|
| 192034 - STRUCTURE EXCAVATION (SACKED CONCRETE SLOPE PROTECTION) |
CY |
04 |
3 |
$100.00 |
$595.65 |
$300.00 |
01-26-1993 |
04-437644 |
1 |
M |
|
|
| 192034 - STRUCTURE EXCAVATION (SACKED CONCRETE SLOPE PROTECTION) |
CY |
04 |
62 |
$25.00 |
$148.91 |
$1550.00 |
08-04-1993 |
04-228014 |
1 |
M |
|
|
| 192034 - STRUCTURE EXCAVATION (SACKED CONCRETE SLOPE PROTECTION) |
CY |
04 |
33 |
$70.00 |
$379.89 |
$2310.00 |
09-21-1994 |
04-180634 |
1 |
M |
|
|
| 192034 - STRUCTURE EXCAVATION (SACKED CONCRETE SLOPE PROTECTION) |
CY |
04 |
11 |
$53.00 |
$303.36 |
$583.00 |
05-29-1996 |
04-150434 |
1 |
M |
|
|
| 192034 - STRUCTURE EXCAVATION (SACKED CONCRETE SLOPE PROTECTION) |
M3 |
05 |
120 |
$30.00 |
$142.26 |
$3600.00 |
04-12-2000 |
05-390404 |
1 |
M |
|
|
| 192034 - STRUCTURE EXCAVATION (SACKED CONCRETE SLOPE PROTECTION) |
M3 |
02 |
8 |
$245.00 |
$632.04 |
$1960.00 |
05-25-2005 |
02-373904 |
1 |
M |
TRO |
|
| 192034 - STRUCTURE EXCAVATION |
CY |
05 |
195 |
$200.00 |
$310.18 |
$39000.00 |
04-21-2022 |
05-1H4804 |
1 |
M |
TRO |
|
| 192034 - STRUCTURE EXCAVATION |
CY |
05 |
195 |
$90.00 |
$139.58 |
$17550.00 |
04-21-2022 |
05-1H4804 |
2 |
M |
TRO |
|
| 192034 - STRUCTURE EXCAVATION |
CY |
05 |
195 |
$150.00 |
$232.64 |
$29250.00 |
04-21-2022 |
05-1H4804 |
3 |
M |
TRO |
|
| 192034 - STRUCTURE EXCAVATION |
CY |
05 |
195 |
$525.00 |
$814.23 |
$102375.00 |
04-21-2022 |
05-1H4804 |
4 |
M |
TRO |
|
| 192034 - STRUCTURE EXCAVATION |
CY |
05 |
195 |
$200.00 |
$310.18 |
$39000.00 |
04-21-2022 |
05-1H4804 |
5 |
M |
TRO |