| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
07 |
25 |
$300.00 |
$1786.95 |
$7500.00 |
01-14-1993 |
07-067044 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
11 |
32 |
$305.00 |
$1816.73 |
$9760.00 |
01-14-1993 |
11-189154 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
07 |
60 |
$250.00 |
$1489.13 |
$15000.00 |
02-04-1993 |
07-110204 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
56 |
$300.00 |
$1786.95 |
$16800.00 |
03-09-1993 |
04-437654 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
70 |
$350.00 |
$2084.78 |
$24500.00 |
05-12-1993 |
04-115984 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
20 |
$500.00 |
$2978.25 |
$10000.00 |
06-29-1993 |
04-180644 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
95 |
$250.00 |
$1489.13 |
$23750.00 |
08-04-1993 |
04-228014 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
3 |
$1500.00 |
$8934.76 |
$4500.00 |
11-17-1993 |
04-126334 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
07 |
90 |
$190.00 |
$1131.74 |
$17100.00 |
11-18-1993 |
07-110334 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
07 |
22 |
$300.00 |
$1786.95 |
$6600.00 |
12-02-1993 |
07-107334 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
01 |
22 |
$320.00 |
$1906.08 |
$7040.00 |
12-14-1993 |
01-228804 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
70 |
$295.00 |
$1600.98 |
$20650.00 |
01-11-1994 |
04-233114 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
128 |
$280.00 |
$1519.57 |
$35840.00 |
02-23-1994 |
04-131374 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
08 |
60 |
$300.00 |
$1628.11 |
$18000.00 |
02-24-1994 |
08-202604 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
10 |
23 |
$350.00 |
$1899.46 |
$8050.00 |
03-23-1994 |
10-336404 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
07 |
5 |
$775.00 |
$4205.95 |
$3875.00 |
06-23-1994 |
07-019594 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
32 |
$400.00 |
$2170.81 |
$12800.00 |
06-29-1994 |
04-121774 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
05 |
18 |
$540.00 |
$2930.60 |
$9720.00 |
10-18-1994 |
05-363204 |
1 |
|
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
84 |
$300.00 |
$1628.11 |
$25200.00 |
11-18-1994 |
04-180254 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
40 |
$300.00 |
$1628.11 |
$12000.00 |
12-06-1994 |
04-233014 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
08 |
537 |
$250.00 |
$1436.57 |
$134250.00 |
01-19-1995 |
08-347214 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
07 |
7 |
$800.00 |
$4597.02 |
$5600.00 |
02-16-1995 |
07-130804 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
07 |
31 |
$500.00 |
$2873.14 |
$15500.00 |
02-23-1995 |
07-110294 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
05 |
86 |
$375.00 |
$2154.85 |
$32250.00 |
05-16-1995 |
05-315414 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
05 |
117 |
$260.00 |
$1494.03 |
$30420.00 |
06-13-1995 |
05-079814 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
11 |
72 |
$340.00 |
$1953.73 |
$24480.00 |
09-07-1995 |
11-179814 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
01 |
47 |
$400.00 |
$2298.51 |
$18800.00 |
10-31-1995 |
01-195624 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
30 |
$400.00 |
$2298.51 |
$12000.00 |
11-28-1995 |
04-131534 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
01 |
12 |
$600.00 |
$3434.30 |
$7200.00 |
04-16-1996 |
01-210524 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
01 |
47 |
$690.00 |
$3949.44 |
$32430.00 |
07-09-1996 |
01-195624 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
03 |
47 |
$375.00 |
$2146.44 |
$17625.00 |
07-09-1996 |
03-298014 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
06 |
83 |
$350.00 |
$2003.34 |
$29050.00 |
07-09-1996 |
06-331904 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
11 |
52 |
$320.00 |
$1831.62 |
$16640.00 |
07-25-1996 |
11-052304 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
08 |
51 |
$430.00 |
$2461.25 |
$21930.00 |
09-26-1996 |
08-200104 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
11 |
108 |
$586.00 |
$3354.16 |
$63288.00 |
09-26-1996 |
11-184954 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
08 |
33 |
$600.00 |
$3292.81 |
$19800.00 |
02-27-1997 |
08-324204 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
03 |
33 |
$520.00 |
$2853.77 |
$17160.00 |
03-25-1997 |
03-394504 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
08 |
15 |
$400.00 |
$2195.21 |
$6000.00 |
06-05-1997 |
08-350704 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
12 |
12 |
$400.00 |
$2195.21 |
$4800.00 |
09-18-1997 |
12-059224 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
7 |
$500.00 |
$2744.01 |
$3500.00 |
10-15-1997 |
04-180154 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
11 |
73 |
$300.00 |
$1569.96 |
$21900.00 |
05-21-1998 |
11-0301J4 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
63 |
$350.00 |
$1831.62 |
$22050.00 |
05-27-1998 |
04-233924 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
11 |
13 |
$1200.00 |
$6279.86 |
$15600.00 |
07-09-1998 |
11-062104 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
12 |
105 |
$375.00 |
$1962.46 |
$39375.00 |
08-13-1998 |
12-059254 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
07 |
4 |
$300.00 |
$1569.96 |
$1200.00 |
10-15-1998 |
07-118084 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
11 |
12 |
$1800.00 |
$9419.79 |
$21600.00 |
10-29-1998 |
11-010744 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
01 |
15 |
$1000.00 |
$5233.21 |
$15000.00 |
11-17-1998 |
01-371704 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
36 |
$575.00 |
$3009.10 |
$20700.00 |
12-03-1998 |
07-126414 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
12 |
$600.00 |
$3139.93 |
$7200.00 |
12-03-1998 |
07-135504 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
11 |
9 |
$1300.00 |
$6349.63 |
$11700.00 |
01-07-1999 |
11-050914 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
03 |
24 |
$600.00 |
$2930.60 |
$14400.00 |
05-11-1999 |
03-4475U4 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
11 |
72 |
$470.80 |
$2299.54 |
$33897.60 |
05-27-1999 |
11-147024 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
03 |
22 |
$350.00 |
$1709.52 |
$7700.00 |
07-21-1999 |
03-291004 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
02 |
20 |
$500.00 |
$2442.17 |
$10000.00 |
08-17-1999 |
02-251454 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
01 |
14 |
$1500.00 |
$7326.50 |
$21000.00 |
10-05-1999 |
01-370624 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
03 |
36 |
$650.00 |
$3082.35 |
$23400.00 |
01-25-2000 |
03-436304 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
04 |
59 |
$400.00 |
$1896.83 |
$23600.00 |
02-02-2000 |
04-228924 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
05 |
17 |
$700.00 |
$3319.45 |
$11900.00 |
03-14-2000 |
05-0A4204 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
06 |
25 |
$600.00 |
$2845.24 |
$15000.00 |
04-12-2000 |
06-338624 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
04 |
53 |
$785.40 |
$3724.42 |
$41626.20 |
04-18-2000 |
04-045034 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
06 |
17 |
$600.00 |
$2845.24 |
$10200.00 |
05-02-2000 |
06-353904 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
08 |
7 |
$800.00 |
$3793.66 |
$5600.00 |
06-08-2000 |
08-3564U4 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
04 |
8 |
$1000.00 |
$4742.07 |
$8000.00 |
08-30-2000 |
04-244804 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
11 |
51 |
$800.00 |
$3793.66 |
$40800.00 |
10-12-2000 |
11-010734 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
10 |
10 |
$800.00 |
$3499.22 |
$8000.00 |
05-02-2001 |
10-3404U4 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
01 |
45 |
$300.00 |
$1312.21 |
$13500.00 |
05-22-2001 |
01-301704 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
06 |
24 |
$900.00 |
$3936.63 |
$21600.00 |
05-22-2001 |
06-407704 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
05 |
25 |
$800.00 |
$3499.22 |
$20000.00 |
08-07-2001 |
05-0161U4 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
06 |
32 |
$929.50 |
$4393.54 |
$29744.00 |
01-08-2002 |
06-4100U4 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
06 |
32 |
$1000.00 |
$4726.77 |
$32000.00 |
01-08-2002 |
06-4100U4 |
2 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
06 |
32 |
$750.00 |
$3545.08 |
$24000.00 |
01-08-2002 |
06-4100U4 |
3 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
06 |
32 |
$850.00 |
$4017.76 |
$27200.00 |
01-08-2002 |
06-4100U4 |
4 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
06 |
32 |
$400.00 |
$1890.71 |
$12800.00 |
01-08-2002 |
06-4100U4 |
5 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
06 |
32 |
$600.00 |
$2836.06 |
$19200.00 |
01-08-2002 |
06-4100U4 |
6 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
06 |
32 |
$700.00 |
$3308.74 |
$22400.00 |
01-08-2002 |
06-4100U4 |
7 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
06 |
32 |
$1200.00 |
$5672.13 |
$38400.00 |
01-08-2002 |
06-4100U4 |
8 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
37 |
$500.00 |
$2363.39 |
$18500.00 |
06-06-2002 |
07-104954 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
37 |
$840.00 |
$3970.49 |
$31080.00 |
06-06-2002 |
07-104954 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
37 |
$430.00 |
$2032.51 |
$15910.00 |
06-06-2002 |
07-104954 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
37 |
$400.00 |
$1890.71 |
$14800.00 |
06-06-2002 |
07-104954 |
4 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
37 |
$500.00 |
$2363.39 |
$18500.00 |
06-06-2002 |
07-104954 |
5 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
37 |
$600.00 |
$2836.06 |
$22200.00 |
06-06-2002 |
07-104954 |
6 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
01 |
6 |
$1100.00 |
$5199.45 |
$6600.00 |
06-11-2002 |
01-293204 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
01 |
6 |
$800.00 |
$3781.42 |
$4800.00 |
06-11-2002 |
01-293204 |
2 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
01 |
6 |
$1500.00 |
$7090.16 |
$9000.00 |
06-11-2002 |
01-293204 |
3 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
01 |
6 |
$1100.00 |
$5199.45 |
$6600.00 |
06-11-2002 |
01-293204 |
4 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
01 |
6 |
$1200.00 |
$5672.13 |
$7200.00 |
06-11-2002 |
01-293204 |
5 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
03 |
36 |
$400.00 |
$1890.71 |
$14400.00 |
08-13-2002 |
03-376104 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
03 |
36 |
$650.00 |
$3072.40 |
$23400.00 |
08-13-2002 |
03-376104 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
03 |
36 |
$600.00 |
$2836.06 |
$21600.00 |
08-13-2002 |
03-376104 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
03 |
36 |
$660.00 |
$3119.67 |
$23760.00 |
08-13-2002 |
03-376104 |
4 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
03 |
36 |
$700.00 |
$3308.74 |
$25200.00 |
08-13-2002 |
03-376104 |
5 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
03 |
36 |
$675.00 |
$3190.57 |
$24300.00 |
08-13-2002 |
03-376104 |
6 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
6 |
$600.00 |
$2836.06 |
$3600.00 |
09-19-2002 |
07-496104 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
11 |
47 |
$655.00 |
$3096.04 |
$30785.00 |
09-19-2002 |
11-091804 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
25 |
$950.00 |
$4490.44 |
$23750.00 |
09-26-2002 |
07-002534 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
25 |
$1300.00 |
$6144.81 |
$32500.00 |
09-26-2002 |
07-002534 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
25 |
$600.00 |
$2836.06 |
$15000.00 |
09-26-2002 |
07-002534 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
11 |
45 |
$725.00 |
$3426.91 |
$32625.00 |
10-03-2002 |
11-199364 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
02 |
23 |
$1600.00 |
$7562.84 |
$36800.00 |
10-30-2002 |
02-258504 |
2 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
02 |
23 |
$2000.00 |
$9453.55 |
$46000.00 |
10-30-2002 |
02-258504 |
3 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
02 |
23 |
$1500.00 |
$7090.16 |
$34500.00 |
10-30-2002 |
02-258504 |
4 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
10 |
5 |
$1500.00 |
$6721.56 |
$7500.00 |
03-04-2003 |
10-444804 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
02 |
23 |
$950.00 |
$4256.99 |
$21850.00 |
03-18-2003 |
02-258504 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
11 |
45 |
$725.00 |
$3248.75 |
$32625.00 |
05-08-2003 |
11-199364 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
12 |
6 |
$900.00 |
$4032.94 |
$5400.00 |
05-22-2003 |
12-085214 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
11 |
4 |
$700.00 |
$3136.73 |
$2800.00 |
06-26-2003 |
11-064904 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
04 |
49 |
$450.00 |
$2016.47 |
$22050.00 |
09-23-2003 |
04-229014 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
04 |
49 |
$1000.00 |
$4481.04 |
$49000.00 |
09-23-2003 |
04-229014 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
04 |
49 |
$540.00 |
$2419.76 |
$26460.00 |
09-23-2003 |
04-229014 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
04 |
49 |
$536.00 |
$2401.84 |
$26264.00 |
09-23-2003 |
04-229014 |
4 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
04 |
49 |
$1000.00 |
$4481.04 |
$49000.00 |
09-23-2003 |
04-229014 |
5 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
04 |
49 |
$525.00 |
$2352.55 |
$25725.00 |
09-23-2003 |
04-229014 |
6 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
04 |
49 |
$600.00 |
$2688.62 |
$29400.00 |
09-23-2003 |
04-229014 |
7 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
11 |
78 |
$500.00 |
$2240.52 |
$39000.00 |
11-20-2003 |
11-068004 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
11 |
78 |
$650.00 |
$2912.68 |
$50700.00 |
11-20-2003 |
11-068004 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
11 |
78 |
$1100.00 |
$4929.14 |
$85800.00 |
11-20-2003 |
11-068004 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
11 |
78 |
$350.00 |
$1568.36 |
$27300.00 |
11-20-2003 |
11-068004 |
4 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
01 |
17 |
$1000.00 |
$2960.20 |
$17000.00 |
03-10-2004 |
01-362404 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
01 |
17 |
$1300.00 |
$3848.26 |
$22100.00 |
03-10-2004 |
01-362404 |
2 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
01 |
17 |
$881.00 |
$2607.94 |
$14977.00 |
03-10-2004 |
01-362404 |
3 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
01 |
17 |
$1300.00 |
$3848.26 |
$22100.00 |
03-10-2004 |
01-362404 |
4 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
01 |
17 |
$1140.00 |
$3374.63 |
$19380.00 |
03-10-2004 |
01-362404 |
5 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
01 |
17 |
$980.00 |
$2901.00 |
$16660.00 |
03-10-2004 |
01-362404 |
6 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
01 |
17 |
$750.00 |
$2220.15 |
$12750.00 |
03-10-2004 |
01-362404 |
7 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
01 |
17 |
$1500.00 |
$4440.30 |
$25500.00 |
03-10-2004 |
01-362404 |
8 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
02 |
26 |
$850.00 |
$2516.17 |
$22100.00 |
05-25-2004 |
02-364104 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
02 |
26 |
$250.00 |
$740.05 |
$6500.00 |
05-25-2004 |
02-364104 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
39 |
$800.00 |
$2368.16 |
$31200.00 |
06-03-2004 |
07-1178U4 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
39 |
$250.00 |
$740.05 |
$9750.00 |
06-03-2004 |
07-1178U4 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
39 |
$700.00 |
$2072.14 |
$27300.00 |
06-03-2004 |
07-1178U4 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
39 |
$1100.00 |
$3256.22 |
$42900.00 |
06-03-2004 |
07-1178U4 |
4 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
39 |
$1274.00 |
$3771.30 |
$49686.00 |
06-03-2004 |
07-1178U4 |
5 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
11 |
16 |
$900.00 |
$2664.18 |
$14400.00 |
06-10-2004 |
11-080914 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
11 |
16 |
$1200.00 |
$3552.24 |
$19200.00 |
06-10-2004 |
11-080914 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
11 |
16 |
$500.00 |
$1480.10 |
$8000.00 |
06-10-2004 |
11-080914 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
11 |
16 |
$900.00 |
$2664.18 |
$14400.00 |
06-10-2004 |
11-080914 |
4 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
11 |
16 |
$1000.00 |
$2960.20 |
$16000.00 |
06-10-2004 |
11-080914 |
5 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
11 |
18 |
$750.00 |
$1934.82 |
$13500.00 |
03-03-2005 |
11-080934 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
11 |
18 |
$600.00 |
$1547.85 |
$10800.00 |
03-03-2005 |
11-080934 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
11 |
18 |
$350.00 |
$902.91 |
$6300.00 |
03-03-2005 |
11-080934 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
11 |
18 |
$1200.00 |
$3095.70 |
$21600.00 |
03-03-2005 |
11-080934 |
4 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
03 |
70 |
$850.00 |
$2192.79 |
$59500.00 |
10-18-2005 |
03-3822V4 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
03 |
70 |
$700.00 |
$1805.83 |
$49000.00 |
10-18-2005 |
03-3822V4 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
03 |
70 |
$850.00 |
$2118.21 |
$59500.00 |
01-11-2006 |
03-3822V4 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
03 |
70 |
$700.00 |
$1744.40 |
$49000.00 |
01-11-2006 |
03-3822V4 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
03 |
70 |
$800.00 |
$1993.61 |
$56000.00 |
01-11-2006 |
03-3822V4 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
02 |
19 |
$650.00 |
$1619.80 |
$12350.00 |
01-18-2006 |
02-251474 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
02 |
19 |
$1000.00 |
$2492.01 |
$19000.00 |
01-18-2006 |
02-251474 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
02 |
19 |
$1200.00 |
$2990.41 |
$22800.00 |
01-18-2006 |
02-251474 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
02 |
19 |
$1200.00 |
$2990.41 |
$22800.00 |
01-18-2006 |
02-251474 |
4 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
02 |
19 |
$850.00 |
$2118.21 |
$16150.00 |
01-18-2006 |
02-251474 |
5 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
02 |
19 |
$780.00 |
$1943.77 |
$14820.00 |
01-18-2006 |
02-251474 |
6 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
03 |
80 |
$2300.00 |
$5731.62 |
$184000.00 |
02-08-2006 |
03-3555U4 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
03 |
80 |
$2000.00 |
$4984.01 |
$160000.00 |
02-08-2006 |
03-3555U4 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
03 |
80 |
$900.00 |
$2242.81 |
$72000.00 |
02-08-2006 |
03-3555U4 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
03 |
80 |
$1350.00 |
$3364.21 |
$108000.00 |
02-08-2006 |
03-3555U4 |
4 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
05 |
4 |
$2000.00 |
$4984.01 |
$8000.00 |
02-22-2006 |
05-0G4104 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
05 |
4 |
$3200.00 |
$7974.42 |
$12800.00 |
02-22-2006 |
05-0G4104 |
2 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
05 |
4 |
$1750.00 |
$4361.01 |
$7000.00 |
02-22-2006 |
05-0G4104 |
3 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
05 |
4 |
$1900.00 |
$4734.81 |
$7600.00 |
02-22-2006 |
05-0G4104 |
4 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
04 |
30 |
$1100.00 |
$2741.21 |
$33000.00 |
03-29-2006 |
04-209914 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
04 |
30 |
$1350.00 |
$3364.21 |
$40500.00 |
03-29-2006 |
04-209914 |
2 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
04 |
30 |
$1000.00 |
$2492.01 |
$30000.00 |
03-29-2006 |
04-209914 |
3 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
04 |
30 |
$1500.00 |
$3738.01 |
$45000.00 |
03-29-2006 |
04-209914 |
4 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
03 |
21 |
$1400.00 |
$3488.81 |
$29400.00 |
07-12-2006 |
03-1A5304 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
03 |
21 |
$1200.00 |
$2990.41 |
$25200.00 |
07-12-2006 |
03-1A5304 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
03 |
21 |
$2000.00 |
$4984.01 |
$42000.00 |
07-12-2006 |
03-1A5304 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
01 |
31 |
$1450.00 |
$3613.41 |
$44950.00 |
12-05-2006 |
01-385704 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
01 |
31 |
$300.00 |
$747.60 |
$9300.00 |
12-05-2006 |
01-385704 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
42 |
$1750.00 |
$4383.38 |
$73500.00 |
01-11-2007 |
07-188504 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
42 |
$1200.00 |
$3005.74 |
$50400.00 |
01-11-2007 |
07-188504 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
42 |
$900.00 |
$2254.31 |
$37800.00 |
01-11-2007 |
07-188504 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
42 |
$700.00 |
$1753.35 |
$29400.00 |
01-11-2007 |
07-188504 |
4 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
08 |
51 |
$1350.00 |
$3381.46 |
$68850.00 |
01-11-2007 |
08-456614 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
08 |
51 |
$350.00 |
$876.68 |
$17850.00 |
01-11-2007 |
08-456614 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
08 |
51 |
$1000.00 |
$2504.79 |
$51000.00 |
01-11-2007 |
08-456614 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
08 |
51 |
$1100.00 |
$2755.26 |
$56100.00 |
01-11-2007 |
08-456614 |
4 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
08 |
51 |
$1000.00 |
$2504.79 |
$51000.00 |
01-11-2007 |
08-456614 |
5 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
08 |
51 |
$1650.00 |
$4132.90 |
$84150.00 |
01-11-2007 |
08-456614 |
6 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
08 |
51 |
$1000.00 |
$2504.79 |
$51000.00 |
01-11-2007 |
08-456614 |
7 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
08 |
51 |
$1450.00 |
$3631.94 |
$73950.00 |
01-11-2007 |
08-456614 |
8 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
08 |
51 |
$1200.00 |
$3005.74 |
$61200.00 |
01-11-2007 |
08-456614 |
9 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
04 |
32 |
$1500.00 |
$3757.18 |
$48000.00 |
06-27-2007 |
04-016014 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
04 |
32 |
$2000.00 |
$5009.57 |
$64000.00 |
06-27-2007 |
04-016014 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
04 |
32 |
$1500.00 |
$3757.18 |
$48000.00 |
06-27-2007 |
04-016014 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
11 |
47 |
$1500.00 |
$3757.18 |
$70500.00 |
12-13-2007 |
11-091824 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
11 |
47 |
$950.00 |
$2379.55 |
$44650.00 |
12-13-2007 |
11-091824 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
11 |
47 |
$1035.00 |
$2592.45 |
$48645.00 |
12-13-2007 |
11-091824 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
11 |
47 |
$890.00 |
$2229.26 |
$41830.00 |
12-13-2007 |
11-091824 |
4 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
11 |
47 |
$1200.00 |
$3005.74 |
$56400.00 |
12-13-2007 |
11-091824 |
5 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
14 |
$1800.00 |
$4813.03 |
$25200.00 |
05-01-2008 |
07-4J1804 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
14 |
$2752.00 |
$7358.59 |
$38528.00 |
05-01-2008 |
07-4J1804 |
2 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
14 |
$2900.00 |
$7754.32 |
$40600.00 |
05-01-2008 |
07-4J1804 |
3 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
14 |
$1450.00 |
$3877.16 |
$20300.00 |
05-01-2008 |
07-4J1804 |
4 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
14 |
$2500.00 |
$6684.76 |
$35000.00 |
05-01-2008 |
07-4J1804 |
5 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
14 |
$2760.00 |
$7379.98 |
$38640.00 |
05-01-2008 |
07-4J1804 |
6 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
14 |
$1750.00 |
$4679.33 |
$24500.00 |
05-01-2008 |
07-4J1804 |
7 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
14 |
$3000.00 |
$8021.72 |
$42000.00 |
05-01-2008 |
07-4J1804 |
8 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
3.2 |
$2700.00 |
$7219.54 |
$8640.00 |
05-15-2008 |
07-178504 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
3.2 |
$1850.00 |
$4946.72 |
$5920.00 |
05-15-2008 |
07-178504 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
3.2 |
$1224.00 |
$3272.86 |
$3916.80 |
05-15-2008 |
07-178504 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
3.2 |
$500.00 |
$1336.95 |
$1600.00 |
05-15-2008 |
07-178504 |
4 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
3.2 |
$2400.00 |
$6417.37 |
$7680.00 |
05-15-2008 |
07-178504 |
5 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
3.2 |
$1800.00 |
$4813.03 |
$5760.00 |
05-15-2008 |
07-178504 |
6 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
3.2 |
$3500.00 |
$9358.67 |
$11200.00 |
05-15-2008 |
07-178504 |
7 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
3.2 |
$2750.00 |
$7353.24 |
$8800.00 |
05-15-2008 |
07-178504 |
8 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
3.2 |
$2000.00 |
$5347.81 |
$6400.00 |
05-15-2008 |
07-178504 |
9 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
03 |
72 |
$1300.00 |
$3476.08 |
$93600.00 |
05-21-2008 |
03-3338U4 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
03 |
72 |
$1200.00 |
$3208.69 |
$86400.00 |
05-21-2008 |
03-3338U4 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
03 |
72 |
$1000.00 |
$2673.91 |
$72000.00 |
05-21-2008 |
03-3338U4 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
03 |
72 |
$900.00 |
$2406.51 |
$64800.00 |
05-21-2008 |
03-3338U4 |
4 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
11 |
70 |
$1200.00 |
$3208.69 |
$84000.00 |
06-19-2008 |
11-2T0824 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
11 |
70 |
$800.00 |
$2139.12 |
$56000.00 |
06-19-2008 |
11-2T0824 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
11 |
70 |
$1650.00 |
$4411.94 |
$115500.00 |
06-19-2008 |
11-2T0824 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
11 |
70 |
$900.00 |
$2406.51 |
$63000.00 |
06-19-2008 |
11-2T0824 |
4 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
11 |
70 |
$1000.00 |
$2673.91 |
$70000.00 |
06-19-2008 |
11-2T0824 |
5 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
11 |
70 |
$800.00 |
$2139.12 |
$56000.00 |
06-19-2008 |
11-2T0824 |
6 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
11 |
70 |
$1064.00 |
$2845.04 |
$74480.00 |
06-19-2008 |
11-2T0824 |
7 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
07 |
36 |
$1000.00 |
$2673.91 |
$36000.00 |
07-31-2008 |
07-1189G4 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
07 |
36 |
$1010.60 |
$2702.25 |
$36381.60 |
07-31-2008 |
07-1189G4 |
2 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
07 |
36 |
$1150.00 |
$3074.99 |
$41400.00 |
07-31-2008 |
07-1189G4 |
3 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
07 |
36 |
$2251.00 |
$6018.96 |
$81036.00 |
07-31-2008 |
07-1189G4 |
4 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
07 |
36 |
$1250.00 |
$3342.38 |
$45000.00 |
07-31-2008 |
07-1189G4 |
5 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
01 |
24 |
$850.00 |
$2272.82 |
$20400.00 |
09-30-2008 |
01-290304 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
01 |
24 |
$2900.00 |
$7754.32 |
$69600.00 |
09-30-2008 |
01-290304 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
01 |
24 |
$1400.00 |
$3743.47 |
$33600.00 |
09-30-2008 |
01-290304 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
8 |
$400.00 |
$1274.17 |
$3200.00 |
04-23-2009 |
07-235504 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
8 |
$730.00 |
$2325.37 |
$5840.00 |
04-23-2009 |
07-235504 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
8 |
$625.00 |
$1990.90 |
$5000.00 |
04-23-2009 |
07-235504 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
8 |
$450.00 |
$1433.45 |
$3600.00 |
04-23-2009 |
07-235504 |
4 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
8 |
$600.00 |
$1911.26 |
$4800.00 |
04-23-2009 |
07-235504 |
5 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
8 |
$1056.00 |
$3363.82 |
$8448.00 |
04-23-2009 |
07-235504 |
6 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
8 |
$1300.00 |
$4141.07 |
$10400.00 |
04-23-2009 |
07-235504 |
7 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
8 |
$850.00 |
$2707.62 |
$6800.00 |
04-23-2009 |
07-235504 |
8 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
8 |
$535.00 |
$1704.21 |
$4280.00 |
04-23-2009 |
07-235504 |
9 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
8 |
$1000.00 |
$3185.43 |
$8000.00 |
04-23-2009 |
07-235504 |
10 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
8 |
$528.00 |
$1681.91 |
$4224.00 |
04-23-2009 |
07-235504 |
11 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
8 |
$840.00 |
$2675.77 |
$6720.00 |
04-23-2009 |
07-235504 |
12 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
8 |
$1300.00 |
$4141.07 |
$10400.00 |
04-23-2009 |
07-235504 |
13 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
01 |
21 |
$700.00 |
$2229.80 |
$14700.00 |
05-06-2009 |
01-380504 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
01 |
21 |
$860.00 |
$2739.47 |
$18060.00 |
05-06-2009 |
01-380504 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
01 |
21 |
$458.00 |
$1458.93 |
$9618.00 |
05-06-2009 |
01-380504 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
01 |
21 |
$1400.00 |
$4459.61 |
$29400.00 |
05-06-2009 |
01-380504 |
4 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
01 |
21 |
$1111.00 |
$3539.02 |
$23331.00 |
05-06-2009 |
01-380504 |
5 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
01 |
21 |
$1200.00 |
$3822.52 |
$25200.00 |
05-06-2009 |
01-380504 |
6 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
04 |
64 |
$820.00 |
$2612.06 |
$52480.00 |
06-09-2009 |
04-171334 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
04 |
64 |
$350.00 |
$1114.90 |
$22400.00 |
06-09-2009 |
04-171334 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
04 |
64 |
$950.00 |
$3026.16 |
$60800.00 |
06-09-2009 |
04-171334 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
04 |
64 |
$900.00 |
$2866.89 |
$57600.00 |
06-09-2009 |
04-171334 |
4 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
04 |
64 |
$900.00 |
$2866.89 |
$57600.00 |
06-09-2009 |
04-171334 |
5 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
04 |
64 |
$1000.00 |
$3185.43 |
$64000.00 |
06-09-2009 |
04-171334 |
6 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
04 |
64 |
$1200.00 |
$3822.52 |
$76800.00 |
06-09-2009 |
04-171334 |
7 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
04 |
64 |
$800.00 |
$2548.35 |
$51200.00 |
06-09-2009 |
04-171334 |
8 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
04 |
64 |
$1200.00 |
$3822.52 |
$76800.00 |
06-09-2009 |
04-171334 |
9 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
04 |
64 |
$1500.00 |
$4778.15 |
$96000.00 |
06-09-2009 |
04-171334 |
10 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
04 |
32 |
$900.00 |
$2866.89 |
$28800.00 |
08-12-2009 |
04-4A8704 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
04 |
32 |
$1250.00 |
$3981.79 |
$40000.00 |
08-12-2009 |
04-4A8704 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
04 |
32 |
$1200.00 |
$3822.52 |
$38400.00 |
08-12-2009 |
04-4A8704 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
04 |
32 |
$1250.00 |
$3981.79 |
$40000.00 |
08-12-2009 |
04-4A8704 |
4 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
04 |
32 |
$1000.00 |
$3185.43 |
$32000.00 |
08-12-2009 |
04-4A8704 |
5 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
04 |
32 |
$1500.00 |
$4778.15 |
$48000.00 |
08-12-2009 |
04-4A8704 |
6 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
04 |
32 |
$500.00 |
$1592.72 |
$16000.00 |
08-12-2009 |
04-4A8704 |
7 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
24 |
$1900.00 |
$6052.33 |
$45600.00 |
10-01-2009 |
07-2411U4 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
24 |
$810.00 |
$2580.20 |
$19440.00 |
10-01-2009 |
07-2411U4 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
24 |
$1000.00 |
$3185.43 |
$24000.00 |
10-01-2009 |
07-2411U4 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
24 |
$1200.00 |
$3822.52 |
$28800.00 |
10-01-2009 |
07-2411U4 |
4 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
24 |
$2900.00 |
$9237.76 |
$69600.00 |
10-01-2009 |
07-2411U4 |
5 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
24 |
$500.00 |
$1592.72 |
$12000.00 |
10-01-2009 |
07-2411U4 |
6 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
24 |
$650.00 |
$2070.53 |
$15600.00 |
10-01-2009 |
07-2411U4 |
7 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
05 |
3 |
$1000.00 |
$3185.43 |
$3000.00 |
11-03-2009 |
05-0L70U4 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
05 |
3 |
$1025.00 |
$3265.07 |
$3075.00 |
11-03-2009 |
05-0L70U4 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
05 |
3 |
$1000.00 |
$3185.43 |
$3000.00 |
11-03-2009 |
05-0L70U4 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
05 |
3 |
$1400.00 |
$4459.61 |
$4200.00 |
11-03-2009 |
05-0L70U4 |
4 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
05 |
3 |
$2000.00 |
$6370.87 |
$6000.00 |
11-03-2009 |
05-0L70U4 |
5 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
05 |
3 |
$2600.00 |
$8282.13 |
$7800.00 |
11-03-2009 |
05-0L70U4 |
6 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
05 |
3 |
$2000.00 |
$6370.87 |
$6000.00 |
11-03-2009 |
05-0L70U4 |
7 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
05 |
3 |
$4100.00 |
$13060.28 |
$12300.00 |
11-03-2009 |
05-0L70U4 |
8 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
05 |
3 |
$2000.00 |
$6370.87 |
$6000.00 |
11-03-2009 |
05-0L70U4 |
9 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
05 |
59 |
$1200.00 |
$3822.52 |
$70800.00 |
11-17-2009 |
05-0M14U4 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
05 |
59 |
$1200.00 |
$3822.52 |
$70800.00 |
11-17-2009 |
05-0M14U4 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
05 |
59 |
$770.00 |
$2452.78 |
$45430.00 |
11-17-2009 |
05-0M14U4 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
05 |
59 |
$1200.00 |
$3822.52 |
$70800.00 |
11-17-2009 |
05-0M14U4 |
4 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
05 |
59 |
$1550.00 |
$4937.42 |
$91450.00 |
11-17-2009 |
05-0M14U4 |
5 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
05 |
59 |
$680.00 |
$2166.10 |
$40120.00 |
11-17-2009 |
05-0M14U4 |
6 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
05 |
59 |
$770.00 |
$2452.78 |
$45430.00 |
11-17-2009 |
05-0M14U4 |
7 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
05 |
59 |
$250.00 |
$796.36 |
$14750.00 |
11-17-2009 |
05-0M14U4 |
8 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
6 |
$2100.00 |
$6689.41 |
$12600.00 |
02-18-2010 |
07-1219U4 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
6 |
$500.00 |
$1592.72 |
$3000.00 |
02-18-2010 |
07-1219U4 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
6 |
$1450.00 |
$4618.88 |
$8700.00 |
02-18-2010 |
07-1219U4 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
6 |
$1775.00 |
$5654.15 |
$10650.00 |
02-18-2010 |
07-1219U4 |
4 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
6 |
$1300.00 |
$4141.07 |
$7800.00 |
02-18-2010 |
07-1219U4 |
5 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
6 |
$950.00 |
$3026.16 |
$5700.00 |
02-18-2010 |
07-1219U4 |
6 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
6 |
$1300.00 |
$4141.07 |
$7800.00 |
02-18-2010 |
07-1219U4 |
7 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
6 |
$1200.00 |
$3822.52 |
$7200.00 |
02-18-2010 |
07-1219U4 |
8 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
03 |
28 |
$1000.00 |
$3185.43 |
$28000.00 |
04-07-2010 |
03-1A4324 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
03 |
28 |
$800.00 |
$2548.35 |
$22400.00 |
04-07-2010 |
03-1A4324 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
03 |
28 |
$850.00 |
$2707.62 |
$23800.00 |
04-07-2010 |
03-1A4324 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
03 |
28 |
$900.00 |
$2866.89 |
$25200.00 |
04-07-2010 |
03-1A4324 |
4 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
03 |
28 |
$1000.00 |
$3185.43 |
$28000.00 |
04-07-2010 |
03-1A4324 |
5 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
03 |
28 |
$200.00 |
$637.09 |
$5600.00 |
04-07-2010 |
03-1A4324 |
6 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
03 |
28 |
$700.00 |
$2229.80 |
$19600.00 |
04-07-2010 |
03-1A4324 |
7 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
03 |
28 |
$750.00 |
$2389.08 |
$21000.00 |
04-07-2010 |
03-1A4324 |
8 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
03 |
28 |
$1400.00 |
$4459.61 |
$39200.00 |
04-07-2010 |
03-1A4324 |
9 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
02 |
21 |
$800.00 |
$2548.35 |
$16800.00 |
04-13-2010 |
02-373104 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
02 |
21 |
$2200.00 |
$7007.96 |
$46200.00 |
04-13-2010 |
02-373104 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
02 |
21 |
$1000.00 |
$3185.43 |
$21000.00 |
04-13-2010 |
02-373104 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
02 |
21 |
$1400.00 |
$4459.61 |
$29400.00 |
04-13-2010 |
02-373104 |
4 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
02 |
21 |
$900.00 |
$2866.89 |
$18900.00 |
04-13-2010 |
02-373104 |
5 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
02 |
21 |
$1000.00 |
$3185.43 |
$21000.00 |
04-13-2010 |
02-373104 |
6 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
04 |
22 |
$1100.00 |
$3503.98 |
$24200.00 |
10-27-2010 |
04-174414 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
04 |
22 |
$900.00 |
$2866.89 |
$19800.00 |
10-27-2010 |
04-174414 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
04 |
22 |
$900.00 |
$2866.89 |
$19800.00 |
10-27-2010 |
04-174414 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
04 |
22 |
$525.00 |
$1672.35 |
$11550.00 |
10-27-2010 |
04-174414 |
4 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
04 |
22 |
$1100.00 |
$3503.98 |
$24200.00 |
10-27-2010 |
04-174414 |
5 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
04 |
22 |
$1400.00 |
$4459.61 |
$30800.00 |
10-27-2010 |
04-174414 |
6 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
04 |
22 |
$1664.00 |
$5300.56 |
$36608.00 |
10-27-2010 |
04-174414 |
7 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
04 |
22 |
$1500.00 |
$4778.15 |
$33000.00 |
10-27-2010 |
04-174414 |
8 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
4 |
$1700.00 |
$4827.54 |
$6800.00 |
04-28-2011 |
07-241304 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
4 |
$1725.00 |
$4898.53 |
$6900.00 |
04-28-2011 |
07-241304 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
4 |
$1060.00 |
$3010.11 |
$4240.00 |
04-28-2011 |
07-241304 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
4 |
$1400.00 |
$3975.62 |
$5600.00 |
04-28-2011 |
07-241304 |
4 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
4 |
$2100.00 |
$5963.43 |
$8400.00 |
04-28-2011 |
07-241304 |
5 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
07 |
4 |
$900.00 |
$2555.76 |
$3600.00 |
04-28-2011 |
07-241304 |
6 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
13 |
$1188.00 |
$3373.60 |
$15444.00 |
10-25-2011 |
04-298304 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
13 |
$1000.00 |
$2839.73 |
$13000.00 |
10-25-2011 |
04-298304 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
13 |
$950.00 |
$2697.74 |
$12350.00 |
10-25-2011 |
04-298304 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
13 |
$1100.00 |
$3123.70 |
$14300.00 |
10-25-2011 |
04-298304 |
4 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
13 |
$800.00 |
$2271.78 |
$10400.00 |
10-25-2011 |
04-298304 |
5 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
13 |
$800.00 |
$2271.78 |
$10400.00 |
10-25-2011 |
04-298304 |
6 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
07 |
72 |
$760.00 |
$2187.87 |
$54720.00 |
02-29-2012 |
07-293904 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
07 |
72 |
$700.00 |
$2015.15 |
$50400.00 |
02-29-2012 |
07-293904 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
07 |
72 |
$1100.00 |
$3166.66 |
$79200.00 |
02-29-2012 |
07-293904 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
07 |
72 |
$700.00 |
$2015.15 |
$50400.00 |
02-29-2012 |
07-293904 |
4 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
07 |
72 |
$900.00 |
$2590.90 |
$64800.00 |
02-29-2012 |
07-293904 |
5 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
07 |
72 |
$1000.00 |
$2878.78 |
$72000.00 |
02-29-2012 |
07-293904 |
6 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
07 |
72 |
$650.00 |
$1871.21 |
$46800.00 |
02-29-2012 |
07-293904 |
7 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
03 |
24 |
$500.00 |
$1374.58 |
$12000.00 |
04-11-2012 |
03-333824 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
03 |
24 |
$1000.00 |
$2749.16 |
$24000.00 |
04-11-2012 |
03-333824 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
03 |
24 |
$1000.00 |
$2749.16 |
$24000.00 |
04-11-2012 |
03-333824 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
03 |
24 |
$600.00 |
$1649.49 |
$14400.00 |
04-11-2012 |
03-333824 |
4 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
05 |
75 |
$866.00 |
$2380.77 |
$64950.00 |
05-08-2012 |
05-330774 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
05 |
75 |
$800.00 |
$2199.32 |
$60000.00 |
05-08-2012 |
05-330774 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
05 |
75 |
$866.00 |
$2380.77 |
$64950.00 |
05-08-2012 |
05-330774 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
05 |
75 |
$600.00 |
$1649.49 |
$45000.00 |
05-08-2012 |
05-330774 |
4 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
05 |
75 |
$670.00 |
$1841.93 |
$50250.00 |
05-08-2012 |
05-330774 |
5 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
05 |
75 |
$1430.00 |
$3931.29 |
$107250.00 |
05-08-2012 |
05-330774 |
6 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
05 |
75 |
$700.00 |
$1924.41 |
$52500.00 |
05-08-2012 |
05-330774 |
7 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
01 |
16 |
$1350.00 |
$4366.79 |
$21600.00 |
07-10-2012 |
01-262004 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
01 |
16 |
$1400.00 |
$4528.52 |
$22400.00 |
07-10-2012 |
01-262004 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
01 |
16 |
$1000.00 |
$3234.66 |
$16000.00 |
07-10-2012 |
01-262004 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
01 |
16 |
$1500.00 |
$4851.99 |
$24000.00 |
07-10-2012 |
01-262004 |
4 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
01 |
16 |
$1000.00 |
$3234.66 |
$16000.00 |
07-10-2012 |
01-262004 |
5 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
M3 |
01 |
16 |
$300.00 |
$970.40 |
$4800.00 |
07-10-2012 |
01-262004 |
6 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
07 |
25 |
$650.00 |
$2102.53 |
$16250.00 |
07-26-2012 |
07-215934 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
07 |
25 |
$750.00 |
$2425.99 |
$18750.00 |
07-26-2012 |
07-215934 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
07 |
25 |
$700.00 |
$2264.26 |
$17500.00 |
07-26-2012 |
07-215934 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
07 |
25 |
$500.00 |
$1617.33 |
$12500.00 |
07-26-2012 |
07-215934 |
4 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
07 |
25 |
$1010.00 |
$3267.00 |
$25250.00 |
07-26-2012 |
07-215934 |
5 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
07 |
25 |
$850.00 |
$2749.46 |
$21250.00 |
07-26-2012 |
07-215934 |
6 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
07 |
25 |
$750.00 |
$2425.99 |
$18750.00 |
07-26-2012 |
07-215934 |
7 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
12 |
70 |
$600.00 |
$1940.79 |
$42000.00 |
08-02-2012 |
12-0E3104 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
12 |
70 |
$780.00 |
$2523.03 |
$54600.00 |
08-02-2012 |
12-0E3104 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
12 |
70 |
$612.00 |
$1979.61 |
$42840.00 |
08-02-2012 |
12-0E3104 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
12 |
70 |
$600.00 |
$1940.79 |
$42000.00 |
08-02-2012 |
12-0E3104 |
4 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
12 |
70 |
$300.00 |
$970.40 |
$21000.00 |
08-02-2012 |
12-0E3104 |
5 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
12 |
70 |
$971.00 |
$3140.85 |
$67970.00 |
08-02-2012 |
12-0E3104 |
6 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
7 |
$1700.00 |
$5498.92 |
$11900.00 |
08-14-2012 |
04-264074 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
7 |
$1000.00 |
$3234.66 |
$7000.00 |
08-14-2012 |
04-264074 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
7 |
$2000.00 |
$6469.32 |
$14000.00 |
08-14-2012 |
04-264074 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
7 |
$750.00 |
$2425.99 |
$5250.00 |
08-14-2012 |
04-264074 |
4 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
7 |
$500.00 |
$1617.33 |
$3500.00 |
08-14-2012 |
04-264074 |
5 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
05 |
46 |
$700.00 |
$2264.26 |
$32200.00 |
08-24-2012 |
05-315804 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
05 |
46 |
$790.00 |
$2555.38 |
$36340.00 |
08-24-2012 |
05-315804 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
05 |
46 |
$300.00 |
$970.40 |
$13800.00 |
08-24-2012 |
05-315804 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
05 |
46 |
$917.00 |
$2966.18 |
$42182.00 |
08-24-2012 |
05-315804 |
4 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
05 |
46 |
$650.00 |
$2102.53 |
$29900.00 |
08-24-2012 |
05-315804 |
5 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
10 |
54 |
$750.00 |
$2425.99 |
$40500.00 |
09-12-2012 |
10-0E6134 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
10 |
54 |
$700.00 |
$2264.26 |
$37800.00 |
09-12-2012 |
10-0E6134 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
10 |
54 |
$950.00 |
$3072.92 |
$51300.00 |
09-12-2012 |
10-0E6134 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
07 |
290 |
$645.00 |
$1607.34 |
$187050.00 |
10-04-2012 |
07-1218W4 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
07 |
290 |
$350.00 |
$872.20 |
$101500.00 |
10-04-2012 |
07-1218W4 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
07 |
290 |
$250.00 |
$623.00 |
$72500.00 |
10-04-2012 |
07-1218W4 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
07 |
290 |
$300.00 |
$747.60 |
$87000.00 |
10-04-2012 |
07-1218W4 |
4 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
07 |
290 |
$390.00 |
$971.88 |
$113100.00 |
10-04-2012 |
07-1218W4 |
5 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
05 |
2 |
$1601.00 |
$3351.35 |
$3202.00 |
01-23-2013 |
05-0L7014 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
05 |
2 |
$2000.00 |
$4186.57 |
$4000.00 |
01-23-2013 |
05-0L7014 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
05 |
2 |
$1000.00 |
$2093.29 |
$2000.00 |
01-23-2013 |
05-0L7014 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
06 |
202 |
$850.00 |
$1779.29 |
$171700.00 |
03-26-2013 |
06-342524 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
06 |
202 |
$1000.00 |
$2093.29 |
$202000.00 |
03-26-2013 |
06-342524 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
06 |
202 |
$825.56 |
$1728.13 |
$166763.12 |
03-26-2013 |
06-342524 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
06 |
202 |
$810.00 |
$1695.56 |
$163620.00 |
03-26-2013 |
06-342524 |
4 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
06 |
202 |
$1000.00 |
$2093.29 |
$202000.00 |
03-26-2013 |
06-342524 |
5 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
06 |
202 |
$900.00 |
$1883.96 |
$181800.00 |
03-26-2013 |
06-342524 |
6 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
06 |
202 |
$1000.00 |
$2093.29 |
$202000.00 |
03-26-2013 |
06-342524 |
7 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
06 |
202 |
$1000.00 |
$2093.29 |
$202000.00 |
03-26-2013 |
06-342524 |
8 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
06 |
202 |
$300.00 |
$627.99 |
$60600.00 |
03-26-2013 |
06-342524 |
9 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
05 |
35 |
$1250.00 |
$2779.40 |
$43750.00 |
10-15-2013 |
05-0G0704 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
05 |
35 |
$900.00 |
$2001.17 |
$31500.00 |
10-15-2013 |
05-0G0704 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
93 |
$800.00 |
$1778.82 |
$74400.00 |
11-20-2013 |
04-0A5344 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
93 |
$975.00 |
$2167.93 |
$90675.00 |
11-20-2013 |
04-0A5344 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
93 |
$1000.00 |
$2223.52 |
$93000.00 |
11-20-2013 |
04-0A5344 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
93 |
$700.00 |
$1556.46 |
$65100.00 |
11-20-2013 |
04-0A5344 |
4 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
93 |
$925.00 |
$2056.76 |
$86025.00 |
11-20-2013 |
04-0A5344 |
5 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
93 |
$1000.00 |
$2223.52 |
$93000.00 |
11-20-2013 |
04-0A5344 |
6 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
93 |
$1200.00 |
$2668.22 |
$111600.00 |
11-20-2013 |
04-0A5344 |
7 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
37 |
$1000.00 |
$1782.39 |
$37000.00 |
02-04-2014 |
04-265604 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
37 |
$1000.00 |
$1782.39 |
$37000.00 |
02-04-2014 |
04-265604 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
37 |
$1300.00 |
$2317.10 |
$48100.00 |
02-04-2014 |
04-265604 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
37 |
$900.00 |
$1604.15 |
$33300.00 |
02-04-2014 |
04-265604 |
4 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
37 |
$1400.00 |
$2495.34 |
$51800.00 |
02-04-2014 |
04-265604 |
5 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
37 |
$1200.00 |
$2138.86 |
$44400.00 |
02-04-2014 |
04-265604 |
6 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
37 |
$500.00 |
$891.19 |
$18500.00 |
02-04-2014 |
04-265604 |
7 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
27 |
$1000.00 |
$1526.04 |
$27000.00 |
01-21-2015 |
04-4A0904 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
27 |
$900.00 |
$1373.43 |
$24300.00 |
01-21-2015 |
04-4A0904 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
27 |
$1000.00 |
$1526.04 |
$27000.00 |
01-21-2015 |
04-4A0904 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
27 |
$1800.00 |
$2746.87 |
$48600.00 |
01-21-2015 |
04-4A0904 |
4 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
27 |
$1250.00 |
$1907.55 |
$33750.00 |
01-21-2015 |
04-4A0904 |
5 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
27 |
$1200.00 |
$1831.24 |
$32400.00 |
01-21-2015 |
04-4A0904 |
6 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
27 |
$1500.00 |
$2289.05 |
$40500.00 |
01-21-2015 |
04-4A0904 |
7 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
27 |
$1000.00 |
$1526.04 |
$27000.00 |
01-21-2015 |
04-4A0904 |
8 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
27 |
$1200.00 |
$1831.24 |
$32400.00 |
01-21-2015 |
04-4A0904 |
9 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
05 |
72 |
$1380.00 |
$2942.11 |
$99360.00 |
04-16-2015 |
05-492804 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
05 |
72 |
$900.00 |
$1918.77 |
$64800.00 |
04-16-2015 |
05-492804 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
05 |
72 |
$1200.00 |
$2558.36 |
$86400.00 |
04-16-2015 |
05-492804 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
05 |
72 |
$1200.00 |
$2558.36 |
$86400.00 |
04-16-2015 |
05-492804 |
4 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
05 |
72 |
$850.00 |
$1812.17 |
$61200.00 |
04-16-2015 |
05-492804 |
5 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
55 |
$850.00 |
$1248.88 |
$46750.00 |
02-15-2017 |
04-3G6414 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
55 |
$900.00 |
$1322.34 |
$49500.00 |
02-15-2017 |
04-3G6414 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
55 |
$600.00 |
$881.56 |
$33000.00 |
02-15-2017 |
04-3G6414 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
55 |
$1250.00 |
$1836.58 |
$68750.00 |
02-15-2017 |
04-3G6414 |
4 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
55 |
$1500.00 |
$2203.90 |
$82500.00 |
02-15-2017 |
04-3G6414 |
5 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
55 |
$1500.00 |
$2203.90 |
$82500.00 |
02-15-2017 |
04-3G6414 |
6 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
55 |
$915.00 |
$1344.38 |
$50325.00 |
02-15-2017 |
04-3G6414 |
7 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
55 |
$905.00 |
$1329.69 |
$49775.00 |
02-15-2017 |
04-3G6414 |
8 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
29 |
$900.00 |
$1309.08 |
$26100.00 |
04-03-2018 |
04-4S7804 |
1 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
29 |
$1200.00 |
$1745.44 |
$34800.00 |
04-03-2018 |
04-4S7804 |
2 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
29 |
$1000.00 |
$1454.54 |
$29000.00 |
04-03-2018 |
04-4S7804 |
3 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
29 |
$1600.00 |
$2327.26 |
$46400.00 |
04-03-2018 |
04-4S7804 |
4 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
29 |
$1650.00 |
$2399.99 |
$47850.00 |
04-03-2018 |
04-4S7804 |
5 |
M |
|
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
47 |
$1000.00 |
$1740.47 |
$47000.00 |
01-09-2019 |
04-1G4304 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
47 |
$1400.00 |
$2436.66 |
$65800.00 |
01-09-2019 |
04-1G4304 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
47 |
$1100.00 |
$1914.51 |
$51700.00 |
01-09-2019 |
04-1G4304 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
47 |
$590.00 |
$1026.88 |
$27730.00 |
01-09-2019 |
04-1G4304 |
4 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
47 |
$1300.00 |
$2262.61 |
$61100.00 |
01-09-2019 |
04-1G4304 |
5 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
04 |
47 |
$1407.00 |
$2448.84 |
$66129.00 |
01-09-2019 |
04-1G4304 |
6 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
03 |
51 |
$1000.00 |
$1309.82 |
$51000.00 |
09-25-2019 |
03-3F5104 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
03 |
51 |
$1650.00 |
$2161.21 |
$84150.00 |
09-25-2019 |
03-3F5104 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
03 |
51 |
$1000.00 |
$1309.82 |
$51000.00 |
09-25-2019 |
03-3F5104 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
03 |
51 |
$1200.00 |
$1571.79 |
$61200.00 |
09-25-2019 |
03-3F5104 |
4 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
03 |
51 |
$1600.00 |
$2095.72 |
$81600.00 |
09-25-2019 |
03-3F5104 |
5 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
03 |
51 |
$894.00 |
$1170.98 |
$45594.00 |
09-25-2019 |
03-3F5104 |
6 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
03 |
51 |
$1200.00 |
$1571.79 |
$61200.00 |
09-25-2019 |
03-3F5104 |
7 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
01 |
53 |
$1700.00 |
$2075.50 |
$90100.00 |
03-26-2020 |
01-0B0904 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
01 |
53 |
$1400.00 |
$1709.23 |
$74200.00 |
03-26-2020 |
01-0B0904 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
01 |
53 |
$6078.00 |
$7420.51 |
$322134.00 |
03-26-2020 |
01-0B0904 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
01 |
53 |
$2100.00 |
$2563.85 |
$111300.00 |
03-26-2020 |
01-0B0904 |
4 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
01 |
53 |
$767.00 |
$936.41 |
$40651.00 |
03-26-2020 |
01-0B0904 |
5 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
05 |
55 |
$2100.00 |
$3675.50 |
$115500.00 |
07-29-2021 |
05-1G2604 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
05 |
55 |
$700.00 |
$1225.17 |
$38500.00 |
07-29-2021 |
05-1G2604 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
05 |
55 |
$1200.00 |
$2100.29 |
$66000.00 |
07-29-2021 |
05-1G2604 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
05 |
55 |
$1600.00 |
$2800.38 |
$88000.00 |
07-29-2021 |
05-1G2604 |
4 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
05 |
55 |
$1700.00 |
$2975.41 |
$93500.00 |
07-29-2021 |
05-1G2604 |
5 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
01 |
9 |
$3500.00 |
$6125.84 |
$31500.00 |
08-31-2021 |
01-0E0814 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
01 |
9 |
$2800.00 |
$4900.67 |
$25200.00 |
08-31-2021 |
01-0E0814 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
01 |
9 |
$1600.00 |
$2800.38 |
$14400.00 |
08-31-2021 |
01-0E0814 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
01 |
9 |
$1400.00 |
$2450.33 |
$12600.00 |
08-31-2021 |
01-0E0814 |
4 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
03 |
31 |
$2500.00 |
$2724.01 |
$77500.00 |
01-19-2023 |
03-3H5404 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
03 |
31 |
$3300.00 |
$3595.69 |
$102300.00 |
01-19-2023 |
03-3H5404 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
03 |
31 |
$3300.00 |
$3595.69 |
$102300.00 |
01-19-2023 |
03-3H5404 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
01 |
24 |
$2500.00 |
$2724.01 |
$60000.00 |
02-09-2023 |
01-0C5004 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
01 |
24 |
$1389.44 |
$1513.94 |
$33346.56 |
02-09-2023 |
01-0C5004 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
01 |
24 |
$2112.00 |
$2301.24 |
$50688.00 |
02-09-2023 |
01-0C5004 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
01 |
24 |
$2400.00 |
$2615.05 |
$57600.00 |
02-09-2023 |
01-0C5004 |
4 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
01 |
24 |
$2450.00 |
$2669.53 |
$58800.00 |
02-09-2023 |
01-0C5004 |
5 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
01 |
24 |
$3000.00 |
$3268.81 |
$72000.00 |
02-09-2023 |
01-0C5004 |
6 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
05 |
30 |
$780.00 |
$911.36 |
$23400.00 |
04-27-2023 |
05-0C7334 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
05 |
30 |
$2000.00 |
$2336.82 |
$60000.00 |
04-27-2023 |
05-0C7334 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
02 |
47 |
$2412.00 |
$2018.22 |
$113364.00 |
07-27-2023 |
02-1H5904 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
02 |
47 |
$2500.00 |
$2091.85 |
$117500.00 |
07-27-2023 |
02-1H5904 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
02 |
47 |
$1232.00 |
$1030.86 |
$57904.00 |
07-27-2023 |
02-1H5904 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
02 |
47 |
$2200.00 |
$1840.83 |
$103400.00 |
07-27-2023 |
02-1H5904 |
4 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
02 |
47 |
$1800.00 |
$1506.13 |
$84600.00 |
07-27-2023 |
02-1H5904 |
5 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
02 |
30 |
$2500.00 |
$1920.75 |
$75000.00 |
02-01-2024 |
02-1H3604 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
02 |
30 |
$2200.00 |
$1690.26 |
$66000.00 |
02-01-2024 |
02-1H3604 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
05 |
60 |
$1800.00 |
$1291.33 |
$108000.00 |
06-04-2025 |
05-1H4704 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
05 |
60 |
$2400.00 |
$1721.77 |
$144000.00 |
06-04-2025 |
05-1H4704 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
05 |
60 |
$3000.00 |
$2152.22 |
$180000.00 |
06-04-2025 |
05-1H4704 |
3 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
05 |
60 |
$2100.00 |
$1506.55 |
$126000.00 |
06-04-2025 |
05-1H4704 |
4 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
05 |
60 |
$1600.00 |
$1147.85 |
$96000.00 |
06-04-2025 |
05-1H4704 |
5 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
05 |
60 |
$2000.00 |
$1434.81 |
$120000.00 |
06-04-2025 |
05-1H4704 |
6 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
11 |
8 |
$5100.00 |
$4484.80 |
$40800.00 |
08-14-2025 |
11-430234 |
1 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
11 |
8 |
$3585.00 |
$3152.55 |
$28680.00 |
08-14-2025 |
11-430234 |
2 |
M |
TRO |
|
| 510085 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ) |
CY |
11 |
8 |
$4600.00 |
$4045.12 |
$36800.00 |
08-14-2025 |
11-430234 |
3 |
M |
TRO |