|
| 723180 - CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY) |
CY |
08 |
226 |
$300.00 |
$516.37 |
$67800.00 |
03-09-2021 |
08-1C0824 |
1 |
M |
TRO |
|
| 723180 - CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY) |
CY |
08 |
226 |
$515.00 |
$886.44 |
$116390.00 |
03-09-2021 |
08-1C0824 |
2 |
M |
TRO |
|
| 723180 - CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY) |
CY |
08 |
226 |
$500.00 |
$860.62 |
$113000.00 |
03-09-2021 |
08-1C0824 |
3 |
M |
TRO |
|
| 723180 - CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY) |
CY |
08 |
226 |
$510.00 |
$877.84 |
$115260.00 |
03-09-2021 |
08-1C0824 |
4 |
M |
TRO |
|
| 723180 - CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY) |
CY |
08 |
226 |
$800.00 |
$1377.00 |
$180800.00 |
03-09-2021 |
08-1C0824 |
5 |
M |
TRO |
|
| 723180 - CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY) |
CY |
08 |
226 |
$480.00 |
$826.20 |
$108480.00 |
03-09-2021 |
08-1C0824 |
6 |
M |
TRO |
|
| 723180 - CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY) |
CY |
08 |
226 |
$265.00 |
$456.13 |
$59890.00 |
03-09-2021 |
08-1C0824 |
7 |
M |
TRO |
|
| 723180 - CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY) |
CY |
11 |
15 |
$1250.00 |
$1771.57 |
$18750.00 |
04-01-2021 |
11-412204 |
1 |
M |
TRO |
|
| 723180 - CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY) |
CY |
11 |
15 |
$260.00 |
$368.49 |
$3900.00 |
04-01-2021 |
11-412204 |
2 |
M |
TRO |
|
| 723180 - CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY) |
CY |
11 |
15 |
$500.00 |
$708.63 |
$7500.00 |
04-01-2021 |
11-412204 |
3 |
M |
TRO |
|
| 723180 - CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY) |
CY |
11 |
15 |
$150.00 |
$212.59 |
$2250.00 |
04-01-2021 |
11-412204 |
4 |
M |
TRO |
|
| 723180 - CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY) |
CY |
11 |
15 |
$500.00 |
$708.63 |
$7500.00 |
04-01-2021 |
11-412204 |
5 |
M |
TRO |
|
| 723180 - CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY) |
CY |
11 |
15 |
$800.00 |
$1133.80 |
$12000.00 |
04-01-2021 |
11-412204 |
6 |
M |
TRO |
|
| 723180 - CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY) |
CY |
11 |
15 |
$700.00 |
$992.08 |
$10500.00 |
04-01-2021 |
11-412204 |
7 |
M |
TRO |
|
| 723180 - CONCRETED-ROCK SLOPE PROTECTION |
CY |
08 |
6 |
$2000.00 |
$2224.87 |
$12000.00 |
10-13-2022 |
08-1G8304 |
1 |
M |
TRO |
|
| 723180 - CONCRETED-ROCK SLOPE PROTECTION |
CY |
08 |
6 |
$350.00 |
$389.35 |
$2100.00 |
10-13-2022 |
08-1G8304 |
2 |
M |
TRO |
|
| 723180 - CONCRETED-ROCK SLOPE PROTECTION |
CY |
08 |
6 |
$526.31 |
$585.49 |
$3157.86 |
10-13-2022 |
08-1G8304 |
3 |
M |
TRO |
|
| 723180 - CONCRETED-ROCK SLOPE PROTECTION |
CY |
05 |
85 |
$400.00 |
$444.97 |
$34000.00 |
10-27-2022 |
05-1K1204 |
1 |
M |
TRO |
|
| 723180 - CONCRETED-ROCK SLOPE PROTECTION |
CY |
05 |
85 |
$440.00 |
$489.47 |
$37400.00 |
10-27-2022 |
05-1K1204 |
2 |
M |
TRO |
|
| 723180 - CONCRETED-ROCK SLOPE PROTECTION |
CY |
05 |
85 |
$559.59 |
$622.51 |
$47565.15 |
10-27-2022 |
05-1K1204 |
3 |
M |
TRO |
|
| 723180 - CONCRETED-ROCK SLOPE PROTECTION |
CY |
05 |
85 |
$800.00 |
$889.95 |
$68000.00 |
10-27-2022 |
05-1K1204 |
4 |
M |
TRO |
|
| 723180 - CONCRETED-ROCK SLOPE PROTECTION |
CY |
05 |
85 |
$708.00 |
$787.60 |
$60180.00 |
10-27-2022 |
05-1K1204 |
5 |
M |
TRO |
|
| 723180 - CONCRETED-ROCK SLOPE PROTECTION |
CY |
05 |
85 |
$530.00 |
$589.59 |
$45050.00 |
10-27-2022 |
05-1K1204 |
6 |
M |
TRO |
|
| 723180 - CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY) |
CY |
07 |
5 |
$700.00 |
$725.76 |
$3500.00 |
12-17-2024 |
07-347904 |
1 |
M |
TRO |
|
| 723180 - CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY) |
CY |
07 |
5 |
$1550.00 |
$1607.03 |
$7750.00 |
12-17-2024 |
07-347904 |
2 |
M |
TRO |
|
| 723180 - CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY) |
CY |
07 |
5 |
$750.00 |
$777.59 |
$3750.00 |
12-17-2024 |
07-347904 |
3 |
M |
TRO |
|
| 723180 - CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY) |
CY |
07 |
5 |
$2259.00 |
$2342.12 |
$11295.00 |
12-17-2024 |
07-347904 |
4 |
M |
TRO |
|
| 723180 - CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY) |
CY |
10 |
2 |
$9309.40 |
$8186.44 |
$18618.80 |
09-10-2025 |
10-1G0204 |
1 |
M |
TRO |
|
| 723180 - CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY) |
CY |
10 |
2 |
$4084.60 |
$3591.89 |
$8169.20 |
09-10-2025 |
10-1G0204 |
2 |
M |
TRO |
|
| 723180 - CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY) |
CY |
10 |
2 |
$6800.00 |
$5979.74 |
$13600.00 |
09-10-2025 |
10-1G0204 |
3 |
M |
TRO |
|
| 723180 - CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY) |
CY |
10 |
2 |
$4335.00 |
$3812.08 |
$8670.00 |
09-10-2025 |
10-1G0204 |
4 |
M |
TRO |
|
| 723180 - CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY) |
CY |
10 |
22 |
$819.16 |
$801.49 |
$18021.52 |
10-21-2025 |
10-1F2504 |
1 |
M |
TRO |
|
| 723180 - CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY) |
CY |
10 |
22 |
$98.00 |
$95.89 |
$2156.00 |
10-21-2025 |
10-1F2504 |
2 |
M |
TRO |
|
| 723180 - CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY) |
CY |
10 |
22 |
$1250.00 |
$1223.04 |
$27500.00 |
10-21-2025 |
10-1F2504 |
3 |
M |
TRO |
|
| 723180 - CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY) |
CY |
10 |
22 |
$1125.00 |
$1100.74 |
$24750.00 |
10-21-2025 |
10-1F2504 |
4 |
M |
TRO |
|
| 723180 - CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY) |
CY |
10 |
22 |
$600.00 |
$587.06 |
$13200.00 |
10-21-2025 |
10-1F2504 |
5 |
M |
TRO |
|
| 723180 - CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY) |
CY |
10 |
22 |
$551.00 |
$539.12 |
$12122.00 |
10-21-2025 |
10-1F2504 |
6 |
M |
TRO |
|
| 723180 - CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY) |
CY |
10 |
22 |
$900.00 |
$880.59 |
$19800.00 |
10-21-2025 |
10-1F2504 |
7 |
M |
TRO |
|
| 723180 - CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY) |
CY |
10 |
22 |
$2400.00 |
$2348.24 |
$52800.00 |
10-21-2025 |
10-1F2504 |
8 |
M |
TRO |
|
| 723180 - CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY) |
CY |
10 |
22 |
$1522.00 |
$1489.17 |
$33484.00 |
10-21-2025 |
10-1F2504 |
9 |
M |
TRO |
|
| 723180 - CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY) |
CY |
10 |
22 |
$4500.00 |
$4402.94 |
$99000.00 |
10-21-2025 |
10-1F2504 |
10 |
M |
TRO |
|
| 723180 - CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY) |
CY |
03 |
8 |
$900.00 |
$880.59 |
$7200.00 |
10-23-2025 |
03-1J6304 |
1 |
M |
TRO |
|
| 723180 - CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY) |
CY |
03 |
8 |
$650.00 |
$635.98 |
$5200.00 |
10-23-2025 |
03-1J6304 |
2 |
M |
TRO |
|
| 723180 - CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY) |
CY |
03 |
8 |
$800.00 |
$782.75 |
$6400.00 |
10-23-2025 |
03-1J6304 |
3 |
M |
TRO |
|
| 723180 - CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY) |
CY |
03 |
8 |
$1315.00 |
$1286.64 |
$10520.00 |
10-23-2025 |
03-1J6304 |
4 |
M |
TRO |
|
| 723180 - CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY) |
CY |
03 |
8 |
$1500.00 |
$1467.65 |
$12000.00 |
10-23-2025 |
03-1J6304 |
5 |
M |
TRO |
|
| 723180 - CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY) |
CY |
03 |
8 |
$1400.00 |
$1369.81 |
$11200.00 |
10-23-2025 |
03-1J6304 |
6 |
M |
TRO |
|
| 723180 - CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY) |
CY |
03 |
8 |
$1500.00 |
$1467.65 |
$12000.00 |
10-23-2025 |
03-1J6304 |
7 |
M |
TRO |
|
| 723180 - CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY) |
CY |
01 |
4 |
$379.36 |
$371.18 |
$1517.44 |
12-09-2025 |
01-0N2904 |
1 |
M |
TRO |
|
| 723180 - CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY) |
CY |
01 |
4 |
$1875.00 |
$1834.56 |
$7500.00 |
12-09-2025 |
01-0N2904 |
2 |
M |
TRO |
|
| 723180 - CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY) |
CY |
01 |
4 |
$1875.00 |
$1834.56 |
$7500.00 |
12-09-2025 |
01-0N2904 |
3 |
M |
TRO |