CALIFORNIA DEPARTMENT OF TRANSPORTATION - CONTRACT COST DATA

Select Item No. / Description Unit Dist Qty Unit
Price
Adj
Price
Total Bid Open
Date
Contract
No.
Bid M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 12 252 $250.00 $1356.76 $63000.00 04-07-1994 12-107224 1 M  
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 12 188 $475.00 $2320.06 $89300.00 05-21-1999 12-069514 1 M  
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 08 78 $650.00 $3082.35 $50700.00 10-26-2000 08-340804 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 04 150 $500.00 $2240.52 $75000.00 01-14-2003 04-253804 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 08 64 $290.00 $1299.50 $18560.00 01-30-2003 08-483754 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 10 41 $1100.00 $4929.14 $45100.00 11-18-2003 10-263414 1 M  
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 10 41 $1000.00 $4481.04 $41000.00 11-18-2003 10-263414 2 M  
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 04 190 $900.00 $2321.78 $171000.00 11-02-2005 04-263904 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 04 190 $950.00 $2450.77 $180500.00 11-02-2005 04-263904 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 04 190 $910.00 $2347.58 $172900.00 11-02-2005 04-263904 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 04 190 $782.00 $2017.37 $148580.00 11-02-2005 04-263904 4 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 10 24 $1000.00 $2492.01 $24000.00 10-31-2006 10-3A1204 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 10 24 $800.00 $1993.61 $19200.00 10-31-2006 10-3A1204 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 10 24 $1200.00 $2990.41 $28800.00 10-31-2006 10-3A1204 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 10 24 $1500.00 $3738.01 $36000.00 10-31-2006 10-3A1204 4 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 10 24 $800.00 $1993.61 $19200.00 10-31-2006 10-3A1204 5 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 12 220 $830.00 $2068.37 $182600.00 11-02-2006 12-056214 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 12 220 $1000.00 $2492.01 $220000.00 11-02-2006 12-056214 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 12 220 $500.00 $1246.00 $110000.00 11-02-2006 12-056214 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 12 220 $930.00 $2317.57 $204600.00 11-02-2006 12-056214 4 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 12 220 $600.00 $1495.20 $132000.00 11-02-2006 12-056214 5 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 12 220 $800.00 $1993.61 $176000.00 11-02-2006 12-056214 6 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 12 220 $610.00 $1520.12 $134200.00 11-02-2006 12-056214 7 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 12 220 $800.00 $1993.61 $176000.00 11-02-2006 12-056214 8 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 12 220 $975.00 $2429.71 $214500.00 11-02-2006 12-056214 9 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 12 220 $900.00 $2242.81 $198000.00 11-02-2006 12-056214 10 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 06 89 $700.00 $1753.35 $62300.00 04-10-2007 06-419614 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 06 89 $1100.00 $2755.26 $97900.00 04-10-2007 06-419614 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 06 89 $850.00 $2129.07 $75650.00 04-10-2007 06-419614 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 06 89 $700.00 $1753.35 $62300.00 04-10-2007 06-419614 4 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 06 89 $1375.28 $3444.78 $122399.92 04-10-2007 06-419614 5 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 06 89 $825.00 $2066.45 $73425.00 04-10-2007 06-419614 6 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 06 89 $1243.00 $3113.45 $110627.00 04-10-2007 06-419614 7 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 04 10 $1500.00 $3757.18 $15000.00 05-30-2007 04-226144 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 04 10 $1500.00 $3757.18 $15000.00 05-30-2007 04-226144 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 04 10 $300.00 $751.44 $3000.00 05-30-2007 04-226144 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 04 10 $2000.00 $5009.57 $20000.00 05-30-2007 04-226144 4 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 11 515 $830.00 $2078.97 $427450.00 11-15-2007 11-010614 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 11 515 $860.00 $2154.12 $442900.00 11-15-2007 11-010614 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 11 515 $875.00 $2191.69 $450625.00 11-15-2007 11-010614 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 11 515 $700.00 $1753.35 $360500.00 11-15-2007 11-010614 4 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 11 515 $350.00 $876.68 $180250.00 11-15-2007 11-010614 5 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 11 515 $700.00 $1753.35 $360500.00 11-15-2007 11-010614 6 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 11 515 $900.00 $2254.31 $463500.00 11-15-2007 11-010614 7 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 11 515 $900.00 $2254.31 $463500.00 11-15-2007 11-010614 8 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 11 515 $1100.00 $2755.26 $566500.00 11-15-2007 11-010614 9 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 11 50 $800.00 $2139.12 $40000.00 01-10-2008 11-2T0934 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 11 50 $1400.00 $3743.47 $70000.00 01-10-2008 11-2T0934 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 11 50 $670.00 $1791.52 $33500.00 01-10-2008 11-2T0934 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 11 50 $900.00 $2406.51 $45000.00 01-10-2008 11-2T0934 4 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 11 50 $740.00 $1978.69 $37000.00 01-10-2008 11-2T0934 5 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 11 298 $925.00 $2473.36 $275650.00 03-20-2008 11-2T0004 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 11 298 $400.00 $1069.56 $119200.00 03-20-2008 11-2T0004 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 11 298 $800.00 $2139.12 $238400.00 03-20-2008 11-2T0004 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 11 298 $700.00 $1871.73 $208600.00 03-20-2008 11-2T0004 4 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 11 298 $750.00 $2005.43 $223500.00 03-20-2008 11-2T0004 5 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 11 298 $990.00 $2647.17 $295020.00 03-20-2008 11-2T0004 6 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 11 275 $1100.00 $2941.30 $302500.00 10-23-2008 11-2T0814 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 11 275 $865.00 $2312.93 $237875.00 10-23-2008 11-2T0814 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 11 275 $850.00 $2272.82 $233750.00 10-23-2008 11-2T0814 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 11 275 $825.00 $2205.97 $226875.00 10-23-2008 11-2T0814 4 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 11 275 $1300.00 $3476.08 $357500.00 10-23-2008 11-2T0814 5 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 11 69 $500.00 $1592.72 $34500.00 06-25-2009 11-081644 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 11 69 $800.00 $2548.35 $55200.00 06-25-2009 11-081644 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 11 69 $900.00 $2866.89 $62100.00 06-25-2009 11-081644 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 11 69 $700.00 $2229.80 $48300.00 06-25-2009 11-081644 4 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 11 69 $475.00 $1513.08 $32775.00 06-25-2009 11-081644 5 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 11 69 $680.00 $2166.10 $46920.00 06-25-2009 11-081644 6 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 11 69 $1100.00 $3503.98 $75900.00 06-25-2009 11-081644 7 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 11 69 $670.00 $2134.24 $46230.00 06-25-2009 11-081644 8 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 02 210 $700.00 $2229.80 $147000.00 08-04-2009 02-378904 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 02 210 $1100.00 $3503.98 $231000.00 08-04-2009 02-378904 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 02 210 $900.00 $2866.89 $189000.00 08-04-2009 02-378904 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 02 210 $400.00 $1274.17 $84000.00 08-04-2009 02-378904 4 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 02 210 $1210.00 $3854.38 $254100.00 08-04-2009 02-378904 5 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 705 $600.00 $1911.26 $423000.00 10-07-2009 04-163734 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 705 $550.00 $1751.99 $387750.00 10-07-2009 04-163734 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 705 $480.00 $1529.01 $338400.00 10-07-2009 04-163734 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 705 $730.00 $2325.37 $514650.00 10-07-2009 04-163734 4 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 705 $462.00 $1471.67 $325710.00 10-07-2009 04-163734 5 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 705 $1000.00 $3185.43 $705000.00 10-07-2009 04-163734 6 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 705 $550.00 $1751.99 $387750.00 10-07-2009 04-163734 7 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 705 $478.00 $1522.64 $336990.00 10-07-2009 04-163734 8 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 07 241 $800.00 $2548.35 $192800.00 02-18-2010 07-1219U4 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 07 241 $420.00 $1337.88 $101220.00 02-18-2010 07-1219U4 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 07 241 $770.00 $2452.78 $185570.00 02-18-2010 07-1219U4 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 07 241 $955.00 $3042.09 $230155.00 02-18-2010 07-1219U4 4 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 07 241 $650.00 $2070.53 $156650.00 02-18-2010 07-1219U4 5 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 07 241 $800.00 $2548.35 $192800.00 02-18-2010 07-1219U4 6 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 07 241 $750.00 $2389.08 $180750.00 02-18-2010 07-1219U4 7 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 07 241 $600.00 $1911.26 $144600.00 02-18-2010 07-1219U4 8 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 11 15 $875.00 $2787.26 $13125.00 04-30-2010 11-2T0404 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 11 15 $700.00 $2229.80 $10500.00 04-30-2010 11-2T0404 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 11 15 $750.00 $2389.08 $11250.00 04-30-2010 11-2T0404 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 11 15 $1000.00 $3185.43 $15000.00 04-30-2010 11-2T0404 4 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 11 15 $1000.00 $3185.43 $15000.00 04-30-2010 11-2T0404 5 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 11 15 $500.00 $1592.72 $7500.00 04-30-2010 11-2T0404 6 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 06 90 $500.00 $1592.72 $45000.00 06-08-2010 06-471904 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 06 90 $700.00 $2229.80 $63000.00 06-08-2010 06-471904 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 06 90 $650.00 $2070.53 $58500.00 06-08-2010 06-471904 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 06 90 $500.00 $1592.72 $45000.00 06-08-2010 06-471904 4 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 06 90 $766.00 $2440.04 $68940.00 06-08-2010 06-471904 5 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 06 90 $800.00 $2548.35 $72000.00 06-08-2010 06-471904 6 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 06 90 $950.00 $3026.16 $85500.00 06-08-2010 06-471904 7 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 07 227 $628.00 $2000.45 $142556.00 08-05-2010 07-121844 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 07 227 $650.00 $2070.53 $147550.00 08-05-2010 07-121844 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 07 227 $980.00 $3121.73 $222460.00 08-05-2010 07-121844 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 07 227 $595.00 $1895.33 $135065.00 08-05-2010 07-121844 4 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 07 227 $700.00 $2229.80 $158900.00 08-05-2010 07-121844 5 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 07 227 $785.00 $2500.57 $178195.00 08-05-2010 07-121844 6 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 07 227 $840.00 $2675.77 $190680.00 08-05-2010 07-121844 7 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 07 227 $900.00 $2866.89 $204300.00 08-05-2010 07-121844 8 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 11 15 $130.00 $414.11 $1950.00 12-16-2010 11-2T0404 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 11 15 $1000.00 $3185.43 $15000.00 12-16-2010 11-2T0404 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 11 15 $800.00 $2548.35 $12000.00 12-16-2010 11-2T0404 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 11 15 $700.00 $2229.80 $10500.00 12-16-2010 11-2T0404 4 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 11 15 $1355.60 $4318.18 $20334.00 12-16-2010 11-2T0404 5 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 11 15 $750.00 $2389.08 $11250.00 12-16-2010 11-2T0404 6 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 01 97 $1200.00 $3407.67 $116400.00 08-16-2011 01-310104 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 01 97 $250.00 $709.93 $24250.00 08-16-2011 01-310104 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 01 97 $1000.00 $2839.73 $97000.00 08-16-2011 01-310104 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 86 $500.00 $1419.86 $43000.00 09-14-2011 04-2285E4 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 86 $700.00 $1987.81 $60200.00 09-14-2011 04-2285E4 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 86 $400.00 $1135.89 $34400.00 09-14-2011 04-2285E4 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 86 $540.00 $1533.45 $46440.00 09-14-2011 04-2285E4 4 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 86 $435.00 $1235.28 $37410.00 09-14-2011 04-2285E4 5 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 86 $200.00 $567.95 $17200.00 09-14-2011 04-2285E4 6 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 86 $517.00 $1468.14 $44462.00 09-14-2011 04-2285E4 7 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 86 $500.00 $1419.86 $43000.00 09-14-2011 04-2285E4 8 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 86 $600.00 $1703.84 $51600.00 09-14-2011 04-2285E4 9 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 04 37 $1050.00 $2981.72 $38850.00 10-05-2011 04-264044 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 04 37 $950.00 $2697.74 $35150.00 10-05-2011 04-264044 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 04 37 $800.00 $2271.78 $29600.00 10-05-2011 04-264044 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 04 37 $1200.00 $3407.67 $44400.00 10-05-2011 04-264044 4 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 04 37 $309.00 $877.48 $11433.00 10-05-2011 04-264044 5 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 04 37 $1125.00 $3194.69 $41625.00 10-05-2011 04-264044 6 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) M3 04 37 $1900.00 $5395.48 $70300.00 10-05-2011 04-264044 7 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 10 1377 $365.00 $1036.50 $502605.00 11-29-2011 10-481004 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 10 1377 $200.00 $567.95 $275400.00 11-29-2011 10-481004 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 10 1377 $575.00 $1632.84 $791775.00 11-29-2011 10-481004 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 10 1377 $420.00 $1192.69 $578340.00 11-29-2011 10-481004 4 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 10 1377 $500.00 $1419.86 $688500.00 11-29-2011 10-481004 5 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 10 1377 $440.00 $1249.48 $605880.00 11-29-2011 10-481004 6 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 10 1377 $450.00 $1277.88 $619650.00 11-29-2011 10-481004 7 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 10 1377 $900.00 $2555.76 $1239300.00 11-29-2011 10-481004 8 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 249 $750.00 $2129.80 $186750.00 12-14-2011 04-0A5354 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 249 $850.00 $2413.77 $211650.00 12-14-2011 04-0A5354 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 249 $918.00 $2606.87 $228582.00 12-14-2011 04-0A5354 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 249 $800.00 $2271.78 $199200.00 12-14-2011 04-0A5354 4 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 249 $913.00 $2592.67 $227337.00 12-14-2011 04-0A5354 5 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 249 $600.00 $1703.84 $149400.00 12-14-2011 04-0A5354 6 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 249 $250.00 $709.93 $62250.00 12-14-2011 04-0A5354 7 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 249 $650.00 $1845.82 $161850.00 12-14-2011 04-0A5354 8 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 249 $770.00 $2186.59 $191730.00 12-14-2011 04-0A5354 9 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 249 $600.00 $1703.84 $149400.00 12-14-2011 04-0A5354 10 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 57 $950.00 $3072.92 $54150.00 09-19-2012 04-2908C4 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 57 $900.00 $2911.19 $51300.00 09-19-2012 04-2908C4 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 57 $1326.00 $4289.16 $75582.00 09-19-2012 04-2908C4 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 57 $950.00 $3072.92 $54150.00 09-19-2012 04-2908C4 4 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 57 $1500.00 $4851.99 $85500.00 09-19-2012 04-2908C4 5 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 57 $1100.00 $3558.12 $62700.00 09-19-2012 04-2908C4 6 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 57 $1300.00 $4205.06 $74100.00 09-19-2012 04-2908C4 7 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 57 $1200.00 $3881.59 $68400.00 09-19-2012 04-2908C4 8 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 07 750 $492.00 $1226.07 $369000.00 10-04-2012 07-1218W4 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 07 750 $460.00 $1146.32 $345000.00 10-04-2012 07-1218W4 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 07 750 $500.00 $1246.00 $375000.00 10-04-2012 07-1218W4 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 07 750 $300.00 $747.60 $225000.00 10-04-2012 07-1218W4 4 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 07 750 $516.00 $1285.88 $387000.00 10-04-2012 07-1218W4 5 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 46 $850.00 $2118.21 $39100.00 10-05-2012 04-2908V4 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 46 $700.00 $1744.40 $32200.00 10-05-2012 04-2908V4 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 46 $1155.00 $2878.27 $53130.00 10-05-2012 04-2908V4 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 46 $950.00 $2367.41 $43700.00 10-05-2012 04-2908V4 4 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 46 $1000.00 $2492.01 $46000.00 10-05-2012 04-2908V4 5 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 46 $900.00 $2242.81 $41400.00 10-05-2012 04-2908V4 6 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 06 93 $895.00 $2230.35 $83235.00 11-07-2012 06-0K3904 1 M  
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 06 93 $650.00 $1619.80 $60450.00 11-07-2012 06-0K3904 2 M  
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 06 93 $650.00 $1619.80 $60450.00 11-07-2012 06-0K3904 3 M  
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 06 93 $662.00 $1649.71 $61566.00 11-07-2012 06-0K3904 4 M  
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 06 93 $900.00 $2242.81 $83700.00 11-07-2012 06-0K3904 5 M  
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 10 46 $800.00 $2576.35 $36800.00 07-16-2013 10-0G8004 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 10 46 $1000.00 $3220.44 $46000.00 07-16-2013 10-0G8004 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 10 46 $800.00 $2576.35 $36800.00 07-16-2013 10-0G8004 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 10 46 $900.00 $2898.40 $41400.00 07-16-2013 10-0G8004 4 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 10 46 $1200.00 $3864.53 $55200.00 07-16-2013 10-0G8004 5 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 10 46 $1050.00 $3381.46 $48300.00 07-16-2013 10-0G8004 6 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 10 46 $850.00 $2737.37 $39100.00 07-16-2013 10-0G8004 7 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 10 46 $850.00 $2737.37 $39100.00 07-16-2013 10-0G8004 8 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 10 46 $1000.00 $3220.44 $46000.00 07-16-2013 10-0G8004 9 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 10 46 $950.00 $3059.42 $43700.00 07-16-2013 10-0G8004 10 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 71 $1000.00 $3220.44 $71000.00 07-24-2013 04-2A1104 1 M  
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 71 $884.07 $2847.09 $62768.97 07-24-2013 04-2A1104 2 M  
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 71 $500.00 $1610.22 $35500.00 07-24-2013 04-2A1104 3 M  
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 71 $1000.00 $3220.44 $71000.00 07-24-2013 04-2A1104 4 M  
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 71 $850.00 $2737.37 $60350.00 07-24-2013 04-2A1104 5 M  
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 71 $1150.00 $3703.51 $81650.00 07-24-2013 04-2A1104 6 M  
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 11 350 $1000.00 $3220.44 $350000.00 09-12-2013 11-0223U4 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 11 350 $700.00 $2254.31 $245000.00 09-12-2013 11-0223U4 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 11 350 $570.00 $1835.65 $199500.00 09-12-2013 11-0223U4 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 11 350 $740.00 $2383.13 $259000.00 09-12-2013 11-0223U4 4 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 11 350 $600.00 $1932.26 $210000.00 09-12-2013 11-0223U4 5 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 11 350 $900.00 $2898.40 $315000.00 09-12-2013 11-0223U4 6 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 174 $900.00 $1604.15 $156600.00 01-28-2014 04-235624 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 174 $450.00 $802.07 $78300.00 01-28-2014 04-235624 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 174 $280.00 $499.07 $48720.00 01-28-2014 04-235624 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 174 $800.00 $1425.91 $139200.00 01-28-2014 04-235624 4 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 174 $860.00 $1532.85 $149640.00 01-28-2014 04-235624 5 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 174 $700.00 $1247.67 $121800.00 01-28-2014 04-235624 6 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 174 $1000.00 $1782.39 $174000.00 01-28-2014 04-235624 7 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 533 $600.00 $1381.27 $319800.00 05-13-2014 04-235844 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 533 $467.25 $1075.67 $249044.25 05-13-2014 04-235844 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 533 $400.00 $920.85 $213200.00 05-13-2014 04-235844 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 533 $700.00 $1611.48 $373100.00 05-13-2014 04-235844 4 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 533 $650.00 $1496.38 $346450.00 05-13-2014 04-235844 5 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 533 $550.00 $1266.17 $293150.00 05-13-2014 04-235844 6 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 533 $770.00 $1772.63 $410410.00 05-13-2014 04-235844 7 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 533 $700.00 $1611.48 $373100.00 05-13-2014 04-235844 8 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 533 $645.00 $1484.87 $343785.00 05-13-2014 04-235844 9 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 08 534 $780.00 $1734.08 $416520.00 07-24-2014 08-3401U4 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 08 534 $640.00 $1422.84 $341760.00 07-24-2014 08-3401U4 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 08 534 $750.00 $1667.39 $400500.00 07-24-2014 08-3401U4 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 08 534 $722.00 $1605.14 $385548.00 07-24-2014 08-3401U4 4 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 08 534 $550.00 $1222.75 $293700.00 07-24-2014 08-3401U4 5 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 08 534 $600.00 $1333.91 $320400.00 07-24-2014 08-3401U4 6 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 08 534 $670.00 $1489.53 $357780.00 07-24-2014 08-3401U4 7 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 08 534 $600.00 $1333.91 $320400.00 07-24-2014 08-3401U4 8 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 08 534 $680.00 $1511.76 $363120.00 07-24-2014 08-3401U4 9 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 08 534 $700.00 $1556.23 $373800.00 07-24-2014 08-3401U4 10 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 08 534 $960.00 $2134.26 $512640.00 07-24-2014 08-3401U4 11 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 11 350 $865.00 $1687.06 $302750.00 10-09-2014 11-0223U4 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 11 350 $600.00 $1170.21 $210000.00 10-09-2014 11-0223U4 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 11 350 $700.00 $1365.25 $245000.00 10-09-2014 11-0223U4 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 11 350 $700.00 $1365.25 $245000.00 10-09-2014 11-0223U4 4 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 11 350 $560.00 $1092.20 $196000.00 10-09-2014 11-0223U4 5 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 174 $900.00 $1373.43 $156600.00 03-18-2015 04-235624 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 174 $850.00 $1297.13 $147900.00 03-18-2015 04-235624 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 174 $950.00 $1449.73 $165300.00 03-18-2015 04-235624 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 174 $750.00 $1144.53 $130500.00 03-18-2015 04-235624 4 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 174 $700.00 $1068.23 $121800.00 03-18-2015 04-235624 5 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 174 $400.00 $610.41 $69600.00 03-18-2015 04-235624 6 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 174 $650.00 $991.92 $113100.00 03-18-2015 04-235624 7 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 06 116 $970.00 $2068.01 $112520.00 06-23-2015 06-0M2604 1 M  
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 06 116 $655.00 $1396.44 $75980.00 06-23-2015 06-0M2604 2 M  
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 06 116 $1600.00 $3411.15 $185600.00 06-23-2015 06-0M2604 3 M  
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 06 116 $725.00 $1545.68 $84100.00 06-23-2015 06-0M2604 4 M  
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 06 116 $783.00 $1669.33 $90828.00 06-23-2015 06-0M2604 5 M  
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 06 116 $780.00 $1662.93 $90480.00 06-23-2015 06-0M2604 6 M  
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 06 116 $1150.00 $2451.76 $133400.00 06-23-2015 06-0M2604 7 M  
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 06 116 $1300.00 $2771.56 $150800.00 06-23-2015 06-0M2604 8 M  
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 10 89 $1500.00 $2886.34 $133500.00 11-05-2015 10-0X9704 1 M  
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 10 89 $1500.00 $2886.34 $133500.00 11-05-2015 10-0X9704 2 M  
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 10 89 $1552.00 $2986.40 $138128.00 11-05-2015 10-0X9704 3 M  
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 10 89 $1700.00 $3271.19 $151300.00 11-05-2015 10-0X9704 4 M  
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 05 218 $550.00 $1037.48 $119900.00 01-12-2016 05-330784 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 05 218 $685.00 $1292.14 $149330.00 01-12-2016 05-330784 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 05 218 $600.00 $1131.80 $130800.00 01-12-2016 05-330784 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 05 218 $825.00 $1556.22 $179850.00 01-12-2016 05-330784 4 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 05 218 $587.00 $1107.27 $127966.00 01-12-2016 05-330784 5 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 05 218 $800.00 $1509.06 $174400.00 01-12-2016 05-330784 6 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 05 218 $1200.00 $2263.59 $261600.00 01-12-2016 05-330784 7 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 05 95 $670.00 $1232.43 $63650.00 04-27-2016 05-4482U4 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 05 95 $850.00 $1563.53 $80750.00 04-27-2016 05-4482U4 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 05 95 $925.00 $1701.48 $87875.00 04-27-2016 05-4482U4 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 05 95 $950.00 $1747.47 $90250.00 04-27-2016 05-4482U4 4 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 05 95 $815.00 $1499.15 $77425.00 04-27-2016 05-4482U4 5 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 07 420 $662.00 $1217.71 $278040.00 04-27-2016 07-2159U4 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 07 420 $800.00 $1471.55 $336000.00 04-27-2016 07-2159U4 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 07 420 $650.00 $1195.64 $273000.00 04-27-2016 07-2159U4 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 07 420 $650.00 $1195.64 $273000.00 04-27-2016 07-2159U4 4 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 07 420 $647.00 $1190.12 $271740.00 04-27-2016 07-2159U4 5 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 07 420 $1000.00 $1839.44 $420000.00 04-27-2016 07-2159U4 6 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 06 514 $680.00 $999.10 $349520.00 02-16-2017 06-342534 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 06 514 $900.00 $1322.34 $462600.00 02-16-2017 06-342534 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 06 514 $700.00 $1028.49 $359800.00 02-16-2017 06-342534 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 06 514 $700.00 $1028.49 $359800.00 02-16-2017 06-342534 4 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 06 514 $850.00 $1248.88 $436900.00 02-16-2017 06-342534 5 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 124 $785.40 $1425.73 $97389.60 10-03-2017 04-4G0564 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 124 $800.00 $1452.23 $99200.00 10-03-2017 04-4G0564 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 124 $750.00 $1361.47 $93000.00 10-03-2017 04-4G0564 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 124 $1100.00 $1996.82 $136400.00 10-03-2017 04-4G0564 4 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 02 252 $1200.00 $1698.57 $302400.00 09-20-2018 02-2E4804 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 02 252 $1400.00 $1981.67 $352800.00 09-20-2018 02-2E4804 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 03 80 $2000.00 $2763.67 $160000.00 10-04-2018 03-3F5304 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 03 80 $1564.49 $2161.87 $125159.20 10-04-2018 03-3F5304 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 03 80 $970.00 $1340.38 $77600.00 10-04-2018 03-3F5304 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 03 80 $2600.00 $3592.78 $208000.00 10-04-2018 03-3F5304 4 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 03 80 $1600.00 $2210.94 $128000.00 10-04-2018 03-3F5304 5 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 03 80 $3000.00 $4145.51 $240000.00 10-04-2018 03-3F5304 6 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 03 80 $2800.00 $3869.14 $224000.00 10-04-2018 03-3F5304 7 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 06 14 $2500.00 $3454.59 $35000.00 10-30-2018 06-0H2004 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 06 14 $2730.00 $3772.42 $38220.00 10-30-2018 06-0H2004 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 05 24 $685.77 $947.62 $16458.48 11-08-2018 05-1F75U4 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 05 24 $810.00 $1119.29 $19440.00 11-08-2018 05-1F75U4 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 05 24 $1027.28 $1419.53 $24654.72 11-08-2018 05-1F75U4 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 05 24 $2000.00 $2763.67 $48000.00 11-08-2018 05-1F75U4 4 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 05 24 $1950.00 $2694.58 $46800.00 11-08-2018 05-1F75U4 5 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 05 24 $1900.00 $2625.49 $45600.00 11-08-2018 05-1F75U4 6 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 05 24 $1950.00 $2694.58 $46800.00 11-08-2018 05-1F75U4 7 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 05 24 $518.12 $715.96 $12434.88 11-08-2018 05-1F75U4 8 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 11 54 $890.00 $1229.83 $48060.00 11-28-2018 11-430184 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 11 54 $701.65 $969.57 $37889.10 11-28-2018 11-430184 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 61 $1000.00 $1740.47 $61000.00 01-23-2019 04-4G8404 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 61 $600.00 $1044.28 $36600.00 01-23-2019 04-4G8404 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 61 $750.00 $1305.35 $45750.00 01-23-2019 04-4G8404 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 61 $1250.00 $2175.58 $76250.00 01-23-2019 04-4G8404 4 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 61 $1300.00 $2262.61 $79300.00 01-23-2019 04-4G8404 5 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 61 $1500.00 $2610.70 $91500.00 01-23-2019 04-4G8404 6 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 61 $1800.00 $3132.84 $109800.00 01-23-2019 04-4G8404 7 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 61 $1212.23 $2109.85 $73946.03 01-23-2019 04-4G8404 8 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 291 $1200.00 $2088.56 $349200.00 02-13-2019 04-4G8204 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 291 $900.00 $1566.42 $261900.00 02-13-2019 04-4G8204 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 291 $925.00 $1609.93 $269175.00 02-13-2019 04-4G8204 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 291 $825.00 $1435.89 $240075.00 02-13-2019 04-4G8204 4 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 291 $900.00 $1566.42 $261900.00 02-13-2019 04-4G8204 5 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 11 623 $715.00 $1244.43 $445445.00 02-28-2019 11-2888U4 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 11 623 $690.00 $1200.92 $429870.00 02-28-2019 11-2888U4 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 11 623 $720.00 $1253.14 $448560.00 02-28-2019 11-2888U4 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 291 $1000.00 $1548.45 $291000.00 11-13-2019 04-4G8204 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 291 $825.00 $1277.47 $240075.00 11-13-2019 04-4G8204 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 291 $1056.00 $1635.17 $307296.00 11-13-2019 04-4G8204 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 291 $1500.00 $2322.68 $436500.00 11-13-2019 04-4G8204 4 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 291 $1400.00 $2167.83 $407400.00 11-13-2019 04-4G8204 5 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 291 $1300.00 $2012.99 $378300.00 11-13-2019 04-4G8204 6 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 291 $1300.00 $2012.99 $378300.00 11-13-2019 04-4G8204 7 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 01 113 $1650.00 $2014.45 $186450.00 01-07-2020 01-0E0004 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 01 113 $650.00 $793.57 $73450.00 01-07-2020 01-0E0004 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 01 113 $2600.00 $3174.29 $293800.00 01-07-2020 01-0E0004 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 01 113 $2940.00 $3589.39 $332220.00 01-07-2020 01-0E0004 4 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 01 113 $1800.00 $2197.58 $203400.00 01-07-2020 01-0E0004 5 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 01 99 $1750.00 $2136.54 $173250.00 03-26-2020 01-0B0904 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 01 99 $1200.00 $1465.06 $118800.00 03-26-2020 01-0B0904 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 01 99 $4035.00 $4926.25 $399465.00 03-26-2020 01-0B0904 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 01 99 $1250.00 $1526.10 $123750.00 03-26-2020 01-0B0904 4 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 01 99 $588.00 $717.88 $58212.00 03-26-2020 01-0B0904 5 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 291 $1000.00 $1593.24 $291000.00 04-08-2020 04-4G8204 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 291 $1600.00 $2549.18 $465600.00 04-08-2020 04-4G8204 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 291 $2000.00 $3186.47 $582000.00 04-08-2020 04-4G8204 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 291 $1117.00 $1779.65 $325047.00 04-08-2020 04-4G8204 4 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 10 138 $750.00 $1194.93 $103500.00 06-17-2020 10-0X3104 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 10 138 $1030.00 $1641.03 $142140.00 06-17-2020 10-0X3104 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 10 138 $900.00 $1433.91 $124200.00 06-17-2020 10-0X3104 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 10 138 $900.00 $1433.91 $124200.00 06-17-2020 10-0X3104 4 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 10 138 $805.00 $1282.56 $111090.00 06-17-2020 10-0X3104 5 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 28 $900.00 $1288.11 $25200.00 10-29-2020 04-160304 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 28 $950.00 $1359.67 $26600.00 10-29-2020 04-160304 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 28 $1000.00 $1431.24 $28000.00 10-29-2020 04-160304 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 28 $1250.00 $1789.05 $35000.00 10-29-2020 04-160304 4 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 28 $900.00 $1288.11 $25200.00 10-29-2020 04-160304 5 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 28 $2000.00 $2862.47 $56000.00 10-29-2020 04-160304 6 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 28 $900.00 $1288.11 $25200.00 10-29-2020 04-160304 7 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 28 $1200.00 $1717.48 $33600.00 10-29-2020 04-160304 8 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 110 $1100.00 $1893.37 $121000.00 02-03-2021 04-297634 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 110 $1000.00 $1721.25 $110000.00 02-03-2021 04-297634 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 110 $750.00 $1290.94 $82500.00 02-03-2021 04-297634 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 110 $1100.00 $1893.37 $121000.00 02-03-2021 04-297634 4 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 110 $690.00 $1187.66 $75900.00 02-03-2021 04-297634 5 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 04 110 $1150.00 $1979.44 $126500.00 02-03-2021 04-297634 6 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 01 250 $970.00 $1697.73 $242500.00 07-22-2021 01-366004 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 01 250 $1073.57 $1879.00 $268392.50 07-22-2021 01-366004 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 01 250 $1260.00 $2205.30 $315000.00 07-22-2021 01-366004 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 05 30 $1712.00 $2996.41 $51360.00 09-30-2021 05-0A0904 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 05 30 $1515.15 $2651.87 $45454.50 09-30-2021 05-0A0904 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 05 30 $800.00 $1400.19 $24000.00 09-30-2021 05-0A0904 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 05 30 $1500.00 $2625.36 $45000.00 09-30-2021 05-0A0904 4 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 05 30 $2222.84 $3890.50 $66685.20 09-30-2021 05-0A0904 5 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 05 30 $1500.00 $2625.36 $45000.00 09-30-2021 05-0A0904 6 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB CY 01 144 $1500.00 $2326.37 $216000.00 05-11-2022 01-436404 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB CY 01 144 $1600.00 $2481.46 $230400.00 05-11-2022 01-436404 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB CY 01 144 $1951.19 $3026.12 $280971.36 05-11-2022 01-436404 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 03 150 $1323.06 $2051.95 $198459.00 06-27-2022 03-3F0734 1   TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB CY 01 250 $1550.00 $1724.27 $387500.00 10-04-2022 01-366004 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB CY 01 250 $1214.70 $1351.28 $303675.00 10-04-2022 01-366004 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB CY 01 250 $1000.00 $1112.44 $250000.00 10-04-2022 01-366004 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB CY 01 250 $1200.00 $1334.92 $300000.00 10-04-2022 01-366004 4 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 12 75 $1220.00 $1020.82 $91500.00 09-28-2023 12-0N8904 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 12 75 $750.00 $627.56 $56250.00 09-28-2023 12-0N8904 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 12 75 $1613.39 $1349.99 $121004.25 09-28-2023 12-0N8904 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 12 75 $1600.00 $1338.78 $120000.00 09-28-2023 12-0N8904 4 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 12 75 $1250.00 $1045.93 $93750.00 09-28-2023 12-0N8904 5 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 12 75 $1500.00 $1255.11 $112500.00 09-28-2023 12-0N8904 6 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 12 75 $1600.00 $1338.78 $120000.00 09-28-2023 12-0N8904 7 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 05 334 $1550.00 $1190.86 $517700.00 03-01-2024 05-0N74V4 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 06 848 $1600.00 $1658.87 $1356800.00 11-14-2024 06-487404 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 06 848 $1350.00 $1399.67 $1144800.00 11-14-2024 06-487404 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 06 848 $700.00 $725.76 $593600.00 11-14-2024 06-487404 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 06 848 $1505.63 $1561.03 $1276774.24 11-14-2024 06-487404 4 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 06 848 $1322.00 $1370.64 $1121056.00 11-14-2024 06-487404 5 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 06 848 $1700.00 $1762.55 $1441600.00 11-14-2024 06-487404 6 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 06 848 $1700.00 $1762.55 $1441600.00 11-14-2024 06-487404 7 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 12 122 $2500.00 $2198.43 $305000.00 09-04-2025 12-0M9704 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 12 122 $2180.00 $1917.03 $265960.00 09-04-2025 12-0M9704 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 12 122 $1900.00 $1670.81 $231800.00 09-04-2025 12-0M9704 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 12 122 $1260.79 $1108.71 $153816.38 09-04-2025 12-0M9704 4 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 12 122 $1500.00 $1319.06 $183000.00 09-04-2025 12-0M9704 5 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 12 122 $1310.00 $1151.98 $159820.00 09-04-2025 12-0M9704 6 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 12 122 $2250.00 $1978.59 $274500.00 09-04-2025 12-0M9704 7 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 03 199 $1450.00 $1418.73 $288550.00 10-23-2025 03-1J6304 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 03 199 $1475.00 $1443.19 $293525.00 10-23-2025 03-1J6304 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 03 199 $1400.00 $1369.81 $278600.00 10-23-2025 03-1J6304 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 03 199 $1825.00 $1785.64 $363175.00 10-23-2025 03-1J6304 4 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 03 199 $1300.00 $1271.96 $258700.00 10-23-2025 03-1J6304 5 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 03 199 $2000.00 $1956.86 $398000.00 10-23-2025 03-1J6304 6 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 03 199 $1500.00 $1467.65 $298500.00 10-23-2025 03-1J6304 7 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 12 615 $1480.00 $1480.00 $910200.00 07-16-2026 12-0K9704 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 12 615 $1815.00 $1815.00 $1116225.00 07-16-2026 12-0K9704 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 12 615 $1280.53 $1280.53 $787525.95 07-16-2026 12-0K9704 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 12 615 $1340.00 $1340.00 $824100.00 07-16-2026 12-0K9704 4 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 12 615 $1308.00 $1308.00 $804420.00 07-16-2026 12-0K9704 5 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 12 615 $1300.00 $1300.00 $799500.00 07-16-2026 12-0K9704 6 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 02 201 $2000.00 $2000.00 $402000.00 07-30-2026 02-2K0004 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 02 201 $2200.00 $2200.00 $442200.00 07-30-2026 02-2K0004 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 02 201 $2560.00 $2560.00 $514560.00 07-30-2026 02-2K0004 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 02 201 $2800.00 $2800.00 $562800.00 07-30-2026 02-2K0004 4 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 12 323 $1740.00 $1740.00 $562020.00 10-22-2026 12-0K9824 1 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 12 323 $1900.00 $1900.00 $613700.00 10-22-2026 12-0K9824 2 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 12 323 $878.44 $878.44 $283736.12 10-22-2026 12-0K9824 3 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 12 323 $1134.00 $1134.00 $366282.00 10-22-2026 12-0K9824 4 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 12 323 $1300.00 $1300.00 $419900.00 10-22-2026 12-0K9824 5 M TRO
510088 - STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 12 323 $1350.00 $1350.00 $436050.00 10-22-2026 12-0K9824 6 M TRO
SUMMARY Unmodified Adjusted    
Average Price/Unit: $ Avg No. Units
Std Dev. (of Unit Price): ±$ Rows Selected
Weighted Avg.: $ Rows Returned
Minimum Price/Unit: $    
Maximum Price/Unit: $    

| Back | New Search |

PARAMETERS: Item = 510088; District=All; Year=All; Convert=No; Bidders=All Bidders
TIMESTAMP: 11/13/2026 05:30:45
CURRENT 12-MO INDEX (CHCCI (2020 Base)): 146.53