| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
11 |
1049 |
$240.00 |
$1373.72 |
$251760.00 |
03-14-1996 |
11-048664 |
1 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
1663 |
$38.00 |
$217.51 |
$63194.00 |
09-10-1996 |
04-496424 |
1 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
12 |
930 |
$20.00 |
$114.48 |
$18600.00 |
10-17-1996 |
12-035714 |
1 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
12 |
150 |
$30.00 |
$164.64 |
$4500.00 |
02-06-1997 |
12-0155U4 |
1 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
08 |
4943 |
$40.00 |
$219.52 |
$197720.00 |
05-15-1997 |
08-367614 |
1 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
01 |
132 |
$100.00 |
$523.32 |
$13200.00 |
06-09-1998 |
01-332304 |
1 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
1400 |
$60.00 |
$313.99 |
$84000.00 |
08-11-1998 |
04-0S1314 |
1 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
06 |
9100 |
$15.00 |
$78.50 |
$136500.00 |
11-03-1998 |
06-278614 |
1 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
390 |
$100.00 |
$488.43 |
$39000.00 |
09-15-1999 |
04-268104 |
1 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
340 |
$100.00 |
$474.21 |
$34000.00 |
01-11-2000 |
04-013014 |
1 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
09 |
540 |
$30.00 |
$142.26 |
$16200.00 |
03-15-2000 |
09-213114 |
1 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
45 |
$67.30 |
$319.14 |
$3028.50 |
04-18-2000 |
04-045034 |
1 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
01 |
1873 |
$26.00 |
$123.29 |
$48698.00 |
07-12-2000 |
01-294704 |
1 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
07 |
124 |
$173.00 |
$820.38 |
$21452.00 |
10-12-2000 |
07-191004 |
1 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
2344 |
$50.00 |
$218.70 |
$117200.00 |
12-12-2001 |
04-226124 |
1 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
160 |
$27.00 |
$127.62 |
$4320.00 |
07-16-2002 |
04-006054 |
1 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
05 |
28 |
$608.00 |
$2873.88 |
$17024.00 |
07-30-2002 |
05-0H6304 |
1 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
05 |
28 |
$608.00 |
$2873.88 |
$17024.00 |
07-30-2002 |
05-0H6304 |
2 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
05 |
28 |
$550.00 |
$2599.73 |
$15400.00 |
07-30-2002 |
05-0H6304 |
3 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
05 |
28 |
$200.00 |
$945.35 |
$5600.00 |
07-30-2002 |
05-0H6304 |
4 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
08 |
830 |
$63.00 |
$297.79 |
$52290.00 |
09-12-2002 |
08-334834 |
1 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
08 |
830 |
$40.00 |
$189.07 |
$33200.00 |
09-12-2002 |
08-334834 |
2 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
08 |
830 |
$16.00 |
$75.63 |
$13280.00 |
09-12-2002 |
08-334834 |
3 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
08 |
830 |
$10.00 |
$47.27 |
$8300.00 |
09-12-2002 |
08-334834 |
4 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
08 |
830 |
$30.00 |
$141.80 |
$24900.00 |
09-12-2002 |
08-334834 |
5 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
08 |
830 |
$23.00 |
$108.72 |
$19090.00 |
09-12-2002 |
08-334834 |
6 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
08 |
830 |
$80.00 |
$378.14 |
$66400.00 |
09-12-2002 |
08-334834 |
7 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
08 |
830 |
$15.00 |
$70.90 |
$12450.00 |
09-12-2002 |
08-334834 |
8 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
08 |
830 |
$35.00 |
$165.44 |
$29050.00 |
09-12-2002 |
08-334834 |
9 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
08 |
830 |
$60.00 |
$283.61 |
$49800.00 |
09-12-2002 |
08-334834 |
10 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
08 |
830 |
$14.00 |
$66.17 |
$11620.00 |
09-12-2002 |
08-334834 |
11 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
07 |
11279 |
$11.00 |
$51.99 |
$124069.00 |
09-26-2002 |
07-1198U4 |
1 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
07 |
11279 |
$11.00 |
$51.99 |
$124069.00 |
09-26-2002 |
07-1198U4 |
2 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
07 |
11279 |
$16.00 |
$75.63 |
$180464.00 |
09-26-2002 |
07-1198U4 |
3 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
08 |
340 |
$31.00 |
$138.91 |
$10540.00 |
07-24-2003 |
08-1A76U4 |
1 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
08 |
340 |
$130.00 |
$582.54 |
$44200.00 |
07-24-2003 |
08-1A76U4 |
2 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
08 |
340 |
$160.00 |
$716.97 |
$54400.00 |
07-24-2003 |
08-1A76U4 |
3 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
08 |
340 |
$42.39 |
$189.95 |
$14412.60 |
07-24-2003 |
08-1A76U4 |
4 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
780 |
$36.20 |
$162.21 |
$28236.00 |
09-17-2003 |
04-228444 |
1 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
780 |
$39.00 |
$174.76 |
$30420.00 |
09-17-2003 |
04-228444 |
2 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
780 |
$20.00 |
$89.62 |
$15600.00 |
09-17-2003 |
04-228444 |
3 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
780 |
$50.00 |
$224.05 |
$39000.00 |
09-17-2003 |
04-228444 |
4 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
780 |
$70.00 |
$313.67 |
$54600.00 |
09-17-2003 |
04-228444 |
5 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
780 |
$80.00 |
$358.48 |
$62400.00 |
09-17-2003 |
04-228444 |
6 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
08 |
773 |
$71.00 |
$318.15 |
$54883.00 |
11-13-2003 |
08-446514 |
1 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
08 |
773 |
$70.00 |
$313.67 |
$54110.00 |
11-13-2003 |
08-446514 |
2 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
08 |
773 |
$45.00 |
$201.65 |
$34785.00 |
11-13-2003 |
08-446514 |
3 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
08 |
773 |
$125.00 |
$560.13 |
$96625.00 |
11-13-2003 |
08-446514 |
4 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
08 |
773 |
$110.00 |
$492.91 |
$85030.00 |
11-13-2003 |
08-446514 |
5 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
08 |
773 |
$70.00 |
$313.67 |
$54110.00 |
11-13-2003 |
08-446514 |
6 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
11 |
3700 |
$25.00 |
$74.01 |
$92500.00 |
06-10-2004 |
11-080914 |
1 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
11 |
3700 |
$12.00 |
$35.52 |
$44400.00 |
06-10-2004 |
11-080914 |
2 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
11 |
3700 |
$20.00 |
$59.20 |
$74000.00 |
06-10-2004 |
11-080914 |
3 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
11 |
3700 |
$50.00 |
$148.01 |
$185000.00 |
06-10-2004 |
11-080914 |
4 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
11 |
3700 |
$13.00 |
$38.48 |
$48100.00 |
06-10-2004 |
11-080914 |
5 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
2880 |
$24.00 |
$61.91 |
$69120.00 |
01-11-2005 |
04-1123C4 |
1 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
2880 |
$24.00 |
$61.91 |
$69120.00 |
01-11-2005 |
04-1123C4 |
2 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
2880 |
$8.00 |
$20.64 |
$23040.00 |
01-11-2005 |
04-1123C4 |
3 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
2880 |
$40.00 |
$103.19 |
$115200.00 |
01-11-2005 |
04-1123C4 |
4 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
2880 |
$12.00 |
$30.96 |
$34560.00 |
01-11-2005 |
04-1123C4 |
5 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
2880 |
$20.00 |
$51.60 |
$57600.00 |
01-11-2005 |
04-1123C4 |
6 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
2880 |
$35.00 |
$90.29 |
$100800.00 |
01-11-2005 |
04-1123C4 |
7 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
2880 |
$400.00 |
$1031.90 |
$1152000.00 |
01-11-2005 |
04-1123C4 |
8 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
210 |
$60.00 |
$154.79 |
$12600.00 |
05-10-2005 |
04-278204 |
1 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
210 |
$172.73 |
$445.60 |
$36273.30 |
05-10-2005 |
04-278204 |
2 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
210 |
$125.00 |
$322.47 |
$26250.00 |
05-10-2005 |
04-278204 |
3 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
12 |
54 |
$164.00 |
$423.08 |
$8856.00 |
05-26-2005 |
12-0A7614 |
1 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
12 |
54 |
$450.00 |
$1160.89 |
$24300.00 |
05-26-2005 |
12-0A7614 |
2 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
12 |
54 |
$135.00 |
$348.27 |
$7290.00 |
05-26-2005 |
12-0A7614 |
3 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
12 |
54 |
$200.00 |
$515.95 |
$10800.00 |
05-26-2005 |
12-0A7614 |
4 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
620 |
$150.00 |
$386.96 |
$93000.00 |
08-16-2005 |
04-1S3224 |
1 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
620 |
$105.00 |
$270.87 |
$65100.00 |
08-16-2005 |
04-1S3224 |
2 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
620 |
$115.00 |
$296.67 |
$71300.00 |
08-16-2005 |
04-1S3224 |
3 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
620 |
$150.00 |
$386.96 |
$93000.00 |
08-16-2005 |
04-1S3224 |
4 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
2015 |
$70.00 |
$180.58 |
$141050.00 |
11-16-2005 |
04-263704 |
1 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
2015 |
$18.00 |
$46.44 |
$36270.00 |
11-16-2005 |
04-263704 |
2 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
2015 |
$40.00 |
$103.19 |
$80600.00 |
11-16-2005 |
04-263704 |
3 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
2015 |
$4.00 |
$10.32 |
$8060.00 |
11-16-2005 |
04-263704 |
4 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
2015 |
$56.00 |
$144.47 |
$112840.00 |
11-16-2005 |
04-263704 |
5 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
2015 |
$26.00 |
$67.07 |
$52390.00 |
11-16-2005 |
04-263704 |
6 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
2015 |
$100.00 |
$257.98 |
$201500.00 |
11-16-2005 |
04-263704 |
7 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
05 |
860 |
$10.00 |
$24.92 |
$8600.00 |
01-24-2006 |
05-129104 |
1 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
05 |
860 |
$50.00 |
$124.60 |
$43000.00 |
01-24-2006 |
05-129104 |
2 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
05 |
860 |
$100.00 |
$249.20 |
$86000.00 |
01-24-2006 |
05-129104 |
3 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
05 |
860 |
$50.00 |
$124.60 |
$43000.00 |
01-24-2006 |
05-129104 |
4 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
05 |
860 |
$30.00 |
$74.76 |
$25800.00 |
01-24-2006 |
05-129104 |
5 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
12 |
270 |
$44.00 |
$109.65 |
$11880.00 |
11-02-2006 |
12-056214 |
1 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
12 |
270 |
$120.00 |
$299.04 |
$32400.00 |
11-02-2006 |
12-056214 |
2 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
12 |
270 |
$80.00 |
$199.36 |
$21600.00 |
11-02-2006 |
12-056214 |
3 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
12 |
270 |
$45.00 |
$112.14 |
$12150.00 |
11-02-2006 |
12-056214 |
4 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
12 |
270 |
$25.00 |
$62.30 |
$6750.00 |
11-02-2006 |
12-056214 |
5 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
12 |
270 |
$45.00 |
$112.14 |
$12150.00 |
11-02-2006 |
12-056214 |
6 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
12 |
270 |
$110.00 |
$274.12 |
$29700.00 |
11-02-2006 |
12-056214 |
7 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
12 |
270 |
$100.00 |
$249.20 |
$27000.00 |
11-02-2006 |
12-056214 |
8 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
12 |
270 |
$190.00 |
$473.48 |
$51300.00 |
11-02-2006 |
12-056214 |
9 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
12 |
270 |
$90.00 |
$224.28 |
$24300.00 |
11-02-2006 |
12-056214 |
10 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
820 |
$50.00 |
$124.60 |
$41000.00 |
11-14-2006 |
04-1123U4 |
1 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
820 |
$25.00 |
$62.30 |
$20500.00 |
11-14-2006 |
04-1123U4 |
2 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
11 |
872 |
$50.00 |
$125.24 |
$43600.00 |
01-25-2007 |
11-224314 |
1 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
11 |
872 |
$82.00 |
$205.39 |
$71504.00 |
01-25-2007 |
11-224314 |
2 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
11 |
872 |
$50.00 |
$125.24 |
$43600.00 |
01-25-2007 |
11-224314 |
3 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
11 |
872 |
$70.00 |
$175.34 |
$61040.00 |
01-25-2007 |
11-224314 |
4 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
11 |
872 |
$110.00 |
$275.53 |
$95920.00 |
01-25-2007 |
11-224314 |
5 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
11 |
872 |
$42.00 |
$105.20 |
$36624.00 |
01-25-2007 |
11-224314 |
6 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
11 |
872 |
$70.00 |
$175.34 |
$61040.00 |
01-25-2007 |
11-224314 |
7 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
11 |
872 |
$19.00 |
$47.59 |
$16568.00 |
01-25-2007 |
11-224314 |
8 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
1720 |
$35.00 |
$87.67 |
$60200.00 |
04-24-2007 |
04-174934 |
1 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
1720 |
$33.00 |
$82.66 |
$56760.00 |
04-24-2007 |
04-174934 |
2 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
1720 |
$90.00 |
$225.43 |
$154800.00 |
04-24-2007 |
04-174934 |
3 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
11 |
1750 |
$50.00 |
$125.24 |
$87500.00 |
06-28-2007 |
11-2358U4 |
1 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
11 |
1750 |
$95.00 |
$237.95 |
$166250.00 |
06-28-2007 |
11-2358U4 |
2 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
11 |
1750 |
$160.00 |
$400.77 |
$280000.00 |
06-28-2007 |
11-2358U4 |
3 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
11 |
1750 |
$50.00 |
$125.24 |
$87500.00 |
06-28-2007 |
11-2358U4 |
4 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
11 |
1750 |
$60.00 |
$150.29 |
$105000.00 |
06-28-2007 |
11-2358U4 |
5 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
11 |
1750 |
$70.00 |
$175.34 |
$122500.00 |
06-28-2007 |
11-2358U4 |
6 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
2860 |
$50.00 |
$125.24 |
$143000.00 |
08-08-2007 |
04-2S2204 |
1 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
2860 |
$38.00 |
$95.18 |
$108680.00 |
08-08-2007 |
04-2S2204 |
2 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
2860 |
$82.00 |
$205.39 |
$234520.00 |
08-08-2007 |
04-2S2204 |
3 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
2860 |
$90.00 |
$225.43 |
$257400.00 |
08-08-2007 |
04-2S2204 |
4 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
2860 |
$84.00 |
$210.40 |
$240240.00 |
08-08-2007 |
04-2S2204 |
5 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
05 |
2520 |
$55.00 |
$137.76 |
$138600.00 |
12-11-2007 |
05-0K3204 |
1 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
05 |
2520 |
$75.00 |
$187.86 |
$189000.00 |
12-11-2007 |
05-0K3204 |
2 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
05 |
2520 |
$80.00 |
$200.38 |
$201600.00 |
12-11-2007 |
05-0K3204 |
3 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
05 |
2520 |
$98.00 |
$245.47 |
$246960.00 |
12-11-2007 |
05-0K3204 |
4 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
05 |
2520 |
$120.00 |
$300.57 |
$302400.00 |
12-11-2007 |
05-0K3204 |
5 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
05 |
2520 |
$160.00 |
$400.77 |
$403200.00 |
12-11-2007 |
05-0K3204 |
6 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
05 |
2520 |
$170.00 |
$425.81 |
$428400.00 |
12-11-2007 |
05-0K3204 |
7 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
05 |
2520 |
$80.00 |
$200.38 |
$201600.00 |
12-11-2007 |
05-0K3204 |
8 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
07 |
60 |
$80.00 |
$213.91 |
$4800.00 |
02-21-2008 |
07-168004 |
1 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
07 |
60 |
$260.00 |
$695.22 |
$15600.00 |
02-21-2008 |
07-168004 |
2 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
07 |
60 |
$250.00 |
$668.48 |
$15000.00 |
02-21-2008 |
07-168004 |
3 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
07 |
60 |
$75.00 |
$200.54 |
$4500.00 |
02-21-2008 |
07-168004 |
4 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
11 |
240 |
$110.00 |
$294.13 |
$26400.00 |
03-20-2008 |
11-2T0004 |
1 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
11 |
240 |
$40.00 |
$106.96 |
$9600.00 |
03-20-2008 |
11-2T0004 |
2 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
11 |
240 |
$100.00 |
$267.39 |
$24000.00 |
03-20-2008 |
11-2T0004 |
3 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
11 |
240 |
$65.00 |
$173.80 |
$15600.00 |
03-20-2008 |
11-2T0004 |
4 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
11 |
240 |
$25.00 |
$66.85 |
$6000.00 |
03-20-2008 |
11-2T0004 |
5 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
11 |
240 |
$50.00 |
$133.70 |
$12000.00 |
03-20-2008 |
11-2T0004 |
6 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
11 |
155 |
$350.00 |
$935.87 |
$54250.00 |
05-01-2008 |
11-2T0914 |
1 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
11 |
155 |
$33.00 |
$88.24 |
$5115.00 |
05-01-2008 |
11-2T0914 |
2 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
11 |
155 |
$100.00 |
$267.39 |
$15500.00 |
05-01-2008 |
11-2T0914 |
3 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
11 |
155 |
$220.00 |
$588.26 |
$34100.00 |
05-01-2008 |
11-2T0914 |
4 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
11 |
155 |
$58.00 |
$155.09 |
$8990.00 |
05-01-2008 |
11-2T0914 |
5 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
11 |
155 |
$115.00 |
$307.50 |
$17825.00 |
05-01-2008 |
11-2T0914 |
6 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
11 |
155 |
$100.00 |
$267.39 |
$15500.00 |
05-01-2008 |
11-2T0914 |
7 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
11 |
495 |
$45.00 |
$120.33 |
$22275.00 |
07-10-2008 |
11-2T0924 |
1 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
11 |
495 |
$178.00 |
$475.96 |
$88110.00 |
07-10-2008 |
11-2T0924 |
2 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
11 |
495 |
$95.00 |
$254.02 |
$47025.00 |
07-10-2008 |
11-2T0924 |
3 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
76 |
$383.50 |
$1025.44 |
$29146.00 |
08-19-2008 |
04-253794 |
1 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
76 |
$70.00 |
$187.17 |
$5320.00 |
08-19-2008 |
04-253794 |
2 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
76 |
$100.00 |
$267.39 |
$7600.00 |
08-19-2008 |
04-253794 |
3 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
76 |
$100.00 |
$267.39 |
$7600.00 |
08-19-2008 |
04-253794 |
4 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
76 |
$120.00 |
$320.87 |
$9120.00 |
08-19-2008 |
04-253794 |
5 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
76 |
$95.00 |
$254.02 |
$7220.00 |
08-19-2008 |
04-253794 |
6 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
76 |
$300.00 |
$802.17 |
$22800.00 |
08-19-2008 |
04-253794 |
7 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
76 |
$150.00 |
$401.09 |
$11400.00 |
08-19-2008 |
04-253794 |
8 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
76 |
$293.00 |
$783.45 |
$22268.00 |
08-19-2008 |
04-253794 |
9 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
76 |
$100.00 |
$267.39 |
$7600.00 |
08-19-2008 |
04-253794 |
10 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
185 |
$70.00 |
$187.17 |
$12950.00 |
08-19-2008 |
04-3S7704 |
1 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
185 |
$103.00 |
$275.41 |
$19055.00 |
08-19-2008 |
04-3S7704 |
2 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
185 |
$117.00 |
$312.85 |
$21645.00 |
08-19-2008 |
04-3S7704 |
3 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
185 |
$250.00 |
$668.48 |
$46250.00 |
08-19-2008 |
04-3S7704 |
4 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
185 |
$111.86 |
$299.10 |
$20694.10 |
08-19-2008 |
04-3S7704 |
5 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
185 |
$135.00 |
$360.98 |
$24975.00 |
08-19-2008 |
04-3S7704 |
6 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
185 |
$465.00 |
$1243.37 |
$86025.00 |
08-19-2008 |
04-3S7704 |
7 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
185 |
$500.00 |
$1336.95 |
$92500.00 |
08-19-2008 |
04-3S7704 |
8 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
05 |
940 |
$12.50 |
$33.42 |
$11750.00 |
09-23-2008 |
05-485624 |
1 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
05 |
940 |
$103.10 |
$275.68 |
$96914.00 |
09-23-2008 |
05-485624 |
2 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
05 |
940 |
$50.00 |
$133.70 |
$47000.00 |
09-23-2008 |
05-485624 |
3 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
05 |
940 |
$21.00 |
$56.15 |
$19740.00 |
09-23-2008 |
05-485624 |
4 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
05 |
940 |
$69.50 |
$185.84 |
$65330.00 |
09-23-2008 |
05-485624 |
5 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
05 |
940 |
$44.00 |
$117.65 |
$41360.00 |
09-23-2008 |
05-485624 |
6 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
05 |
940 |
$35.00 |
$93.59 |
$32900.00 |
09-23-2008 |
05-485624 |
7 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
05 |
940 |
$60.00 |
$160.43 |
$56400.00 |
09-23-2008 |
05-485624 |
8 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
05 |
940 |
$245.22 |
$655.70 |
$230506.80 |
09-23-2008 |
05-485624 |
9 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
02 |
16 |
$300.00 |
$802.17 |
$4800.00 |
10-28-2008 |
02-1C1604 |
1 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
02 |
16 |
$270.00 |
$721.95 |
$4320.00 |
10-28-2008 |
02-1C1604 |
2 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
02 |
16 |
$450.00 |
$1203.26 |
$7200.00 |
10-28-2008 |
02-1C1604 |
3 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
02 |
16 |
$90.00 |
$240.65 |
$1440.00 |
10-28-2008 |
02-1C1604 |
4 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
02 |
16 |
$97.00 |
$259.37 |
$1552.00 |
10-28-2008 |
02-1C1604 |
5 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
02 |
16 |
$200.00 |
$534.78 |
$3200.00 |
10-28-2008 |
02-1C1604 |
6 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
02 |
16 |
$185.00 |
$494.67 |
$2960.00 |
10-28-2008 |
02-1C1604 |
7 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
02 |
16 |
$182.00 |
$486.65 |
$2912.00 |
10-28-2008 |
02-1C1604 |
8 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
02 |
16 |
$440.00 |
$1176.52 |
$7040.00 |
10-28-2008 |
02-1C1604 |
9 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
02 |
16 |
$300.00 |
$802.17 |
$4800.00 |
10-28-2008 |
02-1C1604 |
10 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
02 |
16 |
$100.00 |
$267.39 |
$1600.00 |
10-28-2008 |
02-1C1604 |
11 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
02 |
16 |
$200.00 |
$534.78 |
$3200.00 |
10-28-2008 |
02-1C1604 |
12 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
08 |
53 |
$297.00 |
$794.15 |
$15741.00 |
11-13-2008 |
08-472304 |
1 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
08 |
53 |
$75.00 |
$200.54 |
$3975.00 |
11-13-2008 |
08-472304 |
2 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
08 |
53 |
$105.00 |
$280.76 |
$5565.00 |
11-13-2008 |
08-472304 |
3 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
08 |
53 |
$288.00 |
$770.08 |
$15264.00 |
11-13-2008 |
08-472304 |
4 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
08 |
53 |
$76.00 |
$203.22 |
$4028.00 |
11-13-2008 |
08-472304 |
5 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
08 |
53 |
$80.00 |
$213.91 |
$4240.00 |
11-13-2008 |
08-472304 |
6 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
08 |
53 |
$200.00 |
$534.78 |
$10600.00 |
11-13-2008 |
08-472304 |
7 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
1050 |
$40.00 |
$106.96 |
$42000.00 |
11-14-2008 |
04-448804 |
1 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
1050 |
$60.00 |
$160.43 |
$63000.00 |
11-14-2008 |
04-448804 |
2 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
1050 |
$70.00 |
$187.17 |
$73500.00 |
11-14-2008 |
04-448804 |
3 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
1050 |
$40.00 |
$106.96 |
$42000.00 |
11-14-2008 |
04-448804 |
4 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
1050 |
$25.00 |
$66.85 |
$26250.00 |
11-14-2008 |
04-448804 |
5 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
1050 |
$25.00 |
$66.85 |
$26250.00 |
11-14-2008 |
04-448804 |
6 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
1050 |
$100.00 |
$267.39 |
$105000.00 |
11-14-2008 |
04-448804 |
7 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
1050 |
$56.00 |
$149.74 |
$58800.00 |
11-14-2008 |
04-448804 |
8 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
1050 |
$50.00 |
$133.70 |
$52500.00 |
11-14-2008 |
04-448804 |
9 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
1050 |
$30.00 |
$80.22 |
$31500.00 |
11-14-2008 |
04-448804 |
10 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
1050 |
$200.00 |
$534.78 |
$210000.00 |
11-14-2008 |
04-448804 |
11 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
955 |
$175.00 |
$467.93 |
$167125.00 |
12-10-2008 |
04-4A5204 |
1 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
955 |
$45.00 |
$120.33 |
$42975.00 |
12-10-2008 |
04-4A5204 |
2 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
955 |
$50.00 |
$133.70 |
$47750.00 |
12-10-2008 |
04-4A5204 |
3 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
955 |
$10.00 |
$26.74 |
$9550.00 |
12-10-2008 |
04-4A5204 |
4 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
955 |
$20.25 |
$54.15 |
$19338.75 |
12-10-2008 |
04-4A5204 |
5 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
955 |
$160.00 |
$427.82 |
$152800.00 |
12-10-2008 |
04-4A5204 |
6 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
955 |
$48.00 |
$128.35 |
$45840.00 |
12-10-2008 |
04-4A5204 |
7 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
955 |
$24.00 |
$64.17 |
$22920.00 |
12-10-2008 |
04-4A5204 |
8 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
955 |
$38.00 |
$101.61 |
$36290.00 |
12-10-2008 |
04-4A5204 |
9 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
955 |
$75.00 |
$200.54 |
$71625.00 |
12-10-2008 |
04-4A5204 |
10 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
955 |
$75.00 |
$200.54 |
$71625.00 |
12-10-2008 |
04-4A5204 |
11 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
955 |
$100.00 |
$267.39 |
$95500.00 |
12-10-2008 |
04-4A5204 |
12 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
02 |
156 |
$26.50 |
$84.41 |
$4134.00 |
03-24-2009 |
02-3C0804 |
1 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
02 |
156 |
$30.00 |
$95.56 |
$4680.00 |
03-24-2009 |
02-3C0804 |
2 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
02 |
156 |
$180.00 |
$573.38 |
$28080.00 |
03-24-2009 |
02-3C0804 |
3 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
02 |
156 |
$120.00 |
$382.25 |
$18720.00 |
03-24-2009 |
02-3C0804 |
4 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
02 |
156 |
$49.00 |
$156.09 |
$7644.00 |
03-24-2009 |
02-3C0804 |
5 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
02 |
156 |
$180.00 |
$573.38 |
$28080.00 |
03-24-2009 |
02-3C0804 |
6 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
02 |
156 |
$16.92 |
$53.90 |
$2639.52 |
03-24-2009 |
02-3C0804 |
7 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
02 |
156 |
$75.00 |
$238.91 |
$11700.00 |
03-24-2009 |
02-3C0804 |
8 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
154 |
$150.00 |
$477.82 |
$23100.00 |
07-29-2009 |
04-165424 |
1 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
154 |
$75.00 |
$238.91 |
$11550.00 |
07-29-2009 |
04-165424 |
2 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
154 |
$48.00 |
$152.90 |
$7392.00 |
07-29-2009 |
04-165424 |
3 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
154 |
$500.00 |
$1592.72 |
$77000.00 |
07-29-2009 |
04-165424 |
4 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
154 |
$275.00 |
$875.99 |
$42350.00 |
07-29-2009 |
04-165424 |
5 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
154 |
$150.00 |
$477.82 |
$23100.00 |
07-29-2009 |
04-165424 |
6 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
154 |
$100.00 |
$318.54 |
$15400.00 |
07-29-2009 |
04-165424 |
7 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
154 |
$100.00 |
$318.54 |
$15400.00 |
07-29-2009 |
04-165424 |
8 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
12 |
8145 |
$17.00 |
$54.15 |
$138465.00 |
07-30-2009 |
12-0G0404 |
1 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
12 |
8145 |
$16.00 |
$50.97 |
$130320.00 |
07-30-2009 |
12-0G0404 |
2 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
12 |
8145 |
$25.00 |
$79.64 |
$203625.00 |
07-30-2009 |
12-0G0404 |
3 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
12 |
8145 |
$85.00 |
$270.76 |
$692325.00 |
07-30-2009 |
12-0G0404 |
4 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
12 |
8145 |
$9.00 |
$28.67 |
$73305.00 |
07-30-2009 |
12-0G0404 |
5 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
12 |
8145 |
$13.00 |
$41.41 |
$105885.00 |
07-30-2009 |
12-0G0404 |
6 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
12 |
8145 |
$75.00 |
$238.91 |
$610875.00 |
07-30-2009 |
12-0G0404 |
7 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
12 |
8145 |
$28.00 |
$89.19 |
$228060.00 |
07-30-2009 |
12-0G0404 |
8 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
12 |
8145 |
$50.00 |
$159.27 |
$407250.00 |
07-30-2009 |
12-0G0404 |
9 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
1630 |
$26.00 |
$82.82 |
$42380.00 |
09-29-2009 |
04-294914 |
1 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
1630 |
$75.00 |
$238.91 |
$122250.00 |
09-29-2009 |
04-294914 |
2 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
1630 |
$55.00 |
$175.20 |
$89650.00 |
09-29-2009 |
04-294914 |
3 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
1630 |
$96.00 |
$305.80 |
$156480.00 |
09-29-2009 |
04-294914 |
4 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
4330 |
$30.00 |
$95.56 |
$129900.00 |
10-06-2009 |
04-263724 |
1 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
4330 |
$30.00 |
$95.56 |
$129900.00 |
10-06-2009 |
04-263724 |
2 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
4330 |
$21.00 |
$66.89 |
$90930.00 |
10-06-2009 |
04-263724 |
3 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
4330 |
$21.00 |
$66.89 |
$90930.00 |
10-06-2009 |
04-263724 |
4 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
4330 |
$17.00 |
$54.15 |
$73610.00 |
10-06-2009 |
04-263724 |
5 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
4330 |
$20.00 |
$63.71 |
$86600.00 |
10-06-2009 |
04-263724 |
6 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
4330 |
$34.90 |
$111.17 |
$151117.00 |
10-06-2009 |
04-263724 |
7 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
4330 |
$33.00 |
$105.12 |
$142890.00 |
10-06-2009 |
04-263724 |
8 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
4330 |
$40.00 |
$127.42 |
$173200.00 |
10-06-2009 |
04-263724 |
9 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
2876 |
$22.50 |
$71.67 |
$64710.00 |
11-10-2009 |
04-283814 |
1 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
2876 |
$23.00 |
$73.27 |
$66148.00 |
11-10-2009 |
04-283814 |
2 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
2876 |
$26.55 |
$84.57 |
$76357.80 |
11-10-2009 |
04-283814 |
3 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
2876 |
$5.00 |
$15.93 |
$14380.00 |
11-10-2009 |
04-283814 |
4 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
2876 |
$8.00 |
$25.48 |
$23008.00 |
11-10-2009 |
04-283814 |
5 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
2876 |
$20.00 |
$63.71 |
$57520.00 |
11-10-2009 |
04-283814 |
6 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
2876 |
$30.00 |
$95.56 |
$86280.00 |
11-10-2009 |
04-283814 |
7 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
2876 |
$32.00 |
$101.93 |
$92032.00 |
11-10-2009 |
04-283814 |
8 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
2876 |
$20.00 |
$63.71 |
$57520.00 |
11-10-2009 |
04-283814 |
9 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
2876 |
$45.00 |
$143.34 |
$129420.00 |
11-10-2009 |
04-283814 |
10 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
2876 |
$36.00 |
$114.68 |
$103536.00 |
11-10-2009 |
04-283814 |
11 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
2876 |
$20.00 |
$63.71 |
$57520.00 |
11-10-2009 |
04-283814 |
12 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
2876 |
$22.00 |
$70.08 |
$63272.00 |
11-10-2009 |
04-283814 |
13 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
04 |
2876 |
$140.00 |
$445.96 |
$402640.00 |
11-10-2009 |
04-283814 |
14 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
2698 |
$30.00 |
$95.56 |
$80940.00 |
10-05-2010 |
04-2285C4 |
1 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
2698 |
$10.00 |
$31.85 |
$26980.00 |
10-05-2010 |
04-2285C4 |
2 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
2698 |
$19.00 |
$60.52 |
$51262.00 |
10-05-2010 |
04-2285C4 |
3 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
2698 |
$18.00 |
$57.34 |
$48564.00 |
10-05-2010 |
04-2285C4 |
4 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
2698 |
$25.00 |
$79.64 |
$67450.00 |
10-05-2010 |
04-2285C4 |
5 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
2698 |
$14.00 |
$44.60 |
$37772.00 |
10-05-2010 |
04-2285C4 |
6 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
2698 |
$28.00 |
$89.19 |
$75544.00 |
10-05-2010 |
04-2285C4 |
7 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
2698 |
$13.00 |
$41.41 |
$35074.00 |
10-05-2010 |
04-2285C4 |
8 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
2698 |
$20.00 |
$63.71 |
$53960.00 |
10-05-2010 |
04-2285C4 |
9 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
2698 |
$30.00 |
$95.56 |
$80940.00 |
10-05-2010 |
04-2285C4 |
10 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
2698 |
$20.00 |
$63.71 |
$53960.00 |
10-05-2010 |
04-2285C4 |
11 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
05 |
475 |
$120.00 |
$382.25 |
$57000.00 |
11-30-2010 |
05-0161E4 |
1 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
05 |
475 |
$23.00 |
$73.27 |
$10925.00 |
11-30-2010 |
05-0161E4 |
2 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
05 |
475 |
$100.00 |
$318.54 |
$47500.00 |
11-30-2010 |
05-0161E4 |
3 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
05 |
475 |
$70.00 |
$222.98 |
$33250.00 |
11-30-2010 |
05-0161E4 |
4 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
05 |
475 |
$100.00 |
$318.54 |
$47500.00 |
11-30-2010 |
05-0161E4 |
5 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
05 |
475 |
$46.00 |
$146.53 |
$21850.00 |
11-30-2010 |
05-0161E4 |
6 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
M3 |
05 |
475 |
$160.00 |
$509.67 |
$76000.00 |
11-30-2010 |
05-0161E4 |
7 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
02 |
242 |
$57.50 |
$163.28 |
$13915.00 |
08-16-2011 |
02-2E2004 |
1 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
02 |
242 |
$55.00 |
$156.19 |
$13310.00 |
08-16-2011 |
02-2E2004 |
2 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
02 |
242 |
$75.00 |
$212.98 |
$18150.00 |
08-16-2011 |
02-2E2004 |
3 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
02 |
242 |
$172.00 |
$488.43 |
$41624.00 |
08-16-2011 |
02-2E2004 |
4 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
07 |
2450 |
$25.00 |
$70.99 |
$61250.00 |
09-08-2011 |
07-2332A4 |
1 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
07 |
2450 |
$50.00 |
$141.99 |
$122500.00 |
09-08-2011 |
07-2332A4 |
2 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
07 |
2450 |
$25.00 |
$70.99 |
$61250.00 |
09-08-2011 |
07-2332A4 |
3 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
07 |
2450 |
$25.00 |
$70.99 |
$61250.00 |
09-08-2011 |
07-2332A4 |
4 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
07 |
2450 |
$65.00 |
$184.58 |
$159250.00 |
09-08-2011 |
07-2332A4 |
5 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
07 |
2450 |
$26.00 |
$73.83 |
$63700.00 |
09-08-2011 |
07-2332A4 |
6 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
07 |
2450 |
$25.00 |
$70.99 |
$61250.00 |
09-08-2011 |
07-2332A4 |
7 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
07 |
2450 |
$78.80 |
$223.77 |
$193060.00 |
09-08-2011 |
07-2332A4 |
8 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
07 |
2450 |
$25.00 |
$70.99 |
$61250.00 |
09-08-2011 |
07-2332A4 |
9 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
07 |
2450 |
$70.00 |
$198.78 |
$171500.00 |
09-08-2011 |
07-2332A4 |
10 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
07 |
2450 |
$16.00 |
$45.44 |
$39200.00 |
09-08-2011 |
07-2332A4 |
11 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
900 |
$25.00 |
$70.99 |
$22500.00 |
09-14-2011 |
04-2285E4 |
1 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
900 |
$16.00 |
$45.44 |
$14400.00 |
09-14-2011 |
04-2285E4 |
2 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
900 |
$50.00 |
$141.99 |
$45000.00 |
09-14-2011 |
04-2285E4 |
3 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
900 |
$24.00 |
$68.15 |
$21600.00 |
09-14-2011 |
04-2285E4 |
4 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
900 |
$11.00 |
$31.24 |
$9900.00 |
09-14-2011 |
04-2285E4 |
5 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
900 |
$35.00 |
$99.39 |
$31500.00 |
09-14-2011 |
04-2285E4 |
6 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
900 |
$60.00 |
$170.38 |
$54000.00 |
09-14-2011 |
04-2285E4 |
7 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
900 |
$60.00 |
$170.38 |
$54000.00 |
09-14-2011 |
04-2285E4 |
8 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
900 |
$24.00 |
$68.15 |
$21600.00 |
09-14-2011 |
04-2285E4 |
9 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
2890 |
$26.00 |
$73.83 |
$75140.00 |
09-27-2011 |
04-4A07U4 |
1 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
2890 |
$145.00 |
$411.76 |
$419050.00 |
09-27-2011 |
04-4A07U4 |
2 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
2890 |
$12.00 |
$34.08 |
$34680.00 |
09-27-2011 |
04-4A07U4 |
3 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
2890 |
$31.15 |
$88.46 |
$90023.50 |
09-27-2011 |
04-4A07U4 |
4 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
2890 |
$20.00 |
$56.79 |
$57800.00 |
09-27-2011 |
04-4A07U4 |
5 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
2890 |
$70.00 |
$198.78 |
$202300.00 |
09-27-2011 |
04-4A07U4 |
6 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
2890 |
$108.00 |
$306.69 |
$312120.00 |
09-27-2011 |
04-4A07U4 |
7 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
2890 |
$30.00 |
$85.19 |
$86700.00 |
09-27-2011 |
04-4A07U4 |
8 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
2890 |
$44.00 |
$124.95 |
$127160.00 |
09-27-2011 |
04-4A07U4 |
9 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
2890 |
$100.00 |
$283.97 |
$289000.00 |
09-27-2011 |
04-4A07U4 |
10 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
2890 |
$65.00 |
$184.58 |
$187850.00 |
09-27-2011 |
04-4A07U4 |
11 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
435 |
$44.00 |
$124.95 |
$19140.00 |
10-25-2011 |
04-298304 |
1 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
435 |
$30.00 |
$85.19 |
$13050.00 |
10-25-2011 |
04-298304 |
2 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
435 |
$70.00 |
$198.78 |
$30450.00 |
10-25-2011 |
04-298304 |
3 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
435 |
$35.00 |
$99.39 |
$15225.00 |
10-25-2011 |
04-298304 |
4 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
435 |
$38.00 |
$107.91 |
$16530.00 |
10-25-2011 |
04-298304 |
5 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
435 |
$30.00 |
$85.19 |
$13050.00 |
10-25-2011 |
04-298304 |
6 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
3410 |
$25.00 |
$70.99 |
$85250.00 |
12-06-2011 |
04-264134 |
1 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
3410 |
$13.00 |
$36.92 |
$44330.00 |
12-06-2011 |
04-264134 |
2 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
3410 |
$18.00 |
$51.12 |
$61380.00 |
12-06-2011 |
04-264134 |
3 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
3410 |
$15.00 |
$42.60 |
$51150.00 |
12-06-2011 |
04-264134 |
4 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
3410 |
$15.50 |
$44.02 |
$52855.00 |
12-06-2011 |
04-264134 |
5 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
3410 |
$15.00 |
$42.60 |
$51150.00 |
12-06-2011 |
04-264134 |
6 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
3410 |
$35.00 |
$99.39 |
$119350.00 |
12-06-2011 |
04-264134 |
7 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
08 |
4743 |
$90.00 |
$255.58 |
$426870.00 |
12-08-2011 |
08-448404 |
1 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
08 |
4743 |
$25.00 |
$70.99 |
$118575.00 |
12-08-2011 |
08-448404 |
2 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
08 |
4743 |
$20.00 |
$56.79 |
$94860.00 |
12-08-2011 |
08-448404 |
3 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
08 |
4743 |
$9.00 |
$25.56 |
$42687.00 |
12-08-2011 |
08-448404 |
4 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
08 |
4743 |
$20.00 |
$56.79 |
$94860.00 |
12-08-2011 |
08-448404 |
5 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
08 |
4743 |
$15.00 |
$42.60 |
$71145.00 |
12-08-2011 |
08-448404 |
6 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
08 |
4743 |
$32.00 |
$90.87 |
$151776.00 |
12-08-2011 |
08-448404 |
7 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
30610 |
$14.00 |
$39.76 |
$428540.00 |
12-13-2011 |
04-264144 |
1 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
30610 |
$10.00 |
$28.40 |
$306100.00 |
12-13-2011 |
04-264144 |
2 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
30610 |
$17.00 |
$48.28 |
$520370.00 |
12-13-2011 |
04-264144 |
3 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
30610 |
$4.00 |
$11.36 |
$122440.00 |
12-13-2011 |
04-264144 |
4 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
30610 |
$28.00 |
$79.51 |
$857080.00 |
12-13-2011 |
04-264144 |
5 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
30610 |
$19.00 |
$53.95 |
$581590.00 |
12-13-2011 |
04-264144 |
6 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
30610 |
$30.00 |
$85.19 |
$918300.00 |
12-13-2011 |
04-264144 |
7 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
1018 |
$50.00 |
$143.94 |
$50900.00 |
02-22-2012 |
04-297614 |
1 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
1018 |
$20.00 |
$57.58 |
$20360.00 |
02-22-2012 |
04-297614 |
2 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
1018 |
$11.00 |
$31.67 |
$11198.00 |
02-22-2012 |
04-297614 |
3 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
1018 |
$35.00 |
$100.76 |
$35630.00 |
02-22-2012 |
04-297614 |
4 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
1018 |
$12.00 |
$34.55 |
$12216.00 |
02-22-2012 |
04-297614 |
5 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
1018 |
$48.00 |
$138.18 |
$48864.00 |
02-22-2012 |
04-297614 |
6 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
1018 |
$25.00 |
$71.97 |
$25450.00 |
02-22-2012 |
04-297614 |
7 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
1018 |
$43.00 |
$123.79 |
$43774.00 |
02-22-2012 |
04-297614 |
8 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
1018 |
$210.00 |
$604.54 |
$213780.00 |
02-22-2012 |
04-297614 |
9 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
1018 |
$14.00 |
$40.30 |
$14252.00 |
02-22-2012 |
04-297614 |
10 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
1018 |
$27.00 |
$77.73 |
$27486.00 |
02-22-2012 |
04-297614 |
11 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
1018 |
$110.00 |
$316.67 |
$111980.00 |
02-22-2012 |
04-297614 |
12 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
2890 |
$20.00 |
$54.98 |
$57800.00 |
04-25-2012 |
04-4A07U4 |
1 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
2890 |
$26.00 |
$71.48 |
$75140.00 |
04-25-2012 |
04-4A07U4 |
2 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
2890 |
$12.00 |
$32.99 |
$34680.00 |
04-25-2012 |
04-4A07U4 |
3 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
2890 |
$200.00 |
$549.83 |
$578000.00 |
04-25-2012 |
04-4A07U4 |
4 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
2890 |
$29.30 |
$80.55 |
$84677.00 |
04-25-2012 |
04-4A07U4 |
5 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
2890 |
$21.00 |
$57.73 |
$60690.00 |
04-25-2012 |
04-4A07U4 |
6 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
2890 |
$23.00 |
$63.23 |
$66470.00 |
04-25-2012 |
04-4A07U4 |
7 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
05 |
6090 |
$25.00 |
$80.87 |
$152250.00 |
08-24-2012 |
05-315804 |
1 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
05 |
6090 |
$50.00 |
$161.73 |
$304500.00 |
08-24-2012 |
05-315804 |
2 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
05 |
6090 |
$15.00 |
$48.52 |
$91350.00 |
08-24-2012 |
05-315804 |
3 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
05 |
6090 |
$150.00 |
$485.20 |
$913500.00 |
08-24-2012 |
05-315804 |
4 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
05 |
6090 |
$15.00 |
$48.52 |
$91350.00 |
08-24-2012 |
05-315804 |
5 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
561 |
$25.00 |
$80.87 |
$14025.00 |
08-29-2012 |
04-2908E4 |
1 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
561 |
$40.80 |
$131.97 |
$22888.80 |
08-29-2012 |
04-2908E4 |
2 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
561 |
$45.00 |
$145.56 |
$25245.00 |
08-29-2012 |
04-2908E4 |
3 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
561 |
$70.00 |
$226.43 |
$39270.00 |
08-29-2012 |
04-2908E4 |
4 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
561 |
$40.00 |
$129.39 |
$22440.00 |
08-29-2012 |
04-2908E4 |
5 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
561 |
$30.00 |
$97.04 |
$16830.00 |
08-29-2012 |
04-2908E4 |
6 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
561 |
$50.00 |
$161.73 |
$28050.00 |
08-29-2012 |
04-2908E4 |
7 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
561 |
$100.00 |
$323.47 |
$56100.00 |
08-29-2012 |
04-2908E4 |
8 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
420 |
$55.00 |
$177.91 |
$23100.00 |
09-05-2012 |
04-2640U4 |
1 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
420 |
$17.00 |
$54.99 |
$7140.00 |
09-05-2012 |
04-2640U4 |
2 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
420 |
$20.00 |
$64.69 |
$8400.00 |
09-05-2012 |
04-2640U4 |
3 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
420 |
$31.00 |
$100.27 |
$13020.00 |
09-05-2012 |
04-2640U4 |
4 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
420 |
$60.00 |
$194.08 |
$25200.00 |
09-05-2012 |
04-2640U4 |
5 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
420 |
$75.00 |
$242.60 |
$31500.00 |
09-05-2012 |
04-2640U4 |
6 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
4129 |
$20.00 |
$64.69 |
$82580.00 |
09-19-2012 |
04-2908C4 |
1 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
4129 |
$20.00 |
$64.69 |
$82580.00 |
09-19-2012 |
04-2908C4 |
2 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
4129 |
$21.70 |
$70.19 |
$89599.30 |
09-19-2012 |
04-2908C4 |
3 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
4129 |
$30.00 |
$97.04 |
$123870.00 |
09-19-2012 |
04-2908C4 |
4 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
4129 |
$14.00 |
$45.29 |
$57806.00 |
09-19-2012 |
04-2908C4 |
5 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
4129 |
$23.00 |
$74.40 |
$94967.00 |
09-19-2012 |
04-2908C4 |
6 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
4129 |
$15.00 |
$48.52 |
$61935.00 |
09-19-2012 |
04-2908C4 |
7 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
4129 |
$60.00 |
$194.08 |
$247740.00 |
09-19-2012 |
04-2908C4 |
8 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
1455 |
$25.00 |
$62.30 |
$36375.00 |
10-05-2012 |
04-2908V4 |
1 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
1455 |
$25.00 |
$62.30 |
$36375.00 |
10-05-2012 |
04-2908V4 |
2 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
1455 |
$26.20 |
$65.29 |
$38121.00 |
10-05-2012 |
04-2908V4 |
3 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
1455 |
$23.00 |
$57.32 |
$33465.00 |
10-05-2012 |
04-2908V4 |
4 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
1455 |
$18.00 |
$44.86 |
$26190.00 |
10-05-2012 |
04-2908V4 |
5 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
1455 |
$20.00 |
$49.84 |
$29100.00 |
10-05-2012 |
04-2908V4 |
6 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
46 |
$300.00 |
$747.60 |
$13800.00 |
10-09-2012 |
04-4S0204 |
1 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
46 |
$80.00 |
$199.36 |
$3680.00 |
10-09-2012 |
04-4S0204 |
2 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
46 |
$200.00 |
$498.40 |
$9200.00 |
10-09-2012 |
04-4S0204 |
3 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
46 |
$125.00 |
$311.50 |
$5750.00 |
10-09-2012 |
04-4S0204 |
4 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
08 |
4541 |
$20.00 |
$49.84 |
$90820.00 |
10-11-2012 |
08-0M94U4 |
1 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
08 |
4541 |
$20.00 |
$49.84 |
$90820.00 |
10-11-2012 |
08-0M94U4 |
2 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
08 |
4541 |
$21.00 |
$52.33 |
$95361.00 |
10-11-2012 |
08-0M94U4 |
3 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
08 |
4541 |
$35.00 |
$87.22 |
$158935.00 |
10-11-2012 |
08-0M94U4 |
4 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
08 |
4541 |
$7.00 |
$17.44 |
$31787.00 |
10-11-2012 |
08-0M94U4 |
5 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
1008 |
$50.00 |
$124.60 |
$50400.00 |
11-28-2012 |
04-2285H4 |
1 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
1008 |
$25.00 |
$62.30 |
$25200.00 |
11-28-2012 |
04-2285H4 |
2 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
1008 |
$30.00 |
$74.76 |
$30240.00 |
11-28-2012 |
04-2285H4 |
3 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
1008 |
$60.00 |
$149.52 |
$60480.00 |
11-28-2012 |
04-2285H4 |
4 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
1008 |
$50.00 |
$124.60 |
$50400.00 |
11-28-2012 |
04-2285H4 |
5 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
1008 |
$35.00 |
$87.22 |
$35280.00 |
11-28-2012 |
04-2285H4 |
6 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
1008 |
$50.00 |
$124.60 |
$50400.00 |
11-28-2012 |
04-2285H4 |
7 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
1008 |
$132.00 |
$328.94 |
$133056.00 |
11-28-2012 |
04-2285H4 |
8 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
3323 |
$24.00 |
$50.24 |
$79752.00 |
01-15-2013 |
04-2A4404 |
1 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
3323 |
$13.00 |
$27.21 |
$43199.00 |
01-15-2013 |
04-2A4404 |
2 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
3323 |
$175.00 |
$366.33 |
$581525.00 |
01-15-2013 |
04-2A4404 |
3 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
3323 |
$18.00 |
$37.68 |
$59814.00 |
01-15-2013 |
04-2A4404 |
4 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
3323 |
$22.00 |
$46.05 |
$73106.00 |
01-15-2013 |
04-2A4404 |
5 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
3323 |
$25.00 |
$52.33 |
$83075.00 |
01-15-2013 |
04-2A4404 |
6 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
3323 |
$35.00 |
$73.27 |
$116305.00 |
01-15-2013 |
04-2A4404 |
7 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
3323 |
$20.00 |
$41.87 |
$66460.00 |
01-15-2013 |
04-2A4404 |
8 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
07 |
851 |
$35.00 |
$73.27 |
$29785.00 |
02-07-2013 |
07-3X1804 |
1 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
07 |
851 |
$2.00 |
$4.19 |
$1702.00 |
02-07-2013 |
07-3X1804 |
2 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
07 |
851 |
$42.00 |
$87.92 |
$35742.00 |
02-07-2013 |
07-3X1804 |
3 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
07 |
851 |
$45.00 |
$94.20 |
$38295.00 |
02-07-2013 |
07-3X1804 |
4 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
07 |
851 |
$63.00 |
$131.88 |
$53613.00 |
02-07-2013 |
07-3X1804 |
5 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
07 |
851 |
$15.00 |
$31.40 |
$12765.00 |
02-07-2013 |
07-3X1804 |
6 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
07 |
851 |
$30.00 |
$62.80 |
$25530.00 |
02-07-2013 |
07-3X1804 |
7 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
07 |
851 |
$45.00 |
$94.20 |
$38295.00 |
02-07-2013 |
07-3X1804 |
8 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
07 |
851 |
$53.00 |
$110.94 |
$45103.00 |
02-07-2013 |
07-3X1804 |
9 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
02 |
890 |
$33.00 |
$58.12 |
$29370.00 |
04-30-2013 |
02-2E3504 |
1 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
02 |
890 |
$37.00 |
$65.16 |
$32930.00 |
04-30-2013 |
02-2E3504 |
2 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
02 |
890 |
$160.00 |
$281.79 |
$142400.00 |
04-30-2013 |
02-2E3504 |
3 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
02 |
890 |
$50.00 |
$88.06 |
$44500.00 |
04-30-2013 |
02-2E3504 |
4 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
12 |
764 |
$26.00 |
$83.73 |
$19864.00 |
08-08-2013 |
12-0C5604 |
1 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
12 |
764 |
$90.00 |
$289.84 |
$68760.00 |
08-08-2013 |
12-0C5604 |
2 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
12 |
764 |
$70.00 |
$225.43 |
$53480.00 |
08-08-2013 |
12-0C5604 |
3 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
12 |
764 |
$40.00 |
$128.82 |
$30560.00 |
08-08-2013 |
12-0C5604 |
4 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
12 |
764 |
$18.00 |
$57.97 |
$13752.00 |
08-08-2013 |
12-0C5604 |
5 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
12 |
764 |
$26.00 |
$83.73 |
$19864.00 |
08-08-2013 |
12-0C5604 |
6 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
12 |
764 |
$34.00 |
$109.49 |
$25976.00 |
08-08-2013 |
12-0C5604 |
7 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
12 |
764 |
$55.00 |
$177.12 |
$42020.00 |
08-08-2013 |
12-0C5604 |
8 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
12 |
764 |
$200.00 |
$644.09 |
$152800.00 |
08-08-2013 |
12-0C5604 |
9 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
12 |
764 |
$50.00 |
$161.02 |
$38200.00 |
08-08-2013 |
12-0C5604 |
10 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
11 |
6570 |
$65.00 |
$209.33 |
$427050.00 |
09-12-2013 |
11-0223U4 |
1 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
11 |
6570 |
$30.00 |
$96.61 |
$197100.00 |
09-12-2013 |
11-0223U4 |
2 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
11 |
6570 |
$15.50 |
$49.92 |
$101835.00 |
09-12-2013 |
11-0223U4 |
3 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
11 |
6570 |
$80.00 |
$257.64 |
$525600.00 |
09-12-2013 |
11-0223U4 |
4 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
11 |
6570 |
$35.00 |
$112.72 |
$229950.00 |
09-12-2013 |
11-0223U4 |
5 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
11 |
6570 |
$17.30 |
$55.71 |
$113661.00 |
09-12-2013 |
11-0223U4 |
6 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
01 |
230 |
$125.00 |
$402.55 |
$28750.00 |
09-17-2013 |
01-450904 |
1 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
01 |
230 |
$34.00 |
$109.49 |
$7820.00 |
09-17-2013 |
01-450904 |
2 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
01 |
230 |
$250.00 |
$805.11 |
$57500.00 |
09-17-2013 |
01-450904 |
3 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
01 |
230 |
$90.00 |
$289.84 |
$20700.00 |
09-17-2013 |
01-450904 |
4 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
01 |
230 |
$1000.00 |
$3220.44 |
$230000.00 |
09-17-2013 |
01-450904 |
5 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
735 |
$110.00 |
$354.25 |
$80850.00 |
09-24-2013 |
04-2A4304 |
1 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
735 |
$44.00 |
$141.70 |
$32340.00 |
09-24-2013 |
04-2A4304 |
2 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
735 |
$47.00 |
$151.36 |
$34545.00 |
09-24-2013 |
04-2A4304 |
3 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
735 |
$90.00 |
$289.84 |
$66150.00 |
09-24-2013 |
04-2A4304 |
4 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
735 |
$100.00 |
$322.04 |
$73500.00 |
09-24-2013 |
04-2A4304 |
5 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
735 |
$84.00 |
$270.52 |
$61740.00 |
09-24-2013 |
04-2A4304 |
6 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
735 |
$70.00 |
$225.43 |
$51450.00 |
09-24-2013 |
04-2A4304 |
7 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
12 |
1591 |
$70.00 |
$155.65 |
$111370.00 |
10-31-2013 |
12-0F96E4 |
1 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
12 |
1591 |
$80.00 |
$177.88 |
$127280.00 |
10-31-2013 |
12-0F96E4 |
2 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
12 |
1591 |
$20.00 |
$44.47 |
$31820.00 |
10-31-2013 |
12-0F96E4 |
3 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
12 |
1591 |
$135.00 |
$300.18 |
$214785.00 |
10-31-2013 |
12-0F96E4 |
4 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
12 |
1591 |
$30.00 |
$66.71 |
$47730.00 |
10-31-2013 |
12-0F96E4 |
5 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
12 |
1591 |
$75.00 |
$166.76 |
$119325.00 |
10-31-2013 |
12-0F96E4 |
6 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
05 |
686 |
$232.00 |
$413.51 |
$159152.00 |
02-12-2014 |
05-1C1804 |
1 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
05 |
686 |
$180.00 |
$320.83 |
$123480.00 |
02-12-2014 |
05-1C1804 |
2 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
05 |
686 |
$62.00 |
$110.51 |
$42532.00 |
02-12-2014 |
05-1C1804 |
3 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
05 |
686 |
$100.00 |
$178.24 |
$68600.00 |
02-12-2014 |
05-1C1804 |
4 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
05 |
686 |
$175.00 |
$311.92 |
$120050.00 |
02-12-2014 |
05-1C1804 |
5 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
05 |
686 |
$91.00 |
$162.20 |
$62426.00 |
02-12-2014 |
05-1C1804 |
6 |
M |
|
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
7713 |
$111.00 |
$255.54 |
$856143.00 |
04-29-2014 |
04-2A2504 |
1 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
7713 |
$40.00 |
$92.08 |
$308520.00 |
04-29-2014 |
04-2A2504 |
2 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
7713 |
$13.00 |
$29.93 |
$100269.00 |
04-29-2014 |
04-2A2504 |
3 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
7713 |
$15.00 |
$34.53 |
$115695.00 |
04-29-2014 |
04-2A2504 |
4 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
1267 |
$32.00 |
$71.14 |
$40544.00 |
07-08-2014 |
04-152724 |
1 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
1267 |
$40.00 |
$88.93 |
$50680.00 |
07-08-2014 |
04-152724 |
2 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
1267 |
$75.00 |
$166.74 |
$95025.00 |
07-08-2014 |
04-152724 |
3 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
1267 |
$40.00 |
$88.93 |
$50680.00 |
07-08-2014 |
04-152724 |
4 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
1267 |
$100.00 |
$222.32 |
$126700.00 |
07-08-2014 |
04-152724 |
5 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
1267 |
$60.00 |
$133.39 |
$76020.00 |
07-08-2014 |
04-152724 |
6 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
04 |
1267 |
$55.00 |
$122.28 |
$69685.00 |
07-08-2014 |
04-152724 |
7 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
08 |
774 |
$27.00 |
$60.03 |
$20898.00 |
07-24-2014 |
08-3401U4 |
1 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
08 |
774 |
$25.00 |
$55.58 |
$19350.00 |
07-24-2014 |
08-3401U4 |
2 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
08 |
774 |
$40.00 |
$88.93 |
$30960.00 |
07-24-2014 |
08-3401U4 |
3 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
08 |
774 |
$47.00 |
$104.49 |
$36378.00 |
07-24-2014 |
08-3401U4 |
4 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
08 |
774 |
$20.00 |
$44.46 |
$15480.00 |
07-24-2014 |
08-3401U4 |
5 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
08 |
774 |
$40.00 |
$88.93 |
$30960.00 |
07-24-2014 |
08-3401U4 |
6 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
08 |
774 |
$20.00 |
$44.46 |
$15480.00 |
07-24-2014 |
08-3401U4 |
7 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
08 |
774 |
$50.00 |
$111.16 |
$38700.00 |
07-24-2014 |
08-3401U4 |
8 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
08 |
774 |
$70.00 |
$155.62 |
$54180.00 |
07-24-2014 |
08-3401U4 |
9 |
M |
TRO |
|
| 192055 - STRUCTURE EXCAVATION (SOIL NAIL WALL) |
CY |
08 |
774 |
$215.00 |
$477.98 |
$166410.00 |
07-24-2014 |
08-3401U4 |
10 |
M |
TRO |
|
MORE THAN 500 RESULTS RETURNED. ONLY 500 ROWS SHOWN.
|