Caltrans Logo
Contract Cost Data

CALIFORNIA DEPARTMENT OF TRANSPORTATION - CONTRACT COST DATA

Select Item No. / Description Unit Dist Qty Unit
Price
Adj
Price
Total Bid Open
Date
Contract
No.
Bid M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 10 8 $126.00 $336.91 $1008.00 02-06-2008 10-0H3804 1 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 10 8 $57.00 $152.41 $456.00 02-06-2008 10-0H3804 2 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 10 8 $131.00 $350.28 $1048.00 02-06-2008 10-0H3804 3 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 10 8 $93.00 $248.67 $744.00 02-06-2008 10-0H3804 4 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 10 8 $100.00 $267.39 $800.00 02-06-2008 10-0H3804 5 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 10 8 $100.00 $267.39 $800.00 02-06-2008 10-0H3804 6 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 10 8 $50.00 $133.70 $400.00 02-06-2008 10-0H3804 7 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 950 $18.00 $48.13 $17100.00 02-26-2008 03-3E2304 1    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 950 $33.00 $88.24 $31350.00 02-26-2008 03-3E2304 2    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 950 $15.00 $40.11 $14250.00 02-26-2008 03-3E2304 3    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 05 9 $180.00 $481.30 $1620.00 02-26-2008 05-0L4304 1    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 05 9 $184.00 $492.00 $1656.00 02-26-2008 05-0L4304 2    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 05 9 $90.00 $240.65 $810.00 02-26-2008 05-0L4304 3    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 05 9 $440.90 $1178.92 $3968.10 02-26-2008 05-0L4304 4    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 07 13 $100.00 $267.39 $1300.00 02-28-2008 07-4S3404 1 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 07 13 $350.00 $935.87 $4550.00 02-28-2008 07-4S3404 2 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 07 13 $90.00 $240.65 $1170.00 02-28-2008 07-4S3404 3 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 07 13 $200.00 $534.78 $2600.00 02-28-2008 07-4S3404 4 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 07 13 $129.00 $344.93 $1677.00 02-28-2008 07-4S3404 5 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 07 13 $100.00 $267.39 $1300.00 02-28-2008 07-4S3404 6 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 07 13 $300.00 $802.17 $3900.00 02-28-2008 07-4S3404 7 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 07 13 $720.00 $1925.21 $9360.00 02-28-2008 07-4S3404 8 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 07 13 $45.00 $120.33 $585.00 02-28-2008 07-4S3404 9 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 07 13 $600.00 $1604.34 $7800.00 02-28-2008 07-4S3404 10 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 07 13 $120.00 $320.87 $1560.00 02-28-2008 07-4S3404 11 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQFT 03 900 $5.00 $13.37 $4500.00 03-11-2008 03-3E1904 1    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQFT 03 900 $4.70 $12.57 $4230.00 03-11-2008 03-3E1904 2    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQFT 03 900 $8.00 $21.39 $7200.00 03-11-2008 03-3E1904 3    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQFT 03 900 $10.00 $26.74 $9000.00 03-11-2008 03-3E1904 4    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQFT 03 900 $5.00 $13.37 $4500.00 03-11-2008 03-3E1904 5    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQFT 03 900 $7.25 $19.39 $6525.00 03-11-2008 03-3E1904 6    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQFT 03 900 $6.00 $16.04 $5400.00 03-11-2008 03-3E1904 7    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQFT 03 900 $6.00 $16.04 $5400.00 03-11-2008 03-3E1904 8    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQFT 03 900 $2.00 $5.35 $1800.00 03-11-2008 03-3E1904 9    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQFT 03 900 $7.99 $21.36 $7191.00 03-11-2008 03-3E1904 10    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQFT 03 900 $11.19 $29.92 $10071.00 03-11-2008 03-3E1904 11    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQFT 03 900 $2.13 $5.70 $1917.00 03-11-2008 03-3E1904 12    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQFT 03 900 $10.00 $26.74 $9000.00 03-11-2008 03-3E1904 13    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQFT 03 900 $5.00 $13.37 $4500.00 03-11-2008 03-3E1904 14    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 240 $41.20 $110.16 $9888.00 03-11-2008 03-4C5304 1 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 240 $71.00 $189.85 $17040.00 03-11-2008 03-4C5304 2 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 240 $15.00 $40.11 $3600.00 03-11-2008 03-4C5304 3 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 240 $180.00 $481.30 $43200.00 03-11-2008 03-4C5304 4 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 240 $20.00 $53.48 $4800.00 03-11-2008 03-4C5304 5 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 240 $152.00 $406.43 $36480.00 03-11-2008 03-4C5304 6 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 240 $84.00 $224.61 $20160.00 03-11-2008 03-4C5304 7 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 240 $102.00 $272.74 $24480.00 03-11-2008 03-4C5304 8 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 240 $150.00 $401.09 $36000.00 03-11-2008 03-4C5304 9 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 240 $128.00 $342.26 $30720.00 03-11-2008 03-4C5304 10 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 240 $160.00 $427.82 $38400.00 03-11-2008 03-4C5304 11 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 240 $20.00 $53.48 $4800.00 03-11-2008 03-4C5304 12 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 240 $82.00 $219.26 $19680.00 03-11-2008 03-4C5304 13 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 240 $106.67 $285.23 $25600.80 03-11-2008 03-4C5304 14 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 240 $60.00 $160.43 $14400.00 03-11-2008 03-4C5304 15 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 240 $40.00 $106.96 $9600.00 03-11-2008 03-4C5304 16 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 10 53 $250.00 $668.48 $13250.00 03-12-2008 10-0H5304 1    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 10 53 $172.00 $459.91 $9116.00 03-12-2008 10-0H5304 2    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 10 53 $150.00 $401.09 $7950.00 03-12-2008 10-0H5304 3    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 10 53 $50.00 $133.70 $2650.00 03-12-2008 10-0H5304 4    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 10 53 $190.20 $508.58 $10080.60 03-12-2008 10-0H5304 5    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 10 53 $250.00 $668.48 $13250.00 03-12-2008 10-0H5304 6    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 01 40 $54.00 $144.39 $2160.00 03-19-2008 01-398504 1 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 01 40 $225.00 $601.63 $9000.00 03-19-2008 01-398504 2 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 01 40 $225.00 $601.63 $9000.00 03-19-2008 01-398504 3 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 01 40 $54.00 $144.39 $2160.00 03-19-2008 01-398504 4 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 01 1820 $6.00 $16.04 $10920.00 03-25-2008 01-399304 1 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 01 1820 $2.00 $5.35 $3640.00 03-25-2008 01-399304 2 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 01 1820 $9.00 $24.07 $16380.00 03-25-2008 01-399304 3 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 01 4340 $8.95 $23.93 $38843.00 04-01-2008 01-478904 1 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 01 4340 $8.25 $22.06 $35805.00 04-01-2008 01-478904 2 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 01 4340 $10.00 $26.74 $43400.00 04-01-2008 01-478904 3 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 01 990 $11.00 $29.41 $10890.00 04-02-2008 01-482004 1    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 01 990 $7.00 $18.72 $6930.00 04-02-2008 01-482004 2    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 01 990 $7.00 $18.72 $6930.00 04-02-2008 01-482004 3    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 10 240 $17.50 $46.79 $4200.00 04-02-2008 10-499804 1 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 10 240 $32.00 $85.56 $7680.00 04-02-2008 10-499804 2 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 10 240 $25.00 $66.85 $6000.00 04-02-2008 10-499804 3 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 10 240 $12.00 $32.09 $2880.00 04-02-2008 10-499804 4 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 10 240 $17.00 $45.46 $4080.00 04-02-2008 10-499804 5 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 10 240 $51.00 $136.37 $12240.00 04-02-2008 10-499804 6 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 10 30 $77.00 $205.89 $2310.00 04-08-2008 10-0M8404 1    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 10 30 $80.00 $213.91 $2400.00 04-08-2008 10-0M8404 2    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 10 30 $72.30 $193.32 $2169.00 04-08-2008 10-0M8404 3    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 10 30 $12.00 $32.09 $360.00 04-08-2008 10-0M8404 4    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 02 40 $50.00 $133.70 $2000.00 04-15-2008 02-4C5604 1    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 02 40 $65.00 $173.80 $2600.00 04-15-2008 02-4C5604 2    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 02 40 $50.00 $133.70 $2000.00 04-15-2008 02-4C5604 3    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 02 40 $10.00 $26.74 $400.00 04-15-2008 02-4C5604 4    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 02 40 $105.00 $280.76 $4200.00 04-15-2008 02-4C5604 5    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 02 40 $100.00 $267.39 $4000.00 04-15-2008 02-4C5604 6    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 02 40 $55.00 $147.06 $2200.00 04-15-2008 02-4C5604 7    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 03 950 $48.00 $128.35 $45600.00 04-15-2008 03-367824 1 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 03 950 $20.00 $53.48 $19000.00 04-15-2008 03-367824 2 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 03 950 $40.00 $106.96 $38000.00 04-15-2008 03-367824 3 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 03 950 $40.00 $106.96 $38000.00 04-15-2008 03-367824 4 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 03 950 $20.00 $53.48 $19000.00 04-15-2008 03-367824 5 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 03 950 $44.00 $117.65 $41800.00 04-15-2008 03-367824 6 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 2380 $35.00 $93.59 $83300.00 04-23-2008 03-0E2004 1 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 2380 $42.00 $112.30 $99960.00 04-23-2008 03-0E2004 2 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 2380 $40.00 $106.96 $95200.00 04-23-2008 03-0E2004 3 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 2380 $37.00 $98.93 $88060.00 04-23-2008 03-0E2004 4 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 2380 $50.00 $133.70 $119000.00 04-23-2008 03-0E2004 5 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 2380 $35.00 $93.59 $83300.00 04-23-2008 03-0E2004 6 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 2380 $30.03 $80.30 $71471.40 04-23-2008 03-0E2004 7 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 06 160 $140.00 $374.35 $22400.00 04-23-2008 06-0F9704 1    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 06 160 $40.00 $106.96 $6400.00 04-23-2008 06-0F9704 2    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 06 160 $31.00 $82.89 $4960.00 04-23-2008 06-0F9704 3    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 06 160 $24.00 $64.17 $3840.00 04-23-2008 06-0F9704 4    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 06 1040 $16.00 $42.78 $16640.00 04-23-2008 06-0F9904 1    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 06 1040 $16.00 $42.78 $16640.00 04-23-2008 06-0F9904 2    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 06 1040 $7.50 $20.05 $7800.00 04-23-2008 06-0F9904 3    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 06 1040 $15.00 $40.11 $15600.00 04-23-2008 06-0F9904 4    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 06 1040 $25.00 $66.85 $26000.00 04-23-2008 06-0F9904 5    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 06 1040 $25.00 $66.85 $26000.00 04-23-2008 06-0F9904 6    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 06 1040 $35.00 $93.59 $36400.00 04-23-2008 06-0F9904 7    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 02 32 $35.00 $93.59 $1120.00 05-06-2008 02-4C7504 1    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 02 32 $60.00 $160.43 $1920.00 05-06-2008 02-4C7504 2    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 02 32 $50.00 $133.70 $1600.00 05-06-2008 02-4C7504 3    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 02 32 $95.00 $254.02 $3040.00 05-06-2008 02-4C7504 4    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 02 32 $100.00 $267.39 $3200.00 05-06-2008 02-4C7504 5    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 02 32 $52.00 $139.04 $1664.00 05-06-2008 02-4C7504 6    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 02 32 $48.00 $128.35 $1536.00 05-06-2008 02-4C7504 7    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 07 230 $30.00 $80.22 $6900.00 05-08-2008 07-4S2404 1 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 07 230 $55.00 $147.06 $12650.00 05-08-2008 07-4S2404 2 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 07 230 $24.85 $66.45 $5715.50 05-08-2008 07-4S2404 3 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 07 230 $32.00 $85.56 $7360.00 05-08-2008 07-4S2404 4 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 07 230 $52.00 $139.04 $11960.00 05-08-2008 07-4S2404 5 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 07 230 $36.00 $96.26 $8280.00 05-08-2008 07-4S2404 6 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 04 4890 $5.50 $14.71 $26895.00 05-14-2008 04-2A9904 1 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 04 4890 $10.00 $26.74 $48900.00 05-14-2008 04-2A9904 2 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 04 4890 $4.00 $10.70 $19560.00 05-14-2008 04-2A9904 3 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 04 4890 $12.00 $32.09 $58680.00 05-14-2008 04-2A9904 4 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 05 44 $125.00 $334.24 $5500.00 05-14-2008 05-0K2404 1 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 05 44 $150.00 $401.09 $6600.00 05-14-2008 05-0K2404 2 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 05 44 $162.00 $433.17 $7128.00 05-14-2008 05-0K2404 3 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 12 14 $350.00 $935.87 $4900.00 05-15-2008 12-0J1904 1 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 12 14 $70.00 $187.17 $980.00 05-15-2008 12-0J1904 2 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 12 14 $75.00 $200.54 $1050.00 05-15-2008 12-0J1904 3 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 12 14 $78.00 $208.56 $1092.00 05-15-2008 12-0J1904 4 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 12 14 $195.00 $521.41 $2730.00 05-15-2008 12-0J1904 5 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 07 21 $50.00 $133.70 $1050.00 05-29-2008 07-3N7904 1 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 07 21 $60.00 $160.43 $1260.00 05-29-2008 07-3N7904 2 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 07 21 $175.00 $467.93 $3675.00 05-29-2008 07-3N7904 3 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 07 21 $150.00 $401.09 $3150.00 05-29-2008 07-3N7904 4 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 07 21 $50.65 $135.43 $1063.65 05-29-2008 07-3N7904 5 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 07 21 $273.00 $729.98 $5733.00 05-29-2008 07-3N7904 6 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 07 21 $179.20 $479.16 $3763.20 05-29-2008 07-3N7904 7 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 07 9 $225.00 $601.63 $2025.00 05-29-2008 07-4S2004 1 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 07 9 $100.00 $267.39 $900.00 05-29-2008 07-4S2004 2 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 07 9 $474.00 $1267.43 $4266.00 05-29-2008 07-4S2004 3 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 07 9 $100.00 $267.39 $900.00 05-29-2008 07-4S2004 4 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 07 9 $630.00 $1684.56 $5670.00 05-29-2008 07-4S2004 5 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 07 9 $210.00 $561.52 $1890.00 05-29-2008 07-4S2004 6 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 07 9 $250.00 $668.48 $2250.00 05-29-2008 07-4S2004 7 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 07 9 $220.00 $588.26 $1980.00 05-29-2008 07-4S2004 8 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 07 9 $275.00 $735.32 $2475.00 05-29-2008 07-4S2004 9 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 07 9 $415.00 $1109.67 $3735.00 05-29-2008 07-4S2004 10 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 07 9 $252.00 $673.82 $2268.00 05-29-2008 07-4S2004 11 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 01 49 $135.00 $360.98 $6615.00 05-30-2008 01-479504 1    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 01 49 $100.00 $267.39 $4900.00 05-30-2008 01-479504 2    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 01 49 $20.00 $53.48 $980.00 05-30-2008 01-479504 3    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 01 49 $26.00 $69.52 $1274.00 05-30-2008 01-479504 4    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 1360 $5.00 $13.37 $6800.00 05-30-2008 03-3E5704 1    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 1360 $17.51 $46.82 $23813.60 05-30-2008 03-3E5704 2    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 1360 $20.00 $53.48 $27200.00 05-30-2008 03-3E5704 3    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 1360 $30.00 $80.22 $40800.00 05-30-2008 03-3E5704 4    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 1360 $20.00 $53.48 $27200.00 05-30-2008 03-3E5704 5    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 1360 $7.50 $20.05 $10200.00 05-30-2008 03-3E5704 6    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 1360 $30.00 $80.22 $40800.00 05-30-2008 03-3E5704 7    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 1360 $43.00 $114.98 $58480.00 05-30-2008 03-3E5704 8    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 1360 $22.00 $58.83 $29920.00 05-30-2008 03-3E5704 9    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 1360 $36.00 $96.26 $48960.00 05-30-2008 03-3E5704 10    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 1360 $17.80 $47.60 $24208.00 05-30-2008 03-3E5704 11    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 1360 $23.09 $61.74 $31402.40 05-30-2008 03-3E5704 12    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 1360 $31.43 $84.04 $42744.80 05-30-2008 03-3E5704 13    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 1360 $52.35 $139.98 $71196.00 05-30-2008 03-3E5704 14    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 04 550 $35.00 $93.59 $19250.00 06-03-2008 04-162524 1 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 04 550 $170.00 $454.56 $93500.00 06-03-2008 04-162524 2 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 04 550 $110.00 $294.13 $60500.00 06-03-2008 04-162524 3 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 04 550 $90.00 $240.65 $49500.00 06-03-2008 04-162524 4 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 04 550 $99.00 $264.72 $54450.00 06-03-2008 04-162524 5 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 04 550 $50.00 $133.70 $27500.00 06-03-2008 04-162524 6 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQFT 06 2580 $3.00 $8.02 $7740.00 06-03-2008 06-0E6904 1 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQFT 06 2580 $2.00 $5.35 $5160.00 06-03-2008 06-0E6904 2 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 700 $8.50 $22.73 $5950.00 06-11-2008 03-3E0004 1    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 700 $76.00 $203.22 $53200.00 06-11-2008 03-3E0004 2    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 700 $25.00 $66.85 $17500.00 06-11-2008 03-3E0004 3    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 700 $25.00 $66.85 $17500.00 06-11-2008 03-3E0004 4    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 700 $9.00 $24.07 $6300.00 06-11-2008 03-3E0004 5    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQFT 06 340 $4.00 $10.70 $1360.00 07-01-2008 06-0F5404 1    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQFT 06 340 $6.30 $16.85 $2142.00 07-01-2008 06-0F5404 2    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQFT 06 340 $13.50 $36.10 $4590.00 07-01-2008 06-0F5404 3    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQFT 06 340 $8.10 $21.66 $2754.00 07-01-2008 06-0F5404 4    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 01 6 $200.00 $534.78 $1200.00 07-08-2008 01-481004 1    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 01 6 $100.00 $267.39 $600.00 07-08-2008 01-481004 2    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 01 6 $250.00 $668.48 $1500.00 07-08-2008 01-481004 3    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 05 1.7 $220.00 $588.26 $374.00 07-08-2008 05-0K9604 1 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 05 1.7 $450.00 $1203.26 $765.00 07-08-2008 05-0K9604 2 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 05 1.7 $420.00 $1123.04 $714.00 07-08-2008 05-0K9604 3 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 05 1.7 $100.00 $267.39 $170.00 07-08-2008 05-0K9604 4 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 05 1.7 $250.00 $668.48 $425.00 07-08-2008 05-0K9604 5 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 05 1.7 $666.75 $1782.83 $1133.48 07-08-2008 05-0K9604 6 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 11 2390 $12.00 $32.09 $28680.00 07-10-2008 11-2T0924 1 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 11 2390 $8.00 $21.39 $19120.00 07-10-2008 11-2T0924 2 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 11 2390 $9.30 $24.87 $22227.00 07-10-2008 11-2T0924 3 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 3270 $5.00 $13.37 $16350.00 07-15-2008 03-0A6334 1 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 3270 $4.00 $10.70 $13080.00 07-15-2008 03-0A6334 2 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 3270 $5.00 $13.37 $16350.00 07-15-2008 03-0A6334 3 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 3270 $30.00 $80.22 $98100.00 07-15-2008 03-0A6334 4 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 3270 $30.00 $80.22 $98100.00 07-15-2008 03-0A6334 5 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 6 $41.00 $109.63 $246.00 07-16-2008 03-3E2004 1    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 6 $135.00 $360.98 $810.00 07-16-2008 03-3E2004 2    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 6 $224.00 $598.95 $1344.00 07-16-2008 03-3E2004 3    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 6 $100.00 $267.39 $600.00 07-16-2008 03-3E2004 4    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 6 $200.00 $534.78 $1200.00 07-16-2008 03-3E2004 5    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 6 $119.00 $318.19 $714.00 07-16-2008 03-3E2004 6    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 6 $60.00 $160.43 $360.00 07-16-2008 03-3E2004 7    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 6 $100.00 $267.39 $600.00 07-16-2008 03-3E2004 8    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 6 $100.00 $267.39 $600.00 07-16-2008 03-3E2004 9    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 6 $100.00 $267.39 $600.00 07-16-2008 03-3E2004 10    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 6 $100.00 $267.39 $600.00 07-16-2008 03-3E2004 11    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 6 $172.00 $459.91 $1032.00 07-16-2008 03-3E2004 12    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 6 $125.00 $334.24 $750.00 07-16-2008 03-3E2004 13    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 10 130 $56.00 $149.74 $7280.00 08-05-2008 10-0G7504 1    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 10 130 $60.00 $160.43 $7800.00 08-05-2008 10-0G7504 2    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 10 130 $45.00 $120.33 $5850.00 08-05-2008 10-0G7504 3    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 10 130 $80.00 $213.91 $10400.00 08-05-2008 10-0G7504 4    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 04 200 $32.00 $85.56 $6400.00 08-06-2008 04-2S7004 1    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 04 200 $20.00 $53.48 $4000.00 08-06-2008 04-2S7004 2    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 04 200 $61.00 $163.11 $12200.00 08-06-2008 04-2S7004 3    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 04 200 $80.96 $216.48 $16192.00 08-06-2008 04-2S7004 4    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 04 200 $30.00 $80.22 $6000.00 08-06-2008 04-2S7004 5    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 04 200 $34.00 $90.91 $6800.00 08-06-2008 04-2S7004 6    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 04 200 $50.00 $133.70 $10000.00 08-06-2008 04-2S7004 7    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 04 200 $68.00 $181.83 $13600.00 08-06-2008 04-2S7004 8    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 04 200 $50.00 $133.70 $10000.00 08-06-2008 04-2S7004 9    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 04 200 $26.00 $69.52 $5200.00 08-06-2008 04-2S7004 10    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 04 200 $50.00 $133.70 $10000.00 08-06-2008 04-2S7004 11    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 04 200 $75.00 $200.54 $15000.00 08-06-2008 04-2S7004 12    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 04 200 $67.82 $181.34 $13564.00 08-06-2008 04-2S7004 13    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 04 200 $69.00 $184.50 $13800.00 08-06-2008 04-2S7004 14    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 07 320 $58.00 $155.09 $18560.00 08-07-2008 07-259904 1 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 07 320 $33.00 $88.24 $10560.00 08-07-2008 07-259904 2 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 07 320 $54.00 $144.39 $17280.00 08-07-2008 07-259904 3 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 07 320 $60.00 $160.43 $19200.00 08-07-2008 07-259904 4 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 08 66 $56.00 $149.74 $3696.00 08-07-2008 08-0F3904 1    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 08 66 $175.00 $467.93 $11550.00 08-07-2008 08-0F3904 2    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 08 66 $70.00 $187.17 $4620.00 08-07-2008 08-0F3904 3    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 08 66 $72.40 $193.59 $4778.40 08-07-2008 08-0F3904 4    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 08 66 $55.41 $148.16 $3657.06 08-07-2008 08-0F3904 5    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 08 66 $114.32 $305.68 $7545.12 08-07-2008 08-0F3904 6    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 08 66 $143.72 $384.29 $9485.52 08-07-2008 08-0F3904 7    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 08 66 $70.00 $187.17 $4620.00 08-07-2008 08-0F3904 8    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 08 66 $50.00 $133.70 $3300.00 08-07-2008 08-0F3904 9    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 08 66 $100.00 $267.39 $6600.00 08-07-2008 08-0F3904 10    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 08 66 $50.00 $133.70 $3300.00 08-07-2008 08-0F3904 11    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 01 260 $18.00 $48.13 $4680.00 08-12-2008 01-470214 1 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 01 260 $20.00 $53.48 $5200.00 08-12-2008 01-470214 2 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 01 260 $16.00 $42.78 $4160.00 08-12-2008 01-470214 3 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 01 260 $20.00 $53.48 $5200.00 08-12-2008 01-470214 4 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 01 260 $20.00 $53.48 $5200.00 08-12-2008 01-470214 5 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 01 260 $25.00 $66.85 $6500.00 08-12-2008 01-470214 6 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 01 260 $22.00 $58.83 $5720.00 08-12-2008 01-470214 7 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 01 260 $10.00 $26.74 $2600.00 08-12-2008 01-470214 8 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 06 290 $58.00 $155.09 $16820.00 08-12-2008 06-460704 1 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 06 290 $55.00 $147.06 $15950.00 08-12-2008 06-460704 2 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 06 290 $117.00 $312.85 $33930.00 08-12-2008 06-460704 3 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 06 290 $55.00 $147.06 $15950.00 08-12-2008 06-460704 4 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 06 290 $60.00 $160.43 $17400.00 08-12-2008 06-460704 5 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 06 290 $60.00 $160.43 $17400.00 08-12-2008 06-460704 6 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 06 290 $135.00 $360.98 $39150.00 08-12-2008 06-460704 7 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQFT 02 11200 $1.00 $2.67 $11200.00 08-19-2008 02-368904 1 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQFT 02 11200 $6.50 $17.38 $72800.00 08-19-2008 02-368904 2 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQFT 02 11200 $1.44 $3.85 $16128.00 08-19-2008 02-368904 3 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQFT 02 11200 $1.50 $4.01 $16800.00 08-19-2008 02-368904 4 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQFT 02 11200 $2.00 $5.35 $22400.00 08-19-2008 02-368904 5 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQFT 02 11200 $3.21 $8.58 $35952.00 08-19-2008 02-368904 6 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 02 80 $20.00 $53.48 $1600.00 08-19-2008 02-4C8904 1    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 02 80 $100.00 $267.39 $8000.00 08-19-2008 02-4C8904 2    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 02 80 $60.00 $160.43 $4800.00 08-19-2008 02-4C8904 3    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 02 80 $195.00 $521.41 $15600.00 08-19-2008 02-4C8904 4    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 02 80 $75.00 $200.54 $6000.00 08-19-2008 02-4C8904 5    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 02 80 $125.00 $334.24 $10000.00 08-19-2008 02-4C8904 6    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 04 1470 $21.15 $56.55 $31090.50 08-19-2008 04-253794 1 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 04 1470 $25.00 $66.85 $36750.00 08-19-2008 04-253794 2 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 04 1470 $120.00 $320.87 $176400.00 08-19-2008 04-253794 3 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 04 1470 $10.00 $26.74 $14700.00 08-19-2008 04-253794 4 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 04 1470 $18.00 $48.13 $26460.00 08-19-2008 04-253794 5 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 04 1470 $26.00 $69.52 $38220.00 08-19-2008 04-253794 6 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 04 1470 $5.00 $13.37 $7350.00 08-19-2008 04-253794 7 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 04 1470 $14.00 $37.43 $20580.00 08-19-2008 04-253794 8 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 04 1470 $25.00 $66.85 $36750.00 08-19-2008 04-253794 9 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 04 1470 $50.00 $133.70 $73500.00 08-19-2008 04-253794 10 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 06 2150 $7.00 $18.72 $15050.00 08-19-2008 06-322104 1 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 06 2150 $20.00 $53.48 $43000.00 08-19-2008 06-322104 2 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 06 2150 $13.00 $34.76 $27950.00 08-19-2008 06-322104 3 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 06 2150 $12.00 $32.09 $25800.00 08-19-2008 06-322104 4 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 06 2150 $12.00 $32.09 $25800.00 08-19-2008 06-322104 5 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 06 2150 $15.00 $40.11 $32250.00 08-19-2008 06-322104 6 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 06 2150 $12.65 $33.82 $27197.50 08-19-2008 06-322104 7 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 09 16 $59.00 $157.76 $944.00 08-27-2008 09-316604 1 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 09 16 $140.00 $374.35 $2240.00 08-27-2008 09-316604 2 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 09 16 $100.00 $267.39 $1600.00 08-27-2008 09-316604 3 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 3 $250.00 $668.48 $750.00 09-03-2008 03-2C7404 1    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 3 $100.00 $267.39 $300.00 09-03-2008 03-2C7404 2    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 3 $75.00 $200.54 $225.00 09-03-2008 03-2C7404 3    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 3 $180.00 $481.30 $540.00 09-03-2008 03-2C7404 4    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 3 $305.00 $815.54 $915.00 09-03-2008 03-2C7404 5    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 3 $200.00 $534.78 $600.00 09-03-2008 03-2C7404 6    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 3 $400.00 $1069.56 $1200.00 09-03-2008 03-2C7404 7    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 3 $620.00 $1657.82 $1860.00 09-03-2008 03-2C7404 8    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 3 $530.00 $1417.17 $1590.00 09-03-2008 03-2C7404 9    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 3 $1100.00 $2941.30 $3300.00 09-03-2008 03-2C7404 10    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 3 $80.00 $213.91 $240.00 09-03-2008 03-2C7404 11    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 95 $50.00 $133.70 $4750.00 09-10-2008 03-3A2204 1 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 95 $25.00 $66.85 $2375.00 09-10-2008 03-3A2204 2 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 95 $205.00 $548.15 $19475.00 09-10-2008 03-3A2204 3 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 95 $130.00 $347.61 $12350.00 09-10-2008 03-3A2204 4 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 95 $100.00 $267.39 $9500.00 09-10-2008 03-3A2204 5 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 95 $28.00 $74.87 $2660.00 09-10-2008 03-3A2204 6 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 07 2.2 $68.00 $181.83 $149.60 09-11-2008 07-4S3704 1 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 07 2.2 $100.00 $267.39 $220.00 09-11-2008 07-4S3704 2 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 07 2.2 $100.00 $267.39 $220.00 09-11-2008 07-4S3704 3 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 07 2.2 $750.00 $2005.43 $1650.00 09-11-2008 07-4S3704 4 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 07 2.2 $150.00 $401.09 $330.00 09-11-2008 07-4S3704 5 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 07 2.2 $1600.20 $4278.78 $3520.44 09-11-2008 07-4S3704 6 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 07 2.2 $70.00 $187.17 $154.00 09-11-2008 07-4S3704 7 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 07 2.2 $150.00 $401.09 $330.00 09-11-2008 07-4S3704 8 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 07 2.2 $56.50 $151.08 $124.30 09-11-2008 07-4S3704 9 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 07 2.2 $60.00 $160.43 $132.00 09-11-2008 07-4S3704 10 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 07 2.2 $55.00 $147.06 $121.00 09-11-2008 07-4S3704 11 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 07 2.2 $300.00 $802.17 $660.00 09-11-2008 07-4S3704 12 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 07 2.2 $57.00 $152.41 $125.40 09-11-2008 07-4S3704 13 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 07 2.2 $64.80 $173.27 $142.56 09-11-2008 07-4S3704 14 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 960 $95.00 $254.02 $91200.00 09-17-2008 03-3E0404 1 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 960 $66.00 $176.48 $63360.00 09-17-2008 03-3E0404 2 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 960 $66.00 $176.48 $63360.00 09-17-2008 03-3E0404 3 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 960 $100.00 $267.39 $96000.00 09-17-2008 03-3E0404 4 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 960 $33.50 $89.58 $32160.00 09-17-2008 03-3E0404 5 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 960 $130.00 $347.61 $124800.00 09-17-2008 03-3E0404 6 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 06 10 $455.00 $1216.63 $4550.00 09-17-2008 06-0G3104 1 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 06 10 $600.08 $1604.56 $6000.80 09-17-2008 06-0G3104 2 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 06 10 $550.00 $1470.65 $5500.00 09-17-2008 06-0G3104 3 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 06 10 $35.00 $93.59 $350.00 09-17-2008 06-0G3104 4 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 06 10 $68.00 $181.83 $680.00 09-17-2008 06-0G3104 5 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 06 10 $75.00 $200.54 $750.00 09-17-2008 06-0G3104 6 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 07 450 $13.68 $36.58 $6156.00 09-18-2008 07-223804 1 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 07 450 $18.00 $48.13 $8100.00 09-18-2008 07-223804 2 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 07 450 $30.00 $80.22 $13500.00 09-18-2008 07-223804 3 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 07 450 $6.70 $17.92 $3015.00 09-18-2008 07-223804 4 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 07 450 $17.00 $45.46 $7650.00 09-18-2008 07-223804 5 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 07 450 $10.00 $26.74 $4500.00 09-18-2008 07-223804 6 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 07 450 $125.00 $334.24 $56250.00 09-18-2008 07-223804 7 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 07 450 $8.00 $21.39 $3600.00 09-18-2008 07-223804 8 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 07 450 $110.00 $294.13 $49500.00 09-18-2008 07-223804 9 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 310 $20.00 $53.48 $6200.00 09-23-2008 03-4E3904 1    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 310 $15.00 $40.11 $4650.00 09-23-2008 03-4E3904 2    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 310 $13.00 $34.76 $4030.00 09-23-2008 03-4E3904 3    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 310 $40.00 $106.96 $12400.00 09-23-2008 03-4E3904 4    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 310 $32.00 $85.56 $9920.00 09-23-2008 03-4E3904 5    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 310 $20.00 $53.48 $6200.00 09-23-2008 03-4E3904 6    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 310 $32.00 $85.56 $9920.00 09-23-2008 03-4E3904 7    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 310 $34.50 $92.25 $10695.00 09-23-2008 03-4E3904 8    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 310 $32.00 $85.56 $9920.00 09-23-2008 03-4E3904 9    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 310 $8.00 $21.39 $2480.00 09-23-2008 03-4E3904 10    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 310 $50.00 $133.70 $15500.00 09-23-2008 03-4E3904 11    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 07 7690 $6.00 $16.04 $46140.00 09-25-2008 07-166814 1 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 07 7690 $28.00 $74.87 $215320.00 09-25-2008 07-166814 2 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 07 7690 $8.50 $22.73 $65365.00 09-25-2008 07-166814 3 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 07 7690 $50.00 $133.70 $384500.00 09-25-2008 07-166814 4 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 10 74 $15.00 $40.11 $1110.00 10-07-2008 10-0J8104 1 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 10 74 $13.00 $34.76 $962.00 10-07-2008 10-0J8104 2 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 10 74 $24.25 $64.84 $1794.50 10-07-2008 10-0J8104 3 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 10 74 $150.00 $401.09 $11100.00 10-07-2008 10-0J8104 4 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 01 150 $25.00 $66.85 $3750.00 10-15-2008 01-363204 1 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 01 150 $58.00 $155.09 $8700.00 10-15-2008 01-363204 2 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 01 150 $35.00 $93.59 $5250.00 10-15-2008 01-363204 3 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 01 150 $54.00 $144.39 $8100.00 10-15-2008 01-363204 4 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 01 150 $27.50 $73.53 $4125.00 10-15-2008 01-363204 5 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 05 110 $43.00 $114.98 $4730.00 10-15-2008 05-0N4404 1 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 05 110 $15.50 $41.45 $1705.00 10-15-2008 05-0N4404 2 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 05 110 $20.00 $53.48 $2200.00 10-15-2008 05-0N4404 3 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 05 110 $45.00 $120.33 $4950.00 10-15-2008 05-0N4404 4 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 05 110 $42.00 $112.30 $4620.00 10-15-2008 05-0N4404 5 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 05 110 $65.00 $173.80 $7150.00 10-15-2008 05-0N4404 6 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 05 110 $167.00 $446.54 $18370.00 10-15-2008 05-0N4404 7 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 05 110 $44.30 $118.45 $4873.00 10-15-2008 05-0N4404 8 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 05 110 $56.00 $149.74 $6160.00 10-15-2008 05-0N4404 9 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 05 110 $20.00 $53.48 $2200.00 10-15-2008 05-0N4404 10 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 05 110 $30.00 $80.22 $3300.00 10-15-2008 05-0N4404 11 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 05 110 $150.00 $401.09 $16500.00 10-15-2008 05-0N4404 12 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 05 110 $335.00 $895.76 $36850.00 10-15-2008 05-0N4404 13 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQFT 01 60 $14.00 $37.43 $840.00 10-16-2008 01-488204 1 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQFT 01 60 $9.00 $24.07 $540.00 10-16-2008 01-488204 2 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQFT 01 60 $24.00 $64.17 $1440.00 10-16-2008 01-488204 3 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQFT 01 60 $15.00 $40.11 $900.00 10-16-2008 01-488204 4 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQFT 01 60 $75.00 $200.54 $4500.00 10-16-2008 01-488204 5 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQFT 01 60 $30.00 $80.22 $1800.00 10-16-2008 01-488204 6 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQFT 01 60 $25.00 $66.85 $1500.00 10-16-2008 01-488204 7 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 09 17 $100.00 $267.39 $1700.00 10-21-2008 09-258014 1 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 09 17 $30.00 $80.22 $510.00 10-21-2008 09-258014 2 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 09 17 $220.00 $588.26 $3740.00 10-21-2008 09-258014 3 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 09 17 $50.00 $133.70 $850.00 10-21-2008 09-258014 4 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 09 17 $110.00 $294.13 $1870.00 10-21-2008 09-258014 5 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 11 86 $33.00 $88.24 $2838.00 10-23-2008 11-2T0814 1 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 11 86 $145.00 $387.72 $12470.00 10-23-2008 11-2T0814 2 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 11 86 $80.00 $213.91 $6880.00 10-23-2008 11-2T0814 3 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 11 86 $60.00 $160.43 $5160.00 10-23-2008 11-2T0814 4 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 11 86 $100.00 $267.39 $8600.00 10-23-2008 11-2T0814 5 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 02 27 $100.00 $267.39 $2700.00 10-28-2008 02-1C1604 1 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 02 27 $75.00 $200.54 $2025.00 10-28-2008 02-1C1604 2 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 02 27 $55.00 $147.06 $1485.00 10-28-2008 02-1C1604 3 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 02 27 $75.00 $200.54 $2025.00 10-28-2008 02-1C1604 4 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 02 27 $82.00 $219.26 $2214.00 10-28-2008 02-1C1604 5 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 02 27 $70.00 $187.17 $1890.00 10-28-2008 02-1C1604 6 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 02 27 $65.00 $173.80 $1755.00 10-28-2008 02-1C1604 7 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 02 27 $70.00 $187.17 $1890.00 10-28-2008 02-1C1604 8 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 02 27 $62.00 $165.78 $1674.00 10-28-2008 02-1C1604 9 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 02 27 $60.00 $160.43 $1620.00 10-28-2008 02-1C1604 10 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 02 27 $75.00 $200.54 $2025.00 10-28-2008 02-1C1604 11 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 02 27 $50.00 $133.70 $1350.00 10-28-2008 02-1C1604 12 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 06 10 $66.00 $176.48 $660.00 11-04-2008 06-0H2704 1 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 06 10 $95.00 $254.02 $950.00 11-04-2008 06-0H2704 2 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 06 10 $54.00 $144.39 $540.00 11-04-2008 06-0H2704 3 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 06 10 $54.00 $144.39 $540.00 11-04-2008 06-0H2704 4 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 06 10 $240.00 $641.74 $2400.00 11-04-2008 06-0H2704 5 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 06 10 $80.00 $213.91 $800.00 11-04-2008 06-0H2704 6 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 06 10 $76.00 $203.22 $760.00 11-04-2008 06-0H2704 7 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 06 10 $100.00 $267.39 $1000.00 11-04-2008 06-0H2704 8 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 08 500 $110.00 $294.13 $55000.00 11-13-2008 08-472304 1 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 08 500 $35.00 $93.59 $17500.00 11-13-2008 08-472304 2 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 08 500 $58.00 $155.09 $29000.00 11-13-2008 08-472304 3 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 08 500 $180.00 $481.30 $90000.00 11-13-2008 08-472304 4 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 08 500 $83.00 $221.93 $41500.00 11-13-2008 08-472304 5 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 08 500 $30.00 $80.22 $15000.00 11-13-2008 08-472304 6 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 08 500 $20.00 $53.48 $10000.00 11-13-2008 08-472304 7 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 500 $6.50 $17.38 $3250.00 11-14-2008 03-4C7404 1    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 500 $27.00 $72.20 $13500.00 11-14-2008 03-4C7404 2    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 500 $19.50 $52.14 $9750.00 11-14-2008 03-4C7404 3    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 500 $10.00 $26.74 $5000.00 11-14-2008 03-4C7404 4    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 500 $8.45 $22.59 $4225.00 11-14-2008 03-4C7404 5    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 500 $50.00 $133.70 $25000.00 11-14-2008 03-4C7404 6    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 500 $27.25 $72.86 $13625.00 11-14-2008 03-4C7404 7    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 500 $27.00 $72.20 $13500.00 11-14-2008 03-4C7404 8    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 500 $12.00 $32.09 $6000.00 11-14-2008 03-4C7404 9    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 500 $10.00 $26.74 $5000.00 11-14-2008 03-4C7404 10    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 500 $11.00 $29.41 $5500.00 11-14-2008 03-4C7404 11    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 500 $25.11 $67.14 $12555.00 11-14-2008 03-4C7404 12    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 10 16 $10.00 $26.74 $160.00 11-18-2008 10-0N9504 1 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 10 16 $315.00 $842.28 $5040.00 11-18-2008 10-0N9504 2 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 10 16 $75.00 $200.54 $1200.00 11-18-2008 10-0N9504 3 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 10 16 $170.00 $454.56 $2720.00 11-18-2008 10-0N9504 4 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 10 16 $90.00 $240.65 $1440.00 11-18-2008 10-0N9504 5 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 10 16 $300.00 $802.17 $4800.00 11-18-2008 10-0N9504 6 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 10 16 $250.00 $668.48 $4000.00 11-18-2008 10-0N9504 7 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 10 16 $350.00 $935.87 $5600.00 11-18-2008 10-0N9504 8 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 10 16 $250.00 $668.48 $4000.00 11-18-2008 10-0N9504 9 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 10 16 $440.00 $1176.52 $7040.00 11-18-2008 10-0N9504 10 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 2950 $10.00 $26.74 $29500.00 11-19-2008 03-1E0414 1 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 2950 $17.00 $45.46 $50150.00 11-19-2008 03-1E0414 2 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 2950 $30.00 $80.22 $88500.00 11-19-2008 03-1E0414 3 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 2950 $40.00 $106.96 $118000.00 11-19-2008 03-1E0414 4 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 2950 $15.00 $40.11 $44250.00 11-19-2008 03-1E0414 5 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 2950 $20.00 $53.48 $59000.00 11-19-2008 03-1E0414 6 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 2950 $10.00 $26.74 $29500.00 11-19-2008 03-1E0414 7 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 11 130 $30.00 $80.22 $3900.00 11-20-2008 11-2T0104 1 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 11 130 $18.00 $48.13 $2340.00 11-20-2008 11-2T0104 2 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 11 130 $22.00 $58.83 $2860.00 11-20-2008 11-2T0104 3 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 11 130 $30.00 $80.22 $3900.00 11-20-2008 11-2T0104 4 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 11 130 $65.00 $173.80 $8450.00 11-20-2008 11-2T0104 5 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 08 37 $45.00 $120.33 $1665.00 11-21-2008 08-0C8104 1 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 08 37 $185.00 $494.67 $6845.00 11-21-2008 08-0C8104 2 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 08 37 $100.00 $267.39 $3700.00 11-21-2008 08-0C8104 3 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 08 37 $225.00 $601.63 $8325.00 11-21-2008 08-0C8104 4 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 08 37 $150.00 $401.09 $5550.00 11-21-2008 08-0C8104 5 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 08 37 $200.00 $534.78 $7400.00 11-21-2008 08-0C8104 6 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 08 37 $80.00 $213.91 $2960.00 11-21-2008 08-0C8104 7 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 08 37 $300.00 $802.17 $11100.00 11-21-2008 08-0C8104 8 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 08 37 $115.00 $307.50 $4255.00 11-21-2008 08-0C8104 9 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 08 37 $231.00 $617.67 $8547.00 11-21-2008 08-0C8104 10 M TRO
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 02 27 $161.00 $430.50 $4347.00 12-02-2008 02-3C8104 1 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 02 27 $205.50 $549.49 $5548.50 12-02-2008 02-3C8104 2 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 02 27 $150.00 $401.09 $4050.00 12-02-2008 02-3C8104 3 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 02 27 $118.00 $315.52 $3186.00 12-02-2008 02-3C8104 4 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 02 27 $100.00 $267.39 $2700.00 12-02-2008 02-3C8104 5 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 02 27 $139.00 $371.67 $3753.00 12-02-2008 02-3C8104 6 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 02 27 $60.00 $160.43 $1620.00 12-02-2008 02-3C8104 7 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 02 27 $313.00 $836.93 $8451.00 12-02-2008 02-3C8104 8 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 02 27 $60.00 $160.43 $1620.00 12-02-2008 02-3C8104 9 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 02 27 $51.00 $136.37 $1377.00 12-02-2008 02-3C8104 10 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 02 27 $300.00 $802.17 $8100.00 12-02-2008 02-3C8104 11 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 02 27 $200.00 $534.78 $5400.00 12-02-2008 02-3C8104 12 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) M2 02 27 $200.00 $534.78 $5400.00 12-02-2008 02-3C8104 13 M  
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 17 $54.00 $144.39 $918.00 12-02-2008 03-3M1004 1    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 17 $85.00 $227.28 $1445.00 12-02-2008 03-3M1004 2    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 17 $29.00 $77.54 $493.00 12-02-2008 03-3M1004 3    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 17 $50.00 $133.70 $850.00 12-02-2008 03-3M1004 4    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 17 $60.00 $160.43 $1020.00 12-02-2008 03-3M1004 5    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 17 $250.00 $668.48 $4250.00 12-02-2008 03-3M1004 6    
394090 - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 03 17 $58.00 $155.09 $986.00 12-02-2008 03-3M1004 7    
MORE THAN 500 RESULTS RETURNED. ONLY 500 ROWS SHOWN.
SUMMARY Unmodified Adjusted    
Average Price/Unit: $ Avg No. Units
Std Dev. (of Unit Price): ±$ Rows Selected
Weighted Avg.: $ Rows Returned
Minimum Price/Unit: $    
Maximum Price/Unit: $    

| Back | New Search |

PARAMETERS: Item = 394090; District=All; Year=All; Convert=No; Bidders=All Bidders
TIMESTAMP: 11/13/2026 05:31:37
CURRENT 12-MO INDEX (CHCCI (2020 Base)): 146.53