| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
14 |
$350.00 |
$732.65 |
$4900.00 |
01-10-2013 |
07-4T3904 |
1 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
14 |
$416.00 |
$870.81 |
$5824.00 |
01-10-2013 |
07-4T3904 |
2 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
14 |
$167.00 |
$349.58 |
$2338.00 |
01-10-2013 |
07-4T3904 |
3 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
14 |
$550.00 |
$1151.31 |
$7700.00 |
01-10-2013 |
07-4T3904 |
4 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
14 |
$310.00 |
$648.92 |
$4340.00 |
01-10-2013 |
07-4T3904 |
5 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
14 |
$390.00 |
$816.38 |
$5460.00 |
01-10-2013 |
07-4T3904 |
6 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
14 |
$690.00 |
$1444.37 |
$9660.00 |
01-10-2013 |
07-4T3904 |
7 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
14 |
$625.00 |
$1308.30 |
$8750.00 |
01-10-2013 |
07-4T3904 |
8 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
14 |
$525.00 |
$1098.98 |
$7350.00 |
01-10-2013 |
07-4T3904 |
9 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
14 |
$330.00 |
$690.78 |
$4620.00 |
01-10-2013 |
07-4T3904 |
10 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
14 |
$350.00 |
$732.65 |
$4900.00 |
01-10-2013 |
07-4T3904 |
11 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
14 |
$840.00 |
$1758.36 |
$11760.00 |
01-10-2013 |
07-4T3904 |
12 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
14 |
$830.00 |
$1737.43 |
$11620.00 |
01-10-2013 |
07-4T3904 |
13 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
14 |
$546.00 |
$1142.93 |
$7644.00 |
01-10-2013 |
07-4T3904 |
14 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
5 |
$350.00 |
$616.41 |
$1750.00 |
04-11-2013 |
07-1W5304 |
1 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
5 |
$810.00 |
$1426.55 |
$4050.00 |
04-11-2013 |
07-1W5304 |
2 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
5 |
$300.00 |
$528.35 |
$1500.00 |
04-11-2013 |
07-1W5304 |
3 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
5 |
$299.00 |
$526.59 |
$1495.00 |
04-11-2013 |
07-1W5304 |
4 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
5 |
$2073.80 |
$3652.33 |
$10369.00 |
04-11-2013 |
07-1W5304 |
5 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
5 |
$2044.00 |
$3599.85 |
$10220.00 |
04-11-2013 |
07-1W5304 |
6 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
36 |
$600.00 |
$1056.71 |
$21600.00 |
04-25-2013 |
07-1W0804 |
1 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
36 |
$475.00 |
$836.56 |
$17100.00 |
04-25-2013 |
07-1W0804 |
2 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
250 |
$280.00 |
$493.13 |
$70000.00 |
05-02-2013 |
07-252634 |
1 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
250 |
$285.00 |
$501.94 |
$71250.00 |
05-02-2013 |
07-252634 |
2 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
250 |
$464.00 |
$817.19 |
$116000.00 |
05-02-2013 |
07-252634 |
3 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
250 |
$500.00 |
$880.59 |
$125000.00 |
05-02-2013 |
07-252634 |
4 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
250 |
$350.00 |
$616.41 |
$87500.00 |
05-02-2013 |
07-252634 |
5 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
250 |
$465.00 |
$818.95 |
$116250.00 |
05-02-2013 |
07-252634 |
6 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
250 |
$350.00 |
$616.41 |
$87500.00 |
05-02-2013 |
07-252634 |
7 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
250 |
$490.00 |
$862.98 |
$122500.00 |
05-02-2013 |
07-252634 |
8 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
30 |
$299.00 |
$526.59 |
$8970.00 |
05-09-2013 |
07-4Y0404 |
1 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
30 |
$400.00 |
$704.47 |
$12000.00 |
05-09-2013 |
07-4Y0404 |
2 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
30 |
$400.00 |
$704.47 |
$12000.00 |
05-09-2013 |
07-4Y0404 |
3 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
30 |
$400.00 |
$704.47 |
$12000.00 |
05-09-2013 |
07-4Y0404 |
4 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
30 |
$600.00 |
$1056.71 |
$18000.00 |
05-09-2013 |
07-4Y0404 |
5 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
30 |
$550.00 |
$968.65 |
$16500.00 |
05-09-2013 |
07-4Y0404 |
6 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
18200 |
$215.00 |
$378.65 |
$3913000.00 |
05-30-2013 |
07-252004 |
1 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
18200 |
$254.00 |
$447.34 |
$4622800.00 |
05-30-2013 |
07-252004 |
2 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
18200 |
$308.00 |
$542.44 |
$5605600.00 |
05-30-2013 |
07-252004 |
3 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
18200 |
$225.00 |
$396.27 |
$4095000.00 |
05-30-2013 |
07-252004 |
4 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
18200 |
$310.00 |
$545.97 |
$5642000.00 |
05-30-2013 |
07-252004 |
5 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
18200 |
$308.00 |
$542.44 |
$5605600.00 |
05-30-2013 |
07-252004 |
6 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
18200 |
$378.00 |
$665.73 |
$6879600.00 |
05-30-2013 |
07-252004 |
7 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
1060 |
$266.00 |
$856.64 |
$281960.00 |
09-19-2013 |
07-288014 |
1 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
1060 |
$153.00 |
$492.73 |
$162180.00 |
09-19-2013 |
07-288014 |
2 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
1060 |
$200.00 |
$644.09 |
$212000.00 |
09-19-2013 |
07-288014 |
3 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
1060 |
$435.00 |
$1400.89 |
$461100.00 |
09-19-2013 |
07-288014 |
4 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
1060 |
$140.00 |
$450.86 |
$148400.00 |
09-19-2013 |
07-288014 |
5 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
12 |
160 |
$455.00 |
$1465.30 |
$72800.00 |
09-19-2013 |
12-0L74U4 |
1 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
12 |
160 |
$376.00 |
$1210.89 |
$60160.00 |
09-19-2013 |
12-0L74U4 |
2 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
12 |
160 |
$400.00 |
$1288.18 |
$64000.00 |
09-19-2013 |
12-0L74U4 |
3 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
12 |
160 |
$400.00 |
$1288.18 |
$64000.00 |
09-19-2013 |
12-0L74U4 |
4 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
12 |
160 |
$360.00 |
$1159.36 |
$57600.00 |
09-19-2013 |
12-0L74U4 |
5 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
12 |
160 |
$475.00 |
$1529.71 |
$76000.00 |
09-19-2013 |
12-0L74U4 |
6 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
06 |
430 |
$380.00 |
$1223.77 |
$163400.00 |
09-24-2013 |
06-0N3604 |
1 |
|
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
06 |
430 |
$474.00 |
$1526.49 |
$203820.00 |
09-24-2013 |
06-0N3604 |
2 |
|
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
06 |
430 |
$399.00 |
$1284.96 |
$171570.00 |
09-24-2013 |
06-0N3604 |
3 |
|
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
06 |
430 |
$300.00 |
$966.13 |
$129000.00 |
09-24-2013 |
06-0N3604 |
4 |
|
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
06 |
430 |
$410.00 |
$1320.38 |
$176300.00 |
09-24-2013 |
06-0N3604 |
5 |
|
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
06 |
430 |
$397.00 |
$1278.51 |
$170710.00 |
09-24-2013 |
06-0N3604 |
6 |
|
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
06 |
430 |
$378.00 |
$1217.33 |
$162540.00 |
09-24-2013 |
06-0N3604 |
7 |
|
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
900 |
$145.00 |
$322.41 |
$130500.00 |
12-19-2013 |
07-1170U4 |
1 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
900 |
$223.00 |
$495.85 |
$200700.00 |
12-19-2013 |
07-1170U4 |
2 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
900 |
$350.00 |
$778.23 |
$315000.00 |
12-19-2013 |
07-1170U4 |
3 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
900 |
$300.00 |
$667.06 |
$270000.00 |
12-19-2013 |
07-1170U4 |
4 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
900 |
$330.00 |
$733.76 |
$297000.00 |
12-19-2013 |
07-1170U4 |
5 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
900 |
$218.00 |
$484.73 |
$196200.00 |
12-19-2013 |
07-1170U4 |
6 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
26 |
$323.00 |
$575.71 |
$8398.00 |
02-06-2014 |
07-3P7204 |
1 |
|
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
26 |
$270.00 |
$481.24 |
$7020.00 |
02-06-2014 |
07-3P7204 |
2 |
|
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
26 |
$352.00 |
$627.40 |
$9152.00 |
02-06-2014 |
07-3P7204 |
3 |
|
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
26 |
$440.00 |
$784.25 |
$11440.00 |
02-06-2014 |
07-3P7204 |
4 |
|
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
26 |
$640.00 |
$1140.73 |
$16640.00 |
02-06-2014 |
07-3P7204 |
5 |
|
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
26 |
$370.00 |
$659.48 |
$9620.00 |
02-06-2014 |
07-3P7204 |
6 |
|
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
26 |
$670.00 |
$1194.20 |
$17420.00 |
02-06-2014 |
07-3P7204 |
7 |
|
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
26 |
$400.00 |
$712.95 |
$10400.00 |
02-06-2014 |
07-3P7204 |
8 |
|
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
26 |
$465.00 |
$828.81 |
$12090.00 |
02-06-2014 |
07-3P7204 |
9 |
|
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
26 |
$585.00 |
$1042.70 |
$15210.00 |
02-06-2014 |
07-3P7204 |
10 |
|
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
26 |
$600.00 |
$1069.43 |
$15600.00 |
02-06-2014 |
07-3P7204 |
11 |
|
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
26 |
$1000.00 |
$1782.39 |
$26000.00 |
02-06-2014 |
07-3P7204 |
12 |
|
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
2090 |
$150.00 |
$267.36 |
$313500.00 |
03-18-2014 |
04-0A7104 |
1 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
2090 |
$300.00 |
$534.72 |
$627000.00 |
03-18-2014 |
04-0A7104 |
2 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
2090 |
$500.00 |
$891.19 |
$1045000.00 |
03-18-2014 |
04-0A7104 |
3 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
2090 |
$325.00 |
$579.28 |
$679250.00 |
03-18-2014 |
04-0A7104 |
4 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
140 |
$431.25 |
$768.65 |
$60375.00 |
03-20-2014 |
07-4T5904 |
1 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
140 |
$430.00 |
$766.43 |
$60200.00 |
03-20-2014 |
07-4T5904 |
2 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
140 |
$300.00 |
$534.72 |
$42000.00 |
03-20-2014 |
07-4T5904 |
3 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
140 |
$305.00 |
$543.63 |
$42700.00 |
03-20-2014 |
07-4T5904 |
4 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
140 |
$190.00 |
$338.65 |
$26600.00 |
03-20-2014 |
07-4T5904 |
5 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
140 |
$400.00 |
$712.95 |
$56000.00 |
03-20-2014 |
07-4T5904 |
6 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
140 |
$380.00 |
$677.31 |
$53200.00 |
03-20-2014 |
07-4T5904 |
7 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
11 |
4830 |
$175.00 |
$402.87 |
$845250.00 |
04-10-2014 |
11-406704 |
1 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
11 |
4830 |
$180.00 |
$414.38 |
$869400.00 |
04-10-2014 |
11-406704 |
2 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
11 |
4830 |
$230.00 |
$529.49 |
$1110900.00 |
04-10-2014 |
11-406704 |
3 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
11 |
4830 |
$265.00 |
$610.06 |
$1279950.00 |
04-10-2014 |
11-406704 |
4 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
11 |
4830 |
$340.00 |
$782.72 |
$1642200.00 |
04-10-2014 |
11-406704 |
5 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
11 |
4830 |
$494.06 |
$1137.39 |
$2386309.80 |
04-10-2014 |
11-406704 |
6 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
11 |
4830 |
$350.00 |
$805.74 |
$1690500.00 |
04-10-2014 |
11-406704 |
7 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
12 |
350 |
$320.00 |
$736.68 |
$112000.00 |
04-17-2014 |
12-0F96C4 |
1 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
12 |
350 |
$230.00 |
$529.49 |
$80500.00 |
04-17-2014 |
12-0F96C4 |
2 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
12 |
350 |
$330.00 |
$759.70 |
$115500.00 |
04-17-2014 |
12-0F96C4 |
3 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
12 |
350 |
$200.00 |
$460.42 |
$70000.00 |
04-17-2014 |
12-0F96C4 |
4 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
12 |
350 |
$375.00 |
$863.30 |
$131250.00 |
04-17-2014 |
12-0F96C4 |
5 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
12 |
350 |
$325.00 |
$748.19 |
$113750.00 |
04-17-2014 |
12-0F96C4 |
6 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
12 |
350 |
$310.00 |
$713.66 |
$108500.00 |
04-17-2014 |
12-0F96C4 |
7 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
12 |
350 |
$401.00 |
$923.15 |
$140350.00 |
04-17-2014 |
12-0F96C4 |
8 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
12 |
350 |
$240.00 |
$552.51 |
$84000.00 |
04-17-2014 |
12-0F96C4 |
9 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
12 |
350 |
$457.00 |
$1052.07 |
$159950.00 |
04-17-2014 |
12-0F96C4 |
10 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
250 |
$400.00 |
$920.85 |
$100000.00 |
05-08-2014 |
07-4Y9204 |
1 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
250 |
$230.00 |
$529.49 |
$57500.00 |
05-08-2014 |
07-4Y9204 |
2 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
250 |
$200.00 |
$460.42 |
$50000.00 |
05-08-2014 |
07-4Y9204 |
3 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
250 |
$350.00 |
$805.74 |
$87500.00 |
05-08-2014 |
07-4Y9204 |
4 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
250 |
$374.00 |
$860.99 |
$93500.00 |
05-08-2014 |
07-4Y9204 |
5 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
250 |
$300.00 |
$690.64 |
$75000.00 |
05-08-2014 |
07-4Y9204 |
6 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
250 |
$287.00 |
$660.71 |
$71750.00 |
05-08-2014 |
07-4Y9204 |
7 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
250 |
$335.00 |
$771.21 |
$83750.00 |
05-08-2014 |
07-4Y9204 |
8 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
250 |
$260.00 |
$598.55 |
$65000.00 |
05-08-2014 |
07-4Y9204 |
9 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
250 |
$350.00 |
$805.74 |
$87500.00 |
05-08-2014 |
07-4Y9204 |
10 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
250 |
$510.00 |
$1174.08 |
$127500.00 |
05-08-2014 |
07-4Y9204 |
11 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
08 |
160 |
$485.00 |
$1116.53 |
$77600.00 |
05-15-2014 |
08-0R8104 |
1 |
|
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
08 |
160 |
$380.00 |
$874.81 |
$60800.00 |
05-15-2014 |
08-0R8104 |
2 |
|
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
08 |
160 |
$425.00 |
$978.40 |
$68000.00 |
05-15-2014 |
08-0R8104 |
3 |
|
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
08 |
160 |
$400.00 |
$920.85 |
$64000.00 |
05-15-2014 |
08-0R8104 |
4 |
|
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
08 |
160 |
$300.00 |
$690.64 |
$48000.00 |
05-15-2014 |
08-0R8104 |
5 |
|
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
08 |
160 |
$350.00 |
$805.74 |
$56000.00 |
05-15-2014 |
08-0R8104 |
6 |
|
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
170 |
$420.00 |
$966.89 |
$71400.00 |
06-12-2014 |
07-294904 |
1 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
170 |
$555.00 |
$1277.68 |
$94350.00 |
06-12-2014 |
07-294904 |
2 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
170 |
$207.00 |
$476.54 |
$35190.00 |
06-12-2014 |
07-294904 |
3 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
170 |
$455.00 |
$1047.47 |
$77350.00 |
06-12-2014 |
07-294904 |
4 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
170 |
$440.00 |
$1012.93 |
$74800.00 |
06-12-2014 |
07-294904 |
5 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
170 |
$405.00 |
$932.36 |
$68850.00 |
06-12-2014 |
07-294904 |
6 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
170 |
$462.00 |
$1063.58 |
$78540.00 |
06-12-2014 |
07-294904 |
7 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
170 |
$450.00 |
$1035.95 |
$76500.00 |
06-12-2014 |
07-294904 |
8 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
12 |
$350.00 |
$805.74 |
$4200.00 |
06-12-2014 |
07-296804 |
1 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
12 |
$400.00 |
$920.85 |
$4800.00 |
06-12-2014 |
07-296804 |
2 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
12 |
$550.00 |
$1266.17 |
$6600.00 |
06-12-2014 |
07-296804 |
3 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
10 |
280 |
$315.00 |
$700.30 |
$88200.00 |
09-03-2014 |
10-0V6604 |
1 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
10 |
280 |
$340.25 |
$756.44 |
$95270.00 |
09-03-2014 |
10-0V6604 |
2 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
10 |
280 |
$540.00 |
$1200.52 |
$151200.00 |
09-03-2014 |
10-0V6604 |
3 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
10 |
280 |
$425.00 |
$944.85 |
$119000.00 |
09-03-2014 |
10-0V6604 |
4 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
10 |
280 |
$427.00 |
$949.30 |
$119560.00 |
09-03-2014 |
10-0V6604 |
5 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
4 |
$460.00 |
$897.16 |
$1840.00 |
10-16-2014 |
07-2881U4 |
1 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
4 |
$400.00 |
$780.14 |
$1600.00 |
10-16-2014 |
07-2881U4 |
2 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
4 |
$345.00 |
$672.87 |
$1380.00 |
10-16-2014 |
07-2881U4 |
3 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
4 |
$625.59 |
$1220.12 |
$2502.36 |
10-16-2014 |
07-2881U4 |
4 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
4 |
$900.00 |
$1755.32 |
$3600.00 |
10-16-2014 |
07-2881U4 |
5 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
4 |
$1400.00 |
$2730.49 |
$5600.00 |
10-16-2014 |
07-2881U4 |
6 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
11 |
360 |
$400.00 |
$780.14 |
$144000.00 |
10-16-2014 |
11-275504 |
1 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
11 |
360 |
$280.00 |
$546.10 |
$100800.00 |
10-16-2014 |
11-275504 |
2 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
11 |
360 |
$380.00 |
$741.13 |
$136800.00 |
10-16-2014 |
11-275504 |
3 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
11 |
360 |
$353.07 |
$688.61 |
$127105.20 |
10-16-2014 |
11-275504 |
4 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
11 |
360 |
$230.00 |
$448.58 |
$82800.00 |
10-16-2014 |
11-275504 |
5 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
115 |
$275.00 |
$536.35 |
$31625.00 |
10-21-2014 |
04-1SS024 |
1 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
115 |
$275.00 |
$536.35 |
$31625.00 |
10-21-2014 |
04-1SS024 |
2 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
115 |
$730.00 |
$1423.76 |
$83950.00 |
10-21-2014 |
04-1SS024 |
3 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
115 |
$425.00 |
$828.90 |
$48875.00 |
10-21-2014 |
04-1SS024 |
4 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
115 |
$450.00 |
$877.66 |
$51750.00 |
10-21-2014 |
04-1SS024 |
5 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
115 |
$400.00 |
$780.14 |
$46000.00 |
10-21-2014 |
04-1SS024 |
6 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
115 |
$300.00 |
$585.11 |
$34500.00 |
10-21-2014 |
04-1SS024 |
7 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
12 |
300 |
$277.00 |
$540.25 |
$83100.00 |
10-23-2014 |
12-0F96A4 |
1 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
12 |
300 |
$550.00 |
$1072.69 |
$165000.00 |
10-23-2014 |
12-0F96A4 |
2 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
12 |
300 |
$186.95 |
$364.62 |
$56085.00 |
10-23-2014 |
12-0F96A4 |
3 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
12 |
300 |
$300.00 |
$585.11 |
$90000.00 |
10-23-2014 |
12-0F96A4 |
4 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
12 |
300 |
$390.00 |
$760.64 |
$117000.00 |
10-23-2014 |
12-0F96A4 |
5 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
67 |
$475.00 |
$926.42 |
$31825.00 |
11-20-2014 |
07-2055A4 |
1 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
67 |
$277.21 |
$540.66 |
$18573.07 |
11-20-2014 |
07-2055A4 |
2 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
67 |
$350.00 |
$682.62 |
$23450.00 |
11-20-2014 |
07-2055A4 |
3 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
67 |
$663.00 |
$1293.08 |
$44421.00 |
11-20-2014 |
07-2055A4 |
4 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
67 |
$375.00 |
$731.38 |
$25125.00 |
11-20-2014 |
07-2055A4 |
5 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
67 |
$475.00 |
$926.42 |
$31825.00 |
11-20-2014 |
07-2055A4 |
6 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
67 |
$330.00 |
$643.62 |
$22110.00 |
11-20-2014 |
07-2055A4 |
7 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
67 |
$63.53 |
$123.91 |
$4256.51 |
11-20-2014 |
07-2055A4 |
8 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
67 |
$400.00 |
$780.14 |
$26800.00 |
11-20-2014 |
07-2055A4 |
9 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
67 |
$510.00 |
$994.68 |
$34170.00 |
11-20-2014 |
07-2055A4 |
10 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
67 |
$273.00 |
$532.45 |
$18291.00 |
11-20-2014 |
07-2055A4 |
11 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
67 |
$515.00 |
$1004.43 |
$34505.00 |
11-20-2014 |
07-2055A4 |
12 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
73 |
$400.00 |
$780.14 |
$29200.00 |
11-20-2014 |
07-259024 |
1 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
73 |
$500.00 |
$975.18 |
$36500.00 |
11-20-2014 |
07-259024 |
2 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
73 |
$260.00 |
$507.09 |
$18980.00 |
11-20-2014 |
07-259024 |
3 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
73 |
$325.00 |
$633.86 |
$23725.00 |
11-20-2014 |
07-259024 |
4 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
73 |
$552.60 |
$1077.76 |
$40339.80 |
11-20-2014 |
07-259024 |
5 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
73 |
$270.00 |
$526.60 |
$19710.00 |
11-20-2014 |
07-259024 |
6 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
73 |
$1525.00 |
$2974.29 |
$111325.00 |
11-20-2014 |
07-259024 |
7 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
73 |
$200.00 |
$390.07 |
$14600.00 |
11-20-2014 |
07-259024 |
8 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
73 |
$540.00 |
$1053.19 |
$39420.00 |
11-20-2014 |
07-259024 |
9 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
630 |
$262.00 |
$399.82 |
$165060.00 |
01-15-2015 |
04-4H2214 |
1 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
630 |
$340.00 |
$518.85 |
$214200.00 |
01-15-2015 |
04-4H2214 |
2 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
630 |
$400.00 |
$610.41 |
$252000.00 |
01-15-2015 |
04-4H2214 |
3 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
630 |
$875.00 |
$1335.28 |
$551250.00 |
01-15-2015 |
04-4H2214 |
4 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
630 |
$630.00 |
$961.40 |
$396900.00 |
01-15-2015 |
04-4H2214 |
5 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
630 |
$425.00 |
$648.57 |
$267750.00 |
01-15-2015 |
04-4H2214 |
6 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
630 |
$448.00 |
$683.66 |
$282240.00 |
01-15-2015 |
04-4H2214 |
7 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
05 |
230 |
$550.00 |
$839.32 |
$126500.00 |
01-15-2015 |
05-1F8404 |
1 |
|
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
05 |
230 |
$810.00 |
$1236.09 |
$186300.00 |
01-15-2015 |
05-1F8404 |
2 |
|
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
05 |
230 |
$510.00 |
$778.28 |
$117300.00 |
01-15-2015 |
05-1F8404 |
3 |
|
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
05 |
230 |
$525.00 |
$801.17 |
$120750.00 |
01-15-2015 |
05-1F8404 |
4 |
|
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
05 |
230 |
$830.00 |
$1266.61 |
$190900.00 |
01-15-2015 |
05-1F8404 |
5 |
|
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
05 |
230 |
$350.00 |
$534.11 |
$80500.00 |
01-15-2015 |
05-1F8404 |
6 |
|
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
600 |
$300.00 |
$457.81 |
$180000.00 |
01-28-2015 |
07-2656U4 |
1 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
600 |
$330.00 |
$503.59 |
$198000.00 |
01-28-2015 |
07-2656U4 |
2 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
600 |
$270.00 |
$412.03 |
$162000.00 |
01-28-2015 |
07-2656U4 |
3 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
600 |
$290.00 |
$442.55 |
$174000.00 |
01-28-2015 |
07-2656U4 |
4 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
600 |
$310.26 |
$473.47 |
$186156.00 |
01-28-2015 |
07-2656U4 |
5 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
600 |
$306.00 |
$466.97 |
$183600.00 |
01-28-2015 |
07-2656U4 |
6 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
600 |
$300.00 |
$457.81 |
$180000.00 |
01-28-2015 |
07-2656U4 |
7 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
600 |
$250.00 |
$381.51 |
$150000.00 |
01-28-2015 |
07-2656U4 |
8 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
26 |
$400.00 |
$610.41 |
$10400.00 |
03-18-2015 |
07-3P7204 |
1 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
26 |
$720.00 |
$1098.75 |
$18720.00 |
03-18-2015 |
07-3P7204 |
2 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
26 |
$500.00 |
$763.02 |
$13000.00 |
03-18-2015 |
07-3P7204 |
3 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
26 |
$370.00 |
$564.63 |
$9620.00 |
03-18-2015 |
07-3P7204 |
4 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
26 |
$442.00 |
$674.51 |
$11492.00 |
03-18-2015 |
07-3P7204 |
5 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
26 |
$800.00 |
$1220.83 |
$20800.00 |
03-18-2015 |
07-3P7204 |
6 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
26 |
$550.00 |
$839.32 |
$14300.00 |
03-18-2015 |
07-3P7204 |
7 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
26 |
$600.00 |
$915.62 |
$15600.00 |
03-18-2015 |
07-3P7204 |
8 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
26 |
$1000.00 |
$1526.04 |
$26000.00 |
03-18-2015 |
07-3P7204 |
9 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
54 |
$530.00 |
$1129.94 |
$28620.00 |
04-22-2015 |
07-2W7104 |
1 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
54 |
$450.00 |
$959.38 |
$24300.00 |
04-22-2015 |
07-2W7104 |
2 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
54 |
$550.00 |
$1172.58 |
$29700.00 |
04-22-2015 |
07-2W7104 |
3 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
54 |
$345.00 |
$735.53 |
$18630.00 |
04-22-2015 |
07-2W7104 |
4 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
54 |
$553.08 |
$1179.15 |
$29866.32 |
04-22-2015 |
07-2W7104 |
5 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
54 |
$1000.00 |
$2131.97 |
$54000.00 |
04-22-2015 |
07-2W7104 |
6 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
11 |
220 |
$1028.00 |
$2191.66 |
$226160.00 |
05-12-2015 |
11-2M6504 |
1 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
11 |
220 |
$545.70 |
$1163.41 |
$120054.00 |
05-12-2015 |
11-2M6504 |
2 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
08 |
160 |
$595.00 |
$1268.52 |
$95200.00 |
05-21-2015 |
08-0R8114 |
1 |
|
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
08 |
160 |
$552.00 |
$1176.85 |
$88320.00 |
05-21-2015 |
08-0R8114 |
2 |
|
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
08 |
160 |
$475.00 |
$1012.68 |
$76000.00 |
05-21-2015 |
08-0R8114 |
3 |
|
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
08 |
160 |
$700.00 |
$1492.38 |
$112000.00 |
05-21-2015 |
08-0R8114 |
4 |
|
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
08 |
160 |
$500.00 |
$1065.98 |
$80000.00 |
05-21-2015 |
08-0R8114 |
5 |
|
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
220 |
$430.00 |
$913.42 |
$94600.00 |
09-10-2015 |
04-286804 |
1 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
220 |
$750.00 |
$1593.18 |
$165000.00 |
09-10-2015 |
04-286804 |
2 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
220 |
$575.00 |
$1221.44 |
$126500.00 |
09-10-2015 |
04-286804 |
3 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
220 |
$600.00 |
$1274.54 |
$132000.00 |
09-10-2015 |
04-286804 |
4 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
220 |
$780.00 |
$1656.91 |
$171600.00 |
09-10-2015 |
04-286804 |
5 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
220 |
$974.00 |
$2069.01 |
$214280.00 |
09-10-2015 |
04-286804 |
6 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
05 |
1350 |
$400.00 |
$849.70 |
$540000.00 |
09-10-2015 |
05-1F69U4 |
1 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
05 |
1350 |
$333.90 |
$709.28 |
$450765.00 |
09-10-2015 |
05-1F69U4 |
2 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
05 |
1350 |
$559.85 |
$1189.26 |
$755797.50 |
09-10-2015 |
05-1F69U4 |
3 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
05 |
1350 |
$340.00 |
$722.24 |
$459000.00 |
09-10-2015 |
05-1F69U4 |
4 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
11 |
$1030.00 |
$2187.97 |
$11330.00 |
09-29-2015 |
04-2G5404 |
1 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
11 |
$1900.00 |
$4036.05 |
$20900.00 |
09-29-2015 |
04-2G5404 |
2 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
11 |
$1200.00 |
$2549.09 |
$13200.00 |
09-29-2015 |
04-2G5404 |
3 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
870 |
$250.00 |
$481.06 |
$217500.00 |
10-08-2015 |
07-3X7114 |
1 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
870 |
$385.36 |
$741.52 |
$335263.20 |
10-08-2015 |
07-3X7114 |
2 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
870 |
$387.00 |
$744.68 |
$336690.00 |
10-08-2015 |
07-3X7114 |
3 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
870 |
$330.00 |
$635.00 |
$287100.00 |
10-08-2015 |
07-3X7114 |
4 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
870 |
$370.00 |
$711.96 |
$321900.00 |
10-08-2015 |
07-3X7114 |
5 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
870 |
$280.00 |
$538.78 |
$243600.00 |
10-08-2015 |
07-3X7114 |
6 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
870 |
$396.00 |
$761.99 |
$344520.00 |
10-08-2015 |
07-3X7114 |
7 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
3000 |
$391.00 |
$752.37 |
$1173000.00 |
10-15-2015 |
07-1193U4 |
1 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
3000 |
$500.00 |
$962.11 |
$1500000.00 |
10-15-2015 |
07-1193U4 |
2 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
3000 |
$225.00 |
$432.95 |
$675000.00 |
10-15-2015 |
07-1193U4 |
3 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
3000 |
$381.00 |
$733.13 |
$1143000.00 |
10-15-2015 |
07-1193U4 |
4 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
3000 |
$490.00 |
$942.87 |
$1470000.00 |
10-15-2015 |
07-1193U4 |
5 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
3000 |
$250.00 |
$481.06 |
$750000.00 |
10-15-2015 |
07-1193U4 |
6 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
3000 |
$537.50 |
$1034.27 |
$1612500.00 |
10-15-2015 |
07-1193U4 |
7 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
190 |
$350.00 |
$673.48 |
$66500.00 |
10-29-2015 |
07-255104 |
1 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
190 |
$523.00 |
$1006.37 |
$99370.00 |
10-29-2015 |
07-255104 |
2 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
190 |
$200.00 |
$384.85 |
$38000.00 |
10-29-2015 |
07-255104 |
3 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
190 |
$400.00 |
$769.69 |
$76000.00 |
10-29-2015 |
07-255104 |
4 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
190 |
$450.00 |
$865.90 |
$85500.00 |
10-29-2015 |
07-255104 |
5 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
190 |
$575.00 |
$1106.43 |
$109250.00 |
10-29-2015 |
07-255104 |
6 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
190 |
$1.00 |
$1.92 |
$190.00 |
10-29-2015 |
07-255104 |
7 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
340 |
$430.00 |
$827.42 |
$146200.00 |
11-04-2015 |
04-2G8504 |
1 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
340 |
$527.62 |
$1015.26 |
$179390.80 |
11-04-2015 |
04-2G8504 |
2 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
340 |
$550.00 |
$1058.33 |
$187000.00 |
11-04-2015 |
04-2G8504 |
3 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
340 |
$250.00 |
$481.06 |
$85000.00 |
11-04-2015 |
04-2G8504 |
4 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
340 |
$500.00 |
$962.11 |
$170000.00 |
11-04-2015 |
04-2G8504 |
5 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
340 |
$500.00 |
$962.11 |
$170000.00 |
11-04-2015 |
04-2G8504 |
6 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
340 |
$515.00 |
$990.98 |
$175100.00 |
11-04-2015 |
04-2G8504 |
7 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
340 |
$565.00 |
$1087.19 |
$192100.00 |
11-04-2015 |
04-2G8504 |
8 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
340 |
$500.00 |
$962.11 |
$170000.00 |
11-04-2015 |
04-2G8504 |
9 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
340 |
$520.00 |
$1000.60 |
$176800.00 |
11-04-2015 |
04-2G8504 |
10 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
44 |
$970.00 |
$1866.50 |
$42680.00 |
12-02-2015 |
07-2750U4 |
1 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
44 |
$650.00 |
$1250.75 |
$28600.00 |
12-02-2015 |
07-2750U4 |
2 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
44 |
$228.00 |
$438.72 |
$10032.00 |
12-02-2015 |
07-2750U4 |
3 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
44 |
$600.00 |
$1154.54 |
$26400.00 |
12-02-2015 |
07-2750U4 |
4 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
44 |
$390.00 |
$750.45 |
$17160.00 |
12-02-2015 |
07-2750U4 |
5 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
11 |
450 |
$450.00 |
$865.90 |
$202500.00 |
12-02-2015 |
11-413304 |
1 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
11 |
450 |
$404.00 |
$777.39 |
$181800.00 |
12-02-2015 |
11-413304 |
2 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
11 |
450 |
$440.00 |
$846.66 |
$198000.00 |
12-02-2015 |
11-413304 |
3 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
11 |
450 |
$575.00 |
$1106.43 |
$258750.00 |
12-02-2015 |
11-413304 |
4 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
11 |
450 |
$425.00 |
$817.80 |
$191250.00 |
12-02-2015 |
11-413304 |
5 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
1740 |
$374.50 |
$720.62 |
$651630.00 |
12-03-2015 |
07-306204 |
1 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
1740 |
$275.65 |
$530.41 |
$479631.00 |
12-03-2015 |
07-306204 |
2 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
1740 |
$327.83 |
$630.82 |
$570424.20 |
12-03-2015 |
07-306204 |
3 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
1740 |
$250.00 |
$481.06 |
$435000.00 |
12-03-2015 |
07-306204 |
4 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
1740 |
$395.00 |
$760.07 |
$687300.00 |
12-03-2015 |
07-306204 |
5 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
1740 |
$500.00 |
$962.11 |
$870000.00 |
12-03-2015 |
07-306204 |
6 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
110 |
$100.00 |
$192.42 |
$11000.00 |
12-08-2015 |
07-258404 |
1 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
110 |
$500.00 |
$962.11 |
$55000.00 |
12-08-2015 |
07-258404 |
2 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
110 |
$1000.00 |
$1924.23 |
$110000.00 |
12-08-2015 |
07-258404 |
3 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
110 |
$500.00 |
$962.11 |
$55000.00 |
12-08-2015 |
07-258404 |
4 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
110 |
$385.00 |
$740.83 |
$42350.00 |
12-08-2015 |
07-258404 |
5 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
110 |
$450.00 |
$865.90 |
$49500.00 |
12-08-2015 |
07-258404 |
6 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
110 |
$353.50 |
$680.21 |
$38885.00 |
12-08-2015 |
07-258404 |
7 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
110 |
$375.00 |
$721.59 |
$41250.00 |
12-08-2015 |
07-258404 |
8 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
11 |
220 |
$1113.00 |
$2099.48 |
$244860.00 |
01-07-2016 |
11-2M6504 |
1 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
11 |
220 |
$897.00 |
$1692.04 |
$197340.00 |
01-07-2016 |
11-2M6504 |
2 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
11 |
220 |
$1100.00 |
$2074.96 |
$242000.00 |
01-07-2016 |
11-2M6504 |
3 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
05 |
1520 |
$508.00 |
$958.25 |
$772160.00 |
02-03-2016 |
05-0T6304 |
1 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
05 |
1520 |
$400.00 |
$754.53 |
$608000.00 |
02-03-2016 |
05-0T6304 |
2 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
05 |
1520 |
$457.00 |
$862.05 |
$694640.00 |
02-03-2016 |
05-0T6304 |
3 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
05 |
1520 |
$460.00 |
$867.71 |
$699200.00 |
02-03-2016 |
05-0T6304 |
4 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
05 |
1520 |
$400.00 |
$754.53 |
$608000.00 |
02-03-2016 |
05-0T6304 |
5 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
05 |
1520 |
$466.00 |
$879.03 |
$708320.00 |
02-03-2016 |
05-0T6304 |
6 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
23 |
$740.00 |
$1395.88 |
$17020.00 |
02-03-2016 |
07-300604 |
1 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
23 |
$1065.00 |
$2008.94 |
$24495.00 |
02-03-2016 |
07-300604 |
2 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
23 |
$347.36 |
$655.24 |
$7989.28 |
02-03-2016 |
07-300604 |
3 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
23 |
$500.00 |
$943.16 |
$11500.00 |
02-03-2016 |
07-300604 |
4 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
23 |
$465.00 |
$877.14 |
$10695.00 |
02-03-2016 |
07-300604 |
5 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
23 |
$575.00 |
$1084.64 |
$13225.00 |
02-03-2016 |
07-300604 |
6 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
120 |
$400.00 |
$754.53 |
$48000.00 |
02-09-2016 |
04-1SS024 |
1 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
120 |
$450.00 |
$848.85 |
$54000.00 |
02-09-2016 |
04-1SS024 |
2 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
120 |
$500.00 |
$943.16 |
$60000.00 |
02-09-2016 |
04-1SS024 |
3 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
120 |
$525.00 |
$990.32 |
$63000.00 |
02-09-2016 |
04-1SS024 |
4 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
120 |
$250.00 |
$471.58 |
$30000.00 |
02-09-2016 |
04-1SS024 |
5 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
120 |
$770.00 |
$1452.47 |
$92400.00 |
02-09-2016 |
04-1SS024 |
6 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
120 |
$200.00 |
$377.27 |
$24000.00 |
02-09-2016 |
04-1SS024 |
7 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
490 |
$350.00 |
$660.21 |
$171500.00 |
03-03-2016 |
07-251904 |
1 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
490 |
$548.00 |
$1033.71 |
$268520.00 |
03-03-2016 |
07-251904 |
2 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
20 |
$586.00 |
$1077.91 |
$11720.00 |
04-26-2016 |
07-300704 |
1 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
20 |
$600.00 |
$1103.67 |
$12000.00 |
04-26-2016 |
07-300704 |
2 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
20 |
$750.00 |
$1379.58 |
$15000.00 |
04-26-2016 |
07-300704 |
3 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
20 |
$750.14 |
$1379.84 |
$15002.80 |
04-26-2016 |
07-300704 |
4 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
05 |
2330 |
$290.00 |
$533.44 |
$675700.00 |
04-27-2016 |
05-4482U4 |
1 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
05 |
2330 |
$270.00 |
$496.65 |
$629100.00 |
04-27-2016 |
05-4482U4 |
2 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
05 |
2330 |
$300.00 |
$551.83 |
$699000.00 |
04-27-2016 |
05-4482U4 |
3 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
05 |
2330 |
$370.00 |
$680.59 |
$862100.00 |
04-27-2016 |
05-4482U4 |
4 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
05 |
2330 |
$330.00 |
$607.02 |
$768900.00 |
04-27-2016 |
05-4482U4 |
5 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
140 |
$344.00 |
$632.77 |
$48160.00 |
04-27-2016 |
07-2159U4 |
1 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
140 |
$358.00 |
$658.52 |
$50120.00 |
04-27-2016 |
07-2159U4 |
2 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
140 |
$500.00 |
$919.72 |
$70000.00 |
04-27-2016 |
07-2159U4 |
3 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
140 |
$425.00 |
$781.76 |
$59500.00 |
04-27-2016 |
07-2159U4 |
4 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
140 |
$455.00 |
$836.95 |
$63700.00 |
04-27-2016 |
07-2159U4 |
5 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
140 |
$300.00 |
$551.83 |
$42000.00 |
04-27-2016 |
07-2159U4 |
6 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
11 |
1340 |
$425.00 |
$781.76 |
$569500.00 |
05-03-2016 |
11-413504 |
1 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
11 |
1340 |
$400.00 |
$735.78 |
$536000.00 |
05-03-2016 |
11-413504 |
2 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
11 |
1340 |
$380.00 |
$698.99 |
$509200.00 |
05-03-2016 |
11-413504 |
3 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
11 |
1340 |
$600.00 |
$1103.67 |
$804000.00 |
05-03-2016 |
11-413504 |
4 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
460 |
$587.00 |
$1079.75 |
$270020.00 |
05-04-2016 |
07-302604 |
1 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
460 |
$500.00 |
$919.72 |
$230000.00 |
05-04-2016 |
07-302604 |
2 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
460 |
$500.00 |
$919.72 |
$230000.00 |
05-04-2016 |
07-302604 |
3 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
460 |
$350.69 |
$645.07 |
$161317.40 |
05-04-2016 |
07-302604 |
4 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
460 |
$485.00 |
$892.13 |
$223100.00 |
05-04-2016 |
07-302604 |
5 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
460 |
$750.00 |
$1379.58 |
$345000.00 |
05-04-2016 |
07-302604 |
6 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
460 |
$675.00 |
$1241.62 |
$310500.00 |
05-04-2016 |
07-302604 |
7 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
06 |
160 |
$540.00 |
$993.30 |
$86400.00 |
05-19-2016 |
06-0T8704 |
1 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
06 |
160 |
$250.00 |
$459.86 |
$40000.00 |
05-19-2016 |
06-0T8704 |
2 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
06 |
160 |
$429.00 |
$789.12 |
$68640.00 |
05-19-2016 |
06-0T8704 |
3 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
06 |
160 |
$574.00 |
$1055.84 |
$91840.00 |
05-19-2016 |
06-0T8704 |
4 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
06 |
160 |
$432.00 |
$794.64 |
$69120.00 |
05-19-2016 |
06-0T8704 |
5 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
160 |
$1030.00 |
$1604.23 |
$164800.00 |
08-09-2016 |
07-279114 |
1 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
160 |
$380.00 |
$591.85 |
$60800.00 |
08-09-2016 |
07-279114 |
2 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
160 |
$590.00 |
$918.93 |
$94400.00 |
08-09-2016 |
07-279114 |
3 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
160 |
$445.00 |
$693.09 |
$71200.00 |
08-09-2016 |
07-279114 |
4 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
160 |
$360.00 |
$560.70 |
$57600.00 |
08-09-2016 |
07-279114 |
5 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
160 |
$475.00 |
$739.81 |
$76000.00 |
08-09-2016 |
07-279114 |
6 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
160 |
$450.00 |
$700.88 |
$72000.00 |
08-09-2016 |
07-279114 |
7 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
160 |
$480.00 |
$747.60 |
$76800.00 |
08-09-2016 |
07-279114 |
8 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
160 |
$500.00 |
$778.75 |
$80000.00 |
08-09-2016 |
07-279114 |
9 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
160 |
$610.00 |
$950.08 |
$97600.00 |
08-09-2016 |
07-279114 |
10 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
160 |
$480.00 |
$747.60 |
$76800.00 |
08-09-2016 |
07-279114 |
11 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
5550 |
$472.50 |
$735.92 |
$2622375.00 |
09-14-2016 |
04-3G59U4 |
1 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
5550 |
$454.50 |
$707.89 |
$2522475.00 |
09-14-2016 |
04-3G59U4 |
2 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
5550 |
$450.00 |
$700.88 |
$2497500.00 |
09-14-2016 |
04-3G59U4 |
3 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
5550 |
$350.00 |
$545.13 |
$1942500.00 |
09-14-2016 |
04-3G59U4 |
4 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
5550 |
$301.42 |
$469.46 |
$1672881.00 |
09-14-2016 |
04-3G59U4 |
5 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
5550 |
$295.00 |
$459.46 |
$1637250.00 |
09-14-2016 |
04-3G59U4 |
6 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
5550 |
$500.00 |
$778.75 |
$2775000.00 |
09-14-2016 |
04-3G59U4 |
7 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
190 |
$705.00 |
$1065.98 |
$133950.00 |
10-19-2016 |
07-290804 |
1 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
190 |
$890.00 |
$1345.70 |
$169100.00 |
10-19-2016 |
07-290804 |
2 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
190 |
$810.00 |
$1224.74 |
$153900.00 |
10-19-2016 |
07-290804 |
3 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
190 |
$750.00 |
$1134.02 |
$142500.00 |
10-19-2016 |
07-290804 |
4 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
190 |
$740.00 |
$1118.90 |
$140600.00 |
10-19-2016 |
07-290804 |
5 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
190 |
$1000.00 |
$1512.02 |
$190000.00 |
10-19-2016 |
07-290804 |
6 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
22 |
$510.00 |
$771.13 |
$11220.00 |
10-20-2016 |
07-305204 |
1 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
22 |
$402.98 |
$609.31 |
$8865.56 |
10-20-2016 |
07-305204 |
2 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
40 |
$350.00 |
$529.21 |
$14000.00 |
11-02-2016 |
07-305504 |
1 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
40 |
$350.00 |
$529.21 |
$14000.00 |
11-02-2016 |
07-305504 |
2 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
40 |
$524.30 |
$792.75 |
$20972.00 |
11-02-2016 |
07-305504 |
3 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
49 |
$472.88 |
$715.00 |
$23171.12 |
11-10-2016 |
07-306004 |
1 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
49 |
$370.00 |
$559.45 |
$18130.00 |
11-10-2016 |
07-306004 |
2 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
1590 |
$290.00 |
$438.49 |
$461100.00 |
11-16-2016 |
07-302104 |
1 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
1590 |
$435.14 |
$657.94 |
$691872.60 |
11-16-2016 |
07-302104 |
2 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
1590 |
$340.00 |
$514.09 |
$540600.00 |
11-16-2016 |
07-302104 |
3 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
1590 |
$370.00 |
$559.45 |
$588300.00 |
11-16-2016 |
07-302104 |
4 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
1590 |
$435.00 |
$657.73 |
$691650.00 |
11-16-2016 |
07-302104 |
5 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
38 |
$522.00 |
$789.28 |
$19836.00 |
11-30-2016 |
07-3X8704 |
1 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
38 |
$379.85 |
$574.34 |
$14434.30 |
11-30-2016 |
07-3X8704 |
2 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
38 |
$627.00 |
$948.04 |
$23826.00 |
11-30-2016 |
07-3X8704 |
3 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
38 |
$980.00 |
$1481.78 |
$37240.00 |
11-30-2016 |
07-3X8704 |
4 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
38 |
$625.00 |
$945.01 |
$23750.00 |
11-30-2016 |
07-3X8704 |
5 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
38 |
$980.00 |
$1481.78 |
$37240.00 |
11-30-2016 |
07-3X8704 |
6 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
38 |
$580.00 |
$876.97 |
$22040.00 |
11-30-2016 |
07-3X8704 |
7 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
38 |
$600.00 |
$907.21 |
$22800.00 |
11-30-2016 |
07-3X8704 |
8 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
38 |
$632.00 |
$955.60 |
$24016.00 |
11-30-2016 |
07-3X8704 |
9 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
38 |
$870.00 |
$1315.46 |
$33060.00 |
11-30-2016 |
07-3X8704 |
10 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
3150 |
$400.00 |
$587.71 |
$1260000.00 |
01-18-2017 |
04-0J6404 |
1 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
3150 |
$355.00 |
$521.59 |
$1118250.00 |
01-18-2017 |
04-0J6404 |
2 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
3150 |
$540.00 |
$793.40 |
$1701000.00 |
01-18-2017 |
04-0J6404 |
3 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
3150 |
$320.00 |
$470.17 |
$1008000.00 |
01-18-2017 |
04-0J6404 |
4 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
3150 |
$426.25 |
$626.28 |
$1342687.50 |
01-18-2017 |
04-0J6404 |
5 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
3800 |
$244.00 |
$358.50 |
$927200.00 |
03-21-2017 |
07-252624 |
1 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
3800 |
$161.00 |
$236.55 |
$611800.00 |
03-21-2017 |
07-252624 |
2 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
3800 |
$250.00 |
$367.32 |
$950000.00 |
03-21-2017 |
07-252624 |
3 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
3800 |
$351.08 |
$515.83 |
$1334104.00 |
03-21-2017 |
07-252624 |
4 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
3800 |
$350.00 |
$514.24 |
$1330000.00 |
03-21-2017 |
07-252624 |
5 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
130 |
$820.00 |
$1197.47 |
$106600.00 |
05-04-2017 |
07-3W4504 |
1 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
130 |
$505.00 |
$737.47 |
$65650.00 |
05-04-2017 |
07-3W4504 |
2 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
130 |
$578.59 |
$844.94 |
$75216.70 |
05-04-2017 |
07-3W4504 |
3 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
130 |
$1250.00 |
$1825.42 |
$162500.00 |
05-04-2017 |
07-3W4504 |
4 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
130 |
$565.00 |
$825.09 |
$73450.00 |
05-04-2017 |
07-3W4504 |
5 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
130 |
$350.00 |
$511.12 |
$45500.00 |
05-04-2017 |
07-3W4504 |
6 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
130 |
$200.00 |
$292.07 |
$26000.00 |
05-04-2017 |
07-3W4504 |
7 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
170 |
$649.00 |
$947.76 |
$110330.00 |
05-23-2017 |
04-3J5704 |
1 |
|
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
11 |
1980 |
$355.00 |
$591.65 |
$702900.00 |
09-12-2017 |
11-408704 |
1 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
11 |
1980 |
$315.00 |
$524.99 |
$623700.00 |
09-12-2017 |
11-408704 |
2 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
11 |
1980 |
$300.00 |
$499.99 |
$594000.00 |
09-12-2017 |
11-408704 |
3 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
11 |
1980 |
$740.00 |
$1233.31 |
$1465200.00 |
09-12-2017 |
11-408704 |
4 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
11 |
1980 |
$400.00 |
$666.65 |
$792000.00 |
09-12-2017 |
11-408704 |
5 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
550 |
$248.00 |
$413.32 |
$136400.00 |
09-27-2017 |
07-293704 |
1 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
550 |
$245.00 |
$408.32 |
$134750.00 |
09-27-2017 |
07-293704 |
2 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
550 |
$250.00 |
$416.66 |
$137500.00 |
09-27-2017 |
07-293704 |
3 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
550 |
$470.00 |
$783.32 |
$258500.00 |
09-27-2017 |
07-293704 |
4 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
550 |
$360.00 |
$599.99 |
$198000.00 |
09-27-2017 |
07-293704 |
5 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
550 |
$455.46 |
$759.08 |
$250503.00 |
09-27-2017 |
07-293704 |
6 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
550 |
$310.00 |
$516.65 |
$170500.00 |
09-27-2017 |
07-293704 |
7 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
550 |
$300.00 |
$499.99 |
$165000.00 |
09-27-2017 |
07-293704 |
8 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
550 |
$365.00 |
$608.32 |
$200750.00 |
09-27-2017 |
07-293704 |
9 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
550 |
$540.00 |
$899.98 |
$297000.00 |
09-27-2017 |
07-293704 |
10 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
550 |
$415.00 |
$691.65 |
$228250.00 |
09-27-2017 |
07-293704 |
11 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
4150 |
$336.00 |
$609.94 |
$1394400.00 |
10-03-2017 |
04-4G0564 |
1 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
4150 |
$320.00 |
$580.89 |
$1328000.00 |
10-03-2017 |
04-4G0564 |
2 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
4150 |
$350.00 |
$635.35 |
$1452500.00 |
10-03-2017 |
04-4G0564 |
3 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
4150 |
$385.00 |
$698.89 |
$1597750.00 |
10-03-2017 |
04-4G0564 |
4 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
120 |
$280.00 |
$508.28 |
$33600.00 |
11-08-2017 |
07-3W7804 |
1 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
120 |
$352.00 |
$638.98 |
$42240.00 |
11-08-2017 |
07-3W7804 |
2 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
120 |
$325.00 |
$589.97 |
$39000.00 |
11-08-2017 |
07-3W7804 |
3 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
120 |
$545.00 |
$989.33 |
$65400.00 |
11-08-2017 |
07-3W7804 |
4 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
120 |
$400.00 |
$726.11 |
$48000.00 |
11-08-2017 |
07-3W7804 |
5 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
120 |
$300.00 |
$544.59 |
$36000.00 |
11-08-2017 |
07-3W7804 |
6 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
120 |
$550.00 |
$998.41 |
$66000.00 |
11-08-2017 |
07-3W7804 |
7 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
120 |
$451.00 |
$818.69 |
$54120.00 |
11-08-2017 |
07-3W7804 |
8 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
120 |
$400.00 |
$726.11 |
$48000.00 |
11-08-2017 |
07-3W7804 |
9 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
120 |
$785.00 |
$1425.00 |
$94200.00 |
11-08-2017 |
07-3W7804 |
10 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
120 |
$400.00 |
$726.11 |
$48000.00 |
11-08-2017 |
07-3W7804 |
11 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
120 |
$472.00 |
$856.82 |
$56640.00 |
11-08-2017 |
07-3W7804 |
12 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
120 |
$1150.00 |
$2087.58 |
$138000.00 |
11-08-2017 |
07-3W7804 |
13 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
120 |
$1680.00 |
$3049.68 |
$201600.00 |
11-08-2017 |
07-3W7804 |
14 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
270 |
$300.00 |
$544.59 |
$81000.00 |
11-29-2017 |
07-309804 |
1 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
270 |
$615.00 |
$1116.40 |
$166050.00 |
11-29-2017 |
07-309804 |
2 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
270 |
$275.00 |
$499.20 |
$74250.00 |
11-29-2017 |
07-309804 |
3 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
270 |
$238.00 |
$432.04 |
$64260.00 |
11-29-2017 |
07-309804 |
4 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
270 |
$240.00 |
$435.67 |
$64800.00 |
11-29-2017 |
07-309804 |
5 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
270 |
$377.00 |
$684.36 |
$101790.00 |
11-29-2017 |
07-309804 |
6 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
270 |
$700.00 |
$1270.70 |
$189000.00 |
11-29-2017 |
07-309804 |
7 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
270 |
$570.00 |
$1034.71 |
$153900.00 |
11-29-2017 |
07-309804 |
8 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
270 |
$800.00 |
$1452.23 |
$216000.00 |
11-29-2017 |
07-309804 |
9 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
75 |
$500.00 |
$907.64 |
$37500.00 |
12-12-2017 |
07-307804 |
1 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
75 |
$475.00 |
$862.26 |
$35625.00 |
12-12-2017 |
07-307804 |
2 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
75 |
$470.20 |
$853.55 |
$35265.00 |
12-12-2017 |
07-307804 |
3 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
75 |
$700.00 |
$1270.70 |
$52500.00 |
12-12-2017 |
07-307804 |
4 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
75 |
$750.00 |
$1361.47 |
$56250.00 |
12-12-2017 |
07-307804 |
5 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
11 |
31 |
$650.00 |
$1179.94 |
$20150.00 |
12-12-2017 |
11-411204 |
1 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
11 |
31 |
$900.00 |
$1633.76 |
$27900.00 |
12-12-2017 |
11-411204 |
2 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
11 |
31 |
$700.00 |
$1270.70 |
$21700.00 |
12-12-2017 |
11-411204 |
3 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
11 |
31 |
$1112.90 |
$2020.23 |
$34499.90 |
12-12-2017 |
11-411204 |
4 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
11 |
31 |
$1200.00 |
$2178.34 |
$37200.00 |
12-12-2017 |
11-411204 |
5 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
11 |
31 |
$808.00 |
$1466.75 |
$25048.00 |
12-12-2017 |
11-411204 |
6 |
M |
|
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
870 |
$500.00 |
$907.64 |
$435000.00 |
12-13-2017 |
04-4H5804 |
1 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
870 |
$500.00 |
$907.64 |
$435000.00 |
12-13-2017 |
04-4H5804 |
2 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
870 |
$759.00 |
$1377.80 |
$660330.00 |
12-13-2017 |
04-4H5804 |
3 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
620 |
$467.25 |
$728.83 |
$289695.00 |
01-10-2018 |
04-3G6034 |
1 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
620 |
$385.00 |
$600.53 |
$238700.00 |
01-10-2018 |
04-3G6034 |
2 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
620 |
$450.00 |
$701.92 |
$279000.00 |
01-10-2018 |
04-3G6034 |
3 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
620 |
$445.00 |
$694.12 |
$275900.00 |
01-10-2018 |
04-3G6034 |
4 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
620 |
$420.00 |
$655.13 |
$260400.00 |
01-10-2018 |
04-3G6034 |
5 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
04 |
620 |
$521.95 |
$814.15 |
$323609.00 |
01-10-2018 |
04-3G6034 |
6 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
750 |
$330.00 |
$514.74 |
$247500.00 |
01-10-2018 |
07-302204 |
1 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
750 |
$579.00 |
$903.14 |
$434250.00 |
01-10-2018 |
07-302204 |
2 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
750 |
$470.00 |
$733.12 |
$352500.00 |
01-10-2018 |
07-302204 |
3 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
750 |
$300.00 |
$467.95 |
$225000.00 |
01-10-2018 |
07-302204 |
4 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
750 |
$375.00 |
$584.93 |
$281250.00 |
01-10-2018 |
07-302204 |
5 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
750 |
$450.00 |
$701.92 |
$337500.00 |
01-10-2018 |
07-302204 |
6 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
350 |
$300.00 |
$467.95 |
$105000.00 |
01-18-2018 |
07-300804 |
1 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
350 |
$290.00 |
$452.35 |
$101500.00 |
01-18-2018 |
07-300804 |
2 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
350 |
$468.00 |
$730.00 |
$163800.00 |
01-18-2018 |
07-300804 |
3 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
350 |
$350.00 |
$545.94 |
$122500.00 |
01-18-2018 |
07-300804 |
4 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
350 |
$475.00 |
$740.92 |
$166250.00 |
01-18-2018 |
07-300804 |
5 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
350 |
$490.00 |
$764.31 |
$171500.00 |
01-18-2018 |
07-300804 |
6 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
3920 |
$202.32 |
$315.58 |
$793094.40 |
01-23-2018 |
07-293704 |
1 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
3920 |
$280.00 |
$436.75 |
$1097600.00 |
01-23-2018 |
07-293704 |
2 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
3920 |
$286.21 |
$446.44 |
$1121943.20 |
01-23-2018 |
07-293704 |
3 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
3920 |
$180.00 |
$280.77 |
$705600.00 |
01-23-2018 |
07-293704 |
4 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
3920 |
$280.00 |
$436.75 |
$1097600.00 |
01-23-2018 |
07-293704 |
5 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
3920 |
$230.00 |
$358.76 |
$901600.00 |
01-23-2018 |
07-293704 |
6 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
3920 |
$315.00 |
$491.35 |
$1234800.00 |
01-23-2018 |
07-293704 |
7 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
3920 |
$328.00 |
$511.62 |
$1285760.00 |
01-23-2018 |
07-293704 |
8 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
3920 |
$350.00 |
$545.94 |
$1372000.00 |
01-23-2018 |
07-293704 |
9 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
240 |
$540.00 |
$842.31 |
$129600.00 |
01-24-2018 |
07-286604 |
1 |
M |
TRO |
|
| 280015 - LEAN CONCRETE BASE RAPID SETTING |
CY |
07 |
240 |
$418.00 |
$652.01 |
$100320.00 |
01-24-2018 |
07-286604 |
2 |
M |
TRO |
|
MORE THAN 500 RESULTS RETURNED. ONLY 500 ROWS SHOWN.
|