CALIFORNIA DEPARTMENT OF TRANSPORTATION - CONTRACT COST DATA

Select Item No. / Description Unit Dist Qty Unit
Price
Adj
Price
Total Bid Open
Date
Contract
No.
Bid M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 06 31 $160.00 $953.04 $4960.00 02-09-1993 06-362304 1    
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 03 1.4 $1700.00 $10126.06 $2380.00 03-16-1993 03-352804 1    
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 1.5 $900.00 $5360.85 $1350.00 09-08-1993 04-174004 1 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 16 $400.00 $2382.60 $6400.00 11-17-1993 04-126334 1 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 3.5 $360.00 $1953.73 $1260.00 06-08-1994 04-135314 1    
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 08 9 $300.00 $1628.11 $2700.00 09-01-1994 08-201104 1 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 05 4 $400.00 $2170.81 $1600.00 12-06-1994 05-335604 1 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 03 1.5 $350.00 $2011.20 $525.00 02-08-1995 03-352604 1 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 08 18 $235.00 $1350.37 $4230.00 02-09-1995 08-353504 1 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 10 $250.00 $1430.96 $2500.00 02-14-1996 04-192254 1 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 10 $250.00 $1430.96 $2500.00 03-26-1996 04-132624 1 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 08 9 $385.00 $2203.67 $3465.00 03-28-1996 08-201104 1 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 3 $775.00 $4435.97 $2325.00 04-30-1996 04-178804 1    
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 0.2 $3000.00 $17171.48 $600.00 07-02-1996 04-150184 1    
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 02 16.5 $204.74 $1171.90 $3378.21 09-24-1996 02-287404 1    
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 03 3.9 $600.00 $3292.81 $2340.00 01-22-1997 03-430504 1    
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 04 170 $400.00 $2195.21 $68000.00 05-21-1997 04-180284 1 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 08 101 $230.00 $1262.24 $23230.00 07-17-1997 08-367624 1 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 09 16 $250.00 $1372.00 $4000.00 12-09-1997 09-261604 1    
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 11 55 $181.82 $951.50 $10000.10 01-22-1998 11-204004 1    
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 11 50 $500.00 $2616.61 $25000.00 05-21-1998 11-2030U4 1 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 08 13 $350.00 $1709.52 $4550.00 02-11-1999 08-043524 1 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 08 20 $300.00 $1465.30 $6000.00 03-25-1999 08-344704 1 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 07 41 $350.00 $1709.52 $14350.00 04-29-1999 07-102914 1 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 08 4.8 $410.00 $2002.58 $1968.00 10-14-1999 08-437304 1    
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 03 56 $525.00 $2489.59 $29400.00 05-17-2000 03-0A5204 1    
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 02 17 $425.00 $2015.38 $7225.00 08-22-2000 02-364304 1 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 11 180 $162.76 $711.92 $29296.80 04-19-2001 11-074804 1    
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 08 31 $250.00 $1093.51 $7750.00 05-10-2001 08-4353U4 1 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 04 1.5 $1000.00 $4374.03 $1500.00 10-31-2001 04-045044 1 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 07 7 $450.00 $2127.05 $3150.00 03-28-2002 07-0607U4 1 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 07 7 $500.00 $2363.39 $3500.00 03-28-2002 07-0607U4 2 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 07 7 $500.00 $2363.39 $3500.00 03-28-2002 07-0607U4 3 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 07 7 $420.00 $1985.25 $2940.00 03-28-2002 07-0607U4 4 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 07 7 $450.00 $2127.05 $3150.00 03-28-2002 07-0607U4 5 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 07 7 $500.00 $2363.39 $3500.00 03-28-2002 07-0607U4 6 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 07 7 $373.00 $1763.09 $2611.00 03-28-2002 07-0607U4 7 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 07 7 $590.00 $2788.80 $4130.00 03-28-2002 07-0607U4 8 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 07 1 $2000.00 $9453.55 $2000.00 05-30-2002 07-105484 1 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 07 1 $1150.00 $5435.79 $1150.00 05-30-2002 07-105484 2 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 07 8.5 $800.00 $3781.42 $6800.00 09-19-2002 07-166104 1 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 07 8.5 $800.00 $3781.42 $6800.00 09-19-2002 07-166104 2 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 02 25 $391.00 $1752.09 $9775.00 09-16-2003 02-0C8204 1    
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 02 25 $550.00 $2464.57 $13750.00 09-16-2003 02-0C8204 2    
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 02 25 $675.00 $3024.70 $16875.00 09-16-2003 02-0C8204 3    
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 02 25 $760.00 $3405.59 $19000.00 09-16-2003 02-0C8204 4    
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 11 3.5 $1050.00 $3108.21 $3675.00 04-15-2004 11-256404 1    
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 11 3.5 $600.00 $1776.12 $2100.00 04-15-2004 11-256404 2    
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 11 3.5 $700.00 $2072.14 $2450.00 04-15-2004 11-256404 3    
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 11 3.5 $1300.00 $3848.26 $4550.00 04-15-2004 11-256404 4    
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 11 3.5 $1200.00 $3552.24 $4200.00 04-15-2004 11-256404 5    
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 07 20 $1500.00 $4440.30 $30000.00 06-03-2004 07-1178U4 1 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 07 20 $700.00 $2072.14 $14000.00 06-03-2004 07-1178U4 2 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 07 20 $350.00 $1036.07 $7000.00 06-03-2004 07-1178U4 3 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 07 20 $435.00 $1287.69 $8700.00 06-03-2004 07-1178U4 4 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 07 20 $400.00 $1184.08 $8000.00 06-03-2004 07-1178U4 5 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 04 4.5 $2000.00 $5920.40 $9000.00 06-23-2004 04-247504 1 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 04 4.5 $1200.00 $3552.24 $5400.00 06-23-2004 04-247504 2 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 04 4.5 $1260.00 $3729.85 $5670.00 06-23-2004 04-247504 3 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 04 38 $725.00 $2146.15 $27550.00 06-30-2004 04-270704 1 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 04 38 $1500.00 $4440.30 $57000.00 06-30-2004 04-270704 2 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 04 38 $1000.00 $2960.20 $38000.00 06-30-2004 04-270704 3 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 04 38 $1000.00 $2960.20 $38000.00 06-30-2004 04-270704 4 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 04 38 $1500.00 $4440.30 $57000.00 06-30-2004 04-270704 5 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 04 38 $1000.00 $2960.20 $38000.00 06-30-2004 04-270704 6 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 04 38 $2167.00 $6414.76 $82346.00 06-30-2004 04-270704 7 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 04 4.5 $1200.00 $3552.24 $5400.00 10-05-2004 04-247504 1 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 04 4.5 $1400.00 $4144.28 $6300.00 10-05-2004 04-247504 2 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 04 4.5 $1800.00 $5328.36 $8100.00 10-05-2004 04-247504 3 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 04 4.5 $620.00 $1835.33 $2790.00 10-05-2004 04-247504 4 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 04 4.5 $1200.00 $3552.24 $5400.00 10-05-2004 04-247504 5 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 04 4.5 $1410.00 $4173.88 $6345.00 10-05-2004 04-247504 6 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 04 23 $625.00 $1612.35 $14375.00 11-08-2005 04-270514 1 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 04 23 $650.00 $1676.84 $14950.00 11-08-2005 04-270514 2 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 04 23 $1000.00 $2579.75 $23000.00 11-08-2005 04-270514 3 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 04 23 $1500.00 $3869.63 $34500.00 11-08-2005 04-270514 4 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 04 23 $700.00 $1805.83 $16100.00 11-08-2005 04-270514 5 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 04 23 $370.00 $954.51 $8510.00 11-08-2005 04-270514 6 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 04 23 $508.00 $1310.51 $11684.00 11-08-2005 04-270514 7 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 04 23 $1200.00 $3095.70 $27600.00 11-08-2005 04-270514 8 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 04 12 $1000.00 $2492.01 $12000.00 04-26-2006 04-1A2404 1    
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 04 8 $3000.00 $7476.02 $24000.00 05-10-2006 04-272014 1 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 04 8 $1085.00 $2703.83 $8680.00 05-10-2006 04-272014 2 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 03 1.3 $2200.00 $5482.41 $2860.00 06-21-2006 03-2E2104 1    
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 03 1.3 $1000.00 $2492.01 $1300.00 06-21-2006 03-2E2104 2    
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 03 1.3 $2500.00 $6230.02 $3250.00 06-21-2006 03-2E2104 3    
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 03 1.3 $1200.00 $2990.41 $1560.00 06-21-2006 03-2E2104 4    
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 03 1.3 $2000.00 $4984.01 $2600.00 06-21-2006 03-2E2104 5    
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 03 1.3 $1500.00 $3738.01 $1950.00 06-21-2006 03-2E2104 6    
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 03 1.3 $3000.00 $7476.02 $3900.00 06-21-2006 03-2E2104 7    
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 03 1.3 $3865.00 $9631.61 $5024.50 06-21-2006 03-2E2104 8    
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 03 1.3 $3500.00 $8722.02 $4550.00 06-21-2006 03-2E2104 9    
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 08 1 $1200.00 $2990.41 $1200.00 11-02-2006 08-0C0704 1 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 08 1 $2690.00 $6703.50 $2690.00 11-02-2006 08-0C0704 2 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 08 1 $2500.00 $6230.02 $2500.00 11-02-2006 08-0C0704 3 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 08 1 $4650.00 $11587.83 $4650.00 11-02-2006 08-0C0704 4 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 08 1 $5500.00 $13706.04 $5500.00 11-02-2006 08-0C0704 5 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 08 1 $3000.00 $7476.02 $3000.00 11-02-2006 08-0C0704 6 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 08 1 $2000.00 $4984.01 $2000.00 11-02-2006 08-0C0704 7 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 08 1 $1500.00 $3738.01 $1500.00 11-02-2006 08-0C0704 8 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 08 1 $1500.00 $3738.01 $1500.00 11-02-2006 08-0C0704 9 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 08 1 $3375.00 $8410.52 $3375.00 11-02-2006 08-0C0704 10 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 11 1.2 $1800.00 $4508.62 $2160.00 06-07-2007 11-081104 1 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 11 1.2 $870.00 $2179.16 $1044.00 06-07-2007 11-081104 2 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 11 1.2 $500.00 $1252.39 $600.00 06-07-2007 11-081104 3 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 11 1.2 $650.00 $1628.11 $780.00 06-07-2007 11-081104 4 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 11 1.2 $675.00 $1690.73 $810.00 06-07-2007 11-081104 5 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 11 1.2 $1200.00 $3005.74 $1440.00 06-07-2007 11-081104 6 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 03 3.6 $1000.00 $2504.79 $3600.00 11-07-2007 03-3864U4 1 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 03 3.6 $860.00 $2154.12 $3096.00 11-07-2007 03-3864U4 2 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 03 3.6 $2500.00 $6261.97 $9000.00 11-07-2007 03-3864U4 3 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 03 3.6 $1100.00 $2755.26 $3960.00 11-07-2007 03-3864U4 4 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 8 $900.00 $2406.51 $7200.00 03-11-2008 04-4C1524 1 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 8 $400.00 $1069.56 $3200.00 03-11-2008 04-4C1524 2 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 8 $500.00 $1336.95 $4000.00 03-11-2008 04-4C1524 3 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 8 $1200.00 $3208.69 $9600.00 03-11-2008 04-4C1524 4 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 8 $200.00 $534.78 $1600.00 03-11-2008 04-4C1524 5 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 8 $480.00 $1283.47 $3840.00 03-11-2008 04-4C1524 6 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 8 $766.50 $2049.55 $6132.00 03-11-2008 04-4C1524 7 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 8 $730.00 $1951.95 $5840.00 03-11-2008 04-4C1524 8 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 6 $945.00 $3010.24 $5670.00 01-21-2009 04-1A2404 1    
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 6 $400.00 $1274.17 $2400.00 01-21-2009 04-1A2404 2    
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 6 $1100.00 $3503.98 $6600.00 01-21-2009 04-1A2404 3    
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 6 $1500.00 $4778.15 $9000.00 01-21-2009 04-1A2404 4    
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 6 $400.00 $1274.17 $2400.00 01-21-2009 04-1A2404 5    
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 6 $503.00 $1602.27 $3018.00 01-21-2009 04-1A2404 6    
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 6 $900.00 $2866.89 $5400.00 01-21-2009 04-1A2404 7    
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 6 $2400.00 $7645.04 $14400.00 01-21-2009 04-1A2404 8    
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 6 $1025.00 $3265.07 $6150.00 01-21-2009 04-1A2404 9    
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 2 $780.00 $2484.64 $1560.00 04-14-2009 04-4C15U4 1 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 2 $775.00 $2468.71 $1550.00 04-14-2009 04-4C15U4 2 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 2 $800.00 $2548.35 $1600.00 04-14-2009 04-4C15U4 3 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 2 $700.00 $2229.80 $1400.00 04-14-2009 04-4C15U4 4 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 2 $550.00 $1751.99 $1100.00 04-14-2009 04-4C15U4 5 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 2 $775.00 $2468.71 $1550.00 04-14-2009 04-4C15U4 6 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 2 $775.00 $2468.71 $1550.00 04-14-2009 04-4C15U4 7 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 2 $790.50 $2518.09 $1581.00 04-14-2009 04-4C15U4 8 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 2 $625.00 $1990.90 $1250.00 04-14-2009 04-4C15U4 9 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 2 $1500.00 $4778.15 $3000.00 04-14-2009 04-4C15U4 10 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 2 $775.00 $2468.71 $1550.00 04-14-2009 04-4C15U4 11 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 2 $1060.00 $3376.56 $2120.00 04-14-2009 04-4C15U4 12 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 2 $775.00 $2468.71 $1550.00 04-14-2009 04-4C15U4 13 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 08 0.9 $1400.00 $4459.61 $1260.00 05-21-2009 08-0H7904 1 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 08 0.9 $2000.00 $6370.87 $1800.00 05-21-2009 08-0H7904 2 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 08 0.9 $1700.00 $5415.24 $1530.00 05-21-2009 08-0H7904 3 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 08 0.9 $2000.00 $6370.87 $1800.00 05-21-2009 08-0H7904 4 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 08 0.9 $2500.00 $7963.59 $2250.00 05-21-2009 08-0H7904 5 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 08 0.9 $2163.00 $6890.10 $1946.70 05-21-2009 08-0H7904 6 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 08 0.9 $3500.00 $11149.02 $3150.00 05-21-2009 08-0H7904 7 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 08 0.9 $2800.00 $8919.22 $2520.00 05-21-2009 08-0H7904 8 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 08 0.9 $2000.00 $6370.87 $1800.00 05-21-2009 08-0H7904 9 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 08 0.9 $1000.00 $3185.43 $900.00 05-21-2009 08-0H7904 10 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 08 0.9 $1000.00 $3185.43 $900.00 05-21-2009 08-0H7904 11 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 02 2.4 $750.00 $2389.08 $1800.00 06-02-2009 02-2C50U4 1 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 02 2.4 $500.00 $1592.72 $1200.00 06-02-2009 02-2C50U4 2 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 02 2.4 $700.00 $2229.80 $1680.00 06-02-2009 02-2C50U4 3 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 02 2.4 $1000.00 $3185.43 $2400.00 06-02-2009 02-2C50U4 4 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 02 2.4 $1000.00 $3185.43 $2400.00 06-02-2009 02-2C50U4 5 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 02 2.4 $600.00 $1911.26 $1440.00 06-02-2009 02-2C50U4 6 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 02 2.4 $500.00 $1592.72 $1200.00 06-02-2009 02-2C50U4 7 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 02 2.4 $750.00 $2389.08 $1800.00 06-02-2009 02-2C50U4 8 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 08 3.5 $500.00 $1592.72 $1750.00 09-24-2009 08-4440U4 1 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 08 3.5 $790.00 $2516.49 $2765.00 09-24-2009 08-4440U4 2 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 08 3.5 $700.00 $2229.80 $2450.00 09-24-2009 08-4440U4 3 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 08 3.5 $1000.00 $3185.43 $3500.00 09-24-2009 08-4440U4 4 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 08 3.5 $1560.00 $4969.28 $5460.00 09-24-2009 08-4440U4 5 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 08 3.5 $1535.00 $4889.64 $5372.50 09-24-2009 08-4440U4 6 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 08 3.5 $515.00 $1640.50 $1802.50 09-24-2009 08-4440U4 7 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 04 65 $540.00 $1720.13 $35100.00 10-06-2009 04-263724 1 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 04 65 $500.00 $1592.72 $32500.00 10-06-2009 04-263724 2 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 04 65 $625.00 $1990.90 $40625.00 10-06-2009 04-263724 3 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 04 65 $916.00 $2917.86 $59540.00 10-06-2009 04-263724 4 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 04 65 $300.00 $955.63 $19500.00 10-06-2009 04-263724 5 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 04 65 $850.00 $2707.62 $55250.00 10-06-2009 04-263724 6 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 04 65 $586.50 $1868.26 $38122.50 10-06-2009 04-263724 7 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 04 65 $300.00 $955.63 $19500.00 10-06-2009 04-263724 8 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 04 65 $1000.00 $3185.43 $65000.00 10-06-2009 04-263724 9 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 10 12 $630.00 $2006.82 $7560.00 11-04-2009 10-0H3204 1    
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 10 12 $800.00 $2548.35 $9600.00 11-04-2009 10-0H3204 2    
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 10 12 $925.00 $2946.53 $11100.00 11-04-2009 10-0H3204 3    
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 10 12 $690.00 $2197.95 $8280.00 11-04-2009 10-0H3204 4    
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 10 12 $600.00 $1911.26 $7200.00 11-04-2009 10-0H3204 5    
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 9 $1300.00 $4141.07 $11700.00 04-27-2010 04-1A2414 1    
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 9 $372.75 $1187.37 $3354.75 04-27-2010 04-1A2414 2    
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 9 $225.00 $716.72 $2025.00 04-27-2010 04-1A2414 3    
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 9 $320.00 $1019.34 $2880.00 04-27-2010 04-1A2414 4    
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 9 $1600.00 $5096.70 $14400.00 04-27-2010 04-1A2414 5    
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 07 11 $600.00 $1703.84 $6600.00 05-12-2011 07-2159C4 1 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 07 11 $625.00 $1774.83 $6875.00 05-12-2011 07-2159C4 2 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 07 11 $800.00 $2271.78 $8800.00 05-12-2011 07-2159C4 3 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 07 11 $620.00 $1760.63 $6820.00 05-12-2011 07-2159C4 4 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 07 11 $620.00 $1760.63 $6820.00 05-12-2011 07-2159C4 5 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 07 11 $470.00 $1334.67 $5170.00 05-12-2011 07-2159C4 6 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 07 11 $618.50 $1756.37 $6803.50 05-12-2011 07-2159C4 7 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) M3 07 11 $600.00 $1703.84 $6600.00 05-12-2011 07-2159C4 8 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 07 1 $2000.00 $5679.46 $2000.00 10-27-2011 07-215914 1 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 07 1 $1500.00 $4259.59 $1500.00 10-27-2011 07-215914 2 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 07 1 $1500.00 $4259.59 $1500.00 10-27-2011 07-215914 3 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 07 1 $350.00 $993.91 $350.00 10-27-2011 07-215914 4 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 07 1 $239.00 $678.70 $239.00 10-27-2011 07-215914 5 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 07 1 $875.00 $2484.76 $875.00 10-27-2011 07-215914 6 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 07 1 $1000.00 $2839.73 $1000.00 10-27-2011 07-215914 7 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 07 1 $500.00 $1419.86 $500.00 10-27-2011 07-215914 8 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 07 1 $500.00 $1419.86 $500.00 10-27-2011 07-215914 9 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 07 1 $1200.00 $3407.67 $1200.00 10-27-2011 07-215914 10 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 200 $370.00 $1050.70 $74000.00 11-01-2011 04-4A3304 1 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 200 $400.00 $1135.89 $80000.00 11-01-2011 04-4A3304 2 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 200 $1100.00 $3123.70 $220000.00 11-01-2011 04-4A3304 3 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 200 $388.00 $1101.81 $77600.00 11-01-2011 04-4A3304 4 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 200 $384.19 $1091.00 $76838.00 11-01-2011 04-4A3304 5 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 200 $740.00 $2101.40 $148000.00 11-01-2011 04-4A3304 6 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 200 $419.19 $1190.39 $83838.00 11-01-2011 04-4A3304 7 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 46 $300.00 $851.92 $13800.00 12-06-2011 04-264134 1 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 46 $700.00 $1987.81 $32200.00 12-06-2011 04-264134 2 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 46 $700.00 $1987.81 $32200.00 12-06-2011 04-264134 3 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 46 $500.00 $1419.86 $23000.00 12-06-2011 04-264134 4 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 46 $575.00 $1632.84 $26450.00 12-06-2011 04-264134 5 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 46 $900.00 $2555.76 $41400.00 12-06-2011 04-264134 6 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 46 $375.00 $1064.90 $17250.00 12-06-2011 04-264134 7 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 07 6 $600.00 $1940.79 $3600.00 07-26-2012 07-215934 1 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 07 6 $350.00 $1132.13 $2100.00 07-26-2012 07-215934 2 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 07 6 $436.00 $1410.31 $2616.00 07-26-2012 07-215934 3 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 07 6 $450.00 $1455.60 $2700.00 07-26-2012 07-215934 4 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 07 6 $1340.00 $4334.44 $8040.00 07-26-2012 07-215934 5 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 07 6 $400.00 $1293.86 $2400.00 07-26-2012 07-215934 6 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 07 6 $375.00 $1213.00 $2250.00 07-26-2012 07-215934 7 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 89 $470.00 $1171.24 $41830.00 11-28-2012 04-2285H4 1 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 89 $428.00 $1066.58 $38092.00 11-28-2012 04-2285H4 2 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 89 $700.00 $1744.40 $62300.00 11-28-2012 04-2285H4 3 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 89 $685.00 $1707.02 $60965.00 11-28-2012 04-2285H4 4 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 89 $450.00 $1121.40 $40050.00 11-28-2012 04-2285H4 5 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 89 $470.00 $1171.24 $41830.00 11-28-2012 04-2285H4 6 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 89 $600.00 $1495.20 $53400.00 11-28-2012 04-2285H4 7 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 89 $2100.00 $5233.21 $186900.00 11-28-2012 04-2285H4 8 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 03 31 $350.00 $732.65 $10850.00 03-27-2013 03-3F4204 1 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 03 31 $1450.00 $3035.26 $44950.00 03-27-2013 03-3F4204 2 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 03 31 $1000.00 $2093.29 $31000.00 03-27-2013 03-3F4204 3 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 03 31 $630.00 $1318.77 $19530.00 03-27-2013 03-3F4204 4 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 03 31 $190.00 $397.72 $5890.00 03-27-2013 03-3F4204 5 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 03 31 $900.00 $1883.96 $27900.00 03-27-2013 03-3F4204 6 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 03 31 $1041.50 $2180.16 $32286.50 03-27-2013 03-3F4204 7 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 03 31 $1200.00 $2511.94 $37200.00 03-27-2013 03-3F4204 8 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 03 31 $450.00 $941.98 $13950.00 03-27-2013 03-3F4204 9 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 02 3.3 $800.00 $1408.94 $2640.00 04-30-2013 02-2E3504 1 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 02 3.3 $500.00 $880.59 $1650.00 04-30-2013 02-2E3504 2 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 02 3.3 $5000.00 $8805.89 $16500.00 04-30-2013 02-2E3504 3 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 02 3.3 $355.00 $625.22 $1171.50 04-30-2013 02-2E3504 4 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 05 6.4 $730.00 $1623.17 $4672.00 10-15-2013 05-0G0704 1 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 05 6.4 $550.00 $1222.94 $3520.00 10-15-2013 05-0G0704 2 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 03 65 $904.00 $2010.06 $58760.00 12-17-2013 03-3F4404 1 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 03 65 $700.00 $1556.46 $45500.00 12-17-2013 03-3F4404 2 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 03 65 $833.00 $1852.19 $54145.00 12-17-2013 03-3F4404 3 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 03 65 $1100.00 $2445.87 $71500.00 12-17-2013 03-3F4404 4 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 03 65 $1300.00 $2890.58 $84500.00 12-17-2013 03-3F4404 5 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 03 65 $400.00 $889.41 $26000.00 12-17-2013 03-3F4404 6 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 03 65 $1300.00 $2890.58 $84500.00 12-17-2013 03-3F4404 7 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 07 32 $352.00 $627.40 $11264.00 01-09-2014 07-215954 1 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 07 32 $445.00 $793.16 $14240.00 01-09-2014 07-215954 2 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 07 32 $650.00 $1158.55 $20800.00 01-09-2014 07-215954 3 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 07 32 $500.00 $891.19 $16000.00 01-09-2014 07-215954 4 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 07 32 $600.00 $1069.43 $19200.00 01-09-2014 07-215954 5 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 120 $700.00 $1247.67 $84000.00 03-18-2014 04-0A7104 1 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 120 $500.00 $891.19 $60000.00 03-18-2014 04-0A7104 2 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 120 $560.00 $998.14 $67200.00 03-18-2014 04-0A7104 3 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 120 $550.00 $980.31 $66000.00 03-18-2014 04-0A7104 4 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 03 69 $360.00 $800.35 $24840.00 08-06-2014 03-1A8424 1 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 03 69 $800.00 $1778.55 $55200.00 08-06-2014 03-1A8424 2 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 03 69 $1077.00 $2394.37 $74313.00 08-06-2014 03-1A8424 3 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 02 9 $700.00 $1365.25 $6300.00 11-19-2014 02-3E4104 1 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 02 9 $550.00 $1072.69 $4950.00 11-19-2014 02-3E4104 2 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 02 9 $210.00 $409.57 $1890.00 11-19-2014 02-3E4104 3 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 02 9 $1700.00 $3315.60 $15300.00 11-19-2014 02-3E4104 4 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 02 9 $650.00 $1267.73 $5850.00 11-19-2014 02-3E4104 5 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 03 3 $1600.00 $3120.56 $4800.00 12-17-2014 03-1A8454 1 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 03 3 $764.00 $1490.07 $2292.00 12-17-2014 03-1A8454 2 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 03 3 $825.00 $1609.04 $2475.00 12-17-2014 03-1A8454 3 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 03 3 $1200.00 $2340.42 $3600.00 12-17-2014 03-1A8454 4 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 14 $1400.00 $2973.93 $19600.00 09-24-2015 04-264H34 1 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 14 $500.00 $1062.12 $7000.00 09-24-2015 04-264H34 2 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 14 $850.00 $1805.60 $11900.00 09-24-2015 04-264H34 3 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 14 $675.00 $1433.86 $9450.00 09-24-2015 04-264H34 4 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 14 $750.00 $1593.18 $10500.00 09-24-2015 04-264H34 5 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 14 $700.00 $1486.97 $9800.00 09-24-2015 04-264H34 6 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 07 1.5 $1000.00 $1924.23 $1500.00 10-08-2015 07-3X7114 1 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 07 1.5 $650.00 $1250.75 $975.00 10-08-2015 07-3X7114 2 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 07 1.5 $1000.00 $1924.23 $1500.00 10-08-2015 07-3X7114 3 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 07 1.5 $660.00 $1269.99 $990.00 10-08-2015 07-3X7114 4 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 07 1.5 $1000.00 $1924.23 $1500.00 10-08-2015 07-3X7114 5 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 07 1.5 $665.00 $1279.61 $997.50 10-08-2015 07-3X7114 6 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 07 1.5 $715.00 $1375.82 $1072.50 10-08-2015 07-3X7114 7 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 07 5 $600.00 $1154.54 $3000.00 10-15-2015 07-1193U4 1 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 07 5 $500.00 $962.11 $2500.00 10-15-2015 07-1193U4 2 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 07 5 $1700.00 $3271.19 $8500.00 10-15-2015 07-1193U4 3 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 07 5 $1000.00 $1924.23 $5000.00 10-15-2015 07-1193U4 4 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 07 5 $750.00 $1443.17 $3750.00 10-15-2015 07-1193U4 5 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 07 5 $791.00 $1522.06 $3955.00 10-15-2015 07-1193U4 6 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 07 5 $537.50 $1034.27 $2687.50 10-15-2015 07-1193U4 7 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 40 $1100.00 $2116.65 $44000.00 11-03-2015 04-264094 1 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 40 $840.00 $1616.35 $33600.00 11-03-2015 04-264094 2 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 40 $900.00 $1731.81 $36000.00 11-03-2015 04-264094 3 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 40 $1200.00 $2309.07 $48000.00 11-03-2015 04-264094 4 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 40 $500.00 $962.11 $20000.00 11-03-2015 04-264094 5 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 40 $1200.00 $2309.07 $48000.00 11-03-2015 04-264094 6 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 40 $817.40 $1572.86 $32696.00 11-03-2015 04-264094 7 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 2.3 $1000.00 $1924.23 $2300.00 11-03-2015 04-4G6404 1 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 2.3 $600.00 $1154.54 $1380.00 11-03-2015 04-4G6404 2 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 2.3 $950.00 $1828.02 $2185.00 11-03-2015 04-4G6404 3 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 2.3 $915.48 $1761.59 $2105.60 11-03-2015 04-4G6404 4 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 2.3 $300.00 $577.27 $690.00 11-03-2015 04-4G6404 5 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 2.3 $1000.00 $1924.23 $2300.00 11-03-2015 04-4G6404 6 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 2.3 $1200.00 $2309.07 $2760.00 11-03-2015 04-4G6404 7 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 2.3 $2000.00 $3848.46 $4600.00 11-03-2015 04-4G6404 8 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 05 64 $435.00 $800.16 $27840.00 04-27-2016 05-4482U4 1 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 05 64 $340.00 $625.41 $21760.00 04-27-2016 05-4482U4 2 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 05 64 $325.00 $597.82 $20800.00 04-27-2016 05-4482U4 3 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 05 64 $560.00 $1030.09 $35840.00 04-27-2016 05-4482U4 4 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 05 64 $525.00 $965.71 $33600.00 04-27-2016 05-4482U4 5 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 07 3 $470.00 $864.54 $1410.00 04-27-2016 07-2159U4 1 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 07 3 $700.00 $1287.61 $2100.00 04-27-2016 07-2159U4 2 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 07 3 $1000.00 $1839.44 $3000.00 04-27-2016 07-2159U4 3 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 07 3 $1875.00 $3448.95 $5625.00 04-27-2016 07-2159U4 4 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 07 3 $711.00 $1307.84 $2133.00 04-27-2016 07-2159U4 5 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 07 3 $500.00 $919.72 $1500.00 04-27-2016 07-2159U4 6 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 02 0.6 $525.00 $965.71 $315.00 06-02-2016 02-0E24U4 1 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 02 0.6 $1650.00 $3035.08 $990.00 06-02-2016 02-0E24U4 2 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 02 0.6 $1300.00 $2391.28 $780.00 06-02-2016 02-0E24U4 3 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 02 0.6 $690.00 $1269.22 $414.00 06-02-2016 02-0E24U4 4 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 10 18 $650.00 $1012.38 $11700.00 09-27-2016 10-0Q1604 1 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 10 18 $950.00 $1479.63 $17100.00 09-27-2016 10-0Q1604 2 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 10 18 $1200.00 $1869.01 $21600.00 09-27-2016 10-0Q1604 3 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 10 18 $1750.00 $2725.63 $31500.00 09-27-2016 10-0Q1604 4 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 10 18 $1317.33 $2051.75 $23711.94 09-27-2016 10-0Q1604 5 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 10 18 $1200.00 $1869.01 $21600.00 09-27-2016 10-0Q1604 6 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 03 23 $990.00 $1496.90 $22770.00 10-12-2016 03-0F3104 1 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 03 23 $1000.00 $1512.02 $23000.00 10-12-2016 03-0F3104 2 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 03 23 $990.00 $1496.90 $22770.00 10-12-2016 03-0F3104 3 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 03 23 $855.00 $1292.78 $19665.00 10-12-2016 03-0F3104 4 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 03 23 $950.00 $1436.42 $21850.00 10-12-2016 03-0F3104 5 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 03 23 $990.00 $1496.90 $22770.00 10-12-2016 03-0F3104 6 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 03 23 $1300.00 $1965.63 $29900.00 10-12-2016 03-0F3104 7 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 03 20 $578.00 $873.95 $11560.00 10-26-2016 03-3C3804 1 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 03 20 $3450.00 $5216.47 $69000.00 10-26-2016 03-3C3804 2 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 03 20 $933.00 $1410.72 $18660.00 10-26-2016 03-3C3804 3 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 03 20 $1200.00 $1814.43 $24000.00 10-26-2016 03-3C3804 4 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 03 20 $850.00 $1285.22 $17000.00 10-26-2016 03-3C3804 5 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 03 20 $1721.00 $2602.19 $34420.00 10-26-2016 03-3C3804 6 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 10 2.3 $2500.00 $3673.17 $5750.00 01-05-2017 10-0Y7404 1 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 10 2.3 $625.00 $918.29 $1437.50 01-05-2017 10-0Y7404 2 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 10 2.3 $260.00 $382.01 $598.00 01-05-2017 10-0Y7404 3 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 10 2.3 $1625.00 $2387.56 $3737.50 01-05-2017 10-0Y7404 4 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 03 1.9 $950.00 $1395.80 $1805.00 03-15-2017 03-3F9304 1 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 03 1.9 $800.00 $1175.41 $1520.00 03-15-2017 03-3F9304 2 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 03 1.9 $1100.00 $1616.19 $2090.00 03-15-2017 03-3F9304 3 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 03 1.9 $1100.00 $1616.19 $2090.00 03-15-2017 03-3F9304 4 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 08 51 $1475.00 $2153.99 $75225.00 06-01-2017 08-0M3114 1 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 08 51 $550.00 $803.18 $28050.00 06-01-2017 08-0M3114 2 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 08 51 $550.00 $803.18 $28050.00 06-01-2017 08-0M3114 3 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 08 51 $1600.00 $2336.54 $81600.00 06-01-2017 08-0M3114 4 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 7 $3000.00 $4381.00 $21000.00 06-20-2017 04-4G8304 1 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 7 $2000.00 $2920.67 $14000.00 06-20-2017 04-4G8304 2 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 7 $150.00 $219.05 $1050.00 06-20-2017 04-4G8304 3 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 02 51 $710.00 $1288.85 $36210.00 11-01-2017 02-4F9904 1 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 7 $3400.00 $5303.41 $23800.00 01-17-2018 04-4G8304 1 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 7 $2003.00 $3124.33 $14021.00 01-17-2018 04-4G8304 2 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 7 $1715.00 $2675.10 $12005.00 01-17-2018 04-4G8304 3 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 08 2 $674.00 $1051.32 $1348.00 02-13-2018 08-0K2914 1 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 08 2 $1212.00 $1890.51 $2424.00 02-13-2018 08-0K2914 2 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 08 2 $1000.00 $1559.83 $2000.00 02-13-2018 08-0K2914 3 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 08 2 $1200.00 $1871.79 $2400.00 02-13-2018 08-0K2914 4 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 08 2 $1600.00 $2495.72 $3200.00 02-13-2018 08-0K2914 5 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 08 2 $2500.00 $3899.56 $5000.00 02-13-2018 08-0K2914 6 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 08 2 $1500.00 $2339.74 $3000.00 02-13-2018 08-0K2914 7 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 08 2 $1500.00 $2339.74 $3000.00 02-13-2018 08-0K2914 8 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 2 $1725.00 $2690.70 $3450.00 02-14-2018 04-4G8104 1 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 2 $1720.00 $2682.90 $3440.00 02-14-2018 04-4G8104 2 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 2 $2530.00 $3946.36 $5060.00 02-14-2018 04-4G8104 3 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 2 $1200.00 $1871.79 $2400.00 02-14-2018 04-4G8104 4 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 2 $1000.00 $1559.83 $2000.00 02-14-2018 04-4G8104 5 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 2 $2500.00 $3899.56 $5000.00 02-14-2018 04-4G8104 6 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 2 $2000.00 $3119.65 $4000.00 02-14-2018 04-4G8104 7 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 2 $2500.00 $3899.56 $5000.00 02-14-2018 04-4G8104 8 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 03 9 $3300.00 $4671.07 $29700.00 07-25-2018 03-2F1304 1 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 03 9 $1500.00 $2123.21 $13500.00 07-25-2018 03-2F1304 2 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 06 8 $700.00 $990.83 $5600.00 09-11-2018 06-0Q2804 1 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 06 8 $772.00 $1092.75 $6176.00 09-11-2018 06-0Q2804 2 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 06 8 $960.00 $1358.86 $7680.00 09-11-2018 06-0Q2804 3 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 0.6 $2500.00 $3454.59 $1500.00 12-11-2018 04-270104 1 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 0.6 $3500.00 $4836.43 $2100.00 12-11-2018 04-270104 2 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 0.6 $6745.00 $9320.49 $4047.00 12-11-2018 04-270104 3 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 0.6 $3400.00 $4698.25 $2040.00 12-11-2018 04-270104 4 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 1.4 $2035.00 $3541.85 $2849.00 02-13-2019 04-4G8204 1 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 1.4 $1000.00 $1740.47 $1400.00 02-13-2019 04-4G8204 2 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 1.4 $1900.00 $3306.89 $2660.00 02-13-2019 04-4G8204 3 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 1.4 $586.06 $1020.02 $820.48 02-13-2019 04-4G8204 4 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 1.4 $792.00 $1378.45 $1108.80 02-13-2019 04-4G8204 5 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 1.4 $900.00 $1393.61 $1260.00 11-13-2019 04-4G8204 1 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 1.4 $3173.52 $4914.04 $4442.93 11-13-2019 04-4G8204 2 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 1.4 $1994.00 $3087.61 $2791.60 11-13-2019 04-4G8204 3 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 1.4 $2000.00 $3096.90 $2800.00 11-13-2019 04-4G8204 4 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 1.4 $3000.00 $4645.36 $4200.00 11-13-2019 04-4G8204 5 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 1.4 $3100.00 $4800.20 $4340.00 11-13-2019 04-4G8204 6 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 1.4 $2100.00 $3251.75 $2940.00 11-13-2019 04-4G8204 7 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 48 $150.00 $232.27 $7200.00 12-16-2019 04-2G6904 1 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 48 $350.00 $541.96 $16800.00 12-16-2019 04-2G6904 2 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 48 $1620.00 $2508.49 $77760.00 12-16-2019 04-2G6904 3 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 48 $1800.00 $2787.21 $86400.00 12-16-2019 04-2G6904 4 M  
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 3 $1500.00 $1831.32 $4500.00 01-07-2020 04-3J3204 1 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 3 $2500.00 $3052.20 $7500.00 01-07-2020 04-3J3204 2 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 3 $1965.00 $2399.03 $5895.00 01-07-2020 04-3J3204 3 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 3 $2350.00 $2869.07 $7050.00 01-07-2020 04-3J3204 4 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 3 $4360.04 $5323.08 $13080.12 01-07-2020 04-3J3204 5 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 3 $3194.78 $3900.44 $9584.34 01-07-2020 04-3J3204 6 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 03 1.7 $5000.00 $6104.40 $8500.00 02-26-2020 03-3H4704 1   TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 03 1.7 $4870.00 $5945.68 $8279.00 02-26-2020 03-3H4704 2   TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 03 1.7 $1500.00 $1831.32 $2550.00 02-26-2020 03-3H4704 3   TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 03 1.7 $3400.00 $4150.99 $5780.00 02-26-2020 03-3H4704 4   TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 03 1.7 $4180.00 $5103.28 $7106.00 02-26-2020 03-3H4704 5   TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 1.4 $900.00 $1433.91 $1260.00 04-08-2020 04-4G8204 1 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 1.4 $3100.00 $4939.03 $4340.00 04-08-2020 04-4G8204 2 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 1.4 $2100.00 $3345.80 $2940.00 04-08-2020 04-4G8204 3 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 1.4 $3000.00 $4779.71 $4200.00 04-08-2020 04-4G8204 4 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 10 15 $500.00 $715.62 $7500.00 10-14-2020 10-0X5204 1 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 10 15 $487.00 $697.01 $7305.00 10-14-2020 10-0X5204 2 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 10 15 $176.00 $251.90 $2640.00 10-14-2020 10-0X5204 3 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 10 15 $1100.00 $1574.36 $16500.00 10-14-2020 10-0X5204 4 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 10 15 $1450.00 $2075.29 $21750.00 10-14-2020 10-0X5204 5 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 10 15 $1500.00 $2146.85 $22500.00 10-14-2020 10-0X5204 6 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 10 15 $1500.00 $2146.85 $22500.00 10-14-2020 10-0X5204 7 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 10 15 $1200.00 $1717.48 $18000.00 10-14-2020 10-0X5204 8 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 10 15 $1500.00 $2146.85 $22500.00 10-14-2020 10-0X5204 9 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 10 15 $700.00 $1001.87 $10500.00 10-14-2020 10-0X5204 10 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 08 27 $480.00 $686.99 $12960.00 10-27-2020 08-1F6004 1 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 08 27 $575.00 $822.96 $15525.00 10-27-2020 08-1F6004 2 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 08 27 $590.00 $844.43 $15930.00 10-27-2020 08-1F6004 3 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 08 27 $800.00 $1144.99 $21600.00 10-27-2020 08-1F6004 4 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 08 27 $870.00 $1245.18 $23490.00 10-27-2020 08-1F6004 5 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 08 27 $840.00 $1202.24 $22680.00 10-27-2020 08-1F6004 6 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 08 27 $1350.00 $1932.17 $36450.00 10-27-2020 08-1F6004 7 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 08 27 $1020.00 $1459.86 $27540.00 10-27-2020 08-1F6004 8 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 08 27 $730.00 $1044.80 $19710.00 10-27-2020 08-1F6004 9 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 08 27 $885.00 $1266.64 $23895.00 10-27-2020 08-1F6004 10 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 06 3.1 $1200.00 $1717.48 $3720.00 11-05-2020 06-442554 1 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 06 3.1 $663.00 $948.91 $2055.30 11-05-2020 06-442554 2 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 06 3.1 $805.00 $1152.15 $2495.50 11-05-2020 06-442554 3 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 06 3.1 $2169.00 $3104.35 $6723.90 11-05-2020 06-442554 4 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 07 6 $894.76 $1280.61 $5368.56 12-16-2020 07-210624 1 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 07 6 $2500.00 $3578.09 $15000.00 12-16-2020 07-210624 2 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 07 6 $812.00 $1162.16 $4872.00 12-16-2020 07-210624 3 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 07 6 $810.00 $1159.30 $4860.00 12-16-2020 07-210624 4 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 07 6 $875.00 $1252.33 $5250.00 12-16-2020 07-210624 5 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 07 6 $720.00 $1030.49 $4320.00 12-16-2020 07-210624 6 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 07 6 $900.00 $1288.11 $5400.00 12-16-2020 07-210624 7 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 6 $3200.00 $5570.82 $19200.00 12-14-2021 04-4J0304 1 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 6 $1400.00 $2437.23 $8400.00 12-14-2021 04-4J0304 2 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 6 $2000.00 $3481.76 $12000.00 12-14-2021 04-4J0304 3 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 6 $6000.00 $10445.29 $36000.00 12-14-2021 04-4J0304 4 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 6 $2350.00 $4091.07 $14100.00 12-14-2021 04-4J0304 5 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 02 11 $1150.00 $1720.54 $12650.00 02-03-2022 02-1H7204 1 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 02 11 $1000.50 $1496.87 $11005.50 02-03-2022 02-1H7204 2 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 1 $1200.00 $1861.09 $1200.00 06-09-2022 04-2K2804 1 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 1 $6000.00 $9305.46 $6000.00 06-09-2022 04-2K2804 2 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 1 $2500.00 $3877.28 $2500.00 06-09-2022 04-2K2804 3 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 1 $5500.00 $8530.01 $5500.00 06-09-2022 04-2K2804 4 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 0.9 $4000.00 $6203.64 $3600.00 06-28-2022 04-0Q4504 1   TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 0.9 $7500.00 $11631.83 $6750.00 06-28-2022 04-0Q4504 2   TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 0.9 $4500.00 $6979.10 $4050.00 06-28-2022 04-0Q4504 3   TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 35 $300.00 $333.73 $10500.00 11-17-2022 04-2A9704 1 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 35 $1100.00 $1223.68 $38500.00 11-17-2022 04-2A9704 2 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 35 $1650.00 $1835.52 $57750.00 11-17-2022 04-2A9704 3 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 35 $1000.00 $1112.44 $35000.00 11-17-2022 04-2A9704 4 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 35 $1400.00 $1557.41 $49000.00 11-17-2022 04-2A9704 5 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 35 $1450.00 $1613.03 $50750.00 11-17-2022 04-2A9704 6 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 8 $1800.00 $1768.97 $14400.00 11-28-2023 04-4J5404 1 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 8 $900.00 $884.49 $7200.00 11-28-2023 04-4J5404 2 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 8 $1800.00 $1768.97 $14400.00 11-28-2023 04-4J5404 3 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 8 $1500.00 $1474.14 $12000.00 11-28-2023 04-4J5404 4 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 8 $1000.00 $982.76 $8000.00 11-28-2023 04-4J5404 5 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 8 $1300.00 $1277.59 $10400.00 11-28-2023 04-4J5404 6 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 0.4 $9000.00 $8844.87 $3600.00 12-14-2023 04-0P9804 1 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 0.4 $1150.00 $1130.18 $460.00 12-14-2023 04-0P9804 2 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 0.4 $2300.00 $2260.36 $920.00 12-14-2023 04-0P9804 3 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 0.4 $3000.00 $2948.29 $1200.00 12-14-2023 04-0P9804 4 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 03 67 $2000.00 $1536.60 $134000.00 01-09-2024 03-3H6104 1 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 03 67 $2400.00 $1843.92 $160800.00 01-09-2024 03-3H6104 2 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 6 $3178.00 $2441.65 $19068.00 01-11-2024 04-1J9604 1 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 6 $2200.00 $1690.26 $13200.00 01-11-2024 04-1J9604 2 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 6 $1400.00 $1075.62 $8400.00 01-11-2024 04-1J9604 3 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 6 $5675.16 $4360.22 $34050.96 01-11-2024 04-1J9604 4 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 6 $5675.16 $4360.22 $34050.96 01-11-2024 04-1J9604 5 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 07 44 $1500.00 $1304.81 $66000.00 06-27-2024 07-333604 1 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 07 44 $1550.00 $1348.30 $68200.00 06-27-2024 07-333604 2 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 07 44 $1210.00 $1052.55 $53240.00 06-27-2024 07-333604 3 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 05 4.4 $1380.00 $1025.78 $6072.00 09-19-2024 05-1J7804 1 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 05 4.4 $1600.00 $1189.31 $7040.00 09-19-2024 05-1J7804 2 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 05 4.4 $2330.00 $1731.93 $10252.00 09-19-2024 05-1J7804 3 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 14 $1200.00 $1244.15 $16800.00 11-13-2024 04-2Q8004 1 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 14 $2300.00 $2384.62 $32200.00 11-13-2024 04-2Q8004 2 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 14 $3688.93 $3824.66 $51645.02 11-13-2024 04-2Q8004 3 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 14 $2270.00 $2353.52 $31780.00 11-13-2024 04-2Q8004 4 M TRO
731507 - MINOR CONCRETE (GUTTER DEPRESSION) CY 04 14 $3000.00 $3110.38 $42000.00 11-13-2024 04-2Q8004 5 M TRO
MORE THAN 500 RESULTS RETURNED. ONLY 500 ROWS SHOWN.
SUMMARY Unmodified Adjusted    
Average Price/Unit: $ Avg No. Units
Std Dev. (of Unit Price): ±$ Rows Selected
Weighted Avg.: $ Rows Returned
Minimum Price/Unit: $    
Maximum Price/Unit: $    

| Back | New Search |

PARAMETERS: Item = 731507; District=All; Year=All; Convert=No; Bidders=All Bidders
TIMESTAMP: 11/13/2026 05:31:44
CURRENT 12-MO INDEX (CHCCI (2020 Base)): 146.53