CALIFORNIA DEPARTMENT OF TRANSPORTATION - CONTRACT COST DATA

Select Item No. / Description Unit Dist Qty Unit
Price
Adj
Price
Total Bid Open
Date
Contract
No.
Bid M TRO
390020 - PREPAVING GRINDING DAY EA 01 2 $8000.00 $21993.25 $16000.00 04-17-2012 01-0A7404 1    
390020 - PREPAVING GRINDING DAY EA 01 2 $8500.00 $23367.82 $17000.00 04-17-2012 01-0A7404 2    
390020 - PREPAVING GRINDING DAY EA 01 2 $15500.00 $42611.91 $31000.00 04-17-2012 01-0A7404 3    
390020 - PREPAVING GRINDING DAY EA 01 3 $6500.00 $17869.51 $19500.00 05-02-2012 01-0A7304 1    
390020 - PREPAVING GRINDING DAY EA 01 3 $19500.00 $53608.54 $58500.00 05-02-2012 01-0A7304 2    
390020 - PREPAVING GRINDING DAY EA 01 3 $12000.00 $32989.87 $36000.00 05-02-2012 01-0A7304 3    
390020 - PREPAVING GRINDING DAY EA 01 2 $10000.00 $27491.56 $20000.00 05-15-2012 01-0A8004 1    
390020 - PREPAVING GRINDING DAY EA 01 2 $16000.00 $43986.49 $32000.00 05-15-2012 01-0A8004 2    
390020 - PREPAVING GRINDING DAY EA 01 2 $12000.00 $32989.87 $24000.00 05-15-2012 01-0A8004 3    
390020 - PREPAVING GRINDING DAY EA 01 2 $13000.00 $35739.02 $26000.00 05-15-2012 01-0A8004 4    
390020 - PREPAVING GRINDING DAY EA 04 1 $6000.00 $14952.04 $6000.00 10-03-2012 04-2640L4 1 M TRO
390020 - PREPAVING GRINDING DAY EA 04 1 $11000.00 $27412.07 $11000.00 10-03-2012 04-2640L4 2 M TRO
390020 - PREPAVING GRINDING DAY EA 04 1 $8000.00 $19936.05 $8000.00 10-03-2012 04-2640L4 3 M TRO
390020 - PREPAVING GRINDING DAY EA 12 3 $7500.00 $18690.05 $22500.00 11-29-2012 12-0C5704 1 M TRO
390020 - PREPAVING GRINDING DAY EA 12 3 $5000.00 $12460.03 $15000.00 11-29-2012 12-0C5704 2 M TRO
390020 - PREPAVING GRINDING DAY EA 12 3 $6500.00 $16198.04 $19500.00 11-29-2012 12-0C5704 3 M TRO
390020 - PREPAVING GRINDING DAY EA 12 3 $20000.00 $49840.14 $60000.00 11-29-2012 12-0C5704 4 M TRO
390020 - PREPAVING GRINDING DAY EA 12 3 $10000.00 $24920.07 $30000.00 11-29-2012 12-0C5704 5 M TRO
390020 - PREPAVING GRINDING DAY EA 12 3 $6500.00 $16198.04 $19500.00 11-29-2012 12-0C5704 6 M TRO
390020 - PREPAVING GRINDING DAY EA 02 2 $4000.00 $9968.03 $8000.00 12-18-2012 02-4E9504 1    
390020 - PREPAVING GRINDING DAY EA 02 2 $6500.00 $16198.04 $13000.00 12-18-2012 02-4E9504 2    
390020 - PREPAVING GRINDING DAY EA 02 2 $15000.00 $37380.10 $30000.00 12-18-2012 02-4E9504 3    
390020 - PREPAVING GRINDING DAY EA 02 2 $11000.00 $27412.07 $22000.00 12-18-2012 02-4E9504 4    
390020 - PREPAVING GRINDING DAY EA 06 6 $7600.00 $18939.25 $45600.00 12-19-2012 06-0N1504 1    
390020 - PREPAVING GRINDING DAY EA 06 6 $8000.00 $19936.05 $48000.00 12-19-2012 06-0N1504 2    
390020 - PREPAVING GRINDING DAY EA 06 6 $13500.00 $33642.09 $81000.00 12-19-2012 06-0N1504 3    
390020 - PREPAVING GRINDING DAY EA 06 6 $10500.00 $26166.07 $63000.00 12-19-2012 06-0N1504 4    
390020 - PREPAVING GRINDING DAY EA 06 6 $12500.00 $31150.09 $75000.00 12-19-2012 06-0N1504 5    
390020 - PREPAVING GRINDING DAY EA 02 4 $6000.00 $12559.71 $24000.00 02-12-2013 02-4F1704 1    
390020 - PREPAVING GRINDING DAY EA 02 4 $7000.00 $14653.00 $28000.00 02-12-2013 02-4F1704 2    
390020 - PREPAVING GRINDING DAY EA 02 4 $9300.00 $19467.56 $37200.00 02-12-2013 02-4F1704 3    
390020 - PREPAVING GRINDING DAY EA 02 4 $7100.00 $14862.33 $28400.00 02-12-2013 02-4F1704 4    
390020 - PREPAVING GRINDING DAY EA 02 4 $10500.00 $21979.50 $42000.00 02-12-2013 02-4F1704 5    
390020 - PREPAVING GRINDING DAY EA 02 4 $9325.00 $19519.89 $37300.00 02-12-2013 02-4F1704 6    
390020 - PREPAVING GRINDING DAY EA 02 4 $12000.00 $25119.43 $48000.00 02-12-2013 02-4F1704 7    
390020 - PREPAVING GRINDING DAY EA 03 4 $6000.00 $12559.71 $24000.00 02-13-2013 03-4M5404 1    
390020 - PREPAVING GRINDING DAY EA 03 4 $11800.00 $24700.77 $47200.00 02-13-2013 03-4M5404 2    
390020 - PREPAVING GRINDING DAY EA 03 4 $9300.00 $19467.56 $37200.00 02-13-2013 03-4M5404 3    
390020 - PREPAVING GRINDING DAY EA 03 4 $7500.00 $15699.64 $30000.00 02-13-2013 03-4M5404 4    
390020 - PREPAVING GRINDING DAY EA 03 4 $9000.00 $18839.57 $36000.00 02-13-2013 03-4M5404 5    
390020 - PREPAVING GRINDING DAY EA 03 4 $9200.00 $19258.23 $36800.00 02-13-2013 03-4M5404 6    
390020 - PREPAVING GRINDING DAY EA 03 4 $13000.00 $27212.71 $52000.00 02-13-2013 03-4M5404 7    
390020 - PREPAVING GRINDING DAY EA 03 4 $7300.00 $15280.99 $29200.00 02-13-2013 03-4M5404 8    
390020 - PREPAVING GRINDING DAY EA 03 4 $7800.00 $16327.63 $31200.00 02-13-2013 03-4M5404 9    
390020 - PREPAVING GRINDING DAY EA 03 4 $6000.00 $12559.71 $24000.00 02-13-2013 03-4M5404 10    
390020 - PREPAVING GRINDING DAY EA 06 1 $10000.00 $20932.86 $10000.00 02-20-2013 06-0N7904 1    
390020 - PREPAVING GRINDING DAY EA 06 1 $10000.00 $20932.86 $10000.00 02-20-2013 06-0N7904 2    
390020 - PREPAVING GRINDING DAY EA 06 1 $41000.00 $85824.71 $41000.00 02-20-2013 06-0N7904 3    
390020 - PREPAVING GRINDING DAY EA 06 1 $8500.00 $17792.93 $8500.00 02-20-2013 06-0N7904 4    
390020 - PREPAVING GRINDING DAY EA 06 1 $15000.00 $31399.29 $15000.00 02-20-2013 06-0N7904 5    
390020 - PREPAVING GRINDING DAY EA 06 1 $38000.00 $79544.86 $38000.00 02-26-2013 06-0P7104 1    
390020 - PREPAVING GRINDING DAY EA 06 1 $10000.00 $20932.86 $10000.00 02-26-2013 06-0P7104 2    
390020 - PREPAVING GRINDING DAY EA 06 1 $8500.00 $17792.93 $8500.00 02-26-2013 06-0P7104 3    
390020 - PREPAVING GRINDING DAY EA 06 1 $11600.00 $24282.11 $11600.00 02-26-2013 06-0P7104 4    
390020 - PREPAVING GRINDING DAY EA 06 1 $8200.00 $17164.94 $8200.00 02-26-2013 06-0P7104 5    
390020 - PREPAVING GRINDING DAY EA 06 1 $10000.00 $20932.86 $10000.00 02-27-2013 06-0P7004 1    
390020 - PREPAVING GRINDING DAY EA 06 1 $10000.00 $20932.86 $10000.00 02-27-2013 06-0P7004 2    
390020 - PREPAVING GRINDING DAY EA 06 1 $8000.00 $16746.29 $8000.00 02-27-2013 06-0P7004 3    
390020 - PREPAVING GRINDING DAY EA 06 1 $6600.00 $13815.69 $6600.00 02-27-2013 06-0P7004 4    
390020 - PREPAVING GRINDING DAY EA 06 1 $11750.00 $24596.11 $11750.00 02-27-2013 06-0P7004 5    
390020 - PREPAVING GRINDING DAY EA 06 1 $8000.00 $16746.29 $8000.00 02-27-2013 06-0P7004 6    
390020 - PREPAVING GRINDING DAY EA 06 1 $13000.00 $27212.71 $13000.00 02-27-2013 06-0P7004 7    
390020 - PREPAVING GRINDING DAY EA 06 1 $18500.00 $38725.79 $18500.00 02-27-2013 06-0P7004 8    
390020 - PREPAVING GRINDING DAY EA 02 2 $6500.00 $13606.36 $13000.00 03-26-2013 02-4F1504 1    
390020 - PREPAVING GRINDING DAY EA 02 2 $7000.00 $14653.00 $14000.00 03-26-2013 02-4F1504 2    
390020 - PREPAVING GRINDING DAY EA 02 2 $8000.00 $16746.29 $16000.00 03-26-2013 02-4F1504 3    
390020 - PREPAVING GRINDING DAY EA 02 2 $7200.00 $15071.66 $14400.00 03-26-2013 02-4F1504 4    
390020 - PREPAVING GRINDING DAY EA 02 2 $15000.00 $31399.29 $30000.00 03-26-2013 02-4F1504 5    
390020 - PREPAVING GRINDING DAY EA 03 2 $10500.00 $21979.50 $21000.00 03-26-2013 03-3M5804 1    
390020 - PREPAVING GRINDING DAY EA 03 2 $10000.00 $20932.86 $20000.00 03-26-2013 03-3M5804 2    
390020 - PREPAVING GRINDING DAY EA 03 2 $6000.00 $12559.71 $12000.00 03-26-2013 03-3M5804 3    
390020 - PREPAVING GRINDING DAY EA 03 2 $20000.00 $41865.71 $40000.00 03-26-2013 03-3M5804 4    
390020 - PREPAVING GRINDING DAY EA 04 3 $6600.00 $13815.69 $19800.00 03-26-2013 04-3E2804 1 M  
390020 - PREPAVING GRINDING DAY EA 04 3 $10000.00 $20932.86 $30000.00 03-26-2013 04-3E2804 2 M  
390020 - PREPAVING GRINDING DAY EA 04 3 $5200.00 $10885.09 $15600.00 03-26-2013 04-3E2804 3 M  
390020 - PREPAVING GRINDING DAY EA 06 1 $8000.00 $16746.29 $8000.00 03-26-2013 06-0P7204 1    
390020 - PREPAVING GRINDING DAY EA 06 1 $14000.00 $29306.00 $14000.00 03-26-2013 06-0P7204 2    
390020 - PREPAVING GRINDING DAY EA 06 1 $8200.00 $17164.94 $8200.00 03-26-2013 06-0P7204 3    
390020 - PREPAVING GRINDING DAY EA 06 1 $8715.00 $18242.99 $8715.00 03-26-2013 06-0P7204 4    
390020 - PREPAVING GRINDING DAY EA 03 2 $10000.00 $20932.86 $20000.00 03-27-2013 03-4M5304 1 M  
390020 - PREPAVING GRINDING DAY EA 03 2 $10000.00 $20932.86 $20000.00 03-27-2013 03-4M5304 2 M  
390020 - PREPAVING GRINDING DAY EA 03 2 $10000.00 $20932.86 $20000.00 03-27-2013 03-4M5304 3 M  
390020 - PREPAVING GRINDING DAY EA 03 2 $15000.00 $31399.29 $30000.00 03-27-2013 03-4M5304 4 M  
390020 - PREPAVING GRINDING DAY EA 06 1 $8500.00 $17792.93 $8500.00 03-27-2013 06-0P7304 1    
390020 - PREPAVING GRINDING DAY EA 06 1 $11800.00 $24700.77 $11800.00 03-27-2013 06-0P7304 2    
390020 - PREPAVING GRINDING DAY EA 06 1 $8200.00 $17164.94 $8200.00 03-27-2013 06-0P7304 3    
390020 - PREPAVING GRINDING DAY EA 06 1 $15000.00 $31399.29 $15000.00 03-27-2013 06-0P7304 4    
390020 - PREPAVING GRINDING DAY EA 06 1 $9535.00 $19959.48 $9535.00 03-27-2013 06-0P7304 5    
390020 - PREPAVING GRINDING DAY EA 06 1 $15000.00 $31399.29 $15000.00 03-27-2013 06-0P7304 6    
390020 - PREPAVING GRINDING DAY EA 06 1 $10000.00 $20932.86 $10000.00 03-27-2013 06-0P7304 7    
390020 - PREPAVING GRINDING DAY EA 06 1 $15400.00 $32236.60 $15400.00 03-27-2013 06-0P7304 8    
390020 - PREPAVING GRINDING DAY EA 06 1 $11000.00 $19372.96 $11000.00 04-09-2013 06-0P6104 1    
390020 - PREPAVING GRINDING DAY EA 06 1 $11200.00 $19725.19 $11200.00 04-09-2013 06-0P6104 2    
390020 - PREPAVING GRINDING DAY EA 06 1 $10000.00 $17611.78 $10000.00 04-09-2013 06-0P6104 3    
390020 - PREPAVING GRINDING DAY EA 06 1 $15000.00 $26417.67 $15000.00 04-09-2013 06-0P6104 4    
390020 - PREPAVING GRINDING DAY EA 06 1 $20000.00 $35223.56 $20000.00 04-09-2013 06-0P6104 5    
390020 - PREPAVING GRINDING DAY EA 06 1 $10000.00 $17611.78 $10000.00 04-09-2013 06-0P6104 6    
390020 - PREPAVING GRINDING DAY EA 06 1 $7000.00 $12328.25 $7000.00 04-09-2013 06-0P6104 7    
390020 - PREPAVING GRINDING DAY EA 09 1 $12000.00 $21134.13 $12000.00 04-09-2013 09-354704 1    
390020 - PREPAVING GRINDING DAY EA 09 1 $13000.00 $22895.31 $13000.00 04-09-2013 09-354704 2    
390020 - PREPAVING GRINDING DAY EA 09 1 $18800.00 $33110.14 $18800.00 04-09-2013 09-354704 3    
390020 - PREPAVING GRINDING DAY EA 09 1 $7700.00 $13561.07 $7700.00 04-10-2013 09-357404 1    
390020 - PREPAVING GRINDING DAY EA 09 1 $9500.00 $16731.19 $9500.00 04-10-2013 09-357404 2    
390020 - PREPAVING GRINDING DAY EA 09 1 $1200.00 $2113.41 $1200.00 04-10-2013 09-357404 3    
390020 - PREPAVING GRINDING DAY EA 09 1 $10696.00 $18837.56 $10696.00 04-10-2013 09-357404 4    
390020 - PREPAVING GRINDING DAY EA 09 1 $10600.00 $18668.49 $10600.00 04-10-2013 09-357404 5    
390020 - PREPAVING GRINDING DAY EA 01 1 $7500.00 $13208.83 $7500.00 04-16-2013 01-0B8004 1    
390020 - PREPAVING GRINDING DAY EA 01 1 $12500.00 $22014.72 $12500.00 04-16-2013 01-0B8004 2    
390020 - PREPAVING GRINDING DAY EA 01 1 $10000.00 $17611.78 $10000.00 04-16-2013 01-0B8004 3    
390020 - PREPAVING GRINDING DAY EA 06 1 $9800.00 $17259.54 $9800.00 04-16-2013 06-0N2704 1    
390020 - PREPAVING GRINDING DAY EA 06 1 $14000.00 $24656.49 $14000.00 04-16-2013 06-0N2704 2    
390020 - PREPAVING GRINDING DAY EA 06 1 $1100.00 $1937.30 $1100.00 04-16-2013 06-0N2704 3    
390020 - PREPAVING GRINDING DAY EA 06 1 $11000.00 $19372.96 $11000.00 04-16-2013 06-0N2704 4    
390020 - PREPAVING GRINDING DAY EA 06 1 $7000.00 $12328.25 $7000.00 04-16-2013 06-0N2704 5    
390020 - PREPAVING GRINDING DAY EA 06 1 $8200.00 $14441.66 $8200.00 04-16-2013 06-0N2704 6    
390020 - PREPAVING GRINDING DAY EA 06 1 $11150.00 $19637.13 $11150.00 04-16-2013 06-0N2704 7    
390020 - PREPAVING GRINDING DAY EA 06 1 $20000.00 $35223.56 $20000.00 04-16-2013 06-0P9304 1    
390020 - PREPAVING GRINDING DAY EA 06 1 $9500.00 $16731.19 $9500.00 04-16-2013 06-0P9304 2    
390020 - PREPAVING GRINDING DAY EA 06 1 $11700.00 $20605.78 $11700.00 04-16-2013 06-0P9304 3    
390020 - PREPAVING GRINDING DAY EA 06 1 $10000.00 $17611.78 $10000.00 04-16-2013 06-0P9304 4    
390020 - PREPAVING GRINDING DAY EA 06 1 $12000.00 $21134.13 $12000.00 04-16-2013 06-0P9304 5    
390020 - PREPAVING GRINDING DAY EA 06 1 $10100.00 $17787.90 $10100.00 04-17-2013 06-0P6004 1    
390020 - PREPAVING GRINDING DAY EA 06 1 $9700.00 $17083.43 $9700.00 04-17-2013 06-0P6004 2    
390020 - PREPAVING GRINDING DAY EA 06 1 $16000.00 $28178.85 $16000.00 04-17-2013 06-0P6004 3    
390020 - PREPAVING GRINDING DAY EA 06 1 $9200.00 $16202.84 $9200.00 04-17-2013 06-0P6004 4    
390020 - PREPAVING GRINDING DAY EA 06 1 $11000.00 $19372.96 $11000.00 04-17-2013 06-0P6004 5    
390020 - PREPAVING GRINDING DAY EA 01 1 $25000.00 $44029.45 $25000.00 04-23-2013 01-0A1504 1    
390020 - PREPAVING GRINDING DAY EA 01 1 $9000.00 $15850.60 $9000.00 04-23-2013 01-0A1504 2    
390020 - PREPAVING GRINDING DAY EA 02 1 $11500.00 $20253.55 $11500.00 04-23-2013 02-3C0724 1    
390020 - PREPAVING GRINDING DAY EA 02 1 $10000.00 $17611.78 $10000.00 04-23-2013 02-3C0724 2    
390020 - PREPAVING GRINDING DAY EA 02 1 $7000.00 $12328.25 $7000.00 04-23-2013 02-3C0724 3    
390020 - PREPAVING GRINDING DAY EA 03 4 $9300.00 $16378.95 $37200.00 04-23-2013 03-4M5704 1    
390020 - PREPAVING GRINDING DAY EA 03 4 $7250.00 $12768.54 $29000.00 04-23-2013 03-4M5704 2    
390020 - PREPAVING GRINDING DAY EA 03 4 $7500.00 $13208.83 $30000.00 04-23-2013 03-4M5704 3    
390020 - PREPAVING GRINDING DAY EA 03 4 $6549.00 $11533.95 $26196.00 04-23-2013 03-4M5704 4    
390020 - PREPAVING GRINDING DAY EA 03 4 $11500.00 $20253.55 $46000.00 04-23-2013 03-4M5704 5    
390020 - PREPAVING GRINDING DAY EA 03 4 $8650.00 $15234.19 $34600.00 04-23-2013 03-4M5704 6    
390020 - PREPAVING GRINDING DAY EA 03 4 $8500.00 $14970.01 $34000.00 04-23-2013 03-4M5704 7    
390020 - PREPAVING GRINDING DAY EA 06 1 $10200.00 $17964.01 $10200.00 04-23-2013 06-0P9204 1    
390020 - PREPAVING GRINDING DAY EA 06 1 $20000.00 $35223.56 $20000.00 04-23-2013 06-0P9204 2    
390020 - PREPAVING GRINDING DAY EA 06 1 $8200.00 $14441.66 $8200.00 04-23-2013 06-0P9204 3    
390020 - PREPAVING GRINDING DAY EA 06 1 $16000.00 $28178.85 $16000.00 04-23-2013 06-0P9204 4    
390020 - PREPAVING GRINDING DAY EA 06 1 $12000.00 $21134.13 $12000.00 04-23-2013 06-0P9204 5    
390020 - PREPAVING GRINDING DAY EA 06 1 $16600.00 $29235.55 $16600.00 04-23-2013 06-0P9204 6    
390020 - PREPAVING GRINDING DAY EA 06 1 $10100.00 $17787.90 $10100.00 04-23-2013 06-0P9204 7    
390020 - PREPAVING GRINDING DAY EA 06 1 $6000.00 $10567.07 $6000.00 04-23-2013 06-0P9204 8    
390020 - PREPAVING GRINDING DAY EA 03 5 $10000.00 $17611.78 $50000.00 04-30-2013 03-4M2804 1 M  
390020 - PREPAVING GRINDING DAY EA 03 5 $9500.00 $16731.19 $47500.00 04-30-2013 03-4M2804 2 M  
390020 - PREPAVING GRINDING DAY EA 03 5 $20000.00 $35223.56 $100000.00 04-30-2013 03-4M2804 3 M  
390020 - PREPAVING GRINDING DAY EA 03 5 $6000.00 $10567.07 $30000.00 04-30-2013 03-4M2804 4 M  
390020 - PREPAVING GRINDING DAY EA 08 3 $7000.00 $12328.25 $21000.00 05-02-2013 08-1C4304 1 M  
390020 - PREPAVING GRINDING DAY EA 08 3 $7300.00 $12856.60 $21900.00 05-02-2013 08-1C4304 2 M  
390020 - PREPAVING GRINDING DAY EA 08 3 $9500.00 $16731.19 $28500.00 05-02-2013 08-1C4304 3 M  
390020 - PREPAVING GRINDING DAY EA 08 3 $10000.00 $17611.78 $30000.00 05-02-2013 08-1C4304 4 M  
390020 - PREPAVING GRINDING DAY EA 08 3 $10000.00 $17611.78 $30000.00 05-02-2013 08-1C4304 5 M  
390020 - PREPAVING GRINDING DAY EA 08 3 $7500.00 $13208.83 $22500.00 05-02-2013 08-1C4304 6 M  
390020 - PREPAVING GRINDING DAY EA 03 3 $15000.00 $26417.67 $45000.00 05-07-2013 03-1A8444 1 M TRO
390020 - PREPAVING GRINDING DAY EA 03 3 $7000.00 $12328.25 $21000.00 05-07-2013 03-1A8444 2 M TRO
390020 - PREPAVING GRINDING DAY EA 03 3 $7000.00 $12328.25 $21000.00 05-07-2013 03-1A8444 3 M TRO
390020 - PREPAVING GRINDING DAY EA 03 3 $6000.00 $10567.07 $18000.00 05-07-2013 03-1A8444 4 M TRO
390020 - PREPAVING GRINDING DAY EA 03 6 $5500.00 $9686.48 $33000.00 05-08-2013 03-4M2704 1    
390020 - PREPAVING GRINDING DAY EA 03 6 $3000.00 $5283.53 $18000.00 05-08-2013 03-4M2704 2    
390020 - PREPAVING GRINDING DAY EA 03 6 $5000.00 $8805.89 $30000.00 05-08-2013 03-4M2704 3    
390020 - PREPAVING GRINDING DAY EA 02 1 $11000.00 $19372.96 $11000.00 05-15-2013 02-4E9804 1    
390020 - PREPAVING GRINDING DAY EA 02 1 $10000.00 $17611.78 $10000.00 05-15-2013 02-4E9804 2    
390020 - PREPAVING GRINDING DAY EA 02 1 $10000.00 $17611.78 $10000.00 05-15-2013 02-4E9804 3    
390020 - PREPAVING GRINDING DAY EA 02 1 $10300.00 $18140.13 $10300.00 05-15-2013 02-4E9804 4    
390020 - PREPAVING GRINDING DAY EA 10 1 $4000.00 $7044.71 $4000.00 05-22-2013 10-0N1804 1    
390020 - PREPAVING GRINDING DAY EA 10 1 $7500.00 $13208.83 $7500.00 05-22-2013 10-0N1804 2    
390020 - PREPAVING GRINDING DAY EA 10 1 $12000.00 $21134.13 $12000.00 05-22-2013 10-0N1804 3    
390020 - PREPAVING GRINDING DAY EA 01 2 $16000.00 $35576.33 $32000.00 10-01-2013 01-479404 1 M TRO
390020 - PREPAVING GRINDING DAY EA 01 2 $10100.00 $22457.56 $20200.00 10-01-2013 01-479404 2 M TRO
390020 - PREPAVING GRINDING DAY EA 01 2 $4500.00 $10005.84 $9000.00 10-01-2013 01-479404 3 M TRO
390020 - PREPAVING GRINDING DAY EA 01 2 $16000.00 $35576.33 $32000.00 10-01-2013 01-479404 4 M TRO
390020 - PREPAVING GRINDING DAY EA 01 2 $8000.00 $17788.16 $16000.00 10-01-2013 01-479404 5 M TRO
390020 - PREPAVING GRINDING DAY EA 08 3 $1500.00 $3335.28 $4500.00 10-03-2013 08-0K2304 1 M  
390020 - PREPAVING GRINDING DAY EA 08 3 $2000.00 $4447.04 $6000.00 10-03-2013 08-0K2304 2 M  
390020 - PREPAVING GRINDING DAY EA 08 3 $6000.00 $13341.12 $18000.00 10-03-2013 08-0K2304 3 M  
390020 - PREPAVING GRINDING DAY EA 08 3 $7000.00 $15564.64 $21000.00 10-03-2013 08-0K2304 4 M  
390020 - PREPAVING GRINDING DAY EA 04 10 $7000.00 $15564.64 $70000.00 11-20-2013 04-0A5344 1 M TRO
390020 - PREPAVING GRINDING DAY EA 04 10 $2500.00 $5558.80 $25000.00 11-20-2013 04-0A5344 2 M TRO
390020 - PREPAVING GRINDING DAY EA 04 10 $9000.00 $20011.68 $90000.00 11-20-2013 04-0A5344 3 M TRO
390020 - PREPAVING GRINDING DAY EA 04 10 $1000.00 $2223.52 $10000.00 11-20-2013 04-0A5344 4 M TRO
390020 - PREPAVING GRINDING DAY EA 04 10 $6000.00 $13341.12 $60000.00 11-20-2013 04-0A5344 5 M TRO
390020 - PREPAVING GRINDING DAY EA 04 10 $8600.00 $19122.28 $86000.00 11-20-2013 04-0A5344 6 M TRO
390020 - PREPAVING GRINDING DAY EA 04 10 $2750.00 $6114.68 $27500.00 11-20-2013 04-0A5344 7 M TRO
390020 - PREPAVING GRINDING DAY EA 06 3 $9000.00 $20011.68 $27000.00 12-18-2013 06-0Q7704 1    
390020 - PREPAVING GRINDING DAY EA 06 3 $11000.00 $24458.73 $33000.00 12-18-2013 06-0Q7704 2    
390020 - PREPAVING GRINDING DAY EA 06 3 $12300.00 $27349.30 $36900.00 12-18-2013 06-0Q7704 3    
390020 - PREPAVING GRINDING DAY EA 06 3 $14050.00 $31240.46 $42150.00 12-18-2013 06-0Q7704 4    
390020 - PREPAVING GRINDING DAY EA 06 3 $9000.00 $20011.68 $27000.00 12-18-2013 06-0Q7704 5    
390020 - PREPAVING GRINDING DAY EA 06 3 $15500.00 $34464.57 $46500.00 12-18-2013 06-0Q7704 6    
390020 - PREPAVING GRINDING DAY EA 06 3 $5800.00 $12896.42 $17400.00 12-18-2013 06-0Q7704 7    
390020 - PREPAVING GRINDING DAY EA 06 3 $11500.00 $25570.49 $34500.00 12-18-2013 06-0Q7704 8    
390020 - PREPAVING GRINDING DAY EA 04 5 $11000.00 $19606.25 $55000.00 02-11-2014 04-3E4004 1 M  
390020 - PREPAVING GRINDING DAY EA 04 5 $7625.00 $13590.70 $38125.00 02-11-2014 04-3E4004 2 M  
390020 - PREPAVING GRINDING DAY EA 04 5 $10000.00 $17823.87 $50000.00 02-11-2014 04-3E4004 3 M  
390020 - PREPAVING GRINDING DAY EA 02 3 $6800.00 $12120.23 $20400.00 02-12-2014 02-4E4104 1 M  
390020 - PREPAVING GRINDING DAY EA 02 3 $10000.00 $17823.87 $30000.00 02-12-2014 02-4E4104 2 M  
390020 - PREPAVING GRINDING DAY EA 02 3 $7000.00 $12476.71 $21000.00 02-12-2014 02-4E4104 3 M  
390020 - PREPAVING GRINDING DAY EA 02 3 $1500.00 $2673.58 $4500.00 02-12-2014 02-4E4104 4 M  
390020 - PREPAVING GRINDING DAY EA 02 3 $40000.00 $71295.46 $120000.00 02-12-2014 02-4E4104 5 M  
390020 - PREPAVING GRINDING DAY EA 08 3 $22500.00 $40103.70 $67500.00 02-13-2014 08-0G6204 1 M TRO
390020 - PREPAVING GRINDING DAY EA 08 3 $10000.00 $17823.87 $30000.00 02-13-2014 08-0G6204 2 M TRO
390020 - PREPAVING GRINDING DAY EA 08 3 $9733.50 $17348.86 $29200.50 02-13-2014 08-0G6204 3 M TRO
390020 - PREPAVING GRINDING DAY EA 08 3 $7700.00 $13724.38 $23100.00 02-13-2014 08-0G6204 4 M TRO
390020 - PREPAVING GRINDING DAY EA 01 1 $7500.00 $13367.90 $7500.00 03-12-2014 01-0B8404 1    
390020 - PREPAVING GRINDING DAY EA 01 1 $13000.00 $23171.03 $13000.00 03-12-2014 01-0B8404 2    
390020 - PREPAVING GRINDING DAY EA 01 1 $15000.00 $26735.80 $15000.00 03-12-2014 01-0B8404 3    
390020 - PREPAVING GRINDING DAY EA 05 3 $9600.00 $17110.91 $28800.00 03-12-2014 05-1A3604 1    
390020 - PREPAVING GRINDING DAY EA 05 3 $8900.00 $15863.24 $26700.00 03-12-2014 05-1A3604 2    
390020 - PREPAVING GRINDING DAY EA 05 3 $7800.00 $13902.62 $23400.00 03-12-2014 05-1A3604 3    
390020 - PREPAVING GRINDING DAY EA 05 3 $9500.00 $16932.67 $28500.00 03-12-2014 05-1A3604 4    
390020 - PREPAVING GRINDING DAY EA 05 3 $15000.00 $26735.80 $45000.00 03-12-2014 05-1A3604 5    
390020 - PREPAVING GRINDING DAY EA 09 3 $7000.00 $12476.71 $21000.00 03-12-2014 09-358604 1    
390020 - PREPAVING GRINDING DAY EA 09 3 $11000.00 $19606.25 $33000.00 03-12-2014 09-358604 2    
390020 - PREPAVING GRINDING DAY EA 09 3 $10265.00 $18296.20 $30795.00 03-12-2014 09-358604 3    
390020 - PREPAVING GRINDING DAY EA 09 3 $7000.00 $12476.71 $21000.00 03-12-2014 09-358604 4    
390020 - PREPAVING GRINDING DAY EA 09 3 $7000.00 $12476.71 $21000.00 03-12-2014 09-359104 1    
390020 - PREPAVING GRINDING DAY EA 09 3 $7500.00 $13367.90 $22500.00 03-12-2014 09-359104 2    
390020 - PREPAVING GRINDING DAY EA 12 4 $4000.00 $7129.55 $16000.00 03-13-2014 12-0M3004 1 M  
390020 - PREPAVING GRINDING DAY EA 12 4 $10500.00 $18715.06 $42000.00 03-13-2014 12-0M3004 2 M  
390020 - PREPAVING GRINDING DAY EA 12 4 $2000.00 $3564.77 $8000.00 03-13-2014 12-0M3004 3 M  
390020 - PREPAVING GRINDING DAY EA 12 4 $7000.00 $12476.71 $28000.00 03-13-2014 12-0M3004 4 M  
390020 - PREPAVING GRINDING DAY EA 12 4 $1625.00 $2896.38 $6500.00 03-13-2014 12-0M3004 5 M  
390020 - PREPAVING GRINDING DAY EA 11 3 $15750.00 $28072.59 $47250.00 03-20-2014 11-2M5104 1 M  
390020 - PREPAVING GRINDING DAY EA 11 3 $12000.00 $21388.64 $36000.00 03-20-2014 11-2M5104 2 M  
390020 - PREPAVING GRINDING DAY EA 05 3 $6865.00 $12236.08 $20595.00 03-26-2014 05-1A3504 1    
390020 - PREPAVING GRINDING DAY EA 05 3 $9700.00 $17289.15 $29100.00 03-26-2014 05-1A3504 2    
390020 - PREPAVING GRINDING DAY EA 05 3 $7358.00 $13114.80 $22074.00 03-26-2014 05-1A3504 3    
390020 - PREPAVING GRINDING DAY EA 05 3 $9000.00 $16041.48 $27000.00 03-26-2014 05-1A3504 4    
390020 - PREPAVING GRINDING DAY EA 05 3 $6000.00 $10694.32 $18000.00 03-26-2014 05-1A3804 1    
390020 - PREPAVING GRINDING DAY EA 05 3 $12000.00 $21388.64 $36000.00 03-26-2014 05-1A3804 2    
390020 - PREPAVING GRINDING DAY EA 05 3 $8000.00 $14259.09 $24000.00 03-26-2014 05-1A3804 3    
390020 - PREPAVING GRINDING DAY EA 06 3 $16000.00 $28518.19 $48000.00 03-26-2014 06-0P1704 1 M  
390020 - PREPAVING GRINDING DAY EA 06 3 $8200.00 $14615.57 $24600.00 03-26-2014 06-0P1704 2 M  
390020 - PREPAVING GRINDING DAY EA 06 3 $5000.00 $8911.93 $15000.00 03-26-2014 06-0P1704 3 M  
390020 - PREPAVING GRINDING DAY EA 06 3 $11000.00 $19606.25 $33000.00 03-26-2014 06-0P1704 4 M  
390020 - PREPAVING GRINDING DAY EA 06 3 $10000.00 $17823.87 $30000.00 03-26-2014 06-0P1704 5 M  
390020 - PREPAVING GRINDING DAY EA 06 3 $10000.00 $17823.87 $30000.00 03-26-2014 06-0P1704 6 M  
390020 - PREPAVING GRINDING DAY EA 06 3 $7600.00 $13546.14 $22800.00 03-26-2014 06-0P1704 7 M  
390020 - PREPAVING GRINDING DAY EA 06 1 $18000.00 $32082.96 $18000.00 03-26-2014 06-0Q8104 1    
390020 - PREPAVING GRINDING DAY EA 06 1 $13125.00 $23393.82 $13125.00 03-26-2014 06-0Q8104 2    
390020 - PREPAVING GRINDING DAY EA 06 1 $10000.00 $17823.87 $10000.00 03-26-2014 06-0Q8104 3    
390020 - PREPAVING GRINDING DAY EA 06 1 $11500.00 $20497.45 $11500.00 03-26-2014 06-0Q8104 4    
390020 - PREPAVING GRINDING DAY EA 07 3 $7000.00 $12476.71 $21000.00 03-27-2014 07-1W1004 1 M  
390020 - PREPAVING GRINDING DAY EA 07 3 $5900.00 $10516.08 $17700.00 03-27-2014 07-1W1004 2 M  
390020 - PREPAVING GRINDING DAY EA 07 3 $6100.00 $10872.56 $18300.00 03-27-2014 07-1W1004 3 M  
390020 - PREPAVING GRINDING DAY EA 07 3 $4425.00 $7887.06 $13275.00 03-27-2014 07-1W1004 4 M  
390020 - PREPAVING GRINDING DAY EA 07 3 $7500.00 $13367.90 $22500.00 03-27-2014 07-1W1004 5 M  
390020 - PREPAVING GRINDING DAY EA 07 3 $10000.00 $17823.87 $30000.00 03-27-2014 07-1W1004 6 M  
390020 - PREPAVING GRINDING DAY EA 11 3 $6695.00 $11933.08 $20085.00 03-27-2014 11-2M4904 1 M  
390020 - PREPAVING GRINDING DAY EA 11 3 $6800.00 $12120.23 $20400.00 03-27-2014 11-2M4904 2 M  
390020 - PREPAVING GRINDING DAY EA 11 3 $20000.00 $35647.73 $60000.00 03-27-2014 11-2M4904 3 M  
390020 - PREPAVING GRINDING DAY EA 11 3 $15000.00 $26735.80 $45000.00 03-27-2014 11-2M4904 4 M  
390020 - PREPAVING GRINDING DAY EA 11 3 $7000.00 $12476.71 $21000.00 03-27-2014 11-2M4904 5 M  
390020 - PREPAVING GRINDING DAY EA 11 3 $15000.00 $26735.80 $45000.00 03-27-2014 11-2M4904 6 M  
390020 - PREPAVING GRINDING DAY EA 11 3 $15000.00 $34531.81 $45000.00 04-03-2014 11-2M6604 1 M  
390020 - PREPAVING GRINDING DAY EA 11 3 $15500.00 $35682.88 $46500.00 04-03-2014 11-2M6604 2 M  
390020 - PREPAVING GRINDING DAY EA 02 1 $10000.00 $23021.21 $10000.00 04-09-2014 02-4G1804 1    
390020 - PREPAVING GRINDING DAY EA 02 1 $8000.00 $18416.97 $8000.00 04-09-2014 02-4G1804 2    
390020 - PREPAVING GRINDING DAY EA 02 1 $7500.00 $17265.91 $7500.00 04-09-2014 02-4G1804 3    
390020 - PREPAVING GRINDING DAY EA 02 1 $7500.00 $17265.91 $7500.00 04-09-2014 02-4G1804 4    
390020 - PREPAVING GRINDING DAY EA 02 1 $15000.00 $34531.81 $15000.00 04-09-2014 02-4G1804 5    
390020 - PREPAVING GRINDING DAY EA 02 1 $5600.00 $12891.88 $5600.00 04-09-2014 02-4G1804 6    
390020 - PREPAVING GRINDING DAY EA 02 1 $10000.00 $23021.21 $10000.00 04-09-2014 02-4G1804 7    
390020 - PREPAVING GRINDING DAY EA 11 2 $10500.00 $24172.27 $21000.00 04-10-2014 11-2M6704 1 M  
390020 - PREPAVING GRINDING DAY EA 11 2 $20000.00 $46042.42 $40000.00 04-10-2014 11-2M6704 2 M  
390020 - PREPAVING GRINDING DAY EA 11 2 $7500.00 $17265.91 $15000.00 04-10-2014 11-2M6704 3 M  
390020 - PREPAVING GRINDING DAY EA 11 2 $8200.00 $18877.39 $16400.00 04-10-2014 11-2M6704 4 M  
390020 - PREPAVING GRINDING DAY EA 06 3 $8500.00 $19568.03 $25500.00 04-16-2014 06-0Q8304 1    
390020 - PREPAVING GRINDING DAY EA 06 3 $14000.00 $32229.69 $42000.00 04-16-2014 06-0Q8304 2    
390020 - PREPAVING GRINDING DAY EA 06 3 $8000.00 $18416.97 $24000.00 04-16-2014 06-0Q8304 3    
390020 - PREPAVING GRINDING DAY EA 06 3 $13100.00 $30157.78 $39300.00 04-16-2014 06-0Q8304 4    
390020 - PREPAVING GRINDING DAY EA 06 3 $16250.00 $37409.47 $48750.00 04-16-2014 06-0Q8304 5    
390020 - PREPAVING GRINDING DAY EA 03 2 $7500.00 $17265.91 $15000.00 04-23-2014 03-4M8304 1 M  
390020 - PREPAVING GRINDING DAY EA 03 2 $5000.00 $11510.60 $10000.00 04-23-2014 03-4M8304 2 M  
390020 - PREPAVING GRINDING DAY EA 03 2 $8500.00 $19568.03 $17000.00 04-23-2014 03-4M8304 3 M  
390020 - PREPAVING GRINDING DAY EA 03 2 $9750.00 $22445.68 $19500.00 04-23-2014 03-4M8304 4 M  
390020 - PREPAVING GRINDING DAY EA 03 2 $10000.00 $23021.21 $20000.00 04-23-2014 03-4M8304 5 M  
390020 - PREPAVING GRINDING DAY EA 06 1 $12800.00 $29467.15 $12800.00 04-23-2014 06-0Q8004 1    
390020 - PREPAVING GRINDING DAY EA 06 1 $15000.00 $34531.81 $15000.00 04-23-2014 06-0Q8004 2    
390020 - PREPAVING GRINDING DAY EA 06 1 $10000.00 $23021.21 $10000.00 04-23-2014 06-0Q8004 3    
390020 - PREPAVING GRINDING DAY EA 03 4 $6000.00 $13812.73 $24000.00 04-30-2014 03-3M9204 1 M  
390020 - PREPAVING GRINDING DAY EA 03 4 $5000.00 $11510.60 $20000.00 04-30-2014 03-3M9204 2 M  
390020 - PREPAVING GRINDING DAY EA 03 4 $4600.00 $10589.76 $18400.00 04-30-2014 03-3M9204 3 M  
390020 - PREPAVING GRINDING DAY EA 03 4 $5000.00 $11510.60 $20000.00 04-30-2014 03-3M9204 4 M  
390020 - PREPAVING GRINDING DAY EA 03 4 $6500.00 $14963.79 $26000.00 04-30-2014 03-3M9204 5 M  
390020 - PREPAVING GRINDING DAY EA 02 3 $9000.00 $20719.09 $27000.00 05-07-2014 02-4G1904 1    
390020 - PREPAVING GRINDING DAY EA 02 3 $4400.00 $10129.33 $13200.00 05-07-2014 02-4G1904 2    
390020 - PREPAVING GRINDING DAY EA 02 3 $6500.00 $14963.79 $19500.00 05-07-2014 02-4G1904 3    
390020 - PREPAVING GRINDING DAY EA 02 3 $8000.00 $18416.97 $24000.00 05-07-2014 02-4G1904 4    
390020 - PREPAVING GRINDING DAY EA 05 3 $9600.00 $22100.36 $28800.00 05-07-2014 05-1C9004 1 M  
390020 - PREPAVING GRINDING DAY EA 05 3 $7000.00 $16114.85 $21000.00 05-07-2014 05-1C9004 2 M  
390020 - PREPAVING GRINDING DAY EA 05 3 $11185.00 $25749.22 $33555.00 05-07-2014 05-1C9004 3 M  
390020 - PREPAVING GRINDING DAY EA 05 3 $11400.00 $26244.18 $34200.00 05-07-2014 05-1C9004 4 M  
390020 - PREPAVING GRINDING DAY EA 08 3 $10200.00 $23481.63 $30600.00 05-08-2014 08-0R4004 1    
390020 - PREPAVING GRINDING DAY EA 08 3 $8200.00 $18877.39 $24600.00 05-08-2014 08-0R4004 2    
390020 - PREPAVING GRINDING DAY EA 08 3 $9500.00 $21870.15 $28500.00 05-08-2014 08-0R4004 3    
390020 - PREPAVING GRINDING DAY EA 08 3 $9500.00 $21870.15 $28500.00 05-08-2014 08-0R4004 4    
390020 - PREPAVING GRINDING DAY EA 08 3 $8000.00 $18416.97 $24000.00 05-08-2014 08-0R4004 5    
390020 - PREPAVING GRINDING DAY EA 08 3 $9271.57 $21344.28 $27814.71 05-08-2014 08-0R4004 6    
390020 - PREPAVING GRINDING DAY EA 11 1 $14500.00 $33380.75 $14500.00 05-08-2014 11-2M4404 1 M  
390020 - PREPAVING GRINDING DAY EA 11 1 $20000.00 $46042.42 $20000.00 05-08-2014 11-2M4404 2 M  
390020 - PREPAVING GRINDING DAY EA 04 10 $3000.00 $6906.36 $30000.00 05-13-2014 04-235844 1 M TRO
390020 - PREPAVING GRINDING DAY EA 04 10 $7620.00 $17542.16 $76200.00 05-13-2014 04-235844 2 M TRO
390020 - PREPAVING GRINDING DAY EA 04 10 $7000.00 $16114.85 $70000.00 05-13-2014 04-235844 3 M TRO
390020 - PREPAVING GRINDING DAY EA 04 10 $5000.00 $11510.60 $50000.00 05-13-2014 04-235844 4 M TRO
390020 - PREPAVING GRINDING DAY EA 04 10 $1.00 $2.30 $10.00 05-13-2014 04-235844 5 M TRO
390020 - PREPAVING GRINDING DAY EA 04 10 $5000.00 $11510.60 $50000.00 05-13-2014 04-235844 6 M TRO
390020 - PREPAVING GRINDING DAY EA 04 10 $6000.00 $13812.73 $60000.00 05-13-2014 04-235844 7 M TRO
390020 - PREPAVING GRINDING DAY EA 04 10 $8000.00 $18416.97 $80000.00 05-13-2014 04-235844 8 M TRO
390020 - PREPAVING GRINDING DAY EA 04 10 $7500.00 $17265.91 $75000.00 05-13-2014 04-235844 9 M TRO
390020 - PREPAVING GRINDING DAY EA 01 3 $11000.00 $25323.33 $33000.00 05-14-2014 01-0C9504 1    
390020 - PREPAVING GRINDING DAY EA 01 3 $10000.00 $23021.21 $30000.00 05-14-2014 01-0C9504 2    
390020 - PREPAVING GRINDING DAY EA 01 3 $12000.00 $27625.45 $36000.00 05-14-2014 01-0C9504 3    
390020 - PREPAVING GRINDING DAY EA 03 5 $9000.00 $20719.09 $45000.00 05-14-2014 03-4M8204 1    
390020 - PREPAVING GRINDING DAY EA 03 5 $5000.00 $11510.60 $25000.00 05-14-2014 03-4M8204 2    
390020 - PREPAVING GRINDING DAY EA 03 5 $5750.00 $13237.20 $28750.00 05-14-2014 03-4M8204 3    
390020 - PREPAVING GRINDING DAY EA 03 5 $5000.00 $11510.60 $25000.00 05-14-2014 03-4M8204 4    
390020 - PREPAVING GRINDING DAY EA 03 5 $10000.00 $23021.21 $50000.00 05-14-2014 03-4M8204 5    
390020 - PREPAVING GRINDING DAY EA 03 5 $7500.00 $17265.91 $37500.00 05-14-2014 03-4M8204 6    
390020 - PREPAVING GRINDING DAY EA 11 3 $10000.00 $23021.21 $30000.00 05-15-2014 11-2M6304 1 M  
390020 - PREPAVING GRINDING DAY EA 11 3 $6500.00 $14963.79 $19500.00 05-15-2014 11-2M6304 2 M  
390020 - PREPAVING GRINDING DAY EA 11 3 $10400.00 $23942.06 $31200.00 05-15-2014 11-2M6304 3 M  
390020 - PREPAVING GRINDING DAY EA 12 4 $6630.00 $15263.06 $26520.00 05-15-2014 12-0M7104 1 M  
390020 - PREPAVING GRINDING DAY EA 12 4 $11500.00 $26474.39 $46000.00 05-15-2014 12-0M7104 2 M  
390020 - PREPAVING GRINDING DAY EA 12 4 $5700.00 $13122.09 $22800.00 05-15-2014 12-0M7104 3 M  
390020 - PREPAVING GRINDING DAY EA 03 8 $5500.00 $12661.67 $44000.00 05-21-2014 03-4M8504 1 M  
390020 - PREPAVING GRINDING DAY EA 03 8 $8000.00 $18416.97 $64000.00 05-21-2014 03-4M8504 2 M  
390020 - PREPAVING GRINDING DAY EA 03 8 $5000.00 $11510.60 $40000.00 05-21-2014 03-4M8504 3 M  
390020 - PREPAVING GRINDING DAY EA 03 8 $5300.00 $12201.24 $42400.00 05-21-2014 03-4M8504 4 M  
390020 - PREPAVING GRINDING DAY EA 03 8 $7100.00 $16345.06 $56800.00 05-21-2014 03-4M8504 5 M  
390020 - PREPAVING GRINDING DAY EA 03 8 $9000.00 $20719.09 $72000.00 05-21-2014 03-4M8504 6 M  
390020 - PREPAVING GRINDING DAY EA 03 8 $7000.00 $16114.85 $56000.00 05-21-2014 03-4M8504 7 M  
390020 - PREPAVING GRINDING DAY EA 11 6 $5000.00 $11510.60 $30000.00 06-26-2014 11-263304 1 M TRO
390020 - PREPAVING GRINDING DAY EA 11 6 $8350.00 $19222.71 $50100.00 06-26-2014 11-263304 2 M TRO
390020 - PREPAVING GRINDING DAY EA 11 6 $4500.00 $10359.54 $27000.00 06-26-2014 11-263304 3 M TRO
390020 - PREPAVING GRINDING DAY EA 11 6 $12000.00 $27625.45 $72000.00 06-26-2014 11-263304 4 M TRO
390020 - PREPAVING GRINDING DAY EA 11 6 $8000.00 $18416.97 $48000.00 06-26-2014 11-263304 5 M TRO
390020 - PREPAVING GRINDING DAY EA 01 4 $7000.00 $15562.28 $28000.00 07-30-2014 01-0B0004 1 M TRO
390020 - PREPAVING GRINDING DAY EA 01 4 $15000.00 $33347.75 $60000.00 07-30-2014 01-0B0004 2 M TRO
390020 - PREPAVING GRINDING DAY EA 01 4 $8000.00 $17785.47 $32000.00 07-30-2014 01-0B0004 3 M TRO
390020 - PREPAVING GRINDING DAY EA 01 4 $9000.00 $20008.65 $36000.00 07-30-2014 01-0B0004 4 M TRO
390020 - PREPAVING GRINDING DAY EA 01 4 $6500.00 $14450.69 $26000.00 07-30-2014 01-0B0004 5 M TRO
390020 - PREPAVING GRINDING DAY EA 01 4 $13000.00 $28901.38 $52000.00 07-30-2014 01-0B0004 6 M TRO
390020 - PREPAVING GRINDING DAY EA 01 4 $8000.00 $17785.47 $32000.00 07-30-2014 01-0B0004 7 M TRO
390020 - PREPAVING GRINDING DAY EA 01 3 $10500.00 $23343.42 $31500.00 08-07-2014 01-0E4804 1    
390020 - PREPAVING GRINDING DAY EA 01 3 $7000.00 $15562.28 $21000.00 08-07-2014 01-0E4804 2    
390020 - PREPAVING GRINDING DAY EA 01 3 $12000.00 $26678.20 $36000.00 08-07-2014 01-0E4804 3    
390020 - PREPAVING GRINDING DAY EA 01 3 $10000.00 $22231.83 $30000.00 08-07-2014 01-0E4804 4    
390020 - PREPAVING GRINDING DAY EA 06 5 $8850.00 $17260.62 $44250.00 10-21-2014 06-0P1504 1 M  
390020 - PREPAVING GRINDING DAY EA 06 5 $9700.00 $18918.42 $48500.00 10-21-2014 06-0P1504 2 M  
390020 - PREPAVING GRINDING DAY EA 06 5 $7000.00 $13652.47 $35000.00 10-21-2014 06-0P1504 3 M  
390020 - PREPAVING GRINDING DAY EA 06 5 $9500.00 $18528.35 $47500.00 10-21-2014 06-0P1504 4 M  
390020 - PREPAVING GRINDING DAY EA 06 5 $11070.00 $21590.40 $55350.00 10-21-2014 06-0P1504 5 M  
390020 - PREPAVING GRINDING DAY EA 06 5 $5625.00 $10970.73 $28125.00 10-21-2014 06-0P1504 6 M  
390020 - PREPAVING GRINDING DAY EA 02 5 $20000.00 $39007.05 $100000.00 10-22-2014 02-4E4304 1 M TRO
390020 - PREPAVING GRINDING DAY EA 02 5 $13000.00 $25354.59 $65000.00 10-22-2014 02-4E4304 2 M TRO
390020 - PREPAVING GRINDING DAY EA 02 5 $8723.00 $17012.93 $43615.00 10-22-2014 02-4E4304 3 M TRO
390020 - PREPAVING GRINDING DAY EA 02 5 $10000.00 $19503.53 $50000.00 10-22-2014 02-4E4304 4 M TRO
390020 - PREPAVING GRINDING DAY EA 03 1 $8000.00 $15602.82 $8000.00 10-22-2014 03-3F6704 1 M  
390020 - PREPAVING GRINDING DAY EA 03 1 $12000.00 $23404.23 $12000.00 10-22-2014 03-3F6704 2 M  
390020 - PREPAVING GRINDING DAY EA 03 1 $15000.00 $29255.29 $15000.00 10-22-2014 03-3F6704 3 M  
390020 - PREPAVING GRINDING DAY EA 04 1 $500.00 $975.18 $500.00 10-23-2014 04-1SS224 1 M  
390020 - PREPAVING GRINDING DAY EA 04 1 $10000.00 $19503.53 $10000.00 10-23-2014 04-1SS224 2 M  
390020 - PREPAVING GRINDING DAY EA 04 1 $3000.00 $5851.06 $3000.00 10-23-2014 04-1SS224 3 M  
390020 - PREPAVING GRINDING DAY EA 04 1 $13000.00 $25354.59 $13000.00 10-23-2014 04-1SS224 4 M  
390020 - PREPAVING GRINDING DAY EA 04 1 $12500.00 $24379.41 $12500.00 10-23-2014 04-1SS224 5 M  
390020 - PREPAVING GRINDING DAY EA 04 1 $5500.00 $10726.94 $5500.00 10-23-2014 04-1SS224 6 M  
390020 - PREPAVING GRINDING DAY EA 03 3 $13000.00 $25354.59 $39000.00 10-28-2014 03-3F0004 1    
390020 - PREPAVING GRINDING DAY EA 03 3 $7500.00 $14627.65 $22500.00 10-28-2014 03-3F0004 2    
390020 - PREPAVING GRINDING DAY EA 03 3 $11400.00 $22234.02 $34200.00 10-28-2014 03-3F0004 3    
390020 - PREPAVING GRINDING DAY EA 03 3 $7000.00 $13652.47 $21000.00 10-28-2014 03-3F0004 4    
390020 - PREPAVING GRINDING DAY EA 06 3 $5000.00 $9751.76 $15000.00 10-29-2014 06-0P1804 1 M TRO
390020 - PREPAVING GRINDING DAY EA 06 3 $200.00 $390.07 $600.00 10-29-2014 06-0P1804 2 M TRO
390020 - PREPAVING GRINDING DAY EA 06 3 $5500.00 $10726.94 $16500.00 10-29-2014 06-0P1804 3 M TRO
390020 - PREPAVING GRINDING DAY EA 06 3 $8500.00 $16578.00 $25500.00 10-29-2014 06-0P1804 4 M TRO
390020 - PREPAVING GRINDING DAY EA 06 3 $8800.00 $17163.10 $26400.00 10-29-2014 06-0Q2504 1 M  
390020 - PREPAVING GRINDING DAY EA 06 3 $250.00 $487.59 $750.00 10-29-2014 06-0Q2504 2 M  
390020 - PREPAVING GRINDING DAY EA 06 3 $12000.00 $23404.23 $36000.00 10-29-2014 06-0Q2504 3 M  
390020 - PREPAVING GRINDING DAY EA 06 3 $10000.00 $19503.53 $30000.00 10-29-2014 06-0Q2504 4 M  
390020 - PREPAVING GRINDING DAY EA 06 3 $5500.00 $10726.94 $16500.00 10-29-2014 06-0Q2504 5 M  
390020 - PREPAVING GRINDING DAY EA 05 1 $15000.00 $29255.29 $15000.00 10-30-2014 05-1C8604 1 M TRO
390020 - PREPAVING GRINDING DAY EA 05 1 $10500.00 $20478.70 $10500.00 10-30-2014 05-1C8604 2 M TRO
390020 - PREPAVING GRINDING DAY EA 07 1 $1200.00 $2340.42 $1200.00 10-30-2014 07-274804 1 M  
390020 - PREPAVING GRINDING DAY EA 07 1 $17000.00 $33156.00 $17000.00 10-30-2014 07-274804 2 M  
390020 - PREPAVING GRINDING DAY EA 07 1 $2500.00 $4875.88 $2500.00 10-30-2014 07-274804 3 M  
390020 - PREPAVING GRINDING DAY EA 07 1 $1000.00 $1950.35 $1000.00 10-30-2014 07-274804 4 M  
390020 - PREPAVING GRINDING DAY EA 07 1 $9104.00 $17756.01 $9104.00 10-30-2014 07-274804 5 M  
390020 - PREPAVING GRINDING DAY EA 07 1 $2000.00 $3900.71 $2000.00 10-30-2014 07-274804 6 M  
390020 - PREPAVING GRINDING DAY EA 07 1 $2180.00 $4251.77 $2180.00 10-30-2014 07-274804 7 M  
390020 - PREPAVING GRINDING DAY EA 07 1 $2500.00 $4875.88 $2500.00 10-30-2014 07-274804 8 M  
390020 - PREPAVING GRINDING DAY EA 01 5 $10000.00 $19503.53 $50000.00 11-19-2014 01-0C4604 1 M  
390020 - PREPAVING GRINDING DAY EA 01 5 $12250.00 $23891.82 $61250.00 11-19-2014 01-0C4604 2 M  
390020 - PREPAVING GRINDING DAY EA 01 5 $18500.00 $36081.53 $92500.00 11-19-2014 01-0C4604 3 M  
390020 - PREPAVING GRINDING DAY EA 09 3 $7100.00 $13847.50 $21300.00 12-09-2014 09-358604 1    
390020 - PREPAVING GRINDING DAY EA 09 3 $10000.00 $19503.53 $30000.00 12-09-2014 09-358604 2    
390020 - PREPAVING GRINDING DAY EA 09 3 $7570.00 $14764.17 $22710.00 12-09-2014 09-358604 3    
390020 - PREPAVING GRINDING DAY EA 03 3 $11434.13 $22300.59 $34302.39 12-17-2014 03-3F6604 1 M  
390020 - PREPAVING GRINDING DAY EA 03 3 $10000.00 $19503.53 $30000.00 12-17-2014 03-3F6604 2 M  
390020 - PREPAVING GRINDING DAY EA 03 3 $7500.00 $14627.65 $22500.00 12-17-2014 03-3F6604 3 M  
390020 - PREPAVING GRINDING DAY EA 03 3 $5300.00 $10336.87 $15900.00 12-17-2014 03-3F6604 4 M  
390020 - PREPAVING GRINDING DAY EA 03 3 $7400.00 $14432.61 $22200.00 12-17-2014 03-3F6604 5 M  
390020 - PREPAVING GRINDING DAY EA 03 3 $5000.00 $9751.76 $15000.00 12-17-2014 03-3F6604 6 M  
390020 - PREPAVING GRINDING DAY EA 03 3 $12300.00 $23989.34 $36900.00 12-17-2014 03-3F6604 7 M  
390020 - PREPAVING GRINDING DAY EA 03 3 $5000.00 $9751.76 $15000.00 12-17-2014 03-3F6604 8 M  
390020 - PREPAVING GRINDING DAY EA 03 3 $10000.00 $19503.53 $30000.00 12-17-2014 03-3F6604 9 M  
390020 - PREPAVING GRINDING DAY EA 03 3 $7500.00 $14627.65 $22500.00 12-17-2014 03-3F6604 10 M  
390020 - PREPAVING GRINDING DAY EA 03 3 $10000.00 $19503.53 $30000.00 12-17-2014 03-3F6604 11 M  
390020 - PREPAVING GRINDING DAY EA 10 3 $10000.00 $15260.36 $30000.00 01-21-2015 10-0Y8904 1    
390020 - PREPAVING GRINDING DAY EA 10 3 $10000.00 $15260.36 $30000.00 01-21-2015 10-0Y8904 2    
390020 - PREPAVING GRINDING DAY EA 10 3 $8000.00 $12208.29 $24000.00 01-21-2015 10-0Y8904 3    
390020 - PREPAVING GRINDING DAY EA 10 3 $6700.00 $10224.44 $20100.00 01-21-2015 10-0Y8904 4    
390020 - PREPAVING GRINDING DAY EA 10 3 $8800.00 $13429.12 $26400.00 01-21-2015 10-0Y8904 5    
390020 - PREPAVING GRINDING DAY EA 10 3 $15000.00 $22890.54 $45000.00 01-21-2015 10-0Y8904 6    
390020 - PREPAVING GRINDING DAY EA 10 3 $15000.00 $22890.54 $45000.00 01-21-2015 10-0Y8904 7    
390020 - PREPAVING GRINDING DAY EA 02 1 $15000.00 $22890.54 $15000.00 01-22-2015 02-4G9904 1    
390020 - PREPAVING GRINDING DAY EA 02 1 $11000.00 $16786.40 $11000.00 01-22-2015 02-4G9904 2    
390020 - PREPAVING GRINDING DAY EA 02 1 $15000.00 $22890.54 $15000.00 01-22-2015 02-4G9904 3    
390020 - PREPAVING GRINDING DAY EA 02 1 $13000.00 $19838.47 $13000.00 01-22-2015 02-4G9904 4    
390020 - PREPAVING GRINDING DAY EA 02 1 $9000.00 $13734.33 $9000.00 01-22-2015 02-4G9904 5    
390020 - PREPAVING GRINDING DAY EA 05 5 $5500.00 $8393.20 $27500.00 01-29-2015 05-0C6404 1 M TRO
390020 - PREPAVING GRINDING DAY EA 05 5 $10000.00 $15260.36 $50000.00 01-29-2015 05-0C6404 2 M TRO
390020 - PREPAVING GRINDING DAY EA 05 5 $7000.00 $10682.25 $35000.00 01-29-2015 05-0C6404 3 M TRO
390020 - PREPAVING GRINDING DAY EA 10 3 $14000.00 $21364.51 $42000.00 01-29-2015 10-0Y9204 1    
390020 - PREPAVING GRINDING DAY EA 10 3 $10000.00 $15260.36 $30000.00 01-29-2015 10-0Y9204 2    
390020 - PREPAVING GRINDING DAY EA 10 3 $8500.00 $12971.31 $25500.00 01-29-2015 10-0Y9204 3    
390020 - PREPAVING GRINDING DAY EA 10 3 $8000.00 $12208.29 $24000.00 01-29-2015 10-0Y9204 4    
390020 - PREPAVING GRINDING DAY EA 10 3 $9295.00 $14184.51 $27885.00 01-29-2015 10-0Y9204 5    
390020 - PREPAVING GRINDING DAY EA 10 3 $15000.00 $22890.54 $45000.00 01-29-2015 10-0Y9204 6    
390020 - PREPAVING GRINDING DAY EA 10 3 $16000.00 $24416.58 $48000.00 01-29-2015 10-0Y9204 7    
390020 - PREPAVING GRINDING DAY EA 10 3 $11750.00 $17930.93 $35250.00 01-29-2015 10-0Y9204 8    
390020 - PREPAVING GRINDING DAY EA 10 3 $15000.00 $22890.54 $45000.00 01-29-2015 10-0Y9204 9    
390020 - PREPAVING GRINDING DAY EA 10 3 $8250.00 $12589.80 $24750.00 02-24-2015 10-1C9004 1    
390020 - PREPAVING GRINDING DAY EA 10 3 $9750.00 $14878.85 $29250.00 02-24-2015 10-1C9004 2    
390020 - PREPAVING GRINDING DAY EA 10 3 $13000.00 $19838.47 $39000.00 02-24-2015 10-1C9004 3    
390020 - PREPAVING GRINDING DAY EA 10 3 $6232.00 $9510.26 $18696.00 02-24-2015 10-1C9004 4    
390020 - PREPAVING GRINDING DAY EA 10 3 $10000.00 $15260.36 $30000.00 02-24-2015 10-1C9004 5    
390020 - PREPAVING GRINDING DAY EA 02 1 $11500.00 $17549.42 $11500.00 02-25-2015 02-0H0104 1    
390020 - PREPAVING GRINDING DAY EA 02 1 $20000.00 $30520.72 $20000.00 02-25-2015 02-0H0104 2    
390020 - PREPAVING GRINDING DAY EA 02 1 $15000.00 $22890.54 $15000.00 02-25-2015 02-0H0104 3    
390020 - PREPAVING GRINDING DAY EA 02 1 $10000.00 $15260.36 $10000.00 02-25-2015 02-0H0104 4    
390020 - PREPAVING GRINDING DAY EA 02 1 $18000.00 $27468.65 $18000.00 02-25-2015 02-0H0104 5    
390020 - PREPAVING GRINDING DAY EA 10 3 $8500.00 $12971.31 $25500.00 02-26-2015 10-0Y9404 1    
390020 - PREPAVING GRINDING DAY EA 10 3 $10000.00 $15260.36 $30000.00 02-26-2015 10-0Y9404 2    
390020 - PREPAVING GRINDING DAY EA 10 3 $8126.67 $12401.59 $24380.01 02-26-2015 10-0Y9404 3    
390020 - PREPAVING GRINDING DAY EA 10 3 $6500.00 $9919.24 $19500.00 02-26-2015 10-0Y9404 4    
390020 - PREPAVING GRINDING DAY EA 10 3 $7000.00 $10682.25 $21000.00 02-26-2015 10-0Y9404 5    
390020 - PREPAVING GRINDING DAY EA 10 5 $6000.00 $9156.22 $30000.00 03-11-2015 10-0W5604 1 M TRO
390020 - PREPAVING GRINDING DAY EA 10 5 $8000.00 $12208.29 $40000.00 03-11-2015 10-0W5604 2 M TRO
390020 - PREPAVING GRINDING DAY EA 10 5 $20000.00 $30520.72 $100000.00 03-11-2015 10-0W5604 3 M TRO
390020 - PREPAVING GRINDING DAY EA 10 5 $10000.00 $15260.36 $50000.00 03-11-2015 10-0W5604 4 M TRO
390020 - PREPAVING GRINDING DAY EA 10 5 $9500.00 $14497.34 $47500.00 03-11-2015 10-0W5604 5 M TRO
390020 - PREPAVING GRINDING DAY EA 10 5 $10000.00 $15260.36 $50000.00 03-11-2015 10-0W5604 6 M TRO
390020 - PREPAVING GRINDING DAY EA 10 5 $10670.00 $16282.81 $53350.00 03-11-2015 10-0W5604 7 M TRO
390020 - PREPAVING GRINDING DAY EA 02 1 $20000.00 $30520.72 $20000.00 03-12-2015 02-4G1204 1    
390020 - PREPAVING GRINDING DAY EA 02 1 $7925.00 $12093.84 $7925.00 03-12-2015 02-4G1204 2    
390020 - PREPAVING GRINDING DAY EA 02 1 $11300.00 $17244.21 $11300.00 03-12-2015 02-4G1204 3    
390020 - PREPAVING GRINDING DAY EA 02 1 $12800.00 $19533.26 $12800.00 03-12-2015 02-4G1204 4    
390020 - PREPAVING GRINDING DAY EA 02 1 $15000.00 $22890.54 $15000.00 03-12-2015 02-4G1204 5    
390020 - PREPAVING GRINDING DAY EA 03 7 $9000.00 $13734.33 $63000.00 03-17-2015 03-0G2604 1 M  
390020 - PREPAVING GRINDING DAY EA 03 7 $6000.00 $9156.22 $42000.00 03-17-2015 03-0G2604 2 M  
390020 - PREPAVING GRINDING DAY EA 10 5 $10000.00 $15260.36 $50000.00 03-18-2015 10-0Y9104 1    
390020 - PREPAVING GRINDING DAY EA 10 5 $11000.00 $16786.40 $55000.00 03-18-2015 10-0Y9104 2    
390020 - PREPAVING GRINDING DAY EA 10 5 $7000.00 $10682.25 $35000.00 03-18-2015 10-0Y9104 3    
390020 - PREPAVING GRINDING DAY EA 10 5 $5400.00 $8240.60 $27000.00 03-18-2015 10-0Y9104 4    
390020 - PREPAVING GRINDING DAY EA 10 5 $5856.00 $8936.47 $29280.00 03-18-2015 10-0Y9104 5    
390020 - PREPAVING GRINDING DAY EA 03 12 $5300.00 $8087.99 $63600.00 03-25-2015 03-0G0904 1 M  
390020 - PREPAVING GRINDING DAY EA 03 12 $10000.00 $15260.36 $120000.00 03-25-2015 03-0G0904 2 M  
390020 - PREPAVING GRINDING DAY EA 03 12 $14500.00 $22127.53 $174000.00 03-25-2015 03-0G0904 3 M  
390020 - PREPAVING GRINDING DAY EA 05 17 $5000.00 $10659.83 $85000.00 04-01-2015 05-1A7204 1 M TRO
390020 - PREPAVING GRINDING DAY EA 05 17 $9600.00 $20466.87 $163200.00 04-01-2015 05-1A7204 2 M TRO
390020 - PREPAVING GRINDING DAY EA 05 17 $13427.88 $28627.78 $228273.96 04-01-2015 05-1A7204 3 M TRO
390020 - PREPAVING GRINDING DAY EA 05 5 $9500.00 $20253.67 $47500.00 04-02-2015 05-1A3304 1 M  
390020 - PREPAVING GRINDING DAY EA 05 5 $9600.00 $20466.87 $48000.00 04-02-2015 05-1A3304 2 M  
390020 - PREPAVING GRINDING DAY EA 05 5 $13500.00 $28781.54 $67500.00 04-02-2015 05-1A3304 3 M  
390020 - PREPAVING GRINDING DAY EA 02 3 $9100.00 $19400.89 $27300.00 04-07-2015 02-0H3004 1    
390020 - PREPAVING GRINDING DAY EA 02 3 $22000.00 $46903.24 $66000.00 04-07-2015 02-0H3004 2    
390020 - PREPAVING GRINDING DAY EA 02 3 $12000.00 $25583.59 $36000.00 04-07-2015 02-0H3004 3    
390020 - PREPAVING GRINDING DAY EA 02 6 $11400.00 $24304.41 $68400.00 04-08-2015 02-3E7714 1 M TRO
390020 - PREPAVING GRINDING DAY EA 02 6 $12000.00 $25583.59 $72000.00 04-08-2015 02-3E7714 2 M TRO
390020 - PREPAVING GRINDING DAY EA 02 6 $22000.00 $46903.24 $132000.00 04-08-2015 02-3E7714 3 M TRO
390020 - PREPAVING GRINDING DAY EA 01 3 $5000.00 $10659.83 $15000.00 04-09-2015 01-0E4404 1    
390020 - PREPAVING GRINDING DAY EA 01 3 $11300.00 $24091.21 $33900.00 04-09-2015 01-0E4404 2    
390020 - PREPAVING GRINDING DAY EA 01 3 $13000.00 $27715.55 $39000.00 04-09-2015 01-0E4404 3    
390020 - PREPAVING GRINDING DAY EA 03 3 $9600.00 $20466.87 $28800.00 04-09-2015 03-0G1804 1    
390020 - PREPAVING GRINDING DAY EA 03 3 $5200.00 $11086.22 $15600.00 04-09-2015 03-0G1804 2    
390020 - PREPAVING GRINDING DAY EA 03 3 $15000.00 $31979.48 $45000.00 04-09-2015 03-0G1804 3    
390020 - PREPAVING GRINDING DAY EA 03 3 $9088.00 $19375.30 $27264.00 04-09-2015 03-0G1804 4    
390020 - PREPAVING GRINDING DAY EA 06 3 $10200.00 $21746.05 $30600.00 04-09-2015 06-0T1804 1 M  
390020 - PREPAVING GRINDING DAY EA 06 3 $25000.00 $53299.14 $75000.00 04-09-2015 06-0T1804 2 M  
390020 - PREPAVING GRINDING DAY EA 06 3 $9000.00 $19187.69 $27000.00 04-09-2015 06-0T1804 3 M  
390020 - PREPAVING GRINDING DAY EA 06 3 $20000.00 $42639.31 $60000.00 04-09-2015 06-0T1804 4 M  
390020 - PREPAVING GRINDING DAY EA 09 3 $10000.00 $21319.66 $30000.00 04-09-2015 09-361504 1    
390020 - PREPAVING GRINDING DAY EA 09 3 $10023.00 $21368.69 $30069.00 04-09-2015 09-361504 2    
390020 - PREPAVING GRINDING DAY EA 09 3 $7840.00 $16714.61 $23520.00 04-09-2015 09-361504 3    
390020 - PREPAVING GRINDING DAY EA 09 3 $11800.00 $25157.19 $35400.00 04-09-2015 09-361504 4    
390020 - PREPAVING GRINDING DAY EA 01 1 $20000.00 $42639.31 $20000.00 04-14-2015 01-0E5104 1    
390020 - PREPAVING GRINDING DAY EA 01 1 $12000.00 $25583.59 $12000.00 04-14-2015 01-0E5104 2    
MORE THAN 500 RESULTS RETURNED. ONLY 500 ROWS SHOWN.
SUMMARY Unmodified Adjusted    
Average Price/Unit: $ Avg No. Units
Std Dev. (of Unit Price): ±$ Rows Selected
Weighted Avg.: $ Rows Returned
Minimum Price/Unit: $    
Maximum Price/Unit: $    

| Back | New Search |

PARAMETERS: Item = 390020; District=All; Year=All; Convert=No; Bidders=All Bidders
TIMESTAMP: 11/15/2026 10:13:47
CURRENT 12-MO INDEX (CHCCI (2020 Base)): 146.53