731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 85 $137.00 $201.29 $11645.00 03-15-2017 08-1G0904 1    
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 85 $300.00 $440.78 $25500.00 03-15-2017 08-1G0904 2    
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 85 $785.00 $1153.37 $66725.00 03-15-2017 08-1G0904 3    
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 05 15 $484.00 $706.80 $7260.00 04-12-2017 05-1H4004 1 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 05 15 $585.00 $854.30 $8775.00 04-12-2017 05-1H4004 2 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 06 7 $950.00 $1387.32 $6650.00 06-13-2017 06-0T5104 1 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 06 7 $1041.77 $1521.33 $7292.39 06-13-2017 06-0T5104 2 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 06 7 $1500.00 $2190.50 $10500.00 06-13-2017 06-0T5104 3 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 11 45 $330.00 $599.04 $14850.00 10-03-2017 11-414404 1 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 11 45 $200.00 $363.06 $9000.00 10-03-2017 11-414404 2 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 11 45 $270.00 $490.13 $12150.00 10-03-2017 11-414404 3 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 11 45 $267.80 $486.13 $12051.00 10-03-2017 11-414404 4 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 11 45 $200.00 $363.06 $9000.00 10-03-2017 11-414404 5 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 45 $628.30 $1140.55 $28273.50 10-26-2017 08-1C0604 1 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 45 $390.00 $707.96 $17550.00 10-26-2017 08-1C0604 2 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 45 $325.00 $589.97 $14625.00 10-26-2017 08-1C0604 3 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 45 $1050.00 $1906.05 $47250.00 10-26-2017 08-1C0604 4 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 45 $464.00 $842.29 $20880.00 10-26-2017 08-1C0604 5 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 29 $420.00 $762.42 $12180.00 11-08-2017 04-4H2004 1 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 29 $320.00 $580.89 $9280.00 11-08-2017 04-4H2004 2 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 29 $500.00 $907.64 $14500.00 11-08-2017 04-4H2004 3 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 29 $400.00 $726.11 $11600.00 11-08-2017 04-4H2004 4 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 29 $476.25 $864.53 $13811.25 11-08-2017 04-4H2004 5 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 29 $1130.00 $2051.27 $32770.00 11-08-2017 04-4H2004 6 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 29 $325.00 $589.97 $9425.00 11-08-2017 04-4H2004 7 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 178 $36.15 $65.62 $6434.70 12-05-2017 04-4G1154 1 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 178 $116.00 $210.57 $20648.00 12-05-2017 04-4G1154 2 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 178 $200.00 $363.06 $35600.00 12-05-2017 04-4G1154 3 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 178 $90.00 $163.38 $16020.00 12-05-2017 04-4G1154 4 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 178 $300.00 $544.59 $53400.00 12-05-2017 04-4G1154 5 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 69 $480.00 $871.34 $33120.00 12-12-2017 07-307804 1 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 69 $350.00 $635.35 $24150.00 12-12-2017 07-307804 2 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 69 $846.57 $1536.77 $58413.33 12-12-2017 07-307804 3 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 69 $160.00 $290.45 $11040.00 12-12-2017 07-307804 4 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 69 $170.00 $308.60 $11730.00 12-12-2017 07-307804 5 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 91 $402.00 $729.75 $36582.00 12-13-2017 07-307604 1 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 91 $486.00 $882.23 $44226.00 12-13-2017 07-307604 2 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 91 $501.00 $909.46 $45591.00 12-13-2017 07-307604 3 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 91 $650.00 $1179.94 $59150.00 12-13-2017 07-307604 4 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 91 $629.00 $1141.82 $57239.00 12-13-2017 07-307604 5 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 91 $445.00 $807.80 $40495.00 12-13-2017 07-307604 6 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 91 $300.00 $544.59 $27300.00 12-13-2017 07-307604 7 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 91 $172.50 $313.14 $15697.50 12-13-2017 07-307604 8 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 91 $420.00 $762.42 $38220.00 12-13-2017 07-307604 9 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 59 $250.00 $453.82 $14750.00 12-14-2017 07-307904 1 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 59 $600.00 $1089.17 $35400.00 12-14-2017 07-307904 2 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 59 $499.00 $905.83 $29441.00 12-14-2017 07-307904 3 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 59 $240.00 $435.67 $14160.00 12-14-2017 07-307904 4 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 59 $800.00 $1452.23 $47200.00 12-14-2017 07-307904 5 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 59 $144.00 $261.40 $8496.00 12-14-2017 07-307904 6 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 59 $180.00 $326.75 $10620.00 12-14-2017 07-307904 7 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 59 $670.00 $1216.24 $39530.00 12-14-2017 07-307904 8 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 74 $550.00 $998.41 $40700.00 12-19-2017 07-301404 1 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 74 $350.00 $635.35 $25900.00 12-19-2017 07-301404 2 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 74 $310.00 $562.74 $22940.00 12-19-2017 07-301404 3 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 74 $395.00 $717.04 $29230.00 12-19-2017 07-301404 4 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 74 $360.00 $653.50 $26640.00 12-19-2017 07-301404 5 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 74 $10.00 $18.15 $740.00 12-19-2017 07-301404 6 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 100 $245.00 $382.16 $24500.00 01-11-2018 07-291204 1 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 100 $144.00 $224.61 $14400.00 01-11-2018 07-291204 2 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 100 $714.24 $1114.09 $71424.00 01-11-2018 07-291204 3 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 100 $451.35 $704.03 $45135.00 01-11-2018 07-291204 4 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 100 $550.00 $857.90 $55000.00 01-11-2018 07-291204 5 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 100 $747.50 $1165.97 $74750.00 01-11-2018 07-291204 6 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 100 $300.00 $467.95 $30000.00 01-11-2018 07-291204 7 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 100 $475.00 $740.92 $47500.00 01-11-2018 07-291204 8 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 100 $265.00 $413.35 $26500.00 01-11-2018 07-291204 9 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 100 $731.00 $1140.23 $73100.00 01-11-2018 07-291204 10 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 45 $142.00 $221.50 $6390.00 01-24-2018 04-4G8504 1 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 45 $250.00 $389.96 $11250.00 01-24-2018 04-4G8504 2 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 45 $400.00 $623.93 $18000.00 01-24-2018 04-4G8504 3 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 45 $360.00 $561.54 $16200.00 01-24-2018 04-4G8504 4 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 45 $500.00 $779.91 $22500.00 01-24-2018 04-4G8504 5 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 45 $300.00 $467.95 $13500.00 01-24-2018 04-4G8504 6 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 45 $250.00 $389.96 $11250.00 01-24-2018 04-4G8504 7 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 45 $400.00 $623.93 $18000.00 01-24-2018 04-4G8504 8 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 45 $500.00 $779.91 $22500.00 01-24-2018 04-4G8504 9 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 45 $329.00 $513.18 $14805.00 01-24-2018 04-4G8504 10 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 13 $750.00 $1169.87 $9750.00 01-24-2018 07-286604 1 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 13 $84.00 $131.03 $1092.00 01-24-2018 07-286604 2 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 13 $300.00 $467.95 $3900.00 01-24-2018 07-286604 3 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 13 $206.00 $321.32 $2678.00 01-24-2018 07-286604 4 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 13 $225.00 $350.96 $2925.00 01-24-2018 07-286604 5 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 13 $197.00 $307.29 $2561.00 01-24-2018 07-286604 6 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 13 $340.00 $530.34 $4420.00 01-24-2018 07-286604 7 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 60 $454.32 $708.66 $27259.20 02-06-2018 04-4H2104 1 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 60 $545.49 $850.87 $32729.40 02-06-2018 04-4H2104 2 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 60 $360.00 $561.54 $21600.00 02-06-2018 04-4H2104 3 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 60 $500.00 $779.91 $30000.00 02-06-2018 04-4H2104 4 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 60 $800.00 $1247.86 $48000.00 02-06-2018 04-4H2104 5 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 05 3.6 $1160.00 $1809.40 $4176.00 02-14-2018 05-1J3004 1 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 05 3.6 $2400.00 $3743.58 $8640.00 02-14-2018 05-1J3004 2 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 1.8 $454.08 $708.29 $817.34 02-27-2018 07-308004 1 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 1.8 $6000.00 $9358.95 $10800.00 02-27-2018 07-308004 2 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 1.8 $2400.00 $3743.58 $4320.00 02-27-2018 07-308004 3 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 110 $160.00 $249.57 $17600.00 02-28-2018 07-307404 1 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 110 $420.00 $655.13 $46200.00 02-28-2018 07-307404 2 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 110 $368.00 $574.02 $40480.00 02-28-2018 07-307404 3 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 110 $600.00 $935.90 $66000.00 02-28-2018 07-307404 4 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 17 $401.00 $625.49 $6817.00 03-01-2018 07-3P6804 1 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 17 $230.00 $358.76 $3910.00 03-01-2018 07-3P6804 2 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 17 $264.00 $411.79 $4488.00 03-01-2018 07-3P6804 3 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 17 $350.00 $545.94 $5950.00 03-01-2018 07-3P6804 4 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 17 $210.00 $327.56 $3570.00 03-01-2018 07-3P6804 5 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 17 $658.90 $1027.77 $11201.30 03-01-2018 07-3P6804 6 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 17 $767.00 $1196.39 $13039.00 03-01-2018 07-3P6804 7 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 17 $210.00 $327.56 $3570.00 03-01-2018 07-3P6804 8 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 17 $500.00 $779.91 $8500.00 03-01-2018 07-3P6804 9 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 20 $500.00 $779.91 $10000.00 03-27-2018 07-307704 1 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 20 $790.00 $1232.26 $15800.00 03-27-2018 07-307704 2 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 20 $300.00 $467.95 $6000.00 03-27-2018 07-307704 3 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 20 $760.00 $1185.47 $15200.00 03-27-2018 07-307704 4 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 20 $793.00 $1236.94 $15860.00 03-27-2018 07-307704 5 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 20 $766.00 $1194.83 $15320.00 03-27-2018 07-307704 6 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 20 $925.00 $1442.84 $18500.00 03-27-2018 07-307704 7 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 20 $750.00 $1169.87 $15000.00 03-27-2018 07-307704 8 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 20 $598.60 $933.71 $11972.00 03-27-2018 07-307704 9 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 42 $334.00 $485.82 $14028.00 04-11-2018 07-4T9904 1 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 42 $465.00 $676.36 $19530.00 04-11-2018 07-4T9904 2 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 42 $900.00 $1309.08 $37800.00 04-11-2018 07-4T9904 3 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 42 $1100.00 $1599.99 $46200.00 04-11-2018 07-4T9904 4 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 42 $750.00 $1090.90 $31500.00 04-11-2018 07-4T9904 5 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 42 $695.00 $1010.90 $29190.00 04-11-2018 07-4T9904 6 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 42 $660.00 $959.99 $27720.00 04-11-2018 07-4T9904 7 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 42 $995.00 $1447.26 $41790.00 04-11-2018 07-4T9904 8 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 12 11 $200.00 $290.91 $2200.00 05-08-2018 12-0C8904 1 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 12 11 $750.00 $1090.90 $8250.00 05-08-2018 12-0C8904 2 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 12 11 $433.00 $629.81 $4763.00 05-08-2018 12-0C8904 3 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 12 11 $245.27 $356.75 $2697.97 05-08-2018 12-0C8904 4 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 12 11 $100.00 $145.45 $1100.00 05-08-2018 12-0C8904 5 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 12 11 $411.18 $598.08 $4522.98 05-08-2018 12-0C8904 6 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 12 11 $750.00 $1090.90 $8250.00 05-08-2018 12-0C8904 7 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 12 11 $140.00 $203.64 $1540.00 05-08-2018 12-0C8904 8 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 50 $350.00 $483.64 $17500.00 10-10-2018 04-0G2214 1 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 50 $440.00 $608.01 $22000.00 10-10-2018 04-0G2214 2 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 50 $300.00 $414.55 $15000.00 10-10-2018 04-0G2214 3 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 12 11 $411.18 $568.18 $4522.98 10-18-2018 12-0C8904 1 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 12 11 $250.00 $345.46 $2750.00 10-18-2018 12-0C8904 2 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 05 180 $250.00 $345.46 $45000.00 10-31-2018 05-1F4304 1 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 05 180 $330.00 $456.01 $59400.00 10-31-2018 05-1F4304 2 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 05 180 $535.00 $739.28 $96300.00 10-31-2018 05-1F4304 3 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 670 $264.00 $364.80 $176880.00 10-31-2018 07-301504 1 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 670 $440.00 $608.01 $294800.00 10-31-2018 07-301504 2 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 670 $450.00 $621.83 $301500.00 10-31-2018 07-301504 3 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 670 $200.00 $276.37 $134000.00 10-31-2018 07-301504 4 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 670 $482.00 $666.05 $322940.00 10-31-2018 07-301504 5 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 670 $530.00 $732.37 $355100.00 10-31-2018 07-301504 6 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 230 $57.00 $78.76 $13110.00 11-07-2018 04-4G1134 1 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 230 $400.00 $552.73 $92000.00 11-07-2018 04-4G1134 2 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 05 9 $120.00 $165.82 $1080.00 11-08-2018 05-1F75U4 1 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 05 9 $300.00 $414.55 $2700.00 11-08-2018 05-1F75U4 2 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 05 9 $220.00 $304.00 $1980.00 11-08-2018 05-1F75U4 3 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 05 9 $500.00 $690.92 $4500.00 11-08-2018 05-1F75U4 4 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 05 9 $405.00 $559.64 $3645.00 11-08-2018 05-1F75U4 5 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 05 9 $300.00 $414.55 $2700.00 11-08-2018 05-1F75U4 6 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 05 9 $915.00 $1264.38 $8235.00 11-08-2018 05-1F75U4 7 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 05 9 $377.98 $522.31 $3401.82 11-08-2018 05-1F75U4 8 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 05 130 $628.30 $868.21 $81679.00 11-15-2018 05-1C8904 1 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 05 130 $304.50 $420.77 $39585.00 11-15-2018 05-1C8904 2 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 05 130 $600.00 $829.10 $78000.00 11-15-2018 05-1C8904 3 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 8 $400.00 $552.73 $3200.00 12-11-2018 07-4T9804 1 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 8 $800.00 $1105.47 $6400.00 12-11-2018 07-4T9804 2 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 8 $300.00 $414.55 $2400.00 12-11-2018 07-4T9804 3 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 8 $1022.00 $1412.24 $8176.00 12-11-2018 07-4T9804 4 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 8 $750.00 $1036.38 $6000.00 12-11-2018 07-4T9804 5 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 8 $460.00 $635.65 $3680.00 12-11-2018 07-4T9804 6 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 8 $980.00 $1354.20 $7840.00 12-11-2018 07-4T9804 7 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 8 $600.00 $829.10 $4800.00 12-11-2018 07-4T9804 8 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 8 $419.00 $578.99 $3352.00 12-11-2018 07-4T9804 9 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 8 $420.00 $580.37 $3360.00 12-11-2018 07-4T9804 10 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 8 $875.00 $1209.11 $7000.00 12-11-2018 07-4T9804 11 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 15 $200.00 $276.37 $3000.00 12-13-2018 07-303504 1 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 15 $380.00 $525.10 $5700.00 12-13-2018 07-303504 2 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 15 $475.00 $656.37 $7125.00 12-13-2018 07-303504 3 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 15 $540.00 $746.19 $8100.00 12-13-2018 07-303504 4 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 15 $515.00 $711.65 $7725.00 12-13-2018 07-303504 5 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 05 210 $353.24 $614.80 $74180.40 01-15-2019 05-1C85U4 1 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 05 210 $525.00 $913.75 $110250.00 01-15-2019 05-1C85U4 2 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 03 630 $135.00 $234.96 $85050.00 01-30-2019 03-2F3404 1 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 03 630 $200.00 $348.09 $126000.00 01-30-2019 03-2F3404 2 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 03 630 $106.16 $184.77 $66880.80 01-30-2019 03-2F3404 3 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 03 630 $300.00 $522.14 $189000.00 01-30-2019 03-2F3404 4 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 120 $127.65 $222.17 $15318.00 02-14-2019 08-0F0304 1 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 120 $181.89 $316.57 $21826.80 02-14-2019 08-0F0304 2 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 120 $525.00 $913.75 $63000.00 02-14-2019 08-0F0304 3 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 120 $200.00 $348.09 $24000.00 02-14-2019 08-0F0304 4 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 120 $239.68 $417.16 $28761.60 02-14-2019 08-0F0304 5 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 120 $213.00 $370.72 $25560.00 02-14-2019 08-0F0304 6 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 120 $330.00 $574.35 $39600.00 02-14-2019 08-0F0304 7 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 11 520 $85.00 $147.94 $44200.00 02-28-2019 11-2888U4 1 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 11 520 $101.48 $176.62 $52769.60 02-28-2019 11-2888U4 2 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 11 520 $48.00 $83.54 $24960.00 02-28-2019 11-2888U4 3 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 510 $485.72 $598.84 $247717.20 05-07-2019 04-2K7504 1 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 510 $300.00 $369.87 $153000.00 05-07-2019 04-2K7504 2 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 510 $225.00 $277.40 $114750.00 05-07-2019 04-2K7504 3 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 03 11 $300.00 $369.87 $3300.00 05-22-2019 03-1H4404 1    
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 03 11 $460.00 $567.13 $5060.00 05-22-2019 03-1H4404 2    
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 03 3 $550.00 $678.09 $1650.00 05-23-2019 03-4H0204 1 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 03 3 $1562.00 $1925.79 $4686.00 05-23-2019 03-4H0204 2 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 11 37 $800.00 $986.32 $29600.00 05-24-2019 11-2N0114 1 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 11 37 $211.00 $260.14 $7807.00 05-24-2019 11-2N0114 2 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 11 37 $650.00 $801.38 $24050.00 05-24-2019 11-2N0114 3 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 11 37 $400.00 $493.16 $14800.00 05-24-2019 11-2N0114 4 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 18 $1250.00 $1541.12 $22500.00 05-29-2019 08-1G1204 1 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 18 $527.00 $649.74 $9486.00 05-29-2019 08-1G1204 2 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 18 $250.00 $308.22 $4500.00 05-29-2019 08-1G1204 3 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 19 $130.00 $160.28 $2470.00 05-29-2019 08-1J4104 1 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 19 $403.00 $496.86 $7657.00 05-29-2019 08-1J4104 2 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 19 $220.00 $271.24 $4180.00 05-29-2019 08-1J4104 3 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 19 $420.00 $517.82 $7980.00 05-29-2019 08-1J4104 4 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 19 $150.00 $184.93 $2850.00 05-29-2019 08-1J4104 5 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 19 $750.00 $924.67 $14250.00 05-29-2019 08-1J4104 6 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 19 $250.00 $308.22 $4750.00 05-29-2019 08-1J4104 7 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 27 $600.00 $785.89 $16200.00 07-10-2019 08-1H6604 1 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 27 $536.00 $702.07 $14472.00 07-10-2019 08-1H6604 2 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 27 $178.00 $233.15 $4806.00 07-10-2019 08-1H6604 3 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 27 $390.00 $510.83 $10530.00 07-10-2019 08-1H6604 4 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 27 $420.00 $550.13 $11340.00 07-10-2019 08-1H6604 5 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 27 $530.00 $694.21 $14310.00 07-10-2019 08-1H6604 6 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 27 $944.00 $1236.47 $25488.00 07-10-2019 08-1H6604 7 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 27 $535.00 $700.76 $14445.00 07-10-2019 08-1H6604 8 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 27 $810.00 $1060.96 $21870.00 07-10-2019 08-1H6604 9 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 06 39 $300.00 $392.95 $11700.00 07-18-2019 06-0T2504 1 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 06 39 $400.00 $523.93 $15600.00 07-18-2019 06-0T2504 2 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 06 39 $150.00 $196.47 $5850.00 07-18-2019 06-0T2504 3 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 06 39 $208.79 $273.48 $8142.81 07-18-2019 06-0T2504 4 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 06 39 $750.00 $982.37 $29250.00 07-18-2019 06-0T2504 5 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 90 $525.00 $687.66 $47250.00 07-30-2019 04-2G4824 1 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 90 $435.00 $569.77 $39150.00 07-30-2019 04-2G4824 2 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 90 $340.00 $445.34 $30600.00 07-30-2019 04-2G4824 3 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 90 $550.00 $720.40 $49500.00 07-30-2019 04-2G4824 4 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 190 $50.00 $65.49 $9500.00 08-15-2019 08-1F1424 1 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 190 $90.00 $117.88 $17100.00 08-15-2019 08-1F1424 2 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 190 $250.00 $327.46 $47500.00 08-15-2019 08-1F1424 3 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 190 $140.00 $183.38 $26600.00 08-15-2019 08-1F1424 4 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 190 $305.00 $399.50 $57950.00 08-15-2019 08-1F1424 5 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 190 $45.00 $58.94 $8550.00 08-15-2019 08-1F1424 6 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 190 $200.00 $261.96 $38000.00 08-15-2019 08-1F1424 7 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 190 $342.96 $449.22 $65162.40 08-15-2019 08-1F1424 8 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 340 $290.00 $449.05 $98600.00 10-22-2019 07-306504 1 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 340 $200.00 $309.69 $68000.00 10-22-2019 07-306504 2 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 340 $290.00 $449.05 $98600.00 10-22-2019 07-306504 3 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 340 $324.00 $501.70 $110160.00 10-22-2019 07-306504 4 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 340 $455.00 $704.55 $154700.00 10-22-2019 07-306504 5 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 340 $269.00 $416.53 $91460.00 10-22-2019 07-306504 6 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 340 $295.00 $456.79 $100300.00 10-22-2019 07-306504 7 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 340 $275.00 $425.82 $93500.00 10-22-2019 07-306504 8 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 340 $500.00 $774.23 $170000.00 10-22-2019 07-306504 9 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 340 $325.00 $503.25 $110500.00 10-22-2019 07-306504 10 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 490 $200.00 $309.69 $98000.00 10-23-2019 08-1C38U4 1 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 490 $125.00 $193.56 $61250.00 10-23-2019 08-1C38U4 2 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 21 $495.00 $766.48 $10395.00 11-08-2019 04-2G6604 1 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 21 $545.00 $843.91 $11445.00 11-08-2019 04-2G6604 2 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 21 $1250.00 $1935.56 $26250.00 11-08-2019 04-2G6604 3 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 21 $615.00 $952.30 $12915.00 11-08-2019 04-2G6604 4 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 21 $300.00 $464.54 $6300.00 11-08-2019 04-2G6604 5 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 21 $540.00 $836.16 $11340.00 11-08-2019 04-2G6604 6 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 21 $800.00 $1238.76 $16800.00 11-08-2019 04-2G6604 7 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 21 $700.00 $1083.92 $14700.00 11-08-2019 04-2G6604 8 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 10 9 $651.79 $1009.27 $5866.11 11-14-2019 10-3A7204 1 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 10 9 $200.00 $309.69 $1800.00 11-14-2019 10-3A7204 2 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 10 9 $245.00 $379.37 $2205.00 11-14-2019 10-3A7204 3 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 10 9 $325.00 $503.25 $2925.00 11-14-2019 10-3A7204 4 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 10 9 $300.00 $464.54 $2700.00 11-14-2019 10-3A7204 5 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 550 $268.73 $416.12 $147801.50 11-19-2019 07-306604 1 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 550 $520.00 $805.19 $286000.00 11-19-2019 07-306604 2 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 550 $162.00 $250.85 $89100.00 11-19-2019 07-306604 3 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 550 $290.00 $449.05 $159500.00 11-19-2019 07-306604 4 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 550 $343.00 $531.12 $188650.00 11-19-2019 07-306604 5 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 550 $260.00 $402.60 $143000.00 11-19-2019 07-306604 6 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 550 $285.00 $441.31 $156750.00 11-19-2019 07-306604 7 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 550 $235.00 $363.89 $129250.00 11-19-2019 07-306604 8 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 550 $279.00 $432.02 $153450.00 11-19-2019 07-306604 9 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 550 $275.00 $425.82 $151250.00 11-19-2019 07-306604 10 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 260 $250.00 $387.11 $65000.00 11-21-2019 07-3118U4 1 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 260 $479.00 $741.71 $124540.00 11-21-2019 07-3118U4 2 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 260 $525.00 $812.94 $136500.00 11-21-2019 07-3118U4 3 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 260 $630.00 $975.52 $163800.00 11-21-2019 07-3118U4 4 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 260 $479.00 $741.71 $124540.00 11-21-2019 07-3118U4 5 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 120 $520.00 $805.19 $62400.00 12-16-2019 04-2G6904 1 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 120 $550.00 $851.65 $66000.00 12-16-2019 04-2G6904 2 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 120 $405.00 $627.12 $48600.00 12-16-2019 04-2G6904 3 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 120 $1700.00 $2632.37 $204000.00 12-16-2019 04-2G6904 4 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 160 $500.00 $610.44 $80000.00 01-07-2020 04-3J3204 1 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 160 $100.00 $122.09 $16000.00 01-07-2020 04-3J3204 2 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 160 $200.00 $244.18 $32000.00 01-07-2020 04-3J3204 3 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 160 $422.66 $516.02 $67625.60 01-07-2020 04-3J3204 4 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 160 $1392.65 $1700.26 $222824.00 01-07-2020 04-3J3204 5 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 160 $221.60 $270.55 $35456.00 01-07-2020 04-3J3204 6 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 06 150 $420.00 $512.77 $63000.00 01-14-2020 06-0U6704 1 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 06 150 $400.00 $488.35 $60000.00 01-14-2020 06-0U6704 2 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 06 150 $110.00 $134.30 $16500.00 01-14-2020 06-0U6704 3 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 06 150 $363.00 $443.18 $54450.00 01-14-2020 06-0U6704 4 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 06 150 $400.00 $488.35 $60000.00 01-14-2020 06-0U6704 5 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 06 150 $530.00 $647.07 $79500.00 01-14-2020 06-0U6704 6 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 06 150 $550.00 $671.48 $82500.00 01-14-2020 06-0U6704 7 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 06 150 $295.00 $360.16 $44250.00 01-14-2020 06-0U6704 8 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 06 150 $325.00 $396.79 $48750.00 01-14-2020 06-0U6704 9 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 06 150 $1200.00 $1465.06 $180000.00 01-14-2020 06-0U6704 10 M  
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 300 $350.00 $427.31 $105000.00 01-23-2020 07-302504 1 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 300 $330.00 $402.89 $99000.00 01-23-2020 07-302504 2 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 300 $250.00 $305.22 $75000.00 01-23-2020 07-302504 3 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 300 $65.43 $79.88 $19629.00 01-23-2020 07-302504 4 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 300 $350.00 $427.31 $105000.00 01-23-2020 07-302504 5 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 300 $215.00 $262.49 $64500.00 01-23-2020 07-302504 6 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 150 $450.00 $549.40 $67500.00 02-19-2020 07-311704 1 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 150 $2990.00 $3650.43 $448500.00 02-19-2020 07-311704 2 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 150 $335.00 $408.99 $50250.00 02-19-2020 07-311704 3 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 150 $59.55 $72.70 $8932.50 02-19-2020 07-311704 4 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 150 $250.00 $305.22 $37500.00 02-19-2020 07-311704 5 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 150 $280.00 $341.85 $42000.00 02-19-2020 07-311704 6 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 190 $429.17 $523.97 $81542.30 03-17-2020 07-3096U4 1 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 190 $244.59 $298.62 $46472.10 03-17-2020 07-3096U4 2 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 190 $344.00 $419.98 $65360.00 03-17-2020 07-3096U4 3 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 190 $337.29 $411.79 $64085.10 03-17-2020 07-3096U4 4 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 190 $400.00 $488.35 $76000.00 03-17-2020 07-3096U4 5 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 05 8 $1270.00 $1550.52 $10160.00 03-24-2020 05-1M0004 1 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 05 8 $500.00 $610.44 $4000.00 03-24-2020 05-1M0004 2 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 05 8 $1000.00 $1220.88 $8000.00 03-24-2020 05-1M0004 3 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 11 25 $650.00 $1035.60 $16250.00 04-09-2020 11-2T3464 1 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 11 25 $500.00 $796.62 $12500.00 04-09-2020 11-2T3464 2 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 06 25 $953.00 $1518.35 $23825.00 04-15-2020 06-0W7604 1   TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 06 25 $325.00 $517.80 $8125.00 04-15-2020 06-0W7604 2   TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 06 25 $215.00 $342.55 $5375.00 04-15-2020 06-0W7604 3   TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 06 25 $200.00 $318.65 $5000.00 04-15-2020 06-0W7604 4   TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 06 25 $800.00 $1274.59 $20000.00 04-15-2020 06-0W7604 5   TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 14 $330.00 $525.77 $4620.00 04-22-2020 07-4V0604 1 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 14 $260.00 $414.24 $3640.00 04-22-2020 07-4V0604 2 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 14 $330.00 $525.77 $4620.00 04-22-2020 07-4V0604 3 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 14 $707.00 $1126.42 $9898.00 04-22-2020 07-4V0604 4 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 14 $550.00 $876.28 $7700.00 04-22-2020 07-4V0604 5 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 14 $150.00 $238.99 $2100.00 04-22-2020 07-4V0604 6 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 14 $560.00 $892.21 $7840.00 04-22-2020 07-4V0604 7 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 14 $600.00 $955.94 $8400.00 04-22-2020 07-4V0604 8 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 14 $500.00 $796.62 $7000.00 04-22-2020 07-4V0604 9 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 14 $123.00 $195.97 $1722.00 04-22-2020 07-4V0604 10 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 14 $579.00 $922.48 $8106.00 04-22-2020 07-4V0604 11 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 27 $560.00 $892.21 $15120.00 04-28-2020 07-304504 1 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 27 $685.00 $1091.37 $18495.00 04-28-2020 07-304504 2 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 27 $715.00 $1139.16 $19305.00 04-28-2020 07-304504 3 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 27 $552.00 $879.47 $14904.00 04-28-2020 07-304504 4 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 27 $240.59 $383.32 $6495.93 04-28-2020 07-304504 5 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 27 $450.00 $716.96 $12150.00 04-28-2020 07-304504 6 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 27 $700.00 $1115.27 $18900.00 04-28-2020 07-304504 7 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 14 $250.00 $398.31 $3500.00 05-06-2020 08-1G2914 1   TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 14 $305.00 $485.94 $4270.00 05-06-2020 08-1G2914 2   TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 14 $480.00 $764.75 $6720.00 05-06-2020 08-1G2914 3   TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 14 $450.00 $716.96 $6300.00 05-06-2020 08-1G2914 4   TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 14 $700.00 $1115.27 $9800.00 05-06-2020 08-1G2914 5   TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 14 $411.00 $654.82 $5754.00 05-06-2020 08-1G2914 6   TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 14 $700.00 $1115.27 $9800.00 05-06-2020 08-1G2914 7   TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 14 $4000.00 $6372.95 $56000.00 05-06-2020 08-1G2914 8   TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 09 6 $800.00 $1274.59 $4800.00 05-13-2020 09-370104 1   TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 09 6 $500.00 $796.62 $3000.00 05-13-2020 09-370104 2   TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 09 6 $2000.00 $3186.47 $12000.00 05-13-2020 09-370104 3   TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 09 6 $1200.00 $1911.88 $7200.00 05-13-2020 09-370104 4   TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 09 6 $530.00 $844.42 $3180.00 05-13-2020 09-370104 5   TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 180 $400.00 $637.29 $72000.00 05-19-2020 08-0K1234 1 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 180 $131.00 $208.71 $23580.00 05-19-2020 08-0K1234 2 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 180 $360.00 $573.57 $64800.00 05-19-2020 08-0K1234 3 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 180 $313.00 $498.68 $56340.00 05-19-2020 08-0K1234 4 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 12 1 $1000.00 $1593.24 $1000.00 05-19-2020 12-0P4004 1 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 12 1 $500.00 $796.62 $500.00 05-19-2020 12-0P4004 2 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 12 1 $500.00 $796.62 $500.00 05-19-2020 12-0P4004 3 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 12 1 $770.00 $1226.79 $770.00 05-19-2020 12-0P4004 4 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 12 1 $1400.00 $2230.53 $1400.00 05-19-2020 12-0P4004 5 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 12 1 $1500.00 $2389.86 $1500.00 05-19-2020 12-0P4004 6 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 12 1 $1266.00 $2017.04 $1266.00 05-19-2020 12-0P4004 7 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 12 1 $1200.00 $1911.88 $1200.00 05-19-2020 12-0P4004 8 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 12 1 $2750.00 $4381.40 $2750.00 05-19-2020 12-0P4004 9 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 12 1 $1399.00 $2228.94 $1399.00 05-19-2020 12-0P4004 10 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 12 1 $3235.00 $5154.12 $3235.00 05-19-2020 12-0P4004 11 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 12 1 $3000.00 $4779.71 $3000.00 05-19-2020 12-0P4004 12 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 12 1 $3500.00 $5576.33 $3500.00 05-19-2020 12-0P4004 13 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 23 $385.00 $613.40 $8855.00 05-29-2020 07-4V0204 1 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 23 $460.00 $732.89 $10580.00 05-29-2020 07-4V0204 2 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 23 $260.00 $414.24 $5980.00 05-29-2020 07-4V0204 3 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 23 $400.00 $637.29 $9200.00 05-29-2020 07-4V0204 4 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 23 $300.00 $477.97 $6900.00 05-29-2020 07-4V0204 5 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 23 $1500.00 $2389.86 $34500.00 05-29-2020 07-4V0204 6 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 23 $299.00 $476.38 $6877.00 05-29-2020 07-4V0204 7 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 23 $180.00 $286.78 $4140.00 05-29-2020 07-4V0204 8 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 11 $1750.00 $2512.52 $19250.00 09-09-2020 04-3J7104 1 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 11 $960.00 $1378.30 $10560.00 09-09-2020 04-3J7104 2 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 11 $300.00 $430.72 $3300.00 09-09-2020 04-3J7104 3 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 11 $600.00 $861.43 $6600.00 09-09-2020 04-3J7104 4 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 11 $1000.00 $1435.72 $11000.00 09-09-2020 04-3J7104 5 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 11 $750.00 $1076.79 $8250.00 09-09-2020 04-3J7104 6 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 11 $1364.00 $1958.33 $15004.00 09-09-2020 04-3J7104 7 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 100 $300.00 $430.72 $30000.00 09-09-2020 07-307504 1 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 100 $415.00 $595.83 $41500.00 09-09-2020 07-307504 2 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 100 $975.00 $1399.83 $97500.00 09-09-2020 07-307504 3 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 100 $325.00 $466.61 $32500.00 09-09-2020 07-307504 4 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 100 $300.00 $430.72 $30000.00 09-09-2020 07-307504 5 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 100 $840.00 $1206.01 $84000.00 09-09-2020 07-307504 6 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 100 $714.00 $1025.11 $71400.00 09-09-2020 07-307504 7 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 100 $275.00 $394.82 $27500.00 09-09-2020 07-307504 8 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 170 $295.00 $422.21 $50150.00 10-06-2020 04-2G4604 1 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 170 $450.00 $644.06 $76500.00 10-06-2020 04-2G4604 2 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 170 $250.00 $357.81 $42500.00 10-06-2020 04-2G4604 3 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 170 $260.00 $372.12 $44200.00 10-06-2020 04-2G4604 4 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 170 $330.00 $472.31 $56100.00 10-06-2020 04-2G4604 5 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 170 $425.00 $608.28 $72250.00 10-06-2020 04-2G4604 6 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 170 $443.00 $634.04 $75310.00 10-06-2020 04-2G4604 7 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 170 $550.00 $787.18 $93500.00 10-06-2020 04-2G4604 8 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 170 $260.00 $372.12 $44200.00 10-06-2020 04-2G4604 9 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 170 $775.00 $1109.21 $131750.00 10-06-2020 04-2G4604 10 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 170 $800.00 $1144.99 $136000.00 10-06-2020 04-2G4604 11 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 170 $175.00 $250.47 $29750.00 10-06-2020 04-2G4604 12 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 10 79 $330.00 $472.31 $26070.00 10-06-2020 10-1C2804 1 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 10 79 $290.00 $415.06 $22910.00 10-06-2020 10-1C2804 2 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 10 79 $220.00 $314.87 $17380.00 10-06-2020 10-1C2804 3 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 10 79 $161.63 $231.33 $12768.77 10-06-2020 10-1C2804 4 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 10 79 $220.00 $314.87 $17380.00 10-06-2020 10-1C2804 5 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 10 79 $225.00 $322.03 $17775.00 10-06-2020 10-1C2804 6 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 1030 $136.00 $194.65 $140080.00 10-15-2020 08-1E8404 1 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 1030 $327.75 $469.09 $337582.50 10-15-2020 08-1E8404 2 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 1030 $137.00 $196.08 $141110.00 10-15-2020 08-1E8404 3 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 1030 $650.00 $930.30 $669500.00 10-15-2020 08-1E8404 4 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 1030 $180.00 $257.62 $185400.00 10-15-2020 08-1E8404 5 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 1030 $358.00 $512.38 $368740.00 10-15-2020 08-1E8404 6 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 06 81 $600.00 $858.74 $48600.00 10-21-2020 06-0W3604 1 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 06 81 $550.00 $787.18 $44550.00 10-21-2020 06-0W3604 2 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 06 81 $325.00 $465.15 $26325.00 10-21-2020 06-0W3604 3 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 06 81 $325.00 $465.15 $26325.00 10-21-2020 06-0W3604 4 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 06 81 $200.00 $286.25 $16200.00 10-21-2020 06-0W3604 5 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 06 81 $300.00 $429.37 $24300.00 10-21-2020 06-0W3604 6 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 06 81 $246.00 $352.08 $19926.00 10-21-2020 06-0W3604 7 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 06 81 $450.00 $644.06 $36450.00 10-21-2020 06-0W3604 8 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 06 81 $250.00 $357.81 $20250.00 10-21-2020 06-0W3604 9 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 06 81 $380.00 $543.87 $30780.00 10-21-2020 06-0W3604 10 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 50 $200.00 $286.25 $10000.00 11-04-2020 04-3E6024 1 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 50 $200.00 $286.25 $10000.00 11-04-2020 04-3E6024 2 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 50 $520.00 $744.24 $26000.00 11-04-2020 04-3E6024 3 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 50 $200.00 $286.25 $10000.00 11-04-2020 04-3E6024 4 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 50 $300.00 $429.37 $15000.00 11-04-2020 04-3E6024 5 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 75 $200.00 $286.25 $15000.00 11-05-2020 07-303904 1 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 75 $150.00 $214.69 $11250.00 11-05-2020 07-303904 2 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 75 $325.00 $465.15 $24375.00 11-05-2020 07-303904 3 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 75 $152.00 $217.55 $11400.00 11-05-2020 07-303904 4 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 75 $79.00 $113.07 $5925.00 11-05-2020 07-303904 5 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 240 $70.00 $100.19 $16800.00 11-19-2020 08-1F1434 1 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 240 $120.00 $171.75 $28800.00 11-19-2020 08-1F1434 2 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 240 $200.00 $286.25 $48000.00 11-19-2020 08-1F1434 3 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 240 $250.00 $357.81 $60000.00 11-19-2020 08-1F1434 4 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 240 $300.00 $429.37 $72000.00 11-19-2020 08-1F1434 5 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 08 240 $397.41 $568.79 $95378.40 11-19-2020 08-1F1434 6 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 7 $154.14 $220.61 $1078.98 12-16-2020 07-210624 1 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 7 $260.00 $372.12 $1820.00 12-16-2020 07-210624 2 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 7 $476.00 $681.27 $3332.00 12-16-2020 07-210624 3 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 7 $140.00 $200.37 $980.00 12-16-2020 07-210624 4 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 7 $400.00 $572.49 $2800.00 12-16-2020 07-210624 5 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 7 $1000.00 $1431.24 $7000.00 12-16-2020 07-210624 6 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 7 $280.00 $400.75 $1960.00 12-16-2020 07-210624 7 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 06 7 $750.00 $1290.94 $5250.00 01-14-2021 06-0U1004 1 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 06 7 $650.00 $1118.81 $4550.00 01-14-2021 06-0U1004 2 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 06 7 $150.00 $258.19 $1050.00 01-14-2021 06-0U1004 3 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 06 49 $325.00 $559.41 $15925.00 01-20-2021 06-0S5104 1 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 06 49 $400.00 $688.50 $19600.00 01-20-2021 06-0S5104 2 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 06 49 $200.00 $344.25 $9800.00 01-20-2021 06-0S5104 3 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 230 $275.00 $473.34 $63250.00 02-18-2021 04-1J3604 1 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 230 $500.00 $860.62 $115000.00 02-18-2021 04-1J3604 2 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 230 $280.00 $481.95 $64400.00 02-18-2021 04-1J3604 3 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 230 $210.00 $361.46 $48300.00 02-18-2021 04-1J3604 4 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 230 $550.00 $946.69 $126500.00 02-18-2021 04-1J3604 5 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 230 $180.00 $309.82 $41400.00 02-18-2021 04-1J3604 6 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 41 $265.00 $456.13 $10865.00 02-25-2021 07-4V1404 1 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 41 $280.00 $481.95 $11480.00 02-25-2021 07-4V1404 2 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 41 $434.00 $747.02 $17794.00 02-25-2021 07-4V1404 3 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 41 $285.00 $490.56 $11685.00 02-25-2021 07-4V1404 4 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 41 $440.00 $757.35 $18040.00 02-25-2021 07-4V1404 5 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 41 $450.00 $774.56 $18450.00 02-25-2021 07-4V1404 6 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 41 $68.00 $117.04 $2788.00 02-25-2021 07-4V1404 7 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 41 $170.00 $292.61 $6970.00 02-25-2021 07-4V1404 8 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 11 12 $1120.00 $1587.33 $13440.00 04-06-2021 11-2N0574 1 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 11 12 $750.00 $1062.94 $9000.00 04-06-2021 11-2N0574 2 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 11 12 $500.00 $708.63 $6000.00 04-06-2021 11-2N0574 3 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 11 12 $1000.00 $1417.26 $12000.00 04-06-2021 11-2N0574 4 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 11 12 $530.00 $751.15 $6360.00 04-06-2021 11-2N0574 5 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 06 80 $52.00 $73.70 $4160.00 04-07-2021 06-360244 1 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 06 80 $160.00 $226.76 $12800.00 04-07-2021 06-360244 2 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 06 80 $75.00 $106.29 $6000.00 04-07-2021 06-360244 3 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 06 80 $120.00 $170.07 $9600.00 04-07-2021 06-360244 4 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 06 80 $200.00 $283.45 $16000.00 04-07-2021 06-360244 5 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 06 80 $200.00 $283.45 $16000.00 04-07-2021 06-360244 6 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 320 $445.40 $631.25 $142528.00 04-13-2021 04-1J9704 1 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 320 $325.00 $460.61 $104000.00 04-13-2021 04-1J9704 2 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 320 $105.52 $149.55 $33766.40 04-13-2021 04-1J9704 3 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 320 $400.00 $566.90 $128000.00 04-13-2021 04-1J9704 4 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 320 $250.00 $354.31 $80000.00 04-13-2021 04-1J9704 5 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 04 320 $450.00 $637.76 $144000.00 04-13-2021 04-1J9704 6 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 11 140 $450.00 $637.76 $63000.00 04-15-2021 11-2N0724 1 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 11 140 $280.64 $397.74 $39289.60 04-15-2021 11-2N0724 2 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 11 140 $446.25 $632.45 $62475.00 04-15-2021 11-2N0724 3 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 11 140 $260.00 $368.49 $36400.00 04-15-2021 11-2N0724 4 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 11 140 $125.00 $177.16 $17500.00 04-15-2021 11-2N0724 5 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 43 $235.00 $333.05 $10105.00 04-29-2021 07-4V0304 1 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 43 $310.00 $439.35 $13330.00 04-29-2021 07-4V0304 2 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 43 $190.00 $269.28 $8170.00 04-29-2021 07-4V0304 3 M TRO
731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) CY 07 43 $190.00 $269.28 $8170.00 04-29-2021 07-4V0304 4 M TRO
MORE THAN 500 RESULTS RETURNED. ONLY 500 ROWS SHOWN.
SUMMARY Unmodified Adjusted    
Average Price/Unit: $ Avg No. Units
Std Dev. (of Unit Price): ±$ Rows Selected
Weighted Avg.: $ Rows Returned
Minimum Price/Unit: $    
Maximum Price/Unit: $    

| Back | New Search |

PARAMETERS: Item = 731850; District=All; Year=All; Convert=No; Bidders=All Bidders
TIMESTAMP: 11/13/2026 05:26:51
CURRENT 12-MO INDEX (CHCCI (2020 Base)): 146.53