| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$9700.00 |
$14251.89 |
$9700.00 |
02-15-2017 |
07-3W5404 |
1 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$13183.56 |
$19370.17 |
$13183.56 |
02-15-2017 |
07-3W5404 |
2 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$10250.00 |
$15059.99 |
$10250.00 |
02-15-2017 |
07-3W5404 |
3 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
02 |
1 |
$10399.40 |
$15279.50 |
$10399.40 |
03-14-2017 |
02-1H8804 |
1 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
02 |
1 |
$9500.00 |
$13958.04 |
$9500.00 |
03-14-2017 |
02-1H8804 |
2 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
02 |
1 |
$4200.00 |
$6170.92 |
$4200.00 |
03-14-2017 |
02-1H8804 |
3 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
02 |
1 |
$5550.00 |
$8154.43 |
$5550.00 |
03-14-2017 |
02-1H8804 |
4 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
02 |
1 |
$15000.00 |
$22039.01 |
$15000.00 |
03-14-2017 |
02-1H8804 |
5 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$4140.00 |
$6045.79 |
$4140.00 |
04-06-2017 |
07-3W1904 |
1 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$4000.00 |
$5841.34 |
$4000.00 |
04-06-2017 |
07-3W1904 |
2 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$7000.00 |
$10222.34 |
$7000.00 |
04-06-2017 |
07-3W1904 |
3 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$10000.00 |
$14603.35 |
$10000.00 |
04-06-2017 |
07-3W1904 |
4 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$14000.00 |
$20444.69 |
$14000.00 |
04-06-2017 |
07-3W1904 |
5 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$8250.00 |
$12047.76 |
$8250.00 |
04-25-2017 |
04-4J5604 |
1 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$5600.00 |
$8177.88 |
$5600.00 |
04-25-2017 |
04-4J5604 |
2 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$2000.00 |
$2920.67 |
$2000.00 |
04-25-2017 |
04-4J5604 |
3 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$13000.00 |
$18984.35 |
$13000.00 |
05-02-2017 |
04-4J5804 |
1 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$24700.00 |
$36070.27 |
$24700.00 |
05-03-2017 |
07-3W2004 |
1 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$15000.00 |
$21905.02 |
$15000.00 |
05-03-2017 |
07-3W2004 |
2 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$10500.00 |
$15333.52 |
$10500.00 |
05-03-2017 |
07-3W2004 |
3 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$7755.00 |
$11324.90 |
$7755.00 |
05-03-2017 |
07-3W2004 |
4 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
02 |
1 |
$5550.00 |
$8104.86 |
$5550.00 |
06-01-2017 |
02-1H8804 |
1 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
02 |
1 |
$30000.00 |
$43810.05 |
$30000.00 |
06-01-2017 |
02-1H8804 |
2 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
02 |
1 |
$5000.00 |
$7301.67 |
$5000.00 |
06-01-2017 |
02-1H8804 |
3 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
02 |
1 |
$15000.00 |
$21905.02 |
$15000.00 |
06-01-2017 |
02-1H8804 |
4 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$6200.00 |
$9054.08 |
$6200.00 |
06-21-2017 |
11-2M8204 |
1 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$8800.00 |
$12850.95 |
$8800.00 |
06-21-2017 |
11-2M8204 |
2 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$12000.00 |
$17524.02 |
$12000.00 |
06-21-2017 |
11-2M8204 |
3 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$4500.00 |
$6571.51 |
$4500.00 |
06-21-2017 |
11-2M8204 |
4 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$37000.00 |
$54032.39 |
$37000.00 |
06-21-2017 |
11-2M8204 |
5 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$5250.00 |
$7666.76 |
$5250.00 |
06-21-2017 |
11-2M8204 |
6 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
02 |
1 |
$45000.00 |
$74998.29 |
$45000.00 |
09-06-2017 |
02-4G5504 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
02 |
1 |
$15000.00 |
$24999.43 |
$15000.00 |
09-06-2017 |
02-4G5504 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
02 |
1 |
$50000.00 |
$83331.44 |
$50000.00 |
09-06-2017 |
02-4G5504 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
02 |
1 |
$20000.00 |
$33332.58 |
$20000.00 |
09-06-2017 |
02-4G5504 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
02 |
1 |
$75000.00 |
$124997.16 |
$75000.00 |
09-06-2017 |
02-4G5504 |
5 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
10 |
1 |
$5000.00 |
$9076.44 |
$5000.00 |
10-12-2017 |
10-0G7204 |
1 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
10 |
1 |
$32000.00 |
$58089.20 |
$32000.00 |
10-12-2017 |
10-0G7204 |
2 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
10 |
1 |
$15000.00 |
$27229.31 |
$15000.00 |
10-12-2017 |
10-0G7204 |
3 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
10 |
1 |
$10000.00 |
$18152.87 |
$10000.00 |
10-12-2017 |
10-0G7204 |
4 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
10 |
1 |
$4000.00 |
$7261.15 |
$4000.00 |
10-12-2017 |
10-0G7204 |
5 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
10 |
1 |
$11400.00 |
$20694.28 |
$11400.00 |
10-12-2017 |
10-0G7204 |
6 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
08 |
1 |
$45000.00 |
$81687.93 |
$45000.00 |
10-19-2017 |
08-0Q8904 |
1 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
08 |
1 |
$65000.00 |
$117993.68 |
$65000.00 |
10-19-2017 |
08-0Q8904 |
2 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
08 |
1 |
$18054.87 |
$32774.78 |
$18054.87 |
10-19-2017 |
08-0Q8904 |
3 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
08 |
1 |
$80000.00 |
$145222.99 |
$80000.00 |
10-19-2017 |
08-0Q8904 |
4 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
08 |
1 |
$16500.00 |
$29952.24 |
$16500.00 |
10-19-2017 |
08-0Q8904 |
5 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
08 |
1 |
$222398.00 |
$403716.29 |
$222398.00 |
10-19-2017 |
08-0Q8904 |
6 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
08 |
1 |
$125000.00 |
$226910.93 |
$125000.00 |
10-19-2017 |
08-0Q8904 |
7 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$10800.00 |
$19605.10 |
$10800.00 |
10-24-2017 |
07-318004 |
1 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$50000.00 |
$90764.37 |
$50000.00 |
10-24-2017 |
07-318004 |
2 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$60000.00 |
$108917.24 |
$60000.00 |
10-24-2017 |
07-318004 |
3 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$40000.00 |
$72611.50 |
$40000.00 |
10-24-2017 |
07-318004 |
4 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$66560.00 |
$120825.53 |
$66560.00 |
10-24-2017 |
07-318004 |
5 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$86000.00 |
$156114.72 |
$86000.00 |
10-24-2017 |
07-318004 |
6 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$8700.00 |
$15793.00 |
$8700.00 |
10-31-2017 |
11-299104 |
1 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$21000.00 |
$38121.04 |
$21000.00 |
10-31-2017 |
11-299104 |
2 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$51000.00 |
$92579.66 |
$51000.00 |
10-31-2017 |
11-299104 |
3 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$25000.00 |
$45382.19 |
$25000.00 |
10-31-2017 |
11-299104 |
4 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$13987.20 |
$25390.79 |
$13987.20 |
10-31-2017 |
11-299104 |
5 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$144280.00 |
$225051.61 |
$144280.00 |
01-30-2018 |
07-202124 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$77000.00 |
$120106.56 |
$77000.00 |
01-30-2018 |
07-202124 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$145000.00 |
$226174.69 |
$145000.00 |
01-30-2018 |
07-202124 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$110000.00 |
$171580.80 |
$110000.00 |
01-30-2018 |
07-202124 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
02 |
1 |
$40336.00 |
$62917.12 |
$40336.00 |
02-07-2018 |
02-4G5504 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
02 |
1 |
$42800.00 |
$66760.53 |
$42800.00 |
02-07-2018 |
02-4G5504 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
02 |
1 |
$88268.18 |
$137682.95 |
$88268.18 |
02-07-2018 |
02-4G5504 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
02 |
1 |
$40000.00 |
$62393.02 |
$40000.00 |
02-07-2018 |
02-4G5504 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
02 |
1 |
$42780.00 |
$66729.33 |
$42780.00 |
02-07-2018 |
02-4G5504 |
5 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$11800.00 |
$18405.94 |
$11800.00 |
03-21-2018 |
11-2M0014 |
1 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$6300.00 |
$9826.90 |
$6300.00 |
03-21-2018 |
11-2M0014 |
2 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$25000.00 |
$38995.64 |
$25000.00 |
03-21-2018 |
11-2M0014 |
3 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
05 |
1 |
$45000.00 |
$70192.14 |
$45000.00 |
03-28-2018 |
05-1H6604 |
1 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
05 |
1 |
$12000.00 |
$18717.91 |
$12000.00 |
03-28-2018 |
05-1H6604 |
2 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
05 |
1 |
$10000.00 |
$15598.25 |
$10000.00 |
03-28-2018 |
05-1H6604 |
3 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
05 |
1 |
$55000.00 |
$85790.40 |
$55000.00 |
03-28-2018 |
05-1H6604 |
4 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$22450.00 |
$32654.34 |
$22450.00 |
04-25-2018 |
11-405804 |
1 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$8900.00 |
$12945.37 |
$8900.00 |
04-25-2018 |
11-405804 |
2 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$7500.00 |
$10909.02 |
$7500.00 |
04-25-2018 |
11-405804 |
3 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$42000.00 |
$61090.53 |
$42000.00 |
04-25-2018 |
11-405804 |
4 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$13050.00 |
$18981.70 |
$13050.00 |
04-25-2018 |
11-405804 |
5 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$250520.00 |
$354604.86 |
$250520.00 |
07-12-2018 |
04-155004 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$275000.00 |
$389255.70 |
$275000.00 |
07-12-2018 |
04-155004 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
03 |
1 |
$16816.33 |
$23803.10 |
$16816.33 |
08-16-2018 |
03-0H10U4 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
03 |
1 |
$170884.00 |
$241882.08 |
$170884.00 |
08-16-2018 |
03-0H10U4 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
03 |
1 |
$25000.00 |
$35386.88 |
$25000.00 |
08-16-2018 |
03-0H10U4 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
02 |
1 |
$78300.00 |
$110831.71 |
$78300.00 |
08-28-2018 |
02-4C40V4 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
02 |
1 |
$50000.00 |
$70773.76 |
$50000.00 |
08-28-2018 |
02-4C40V4 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
02 |
1 |
$60000.00 |
$84928.52 |
$60000.00 |
08-28-2018 |
02-4C40V4 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
02 |
1 |
$45000.00 |
$63696.39 |
$45000.00 |
08-28-2018 |
02-4C40V4 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
12 |
1 |
$25000.00 |
$35386.88 |
$25000.00 |
09-26-2018 |
12-0M9004 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
12 |
1 |
$17400.00 |
$24629.27 |
$17400.00 |
09-26-2018 |
12-0M9004 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
12 |
1 |
$20000.00 |
$28309.51 |
$20000.00 |
09-26-2018 |
12-0M9004 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
12 |
1 |
$40000.00 |
$56619.01 |
$40000.00 |
09-26-2018 |
12-0M9004 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
12 |
1 |
$28000.00 |
$39633.31 |
$28000.00 |
09-26-2018 |
12-0M9004 |
5 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
06 |
1 |
$225000.00 |
$310913.33 |
$225000.00 |
10-30-2018 |
06-0H2004 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
06 |
1 |
$92090.00 |
$127253.37 |
$92090.00 |
10-30-2018 |
06-0H2004 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$12280.00 |
$16968.96 |
$12280.00 |
10-31-2018 |
07-301504 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$3100.00 |
$4283.69 |
$3100.00 |
10-31-2018 |
07-301504 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$6656.00 |
$9197.51 |
$6656.00 |
10-31-2018 |
07-301504 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$4000.00 |
$5527.35 |
$4000.00 |
10-31-2018 |
07-301504 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$3200.00 |
$4421.88 |
$3200.00 |
10-31-2018 |
07-301504 |
5 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$20000.00 |
$27636.74 |
$20000.00 |
10-31-2018 |
07-301504 |
6 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
05 |
1 |
$13683.73 |
$23816.09 |
$13683.73 |
01-15-2019 |
05-1C85U4 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
05 |
1 |
$255000.00 |
$443819.34 |
$255000.00 |
01-15-2019 |
05-1C85U4 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
08 |
1 |
$15850.00 |
$27586.42 |
$15850.00 |
03-14-2019 |
08-1J1304 |
1 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
08 |
1 |
$35000.00 |
$60916.38 |
$35000.00 |
03-14-2019 |
08-1J1304 |
2 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
08 |
1 |
$18000.00 |
$31328.42 |
$18000.00 |
03-14-2019 |
08-1J1304 |
3 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
08 |
1 |
$75000.00 |
$130535.10 |
$75000.00 |
03-14-2019 |
08-1J1304 |
4 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
08 |
1 |
$55000.00 |
$95725.74 |
$55000.00 |
03-14-2019 |
08-1J1304 |
5 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
08 |
1 |
$15000.00 |
$26107.02 |
$15000.00 |
03-14-2019 |
08-1J1304 |
6 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
03 |
1 |
$150780.00 |
$262427.76 |
$150780.00 |
03-20-2019 |
03-0H10U4 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
03 |
1 |
$19877.55 |
$34596.24 |
$19877.55 |
03-20-2019 |
03-0H10U4 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
10 |
1 |
$29000.00 |
$50473.57 |
$29000.00 |
03-26-2019 |
10-1H6404 |
1 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
10 |
1 |
$36000.00 |
$62656.85 |
$36000.00 |
03-26-2019 |
10-1H6404 |
2 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
10 |
1 |
$14000.00 |
$24366.55 |
$14000.00 |
03-26-2019 |
10-1H6404 |
3 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
10 |
1 |
$35000.00 |
$60916.38 |
$35000.00 |
03-26-2019 |
10-1H6404 |
4 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$21000.00 |
$25890.87 |
$21000.00 |
04-17-2019 |
11-2N0034 |
1 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$88000.00 |
$108495.08 |
$88000.00 |
04-17-2019 |
11-2N0034 |
2 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$33000.00 |
$40685.65 |
$33000.00 |
04-17-2019 |
11-2N0034 |
3 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$20400.00 |
$25151.13 |
$20400.00 |
04-17-2019 |
11-2N0034 |
4 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$40700.00 |
$50178.97 |
$40700.00 |
04-23-2019 |
11-2M0024 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$22000.00 |
$27123.77 |
$22000.00 |
04-23-2019 |
11-2M0024 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$15750.00 |
$19418.15 |
$15750.00 |
04-23-2019 |
11-2M0024 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$25200.00 |
$31069.05 |
$25200.00 |
04-23-2019 |
11-2M0024 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$50000.00 |
$61644.93 |
$50000.00 |
05-15-2019 |
04-0P3404 |
1 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$25000.00 |
$30822.47 |
$25000.00 |
05-15-2019 |
04-0P3404 |
2 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$326000.00 |
$401924.95 |
$326000.00 |
05-15-2019 |
04-0P3404 |
3 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$405000.00 |
$499323.94 |
$405000.00 |
05-15-2019 |
04-0P3404 |
4 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$2500.00 |
$3082.25 |
$2500.00 |
05-16-2019 |
07-301104 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$12125.19 |
$14949.13 |
$12125.19 |
05-16-2019 |
07-301104 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$3118.52 |
$3844.82 |
$3118.52 |
05-16-2019 |
07-301104 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$38000.00 |
$46850.15 |
$38000.00 |
05-21-2019 |
07-4W1304 |
1 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$26108.00 |
$32188.52 |
$26108.00 |
05-21-2019 |
07-4W1304 |
2 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$4700.00 |
$5794.62 |
$4700.00 |
05-21-2019 |
07-4W1304 |
3 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$128900.00 |
$158920.63 |
$128900.00 |
05-21-2019 |
07-4W1304 |
4 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$19800.00 |
$24411.39 |
$19800.00 |
05-24-2019 |
07-4W1004 |
1 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$53000.00 |
$65343.63 |
$53000.00 |
05-24-2019 |
07-4W1004 |
2 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$34560.00 |
$42608.98 |
$34560.00 |
05-24-2019 |
07-4W1004 |
3 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$115750.00 |
$142708.01 |
$115750.00 |
05-24-2019 |
07-4W1004 |
4 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$12500.00 |
$15411.23 |
$12500.00 |
05-24-2019 |
07-4W1004 |
5 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$10000.00 |
$12328.99 |
$10000.00 |
05-30-2019 |
04-0P5104 |
1 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$56000.00 |
$69042.32 |
$56000.00 |
05-30-2019 |
04-0P5104 |
2 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$18000.00 |
$22192.18 |
$18000.00 |
05-30-2019 |
04-0P5104 |
3 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$23000.00 |
$28356.67 |
$23000.00 |
05-30-2019 |
04-0P5104 |
4 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$38000.00 |
$46850.15 |
$38000.00 |
05-30-2019 |
04-0P5104 |
5 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$13000.00 |
$16027.68 |
$13000.00 |
05-30-2019 |
04-0P5104 |
6 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
08 |
1 |
$70605.00 |
$87048.81 |
$70605.00 |
05-30-2019 |
08-1J1104 |
1 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
08 |
1 |
$164000.00 |
$202195.37 |
$164000.00 |
05-30-2019 |
08-1J1104 |
2 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
08 |
1 |
$225000.00 |
$277402.19 |
$225000.00 |
05-30-2019 |
08-1J1104 |
3 |
M |
|
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
10 |
1 |
$69258.80 |
$90716.83 |
$69258.80 |
09-11-2019 |
10-0Q1214 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
10 |
1 |
$125000.00 |
$163727.99 |
$125000.00 |
09-11-2019 |
10-0Q1214 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
10 |
1 |
$65000.00 |
$85138.55 |
$65000.00 |
09-11-2019 |
10-0Q1214 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
10 |
1 |
$65000.00 |
$85138.55 |
$65000.00 |
09-11-2019 |
10-0Q1214 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
10 |
1 |
$70285.54 |
$92061.68 |
$70285.54 |
09-11-2019 |
10-0Q1214 |
5 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$61000.00 |
$94455.56 |
$61000.00 |
11-13-2019 |
07-312004 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$17020.00 |
$26354.65 |
$17020.00 |
11-13-2019 |
07-312004 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$9900.00 |
$15329.67 |
$9900.00 |
11-13-2019 |
07-312004 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$44477.10 |
$68870.65 |
$44477.10 |
11-13-2019 |
07-312004 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$8620.00 |
$13347.66 |
$8620.00 |
11-13-2019 |
07-312004 |
5 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$25000.00 |
$38711.30 |
$25000.00 |
11-13-2019 |
07-312004 |
6 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$16688.00 |
$25840.56 |
$16688.00 |
11-13-2019 |
07-312004 |
7 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$11705.59 |
$18125.54 |
$11705.59 |
11-14-2019 |
07-303704 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$9500.00 |
$14710.29 |
$9500.00 |
11-14-2019 |
07-303704 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$15040.00 |
$23288.72 |
$15040.00 |
11-14-2019 |
07-303704 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$14476.00 |
$22415.39 |
$14476.00 |
11-14-2019 |
07-303704 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
02 |
1 |
$35000.00 |
$54195.82 |
$35000.00 |
12-17-2019 |
02-4F6004 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
02 |
1 |
$18000.00 |
$27872.13 |
$18000.00 |
12-17-2019 |
02-4F6004 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
02 |
1 |
$35000.00 |
$54195.82 |
$35000.00 |
12-17-2019 |
02-4F6004 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
03 |
1 |
$150000.00 |
$183131.98 |
$150000.00 |
01-08-2020 |
03-3F5404 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
03 |
1 |
$105000.00 |
$128192.38 |
$105000.00 |
01-08-2020 |
03-3F5404 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
03 |
1 |
$115000.00 |
$140401.18 |
$115000.00 |
01-08-2020 |
03-3F5404 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
03 |
1 |
$150000.00 |
$183131.98 |
$150000.00 |
01-08-2020 |
03-3F5404 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
03 |
1 |
$135000.00 |
$164818.78 |
$135000.00 |
01-08-2020 |
03-3F5404 |
5 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
03 |
1 |
$140000.00 |
$170923.18 |
$140000.00 |
01-08-2020 |
03-3F5404 |
6 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$150000.00 |
$183131.98 |
$150000.00 |
02-27-2020 |
04-0J7104 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$98400.00 |
$120134.58 |
$98400.00 |
02-27-2020 |
04-0J7104 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$100000.00 |
$122087.99 |
$100000.00 |
02-27-2020 |
04-0J7104 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$85000.00 |
$103774.79 |
$85000.00 |
02-27-2020 |
04-0J7104 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$99000.00 |
$120867.11 |
$99000.00 |
02-27-2020 |
04-0J7104 |
5 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
03 |
1 |
$25000.00 |
$30522.00 |
$25000.00 |
03-17-2020 |
03-0H3304 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
03 |
1 |
$13000.00 |
$15871.44 |
$13000.00 |
03-17-2020 |
03-0H3304 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
03 |
1 |
$15120.00 |
$18459.70 |
$15120.00 |
03-17-2020 |
03-0H3304 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
03 |
1 |
$28000.00 |
$34184.64 |
$28000.00 |
03-17-2020 |
03-0H3304 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
03 |
1 |
$35000.00 |
$42730.79 |
$35000.00 |
03-17-2020 |
03-0H3304 |
5 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$118495.67 |
$144668.98 |
$118495.67 |
03-17-2020 |
07-3096U4 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$130000.00 |
$158714.38 |
$130000.00 |
03-17-2020 |
07-3096U4 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$103000.00 |
$125750.62 |
$103000.00 |
03-17-2020 |
07-3096U4 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$239335.68 |
$292200.11 |
$239335.68 |
03-17-2020 |
07-3096U4 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$154750.00 |
$188931.16 |
$154750.00 |
03-17-2020 |
07-3096U4 |
5 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
12 |
1 |
$12500.00 |
$15261.00 |
$12500.00 |
03-18-2020 |
12-0R5304 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
12 |
1 |
$6200.00 |
$7569.46 |
$6200.00 |
03-18-2020 |
12-0R5304 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
12 |
1 |
$10000.00 |
$12208.80 |
$10000.00 |
03-18-2020 |
12-0R5304 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
12 |
1 |
$15000.00 |
$18313.20 |
$15000.00 |
03-18-2020 |
12-0R5304 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
12 |
1 |
$2625.00 |
$3204.81 |
$2625.00 |
03-18-2020 |
12-0R5304 |
5 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
12 |
1 |
$10000.00 |
$12208.80 |
$10000.00 |
03-18-2020 |
12-0R5304 |
6 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
12 |
1 |
$20000.00 |
$24417.60 |
$20000.00 |
03-18-2020 |
12-0R5304 |
7 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
03 |
1 |
$23000.00 |
$36644.45 |
$23000.00 |
04-23-2020 |
03-1G4804 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
03 |
1 |
$27500.00 |
$43814.02 |
$27500.00 |
04-23-2020 |
03-1G4804 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
03 |
1 |
$13000.00 |
$20712.08 |
$13000.00 |
04-23-2020 |
03-1G4804 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
03 |
1 |
$32000.00 |
$50983.58 |
$32000.00 |
04-23-2020 |
03-1G4804 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$35000.00 |
$50093.28 |
$35000.00 |
10-22-2020 |
04-3J7004 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$55000.00 |
$78718.01 |
$55000.00 |
10-22-2020 |
04-3J7004 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$126262.63 |
$180711.69 |
$126262.63 |
10-22-2020 |
04-3J7004 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
10 |
1 |
$15000.00 |
$21468.55 |
$15000.00 |
10-29-2020 |
10-1F8304 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
10 |
1 |
$8000.00 |
$11449.89 |
$8000.00 |
10-29-2020 |
10-1F8304 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
10 |
1 |
$6000.00 |
$8587.42 |
$6000.00 |
10-29-2020 |
10-1F8304 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$8000.00 |
$11449.89 |
$8000.00 |
11-17-2020 |
07-4W5604 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$3000.00 |
$4293.71 |
$3000.00 |
11-17-2020 |
07-4W5604 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$10000.00 |
$14312.37 |
$10000.00 |
11-17-2020 |
07-4W5604 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$15900.00 |
$22756.66 |
$15900.00 |
11-17-2020 |
07-4W5604 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$6000.00 |
$8587.42 |
$6000.00 |
11-17-2020 |
07-4W5604 |
5 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$2200.00 |
$3148.72 |
$2200.00 |
11-17-2020 |
07-4W5604 |
6 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$12712.00 |
$18193.88 |
$12712.00 |
12-03-2020 |
07-332604 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$26000.00 |
$37212.15 |
$26000.00 |
12-03-2020 |
07-332604 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$20120.00 |
$28796.48 |
$20120.00 |
12-03-2020 |
07-332604 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$15000.00 |
$21468.55 |
$15000.00 |
12-03-2020 |
07-332604 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$21900.00 |
$31344.08 |
$21900.00 |
12-03-2020 |
07-332604 |
5 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$19200.00 |
$27479.74 |
$19200.00 |
12-08-2020 |
04-2Q0304 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$1805.00 |
$2583.38 |
$1805.00 |
12-08-2020 |
04-2Q0304 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$5500.00 |
$7871.80 |
$5500.00 |
12-08-2020 |
04-2Q0304 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$5000.00 |
$7156.18 |
$5000.00 |
12-08-2020 |
04-2Q0304 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$5000.00 |
$7156.18 |
$5000.00 |
12-08-2020 |
04-2Q0304 |
5 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$10000.00 |
$14312.37 |
$10000.00 |
12-08-2020 |
04-2Q0304 |
6 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
08 |
1 |
$15000.00 |
$21468.55 |
$15000.00 |
12-17-2020 |
08-1C6804 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
08 |
1 |
$4000.00 |
$5724.95 |
$4000.00 |
12-17-2020 |
08-1C6804 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
08 |
1 |
$20000.00 |
$28624.73 |
$20000.00 |
12-17-2020 |
08-1C6804 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
08 |
1 |
$11000.00 |
$15743.60 |
$11000.00 |
12-17-2020 |
08-1C6804 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
08 |
1 |
$30385.59 |
$43488.97 |
$30385.59 |
12-17-2020 |
08-1C6804 |
5 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
08 |
1 |
$33000.00 |
$47230.81 |
$33000.00 |
12-17-2020 |
08-1C6804 |
6 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
08 |
1 |
$53500.00 |
$76571.16 |
$53500.00 |
12-17-2020 |
08-1C6804 |
7 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
08 |
1 |
$82500.00 |
$118077.02 |
$82500.00 |
12-17-2020 |
08-1C6804 |
8 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
08 |
1 |
$20000.00 |
$28624.73 |
$20000.00 |
12-17-2020 |
08-1C6804 |
9 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
08 |
1 |
$49000.00 |
$70130.59 |
$49000.00 |
12-17-2020 |
08-1C6804 |
10 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
08 |
1 |
$68000.00 |
$97324.09 |
$68000.00 |
12-17-2020 |
08-1C6804 |
11 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
08 |
1 |
$15000.00 |
$21468.55 |
$15000.00 |
12-17-2020 |
08-1C6804 |
12 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$15500.00 |
$26679.37 |
$15500.00 |
01-13-2021 |
07-4W5304 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$2500.00 |
$4303.12 |
$2500.00 |
01-13-2021 |
07-4W5304 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$3000.00 |
$5163.75 |
$3000.00 |
01-13-2021 |
07-4W5304 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$8000.00 |
$13770.00 |
$8000.00 |
01-13-2021 |
07-4W5304 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$1831.00 |
$3151.61 |
$1831.00 |
01-13-2021 |
07-4W5304 |
5 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$15000.00 |
$25818.75 |
$15000.00 |
01-13-2021 |
07-4W5304 |
6 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$14000.00 |
$24097.50 |
$14000.00 |
01-13-2021 |
07-4W5304 |
7 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
08 |
1 |
$3900.00 |
$6712.87 |
$3900.00 |
01-21-2021 |
08-1K1904 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
08 |
1 |
$2000.00 |
$3442.50 |
$2000.00 |
01-21-2021 |
08-1K1904 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
08 |
1 |
$8000.00 |
$13770.00 |
$8000.00 |
01-21-2021 |
08-1K1904 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
08 |
1 |
$6500.00 |
$11188.12 |
$6500.00 |
01-21-2021 |
08-1K1904 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
08 |
1 |
$31688.00 |
$54542.97 |
$31688.00 |
01-21-2021 |
08-1K1904 |
5 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
08 |
1 |
$33333.00 |
$57374.42 |
$33333.00 |
01-21-2021 |
08-1K1904 |
6 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
08 |
1 |
$26000.00 |
$44752.50 |
$26000.00 |
01-21-2021 |
08-1K1904 |
7 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
08 |
1 |
$5000.00 |
$8606.25 |
$5000.00 |
01-21-2021 |
08-1K1904 |
8 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
08 |
1 |
$1000.00 |
$1721.25 |
$1000.00 |
01-21-2021 |
08-1K1904 |
9 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
08 |
1 |
$14500.00 |
$24958.12 |
$14500.00 |
01-21-2021 |
08-1K1904 |
10 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
08 |
1 |
$24000.00 |
$41310.00 |
$24000.00 |
01-21-2021 |
08-1K1904 |
11 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$15700.00 |
$27023.62 |
$15700.00 |
01-21-2021 |
11-2N0534 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$14920.00 |
$25681.05 |
$14920.00 |
01-21-2021 |
11-2N0534 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$12650.00 |
$21773.81 |
$12650.00 |
01-21-2021 |
11-2N0534 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$10400.00 |
$17901.00 |
$10400.00 |
01-21-2021 |
11-2N0534 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$10000.00 |
$17212.50 |
$10000.00 |
01-21-2021 |
11-2N0534 |
5 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$45210.00 |
$77817.71 |
$45210.00 |
01-21-2021 |
11-2N0534 |
6 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$5500.00 |
$9466.87 |
$5500.00 |
01-21-2021 |
11-2N0534 |
7 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$25000.00 |
$43031.25 |
$25000.00 |
02-03-2021 |
04-297634 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$25000.00 |
$43031.25 |
$25000.00 |
02-03-2021 |
04-297634 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$42338.12 |
$72874.48 |
$42338.12 |
02-03-2021 |
04-297634 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$100000.00 |
$172124.99 |
$100000.00 |
02-03-2021 |
04-297634 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$53000.00 |
$91226.24 |
$53000.00 |
02-03-2021 |
04-297634 |
5 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$23000.00 |
$39588.75 |
$23000.00 |
02-03-2021 |
04-297634 |
6 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$25000.00 |
$43031.25 |
$25000.00 |
03-03-2021 |
04-0J5604 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$33464.71 |
$57601.13 |
$33464.71 |
03-03-2021 |
04-0J5604 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$30000.00 |
$51637.50 |
$30000.00 |
03-03-2021 |
04-0J5604 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$102000.00 |
$175567.49 |
$102000.00 |
03-03-2021 |
04-0J5604 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$145000.00 |
$249581.23 |
$145000.00 |
03-03-2021 |
04-0J5604 |
5 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$300000.00 |
$516374.96 |
$300000.00 |
03-03-2021 |
04-0J5604 |
6 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$180000.00 |
$309824.97 |
$180000.00 |
03-03-2021 |
04-0J5604 |
7 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$45000.00 |
$77456.24 |
$45000.00 |
03-03-2021 |
04-0J5604 |
8 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
06 |
1 |
$48000.00 |
$82619.99 |
$48000.00 |
03-04-2021 |
06-0X1904 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
06 |
1 |
$68000.00 |
$117044.99 |
$68000.00 |
03-04-2021 |
06-0X1904 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
06 |
1 |
$45000.00 |
$77456.24 |
$45000.00 |
03-04-2021 |
06-0X1904 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
06 |
1 |
$87000.00 |
$149748.74 |
$87000.00 |
03-04-2021 |
06-0X1904 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
06 |
1 |
$50000.00 |
$86062.49 |
$50000.00 |
03-04-2021 |
06-0X1904 |
5 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
06 |
1 |
$40000.00 |
$68849.99 |
$40000.00 |
03-04-2021 |
06-0X1904 |
6 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
08 |
1 |
$40000.00 |
$68849.99 |
$40000.00 |
03-09-2021 |
08-1C0824 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
08 |
1 |
$17000.00 |
$29261.25 |
$17000.00 |
03-09-2021 |
08-1C0824 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
08 |
1 |
$25000.00 |
$43031.25 |
$25000.00 |
03-09-2021 |
08-1C0824 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
08 |
1 |
$25000.00 |
$43031.25 |
$25000.00 |
03-09-2021 |
08-1C0824 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
08 |
1 |
$12000.00 |
$20655.00 |
$12000.00 |
03-09-2021 |
08-1C0824 |
5 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
08 |
1 |
$11000.00 |
$18933.75 |
$11000.00 |
03-09-2021 |
08-1C0824 |
6 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
08 |
1 |
$40000.00 |
$68849.99 |
$40000.00 |
03-09-2021 |
08-1C0824 |
7 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$15000.00 |
$25818.75 |
$15000.00 |
03-17-2021 |
04-2Q0804 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$25000.00 |
$43031.25 |
$25000.00 |
03-17-2021 |
04-2Q0804 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$22200.00 |
$38211.75 |
$22200.00 |
03-17-2021 |
04-2Q0804 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$41000.00 |
$70571.24 |
$41000.00 |
03-17-2021 |
04-2Q0804 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$20000.00 |
$34425.00 |
$20000.00 |
03-17-2021 |
04-2Q0804 |
5 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$8000.00 |
$11338.04 |
$8000.00 |
04-13-2021 |
04-1J9704 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$5000.00 |
$7086.28 |
$5000.00 |
04-13-2021 |
04-1J9704 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$2796.45 |
$3963.28 |
$2796.45 |
04-13-2021 |
04-1J9704 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$5000.00 |
$7086.28 |
$5000.00 |
04-13-2021 |
04-1J9704 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$4000.00 |
$5669.02 |
$4000.00 |
04-13-2021 |
04-1J9704 |
5 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$2000.00 |
$2834.51 |
$2000.00 |
04-13-2021 |
04-1J9704 |
6 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
06 |
1 |
$20000.00 |
$28345.10 |
$20000.00 |
04-21-2021 |
06-0Y6904 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
06 |
1 |
$12500.00 |
$17715.69 |
$12500.00 |
04-21-2021 |
06-0Y6904 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
06 |
1 |
$15000.00 |
$21258.83 |
$15000.00 |
04-21-2021 |
06-0Y6904 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
06 |
1 |
$19500.00 |
$27636.47 |
$19500.00 |
04-21-2021 |
06-0Y6904 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
06 |
1 |
$17000.00 |
$24093.34 |
$17000.00 |
04-21-2021 |
06-0Y6904 |
5 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$50236.00 |
$71197.22 |
$50236.00 |
04-28-2021 |
07-4W7904 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$14600.00 |
$20691.92 |
$14600.00 |
04-28-2021 |
07-4W7904 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$8000.00 |
$11338.04 |
$8000.00 |
04-28-2021 |
07-4W7904 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$10500.00 |
$14881.18 |
$10500.00 |
04-28-2021 |
07-4W7904 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$150000.00 |
$212588.26 |
$150000.00 |
04-28-2021 |
07-4W7904 |
5 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
06 |
1 |
$40000.00 |
$56690.20 |
$40000.00 |
05-04-2021 |
06-0Y9304 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
06 |
1 |
$20000.00 |
$28345.10 |
$20000.00 |
05-04-2021 |
06-0Y9304 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
06 |
1 |
$40000.00 |
$56690.20 |
$40000.00 |
05-04-2021 |
06-0Y9304 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
06 |
1 |
$30000.00 |
$42517.65 |
$30000.00 |
05-04-2021 |
06-0Y9304 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
06 |
1 |
$11135.00 |
$15781.14 |
$11135.00 |
05-04-2021 |
06-0Y9304 |
5 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
01 |
1 |
$5000.00 |
$7086.28 |
$5000.00 |
05-12-2021 |
01-0J8604 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
01 |
1 |
$6969.00 |
$9876.85 |
$6969.00 |
05-12-2021 |
01-0J8604 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
01 |
1 |
$30000.00 |
$42517.65 |
$30000.00 |
05-12-2021 |
01-0J8604 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
01 |
1 |
$3000.00 |
$4251.77 |
$3000.00 |
05-12-2021 |
01-0J8604 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
02 |
1 |
$55000.00 |
$77949.03 |
$55000.00 |
05-12-2021 |
02-0J9104 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
02 |
1 |
$50000.00 |
$70862.75 |
$50000.00 |
05-12-2021 |
02-0J9104 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
02 |
1 |
$45000.00 |
$63776.48 |
$45000.00 |
05-12-2021 |
02-0J9104 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
02 |
1 |
$30000.00 |
$42517.65 |
$30000.00 |
05-12-2021 |
02-0J9104 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$30000.00 |
$42517.65 |
$30000.00 |
05-12-2021 |
07-4W5104 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$28000.00 |
$39683.14 |
$28000.00 |
05-12-2021 |
07-4W5104 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$5250.00 |
$7440.59 |
$5250.00 |
05-12-2021 |
07-4W5104 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$20000.00 |
$28345.10 |
$20000.00 |
05-12-2021 |
07-4W5104 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$30000.00 |
$42517.65 |
$30000.00 |
05-12-2021 |
07-4W5104 |
5 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
03 |
1 |
$24000.00 |
$34014.12 |
$24000.00 |
05-13-2021 |
03-1G7604 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
03 |
1 |
$30000.00 |
$42517.65 |
$30000.00 |
05-13-2021 |
03-1G7604 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
03 |
1 |
$15000.00 |
$21258.83 |
$15000.00 |
05-13-2021 |
03-1G7604 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
06 |
1 |
$185000.00 |
$262192.18 |
$185000.00 |
05-18-2021 |
06-0U2704 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
06 |
1 |
$131000.00 |
$185660.41 |
$131000.00 |
05-18-2021 |
06-0U2704 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
06 |
1 |
$143750.00 |
$203730.41 |
$143750.00 |
05-18-2021 |
06-0U2704 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
06 |
1 |
$171000.00 |
$242350.61 |
$171000.00 |
05-18-2021 |
06-0U2704 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
06 |
1 |
$113000.00 |
$160149.82 |
$113000.00 |
05-18-2021 |
06-0U2704 |
5 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
01 |
1 |
$32500.00 |
$46060.79 |
$32500.00 |
05-25-2021 |
01-0J8804 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
01 |
1 |
$30000.00 |
$42517.65 |
$30000.00 |
05-25-2021 |
01-0J8804 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
01 |
1 |
$49000.00 |
$69445.50 |
$49000.00 |
05-25-2021 |
01-0J8804 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
01 |
1 |
$30000.00 |
$42517.65 |
$30000.00 |
05-25-2021 |
01-0J8804 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$30211.48 |
$52594.61 |
$30211.48 |
12-07-2021 |
04-4G0804 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$30000.00 |
$52226.45 |
$30000.00 |
12-07-2021 |
04-4G0804 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$88000.00 |
$153197.58 |
$88000.00 |
12-07-2021 |
04-4G0804 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$80000.00 |
$139270.52 |
$80000.00 |
12-07-2021 |
04-4G0804 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$30000.00 |
$52226.45 |
$30000.00 |
12-07-2021 |
04-4G0804 |
5 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$60499.12 |
$105321.80 |
$60499.12 |
12-07-2021 |
04-4G0804 |
6 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$65406.12 |
$113864.31 |
$65406.12 |
12-07-2021 |
04-4G0804 |
7 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$62700.00 |
$109153.27 |
$62700.00 |
12-17-2021 |
11-423704 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$24000.00 |
$41781.16 |
$24000.00 |
12-17-2021 |
11-423704 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$46000.00 |
$80080.55 |
$46000.00 |
12-17-2021 |
11-423704 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$50000.00 |
$87044.08 |
$50000.00 |
12-17-2021 |
11-423704 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$25000.00 |
$43522.04 |
$25000.00 |
12-17-2021 |
11-423704 |
5 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$45000.00 |
$78339.67 |
$45000.00 |
12-17-2021 |
11-423704 |
6 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$90000.00 |
$156679.34 |
$90000.00 |
12-17-2021 |
11-423704 |
7 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$180000.00 |
$269301.61 |
$180000.00 |
01-11-2022 |
04-2K1904 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$140000.00 |
$209456.81 |
$140000.00 |
01-11-2022 |
04-2K1904 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$200000.00 |
$299224.01 |
$200000.00 |
01-11-2022 |
04-2K1904 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$275000.00 |
$411433.02 |
$275000.00 |
01-11-2022 |
04-2K1904 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$320000.00 |
$478758.42 |
$320000.00 |
01-11-2022 |
04-2K1904 |
5 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
12 |
1 |
$7000.00 |
$10472.84 |
$7000.00 |
02-09-2022 |
12-0S2104 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
12 |
1 |
$6300.00 |
$9425.56 |
$6300.00 |
02-09-2022 |
12-0S2104 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
12 |
1 |
$12000.00 |
$17953.44 |
$12000.00 |
02-09-2022 |
12-0S2104 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
12 |
1 |
$10000.00 |
$14961.20 |
$10000.00 |
02-09-2022 |
12-0S2104 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
12 |
1 |
$12480.00 |
$18671.58 |
$12480.00 |
02-09-2022 |
12-0S2104 |
5 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
12 |
1 |
$38900.00 |
$58199.07 |
$38900.00 |
02-09-2022 |
12-0S2104 |
6 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
12 |
1 |
$10000.00 |
$14961.20 |
$10000.00 |
02-09-2022 |
12-0S2104 |
7 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
12 |
1 |
$50000.00 |
$74806.00 |
$50000.00 |
02-09-2022 |
12-0S2104 |
8 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
12 |
1 |
$30000.00 |
$44883.60 |
$30000.00 |
02-09-2022 |
12-0S2104 |
9 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
10 |
1 |
$12818.02 |
$19177.30 |
$12818.02 |
03-10-2022 |
10-0Q1224 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
10 |
1 |
$7864.00 |
$11765.49 |
$7864.00 |
03-10-2022 |
10-0Q1224 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
10 |
1 |
$7864.00 |
$11765.49 |
$7864.00 |
03-10-2022 |
10-0Q1224 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
10 |
1 |
$10050.25 |
$15036.38 |
$10050.25 |
03-10-2022 |
10-0Q1224 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
10 |
1 |
$45000.00 |
$67325.40 |
$45000.00 |
03-10-2022 |
10-0Q1224 |
5 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
12 |
1 |
$114500.00 |
$171305.75 |
$114500.00 |
03-10-2022 |
12-0J34U4 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
12 |
1 |
$145000.00 |
$216937.41 |
$145000.00 |
03-10-2022 |
12-0J34U4 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
12 |
1 |
$140000.00 |
$209456.81 |
$140000.00 |
03-10-2022 |
12-0J34U4 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
12 |
1 |
$10000.00 |
$15509.10 |
$10000.00 |
04-05-2022 |
12-0Q9304 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
12 |
1 |
$15000.00 |
$23263.65 |
$15000.00 |
04-05-2022 |
12-0Q9304 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
12 |
1 |
$40000.00 |
$62036.41 |
$40000.00 |
04-05-2022 |
12-0Q9304 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$165000.00 |
$255900.19 |
$165000.00 |
04-12-2022 |
04-2K2404 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$164000.00 |
$254349.28 |
$164000.00 |
04-12-2022 |
04-2K2404 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$250000.00 |
$387727.56 |
$250000.00 |
04-12-2022 |
04-2K2404 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$12000.00 |
$18610.92 |
$12000.00 |
04-13-2022 |
11-2N0874 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$25000.00 |
$38772.76 |
$25000.00 |
04-13-2022 |
11-2N0874 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$26000.00 |
$40323.67 |
$26000.00 |
04-13-2022 |
11-2N0874 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$15422.34 |
$23918.67 |
$15422.34 |
04-13-2022 |
11-2N0874 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$18500.00 |
$28691.84 |
$18500.00 |
04-13-2022 |
11-2N0874 |
5 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$18000.00 |
$27916.38 |
$18000.00 |
04-13-2022 |
11-2N0874 |
6 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$11600.00 |
$17990.56 |
$11600.00 |
04-13-2022 |
11-2N0874 |
7 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
08 |
1 |
$17400.00 |
$26985.84 |
$17400.00 |
04-26-2022 |
08-1K6504 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
08 |
1 |
$15000.00 |
$23263.65 |
$15000.00 |
04-26-2022 |
08-1K6504 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
08 |
1 |
$45000.00 |
$69790.96 |
$45000.00 |
04-26-2022 |
08-1K6504 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
08 |
1 |
$15000.00 |
$23263.65 |
$15000.00 |
04-26-2022 |
08-1K6504 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
08 |
1 |
$46000.00 |
$71341.87 |
$46000.00 |
04-26-2022 |
08-1K6504 |
5 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
10 |
1 |
$43000.00 |
$66689.14 |
$43000.00 |
04-28-2022 |
10-1J5304 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
10 |
1 |
$47000.00 |
$72892.78 |
$47000.00 |
04-28-2022 |
10-1J5304 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
10 |
1 |
$45000.00 |
$69790.96 |
$45000.00 |
04-28-2022 |
10-1J5304 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
10 |
1 |
$40000.00 |
$62036.41 |
$40000.00 |
04-28-2022 |
10-1J5304 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$30740.00 |
$47674.98 |
$30740.00 |
05-04-2022 |
07-2965U4 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$90000.00 |
$139581.92 |
$90000.00 |
05-04-2022 |
07-2965U4 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$70000.00 |
$108563.72 |
$70000.00 |
05-04-2022 |
07-2965U4 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
01 |
1 |
$18000.00 |
$27916.38 |
$18000.00 |
05-25-2022 |
01-0K7704 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
01 |
1 |
$200000.00 |
$310182.05 |
$200000.00 |
05-25-2022 |
01-0K7704 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
01 |
1 |
$126000.00 |
$195414.69 |
$126000.00 |
06-08-2022 |
01-0G1404 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
01 |
1 |
$107484.00 |
$166698.04 |
$107484.00 |
06-08-2022 |
01-0G1404 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
01 |
1 |
$267000.00 |
$414093.04 |
$267000.00 |
06-08-2022 |
01-0G1404 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$6000.00 |
$6674.61 |
$6000.00 |
11-10-2022 |
04-2J7404 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$100000.00 |
$111243.55 |
$100000.00 |
11-10-2022 |
04-2J7404 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$15000.00 |
$16686.53 |
$15000.00 |
11-10-2022 |
04-2J7404 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$50000.00 |
$55621.77 |
$50000.00 |
11-10-2022 |
04-2J7404 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$75000.00 |
$83432.66 |
$75000.00 |
11-10-2022 |
04-2J7404 |
5 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$9200.00 |
$10234.41 |
$9200.00 |
11-10-2022 |
04-2J7404 |
6 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$145000.00 |
$161303.14 |
$145000.00 |
11-17-2022 |
11-430444 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$320000.00 |
$355979.35 |
$320000.00 |
11-17-2022 |
11-430444 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$250000.00 |
$278108.87 |
$250000.00 |
12-15-2022 |
04-2K1704 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$125000.00 |
$139054.43 |
$125000.00 |
12-15-2022 |
04-2K1704 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$270000.00 |
$300357.58 |
$270000.00 |
12-15-2022 |
04-2K1704 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$350000.00 |
$389352.41 |
$350000.00 |
12-15-2022 |
04-2K1704 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
03 |
1 |
$40627.00 |
$44267.36 |
$40627.00 |
01-25-2023 |
03-4F6504 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
03 |
1 |
$50000.00 |
$54480.22 |
$50000.00 |
01-25-2023 |
03-4F6504 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
03 |
1 |
$195454.55 |
$212968.14 |
$195454.55 |
01-25-2023 |
03-4F6504 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
08 |
1 |
$250000.00 |
$292101.91 |
$250000.00 |
04-05-2023 |
08-1C08U4 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
08 |
1 |
$17400.00 |
$20330.29 |
$17400.00 |
04-05-2023 |
08-1C08U4 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
01 |
1 |
$35.00 |
$40.89 |
$35.00 |
04-25-2023 |
01-0L1604 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
01 |
1 |
$50000.00 |
$58420.38 |
$50000.00 |
04-25-2023 |
01-0L1604 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
01 |
1 |
$31000.00 |
$36220.64 |
$31000.00 |
04-25-2023 |
01-0L1604 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
01 |
1 |
$75000.00 |
$87630.57 |
$75000.00 |
04-25-2023 |
01-0L1604 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
02 |
1 |
$55000.00 |
$64262.42 |
$55000.00 |
05-17-2023 |
02-2J9804 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
02 |
1 |
$70000.00 |
$81788.53 |
$70000.00 |
05-17-2023 |
02-2J9804 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
03 |
1 |
$67000.00 |
$78283.31 |
$67000.00 |
05-18-2023 |
03-2G5504 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
03 |
1 |
$27702.00 |
$32367.23 |
$27702.00 |
05-18-2023 |
03-2G5504 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
08 |
1 |
$20000.00 |
$23368.15 |
$20000.00 |
05-31-2023 |
08-1M1704 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$77000.00 |
$89967.39 |
$77000.00 |
06-01-2023 |
04-3Q6004 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$37500.00 |
$43815.29 |
$37500.00 |
06-01-2023 |
04-3Q6004 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$110000.00 |
$128524.84 |
$110000.00 |
06-01-2023 |
04-3Q6004 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$150000.00 |
$175261.14 |
$150000.00 |
06-01-2023 |
04-3Q6004 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
02 |
1 |
$63905.36 |
$74667.51 |
$63905.36 |
06-12-2023 |
02-3H32U4 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
10 |
1 |
$150000.00 |
$175261.14 |
$150000.00 |
06-21-2023 |
10-0G8304 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
10 |
1 |
$230000.00 |
$268733.75 |
$230000.00 |
06-21-2023 |
10-0G8304 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
10 |
1 |
$125000.00 |
$104592.57 |
$125000.00 |
08-10-2023 |
10-1F1804 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
10 |
1 |
$142800.00 |
$119486.55 |
$142800.00 |
08-10-2023 |
10-1F1804 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
10 |
1 |
$60000.00 |
$50204.43 |
$60000.00 |
08-10-2023 |
10-1F1804 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
10 |
1 |
$200000.00 |
$167348.10 |
$200000.00 |
08-10-2023 |
10-1F1804 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$280000.00 |
$234287.35 |
$280000.00 |
08-16-2023 |
07-328304 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$97200.00 |
$81331.18 |
$97200.00 |
08-16-2023 |
07-328304 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$775000.00 |
$648473.90 |
$775000.00 |
08-16-2023 |
07-328304 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
03 |
1 |
$65655.37 |
$54936.51 |
$65655.37 |
08-18-2023 |
03-3F0704 |
1 |
|
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
06 |
1 |
$40000.00 |
$33469.62 |
$40000.00 |
08-29-2023 |
06-0U0004 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
06 |
1 |
$110000.00 |
$92041.46 |
$110000.00 |
08-29-2023 |
06-0U0004 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
06 |
1 |
$70200.00 |
$58739.18 |
$70200.00 |
08-29-2023 |
06-0U0004 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
06 |
1 |
$125000.00 |
$104592.57 |
$125000.00 |
08-29-2023 |
06-0U0004 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$200000.00 |
$196552.65 |
$200000.00 |
12-14-2023 |
04-0P9804 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$400000.00 |
$393105.30 |
$400000.00 |
12-14-2023 |
04-0P9804 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$500000.00 |
$491381.62 |
$500000.00 |
12-14-2023 |
04-0P9804 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$351166.00 |
$345113.04 |
$351166.00 |
12-14-2023 |
04-0P9804 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
10 |
1 |
$145000.00 |
$142500.67 |
$145000.00 |
12-14-2023 |
10-1E3004 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
10 |
1 |
$145000.00 |
$142500.67 |
$145000.00 |
12-14-2023 |
10-1E3004 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
10 |
1 |
$150000.00 |
$147414.49 |
$150000.00 |
12-14-2023 |
10-1E3004 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
10 |
1 |
$100000.00 |
$98276.32 |
$100000.00 |
12-14-2023 |
10-1E3004 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
10 |
1 |
$276320.00 |
$271557.14 |
$276320.00 |
12-14-2023 |
10-1E3004 |
5 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
10 |
1 |
$276320.00 |
$271557.14 |
$276320.00 |
12-14-2023 |
10-1E3004 |
6 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
12 |
1 |
$62000.00 |
$47634.54 |
$62000.00 |
01-30-2024 |
12-0T8704 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
12 |
1 |
$6300.00 |
$4840.28 |
$6300.00 |
01-30-2024 |
12-0T8704 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
12 |
1 |
$67000.00 |
$51476.04 |
$67000.00 |
01-30-2024 |
12-0T8704 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
12 |
1 |
$65179.42 |
$50077.29 |
$65179.42 |
01-30-2024 |
12-0T8704 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
05 |
1 |
$850000.00 |
$653054.22 |
$850000.00 |
03-01-2024 |
05-0N74V4 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
05 |
1 |
$6000.00 |
$4609.79 |
$6000.00 |
03-13-2024 |
05-1Q1704 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
05 |
1 |
$5479.00 |
$4209.51 |
$5479.00 |
03-13-2024 |
05-1Q1704 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
05 |
1 |
$10000.00 |
$7682.99 |
$10000.00 |
03-13-2024 |
05-1Q1704 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
05 |
1 |
$5000.00 |
$3841.50 |
$5000.00 |
03-13-2024 |
05-1Q1704 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
05 |
1 |
$12500.00 |
$9603.74 |
$12500.00 |
03-13-2024 |
05-1Q1704 |
5 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
10 |
1 |
$42000.00 |
$36534.64 |
$42000.00 |
04-10-2024 |
10-1N4204 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
10 |
1 |
$85000.00 |
$73939.15 |
$85000.00 |
04-10-2024 |
10-1N4204 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
10 |
1 |
$75000.00 |
$65240.43 |
$75000.00 |
04-10-2024 |
10-1N4204 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
03 |
1 |
$7450.00 |
$6480.55 |
$7450.00 |
04-30-2024 |
03-2G8004 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
03 |
1 |
$6500.00 |
$5654.17 |
$6500.00 |
04-30-2024 |
03-2G8004 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
03 |
1 |
$7500.00 |
$6524.04 |
$7500.00 |
04-30-2024 |
03-2G8004 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
03 |
1 |
$3750.00 |
$3262.02 |
$3750.00 |
04-30-2024 |
03-2G8004 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
03 |
1 |
$20000.00 |
$17397.45 |
$20000.00 |
04-30-2024 |
03-2G8004 |
5 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
03 |
1 |
$15000.00 |
$13048.09 |
$15000.00 |
04-30-2024 |
03-2G8004 |
6 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$35000.00 |
$30445.53 |
$35000.00 |
05-08-2024 |
11-2N1714 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$20000.00 |
$17397.45 |
$20000.00 |
05-08-2024 |
11-2N1714 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$49000.00 |
$42623.75 |
$49000.00 |
05-08-2024 |
11-2N1714 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$50000.00 |
$43493.62 |
$50000.00 |
06-20-2024 |
07-301604 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$88000.00 |
$76548.77 |
$88000.00 |
06-20-2024 |
07-301604 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$100000.00 |
$86987.24 |
$100000.00 |
06-20-2024 |
07-301604 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$113300.00 |
$98556.54 |
$113300.00 |
06-20-2024 |
07-301604 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$90000.00 |
$78288.51 |
$90000.00 |
06-20-2024 |
07-301604 |
5 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
07 |
1 |
$95000.00 |
$82637.87 |
$95000.00 |
06-20-2024 |
07-301604 |
6 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$70000.00 |
$52032.16 |
$70000.00 |
07-17-2024 |
11-430324 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$4815.00 |
$3579.07 |
$4815.00 |
07-17-2024 |
11-430324 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$150000.00 |
$111497.49 |
$150000.00 |
07-17-2024 |
11-430324 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$21500.00 |
$15981.31 |
$21500.00 |
07-17-2024 |
11-430324 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$50010.00 |
$37173.26 |
$50010.00 |
07-17-2024 |
11-430324 |
5 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
12 |
1 |
$35000.00 |
$26016.08 |
$35000.00 |
08-14-2024 |
12-0S1104 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
12 |
1 |
$8900.00 |
$6615.52 |
$8900.00 |
08-14-2024 |
12-0S1104 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
12 |
1 |
$11000.00 |
$8176.48 |
$11000.00 |
08-14-2024 |
12-0S1104 |
3 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
12 |
1 |
$9181.38 |
$6824.67 |
$9181.38 |
08-14-2024 |
12-0S1104 |
4 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$20000.00 |
$20735.87 |
$20000.00 |
10-29-2024 |
11-430904 |
1 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
11 |
1 |
$65000.00 |
$67391.57 |
$65000.00 |
10-29-2024 |
11-430904 |
2 |
M |
TRO |
|
| 600117 - BRIDGE REMOVAL (PORTION), LOCATION C |
LS |
04 |
1 |
$30000.00 |
$31103.80 |
$30000.00 |
11-13-2024 |
04-2Q8004 |
1 |
M |
TRO |
|
MORE THAN 500 RESULTS RETURNED. ONLY 500 ROWS SHOWN.
|