Caltrans Logo
Contract Cost Data

CALIFORNIA DEPARTMENT OF TRANSPORTATION - CONTRACT COST DATA

Select Item No. / Description Unit Dist Qty Unit
Price
Adj
Price
Total Bid Open
Date
Contract
No.
Bid M TRO
192034 - STRUCTURE EXCAVATION (SACKED CONCRETE SLOPE PROTECTION) CY 04 3 $100.00 $595.65 $300.00 01-26-1993 04-437644 1 M  
192034 - STRUCTURE EXCAVATION (SACKED CONCRETE SLOPE PROTECTION) CY 04 62 $25.00 $148.91 $1550.00 08-04-1993 04-228014 1 M  
192034 - STRUCTURE EXCAVATION (SACKED CONCRETE SLOPE PROTECTION) CY 04 33 $70.00 $379.89 $2310.00 09-21-1994 04-180634 1 M  
192034 - STRUCTURE EXCAVATION (SACKED CONCRETE SLOPE PROTECTION) CY 04 11 $53.00 $303.36 $583.00 05-29-1996 04-150434 1 M  
192034 - STRUCTURE EXCAVATION (SACKED CONCRETE SLOPE PROTECTION) M3 05 120 $30.00 $142.26 $3600.00 04-12-2000 05-390404 1 M  
192034 - STRUCTURE EXCAVATION (SACKED CONCRETE SLOPE PROTECTION) M3 02 8 $245.00 $632.04 $1960.00 05-25-2005 02-373904 1 M TRO
192034 - STRUCTURE EXCAVATION CY 05 195 $200.00 $310.18 $39000.00 04-21-2022 05-1H4804 1 M TRO
192034 - STRUCTURE EXCAVATION CY 05 195 $90.00 $139.58 $17550.00 04-21-2022 05-1H4804 2 M TRO
192034 - STRUCTURE EXCAVATION CY 05 195 $150.00 $232.64 $29250.00 04-21-2022 05-1H4804 3 M TRO
192034 - STRUCTURE EXCAVATION CY 05 195 $525.00 $814.23 $102375.00 04-21-2022 05-1H4804 4 M TRO
192034 - STRUCTURE EXCAVATION CY 05 195 $200.00 $310.18 $39000.00 04-21-2022 05-1H4804 5 M TRO
SUMMARY Unmodified Adjusted    
Average Price/Unit: $ Avg No. Units
Std Dev. (of Unit Price): ±$ Rows Selected
Weighted Avg.: $ Rows Returned
Minimum Price/Unit: $    
Maximum Price/Unit: $    

| Back | New Search |

PARAMETERS: Item = 192034; District=All; Year=All; Convert=No; Bidders=All Bidders
TIMESTAMP: 09/27/2026 07:17:01
CURRENT 12-MO INDEX (CHCCI (2020 Base)): 146.53