59 |
$3059000.00 |
03-09-2021 |
08-1C0824 |
6 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
08 |
133000 |
$12.00 |
$20.65 |
$1596000.00 |
03-09-2021 |
08-1C0824 |
7 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
10 |
466 |
$445.00 |
$630.68 |
$207370.00 |
05-25-2021 |
10-1C8104 |
1 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
10 |
466 |
$150.00 |
$212.59 |
$69900.00 |
05-25-2021 |
10-1C8104 |
2 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
04 |
314 |
$150.00 |
$261.13 |
$47100.00 |
11-09-2021 |
04-2J7804 |
1 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
04 |
314 |
$140.00 |
$243.72 |
$43960.00 |
11-09-2021 |
04-2J7804 |
2 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
04 |
314 |
$200.00 |
$348.18 |
$62800.00 |
11-09-2021 |
04-2J7804 |
3 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
04 |
314 |
$100.00 |
$174.09 |
$31400.00 |
11-09-2021 |
04-2J7804 |
4 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
04 |
314 |
$160.00 |
$278.54 |
$50240.00 |
11-09-2021 |
04-2J7804 |
5 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION |
CY |
08 |
13618 |
$28.00 |
$29.70 |
$381304.00 |
09-08-2022 |
08-1H2004 |
1 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION |
CY |
08 |
13618 |
$48.15 |
$51.07 |
$655706.70 |
09-08-2022 |
08-1H2004 |
2 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION |
CY |
08 |
13618 |
$78.00 |
$82.73 |
$1062204.00 |
09-08-2022 |
08-1H2004 |
3 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION |
CY |
08 |
13618 |
$35.00 |
$37.12 |
$476630.00 |
09-08-2022 |
08-1H2004 |
4 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION |
CY |
08 |
13618 |
$45.00 |
$47.73 |
$612810.00 |
09-08-2022 |
08-1H2004 |
5 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION |
CY |
08 |
2500 |
$30.00 |
$33.37 |
$75000.00 |
10-13-2022 |
08-1G8304 |
1 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION |
CY |
08 |
2500 |
$13.00 |
$14.46 |
$32500.00 |
10-13-2022 |
08-1G8304 |
2 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION |
CY |
08 |
2500 |
$63.44 |
$70.57 |
$158600.00 |
10-13-2022 |
08-1G8304 |
3 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
07 |
5 |
$290.00 |
$315.99 |
$1450.00 |
01-10-2023 |
07-323904 |
1 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
07 |
5 |
$865.00 |
$942.51 |
$4325.00 |
01-10-2023 |
07-323904 |
2 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
07 |
5 |
$500.00 |
$544.80 |
$2500.00 |
01-10-2023 |
07-323904 |
3 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
07 |
5 |
$325.00 |
$354.12 |
$1625.00 |
01-10-2023 |
07-323904 |
4 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
10 |
4 |
$400.00 |
$347.95 |
$1600.00 |
04-04-2024 |
10-1J0404 |
1 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
10 |
4 |
$230.00 |
$200.07 |
$920.00 |
04-04-2024 |
10-1J0404 |
2 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
08 |
4820 |
$27.30 |
$20.29 |
$131586.00 |
07-17-2024 |
08-1J4704 |
1 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
08 |
4820 |
$64.00 |
$47.57 |
$308480.00 |
07-17-2024 |
08-1J4704 |
2 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
08 |
4820 |
$54.00 |
$40.14 |
$260280.00 |
07-17-2024 |
08-1J4704 |
3 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
08 |
4820 |
$35.00 |
$26.02 |
$168700.00 |
07-17-2024 |
08-1J4704 |
4 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
08 |
4820 |
$83.40 |
$61.99 |
$401988.00 |
07-17-2024 |
08-1J4704 |
5 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
08 |
4820 |
$50.00 |
$37.17 |
$241000.00 |
07-17-2024 |
08-1J4704 |
6 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
08 |
4820 |
$200.00 |
$148.66 |
$964000.00 |
07-17-2024 |
08-1J4704 |
7 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
08 |
4820 |
$57.79 |
$42.96 |
$278547.80 |
07-17-2024 |
08-1J4704 |
8 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
08 |
4820 |
$180.00 |
$133.80 |
$867600.00 |
07-17-2024 |
08-1J4704 |
9 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
08 |
4820 |
$327.00 |
$243.06 |
$1576140.00 |
07-17-2024 |
08-1J4704 |
10 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
08 |
40 |
$354.05 |
$367.08 |
$14162.00 |
11-13-2024 |
08-1J2704 |
1 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
08 |
40 |
$208.00 |
$215.65 |
$8320.00 |
11-13-2024 |
08-1J2704 |
2 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
08 |
40 |
$180.00 |
$186.62 |
$7200.00 |
11-13-2024 |
08-1J2704 |
3 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
08 |
40 |
$250.00 |
$259.20 |
$10000.00 |
11-13-2024 |
08-1J2704 |
4 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
08 |
5804 |
$65.00 |
$67.39 |
$377260.00 |
12-05-2024 |
08-1J7204 |
1 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
08 |
5804 |
$41.50 |
$43.03 |
$240866.00 |
12-05-2024 |
08-1J7204 |
2 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
08 |
5804 |
$48.00 |
$49.77 |
$278592.00 |
12-05-2024 |
08-1J7204 |
3 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
05 |
530 |
$56.00 |
$54.79 |
$29680.00 |
11-13-2025 |
05-1R1004 |
1 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
05 |
530 |
$112.00 |
$109.58 |
$59360.00 |
11-13-2025 |
05-1R1004 |
2 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
05 |
530 |
$205.00 |
$200.58 |
$108650.00 |
11-13-2025 |
05-1R1004 |
3 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
05 |
530 |
$77.00 |
$75.34 |
$40810.00 |
11-13-2025 |
05-1R1004 |
4 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
05 |
530 |
$225.00 |
$220.15 |
$119250.00 |
11-13-2025 |
05-1R1004 |
5 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
06 |
41 |
$165.00 |
$161.44 |
$6765.00 |
11-20-2025 |
06-0V6104 |
1 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
06 |
41 |
$170.00 |
$166.33 |
$6970.00 |
11-20-2025 |
06-0V6104 |
2 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
06 |
41 |
$310.00 |
$303.31 |
$12710.00 |
11-20-2025 |
06-0V6104 |
3 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
06 |
41 |
$215.00 |
$210.36 |
$8815.00 |
11-20-2025 |
06-0V6104 |
4 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
03 |
8 |
$400.00 |
$400.00 |
$3200.00 |
10-20-2026 |
03-0J6304 |
1 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
03 |
8 |
$700.00 |
$700.00 |
$5600.00 |
10-20-2026 |
03-0J6304 |
2 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
03 |
8 |
$800.00 |
$800.00 |
$6400.00 |
10-20-2026 |
03-0J6304 |
3 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
03 |
8 |
$500.00 |
$500.00 |
$4000.00 |
10-20-2026 |
03-0J6304 |
4 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
03 |
8 |
$490.00 |
$490.00 |
$3920.00 |
10-20-2026 |
03-0J6304 |
5 |
M |
TRO |
|
| 192032 - STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) |
CY |
03 |
8 |
$629.00 |
$629.00 |
$5032.00 |
10-20-2026 |
03-0J6304 |
6 |
M |
TRO |