| 280000 - LEAN CONCRETE BASE |
CY |
07 |
2700 |
$80.00 |
$476.52 |
$216000.00 |
01-28-1993 |
07-110274 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
06 |
11400 |
$50.00 |
$297.83 |
$570000.00 |
02-09-1993 |
06-362304 |
1 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
07 |
560 |
$72.00 |
$428.87 |
$40320.00 |
02-18-1993 |
07-114134 |
1 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
04 |
720 |
$110.00 |
$655.22 |
$79200.00 |
03-03-1993 |
04-124724 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
04 |
3200 |
$55.00 |
$327.61 |
$176000.00 |
03-09-1993 |
04-437654 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
02 |
110 |
$85.00 |
$506.30 |
$9350.00 |
03-23-1993 |
02-289204 |
1 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
07 |
14 |
$150.00 |
$893.48 |
$2100.00 |
03-25-1993 |
07-103994 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
07 |
3750 |
$60.00 |
$357.39 |
$225000.00 |
04-22-1993 |
07-110324 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
07 |
40 |
$200.00 |
$1191.30 |
$8000.00 |
04-22-1993 |
07-120034 |
1 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
12 |
13600 |
$62.00 |
$369.30 |
$843200.00 |
04-22-1993 |
12-027314 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
07 |
32 |
$120.00 |
$714.78 |
$3840.00 |
05-13-1993 |
07-402254 |
1 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
08 |
10600 |
$51.00 |
$303.78 |
$540600.00 |
05-20-1993 |
08-461504 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
06 |
19000 |
$40.00 |
$238.26 |
$760000.00 |
06-22-1993 |
06-300904 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
04 |
510 |
$87.00 |
$518.22 |
$44370.00 |
06-29-1993 |
04-135904 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
04 |
14100 |
$73.00 |
$434.82 |
$1029300.00 |
09-28-1993 |
04-233714 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
04 |
75 |
$85.00 |
$506.30 |
$6375.00 |
10-06-1993 |
04-134534 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
12 |
10400 |
$65.00 |
$387.17 |
$676000.00 |
10-14-1993 |
12-107184 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
12 |
130 |
$105.00 |
$625.43 |
$13650.00 |
10-28-1993 |
12-008604 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
07 |
3260 |
$65.00 |
$387.17 |
$211900.00 |
11-18-1993 |
07-110334 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
07 |
5820 |
$60.00 |
$325.62 |
$349200.00 |
01-06-1994 |
07-107734 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
07 |
2800 |
$65.00 |
$352.76 |
$182000.00 |
01-29-1994 |
07-0Q0204 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
07 |
8790 |
$56.00 |
$303.91 |
$492240.00 |
02-10-1994 |
07-120274 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
07 |
170 |
$100.00 |
$542.70 |
$17000.00 |
03-18-1994 |
07-0Q0504 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
12 |
8380 |
$62.00 |
$336.48 |
$519560.00 |
04-07-1994 |
12-107224 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
07 |
15200 |
$66.40 |
$360.36 |
$1009280.00 |
04-21-1994 |
07-120334 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
07 |
7320 |
$58.00 |
$314.77 |
$424560.00 |
04-28-1994 |
07-120284 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
06 |
450 |
$73.74 |
$400.19 |
$33183.00 |
05-11-1994 |
06-337004 |
1 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
07 |
1790 |
$50.00 |
$271.35 |
$89500.00 |
05-12-1994 |
07-1Q5204 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
07 |
150 |
$77.00 |
$417.88 |
$11550.00 |
05-12-1994 |
07-401654 |
1 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
12 |
22100 |
$64.00 |
$347.33 |
$1414400.00 |
05-12-1994 |
12-107234 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
07 |
3 |
$250.00 |
$1356.76 |
$750.00 |
06-09-1994 |
07-119384 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
07 |
30400 |
$52.00 |
$282.21 |
$1580800.00 |
06-16-1994 |
07-115054 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
12 |
9 |
$85.00 |
$461.30 |
$765.00 |
06-16-1994 |
12-008804 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
07 |
760 |
$70.20 |
$380.98 |
$53352.00 |
06-23-1994 |
07-019594 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
07 |
544 |
$110.00 |
$596.97 |
$59840.00 |
07-08-1994 |
07-0Q0704 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
07 |
6350 |
$63.00 |
$341.90 |
$400050.00 |
09-22-1994 |
07-118504 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
07 |
11 |
$218.00 |
$1183.09 |
$2398.00 |
10-06-1994 |
07-129004 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
12 |
82 |
$126.30 |
$685.43 |
$10356.60 |
10-06-1994 |
12-010204 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
12 |
290 |
$100.00 |
$542.70 |
$29000.00 |
10-20-1994 |
12-016204 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
06 |
10800 |
$50.00 |
$271.35 |
$540000.00 |
11-02-1994 |
06-301014 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
07 |
4 |
$400.00 |
$2170.81 |
$1600.00 |
11-03-1994 |
07-119654 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
08 |
12700 |
$36.00 |
$195.37 |
$457200.00 |
11-03-1994 |
08-362204 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
07 |
9800 |
$58.50 |
$317.48 |
$573300.00 |
12-08-1994 |
07-119394 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
08 |
200 |
$60.00 |
$325.62 |
$12000.00 |
12-08-1994 |
08-268914 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
08 |
50900 |
$34.00 |
$195.37 |
$1730600.00 |
01-19-1995 |
08-347214 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
07 |
1810 |
$87.50 |
$502.80 |
$158375.00 |
02-23-1995 |
07-110294 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
07 |
160 |
$53.00 |
$304.55 |
$8480.00 |
03-09-1995 |
07-119114 |
1 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
12 |
190 |
$82.00 |
$471.19 |
$15580.00 |
05-18-1995 |
12-013404 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
07 |
20200 |
$85.00 |
$488.43 |
$1717000.00 |
06-22-1995 |
07-116874 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
07 |
3 |
$100.00 |
$574.63 |
$300.00 |
07-27-1995 |
07-149804 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
07 |
5 |
$145.00 |
$833.21 |
$725.00 |
08-24-1995 |
07-163704 |
1 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
07 |
17300 |
$80.00 |
$459.70 |
$1384000.00 |
08-31-1995 |
07-115174 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
07 |
160 |
$63.43 |
$364.49 |
$10148.80 |
09-14-1995 |
07-119114 |
1 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
07 |
10 |
$300.00 |
$1723.88 |
$3000.00 |
09-21-1995 |
07-118814 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
07 |
14910 |
$30.00 |
$172.39 |
$447300.00 |
11-02-1995 |
07-116204 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
07 |
155 |
$75.00 |
$430.97 |
$11625.00 |
11-30-1995 |
07-112584 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
07 |
32700 |
$52.00 |
$297.64 |
$1700400.00 |
01-04-1996 |
07-115034 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
07 |
5180 |
$60.00 |
$343.43 |
$310800.00 |
01-11-1996 |
07-119234 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
07 |
19500 |
$55.00 |
$314.81 |
$1072500.00 |
02-15-1996 |
07-119944 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
08 |
460 |
$84.00 |
$480.80 |
$38640.00 |
04-04-1996 |
08-322104 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
08 |
310 |
$65.00 |
$372.05 |
$20150.00 |
04-25-1996 |
08-402104 |
1 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
07 |
35500 |
$54.00 |
$309.09 |
$1917000.00 |
05-02-1996 |
07-115044 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
07 |
160 |
$150.00 |
$858.57 |
$24000.00 |
05-02-1996 |
07-420704 |
1 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
04 |
235 |
$100.00 |
$572.38 |
$23500.00 |
05-08-1996 |
04-228294 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
07 |
28600 |
$46.00 |
$263.30 |
$1315600.00 |
05-23-1996 |
07-125604 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
06 |
19700 |
$48.00 |
$274.74 |
$945600.00 |
07-23-1996 |
06-0257U4 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
06 |
150 |
$155.00 |
$887.19 |
$23250.00 |
07-30-1996 |
06-2935U4 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
07 |
7000 |
$51.00 |
$291.92 |
$357000.00 |
09-05-1996 |
07-119984 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
12 |
24 |
$100.00 |
$572.38 |
$2400.00 |
09-05-1996 |
12-0084U4 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
02 |
11800 |
$63.90 |
$365.75 |
$754020.00 |
09-24-1996 |
02-287404 |
1 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
12 |
38 |
$90.00 |
$515.14 |
$3420.00 |
09-26-1996 |
12-014814 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
12 |
5730 |
$85.00 |
$486.53 |
$487050.00 |
10-17-1996 |
12-035714 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
06 |
3810 |
$90.00 |
$493.92 |
$342900.00 |
02-04-1997 |
06-362404 |
1 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
12 |
1300 |
$90.00 |
$493.92 |
$117000.00 |
02-06-1997 |
12-0155U4 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
12 |
8870 |
$85.00 |
$466.48 |
$753950.00 |
04-02-1997 |
12-012614 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
12 |
1030 |
$100.00 |
$548.80 |
$103000.00 |
04-17-1997 |
12-0124V4 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
06 |
24600 |
$56.20 |
$308.43 |
$1382520.00 |
04-22-1997 |
06-342124 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
590 |
$130.00 |
$713.44 |
$76700.00 |
04-24-1997 |
07-402274 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
06 |
15700 |
$47.00 |
$257.94 |
$737900.00 |
05-06-1997 |
06-342114 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
06 |
7370 |
$55.00 |
$301.84 |
$405350.00 |
05-13-1997 |
06-342254 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
08 |
32400 |
$68.00 |
$373.19 |
$2203200.00 |
05-15-1997 |
08-367614 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
07 |
72 |
$302.00 |
$1657.38 |
$21744.00 |
05-29-1997 |
07-4C1604 |
1 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
07 |
240 |
$127.00 |
$696.98 |
$30480.00 |
06-12-1997 |
07-147534 |
1 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
160 |
$110.00 |
$603.68 |
$17600.00 |
06-12-1997 |
07-4A8904 |
1 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
08 |
20200 |
$81.00 |
$444.53 |
$1636200.00 |
07-17-1997 |
08-367624 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
07 |
2200 |
$84.00 |
$460.99 |
$184800.00 |
08-21-1997 |
07-1147U4 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
20 |
$175.00 |
$960.40 |
$3500.00 |
09-03-1997 |
04-179304 |
1 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
12 |
1390 |
$90.00 |
$493.92 |
$125100.00 |
09-18-1997 |
12-059224 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
1980 |
$100.00 |
$548.80 |
$198000.00 |
10-23-1997 |
07-180404 |
1 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
08 |
34700 |
$66.00 |
$362.21 |
$2290200.00 |
11-13-1997 |
08-4632V4 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
12 |
1230 |
$80.00 |
$418.66 |
$98400.00 |
01-08-1998 |
12-059234 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
08 |
4800 |
$50.00 |
$261.66 |
$240000.00 |
02-05-1998 |
08-204304 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
710 |
$140.00 |
$732.65 |
$99400.00 |
03-19-1998 |
07-126234 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
12 |
1640 |
$95.00 |
$497.16 |
$155800.00 |
03-26-1998 |
12-035724 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
12 |
140 |
$91.00 |
$476.22 |
$12740.00 |
04-09-1998 |
12-059244 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
06 |
9290 |
$60.00 |
$313.99 |
$557400.00 |
04-15-1998 |
06-342264 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
06 |
70 |
$200.00 |
$1046.64 |
$14000.00 |
04-15-1998 |
06-371004 |
1 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
08 |
96 |
$120.00 |
$627.99 |
$11520.00 |
04-30-1998 |
08-426304 |
1 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
13 |
$125.00 |
$654.15 |
$1625.00 |
05-14-1998 |
07-1M8704 |
1 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
06 |
1230 |
$113.00 |
$591.35 |
$138990.00 |
05-20-1998 |
06-351204 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
130 |
$230.00 |
$1203.64 |
$29900.00 |
05-28-1998 |
07-1187C4 |
1 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
12 |
120 |
$95.00 |
$497.16 |
$11400.00 |
06-04-1998 |
12-042524 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
1660 |
$150.00 |
$784.98 |
$249000.00 |
06-11-1998 |
07-4C2804 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
12 |
2340 |
$74.00 |
$387.26 |
$173160.00 |
08-13-1998 |
12-059254 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
08 |
750 |
$150.00 |
$784.98 |
$112500.00 |
10-01-1998 |
08-330504 |
1 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
10 |
850 |
$68.00 |
$355.86 |
$57800.00 |
10-06-1998 |
10-0437U4 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
07 |
540 |
$100.00 |
$523.32 |
$54000.00 |
10-15-1998 |
07-118084 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
08 |
1790 |
$99.00 |
$518.09 |
$177210.00 |
10-15-1998 |
08-007114 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
12 |
1070 |
$98.00 |
$512.86 |
$104860.00 |
10-22-1998 |
12-0357A4 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
06 |
11200 |
$50.00 |
$261.66 |
$560000.00 |
11-03-1998 |
06-278614 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
730 |
$170.00 |
$889.65 |
$124100.00 |
11-19-1998 |
12-013324 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
1240 |
$130.00 |
$680.32 |
$161200.00 |
12-03-1998 |
07-135504 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
100 |
$126.00 |
$615.43 |
$12600.00 |
03-11-1999 |
07-1153A4 |
1 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
07 |
870 |
$135.00 |
$659.38 |
$117450.00 |
03-11-1999 |
07-119464 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
07 |
10 |
$160.00 |
$781.49 |
$1600.00 |
03-11-1999 |
07-3M8704 |
1 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
1140 |
$185.00 |
$903.60 |
$210900.00 |
03-18-1999 |
12-013344 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
230 |
$130.00 |
$634.96 |
$29900.00 |
03-25-1999 |
12-013334 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
28 |
$320.00 |
$1562.99 |
$8960.00 |
04-08-1999 |
07-115064 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
170 |
$120.00 |
$586.12 |
$20400.00 |
04-22-1999 |
07-4M5204 |
1 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
07 |
10 |
$250.00 |
$1221.08 |
$2500.00 |
04-29-1999 |
07-102914 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
210 |
$228.57 |
$1116.41 |
$47999.70 |
04-29-1999 |
07-4F9804 |
1 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
2930 |
$90.00 |
$439.59 |
$263700.00 |
05-06-1999 |
12-0008A4 |
1 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
720 |
$160.00 |
$781.49 |
$115200.00 |
05-13-1999 |
07-195004 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
530 |
$80.00 |
$390.75 |
$42400.00 |
05-21-1999 |
12-069514 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
11500 |
$90.00 |
$439.59 |
$1035000.00 |
05-27-1999 |
07-1347U4 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
8210 |
$114.00 |
$556.81 |
$935940.00 |
06-10-1999 |
07-1667U4 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
54 |
$145.00 |
$708.23 |
$7830.00 |
06-17-1999 |
07-065184 |
1 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
CY |
07 |
480 |
$100.00 |
$488.43 |
$48000.00 |
06-17-1999 |
07-185004 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
1420 |
$150.00 |
$732.65 |
$213000.00 |
07-01-1999 |
07-003104 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
03 |
3140 |
$125.00 |
$610.54 |
$392500.00 |
07-21-1999 |
03-291004 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
03 |
1880 |
$125.00 |
$610.54 |
$235000.00 |
08-03-1999 |
03-1A0704 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
08 |
3620 |
$100.00 |
$488.43 |
$362000.00 |
09-02-1999 |
08-4277U4 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
08 |
6410 |
$60.00 |
$293.06 |
$384600.00 |
09-23-1999 |
08-4278U4 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
08 |
7400 |
$60.00 |
$293.06 |
$444000.00 |
09-30-1999 |
08-4177U4 |
1 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
1.3 |
$500.00 |
$2442.17 |
$650.00 |
12-02-1999 |
07-192804 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
2530 |
$120.00 |
$569.05 |
$303600.00 |
02-10-2000 |
07-1957U4 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
08 |
205 |
$125.00 |
$592.76 |
$25625.00 |
02-24-2000 |
08-3979U4 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
200 |
$215.00 |
$1019.55 |
$43000.00 |
03-02-2000 |
07-143904 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
110 |
$150.00 |
$711.31 |
$16500.00 |
03-16-2000 |
07-181504 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
71 |
$163.00 |
$772.96 |
$11573.00 |
04-27-2000 |
07-401004 |
1 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
40300 |
$60.00 |
$284.52 |
$2418000.00 |
06-15-2000 |
07-117104 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
30 |
$167.00 |
$791.93 |
$5010.00 |
06-22-2000 |
07-4C5704 |
1 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
08 |
870 |
$100.00 |
$474.21 |
$87000.00 |
06-22-2000 |
08-453004 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
08 |
910 |
$137.00 |
$649.66 |
$124670.00 |
06-29-2000 |
08-434704 |
1 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
27400 |
$51.00 |
$241.85 |
$1397400.00 |
08-10-2000 |
07-1264A4 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
305 |
$135.00 |
$640.18 |
$41175.00 |
09-14-2000 |
07-184404 |
1 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
31500 |
$65.00 |
$308.23 |
$2047500.00 |
09-21-2000 |
07-126494 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
90 |
$152.00 |
$720.79 |
$13680.00 |
09-21-2000 |
12-012104 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
06 |
14500 |
$65.00 |
$308.23 |
$942500.00 |
10-11-2000 |
06-342154 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
2350 |
$97.00 |
$459.98 |
$227950.00 |
10-12-2000 |
07-191004 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
920 |
$100.00 |
$474.21 |
$92000.00 |
10-20-2000 |
12-087704 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
06 |
36200 |
$50.00 |
$237.10 |
$1810000.00 |
10-24-2000 |
06-243404 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
CY |
08 |
3040 |
$100.00 |
$474.21 |
$304000.00 |
10-26-2000 |
08-340804 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
60 |
$130.00 |
$616.47 |
$7800.00 |
11-02-2000 |
07-172204 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
350 |
$150.00 |
$711.31 |
$52500.00 |
11-02-2000 |
07-201104 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
03 |
12300 |
$77.00 |
$365.14 |
$947100.00 |
11-14-2000 |
03-3A21U4 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
4970 |
$120.00 |
$569.05 |
$596400.00 |
11-15-2000 |
04-013054 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
610 |
$166.00 |
$787.18 |
$101260.00 |
11-16-2000 |
07-142904 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
250 |
$150.00 |
$711.31 |
$37500.00 |
12-06-2000 |
07-117044 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
2730 |
$120.00 |
$569.05 |
$327600.00 |
12-07-2000 |
12-083804 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
CY |
07 |
36800 |
$40.00 |
$189.68 |
$1472000.00 |
12-14-2000 |
07-1224U4 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
4530 |
$100.00 |
$437.40 |
$453000.00 |
01-04-2001 |
07-119844 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
36900 |
$75.00 |
$328.05 |
$2767500.00 |
01-11-2001 |
07-172154 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
120 |
$212.00 |
$927.29 |
$25440.00 |
01-31-2001 |
04-2724U4 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
13700 |
$100.00 |
$437.40 |
$1370000.00 |
04-11-2001 |
04-253714 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
4550 |
$105.00 |
$459.27 |
$477750.00 |
04-12-2001 |
07-135604 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
03 |
45 |
$234.00 |
$1023.52 |
$10530.00 |
05-08-2001 |
03-0C4204 |
1 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
08 |
9030 |
$92.00 |
$402.41 |
$830760.00 |
05-10-2001 |
08-4353U4 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
CY |
08 |
11200 |
$72.00 |
$314.93 |
$806400.00 |
05-24-2001 |
08-350724 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
270 |
$120.00 |
$524.88 |
$32400.00 |
05-31-2001 |
07-136904 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
360 |
$90.00 |
$393.66 |
$32400.00 |
09-06-2001 |
07-020484 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
220 |
$115.00 |
$503.01 |
$25300.00 |
09-06-2001 |
07-1264G4 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
97 |
$200.00 |
$874.81 |
$19400.00 |
09-06-2001 |
12-0C5804 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
06 |
1460 |
$129.00 |
$564.25 |
$188340.00 |
10-02-2001 |
06-336604 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
08 |
5010 |
$82.00 |
$358.67 |
$410820.00 |
10-04-2001 |
08-4221U4 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
CY |
07 |
23000 |
$70.00 |
$306.18 |
$1610000.00 |
11-01-2001 |
07-1069U4 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
810 |
$96.00 |
$419.91 |
$77760.00 |
11-01-2001 |
07-201304 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
800 |
$100.00 |
$437.40 |
$80000.00 |
11-15-2001 |
07-1760U4 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
03 |
1490 |
$140.00 |
$612.36 |
$208600.00 |
11-20-2001 |
03-2A4604 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
600 |
$140.00 |
$661.75 |
$84000.00 |
02-21-2002 |
07-191304 |
2 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
600 |
$134.00 |
$633.39 |
$80400.00 |
02-21-2002 |
07-191304 |
3 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
600 |
$182.00 |
$860.27 |
$109200.00 |
02-21-2002 |
07-191304 |
4 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
600 |
$140.00 |
$661.75 |
$84000.00 |
02-21-2002 |
07-191304 |
5 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
600 |
$150.00 |
$709.02 |
$90000.00 |
02-21-2002 |
07-191304 |
6 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
600 |
$210.00 |
$992.62 |
$126000.00 |
02-21-2002 |
07-191304 |
7 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
490 |
$160.50 |
$758.65 |
$78645.00 |
02-21-2002 |
12-029824 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
490 |
$137.60 |
$650.40 |
$67424.00 |
02-21-2002 |
12-029824 |
2 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
490 |
$178.00 |
$841.37 |
$87220.00 |
02-21-2002 |
12-029824 |
3 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
490 |
$150.00 |
$709.02 |
$73500.00 |
02-21-2002 |
12-029824 |
4 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
490 |
$170.00 |
$803.55 |
$83300.00 |
02-21-2002 |
12-029824 |
5 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
490 |
$195.00 |
$921.72 |
$95550.00 |
02-21-2002 |
12-029824 |
6 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
08 |
118000 |
$62.00 |
$293.06 |
$7316000.00 |
02-28-2002 |
08-3555U4 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
08 |
118000 |
$52.00 |
$245.79 |
$6136000.00 |
02-28-2002 |
08-3555U4 |
2 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
08 |
118000 |
$67.00 |
$316.69 |
$7906000.00 |
02-28-2002 |
08-3555U4 |
3 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
08 |
118000 |
$59.00 |
$278.88 |
$6962000.00 |
02-28-2002 |
08-3555U4 |
4 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
08 |
118000 |
$88.00 |
$415.96 |
$10384000.00 |
02-28-2002 |
08-3555U4 |
5 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
08 |
118000 |
$75.00 |
$354.51 |
$8850000.00 |
02-28-2002 |
08-3555U4 |
6 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
6000 |
$95.00 |
$449.04 |
$570000.00 |
03-07-2002 |
12-0008E4 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
6000 |
$110.00 |
$519.95 |
$660000.00 |
03-07-2002 |
12-0008E4 |
2 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
6000 |
$74.00 |
$349.78 |
$444000.00 |
03-07-2002 |
12-0008E4 |
3 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
6000 |
$90.00 |
$425.41 |
$540000.00 |
03-07-2002 |
12-0008E4 |
4 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
6000 |
$85.00 |
$401.78 |
$510000.00 |
03-07-2002 |
12-0008E4 |
5 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
6000 |
$98.00 |
$463.22 |
$588000.00 |
03-07-2002 |
12-0008E4 |
6 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
6000 |
$102.00 |
$482.13 |
$612000.00 |
03-07-2002 |
12-0008E4 |
7 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
6000 |
$82.75 |
$391.14 |
$496500.00 |
03-07-2002 |
12-0008E4 |
8 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
23400 |
$96.00 |
$453.77 |
$2246400.00 |
03-28-2002 |
07-0607U4 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
23400 |
$87.00 |
$411.23 |
$2035800.00 |
03-28-2002 |
07-0607U4 |
2 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
23400 |
$105.00 |
$496.31 |
$2457000.00 |
03-28-2002 |
07-0607U4 |
3 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
23400 |
$109.00 |
$515.22 |
$2550600.00 |
03-28-2002 |
07-0607U4 |
4 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
23400 |
$100.00 |
$472.68 |
$2340000.00 |
03-28-2002 |
07-0607U4 |
5 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
23400 |
$110.00 |
$519.95 |
$2574000.00 |
03-28-2002 |
07-0607U4 |
6 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
23400 |
$102.00 |
$482.13 |
$2386800.00 |
03-28-2002 |
07-0607U4 |
7 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
23400 |
$110.00 |
$519.95 |
$2574000.00 |
03-28-2002 |
07-0607U4 |
8 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
600 |
$120.00 |
$567.21 |
$72000.00 |
04-25-2002 |
07-191304 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
600 |
$152.00 |
$718.47 |
$91200.00 |
04-25-2002 |
07-191304 |
2 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
600 |
$135.00 |
$638.11 |
$81000.00 |
04-25-2002 |
07-191304 |
3 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
600 |
$140.00 |
$661.75 |
$84000.00 |
04-25-2002 |
07-191304 |
4 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
600 |
$132.00 |
$623.93 |
$79200.00 |
04-25-2002 |
07-191304 |
5 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
600 |
$120.00 |
$567.21 |
$72000.00 |
04-25-2002 |
07-191304 |
6 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
3620 |
$120.00 |
$567.21 |
$434400.00 |
06-06-2002 |
07-104954 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
3620 |
$110.00 |
$519.95 |
$398200.00 |
06-06-2002 |
07-104954 |
2 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
3620 |
$150.00 |
$709.02 |
$543000.00 |
06-06-2002 |
07-104954 |
3 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
3620 |
$100.00 |
$472.68 |
$362000.00 |
06-06-2002 |
07-104954 |
4 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
3620 |
$140.00 |
$661.75 |
$506800.00 |
06-06-2002 |
07-104954 |
5 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
3620 |
$78.00 |
$368.69 |
$282360.00 |
06-06-2002 |
07-104954 |
6 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
06 |
13300 |
$79.00 |
$373.42 |
$1050700.00 |
06-18-2002 |
06-342424 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
06 |
13300 |
$80.00 |
$378.14 |
$1064000.00 |
06-18-2002 |
06-342424 |
2 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
06 |
13300 |
$70.00 |
$330.87 |
$931000.00 |
06-18-2002 |
06-342424 |
3 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
06 |
13300 |
$100.00 |
$472.68 |
$1330000.00 |
06-18-2002 |
06-342424 |
4 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
06 |
13300 |
$65.00 |
$307.24 |
$864500.00 |
06-18-2002 |
06-342424 |
5 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
4 |
$450.00 |
$2127.05 |
$1800.00 |
07-25-2002 |
07-166504 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
4 |
$225.00 |
$1063.52 |
$900.00 |
07-25-2002 |
07-166504 |
2 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
11000 |
$91.55 |
$432.74 |
$1007050.00 |
08-01-2002 |
07-181604 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
11000 |
$94.00 |
$444.32 |
$1034000.00 |
08-01-2002 |
07-181604 |
2 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
11000 |
$125.00 |
$590.85 |
$1375000.00 |
08-01-2002 |
07-181604 |
3 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
11000 |
$110.00 |
$519.95 |
$1210000.00 |
08-01-2002 |
07-181604 |
4 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
11000 |
$100.00 |
$472.68 |
$1100000.00 |
08-01-2002 |
07-181604 |
5 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
11000 |
$96.00 |
$453.77 |
$1056000.00 |
08-01-2002 |
07-181604 |
6 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
11000 |
$101.00 |
$477.40 |
$1111000.00 |
08-01-2002 |
07-181604 |
7 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
12300 |
$120.00 |
$567.21 |
$1476000.00 |
09-26-2002 |
07-1198U4 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
12300 |
$122.00 |
$576.67 |
$1500600.00 |
09-26-2002 |
07-1198U4 |
2 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
12300 |
$120.00 |
$567.21 |
$1476000.00 |
09-26-2002 |
07-1198U4 |
3 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
630 |
$140.00 |
$661.75 |
$88200.00 |
10-24-2002 |
07-134804 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
630 |
$300.00 |
$1418.03 |
$189000.00 |
10-24-2002 |
07-134804 |
2 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
101 |
$109.00 |
$515.22 |
$11009.00 |
11-07-2002 |
12-1072U4 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
101 |
$170.00 |
$803.55 |
$17170.00 |
11-07-2002 |
12-1072U4 |
2 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
101 |
$160.00 |
$756.28 |
$16160.00 |
11-07-2002 |
12-1072U4 |
3 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
101 |
$135.00 |
$638.11 |
$13635.00 |
11-07-2002 |
12-1072U4 |
4 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
101 |
$260.00 |
$1228.96 |
$26260.00 |
11-07-2002 |
12-1072U4 |
5 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
101 |
$195.00 |
$921.72 |
$19695.00 |
11-07-2002 |
12-1072U4 |
6 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
101 |
$120.00 |
$567.21 |
$12120.00 |
11-07-2002 |
12-1072U4 |
7 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
4800 |
$93.50 |
$441.95 |
$448800.00 |
12-12-2002 |
07-187204 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
2390 |
$140.00 |
$627.35 |
$334600.00 |
01-08-2003 |
04-2285U4 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
08 |
4820 |
$70.00 |
$313.67 |
$337400.00 |
02-20-2003 |
08-448504 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
13500 |
$130.00 |
$582.54 |
$1755000.00 |
02-27-2003 |
07-1257U4 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
08 |
23400 |
$70.00 |
$313.67 |
$1638000.00 |
04-24-2003 |
08-4437U4 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
4220 |
$95.00 |
$425.70 |
$400900.00 |
05-15-2003 |
12-079204 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
2890 |
$98.00 |
$439.14 |
$283220.00 |
05-22-2003 |
12-085214 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
1520 |
$85.00 |
$380.89 |
$129200.00 |
06-19-2003 |
12-086204 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
05 |
200 |
$255.00 |
$1142.67 |
$51000.00 |
06-26-2003 |
05-0A1304 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
13900 |
$95.00 |
$425.70 |
$1320500.00 |
09-23-2003 |
04-229014 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
13900 |
$120.00 |
$537.72 |
$1668000.00 |
09-23-2003 |
04-229014 |
2 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
13900 |
$140.00 |
$627.35 |
$1946000.00 |
09-23-2003 |
04-229014 |
3 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
13900 |
$122.40 |
$548.48 |
$1701360.00 |
09-23-2003 |
04-229014 |
4 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
13900 |
$120.00 |
$537.72 |
$1668000.00 |
09-23-2003 |
04-229014 |
5 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
13900 |
$120.00 |
$537.72 |
$1668000.00 |
09-23-2003 |
04-229014 |
6 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
13900 |
$145.00 |
$649.75 |
$2015500.00 |
09-23-2003 |
04-229014 |
7 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
470 |
$200.00 |
$896.21 |
$94000.00 |
09-23-2003 |
04-270304 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
470 |
$325.00 |
$1456.34 |
$152750.00 |
09-23-2003 |
04-270304 |
2 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
470 |
$285.00 |
$1277.10 |
$133950.00 |
09-23-2003 |
04-270304 |
3 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
470 |
$300.00 |
$1344.31 |
$141000.00 |
09-23-2003 |
04-270304 |
4 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
470 |
$120.00 |
$537.72 |
$56400.00 |
09-23-2003 |
04-270304 |
5 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
400 |
$155.00 |
$694.56 |
$62000.00 |
10-09-2003 |
07-0510A4 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
400 |
$140.00 |
$627.35 |
$56000.00 |
10-09-2003 |
07-0510A4 |
2 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
400 |
$140.00 |
$627.35 |
$56000.00 |
10-09-2003 |
07-0510A4 |
3 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
400 |
$165.00 |
$739.37 |
$66000.00 |
10-09-2003 |
07-0510A4 |
4 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
400 |
$155.00 |
$694.56 |
$62000.00 |
10-09-2003 |
07-0510A4 |
5 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
400 |
$200.00 |
$896.21 |
$80000.00 |
10-09-2003 |
07-0510A4 |
6 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
410 |
$127.50 |
$571.33 |
$52275.00 |
10-16-2003 |
07-184004 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
410 |
$120.00 |
$537.72 |
$49200.00 |
10-16-2003 |
07-184004 |
2 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
410 |
$140.00 |
$627.35 |
$57400.00 |
10-16-2003 |
07-184004 |
3 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
410 |
$175.00 |
$784.18 |
$71750.00 |
10-16-2003 |
07-184004 |
4 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
410 |
$350.00 |
$1568.36 |
$143500.00 |
10-16-2003 |
07-184004 |
5 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
390 |
$130.00 |
$582.54 |
$50700.00 |
11-06-2003 |
07-066334 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
390 |
$100.00 |
$448.10 |
$39000.00 |
11-06-2003 |
07-066334 |
2 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
1990 |
$140.00 |
$627.35 |
$278600.00 |
11-06-2003 |
07-148004 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
1990 |
$200.00 |
$896.21 |
$398000.00 |
11-06-2003 |
07-148004 |
2 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
08 |
24600 |
$134.00 |
$600.46 |
$3296400.00 |
12-04-2003 |
08-334844 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
08 |
24600 |
$120.00 |
$537.72 |
$2952000.00 |
12-04-2003 |
08-334844 |
2 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
08 |
24600 |
$107.00 |
$479.47 |
$2632200.00 |
12-04-2003 |
08-334844 |
3 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
08 |
24600 |
$110.00 |
$492.91 |
$2706000.00 |
12-04-2003 |
08-334844 |
4 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
06 |
1160 |
$150.00 |
$444.03 |
$174000.00 |
02-18-2004 |
06-434504 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
06 |
1160 |
$155.00 |
$458.83 |
$179800.00 |
02-18-2004 |
06-434504 |
2 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
06 |
1160 |
$160.00 |
$473.63 |
$185600.00 |
02-18-2004 |
06-434504 |
3 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
08 |
510 |
$150.00 |
$444.03 |
$76500.00 |
03-11-2004 |
08-1A1704 |
2 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
08 |
510 |
$110.00 |
$325.62 |
$56100.00 |
03-11-2004 |
08-1A1704 |
3 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
08 |
510 |
$625.00 |
$1850.13 |
$318750.00 |
03-11-2004 |
08-1A1704 |
4 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
10 |
$200.00 |
$592.04 |
$2000.00 |
04-15-2004 |
07-4H3104 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
10 |
$600.00 |
$1776.12 |
$6000.00 |
04-15-2004 |
07-4H3104 |
2 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
10 |
$650.00 |
$1924.13 |
$6500.00 |
04-15-2004 |
07-4H3104 |
3 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
03 |
2430 |
$140.00 |
$414.43 |
$340200.00 |
04-21-2004 |
03-1A8014 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
03 |
2430 |
$130.00 |
$384.83 |
$315900.00 |
04-21-2004 |
03-1A8014 |
2 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
03 |
2430 |
$180.00 |
$532.84 |
$437400.00 |
04-21-2004 |
03-1A8014 |
3 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
76 |
$300.00 |
$888.06 |
$22800.00 |
04-22-2004 |
07-4H1004 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
76 |
$300.00 |
$888.06 |
$22800.00 |
04-22-2004 |
07-4H1004 |
2 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
76 |
$200.00 |
$592.04 |
$15200.00 |
04-22-2004 |
07-4H1004 |
3 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
130 |
$200.00 |
$592.04 |
$26000.00 |
05-06-2004 |
12-0G1504 |
1 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
130 |
$325.00 |
$962.07 |
$42250.00 |
05-06-2004 |
12-0G1504 |
2 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
130 |
$228.00 |
$674.93 |
$29640.00 |
05-06-2004 |
12-0G1504 |
3 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
18900 |
$93.00 |
$275.30 |
$1757700.00 |
06-03-2004 |
07-1178U4 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
18900 |
$150.00 |
$444.03 |
$2835000.00 |
06-03-2004 |
07-1178U4 |
2 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
18900 |
$135.00 |
$399.63 |
$2551500.00 |
06-03-2004 |
07-1178U4 |
3 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
18900 |
$165.00 |
$488.43 |
$3118500.00 |
06-03-2004 |
07-1178U4 |
4 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
18900 |
$145.00 |
$429.23 |
$2740500.00 |
06-03-2004 |
07-1178U4 |
5 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
1040 |
$200.00 |
$592.04 |
$208000.00 |
06-09-2004 |
04-2332U4 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
1040 |
$200.00 |
$592.04 |
$208000.00 |
06-09-2004 |
04-2332U4 |
2 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
1040 |
$202.00 |
$597.96 |
$210080.00 |
06-09-2004 |
04-2332U4 |
3 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
1040 |
$175.00 |
$518.04 |
$182000.00 |
06-09-2004 |
04-2332U4 |
4 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
1040 |
$110.00 |
$325.62 |
$114400.00 |
06-09-2004 |
04-2332U4 |
5 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
35 |
$300.00 |
$888.06 |
$10500.00 |
06-10-2004 |
07-187504 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
35 |
$250.00 |
$740.05 |
$8750.00 |
06-10-2004 |
07-187504 |
2 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
35 |
$425.00 |
$1258.09 |
$14875.00 |
06-10-2004 |
07-187504 |
3 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
180 |
$150.00 |
$444.03 |
$27000.00 |
06-17-2004 |
07-4J9804 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
180 |
$150.00 |
$444.03 |
$27000.00 |
06-17-2004 |
07-4J9804 |
2 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
180 |
$310.00 |
$917.66 |
$55800.00 |
06-17-2004 |
07-4J9804 |
3 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
930 |
$300.00 |
$888.06 |
$279000.00 |
06-30-2004 |
04-270704 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
930 |
$150.00 |
$444.03 |
$139500.00 |
06-30-2004 |
04-270704 |
2 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
930 |
$245.00 |
$725.25 |
$227850.00 |
06-30-2004 |
04-270704 |
3 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
930 |
$280.00 |
$828.86 |
$260400.00 |
06-30-2004 |
04-270704 |
4 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
930 |
$400.00 |
$1184.08 |
$372000.00 |
06-30-2004 |
04-270704 |
5 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
930 |
$200.00 |
$592.04 |
$186000.00 |
06-30-2004 |
04-270704 |
6 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
930 |
$230.00 |
$680.85 |
$213900.00 |
06-30-2004 |
04-270704 |
7 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
760 |
$137.00 |
$405.55 |
$104120.00 |
07-01-2004 |
07-185604 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
760 |
$155.00 |
$458.83 |
$117800.00 |
07-01-2004 |
07-185604 |
2 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
760 |
$230.00 |
$680.85 |
$174800.00 |
07-01-2004 |
07-185604 |
3 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
760 |
$175.00 |
$518.04 |
$133000.00 |
07-01-2004 |
07-185604 |
4 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
670 |
$220.00 |
$651.24 |
$147400.00 |
07-29-2004 |
07-1199U4 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
670 |
$185.00 |
$547.64 |
$123950.00 |
07-29-2004 |
07-1199U4 |
2 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
670 |
$115.00 |
$340.42 |
$77050.00 |
07-29-2004 |
07-1199U4 |
3 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
150 |
$150.00 |
$444.03 |
$22500.00 |
08-12-2004 |
07-222204 |
2 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
20 |
$260.00 |
$769.65 |
$5200.00 |
09-09-2004 |
12-0C9874 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
20 |
$450.00 |
$1332.09 |
$9000.00 |
09-09-2004 |
12-0C9874 |
2 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
20 |
$280.00 |
$828.86 |
$5600.00 |
09-09-2004 |
12-0C9874 |
3 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
20 |
$400.00 |
$1184.08 |
$8000.00 |
09-09-2004 |
12-0C9874 |
4 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
29 |
$300.00 |
$888.06 |
$8700.00 |
09-09-2004 |
12-0C9884 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
29 |
$337.00 |
$997.59 |
$9773.00 |
09-09-2004 |
12-0C9884 |
2 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
29 |
$350.00 |
$1036.07 |
$10150.00 |
09-09-2004 |
12-0C9884 |
3 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
1040 |
$200.00 |
$592.04 |
$208000.00 |
10-13-2004 |
04-2332U4 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
1040 |
$175.00 |
$518.04 |
$182000.00 |
10-13-2004 |
04-2332U4 |
2 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
1040 |
$220.00 |
$651.24 |
$228800.00 |
10-13-2004 |
04-2332U4 |
3 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
1040 |
$224.00 |
$663.09 |
$232960.00 |
10-13-2004 |
04-2332U4 |
4 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
1040 |
$198.00 |
$586.12 |
$205920.00 |
10-13-2004 |
04-2332U4 |
5 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
36 |
$551.25 |
$1631.81 |
$19845.00 |
10-26-2004 |
04-270204 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
36 |
$500.00 |
$1480.10 |
$18000.00 |
10-26-2004 |
04-270204 |
2 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
36 |
$360.00 |
$1065.67 |
$12960.00 |
10-26-2004 |
04-270204 |
3 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
36 |
$565.00 |
$1672.51 |
$20340.00 |
10-26-2004 |
04-270204 |
4 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
36 |
$330.00 |
$976.87 |
$11880.00 |
10-26-2004 |
04-270204 |
5 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
36 |
$100.00 |
$296.02 |
$3600.00 |
10-26-2004 |
04-270204 |
6 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
36 |
$250.00 |
$740.05 |
$9000.00 |
10-26-2004 |
04-270204 |
7 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
05 |
7 |
$500.00 |
$1480.10 |
$3500.00 |
11-23-2004 |
05-0161G4 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
05 |
7 |
$650.00 |
$1924.13 |
$4550.00 |
11-23-2004 |
05-0161G4 |
2 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
05 |
7 |
$750.00 |
$2220.15 |
$5250.00 |
11-23-2004 |
05-0161G4 |
3 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
05 |
7 |
$400.00 |
$1184.08 |
$2800.00 |
11-23-2004 |
05-0161G4 |
4 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
05 |
7 |
$600.00 |
$1776.12 |
$4200.00 |
11-23-2004 |
05-0161G4 |
5 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
05 |
7 |
$625.00 |
$1850.13 |
$4375.00 |
11-23-2004 |
05-0161G4 |
6 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
26 |
$300.00 |
$888.06 |
$7800.00 |
12-16-2004 |
07-1661A4 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
10500 |
$145.00 |
$374.06 |
$1522500.00 |
01-06-2005 |
07-122004 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
10500 |
$185.00 |
$477.25 |
$1942500.00 |
01-06-2005 |
07-122004 |
2 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
630 |
$90.00 |
$232.18 |
$56700.00 |
01-06-2005 |
07-1693C4 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
630 |
$126.00 |
$325.05 |
$79380.00 |
01-06-2005 |
07-1693C4 |
2 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
630 |
$225.00 |
$580.44 |
$141750.00 |
01-06-2005 |
07-1693C4 |
3 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
630 |
$152.00 |
$392.12 |
$95760.00 |
01-06-2005 |
07-1693C4 |
4 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
630 |
$110.00 |
$283.77 |
$69300.00 |
01-06-2005 |
07-1693C4 |
5 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
3060 |
$160.00 |
$412.76 |
$489600.00 |
01-13-2005 |
07-201204 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
3060 |
$150.00 |
$386.96 |
$459000.00 |
01-13-2005 |
07-201204 |
2 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
05 |
1230 |
$222.00 |
$572.71 |
$273060.00 |
01-19-2005 |
05-0H1004 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
05 |
1230 |
$248.00 |
$639.78 |
$305040.00 |
01-19-2005 |
05-0H1004 |
2 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
05 |
1230 |
$300.00 |
$773.93 |
$369000.00 |
01-19-2005 |
05-0H1004 |
3 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
05 |
1230 |
$260.00 |
$670.74 |
$319800.00 |
01-19-2005 |
05-0H1004 |
4 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
17600 |
$90.00 |
$232.18 |
$1584000.00 |
01-27-2005 |
07-125204 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
17600 |
$115.00 |
$296.67 |
$2024000.00 |
01-27-2005 |
07-125204 |
2 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
17600 |
$110.00 |
$283.77 |
$1936000.00 |
01-27-2005 |
07-125204 |
3 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
17600 |
$100.00 |
$257.98 |
$1760000.00 |
01-27-2005 |
07-125204 |
4 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
17600 |
$120.00 |
$309.57 |
$2112000.00 |
01-27-2005 |
07-125204 |
5 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
17600 |
$142.00 |
$366.32 |
$2499200.00 |
01-27-2005 |
07-125204 |
6 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
5360 |
$160.00 |
$412.76 |
$857600.00 |
02-03-2005 |
07-195904 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
5360 |
$140.00 |
$361.17 |
$750400.00 |
02-03-2005 |
07-195904 |
2 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
5360 |
$140.00 |
$361.17 |
$750400.00 |
02-03-2005 |
07-195904 |
3 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
5360 |
$210.00 |
$541.75 |
$1125600.00 |
02-03-2005 |
07-195904 |
4 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
500 |
$220.00 |
$567.55 |
$110000.00 |
04-14-2005 |
07-199624 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
500 |
$275.00 |
$709.43 |
$137500.00 |
04-14-2005 |
07-199624 |
2 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
500 |
$150.00 |
$386.96 |
$75000.00 |
04-14-2005 |
07-199624 |
3 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
500 |
$180.00 |
$464.36 |
$90000.00 |
04-14-2005 |
07-199624 |
4 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
39 |
$1050.00 |
$2708.74 |
$40950.00 |
05-05-2005 |
07-222204 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
39 |
$350.00 |
$902.91 |
$13650.00 |
05-05-2005 |
07-222204 |
2 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
39 |
$180.00 |
$464.36 |
$7020.00 |
05-05-2005 |
07-222204 |
3 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
39 |
$400.00 |
$1031.90 |
$15600.00 |
05-05-2005 |
07-222204 |
4 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
03 |
1020 |
$240.00 |
$619.14 |
$244800.00 |
05-25-2005 |
03-3C9304 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
03 |
1020 |
$250.00 |
$644.94 |
$255000.00 |
05-25-2005 |
03-3C9304 |
2 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
4 |
$500.00 |
$1289.88 |
$2000.00 |
07-14-2005 |
12-0C9854 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
4 |
$700.00 |
$1805.83 |
$2800.00 |
07-14-2005 |
12-0C9854 |
2 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
4 |
$700.00 |
$1805.83 |
$2800.00 |
07-14-2005 |
12-0C9854 |
3 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
4 |
$575.00 |
$1483.36 |
$2300.00 |
07-14-2005 |
12-0C9854 |
4 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
4 |
$2500.00 |
$6449.38 |
$10000.00 |
07-14-2005 |
12-0C9854 |
5 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
4 |
$500.00 |
$1289.88 |
$2000.00 |
07-14-2005 |
12-0C9854 |
6 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
4 |
$400.00 |
$1031.90 |
$1600.00 |
07-14-2005 |
12-0C9854 |
7 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
4 |
$800.00 |
$2063.80 |
$3200.00 |
07-14-2005 |
12-0C9854 |
8 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
05 |
330 |
$305.00 |
$786.82 |
$100650.00 |
07-19-2005 |
05-0K1004 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
05 |
330 |
$300.00 |
$773.93 |
$99000.00 |
07-19-2005 |
05-0K1004 |
2 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
05 |
330 |
$207.00 |
$534.01 |
$68310.00 |
07-19-2005 |
05-0K1004 |
3 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
08 |
120 |
$180.00 |
$464.36 |
$21600.00 |
07-21-2005 |
08-279004 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
08 |
120 |
$240.00 |
$619.14 |
$28800.00 |
07-21-2005 |
08-279004 |
2 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
14 |
$810.00 |
$2089.60 |
$11340.00 |
07-21-2005 |
12-0C9864 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
14 |
$700.00 |
$1805.83 |
$9800.00 |
07-21-2005 |
12-0C9864 |
2 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
14 |
$410.00 |
$1057.70 |
$5740.00 |
07-21-2005 |
12-0C9864 |
3 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
14 |
$280.00 |
$722.33 |
$3920.00 |
07-21-2005 |
12-0C9864 |
4 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
08 |
26 |
$191.71 |
$494.56 |
$4984.46 |
08-04-2005 |
08-438604 |
1 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
08 |
26 |
$415.00 |
$1070.60 |
$10790.00 |
08-04-2005 |
08-438604 |
2 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
10 |
50 |
$500.00 |
$1289.88 |
$25000.00 |
09-13-2005 |
10-0L0504 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
12 |
$250.00 |
$644.94 |
$3000.00 |
09-22-2005 |
12-0E1004 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
190 |
$350.00 |
$902.91 |
$66500.00 |
09-29-2005 |
07-194104 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
190 |
$225.00 |
$580.44 |
$42750.00 |
09-29-2005 |
07-194104 |
2 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
06 |
28100 |
$146.00 |
$376.64 |
$4102600.00 |
10-04-2005 |
06-350704 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
06 |
28100 |
$135.00 |
$348.27 |
$3793500.00 |
10-04-2005 |
06-350704 |
2 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
26 |
$620.00 |
$1599.45 |
$16120.00 |
10-06-2005 |
12-089504 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
26 |
$800.00 |
$2063.80 |
$20800.00 |
10-06-2005 |
12-089504 |
2 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
13600 |
$185.00 |
$477.25 |
$2516000.00 |
10-13-2005 |
07-182204 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
13600 |
$185.00 |
$477.25 |
$2516000.00 |
10-13-2005 |
07-182204 |
2 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
160 |
$140.00 |
$361.17 |
$22400.00 |
10-13-2005 |
07-4H9004 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
160 |
$225.00 |
$580.44 |
$36000.00 |
10-13-2005 |
07-4H9004 |
2 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
160 |
$250.00 |
$644.94 |
$40000.00 |
10-13-2005 |
07-4H9004 |
3 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
160 |
$400.00 |
$1031.90 |
$64000.00 |
10-13-2005 |
07-4H9004 |
4 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
21 |
$440.00 |
$1135.09 |
$9240.00 |
11-03-2005 |
07-201704 |
1 |
|
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
21 |
$575.00 |
$1483.36 |
$12075.00 |
11-03-2005 |
07-201704 |
2 |
|
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
110 |
$250.00 |
$644.94 |
$27500.00 |
11-03-2005 |
07-4J2504 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
110 |
$500.00 |
$1289.88 |
$55000.00 |
11-03-2005 |
07-4J2504 |
2 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
05 |
590 |
$250.00 |
$644.94 |
$147500.00 |
11-08-2005 |
05-0L5504 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
05 |
590 |
$250.00 |
$644.94 |
$147500.00 |
11-08-2005 |
05-0L5504 |
2 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
05 |
590 |
$271.00 |
$699.11 |
$159890.00 |
11-08-2005 |
05-0L5504 |
3 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
3700 |
$230.00 |
$593.34 |
$851000.00 |
11-16-2005 |
04-263704 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
3700 |
$162.00 |
$417.92 |
$599400.00 |
11-16-2005 |
04-263704 |
2 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
3700 |
$180.00 |
$464.36 |
$666000.00 |
11-16-2005 |
04-263704 |
3 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
3700 |
$166.00 |
$428.24 |
$614200.00 |
11-16-2005 |
04-263704 |
4 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
3700 |
$367.00 |
$946.77 |
$1357900.00 |
11-16-2005 |
04-263704 |
5 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
3700 |
$220.00 |
$567.55 |
$814000.00 |
11-16-2005 |
04-263704 |
6 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
3700 |
$250.00 |
$644.94 |
$925000.00 |
11-16-2005 |
04-263704 |
7 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
6480 |
$255.00 |
$657.84 |
$1652400.00 |
12-01-2005 |
07-242604 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
6480 |
$198.00 |
$510.79 |
$1283040.00 |
12-01-2005 |
07-242604 |
2 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
910 |
$66.00 |
$170.26 |
$60060.00 |
12-13-2005 |
04-2261V4 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
910 |
$340.00 |
$877.12 |
$309400.00 |
12-13-2005 |
04-2261V4 |
2 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
910 |
$285.00 |
$735.23 |
$259350.00 |
12-13-2005 |
04-2261V4 |
3 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
910 |
$300.00 |
$773.93 |
$273000.00 |
12-13-2005 |
04-2261V4 |
4 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
910 |
$66.00 |
$170.26 |
$60060.00 |
12-13-2005 |
04-2261V4 |
5 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
08 |
25500 |
$154.00 |
$383.77 |
$3927000.00 |
01-05-2006 |
08-354804 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
08 |
25500 |
$145.00 |
$361.34 |
$3697500.00 |
01-05-2006 |
08-354804 |
2 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
08 |
25500 |
$198.00 |
$493.42 |
$5049000.00 |
01-05-2006 |
08-354804 |
3 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
120 |
$564.00 |
$1405.49 |
$67680.00 |
01-05-2006 |
12-0A6604 |
1 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
120 |
$250.00 |
$623.00 |
$30000.00 |
01-05-2006 |
12-0A6604 |
2 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
120 |
$550.00 |
$1370.60 |
$66000.00 |
01-05-2006 |
12-0A6604 |
3 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
120 |
$556.95 |
$1387.92 |
$66834.00 |
01-05-2006 |
12-0A6604 |
4 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
74 |
$672.00 |
$1674.63 |
$49728.00 |
01-26-2006 |
12-079304 |
1 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
74 |
$336.13 |
$837.64 |
$24873.62 |
01-26-2006 |
12-079304 |
2 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
74 |
$400.00 |
$996.80 |
$29600.00 |
01-26-2006 |
12-079304 |
3 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
74 |
$525.00 |
$1308.30 |
$38850.00 |
01-26-2006 |
12-079304 |
4 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
74 |
$850.00 |
$2118.21 |
$62900.00 |
01-26-2006 |
12-079304 |
5 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
74 |
$240.00 |
$598.08 |
$17760.00 |
01-26-2006 |
12-079304 |
6 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
74 |
$600.00 |
$1495.20 |
$44400.00 |
01-26-2006 |
12-079304 |
7 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
25700 |
$155.00 |
$386.26 |
$3983500.00 |
02-09-2006 |
12-101674 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
25700 |
$200.00 |
$498.40 |
$5140000.00 |
02-09-2006 |
12-101674 |
2 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
12 |
25700 |
$275.00 |
$685.30 |
$7067500.00 |
02-09-2006 |
12-101674 |
3 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
22700 |
$123.50 |
$307.76 |
$2803450.00 |
02-23-2006 |
07-115454 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
22700 |
$150.00 |
$373.80 |
$3405000.00 |
02-23-2006 |
07-115454 |
2 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
22700 |
$225.00 |
$560.70 |
$5107500.00 |
02-23-2006 |
07-115454 |
3 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
3720 |
$225.00 |
$560.70 |
$837000.00 |
03-02-2006 |
07-183114 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
2630 |
$250.00 |
$623.00 |
$657500.00 |
03-08-2006 |
04-228554 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
2630 |
$139.00 |
$346.39 |
$365570.00 |
03-08-2006 |
04-228554 |
2 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
2630 |
$175.00 |
$436.10 |
$460250.00 |
03-08-2006 |
04-228554 |
3 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
2630 |
$245.00 |
$610.54 |
$644350.00 |
03-08-2006 |
04-228554 |
4 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
2630 |
$225.00 |
$560.70 |
$591750.00 |
03-08-2006 |
04-228554 |
5 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
2630 |
$250.00 |
$623.00 |
$657500.00 |
03-08-2006 |
04-228554 |
6 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
04 |
2630 |
$200.00 |
$498.40 |
$526000.00 |
03-08-2006 |
04-228554 |
7 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
03 |
300 |
$300.00 |
$747.60 |
$90000.00 |
04-25-2006 |
03-0C7704 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
03 |
300 |
$280.00 |
$697.76 |
$84000.00 |
04-25-2006 |
03-0C7704 |
2 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
08 |
650 |
$195.00 |
$485.94 |
$126750.00 |
05-04-2006 |
08-0C1804 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
08 |
650 |
$350.00 |
$872.20 |
$227500.00 |
05-04-2006 |
08-0C1804 |
2 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
08 |
650 |
$205.00 |
$510.86 |
$133250.00 |
05-04-2006 |
08-0C1804 |
3 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
08 |
650 |
$375.00 |
$934.50 |
$243750.00 |
05-04-2006 |
08-0C1804 |
4 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
08 |
650 |
$315.00 |
$784.98 |
$204750.00 |
05-04-2006 |
08-0C1804 |
5 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
160 |
$498.00 |
$1241.02 |
$79680.00 |
05-25-2006 |
07-4J7004 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
58 |
$280.00 |
$697.76 |
$16240.00 |
06-01-2006 |
07-4J6904 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
58 |
$326.00 |
$812.39 |
$18908.00 |
06-01-2006 |
07-4J6904 |
2 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
58 |
$450.00 |
$1121.40 |
$26100.00 |
06-01-2006 |
07-4J6904 |
3 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
07 |
3 |
$1000.00 |
$2492.01 |
$3000.00 |
06-01-2006 |
07-4K6604 |
1 |
M |
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
08 |
240 |
$200.00 |
$498.40 |
$48000.00 |
06-08-2006 |
08-0F9404 |
1 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
08 |
240 |
$300.00 |
$747.60 |
$72000.00 |
06-08-2006 |
08-0F9404 |
2 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
08 |
240 |
$190.00 |
$473.48 |
$45600.00 |
06-08-2006 |
08-0F9404 |
3 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
08 |
240 |
$350.00 |
$872.20 |
$84000.00 |
06-08-2006 |
08-0F9404 |
4 |
|
|
|
| 280000 - LEAN CONCRETE BASE |
M3 |
02 |
280 |
$400.00 |
$996.80 |
$112000.00 |
06-28-2006 |
02-3C1414 |
1 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |
M3 |
02 |
280 |
$350.00 |
$872.20 |
$98000.00 |
06-28-2006 |
02-3C1414 |
2 |
M |
TRO |
|
| 280000 - LEAN CONCRETE BASE |