Contract Cost Data

CALIFORNIA DEPARTMENT OF TRANSPORTATION - CONTRACT COST DATA

Select Item No. / Description Unit Dist Qty Unit
Price
Adj
Price
Total Bid Open
Date
Contract
No.
Bid M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 04 79 $13.00 $42.05 $1027.00 09-19-2012 04-2908C4 1 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 04 79 $20.00 $64.69 $1580.00 09-19-2012 04-2908C4 2 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 04 79 $86.45 $279.64 $6829.55 09-19-2012 04-2908C4 3 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 04 79 $30.00 $97.04 $2370.00 09-19-2012 04-2908C4 4 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 04 79 $30.00 $97.04 $2370.00 09-19-2012 04-2908C4 5 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 04 79 $50.00 $161.73 $3950.00 09-19-2012 04-2908C4 6 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 04 79 $15.00 $48.52 $1185.00 09-19-2012 04-2908C4 7 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 04 79 $100.00 $323.47 $7900.00 09-19-2012 04-2908C4 8 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 04 243 $67.00 $216.72 $16281.00 09-28-2012 04-4G1004 1 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 04 243 $50.00 $161.73 $12150.00 09-28-2012 04-4G1004 2 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 04 243 $66.00 $213.49 $16038.00 09-28-2012 04-4G1004 3 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 04 243 $50.00 $161.73 $12150.00 09-28-2012 04-4G1004 4 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 04 243 $43.00 $139.09 $10449.00 09-28-2012 04-4G1004 5 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 04 243 $75.00 $242.60 $18225.00 09-28-2012 04-4G1004 6 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 04 243 $100.00 $323.47 $24300.00 09-28-2012 04-4G1004 7 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 04 6794 $13.00 $32.40 $88322.00 10-05-2012 04-2908V4 1 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 04 6794 $80.00 $199.36 $543520.00 10-05-2012 04-2908V4 2 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 04 6794 $31.40 $78.25 $213331.60 10-05-2012 04-2908V4 3 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 04 6794 $21.00 $52.33 $142674.00 10-05-2012 04-2908V4 4 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 04 6794 $80.00 $199.36 $543520.00 10-05-2012 04-2908V4 5 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 04 6794 $90.00 $224.28 $611460.00 10-05-2012 04-2908V4 6 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 08 194 $50.00 $124.60 $9700.00 10-11-2012 08-0M94U4 1 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 08 194 $94.00 $234.25 $18236.00 10-11-2012 08-0M94U4 2 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 08 194 $44.00 $109.65 $8536.00 10-11-2012 08-0M94U4 3 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 08 194 $57.00 $142.04 $11058.00 10-11-2012 08-0M94U4 4 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 08 194 $45.00 $112.14 $8730.00 10-11-2012 08-0M94U4 5 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 04 313 $50.00 $124.60 $15650.00 11-28-2012 04-2285H4 1 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 04 313 $26.00 $64.79 $8138.00 11-28-2012 04-2285H4 2 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 04 313 $45.00 $112.14 $14085.00 11-28-2012 04-2285H4 3 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 04 313 $45.00 $112.14 $14085.00 11-28-2012 04-2285H4 4 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 04 313 $50.00 $124.60 $15650.00 11-28-2012 04-2285H4 5 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 04 313 $30.00 $74.76 $9390.00 11-28-2012 04-2285H4 6 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 04 313 $75.00 $186.90 $23475.00 11-28-2012 04-2285H4 7 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 04 313 $159.00 $396.23 $49767.00 11-28-2012 04-2285H4 8 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 11 $150.00 $373.80 $1650.00 11-29-2012 12-0C5704 1 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 11 $130.00 $323.96 $1430.00 11-29-2012 12-0C5704 2 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 11 $100.00 $249.20 $1100.00 11-29-2012 12-0C5704 3 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 11 $260.00 $647.92 $2860.00 11-29-2012 12-0C5704 4 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 11 $100.00 $249.20 $1100.00 11-29-2012 12-0C5704 5 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 11 $150.00 $373.80 $1650.00 11-29-2012 12-0C5704 6 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 90 $26.00 $83.73 $2340.00 08-08-2013 12-0C5604 1 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 90 $75.00 $241.53 $6750.00 08-08-2013 12-0C5604 2 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 90 $98.00 $315.60 $8820.00 08-08-2013 12-0C5604 3 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 90 $105.00 $338.15 $9450.00 08-08-2013 12-0C5604 4 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 90 $185.00 $595.78 $16650.00 08-08-2013 12-0C5604 5 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 90 $100.00 $322.04 $9000.00 08-08-2013 12-0C5604 6 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 90 $55.00 $177.12 $4950.00 08-08-2013 12-0C5604 7 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 90 $150.00 $483.07 $13500.00 08-08-2013 12-0C5604 8 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 90 $200.00 $644.09 $18000.00 08-08-2013 12-0C5604 9 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 90 $100.00 $322.04 $9000.00 08-08-2013 12-0C5604 10 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 11 9400 $40.00 $128.82 $376000.00 09-12-2013 11-0223U4 1 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 11 9400 $30.00 $96.61 $282000.00 09-12-2013 11-0223U4 2 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 11 9400 $12.00 $38.65 $112800.00 09-12-2013 11-0223U4 3 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 11 9400 $45.00 $144.92 $423000.00 09-12-2013 11-0223U4 4 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 11 9400 $30.00 $96.61 $282000.00 09-12-2013 11-0223U4 5 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 11 9400 $12.00 $38.65 $112800.00 09-12-2013 11-0223U4 6 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 01 460 $100.00 $322.04 $46000.00 09-17-2013 01-450904 1 M  
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 01 460 $28.00 $90.17 $12880.00 09-17-2013 01-450904 2 M  
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 01 460 $100.00 $322.04 $46000.00 09-17-2013 01-450904 3 M  
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 01 460 $100.00 $322.04 $46000.00 09-17-2013 01-450904 4 M  
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 01 460 $1000.00 $3220.44 $460000.00 09-17-2013 01-450904 5 M  
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 222 $300.00 $667.06 $66600.00 10-31-2013 12-0F96E4 1 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 222 $50.00 $111.18 $11100.00 10-31-2013 12-0F96E4 2 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 222 $40.00 $88.94 $8880.00 10-31-2013 12-0F96E4 3 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 222 $135.00 $300.18 $29970.00 10-31-2013 12-0F96E4 4 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 222 $30.00 $66.71 $6660.00 10-31-2013 12-0F96E4 5 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 222 $625.00 $1389.70 $138750.00 10-31-2013 12-0F96E4 6 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 06 171 $67.00 $119.42 $11457.00 03-26-2014 06-487504 1 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 06 171 $55.00 $98.03 $9405.00 03-26-2014 06-487504 2 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 06 171 $60.00 $106.94 $10260.00 03-26-2014 06-487504 3 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 06 171 $100.00 $178.24 $17100.00 03-26-2014 06-487504 4 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 06 171 $55.00 $98.03 $9405.00 03-26-2014 06-487504 5 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 06 171 $125.00 $222.80 $21375.00 03-26-2014 06-487504 6 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 06 171 $60.00 $106.94 $10260.00 03-26-2014 06-487504 7 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 06 171 $7.00 $12.48 $1197.00 03-26-2014 06-487504 8 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 504 $84.00 $193.38 $42336.00 04-17-2014 12-0F96C4 1 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 504 $120.00 $276.25 $60480.00 04-17-2014 12-0F96C4 2 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 504 $55.00 $126.62 $27720.00 04-17-2014 12-0F96C4 3 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 504 $52.00 $119.71 $26208.00 04-17-2014 12-0F96C4 4 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 504 $15.00 $34.53 $7560.00 04-17-2014 12-0F96C4 5 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 504 $115.00 $264.74 $57960.00 04-17-2014 12-0F96C4 6 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 504 $50.00 $115.11 $25200.00 04-17-2014 12-0F96C4 7 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 504 $60.00 $138.13 $30240.00 04-17-2014 12-0F96C4 8 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 504 $70.00 $161.15 $35280.00 04-17-2014 12-0F96C4 9 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 504 $38.00 $87.48 $19152.00 04-17-2014 12-0F96C4 10 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 11 3600 $10.60 $20.67 $38160.00 10-09-2014 11-0223U4 1 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 11 3600 $120.00 $234.04 $432000.00 10-09-2014 11-0223U4 2 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 11 3600 $40.00 $78.01 $144000.00 10-09-2014 11-0223U4 3 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 11 3600 $15.00 $29.26 $54000.00 10-09-2014 11-0223U4 4 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 11 3600 $15.00 $29.26 $54000.00 10-09-2014 11-0223U4 5 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 1480 $34.00 $66.31 $50320.00 10-23-2014 12-0F96A4 1 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 1480 $50.00 $97.52 $74000.00 10-23-2014 12-0F96A4 2 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 1480 $70.00 $136.52 $103600.00 10-23-2014 12-0F96A4 3 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 1480 $150.00 $292.55 $222000.00 10-23-2014 12-0F96A4 4 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 1480 $70.00 $136.52 $103600.00 10-23-2014 12-0F96A4 5 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 07 324 $29.00 $55.80 $9396.00 10-15-2015 07-1193U4 1 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 07 324 $200.00 $384.85 $64800.00 10-15-2015 07-1193U4 2 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 07 324 $55.00 $105.83 $17820.00 10-15-2015 07-1193U4 3 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 07 324 $105.00 $202.04 $34020.00 10-15-2015 07-1193U4 4 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 07 324 $35.00 $67.35 $11340.00 10-15-2015 07-1193U4 5 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 07 324 $15.00 $28.86 $4860.00 10-15-2015 07-1193U4 6 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 07 324 $64.50 $124.11 $20898.00 10-15-2015 07-1193U4 7 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 240 $53.00 $80.14 $12720.00 10-19-2016 12-0M3504 1 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 240 $31.00 $46.87 $7440.00 10-19-2016 12-0M3504 2 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 240 $19.00 $28.73 $4560.00 10-19-2016 12-0M3504 3 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 240 $21.00 $31.75 $5040.00 10-19-2016 12-0M3504 4 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 240 $30.00 $45.36 $7200.00 10-19-2016 12-0M3504 5 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 240 $30.03 $45.41 $7207.20 10-19-2016 12-0M3504 6 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 240 $118.28 $178.84 $28387.20 10-19-2016 12-0M3504 7 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 240 $50.00 $75.60 $12000.00 10-19-2016 12-0M3504 8 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 240 $27.00 $40.82 $6480.00 10-19-2016 12-0M3504 9 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 240 $75.00 $113.40 $18000.00 10-19-2016 12-0M3504 10 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 240 $97.00 $146.67 $23280.00 10-19-2016 12-0M3504 11 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 240 $60.00 $90.72 $14400.00 10-19-2016 12-0M3504 12 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 240 $43.20 $65.32 $10368.00 10-19-2016 12-0M3504 13 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 11 829 $29.00 $43.85 $24041.00 11-29-2016 11-085784 1 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 11 829 $60.00 $90.72 $49740.00 11-29-2016 11-085784 2 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 11 829 $43.00 $65.02 $35647.00 11-29-2016 11-085784 3 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 11 829 $28.00 $42.34 $23212.00 11-29-2016 11-085784 4 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 11 829 $79.42 $120.08 $65839.18 11-29-2016 11-085784 5 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 11 829 $75.00 $113.40 $62175.00 11-29-2016 11-085784 6 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 07 700 $7.00 $11.67 $4900.00 09-27-2017 07-293704 1 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 07 700 $79.00 $131.66 $55300.00 09-27-2017 07-293704 2 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 07 700 $18.00 $30.00 $12600.00 09-27-2017 07-293704 3 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 07 700 $51.00 $85.00 $35700.00 09-27-2017 07-293704 4 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 07 700 $46.00 $76.66 $32200.00 09-27-2017 07-293704 5 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 07 700 $26.94 $44.90 $18858.00 09-27-2017 07-293704 6 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 07 700 $65.00 $108.33 $45500.00 09-27-2017 07-293704 7 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 07 700 $75.00 $125.00 $52500.00 09-27-2017 07-293704 8 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 07 700 $50.00 $83.33 $35000.00 09-27-2017 07-293704 9 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 07 700 $31.86 $53.10 $22302.00 09-27-2017 07-293704 10 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 07 700 $110.00 $183.33 $77000.00 09-27-2017 07-293704 11 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 04 225 $68.35 $124.07 $15378.75 10-03-2017 04-4G0564 1 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 04 225 $30.00 $54.46 $6750.00 10-03-2017 04-4G0564 2 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 04 225 $300.00 $544.59 $67500.00 10-03-2017 04-4G0564 3 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 04 225 $150.00 $272.29 $33750.00 10-03-2017 04-4G0564 4 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 07 700 $79.00 $123.23 $55300.00 01-23-2018 07-293704 1 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 07 700 $7.00 $10.92 $4900.00 01-23-2018 07-293704 2 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 07 700 $20.16 $31.45 $14112.00 01-23-2018 07-293704 3 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 07 700 $20.00 $31.20 $14000.00 01-23-2018 07-293704 4 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 07 700 $47.00 $73.31 $32900.00 01-23-2018 07-293704 5 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 07 700 $56.00 $87.35 $39200.00 01-23-2018 07-293704 6 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 07 700 $95.00 $148.18 $66500.00 01-23-2018 07-293704 7 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 07 700 $44.00 $68.63 $30800.00 01-23-2018 07-293704 8 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 07 700 $80.00 $124.79 $56000.00 01-23-2018 07-293704 9 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 94 $42.00 $61.09 $3948.00 05-08-2018 12-0C8904 1 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 94 $151.47 $220.32 $14238.18 05-08-2018 12-0C8904 2 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 94 $193.00 $280.73 $18142.00 05-08-2018 12-0C8904 3 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 94 $55.70 $81.02 $5235.80 05-08-2018 12-0C8904 4 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 94 $117.00 $170.18 $10998.00 05-08-2018 12-0C8904 5 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 94 $70.00 $101.82 $6580.00 05-08-2018 12-0C8904 6 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 94 $105.00 $152.73 $9870.00 05-08-2018 12-0C8904 7 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 94 $160.00 $232.73 $15040.00 05-08-2018 12-0C8904 8 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 03 295 $85.00 $120.32 $25075.00 08-16-2018 03-0H10U4 1 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 03 295 $256.33 $362.83 $75617.35 08-16-2018 03-0H10U4 2 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 03 295 $100.00 $141.55 $29500.00 08-16-2018 03-0H10U4 3 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 06 390 $35.00 $49.54 $13650.00 09-11-2018 06-0Q2804 1 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 06 390 $74.00 $104.75 $28860.00 09-11-2018 06-0Q2804 2 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 06 390 $45.00 $63.70 $17550.00 09-11-2018 06-0Q2804 3 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 94 $70.00 $96.73 $6580.00 10-18-2018 12-0C8904 1 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 94 $110.00 $152.00 $10340.00 10-18-2018 12-0C8904 2 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 297 $100.00 $174.05 $29700.00 01-16-2019 12-0K0224 1 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 297 $140.00 $243.67 $41580.00 01-16-2019 12-0K0224 2 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 297 $65.00 $113.13 $19305.00 01-16-2019 12-0K0224 3 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 353 $98.00 $170.57 $34594.00 02-13-2019 12-0C1104 1 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 353 $50.00 $87.02 $17650.00 02-13-2019 12-0C1104 2 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 353 $90.00 $156.64 $31770.00 02-13-2019 12-0C1104 3 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 353 $50.00 $87.02 $17650.00 02-13-2019 12-0C1104 4 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 353 $25.00 $43.51 $8825.00 02-13-2019 12-0C1104 5 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 353 $150.00 $261.07 $52950.00 02-13-2019 12-0C1104 6 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 353 $39.00 $67.88 $13767.00 02-13-2019 12-0C1104 7 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 353 $100.00 $174.05 $35300.00 02-13-2019 12-0C1104 8 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 08 178 $31.10 $54.13 $5535.80 02-14-2019 08-0F0304 1 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 08 178 $118.59 $206.40 $21109.02 02-14-2019 08-0F0304 2 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 08 178 $110.00 $191.45 $19580.00 02-14-2019 08-0F0304 3 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 08 178 $150.00 $261.07 $26700.00 02-14-2019 08-0F0304 4 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 08 178 $86.00 $149.68 $15308.00 02-14-2019 08-0F0304 5 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 08 178 $91.30 $158.90 $16251.40 02-14-2019 08-0F0304 6 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 08 178 $180.00 $313.28 $32040.00 02-14-2019 08-0F0304 7 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 03 295 $251.30 $437.38 $74133.50 03-20-2019 03-0H10U4 1 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 03 295 $225.00 $391.61 $66375.00 03-20-2019 03-0H10U4 2 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 179 $100.00 $123.29 $17900.00 05-24-2019 12-0Q8104 1 M  
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 179 $210.49 $259.51 $37677.71 05-24-2019 12-0Q8104 2 M  
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 179 $160.00 $197.26 $28640.00 05-24-2019 12-0Q8104 3 M  
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 179 $115.00 $141.78 $20585.00 05-24-2019 12-0Q8104 4 M  
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 179 $120.00 $147.95 $21480.00 05-24-2019 12-0Q8104 5 M  
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 179 $300.00 $369.87 $53700.00 05-24-2019 12-0Q8104 6 M  
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 179 $100.00 $123.29 $17900.00 05-24-2019 12-0Q8104 7 M  
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 179 $130.00 $160.28 $23270.00 05-24-2019 12-0Q8104 8 M  
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 04 73 $225.00 $277.40 $16425.00 06-12-2019 04-2640F4 1 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 04 73 $200.00 $246.58 $14600.00 06-12-2019 04-2640F4 2 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 04 73 $300.00 $369.87 $21900.00 06-12-2019 04-2640F4 3 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 04 73 $250.00 $308.22 $18250.00 06-12-2019 04-2640F4 4 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 04 73 $175.00 $215.76 $12775.00 06-12-2019 04-2640F4 5 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 303 $135.00 $209.04 $40905.00 10-15-2019 12-0K0214 1 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 303 $45.00 $69.68 $13635.00 10-15-2019 12-0K0214 2 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 303 $38.00 $58.84 $11514.00 10-15-2019 12-0K0214 3 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 303 $115.00 $178.07 $34845.00 10-15-2019 12-0K0214 4 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 303 $222.00 $343.76 $67266.00 10-15-2019 12-0K0214 5 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 01 818 $66.00 $102.20 $53988.00 10-17-2019 01-2982U4 1 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 01 818 $90.00 $139.36 $73620.00 10-17-2019 01-2982U4 2 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 01 818 $100.00 $154.85 $81800.00 10-17-2019 01-2982U4 3 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 01 818 $140.00 $216.78 $114520.00 10-17-2019 01-2982U4 4 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 01 818 $200.00 $309.69 $163600.00 10-17-2019 01-2982U4 5 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 08 265 $86.00 $105.00 $22790.00 02-12-2020 08-1H7704 1 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 08 265 $125.00 $152.61 $33125.00 02-12-2020 08-1H7704 2 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 08 265 $210.00 $256.38 $55650.00 02-12-2020 08-1H7704 3 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 08 265 $87.50 $106.83 $23187.50 02-12-2020 08-1H7704 4 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 08 265 $118.00 $144.06 $31270.00 02-12-2020 08-1H7704 5 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 08 265 $145.00 $177.03 $38425.00 02-12-2020 08-1H7704 6 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 910 $41.50 $66.12 $37765.00 06-30-2020 12-0K0234 1 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 910 $56.00 $89.22 $50960.00 06-30-2020 12-0K0234 2 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 910 $105.00 $167.29 $95550.00 06-30-2020 12-0K0234 3 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 910 $90.00 $143.39 $81900.00 06-30-2020 12-0K0234 4 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 910 $112.00 $178.44 $101920.00 06-30-2020 12-0K0234 5 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 910 $131.00 $208.71 $119210.00 06-30-2020 12-0K0234 6 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 08 178 $200.00 $283.45 $35600.00 04-08-2021 08-0E33U4 1 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 08 178 $46.00 $65.19 $8188.00 04-08-2021 08-0E33U4 2 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 08 178 $43.00 $60.94 $7654.00 04-08-2021 08-0E33U4 3 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 08 178 $82.00 $116.21 $14596.00 04-08-2021 08-0E33U4 4 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 08 178 $300.00 $425.18 $53400.00 04-08-2021 08-0E33U4 5 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 08 178 $310.00 $439.35 $55180.00 04-08-2021 08-0E33U4 6 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 08 178 $200.00 $283.45 $35600.00 04-08-2021 08-0E33U4 7 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 08 178 $85.00 $120.47 $15130.00 04-08-2021 08-0E33U4 8 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 08 178 $81.72 $115.82 $14546.16 04-08-2021 08-0E33U4 9 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 08 178 $200.00 $283.45 $35600.00 04-08-2021 08-0E33U4 10 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 08 178 $85.00 $120.47 $15130.00 04-08-2021 08-0E33U4 11 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR CY 12 100 $110.00 $164.57 $11000.00 03-10-2022 12-0J34U4 1 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR CY 12 100 $170.00 $254.34 $17000.00 03-10-2022 12-0J34U4 2 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR CY 12 100 $100.00 $149.61 $10000.00 03-10-2022 12-0J34U4 3 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR CY 03 1064 $85.00 $90.15 $90440.00 08-24-2022 03-4H5814 1 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR CY 03 1064 $68.00 $72.12 $72352.00 08-24-2022 03-4H5814 2 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR CY 03 1064 $152.00 $161.21 $161728.00 08-24-2022 03-4H5814 3 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR CY 03 1064 $142.00 $150.60 $151088.00 08-24-2022 03-4H5814 4 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR CY 03 1064 $100.00 $106.06 $106400.00 08-24-2022 03-4H5814 5 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR CY 03 1064 $72.33 $76.71 $76959.12 08-24-2022 03-4H5814 6 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR CY 06 95 $100.00 $111.24 $9500.00 10-20-2022 06-0W1704 1 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR CY 06 95 $71.10 $79.09 $6754.50 10-20-2022 06-0W1704 2 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR CY 06 95 $30.00 $33.37 $2850.00 10-20-2022 06-0W1704 3 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR CY 06 95 $90.00 $100.12 $8550.00 10-20-2022 06-0W1704 4 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR CY 06 95 $150.00 $166.87 $14250.00 10-20-2022 06-0W1704 5 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR CY 06 95 $225.00 $250.30 $21375.00 10-20-2022 06-0W1704 6 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 40 $240.00 $266.98 $9600.00 12-15-2022 12-0R5604 1 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 40 $400.00 $444.97 $16000.00 12-15-2022 12-0R5604 2 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 40 $1300.00 $1446.17 $52000.00 12-15-2022 12-0R5604 3 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 05 115 $100.00 $116.84 $11500.00 04-27-2023 05-0C7334 1 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 05 115 $225.00 $262.89 $25875.00 04-27-2023 05-0C7334 2 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 292 $173.00 $144.76 $50516.00 09-28-2023 12-0N8904 1 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 292 $90.00 $75.31 $26280.00 09-28-2023 12-0N8904 2 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 292 $55.53 $46.46 $16214.76 09-28-2023 12-0N8904 3 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 292 $400.00 $334.70 $116800.00 09-28-2023 12-0N8904 4 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 292 $210.00 $175.72 $61320.00 09-28-2023 12-0N8904 5 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 292 $100.00 $83.67 $29200.00 09-28-2023 12-0N8904 6 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 292 $100.00 $83.67 $29200.00 09-28-2023 12-0N8904 7 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 11 250 $175.00 $171.98 $43750.00 11-17-2023 11-2T36U4 1 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 03 150 $400.00 $307.32 $60000.00 01-09-2024 03-3H6104 1 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 03 150 $400.00 $307.32 $60000.00 01-09-2024 03-3H6104 2 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 08 68 $580.00 $601.34 $39440.00 12-11-2024 08-1K4004 1 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 08 68 $350.00 $362.88 $23800.00 12-11-2024 08-1K4004 2 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 08 68 $375.00 $388.80 $25500.00 12-11-2024 08-1K4004 3 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 08 68 $101.78 $105.52 $6921.04 12-11-2024 08-1K4004 4 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 195 $42.00 $30.13 $8190.00 06-04-2025 12-0S5304 1 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 195 $290.00 $208.05 $56550.00 06-04-2025 12-0S5304 2 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 195 $225.00 $161.42 $43875.00 06-04-2025 12-0S5304 3 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 195 $160.00 $114.78 $31200.00 06-04-2025 12-0S5304 4 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 195 $210.00 $150.66 $40950.00 06-04-2025 12-0S5304 5 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 195 $194.46 $139.51 $37919.70 06-04-2025 12-0S5304 6 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 195 $315.00 $225.98 $61425.00 06-04-2025 12-0S5304 7 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 04 325 $143.92 $103.25 $46774.00 06-17-2025 04-0G3604 1 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 04 325 $475.00 $340.77 $154375.00 06-17-2025 04-0G3604 2 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 311 $494.05 $434.45 $153649.55 08-12-2025 12-0K93U4 1 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 311 $45.00 $39.57 $13995.00 08-12-2025 12-0K93U4 2 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 311 $360.00 $316.57 $111960.00 08-12-2025 12-0K93U4 3 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 311 $288.00 $253.26 $89568.00 08-12-2025 12-0K93U4 4 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 311 $160.00 $140.70 $49760.00 08-12-2025 12-0K93U4 5 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 311 $216.00 $189.94 $67176.00 08-12-2025 12-0K93U4 6 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 311 $300.00 $263.81 $93300.00 08-12-2025 12-0K93U4 7 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 310 $295.00 $259.42 $91450.00 09-18-2025 12-0S3804 1 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 310 $137.00 $120.47 $42470.00 09-18-2025 12-0S3804 2 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 310 $282.00 $247.98 $87420.00 09-18-2025 12-0S3804 3 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 310 $900.00 $791.44 $279000.00 09-18-2025 12-0S3804 4 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 310 $160.00 $140.70 $49600.00 09-18-2025 12-0S3804 5 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 310 $220.00 $193.46 $68200.00 09-18-2025 12-0S3804 6 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 2064 $95.00 $92.95 $196080.00 11-18-2025 12-0K61U4 1 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 2064 $150.88 $147.63 $311416.32 11-18-2025 12-0K61U4 2 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 2064 $215.00 $210.36 $443760.00 11-18-2025 12-0K61U4 3 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 50 $250.00 $250.00 $12500.00 07-16-2026 12-0K9704 1 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 50 $565.00 $565.00 $28250.00 07-16-2026 12-0K9704 2 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 50 $2685.67 $2685.67 $134283.50 07-16-2026 12-0K9704 3 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 50 $210.00 $210.00 $10500.00 07-16-2026 12-0K9704 4 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 50 $340.00 $340.00 $17000.00 07-16-2026 12-0K9704 5 M TRO
192060 - STRUCTURE EXCAVATION (GROUND ANCHOR WALL) CY 12 50 $135.00 $135.00 $6750.00 07-16-2026 12-0K9704 6 M TRO
SUMMARY Unmodified Adjusted    
Average Price/Unit: $ Avg No. Units
Std Dev. (of Unit Price): ±$ Rows Selected
Weighted Avg.: $ Rows Returned
Minimum Price/Unit: $    
Maximum Price/Unit: $    

| Back | New Search |

PARAMETERS: Item = 192060; District=All; Year=All; Convert=No; Bidders=All Bidders
TIMESTAMP: 11/13/2026 05:33:35
CURRENT 12-MO INDEX (CHCCI (2020 Base)): 146.53