CALIFORNIA DEPARTMENT OF TRANSPORTATION - CONTRACT COST DATA

Select Item No. / Description Unit Dist Qty Unit
Price
Adj
Price
Total Bid Open
Date
Contract
No.
Bid M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 01 2697 $25.00 $122.11 $67425.00 06-08-1999 01-386604 1    
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 645 $35.00 $170.95 $22575.00 06-30-1999 04-228914 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 345 $40.00 $195.37 $13800.00 07-13-1999 04-258004 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 05 629 $73.00 $356.56 $45917.00 07-21-1999 05-4591U4 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 01 1100 $70.00 $341.90 $77000.00 07-28-1999 01-371104 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 01 110 $40.00 $195.37 $4400.00 08-10-1999 01-402204 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 01 60 $80.00 $390.75 $4800.00 09-01-1999 01-402104 1    
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 08 1260 $41.00 $200.26 $51660.00 10-21-1999 08-315004 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 550 $50.00 $237.10 $27500.00 01-11-2000 04-013014 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 06 68 $120.00 $569.05 $8160.00 03-28-2000 06-323304 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 320 $40.00 $189.68 $12800.00 03-29-2000 04-0S4504 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 05 250 $75.00 $355.66 $18750.00 04-25-2000 05-016174 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 07 2860 $30.00 $142.26 $85800.00 08-10-2000 07-1264A4 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 500 $110.00 $521.63 $55000.00 08-17-2000 04-1S2304 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 10 112 $25.00 $118.55 $2800.00 08-22-2000 10-484904 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 07 305 $60.00 $284.52 $18300.00 09-21-2000 07-126494 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 530 $80.00 $379.37 $42400.00 10-12-2000 04-1S5704 1    
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 2125 $40.00 $189.68 $85000.00 11-15-2000 04-013054 1 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 07 7060 $20.00 $94.84 $141200.00 11-16-2000 07-142904 1 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 01 2048 $16.00 $75.87 $32768.00 12-12-2000 01-383104 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 01 1025 $15.00 $65.61 $15375.00 07-10-2001 01-407304 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 05 480 $44.00 $192.46 $21120.00 07-19-2001 05-0G4804 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 01 640 $50.00 $218.70 $32000.00 08-14-2001 01-370634 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 2325 $50.00 $218.70 $116250.00 08-21-2001 04-1S2504 1 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 114 $55.00 $240.57 $6270.00 10-02-2001 04-1S1514 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 97 $125.00 $546.75 $12125.00 11-20-2001 04-1S7704 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 06 220 $80.00 $378.14 $17600.00 05-22-2002 06-323634 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 06 220 $200.00 $945.35 $44000.00 05-22-2002 06-323634 2 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 06 220 $100.00 $472.68 $22000.00 05-22-2002 06-323634 3 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 06 220 $75.00 $354.51 $16500.00 05-22-2002 06-323634 4 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 06 220 $160.00 $756.28 $35200.00 05-22-2002 06-323634 5 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 12 52 $96.15 $454.48 $5000.01 11-21-2002 12-0E5804 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 12 52 $300.00 $1418.03 $15600.00 11-21-2002 12-0E5804 2 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 12 52 $495.00 $2339.75 $25740.00 11-21-2002 12-0E5804 3 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 12 52 $150.00 $709.02 $7800.00 11-21-2002 12-0E5804 4 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 01 74 $43.00 $203.25 $3182.00 12-04-2002 01-291704 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 314 $65.00 $291.27 $20410.00 02-04-2003 04-1S2604 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 250 $50.00 $224.05 $12500.00 06-04-2003 04-1S1524 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 2 $800.00 $3584.83 $1600.00 06-26-2003 04-0120Q4 1 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 390 $22.00 $98.58 $8580.00 09-03-2003 04-1S0224 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 390 $50.00 $224.05 $19500.00 09-03-2003 04-1S0224 2 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 390 $20.00 $89.62 $7800.00 09-03-2003 04-1S0224 3 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 390 $80.00 $358.48 $31200.00 09-03-2003 04-1S0224 4 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 390 $70.00 $313.67 $27300.00 09-03-2003 04-1S0224 5 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 390 $75.00 $336.08 $29250.00 09-03-2003 04-1S0224 6 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 390 $65.00 $291.27 $25350.00 09-03-2003 04-1S0224 7 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 390 $90.00 $403.29 $35100.00 09-03-2003 04-1S0224 8 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 390 $80.00 $358.48 $31200.00 09-03-2003 04-1S0224 9 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 353 $40.00 $179.24 $14120.00 09-09-2003 04-1S2724 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 353 $55.00 $246.46 $19415.00 09-09-2003 04-1S2724 2 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 353 $40.00 $179.24 $14120.00 09-09-2003 04-1S2724 3 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 353 $80.00 $358.48 $28240.00 09-09-2003 04-1S2724 4 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 670 $80.00 $358.48 $53600.00 09-30-2003 04-1S8004 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 670 $45.00 $201.65 $30150.00 09-30-2003 04-1S8004 2 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 670 $150.00 $672.16 $100500.00 09-30-2003 04-1S8004 3 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 670 $108.00 $483.95 $72360.00 09-30-2003 04-1S8004 4 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 670 $220.00 $985.83 $147400.00 09-30-2003 04-1S8004 5 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 670 $50.00 $224.05 $33500.00 09-30-2003 04-1S8004 6 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 670 $90.00 $403.29 $60300.00 09-30-2003 04-1S8004 7 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 670 $150.00 $672.16 $100500.00 09-30-2003 04-1S8004 8 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 670 $65.00 $291.27 $43550.00 09-30-2003 04-1S8004 9 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 670 $100.00 $448.10 $67000.00 09-30-2003 04-1S8004 10 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 115 $100.00 $296.02 $11500.00 04-21-2004 04-1S1704 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 115 $72.00 $213.13 $8280.00 04-21-2004 04-1S1704 2 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 115 $200.00 $592.04 $23000.00 04-21-2004 04-1S1704 3 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 115 $150.00 $444.03 $17250.00 04-21-2004 04-1S1704 4 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 130 $80.00 $206.38 $10400.00 03-01-2005 04-013094 1 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 130 $30.00 $77.39 $3900.00 03-01-2005 04-013094 2 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 130 $50.00 $128.99 $6500.00 03-01-2005 04-013094 3 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 130 $160.00 $412.76 $20800.00 03-01-2005 04-013094 4 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 130 $31.00 $79.97 $4030.00 03-01-2005 04-013094 5 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 01 110 $75.00 $193.48 $8250.00 03-30-2005 01-363104 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 01 110 $10.00 $25.80 $1100.00 03-30-2005 01-363104 2 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 01 110 $255.00 $657.84 $28050.00 03-30-2005 01-363104 3 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 05 730 $116.00 $299.25 $84680.00 06-08-2005 05-0M7304 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 05 730 $13.80 $35.60 $10074.00 06-08-2005 05-0M7304 2 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 05 730 $180.00 $464.36 $131400.00 06-08-2005 05-0M7304 3 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 05 730 $50.00 $128.99 $36500.00 06-08-2005 05-0M7304 4 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 05 730 $117.00 $301.83 $85410.00 06-08-2005 05-0M7304 5 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 05 550 $178.00 $459.20 $97900.00 06-08-2005 05-0M7404 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 05 550 $240.00 $619.14 $132000.00 06-08-2005 05-0M7404 2 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 05 550 $82.00 $211.54 $45100.00 06-08-2005 05-0M7404 3 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 05 550 $90.00 $232.18 $49500.00 06-08-2005 05-0M7404 4 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 140 $80.00 $206.38 $11200.00 08-16-2005 04-1S3224 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 140 $175.00 $451.46 $24500.00 08-16-2005 04-1S3224 2 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 140 $80.00 $206.38 $11200.00 08-16-2005 04-1S3224 3 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 140 $120.00 $309.57 $16800.00 08-16-2005 04-1S3224 4 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 25 $336.00 $866.80 $8400.00 09-07-2005 04-2S6704 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 25 $360.00 $928.71 $9000.00 09-07-2005 04-2S6704 2 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 25 $100.00 $257.98 $2500.00 09-07-2005 04-2S6704 3 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 25 $300.00 $773.93 $7500.00 09-07-2005 04-2S6704 4 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 125 $200.00 $515.95 $25000.00 09-27-2005 04-1S2814 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 125 $175.00 $451.46 $21875.00 09-27-2005 04-1S2814 2 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 125 $90.00 $232.18 $11250.00 09-27-2005 04-1S2814 3 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 125 $100.00 $257.98 $12500.00 09-27-2005 04-1S2814 4 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 270 $150.00 $386.96 $40500.00 09-28-2005 04-212804 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 270 $80.00 $206.38 $21600.00 09-28-2005 04-212804 2 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 05 50 $26.00 $67.07 $1300.00 10-05-2005 05-420744 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 05 50 $450.00 $1160.89 $22500.00 10-05-2005 05-420744 2 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 05 50 $248.00 $639.78 $12400.00 10-05-2005 05-420744 3 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 05 50 $400.00 $1031.90 $20000.00 10-05-2005 05-420744 4 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 05 50 $156.00 $402.44 $7800.00 10-05-2005 05-420744 5 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 229 $150.00 $373.80 $34350.00 01-04-2006 04-1S3004 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 229 $125.00 $311.50 $28625.00 01-04-2006 04-1S3004 2 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 229 $80.00 $199.36 $18320.00 01-04-2006 04-1S3004 3 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 229 $100.00 $249.20 $22900.00 01-04-2006 04-1S3004 4 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 229 $62.00 $154.50 $14198.00 01-04-2006 04-1S3004 5 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 229 $105.00 $261.66 $24045.00 01-04-2006 04-1S3004 6 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 11 $70.00 $174.44 $770.00 03-29-2006 04-209914 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 11 $230.00 $573.16 $2530.00 03-29-2006 04-209914 2 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 11 $500.00 $1246.00 $5500.00 03-29-2006 04-209914 3 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 11 $300.00 $747.60 $3300.00 03-29-2006 04-209914 4 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 01 1850 $100.00 $249.20 $185000.00 05-09-2006 01-397514 1 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 01 1850 $100.00 $249.20 $185000.00 05-09-2006 01-397514 2 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 01 1850 $78.00 $194.38 $144300.00 05-09-2006 01-397514 3 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 05 651 $137.10 $341.65 $89252.10 07-25-2006 05-0C5404 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 05 651 $516.00 $1285.88 $335916.00 07-25-2006 05-0C5404 2 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 01 360 $41.10 $102.42 $14796.00 08-29-2006 01-4146V4 1 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 01 360 $400.00 $996.80 $144000.00 08-29-2006 01-4146V4 2 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 01 360 $195.00 $485.94 $70200.00 08-29-2006 01-4146V4 3 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 12 2000 $20.00 $49.84 $40000.00 11-02-2006 12-056214 1 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 12 2000 $80.00 $199.36 $160000.00 11-02-2006 12-056214 2 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 12 2000 $35.00 $87.22 $70000.00 11-02-2006 12-056214 3 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 12 2000 $20.00 $49.84 $40000.00 11-02-2006 12-056214 4 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 12 2000 $25.00 $62.30 $50000.00 11-02-2006 12-056214 5 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 12 2000 $22.00 $54.82 $44000.00 11-02-2006 12-056214 6 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 12 2000 $135.00 $336.42 $270000.00 11-02-2006 12-056214 7 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 12 2000 $50.00 $124.60 $100000.00 11-02-2006 12-056214 8 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 12 2000 $50.00 $124.60 $100000.00 11-02-2006 12-056214 9 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 12 2000 $30.00 $74.76 $60000.00 11-02-2006 12-056214 10 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 12 710 $260.00 $651.24 $184600.00 03-29-2007 12-0H2104 1 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 12 710 $250.00 $626.20 $177500.00 03-29-2007 12-0H2104 2 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 12 710 $110.00 $275.53 $78100.00 03-29-2007 12-0H2104 3 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 12 710 $150.00 $375.72 $106500.00 03-29-2007 12-0H2104 4 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 12 710 $195.00 $488.43 $138450.00 03-29-2007 12-0H2104 5 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 12 710 $130.00 $325.62 $92300.00 03-29-2007 12-0H2104 6 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 12 710 $270.00 $676.29 $191700.00 03-29-2007 12-0H2104 7 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 12 710 $180.00 $450.86 $127800.00 03-29-2007 12-0H2104 8 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 12 710 $250.00 $626.20 $177500.00 03-29-2007 12-0H2104 9 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 12 710 $175.00 $438.34 $124250.00 03-29-2007 12-0H2104 10 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 05 14 $271.00 $678.80 $3794.00 06-19-2007 05-0L3504 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 05 14 $1000.00 $2504.79 $14000.00 06-19-2007 05-0L3504 2 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 05 14 $1200.00 $3005.74 $16800.00 06-19-2007 05-0L3504 3 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 05 14 $930.36 $2330.35 $13025.04 06-19-2007 05-0L3504 4 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 05 14 $2000.00 $5009.57 $28000.00 06-19-2007 05-0L3504 5 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 05 14 $1000.00 $2504.79 $14000.00 06-19-2007 05-0L3504 6 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 11 612 $50.00 $125.24 $30600.00 06-28-2007 11-2358U4 1 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 11 612 $70.00 $175.34 $42840.00 06-28-2007 11-2358U4 2 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 11 612 $120.00 $300.57 $73440.00 06-28-2007 11-2358U4 3 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 11 612 $71.00 $177.84 $43452.00 06-28-2007 11-2358U4 4 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 11 612 $90.00 $225.43 $55080.00 06-28-2007 11-2358U4 5 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 11 612 $200.00 $500.96 $122400.00 06-28-2007 11-2358U4 6 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 861 $25.00 $62.62 $21525.00 07-17-2007 01-480714 1 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 861 $22.00 $55.11 $18942.00 07-17-2007 01-480714 2 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 861 $60.00 $150.29 $51660.00 07-17-2007 01-480714 3 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 861 $140.00 $350.67 $120540.00 07-17-2007 01-480714 4 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 861 $125.00 $313.10 $107625.00 07-17-2007 01-480714 5 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 280 $45.00 $120.33 $12600.00 01-08-2008 04-3S6304 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 280 $50.00 $133.70 $14000.00 01-08-2008 04-3S6304 2 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 280 $85.00 $227.28 $23800.00 01-08-2008 04-3S6304 3 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 280 $60.00 $160.43 $16800.00 01-08-2008 04-3S6304 4 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 280 $55.00 $147.06 $15400.00 01-08-2008 04-3S6304 5 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 280 $165.00 $441.19 $46200.00 01-08-2008 04-3S6304 6 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 280 $78.00 $208.56 $21840.00 01-08-2008 04-3S6304 7 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 280 $110.00 $294.13 $30800.00 01-08-2008 04-3S6304 8 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 280 $75.00 $200.54 $21000.00 01-08-2008 04-3S6304 9 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 280 $100.00 $267.39 $28000.00 01-08-2008 04-3S6304 10 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 280 $60.00 $160.43 $16800.00 01-08-2008 04-3S6304 11 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 280 $100.00 $267.39 $28000.00 01-08-2008 04-3S6304 12 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 280 $300.00 $802.17 $84000.00 01-08-2008 04-3S6304 13 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 11 450 $65.00 $173.80 $29250.00 01-10-2008 11-2T0934 1 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 11 450 $60.00 $160.43 $27000.00 01-10-2008 11-2T0934 2 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 11 450 $30.00 $80.22 $13500.00 01-10-2008 11-2T0934 3 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 11 450 $20.00 $53.48 $9000.00 01-10-2008 11-2T0934 4 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 11 450 $20.00 $53.48 $9000.00 01-10-2008 11-2T0934 5 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 05 270 $25.00 $66.85 $6750.00 02-06-2008 05-496804 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 05 270 $250.00 $668.48 $67500.00 02-06-2008 05-496804 2 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 05 270 $95.00 $254.02 $25650.00 02-06-2008 05-496804 3 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 05 270 $150.00 $401.09 $40500.00 02-06-2008 05-496804 4 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 05 270 $1000.00 $2673.91 $270000.00 02-06-2008 05-496804 5 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 05 270 $135.00 $360.98 $36450.00 02-06-2008 05-496804 6 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 05 270 $80.00 $213.91 $21600.00 02-06-2008 05-496804 7 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 05 270 $46.00 $123.00 $12420.00 02-06-2008 05-496804 8 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 05 270 $131.38 $351.30 $35472.60 02-06-2008 05-496804 9 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 05 270 $50.00 $133.70 $13500.00 02-06-2008 05-496804 10 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 05 270 $425.00 $1136.41 $114750.00 02-06-2008 05-496804 11 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 05 270 $68.00 $181.83 $18360.00 02-06-2008 05-496804 12 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 05 270 $500.00 $1336.95 $135000.00 02-06-2008 05-496804 13 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 05 270 $35.00 $93.59 $9450.00 02-06-2008 05-496804 14 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 11 65 $62.00 $165.78 $4030.00 02-14-2008 11-167884 1 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 11 65 $45.00 $120.33 $2925.00 02-14-2008 11-167884 2 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 11 65 $80.00 $213.91 $5200.00 02-14-2008 11-167884 3 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 11 65 $200.00 $534.78 $13000.00 02-14-2008 11-167884 4 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 07 78 $80.00 $213.91 $6240.00 02-21-2008 07-168004 1 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 07 78 $75.00 $200.54 $5850.00 02-21-2008 07-168004 2 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 07 78 $100.00 $267.39 $7800.00 02-21-2008 07-168004 3 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 07 78 $75.00 $200.54 $5850.00 02-21-2008 07-168004 4 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 11 1390 $20.00 $53.48 $27800.00 06-19-2008 11-2T0824 1 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 11 1390 $65.00 $173.80 $90350.00 06-19-2008 11-2T0824 2 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 11 1390 $100.00 $267.39 $139000.00 06-19-2008 11-2T0824 3 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 11 1390 $20.00 $53.48 $27800.00 06-19-2008 11-2T0824 4 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 11 1390 $175.00 $467.93 $243250.00 06-19-2008 11-2T0824 5 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 11 1390 $50.00 $133.70 $69500.00 06-19-2008 11-2T0824 6 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 11 1390 $22.00 $58.83 $30580.00 06-19-2008 11-2T0824 7 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 11 490 $50.00 $133.70 $24500.00 07-10-2008 11-2T0924 1 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 11 490 $139.00 $371.67 $68110.00 07-10-2008 11-2T0924 2 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 11 490 $64.00 $171.13 $31360.00 07-10-2008 11-2T0924 3 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 1070 $50.00 $133.70 $53500.00 08-12-2008 01-470214 1 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 1070 $50.00 $133.70 $53500.00 08-12-2008 01-470214 2 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 1070 $80.00 $213.91 $85600.00 08-12-2008 01-470214 3 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 1070 $14.00 $37.43 $14980.00 08-12-2008 01-470214 4 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 1070 $35.00 $93.59 $37450.00 08-12-2008 01-470214 5 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 1070 $90.00 $240.65 $96300.00 08-12-2008 01-470214 6 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 1070 $100.00 $267.39 $107000.00 08-12-2008 01-470214 7 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 1070 $110.00 $294.13 $117700.00 08-12-2008 01-470214 8 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 820 $32.00 $85.56 $26240.00 09-16-2008 04-3S8404 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 820 $60.00 $160.43 $49200.00 09-16-2008 04-3S8404 2 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 820 $75.00 $200.54 $61500.00 09-16-2008 04-3S8404 3 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 820 $60.00 $160.43 $49200.00 09-16-2008 04-3S8404 4 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 820 $123.00 $328.89 $100860.00 09-16-2008 04-3S8404 5 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 820 $35.00 $93.59 $28700.00 09-16-2008 04-3S8404 6 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 820 $70.00 $187.17 $57400.00 09-16-2008 04-3S8404 7 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 820 $115.00 $307.50 $94300.00 09-16-2008 04-3S8404 8 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 820 $76.00 $203.22 $62320.00 09-16-2008 04-3S8404 9 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 820 $75.00 $200.54 $61500.00 09-16-2008 04-3S8404 10 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 57 $300.00 $802.17 $17100.00 12-02-2008 01-452404 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 57 $1100.00 $2941.30 $62700.00 12-02-2008 01-452404 2 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 57 $100.00 $267.39 $5700.00 12-02-2008 01-452404 3 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 57 $330.00 $882.39 $18810.00 12-02-2008 01-452404 4 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 57 $62.00 $165.78 $3534.00 12-02-2008 01-452404 5 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 57 $3000.00 $8021.72 $171000.00 12-02-2008 01-452404 6 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 01 372 $108.00 $288.78 $40176.00 12-03-2008 01-291714 1 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 01 372 $42.00 $112.30 $15624.00 12-03-2008 01-291714 2 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 01 372 $45.00 $120.33 $16740.00 12-03-2008 01-291714 3 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 01 372 $130.00 $347.61 $48360.00 12-03-2008 01-291714 4 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 01 372 $140.00 $374.35 $52080.00 12-03-2008 01-291714 5 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 01 372 $10.00 $26.74 $3720.00 12-03-2008 01-291714 6 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 01 372 $150.00 $401.09 $55800.00 12-03-2008 01-291714 7 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 01 372 $125.00 $334.24 $46500.00 12-03-2008 01-291714 8 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 01 372 $288.00 $770.08 $107136.00 12-03-2008 01-291714 9 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 01 372 $172.12 $460.23 $64028.64 12-03-2008 01-291714 10 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 01 40 $220.00 $588.26 $8800.00 12-09-2008 01-473804 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 01 40 $450.00 $1203.26 $18000.00 12-09-2008 01-473804 2 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 01 40 $250.00 $668.48 $10000.00 12-09-2008 01-473804 3 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 01 40 $15.00 $40.11 $600.00 12-09-2008 01-473804 4 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 01 40 $127.00 $339.59 $5080.00 12-09-2008 01-473804 5 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 01 40 $300.00 $802.17 $12000.00 12-09-2008 01-473804 6 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 01 40 $200.00 $534.78 $8000.00 12-09-2008 01-473804 7 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 01 40 $425.00 $1136.41 $17000.00 12-09-2008 01-473804 8 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 01 40 $190.00 $508.04 $7600.00 12-09-2008 01-473804 9 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 01 40 $1443.81 $3860.61 $57752.40 12-09-2008 01-473804 10 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 1224 $100.00 $267.39 $122400.00 12-10-2008 04-4A5204 1 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 1224 $30.00 $80.22 $36720.00 12-10-2008 04-4A5204 2 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 1224 $90.00 $240.65 $110160.00 12-10-2008 04-4A5204 3 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 1224 $10.00 $26.74 $12240.00 12-10-2008 04-4A5204 4 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 1224 $10.10 $27.01 $12362.40 12-10-2008 04-4A5204 5 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 1224 $100.00 $267.39 $122400.00 12-10-2008 04-4A5204 6 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 1224 $42.00 $112.30 $51408.00 12-10-2008 04-4A5204 7 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 1224 $23.00 $61.50 $28152.00 12-10-2008 04-4A5204 8 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 1224 $28.00 $74.87 $34272.00 12-10-2008 04-4A5204 9 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 1224 $50.00 $133.70 $61200.00 12-10-2008 04-4A5204 10 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 1224 $15.00 $40.11 $18360.00 12-10-2008 04-4A5204 11 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 1224 $50.00 $133.70 $61200.00 12-10-2008 04-4A5204 12 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 02 537 $47.00 $149.72 $25239.00 01-28-2009 02-4C3604 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 02 537 $26.00 $82.82 $13962.00 01-28-2009 02-4C3604 2 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 02 537 $25.00 $79.64 $13425.00 01-28-2009 02-4C3604 3 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 02 537 $52.00 $165.64 $27924.00 01-28-2009 02-4C3604 4 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 02 537 $28.00 $89.19 $15036.00 01-28-2009 02-4C3604 5 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 02 537 $50.00 $159.27 $26850.00 01-28-2009 02-4C3604 6 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 02 537 $75.00 $238.91 $40275.00 01-28-2009 02-4C3604 7 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 02 537 $150.00 $477.82 $80550.00 01-28-2009 02-4C3604 8 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 02 537 $152.00 $484.19 $81624.00 01-28-2009 02-4C3604 9 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 02 537 $33.00 $105.12 $17721.00 01-28-2009 02-4C3604 10 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 220 $37.00 $117.86 $8140.00 02-25-2009 01-474304 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 220 $26.00 $82.82 $5720.00 02-25-2009 01-474304 2 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 220 $48.63 $154.91 $10698.60 02-25-2009 01-474304 3 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 220 $61.00 $194.31 $13420.00 02-25-2009 01-474304 4 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 220 $65.72 $209.35 $14458.40 02-25-2009 01-474304 5 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 220 $100.00 $318.54 $22000.00 02-25-2009 01-474304 6 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 220 $51.22 $163.16 $11268.40 02-25-2009 01-474304 7 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 220 $38.00 $121.05 $8360.00 02-25-2009 01-474304 8 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 220 $125.00 $398.18 $27500.00 02-25-2009 01-474304 9 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 220 $68.00 $216.61 $14960.00 02-25-2009 01-474304 10 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 220 $150.00 $477.82 $33000.00 02-25-2009 01-474304 11 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 220 $65.00 $207.05 $14300.00 02-25-2009 01-474304 12 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 220 $314.95 $1003.25 $69289.00 02-25-2009 01-474304 13 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 771 $56.00 $178.38 $43176.00 05-12-2009 01-324704 1 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 771 $125.00 $398.18 $96375.00 05-12-2009 01-324704 2 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 771 $100.00 $318.54 $77100.00 05-12-2009 01-324704 3 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 771 $250.00 $796.36 $192750.00 05-12-2009 01-324704 4 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 771 $80.00 $254.83 $61680.00 05-12-2009 01-324704 5 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 771 $128.00 $407.74 $98688.00 05-12-2009 01-324704 6 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 771 $255.00 $812.29 $196605.00 05-12-2009 01-324704 7 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 771 $34.00 $108.30 $26214.00 05-12-2009 01-324704 8 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 771 $30.00 $95.56 $23130.00 05-12-2009 01-324704 9 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 10 26 $100.00 $318.54 $2600.00 05-15-2009 10-0M2404 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 10 26 $200.00 $637.09 $5200.00 05-15-2009 10-0M2404 2 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 10 26 $85.00 $270.76 $2210.00 05-15-2009 10-0M2404 3 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 10 26 $750.00 $2389.08 $19500.00 05-15-2009 10-0M2404 4 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 10 26 $1000.00 $3185.43 $26000.00 05-15-2009 10-0M2404 5 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 10 26 $900.00 $2866.89 $23400.00 05-15-2009 10-0M2404 6 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 05 440 $160.00 $509.67 $70400.00 06-10-2009 05-0P3404 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 05 440 $150.00 $477.82 $66000.00 06-10-2009 05-0P3404 2 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 05 440 $157.00 $500.11 $69080.00 06-10-2009 05-0P3404 3 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 05 440 $214.00 $681.68 $94160.00 06-10-2009 05-0P3404 4 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 05 440 $110.00 $350.40 $48400.00 06-10-2009 05-0P3404 5 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 05 440 $200.00 $637.09 $88000.00 06-10-2009 05-0P3404 6 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 05 440 $180.00 $573.38 $79200.00 06-10-2009 05-0P3404 7 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 05 440 $430.00 $1369.74 $189200.00 06-10-2009 05-0P3404 8 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 05 440 $130.00 $414.11 $57200.00 06-10-2009 05-0P3404 9 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 05 440 $750.00 $2389.08 $330000.00 06-10-2009 05-0P3404 10 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 05 440 $300.00 $955.63 $132000.00 06-10-2009 05-0P3404 11 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 05 440 $205.00 $653.01 $90200.00 06-10-2009 05-0P3404 12 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 178 $50.00 $159.27 $8900.00 06-30-2009 01-473904 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 178 $100.00 $318.54 $17800.00 06-30-2009 01-473904 2 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 178 $25.00 $79.64 $4450.00 06-30-2009 01-473904 3 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 178 $19.00 $60.52 $3382.00 06-30-2009 01-473904 4 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 178 $100.00 $318.54 $17800.00 06-30-2009 01-473904 5 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 178 $100.00 $318.54 $17800.00 06-30-2009 01-473904 6 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 178 $67.00 $213.42 $11926.00 06-30-2009 01-473904 7 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 178 $140.00 $445.96 $24920.00 06-30-2009 01-473904 8 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 178 $250.00 $796.36 $44500.00 06-30-2009 01-473904 9 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 178 $55.00 $175.20 $9790.00 06-30-2009 01-473904 10 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 170 $30.00 $95.56 $5100.00 06-30-2009 01-475704 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 170 $65.00 $207.05 $11050.00 06-30-2009 01-475704 2 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 170 $92.00 $293.06 $15640.00 06-30-2009 01-475704 3 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 170 $90.00 $286.69 $15300.00 06-30-2009 01-475704 4 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 170 $50.00 $159.27 $8500.00 06-30-2009 01-475704 5 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 170 $37.00 $117.86 $6290.00 06-30-2009 01-475704 6 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 170 $265.00 $844.14 $45050.00 06-30-2009 01-475704 7 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 170 $81.00 $258.02 $13770.00 06-30-2009 01-475704 8 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 170 $300.00 $955.63 $51000.00 06-30-2009 01-475704 9 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 170 $120.00 $382.25 $20400.00 06-30-2009 01-475704 10 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 170 $390.00 $1242.32 $66300.00 06-30-2009 01-475704 11 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 109 $126.00 $401.36 $13734.00 07-07-2009 01-476104 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 109 $85.00 $270.76 $9265.00 07-07-2009 01-476104 2 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 109 $60.00 $191.13 $6540.00 07-07-2009 01-476104 3 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 109 $100.00 $318.54 $10900.00 07-07-2009 01-476104 4 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 109 $50.00 $159.27 $5450.00 07-07-2009 01-476104 5 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 109 $90.00 $286.69 $9810.00 07-07-2009 01-476104 6 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 109 $190.00 $605.23 $20710.00 07-07-2009 01-476104 7 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 109 $300.00 $955.63 $32700.00 07-07-2009 01-476104 8 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 109 $75.00 $238.91 $8175.00 07-07-2009 01-476104 9 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 11 $300.00 $955.63 $3300.00 08-12-2009 04-4A8704 1 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 11 $100.00 $318.54 $1100.00 08-12-2009 04-4A8704 2 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 11 $95.00 $302.62 $1045.00 08-12-2009 04-4A8704 3 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 11 $70.00 $222.98 $770.00 08-12-2009 04-4A8704 4 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 11 $225.00 $716.72 $2475.00 08-12-2009 04-4A8704 5 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 11 $650.00 $2070.53 $7150.00 08-12-2009 04-4A8704 6 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 11 $150.00 $477.82 $1650.00 08-12-2009 04-4A8704 7 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 2200 $22.00 $70.08 $48400.00 08-25-2009 01-472104 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 2200 $28.00 $89.19 $61600.00 08-25-2009 01-472104 2 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 2200 $15.00 $47.78 $33000.00 08-25-2009 01-472104 3 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 2200 $35.00 $111.49 $77000.00 08-25-2009 01-472104 4 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 2200 $37.00 $117.86 $81400.00 08-25-2009 01-472104 5 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 2200 $65.00 $207.05 $143000.00 08-25-2009 01-472104 6 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 2200 $37.00 $117.86 $81400.00 08-25-2009 01-472104 7 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 2200 $45.00 $143.34 $99000.00 08-25-2009 01-472104 8 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 2200 $50.00 $159.27 $110000.00 08-25-2009 01-472104 9 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 2200 $22.00 $70.08 $48400.00 08-25-2009 01-472104 10 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 2200 $44.00 $140.16 $96800.00 08-25-2009 01-472104 11 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 2200 $20.00 $63.71 $44000.00 08-25-2009 01-472104 12 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 2200 $30.00 $95.56 $66000.00 08-25-2009 01-472104 13 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 07 578 $39.00 $124.23 $22542.00 09-10-2009 07-1X3224 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 07 578 $24.00 $76.45 $13872.00 09-10-2009 07-1X3224 2 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 07 578 $45.00 $143.34 $26010.00 09-10-2009 07-1X3224 3 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 07 578 $52.00 $165.64 $30056.00 09-10-2009 07-1X3224 4 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 07 578 $65.00 $207.05 $37570.00 09-10-2009 07-1X3224 5 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 07 578 $50.00 $159.27 $28900.00 09-10-2009 07-1X3224 6 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 07 578 $127.00 $404.55 $73406.00 09-10-2009 07-1X3224 7 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 07 578 $55.00 $175.20 $31790.00 09-10-2009 07-1X3224 8 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 07 578 $80.00 $254.83 $46240.00 09-10-2009 07-1X3224 9 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 07 578 $45.00 $143.34 $26010.00 09-10-2009 07-1X3224 10 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 07 578 $80.00 $254.83 $46240.00 09-10-2009 07-1X3224 11 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 07 578 $375.00 $1194.54 $216750.00 09-10-2009 07-1X3224 12 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 07 995 $27.00 $86.01 $26865.00 09-17-2009 07-1X3214 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 07 995 $60.00 $191.13 $59700.00 09-17-2009 07-1X3214 2 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 07 995 $55.00 $175.20 $54725.00 09-17-2009 07-1X3214 3 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 07 995 $20.00 $63.71 $19900.00 09-17-2009 07-1X3214 4 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 07 995 $311.00 $990.67 $309445.00 09-17-2009 07-1X3214 5 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 07 995 $120.00 $382.25 $119400.00 09-17-2009 07-1X3214 6 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 1070 $21.00 $66.89 $22470.00 09-29-2009 04-294914 1 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 1070 $75.00 $238.91 $80250.00 09-29-2009 04-294914 2 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 1070 $40.00 $127.42 $42800.00 09-29-2009 04-294914 3 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 04 1070 $220.00 $700.80 $235400.00 09-29-2009 04-294914 4 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 05 845 $75.00 $238.91 $63375.00 11-03-2009 05-0L70U4 1 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 05 845 $32.00 $101.93 $27040.00 11-03-2009 05-0L70U4 2 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 05 845 $100.00 $318.54 $84500.00 11-03-2009 05-0L70U4 3 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 05 845 $74.00 $235.72 $62530.00 11-03-2009 05-0L70U4 4 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 05 845 $100.00 $318.54 $84500.00 11-03-2009 05-0L70U4 5 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 05 845 $86.00 $273.95 $72670.00 11-03-2009 05-0L70U4 6 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 05 845 $85.00 $270.76 $71825.00 11-03-2009 05-0L70U4 7 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 05 845 $90.00 $286.69 $76050.00 11-03-2009 05-0L70U4 8 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 05 845 $150.00 $477.82 $126750.00 11-03-2009 05-0L70U4 9 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 04 4050 $25.00 $79.64 $101250.00 02-26-2010 04-163744 1 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 04 4050 $30.00 $95.56 $121500.00 02-26-2010 04-163744 2 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 04 4050 $4.00 $12.74 $16200.00 02-26-2010 04-163744 3 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 04 4050 $60.00 $191.13 $243000.00 02-26-2010 04-163744 4 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 04 4050 $85.00 $270.76 $344250.00 02-26-2010 04-163744 5 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 04 4050 $40.00 $127.42 $162000.00 02-26-2010 04-163744 6 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 04 4050 $185.00 $589.31 $749250.00 02-26-2010 04-163744 7 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 04 4050 $70.00 $222.98 $283500.00 02-26-2010 04-163744 8 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 05 94 $50.00 $159.27 $4700.00 04-06-2010 05-0P6504 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 05 94 $200.00 $637.09 $18800.00 04-06-2010 05-0P6504 2 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 05 94 $74.00 $235.72 $6956.00 04-06-2010 05-0P6504 3 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 05 94 $100.00 $318.54 $9400.00 04-06-2010 05-0P6504 4 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 05 94 $178.00 $567.01 $16732.00 04-06-2010 05-0P6504 5 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 05 94 $65.00 $207.05 $6110.00 04-06-2010 05-0P6504 6 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 05 94 $170.00 $541.52 $15980.00 04-06-2010 05-0P6504 7 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 05 94 $1150.00 $3663.25 $108100.00 04-06-2010 05-0P6504 8 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 05 94 $85.00 $270.76 $7990.00 04-06-2010 05-0P6504 9 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 05 94 $90.00 $286.69 $8460.00 04-06-2010 05-0P6504 10 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 1590 $12.61 $40.17 $20049.90 04-20-2010 01-475104 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 1590 $40.00 $127.42 $63600.00 04-20-2010 01-475104 2 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 1590 $19.00 $60.52 $30210.00 04-20-2010 01-475104 3 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 1590 $18.00 $57.34 $28620.00 04-20-2010 01-475104 4 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 1590 $45.00 $143.34 $71550.00 04-20-2010 01-475104 5 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 1590 $35.00 $111.49 $55650.00 04-20-2010 01-475104 6 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 1590 $30.00 $95.56 $47700.00 04-20-2010 01-475104 7 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 1590 $23.00 $73.27 $36570.00 04-20-2010 01-475104 8 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 1590 $13.86 $44.15 $22037.40 04-20-2010 01-475104 9 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 335 $95.00 $302.62 $31825.00 04-27-2010 01-472604 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 335 $32.62 $103.91 $10927.70 04-27-2010 01-472604 2 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 335 $90.00 $286.69 $30150.00 04-27-2010 01-472604 3 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 335 $129.00 $410.92 $43215.00 04-27-2010 01-472604 4 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 335 $145.00 $461.89 $48575.00 04-27-2010 01-472604 5 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 335 $85.00 $270.76 $28475.00 04-27-2010 01-472604 6 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 11 2940 $35.00 $111.49 $102900.00 04-30-2010 11-2T0404 1 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 11 2940 $60.00 $191.13 $176400.00 04-30-2010 11-2T0404 2 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 11 2940 $15.00 $47.78 $44100.00 04-30-2010 11-2T0404 3 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 11 2940 $75.00 $238.91 $220500.00 04-30-2010 11-2T0404 4 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 11 2940 $15.00 $47.78 $44100.00 04-30-2010 11-2T0404 5 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) M3 11 2940 $5.00 $15.93 $14700.00 04-30-2010 11-2T0404 6 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 615 $16.00 $50.97 $9840.00 05-05-2010 01-478304 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 615 $66.00 $210.24 $40590.00 05-05-2010 01-478304 2 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 615 $78.00 $248.46 $47970.00 05-05-2010 01-478304 3 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 615 $115.00 $366.32 $70725.00 05-05-2010 01-478304 4 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 615 $50.00 $159.27 $30750.00 05-05-2010 01-478304 5 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 12 88 $45.00 $143.34 $3960.00 08-26-2010 12-0K3704 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 12 88 $100.00 $318.54 $8800.00 08-26-2010 12-0K3704 2 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 12 88 $75.00 $238.91 $6600.00 08-26-2010 12-0K3704 3 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 12 88 $50.00 $159.27 $4400.00 08-26-2010 12-0K3704 4 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 12 88 $130.00 $414.11 $11440.00 08-26-2010 12-0K3704 5 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 12 88 $72.00 $229.35 $6336.00 08-26-2010 12-0K3704 6 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 12 88 $135.00 $430.03 $11880.00 08-26-2010 12-0K3704 7 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 12 88 $108.30 $344.98 $9530.40 08-26-2010 12-0K3704 8 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 12 88 $300.00 $955.63 $26400.00 08-26-2010 12-0K3704 9 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 12 88 $100.00 $318.54 $8800.00 08-26-2010 12-0K3704 10 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 12 88 $250.00 $796.36 $22000.00 08-26-2010 12-0K3704 11 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 12 88 $235.00 $748.58 $20680.00 08-26-2010 12-0K3704 12 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 12 88 $440.00 $1401.59 $38720.00 08-26-2010 12-0K3704 13 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 12 88 $157.00 $500.11 $13816.00 08-26-2010 12-0K3704 14 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 12 88 $150.00 $477.82 $13200.00 08-26-2010 12-0K3704 15 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 12 88 $500.00 $1592.72 $44000.00 08-26-2010 12-0K3704 16 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 05 2700 $185.00 $589.31 $499500.00 09-16-2010 05-0T5604 1 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 05 2700 $270.00 $860.07 $729000.00 09-16-2010 05-0T5604 2 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 05 2700 $333.00 $1060.75 $899100.00 09-16-2010 05-0T5604 3 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 05 2700 $152.00 $484.19 $410400.00 09-16-2010 05-0T5604 4 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 05 2700 $500.00 $1592.72 $1350000.00 09-16-2010 05-0T5604 5 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 04 17 $35.00 $111.49 $595.00 10-05-2010 04-2285C4 1 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 04 17 $100.00 $318.54 $1700.00 10-05-2010 04-2285C4 2 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 04 17 $120.00 $382.25 $2040.00 10-05-2010 04-2285C4 3 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 04 17 $275.00 $875.99 $4675.00 10-05-2010 04-2285C4 4 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 04 17 $250.00 $796.36 $4250.00 10-05-2010 04-2285C4 5 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 04 17 $50.00 $159.27 $850.00 10-05-2010 04-2285C4 6 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 04 17 $62.00 $197.50 $1054.00 10-05-2010 04-2285C4 7 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 04 17 $125.00 $398.18 $2125.00 10-05-2010 04-2285C4 8 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 04 17 $120.00 $382.25 $2040.00 10-05-2010 04-2285C4 9 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 04 17 $50.00 $159.27 $850.00 10-05-2010 04-2285C4 10 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 04 17 $85.00 $270.76 $1445.00 10-05-2010 04-2285C4 11 M TRO
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 05 328 $100.00 $318.54 $32800.00 10-06-2010 05-0G4004 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 05 328 $150.00 $477.82 $49200.00 10-06-2010 05-0G4004 2 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 05 328 $175.00 $557.45 $57400.00 10-06-2010 05-0G4004 3 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 05 328 $420.00 $1337.88 $137760.00 10-06-2010 05-0G4004 4 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 05 328 $50.00 $159.27 $16400.00 10-06-2010 05-0G4004 5 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 359 $44.00 $140.16 $15796.00 10-20-2010 01-475604 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 359 $106.00 $337.66 $38054.00 10-20-2010 01-475604 2 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 01 359 $60.00 $191.13 $21540.00 10-20-2010 01-475604 3 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 04 116 $88.50 $281.91 $10266.00 10-20-2010 04-3S8414 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 04 116 $71.00 $226.17 $8236.00 10-20-2010 04-3S8414 2 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 04 116 $55.00 $175.20 $6380.00 10-20-2010 04-3S8414 3 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 04 116 $100.00 $318.54 $11600.00 10-20-2010 04-3S8414 4 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 04 116 $129.00 $410.92 $14964.00 10-20-2010 04-3S8414 5 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 04 116 $110.00 $350.40 $12760.00 10-20-2010 04-3S8414 6 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 04 116 $78.00 $248.46 $9048.00 10-20-2010 04-3S8414 7 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 04 116 $175.00 $557.45 $20300.00 10-20-2010 04-3S8414 8 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 04 116 $58.00 $184.76 $6728.00 10-20-2010 04-3S8414 9 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 04 116 $90.00 $286.69 $10440.00 10-20-2010 04-3S8414 10 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 04 606 $110.00 $350.40 $66660.00 10-27-2010 04-3S7404 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 04 606 $43.00 $136.97 $26058.00 10-27-2010 04-3S7404 2 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 04 606 $40.00 $127.42 $24240.00 10-27-2010 04-3S7404 3 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 04 606 $70.00 $222.98 $42420.00 10-27-2010 04-3S7404 4 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 04 606 $145.00 $461.89 $87870.00 10-27-2010 04-3S7404 5 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 04 606 $110.00 $350.40 $66660.00 10-27-2010 04-3S7404 6 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 04 606 $35.00 $111.49 $21210.00 10-27-2010 04-3S7404 7 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 04 606 $95.00 $302.62 $57570.00 10-27-2010 04-3S7404 8 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 04 606 $35.00 $111.49 $21210.00 10-27-2010 04-3S7404 9 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 04 14 $260.00 $828.21 $3640.00 11-16-2010 04-3S8204 1 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 04 14 $82.00 $261.21 $1148.00 11-16-2010 04-3S8204 2 M  
192049 - STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 04 14 $100.00 $318.54 $1400.00 11-16-2010 04-3S8204 3 M  
MORE THAN 500 RESULTS RETURNED. ONLY 500 ROWS SHOWN.
SUMMARY Unmodified Adjusted    
Average Price/Unit: $ Avg No. Units
Std Dev. (of Unit Price): ±$ Rows Selected
Weighted Avg.: $ Rows Returned
Minimum Price/Unit: $    
Maximum Price/Unit: $    

| Back | New Search |

PARAMETERS: Item = 192049; District=All; Year=All; Convert=No; Bidders=All Bidders
TIMESTAMP: 11/13/2026 05:26:50
CURRENT 12-MO INDEX (CHCCI (2020 Base)): 146.53