731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 440 $18.50 $30.83 $8140.00 08-02-2017 04-2J6604 1 M  
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 440 $50.00 $83.33 $22000.00 08-02-2017 04-2J6604 2 M  
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 440 $45.00 $75.00 $19800.00 08-02-2017 04-2J6604 3 M  
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 03 470 $20.00 $36.31 $9400.00 11-14-2017 03-0H26U4 1 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 03 470 $22.00 $39.94 $10340.00 11-14-2017 03-0H26U4 2 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 03 470 $11.00 $19.97 $5170.00 11-14-2017 03-0H26U4 3 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 03 470 $22.00 $39.94 $10340.00 11-14-2017 03-0H26U4 4 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 03 470 $39.78 $72.21 $18696.60 11-14-2017 03-0H26U4 5 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 06 2100 $17.00 $24.06 $35700.00 09-11-2018 06-0Q2804 1 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 06 2100 $16.00 $22.65 $33600.00 09-11-2018 06-0Q2804 2 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 06 2100 $30.00 $42.46 $63000.00 09-11-2018 06-0Q2804 3 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 280 $75.00 $103.64 $21000.00 11-27-2018 04-151614 1 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 280 $27.00 $37.31 $7560.00 11-27-2018 04-151614 2 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 280 $25.00 $34.55 $7000.00 11-27-2018 04-151614 3 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 280 $30.00 $41.46 $8400.00 11-27-2018 04-151614 4 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 46 $70.00 $96.73 $3220.00 12-11-2018 04-270104 1 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 46 $140.00 $193.46 $6440.00 12-11-2018 04-270104 2 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 46 $100.00 $138.18 $4600.00 12-11-2018 04-270104 3 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 46 $76.00 $105.02 $3496.00 12-11-2018 04-270104 4 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 12 1290 $13.00 $22.63 $16770.00 02-13-2019 12-0C1104 1 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 12 1290 $9.00 $15.66 $11610.00 02-13-2019 12-0C1104 2 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 12 1290 $18.25 $31.76 $23542.50 02-13-2019 12-0C1104 3 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 12 1290 $16.00 $27.85 $20640.00 02-13-2019 12-0C1104 4 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 12 1290 $17.62 $30.67 $22729.80 02-13-2019 12-0C1104 5 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 12 1290 $20.00 $34.81 $25800.00 02-13-2019 12-0C1104 6 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 12 1290 $62.00 $107.91 $79980.00 02-13-2019 12-0C1104 7 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 12 1290 $45.00 $78.32 $58050.00 02-13-2019 12-0C1104 8 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 340 $25.00 $30.82 $8500.00 06-12-2019 04-2640F4 1 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 340 $45.00 $55.48 $15300.00 06-12-2019 04-2640F4 2 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 340 $25.00 $30.82 $8500.00 06-12-2019 04-2640F4 3 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 340 $10.00 $12.33 $3400.00 06-12-2019 04-2640F4 4 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 340 $10.00 $12.33 $3400.00 06-12-2019 04-2640F4 5 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 05 9 $850.00 $1316.18 $7650.00 10-17-2019 05-1F6804 1 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 05 9 $300.00 $464.54 $2700.00 10-17-2019 05-1F6804 2 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 05 9 $330.00 $510.99 $2970.00 10-17-2019 05-1F6804 3 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 05 9 $545.00 $843.91 $4905.00 10-17-2019 05-1F6804 4 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 500 $200.00 $244.18 $100000.00 01-09-2020 04-3G6204 1 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 500 $25.00 $30.52 $12500.00 01-09-2020 04-3G6204 2 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 500 $60.00 $73.25 $30000.00 01-09-2020 04-3G6204 3 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 500 $35.00 $42.73 $17500.00 01-09-2020 04-3G6204 4 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 01 30 $200.00 $318.65 $6000.00 06-09-2020 01-0E6504 1 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 01 30 $75.00 $119.49 $2250.00 06-09-2020 01-0E6504 2 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 01 30 $100.00 $159.32 $3000.00 06-09-2020 01-0E6504 3 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 01 130 $55.00 $78.72 $7150.00 10-20-2020 01-0C6604 1 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 01 130 $300.00 $429.37 $39000.00 10-20-2020 01-0C6604 2 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 01 130 $140.00 $200.37 $18200.00 10-20-2020 01-0C6604 3 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 01 130 $40.00 $57.25 $5200.00 10-20-2020 01-0C6604 4 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 100 $30.00 $42.94 $3000.00 12-10-2020 04-4J4504 1 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 100 $100.00 $143.12 $10000.00 12-10-2020 04-4J4504 2 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 100 $51.00 $72.99 $5100.00 12-10-2020 04-4J4504 3 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 100 $38.00 $54.39 $3800.00 12-10-2020 04-4J4504 4 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 33 $72.00 $103.05 $2376.00 12-15-2020 04-4J7304 1 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 33 $50.00 $71.56 $1650.00 12-15-2020 04-4J7304 2 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 33 $160.00 $229.00 $5280.00 12-15-2020 04-4J7304 3 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 33 $62.00 $88.74 $2046.00 12-15-2020 04-4J7304 4 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 33 $109.97 $157.39 $3629.01 12-15-2020 04-4J7304 5 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 33 $177.00 $253.33 $5841.00 12-15-2020 04-4J7304 6 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 33 $250.00 $357.81 $8250.00 12-15-2020 04-4J7304 7 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 33 $30.00 $42.94 $990.00 12-15-2020 04-4J7304 8 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 33 $65.00 $93.03 $2145.00 12-15-2020 04-4J7304 9 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 33 $9.09 $13.01 $299.97 12-15-2020 04-4J7304 10 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 33 $160.00 $229.00 $5280.00 12-15-2020 04-4J7304 11 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 08 540 $11.10 $19.11 $5994.00 01-12-2021 08-1F7304 1 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 08 540 $13.00 $22.38 $7020.00 01-12-2021 08-1F7304 2 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 08 540 $47.00 $80.90 $25380.00 01-12-2021 08-1F7304 3 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 08 540 $30.91 $53.20 $16691.40 01-12-2021 08-1F7304 4 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 08 540 $10.00 $17.21 $5400.00 01-12-2021 08-1F7304 5 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 08 540 $16.00 $27.54 $8640.00 01-12-2021 08-1F7304 6 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 08 540 $10.74 $18.49 $5799.60 01-12-2021 08-1F7304 7 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 08 540 $35.57 $61.22 $19207.80 01-12-2021 08-1F7304 8 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 08 540 $40.00 $68.85 $21600.00 01-12-2021 08-1F7304 9 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 08 540 $20.00 $34.42 $10800.00 01-12-2021 08-1F7304 10 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 02 380 $53.84 $83.50 $20459.20 06-10-2022 02-1H5204 1 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 430 $23.79 $26.46 $10229.70 11-10-2022 04-2J7404 1 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 430 $60.00 $66.75 $25800.00 11-10-2022 04-2J7404 2 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 430 $75.00 $83.43 $32250.00 11-10-2022 04-2J7404 3 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 430 $50.00 $55.62 $21500.00 11-10-2022 04-2J7404 4 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 430 $40.00 $44.50 $17200.00 11-10-2022 04-2J7404 5 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 430 $65.00 $72.31 $27950.00 11-10-2022 04-2J7404 6 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 68 $150.00 $163.44 $10200.00 01-25-2023 04-0K5204 1 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 68 $100.00 $108.96 $6800.00 01-25-2023 04-0K5204 2 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 68 $110.00 $119.86 $7480.00 01-25-2023 04-0K5204 3 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 68 $150.00 $163.44 $10200.00 01-25-2023 04-0K5204 4 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 140 $85.00 $92.62 $11900.00 02-01-2023 04-4J9104 1 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 140 $86.80 $94.58 $12152.00 02-01-2023 04-4J9104 2 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 140 $60.00 $65.38 $8400.00 02-01-2023 04-4J9104 3 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 140 $55.00 $59.93 $7700.00 02-01-2023 04-4J9104 4 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 26 $600.00 $502.04 $15600.00 07-13-2023 04-4J89U4 1 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 26 $222.00 $185.76 $5772.00 07-13-2023 04-4J89U4 2 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 26 $350.00 $292.86 $9100.00 07-13-2023 04-4J89U4 3 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 26 $400.00 $334.70 $10400.00 07-13-2023 04-4J89U4 4 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 26 $900.00 $753.07 $23400.00 07-13-2023 04-4J89U4 5 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 26 $2003.63 $1676.52 $52094.38 07-13-2023 04-4J89U4 6 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 26 $1311.99 $1097.80 $34111.74 07-13-2023 04-4J89U4 7 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 43 $224.00 $187.43 $9632.00 09-13-2023 04-0K1304 1 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 43 $250.00 $209.19 $10750.00 09-13-2023 04-0K1304 2 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 170 $80.00 $78.62 $13600.00 10-25-2023 04-0K7804 1 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 170 $54.00 $53.07 $9180.00 10-25-2023 04-0K7804 2 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 170 $60.00 $58.97 $10200.00 10-25-2023 04-0K7804 3 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 170 $54.00 $53.07 $9180.00 10-25-2023 04-0K7804 4 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 170 $95.28 $93.64 $16197.60 10-25-2023 04-0K7804 5 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 170 $57.00 $56.02 $9690.00 10-25-2023 04-0K7804 6 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 170 $200.00 $196.55 $34000.00 10-25-2023 04-0K7804 7 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 03 20 $45.00 $33.45 $900.00 09-26-2024 03-3H8304 1 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 03 20 $141.71 $105.34 $2834.20 09-26-2024 03-3H8304 2 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 03 20 $80.00 $59.47 $1600.00 09-26-2024 03-3H8304 3 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 03 20 $75.00 $55.75 $1500.00 09-26-2024 03-3H8304 4 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 03 20 $169.00 $125.62 $3380.00 09-26-2024 03-3H8304 5 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 03 20 $45.00 $33.45 $900.00 09-26-2024 03-3H8304 6 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 03 20 $115.00 $85.48 $2300.00 09-26-2024 03-3H8304 7 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 03 20 $200.00 $148.66 $4000.00 09-26-2024 03-3H8304 8 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 12 360 $15.00 $15.55 $5400.00 10-16-2024 12-0K91U4 1 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 12 360 $20.00 $20.74 $7200.00 10-16-2024 12-0K91U4 2 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 12 360 $15.63 $16.21 $5626.80 10-16-2024 12-0K91U4 3 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 12 360 $45.00 $46.66 $16200.00 10-16-2024 12-0K91U4 4 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 12 360 $50.00 $51.84 $18000.00 10-16-2024 12-0K91U4 5 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 06 1470 $21.00 $21.77 $30870.00 11-14-2024 06-487404 1 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 06 1470 $16.00 $16.59 $23520.00 11-14-2024 06-487404 2 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 06 1470 $18.00 $18.66 $26460.00 11-14-2024 06-487404 3 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 06 1470 $13.44 $13.93 $19756.80 11-14-2024 06-487404 4 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 06 1470 $23.88 $24.76 $35103.60 11-14-2024 06-487404 5 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 06 1470 $36.50 $37.84 $53655.00 11-14-2024 06-487404 6 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 06 1470 $65.50 $67.91 $96285.00 11-14-2024 06-487404 7 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 260 $21.00 $21.77 $5460.00 11-20-2024 04-0K8004 1 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 260 $100.00 $103.68 $26000.00 11-20-2024 04-0K8004 2 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 260 $55.00 $57.02 $14300.00 11-20-2024 04-0K8004 3 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 260 $43.00 $44.58 $11180.00 11-20-2024 04-0K8004 4 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 260 $189.00 $195.95 $49140.00 11-20-2024 04-0K8004 5 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 08 240 $30.00 $31.10 $7200.00 11-21-2024 08-0G8504 1 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 08 240 $135.56 $140.55 $32534.40 11-21-2024 08-0G8504 2 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 08 240 $21.00 $21.77 $5040.00 11-21-2024 08-0G8504 3 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 08 240 $125.00 $129.60 $30000.00 11-21-2024 08-0G8504 4 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 07 32 $282.00 $196.10 $9024.00 03-13-2025 07-346304 1 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 07 32 $235.00 $163.41 $7520.00 03-13-2025 07-346304 2 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 07 32 $150.00 $104.31 $4800.00 03-13-2025 07-346304 3 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 07 32 $325.00 $226.00 $10400.00 03-13-2025 07-346304 4 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 07 32 $125.00 $86.92 $4000.00 03-13-2025 07-346304 5 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 99 $77.00 $55.24 $7623.00 06-04-2025 04-0Q1304 1 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 99 $40.00 $28.70 $3960.00 06-04-2025 04-0Q1304 2 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 99 $109.36 $78.46 $10826.64 06-04-2025 04-0Q1304 3 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 99 $180.00 $129.13 $17820.00 06-04-2025 04-0Q1304 4 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 99 $64.00 $45.91 $6336.00 06-04-2025 04-0Q1304 5 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 99 $64.00 $45.91 $6336.00 06-04-2025 04-0Q1304 6 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 99 $180.00 $129.13 $17820.00 06-04-2025 04-0Q1304 7 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 07 100 $15.00 $10.76 $1500.00 06-05-2025 07-4V5404 1 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 07 100 $51.00 $36.59 $5100.00 06-05-2025 07-4V5404 2 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 07 100 $135.00 $96.85 $13500.00 06-05-2025 07-4V5404 3 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 07 100 $85.00 $60.98 $8500.00 06-05-2025 07-4V5404 4 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 07 100 $240.00 $172.18 $24000.00 06-05-2025 07-4V5404 5 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 12 170 $16.07 $14.13 $2731.90 09-04-2025 12-0M9704 1 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 12 170 $52.00 $45.73 $8840.00 09-04-2025 12-0M9704 2 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 12 170 $75.00 $65.95 $12750.00 09-04-2025 12-0M9704 3 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 12 170 $18.85 $16.58 $3204.50 09-04-2025 12-0M9704 4 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 12 170 $65.00 $57.16 $11050.00 09-04-2025 12-0M9704 5 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 12 170 $100.00 $87.94 $17000.00 09-04-2025 12-0M9704 6 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 12 170 $28.27 $24.86 $4805.90 09-04-2025 12-0M9704 7 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 180 $83.12 $73.09 $14961.60 09-10-2025 04-1Q5824 1 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 180 $31.00 $27.26 $5580.00 09-10-2025 04-1Q5824 2 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 04 180 $100.00 $87.94 $18000.00 09-10-2025 04-1Q5824 3 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 03 9 $951.00 $836.28 $8559.00 09-17-2025 03-3J6804 1 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 03 9 $75.00 $65.95 $675.00 09-17-2025 03-3J6804 2 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 03 9 $478.00 $420.34 $4302.00 09-17-2025 03-3J6804 3 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 03 9 $85.00 $74.75 $765.00 09-17-2025 03-3J6804 4 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 03 9 $800.00 $703.50 $7200.00 09-17-2025 03-3J6804 5 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 03 220 $37.00 $36.20 $8140.00 10-22-2025 03-1J1704 1 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 03 220 $62.80 $61.45 $13816.00 10-22-2025 03-1J1704 2 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 03 220 $70.00 $68.49 $15400.00 10-22-2025 03-1J1704 3 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 03 220 $160.00 $156.55 $35200.00 10-22-2025 03-1J1704 4 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 03 220 $70.00 $68.49 $15400.00 10-22-2025 03-1J1704 5 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 03 220 $50.00 $48.92 $11000.00 10-22-2025 03-1J1704 6 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 03 220 $115.00 $112.52 $25300.00 10-22-2025 03-1J1704 7 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 03 220 $120.00 $117.41 $26400.00 10-22-2025 03-1J1704 8 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 07 1.7 $2000.00 $1956.86 $3400.00 10-23-2025 07-361804 1 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 07 1.7 $374.00 $365.93 $635.80 10-23-2025 07-361804 2 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 07 1.7 $1320.00 $1291.53 $2244.00 10-23-2025 07-361804 3 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 07 1.7 $3250.00 $3179.90 $5525.00 10-23-2025 07-361804 4 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 07 1.7 $3036.00 $2970.52 $5161.20 10-23-2025 07-361804 5 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 07 1.7 $1978.24 $1935.57 $3363.01 10-23-2025 07-361804 6 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 07 1.7 $1391.76 $1361.74 $2365.99 10-23-2025 07-361804 7 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 07 1.7 $1200.00 $1174.12 $2040.00 10-23-2025 07-361804 8 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 07 1.7 $3300.00 $3228.83 $5610.00 10-23-2025 07-361804 9 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 11 310 $150.00 $146.76 $46500.00 12-11-2025 11-430344 1 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 11 310 $100.00 $97.84 $31000.00 12-11-2025 11-430344 2 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 11 310 $85.00 $83.17 $26350.00 12-11-2025 11-430344 3 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 12 1200 $35.00 $35.00 $42000.00 10-22-2026 12-0K9824 1 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 12 1200 $20.00 $20.00 $24000.00 10-22-2026 12-0K9824 2 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 12 1200 $28.00 $28.00 $33600.00 10-22-2026 12-0K9824 3 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 12 1200 $22.00 $22.00 $26400.00 10-22-2026 12-0K9824 4 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 12 1200 $35.00 $35.00 $42000.00 10-22-2026 12-0K9824 5 M TRO
731790 - REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 12 1200 $50.00 $50.00 $60000.00 10-22-2026 12-0K9824 6 M TRO
SUMMARY Unmodified Adjusted    
Average Price/Unit: $ Avg No. Units
Std Dev. (of Unit Price): ±$ Rows Selected
Weighted Avg.: $ Rows Returned
Minimum Price/Unit: $    
Maximum Price/Unit: $    

| Back | New Search |

PARAMETERS: Item = 731790; District=All; Year=All; Convert=No; Bidders=All Bidders
TIMESTAMP: 11/13/2026 05:32:16
CURRENT 12-MO INDEX (CHCCI (2020 Base)): 146.53