| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
85 |
$137.00 |
$201.29 |
$11645.00 |
03-15-2017 |
08-1G0904 |
1 |
|
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
85 |
$300.00 |
$440.78 |
$25500.00 |
03-15-2017 |
08-1G0904 |
2 |
|
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
85 |
$785.00 |
$1153.37 |
$66725.00 |
03-15-2017 |
08-1G0904 |
3 |
|
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
05 |
15 |
$484.00 |
$706.80 |
$7260.00 |
04-12-2017 |
05-1H4004 |
1 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
05 |
15 |
$585.00 |
$854.30 |
$8775.00 |
04-12-2017 |
05-1H4004 |
2 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
06 |
7 |
$950.00 |
$1387.32 |
$6650.00 |
06-13-2017 |
06-0T5104 |
1 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
06 |
7 |
$1041.77 |
$1521.33 |
$7292.39 |
06-13-2017 |
06-0T5104 |
2 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
06 |
7 |
$1500.00 |
$2190.50 |
$10500.00 |
06-13-2017 |
06-0T5104 |
3 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
11 |
45 |
$330.00 |
$599.04 |
$14850.00 |
10-03-2017 |
11-414404 |
1 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
11 |
45 |
$200.00 |
$363.06 |
$9000.00 |
10-03-2017 |
11-414404 |
2 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
11 |
45 |
$270.00 |
$490.13 |
$12150.00 |
10-03-2017 |
11-414404 |
3 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
11 |
45 |
$267.80 |
$486.13 |
$12051.00 |
10-03-2017 |
11-414404 |
4 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
11 |
45 |
$200.00 |
$363.06 |
$9000.00 |
10-03-2017 |
11-414404 |
5 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
45 |
$628.30 |
$1140.55 |
$28273.50 |
10-26-2017 |
08-1C0604 |
1 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
45 |
$390.00 |
$707.96 |
$17550.00 |
10-26-2017 |
08-1C0604 |
2 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
45 |
$325.00 |
$589.97 |
$14625.00 |
10-26-2017 |
08-1C0604 |
3 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
45 |
$1050.00 |
$1906.05 |
$47250.00 |
10-26-2017 |
08-1C0604 |
4 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
45 |
$464.00 |
$842.29 |
$20880.00 |
10-26-2017 |
08-1C0604 |
5 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
29 |
$420.00 |
$762.42 |
$12180.00 |
11-08-2017 |
04-4H2004 |
1 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
29 |
$320.00 |
$580.89 |
$9280.00 |
11-08-2017 |
04-4H2004 |
2 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
29 |
$500.00 |
$907.64 |
$14500.00 |
11-08-2017 |
04-4H2004 |
3 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
29 |
$400.00 |
$726.11 |
$11600.00 |
11-08-2017 |
04-4H2004 |
4 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
29 |
$476.25 |
$864.53 |
$13811.25 |
11-08-2017 |
04-4H2004 |
5 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
29 |
$1130.00 |
$2051.27 |
$32770.00 |
11-08-2017 |
04-4H2004 |
6 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
29 |
$325.00 |
$589.97 |
$9425.00 |
11-08-2017 |
04-4H2004 |
7 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
178 |
$36.15 |
$65.62 |
$6434.70 |
12-05-2017 |
04-4G1154 |
1 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
178 |
$116.00 |
$210.57 |
$20648.00 |
12-05-2017 |
04-4G1154 |
2 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
178 |
$200.00 |
$363.06 |
$35600.00 |
12-05-2017 |
04-4G1154 |
3 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
178 |
$90.00 |
$163.38 |
$16020.00 |
12-05-2017 |
04-4G1154 |
4 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
178 |
$300.00 |
$544.59 |
$53400.00 |
12-05-2017 |
04-4G1154 |
5 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
69 |
$480.00 |
$871.34 |
$33120.00 |
12-12-2017 |
07-307804 |
1 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
69 |
$350.00 |
$635.35 |
$24150.00 |
12-12-2017 |
07-307804 |
2 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
69 |
$846.57 |
$1536.77 |
$58413.33 |
12-12-2017 |
07-307804 |
3 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
69 |
$160.00 |
$290.45 |
$11040.00 |
12-12-2017 |
07-307804 |
4 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
69 |
$170.00 |
$308.60 |
$11730.00 |
12-12-2017 |
07-307804 |
5 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
91 |
$402.00 |
$729.75 |
$36582.00 |
12-13-2017 |
07-307604 |
1 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
91 |
$486.00 |
$882.23 |
$44226.00 |
12-13-2017 |
07-307604 |
2 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
91 |
$501.00 |
$909.46 |
$45591.00 |
12-13-2017 |
07-307604 |
3 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
91 |
$650.00 |
$1179.94 |
$59150.00 |
12-13-2017 |
07-307604 |
4 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
91 |
$629.00 |
$1141.82 |
$57239.00 |
12-13-2017 |
07-307604 |
5 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
91 |
$445.00 |
$807.80 |
$40495.00 |
12-13-2017 |
07-307604 |
6 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
91 |
$300.00 |
$544.59 |
$27300.00 |
12-13-2017 |
07-307604 |
7 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
91 |
$172.50 |
$313.14 |
$15697.50 |
12-13-2017 |
07-307604 |
8 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
91 |
$420.00 |
$762.42 |
$38220.00 |
12-13-2017 |
07-307604 |
9 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
59 |
$250.00 |
$453.82 |
$14750.00 |
12-14-2017 |
07-307904 |
1 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
59 |
$600.00 |
$1089.17 |
$35400.00 |
12-14-2017 |
07-307904 |
2 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
59 |
$499.00 |
$905.83 |
$29441.00 |
12-14-2017 |
07-307904 |
3 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
59 |
$240.00 |
$435.67 |
$14160.00 |
12-14-2017 |
07-307904 |
4 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
59 |
$800.00 |
$1452.23 |
$47200.00 |
12-14-2017 |
07-307904 |
5 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
59 |
$144.00 |
$261.40 |
$8496.00 |
12-14-2017 |
07-307904 |
6 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
59 |
$180.00 |
$326.75 |
$10620.00 |
12-14-2017 |
07-307904 |
7 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
59 |
$670.00 |
$1216.24 |
$39530.00 |
12-14-2017 |
07-307904 |
8 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
74 |
$550.00 |
$998.41 |
$40700.00 |
12-19-2017 |
07-301404 |
1 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
74 |
$350.00 |
$635.35 |
$25900.00 |
12-19-2017 |
07-301404 |
2 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
74 |
$310.00 |
$562.74 |
$22940.00 |
12-19-2017 |
07-301404 |
3 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
74 |
$395.00 |
$717.04 |
$29230.00 |
12-19-2017 |
07-301404 |
4 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
74 |
$360.00 |
$653.50 |
$26640.00 |
12-19-2017 |
07-301404 |
5 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
74 |
$10.00 |
$18.15 |
$740.00 |
12-19-2017 |
07-301404 |
6 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
100 |
$245.00 |
$382.16 |
$24500.00 |
01-11-2018 |
07-291204 |
1 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
100 |
$144.00 |
$224.61 |
$14400.00 |
01-11-2018 |
07-291204 |
2 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
100 |
$714.24 |
$1114.09 |
$71424.00 |
01-11-2018 |
07-291204 |
3 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
100 |
$451.35 |
$704.03 |
$45135.00 |
01-11-2018 |
07-291204 |
4 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
100 |
$550.00 |
$857.90 |
$55000.00 |
01-11-2018 |
07-291204 |
5 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
100 |
$747.50 |
$1165.97 |
$74750.00 |
01-11-2018 |
07-291204 |
6 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
100 |
$300.00 |
$467.95 |
$30000.00 |
01-11-2018 |
07-291204 |
7 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
100 |
$475.00 |
$740.92 |
$47500.00 |
01-11-2018 |
07-291204 |
8 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
100 |
$265.00 |
$413.35 |
$26500.00 |
01-11-2018 |
07-291204 |
9 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
100 |
$731.00 |
$1140.23 |
$73100.00 |
01-11-2018 |
07-291204 |
10 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
45 |
$142.00 |
$221.50 |
$6390.00 |
01-24-2018 |
04-4G8504 |
1 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
45 |
$250.00 |
$389.96 |
$11250.00 |
01-24-2018 |
04-4G8504 |
2 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
45 |
$400.00 |
$623.93 |
$18000.00 |
01-24-2018 |
04-4G8504 |
3 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
45 |
$360.00 |
$561.54 |
$16200.00 |
01-24-2018 |
04-4G8504 |
4 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
45 |
$500.00 |
$779.91 |
$22500.00 |
01-24-2018 |
04-4G8504 |
5 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
45 |
$300.00 |
$467.95 |
$13500.00 |
01-24-2018 |
04-4G8504 |
6 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
45 |
$250.00 |
$389.96 |
$11250.00 |
01-24-2018 |
04-4G8504 |
7 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
45 |
$400.00 |
$623.93 |
$18000.00 |
01-24-2018 |
04-4G8504 |
8 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
45 |
$500.00 |
$779.91 |
$22500.00 |
01-24-2018 |
04-4G8504 |
9 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
45 |
$329.00 |
$513.18 |
$14805.00 |
01-24-2018 |
04-4G8504 |
10 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
13 |
$750.00 |
$1169.87 |
$9750.00 |
01-24-2018 |
07-286604 |
1 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
13 |
$84.00 |
$131.03 |
$1092.00 |
01-24-2018 |
07-286604 |
2 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
13 |
$300.00 |
$467.95 |
$3900.00 |
01-24-2018 |
07-286604 |
3 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
13 |
$206.00 |
$321.32 |
$2678.00 |
01-24-2018 |
07-286604 |
4 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
13 |
$225.00 |
$350.96 |
$2925.00 |
01-24-2018 |
07-286604 |
5 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
13 |
$197.00 |
$307.29 |
$2561.00 |
01-24-2018 |
07-286604 |
6 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
13 |
$340.00 |
$530.34 |
$4420.00 |
01-24-2018 |
07-286604 |
7 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
60 |
$454.32 |
$708.66 |
$27259.20 |
02-06-2018 |
04-4H2104 |
1 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
60 |
$545.49 |
$850.87 |
$32729.40 |
02-06-2018 |
04-4H2104 |
2 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
60 |
$360.00 |
$561.54 |
$21600.00 |
02-06-2018 |
04-4H2104 |
3 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
60 |
$500.00 |
$779.91 |
$30000.00 |
02-06-2018 |
04-4H2104 |
4 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
60 |
$800.00 |
$1247.86 |
$48000.00 |
02-06-2018 |
04-4H2104 |
5 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
05 |
3.6 |
$1160.00 |
$1809.40 |
$4176.00 |
02-14-2018 |
05-1J3004 |
1 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
05 |
3.6 |
$2400.00 |
$3743.58 |
$8640.00 |
02-14-2018 |
05-1J3004 |
2 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
1.8 |
$454.08 |
$708.29 |
$817.34 |
02-27-2018 |
07-308004 |
1 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
1.8 |
$6000.00 |
$9358.95 |
$10800.00 |
02-27-2018 |
07-308004 |
2 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
1.8 |
$2400.00 |
$3743.58 |
$4320.00 |
02-27-2018 |
07-308004 |
3 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
110 |
$160.00 |
$249.57 |
$17600.00 |
02-28-2018 |
07-307404 |
1 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
110 |
$420.00 |
$655.13 |
$46200.00 |
02-28-2018 |
07-307404 |
2 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
110 |
$368.00 |
$574.02 |
$40480.00 |
02-28-2018 |
07-307404 |
3 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
110 |
$600.00 |
$935.90 |
$66000.00 |
02-28-2018 |
07-307404 |
4 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
17 |
$401.00 |
$625.49 |
$6817.00 |
03-01-2018 |
07-3P6804 |
1 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
17 |
$230.00 |
$358.76 |
$3910.00 |
03-01-2018 |
07-3P6804 |
2 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
17 |
$264.00 |
$411.79 |
$4488.00 |
03-01-2018 |
07-3P6804 |
3 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
17 |
$350.00 |
$545.94 |
$5950.00 |
03-01-2018 |
07-3P6804 |
4 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
17 |
$210.00 |
$327.56 |
$3570.00 |
03-01-2018 |
07-3P6804 |
5 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
17 |
$658.90 |
$1027.77 |
$11201.30 |
03-01-2018 |
07-3P6804 |
6 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
17 |
$767.00 |
$1196.39 |
$13039.00 |
03-01-2018 |
07-3P6804 |
7 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
17 |
$210.00 |
$327.56 |
$3570.00 |
03-01-2018 |
07-3P6804 |
8 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
17 |
$500.00 |
$779.91 |
$8500.00 |
03-01-2018 |
07-3P6804 |
9 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
20 |
$500.00 |
$779.91 |
$10000.00 |
03-27-2018 |
07-307704 |
1 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
20 |
$790.00 |
$1232.26 |
$15800.00 |
03-27-2018 |
07-307704 |
2 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
20 |
$300.00 |
$467.95 |
$6000.00 |
03-27-2018 |
07-307704 |
3 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
20 |
$760.00 |
$1185.47 |
$15200.00 |
03-27-2018 |
07-307704 |
4 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
20 |
$793.00 |
$1236.94 |
$15860.00 |
03-27-2018 |
07-307704 |
5 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
20 |
$766.00 |
$1194.83 |
$15320.00 |
03-27-2018 |
07-307704 |
6 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
20 |
$925.00 |
$1442.84 |
$18500.00 |
03-27-2018 |
07-307704 |
7 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
20 |
$750.00 |
$1169.87 |
$15000.00 |
03-27-2018 |
07-307704 |
8 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
20 |
$598.60 |
$933.71 |
$11972.00 |
03-27-2018 |
07-307704 |
9 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
42 |
$334.00 |
$485.82 |
$14028.00 |
04-11-2018 |
07-4T9904 |
1 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
42 |
$465.00 |
$676.36 |
$19530.00 |
04-11-2018 |
07-4T9904 |
2 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
42 |
$900.00 |
$1309.08 |
$37800.00 |
04-11-2018 |
07-4T9904 |
3 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
42 |
$1100.00 |
$1599.99 |
$46200.00 |
04-11-2018 |
07-4T9904 |
4 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
42 |
$750.00 |
$1090.90 |
$31500.00 |
04-11-2018 |
07-4T9904 |
5 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
42 |
$695.00 |
$1010.90 |
$29190.00 |
04-11-2018 |
07-4T9904 |
6 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
42 |
$660.00 |
$959.99 |
$27720.00 |
04-11-2018 |
07-4T9904 |
7 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
42 |
$995.00 |
$1447.26 |
$41790.00 |
04-11-2018 |
07-4T9904 |
8 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
12 |
11 |
$200.00 |
$290.91 |
$2200.00 |
05-08-2018 |
12-0C8904 |
1 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
12 |
11 |
$750.00 |
$1090.90 |
$8250.00 |
05-08-2018 |
12-0C8904 |
2 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
12 |
11 |
$433.00 |
$629.81 |
$4763.00 |
05-08-2018 |
12-0C8904 |
3 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
12 |
11 |
$245.27 |
$356.75 |
$2697.97 |
05-08-2018 |
12-0C8904 |
4 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
12 |
11 |
$100.00 |
$145.45 |
$1100.00 |
05-08-2018 |
12-0C8904 |
5 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
12 |
11 |
$411.18 |
$598.08 |
$4522.98 |
05-08-2018 |
12-0C8904 |
6 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
12 |
11 |
$750.00 |
$1090.90 |
$8250.00 |
05-08-2018 |
12-0C8904 |
7 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
12 |
11 |
$140.00 |
$203.64 |
$1540.00 |
05-08-2018 |
12-0C8904 |
8 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
50 |
$350.00 |
$483.64 |
$17500.00 |
10-10-2018 |
04-0G2214 |
1 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
50 |
$440.00 |
$608.01 |
$22000.00 |
10-10-2018 |
04-0G2214 |
2 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
50 |
$300.00 |
$414.55 |
$15000.00 |
10-10-2018 |
04-0G2214 |
3 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
12 |
11 |
$411.18 |
$568.18 |
$4522.98 |
10-18-2018 |
12-0C8904 |
1 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
12 |
11 |
$250.00 |
$345.46 |
$2750.00 |
10-18-2018 |
12-0C8904 |
2 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
05 |
180 |
$250.00 |
$345.46 |
$45000.00 |
10-31-2018 |
05-1F4304 |
1 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
05 |
180 |
$330.00 |
$456.01 |
$59400.00 |
10-31-2018 |
05-1F4304 |
2 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
05 |
180 |
$535.00 |
$739.28 |
$96300.00 |
10-31-2018 |
05-1F4304 |
3 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
670 |
$264.00 |
$364.80 |
$176880.00 |
10-31-2018 |
07-301504 |
1 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
670 |
$440.00 |
$608.01 |
$294800.00 |
10-31-2018 |
07-301504 |
2 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
670 |
$450.00 |
$621.83 |
$301500.00 |
10-31-2018 |
07-301504 |
3 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
670 |
$200.00 |
$276.37 |
$134000.00 |
10-31-2018 |
07-301504 |
4 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
670 |
$482.00 |
$666.05 |
$322940.00 |
10-31-2018 |
07-301504 |
5 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
670 |
$530.00 |
$732.37 |
$355100.00 |
10-31-2018 |
07-301504 |
6 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
230 |
$57.00 |
$78.76 |
$13110.00 |
11-07-2018 |
04-4G1134 |
1 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
230 |
$400.00 |
$552.73 |
$92000.00 |
11-07-2018 |
04-4G1134 |
2 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
05 |
9 |
$120.00 |
$165.82 |
$1080.00 |
11-08-2018 |
05-1F75U4 |
1 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
05 |
9 |
$300.00 |
$414.55 |
$2700.00 |
11-08-2018 |
05-1F75U4 |
2 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
05 |
9 |
$220.00 |
$304.00 |
$1980.00 |
11-08-2018 |
05-1F75U4 |
3 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
05 |
9 |
$500.00 |
$690.92 |
$4500.00 |
11-08-2018 |
05-1F75U4 |
4 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
05 |
9 |
$405.00 |
$559.64 |
$3645.00 |
11-08-2018 |
05-1F75U4 |
5 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
05 |
9 |
$300.00 |
$414.55 |
$2700.00 |
11-08-2018 |
05-1F75U4 |
6 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
05 |
9 |
$915.00 |
$1264.38 |
$8235.00 |
11-08-2018 |
05-1F75U4 |
7 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
05 |
9 |
$377.98 |
$522.31 |
$3401.82 |
11-08-2018 |
05-1F75U4 |
8 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
05 |
130 |
$628.30 |
$868.21 |
$81679.00 |
11-15-2018 |
05-1C8904 |
1 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
05 |
130 |
$304.50 |
$420.77 |
$39585.00 |
11-15-2018 |
05-1C8904 |
2 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
05 |
130 |
$600.00 |
$829.10 |
$78000.00 |
11-15-2018 |
05-1C8904 |
3 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
8 |
$400.00 |
$552.73 |
$3200.00 |
12-11-2018 |
07-4T9804 |
1 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
8 |
$800.00 |
$1105.47 |
$6400.00 |
12-11-2018 |
07-4T9804 |
2 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
8 |
$300.00 |
$414.55 |
$2400.00 |
12-11-2018 |
07-4T9804 |
3 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
8 |
$1022.00 |
$1412.24 |
$8176.00 |
12-11-2018 |
07-4T9804 |
4 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
8 |
$750.00 |
$1036.38 |
$6000.00 |
12-11-2018 |
07-4T9804 |
5 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
8 |
$460.00 |
$635.65 |
$3680.00 |
12-11-2018 |
07-4T9804 |
6 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
8 |
$980.00 |
$1354.20 |
$7840.00 |
12-11-2018 |
07-4T9804 |
7 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
8 |
$600.00 |
$829.10 |
$4800.00 |
12-11-2018 |
07-4T9804 |
8 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
8 |
$419.00 |
$578.99 |
$3352.00 |
12-11-2018 |
07-4T9804 |
9 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
8 |
$420.00 |
$580.37 |
$3360.00 |
12-11-2018 |
07-4T9804 |
10 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
8 |
$875.00 |
$1209.11 |
$7000.00 |
12-11-2018 |
07-4T9804 |
11 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
15 |
$200.00 |
$276.37 |
$3000.00 |
12-13-2018 |
07-303504 |
1 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
15 |
$380.00 |
$525.10 |
$5700.00 |
12-13-2018 |
07-303504 |
2 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
15 |
$475.00 |
$656.37 |
$7125.00 |
12-13-2018 |
07-303504 |
3 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
15 |
$540.00 |
$746.19 |
$8100.00 |
12-13-2018 |
07-303504 |
4 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
15 |
$515.00 |
$711.65 |
$7725.00 |
12-13-2018 |
07-303504 |
5 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
05 |
210 |
$353.24 |
$614.80 |
$74180.40 |
01-15-2019 |
05-1C85U4 |
1 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
05 |
210 |
$525.00 |
$913.75 |
$110250.00 |
01-15-2019 |
05-1C85U4 |
2 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
03 |
630 |
$135.00 |
$234.96 |
$85050.00 |
01-30-2019 |
03-2F3404 |
1 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
03 |
630 |
$200.00 |
$348.09 |
$126000.00 |
01-30-2019 |
03-2F3404 |
2 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
03 |
630 |
$106.16 |
$184.77 |
$66880.80 |
01-30-2019 |
03-2F3404 |
3 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
03 |
630 |
$300.00 |
$522.14 |
$189000.00 |
01-30-2019 |
03-2F3404 |
4 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
120 |
$127.65 |
$222.17 |
$15318.00 |
02-14-2019 |
08-0F0304 |
1 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
120 |
$181.89 |
$316.57 |
$21826.80 |
02-14-2019 |
08-0F0304 |
2 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
120 |
$525.00 |
$913.75 |
$63000.00 |
02-14-2019 |
08-0F0304 |
3 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
120 |
$200.00 |
$348.09 |
$24000.00 |
02-14-2019 |
08-0F0304 |
4 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
120 |
$239.68 |
$417.16 |
$28761.60 |
02-14-2019 |
08-0F0304 |
5 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
120 |
$213.00 |
$370.72 |
$25560.00 |
02-14-2019 |
08-0F0304 |
6 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
120 |
$330.00 |
$574.35 |
$39600.00 |
02-14-2019 |
08-0F0304 |
7 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
11 |
520 |
$85.00 |
$147.94 |
$44200.00 |
02-28-2019 |
11-2888U4 |
1 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
11 |
520 |
$101.48 |
$176.62 |
$52769.60 |
02-28-2019 |
11-2888U4 |
2 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
11 |
520 |
$48.00 |
$83.54 |
$24960.00 |
02-28-2019 |
11-2888U4 |
3 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
510 |
$485.72 |
$598.84 |
$247717.20 |
05-07-2019 |
04-2K7504 |
1 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
510 |
$300.00 |
$369.87 |
$153000.00 |
05-07-2019 |
04-2K7504 |
2 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
510 |
$225.00 |
$277.40 |
$114750.00 |
05-07-2019 |
04-2K7504 |
3 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
03 |
11 |
$300.00 |
$369.87 |
$3300.00 |
05-22-2019 |
03-1H4404 |
1 |
|
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
03 |
11 |
$460.00 |
$567.13 |
$5060.00 |
05-22-2019 |
03-1H4404 |
2 |
|
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
03 |
3 |
$550.00 |
$678.09 |
$1650.00 |
05-23-2019 |
03-4H0204 |
1 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
03 |
3 |
$1562.00 |
$1925.79 |
$4686.00 |
05-23-2019 |
03-4H0204 |
2 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
11 |
37 |
$800.00 |
$986.32 |
$29600.00 |
05-24-2019 |
11-2N0114 |
1 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
11 |
37 |
$211.00 |
$260.14 |
$7807.00 |
05-24-2019 |
11-2N0114 |
2 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
11 |
37 |
$650.00 |
$801.38 |
$24050.00 |
05-24-2019 |
11-2N0114 |
3 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
11 |
37 |
$400.00 |
$493.16 |
$14800.00 |
05-24-2019 |
11-2N0114 |
4 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
18 |
$1250.00 |
$1541.12 |
$22500.00 |
05-29-2019 |
08-1G1204 |
1 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
18 |
$527.00 |
$649.74 |
$9486.00 |
05-29-2019 |
08-1G1204 |
2 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
18 |
$250.00 |
$308.22 |
$4500.00 |
05-29-2019 |
08-1G1204 |
3 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
19 |
$130.00 |
$160.28 |
$2470.00 |
05-29-2019 |
08-1J4104 |
1 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
19 |
$403.00 |
$496.86 |
$7657.00 |
05-29-2019 |
08-1J4104 |
2 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
19 |
$220.00 |
$271.24 |
$4180.00 |
05-29-2019 |
08-1J4104 |
3 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
19 |
$420.00 |
$517.82 |
$7980.00 |
05-29-2019 |
08-1J4104 |
4 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
19 |
$150.00 |
$184.93 |
$2850.00 |
05-29-2019 |
08-1J4104 |
5 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
19 |
$750.00 |
$924.67 |
$14250.00 |
05-29-2019 |
08-1J4104 |
6 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
19 |
$250.00 |
$308.22 |
$4750.00 |
05-29-2019 |
08-1J4104 |
7 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
27 |
$600.00 |
$785.89 |
$16200.00 |
07-10-2019 |
08-1H6604 |
1 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
27 |
$536.00 |
$702.07 |
$14472.00 |
07-10-2019 |
08-1H6604 |
2 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
27 |
$178.00 |
$233.15 |
$4806.00 |
07-10-2019 |
08-1H6604 |
3 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
27 |
$390.00 |
$510.83 |
$10530.00 |
07-10-2019 |
08-1H6604 |
4 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
27 |
$420.00 |
$550.13 |
$11340.00 |
07-10-2019 |
08-1H6604 |
5 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
27 |
$530.00 |
$694.21 |
$14310.00 |
07-10-2019 |
08-1H6604 |
6 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
27 |
$944.00 |
$1236.47 |
$25488.00 |
07-10-2019 |
08-1H6604 |
7 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
27 |
$535.00 |
$700.76 |
$14445.00 |
07-10-2019 |
08-1H6604 |
8 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
27 |
$810.00 |
$1060.96 |
$21870.00 |
07-10-2019 |
08-1H6604 |
9 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
06 |
39 |
$300.00 |
$392.95 |
$11700.00 |
07-18-2019 |
06-0T2504 |
1 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
06 |
39 |
$400.00 |
$523.93 |
$15600.00 |
07-18-2019 |
06-0T2504 |
2 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
06 |
39 |
$150.00 |
$196.47 |
$5850.00 |
07-18-2019 |
06-0T2504 |
3 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
06 |
39 |
$208.79 |
$273.48 |
$8142.81 |
07-18-2019 |
06-0T2504 |
4 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
06 |
39 |
$750.00 |
$982.37 |
$29250.00 |
07-18-2019 |
06-0T2504 |
5 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
90 |
$525.00 |
$687.66 |
$47250.00 |
07-30-2019 |
04-2G4824 |
1 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
90 |
$435.00 |
$569.77 |
$39150.00 |
07-30-2019 |
04-2G4824 |
2 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
90 |
$340.00 |
$445.34 |
$30600.00 |
07-30-2019 |
04-2G4824 |
3 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
90 |
$550.00 |
$720.40 |
$49500.00 |
07-30-2019 |
04-2G4824 |
4 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
190 |
$50.00 |
$65.49 |
$9500.00 |
08-15-2019 |
08-1F1424 |
1 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
190 |
$90.00 |
$117.88 |
$17100.00 |
08-15-2019 |
08-1F1424 |
2 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
190 |
$250.00 |
$327.46 |
$47500.00 |
08-15-2019 |
08-1F1424 |
3 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
190 |
$140.00 |
$183.38 |
$26600.00 |
08-15-2019 |
08-1F1424 |
4 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
190 |
$305.00 |
$399.50 |
$57950.00 |
08-15-2019 |
08-1F1424 |
5 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
190 |
$45.00 |
$58.94 |
$8550.00 |
08-15-2019 |
08-1F1424 |
6 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
190 |
$200.00 |
$261.96 |
$38000.00 |
08-15-2019 |
08-1F1424 |
7 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
190 |
$342.96 |
$449.22 |
$65162.40 |
08-15-2019 |
08-1F1424 |
8 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
340 |
$290.00 |
$449.05 |
$98600.00 |
10-22-2019 |
07-306504 |
1 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
340 |
$200.00 |
$309.69 |
$68000.00 |
10-22-2019 |
07-306504 |
2 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
340 |
$290.00 |
$449.05 |
$98600.00 |
10-22-2019 |
07-306504 |
3 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
340 |
$324.00 |
$501.70 |
$110160.00 |
10-22-2019 |
07-306504 |
4 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
340 |
$455.00 |
$704.55 |
$154700.00 |
10-22-2019 |
07-306504 |
5 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
340 |
$269.00 |
$416.53 |
$91460.00 |
10-22-2019 |
07-306504 |
6 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
340 |
$295.00 |
$456.79 |
$100300.00 |
10-22-2019 |
07-306504 |
7 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
340 |
$275.00 |
$425.82 |
$93500.00 |
10-22-2019 |
07-306504 |
8 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
340 |
$500.00 |
$774.23 |
$170000.00 |
10-22-2019 |
07-306504 |
9 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
340 |
$325.00 |
$503.25 |
$110500.00 |
10-22-2019 |
07-306504 |
10 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
490 |
$200.00 |
$309.69 |
$98000.00 |
10-23-2019 |
08-1C38U4 |
1 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
490 |
$125.00 |
$193.56 |
$61250.00 |
10-23-2019 |
08-1C38U4 |
2 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
21 |
$495.00 |
$766.48 |
$10395.00 |
11-08-2019 |
04-2G6604 |
1 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
21 |
$545.00 |
$843.91 |
$11445.00 |
11-08-2019 |
04-2G6604 |
2 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
21 |
$1250.00 |
$1935.56 |
$26250.00 |
11-08-2019 |
04-2G6604 |
3 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
21 |
$615.00 |
$952.30 |
$12915.00 |
11-08-2019 |
04-2G6604 |
4 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
21 |
$300.00 |
$464.54 |
$6300.00 |
11-08-2019 |
04-2G6604 |
5 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
21 |
$540.00 |
$836.16 |
$11340.00 |
11-08-2019 |
04-2G6604 |
6 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
21 |
$800.00 |
$1238.76 |
$16800.00 |
11-08-2019 |
04-2G6604 |
7 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
21 |
$700.00 |
$1083.92 |
$14700.00 |
11-08-2019 |
04-2G6604 |
8 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
10 |
9 |
$651.79 |
$1009.27 |
$5866.11 |
11-14-2019 |
10-3A7204 |
1 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
10 |
9 |
$200.00 |
$309.69 |
$1800.00 |
11-14-2019 |
10-3A7204 |
2 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
10 |
9 |
$245.00 |
$379.37 |
$2205.00 |
11-14-2019 |
10-3A7204 |
3 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
10 |
9 |
$325.00 |
$503.25 |
$2925.00 |
11-14-2019 |
10-3A7204 |
4 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
10 |
9 |
$300.00 |
$464.54 |
$2700.00 |
11-14-2019 |
10-3A7204 |
5 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
550 |
$268.73 |
$416.12 |
$147801.50 |
11-19-2019 |
07-306604 |
1 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
550 |
$520.00 |
$805.19 |
$286000.00 |
11-19-2019 |
07-306604 |
2 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
550 |
$162.00 |
$250.85 |
$89100.00 |
11-19-2019 |
07-306604 |
3 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
550 |
$290.00 |
$449.05 |
$159500.00 |
11-19-2019 |
07-306604 |
4 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
550 |
$343.00 |
$531.12 |
$188650.00 |
11-19-2019 |
07-306604 |
5 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
550 |
$260.00 |
$402.60 |
$143000.00 |
11-19-2019 |
07-306604 |
6 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
550 |
$285.00 |
$441.31 |
$156750.00 |
11-19-2019 |
07-306604 |
7 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
550 |
$235.00 |
$363.89 |
$129250.00 |
11-19-2019 |
07-306604 |
8 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
550 |
$279.00 |
$432.02 |
$153450.00 |
11-19-2019 |
07-306604 |
9 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
550 |
$275.00 |
$425.82 |
$151250.00 |
11-19-2019 |
07-306604 |
10 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
260 |
$250.00 |
$387.11 |
$65000.00 |
11-21-2019 |
07-3118U4 |
1 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
260 |
$479.00 |
$741.71 |
$124540.00 |
11-21-2019 |
07-3118U4 |
2 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
260 |
$525.00 |
$812.94 |
$136500.00 |
11-21-2019 |
07-3118U4 |
3 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
260 |
$630.00 |
$975.52 |
$163800.00 |
11-21-2019 |
07-3118U4 |
4 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
260 |
$479.00 |
$741.71 |
$124540.00 |
11-21-2019 |
07-3118U4 |
5 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
120 |
$520.00 |
$805.19 |
$62400.00 |
12-16-2019 |
04-2G6904 |
1 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
120 |
$550.00 |
$851.65 |
$66000.00 |
12-16-2019 |
04-2G6904 |
2 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
120 |
$405.00 |
$627.12 |
$48600.00 |
12-16-2019 |
04-2G6904 |
3 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
120 |
$1700.00 |
$2632.37 |
$204000.00 |
12-16-2019 |
04-2G6904 |
4 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
160 |
$500.00 |
$610.44 |
$80000.00 |
01-07-2020 |
04-3J3204 |
1 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
160 |
$100.00 |
$122.09 |
$16000.00 |
01-07-2020 |
04-3J3204 |
2 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
160 |
$200.00 |
$244.18 |
$32000.00 |
01-07-2020 |
04-3J3204 |
3 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
160 |
$422.66 |
$516.02 |
$67625.60 |
01-07-2020 |
04-3J3204 |
4 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
160 |
$1392.65 |
$1700.26 |
$222824.00 |
01-07-2020 |
04-3J3204 |
5 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
160 |
$221.60 |
$270.55 |
$35456.00 |
01-07-2020 |
04-3J3204 |
6 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
06 |
150 |
$420.00 |
$512.77 |
$63000.00 |
01-14-2020 |
06-0U6704 |
1 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
06 |
150 |
$400.00 |
$488.35 |
$60000.00 |
01-14-2020 |
06-0U6704 |
2 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
06 |
150 |
$110.00 |
$134.30 |
$16500.00 |
01-14-2020 |
06-0U6704 |
3 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
06 |
150 |
$363.00 |
$443.18 |
$54450.00 |
01-14-2020 |
06-0U6704 |
4 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
06 |
150 |
$400.00 |
$488.35 |
$60000.00 |
01-14-2020 |
06-0U6704 |
5 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
06 |
150 |
$530.00 |
$647.07 |
$79500.00 |
01-14-2020 |
06-0U6704 |
6 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
06 |
150 |
$550.00 |
$671.48 |
$82500.00 |
01-14-2020 |
06-0U6704 |
7 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
06 |
150 |
$295.00 |
$360.16 |
$44250.00 |
01-14-2020 |
06-0U6704 |
8 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
06 |
150 |
$325.00 |
$396.79 |
$48750.00 |
01-14-2020 |
06-0U6704 |
9 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
06 |
150 |
$1200.00 |
$1465.06 |
$180000.00 |
01-14-2020 |
06-0U6704 |
10 |
M |
|
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
300 |
$350.00 |
$427.31 |
$105000.00 |
01-23-2020 |
07-302504 |
1 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
300 |
$330.00 |
$402.89 |
$99000.00 |
01-23-2020 |
07-302504 |
2 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
300 |
$250.00 |
$305.22 |
$75000.00 |
01-23-2020 |
07-302504 |
3 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
300 |
$65.43 |
$79.88 |
$19629.00 |
01-23-2020 |
07-302504 |
4 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
300 |
$350.00 |
$427.31 |
$105000.00 |
01-23-2020 |
07-302504 |
5 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
300 |
$215.00 |
$262.49 |
$64500.00 |
01-23-2020 |
07-302504 |
6 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
150 |
$450.00 |
$549.40 |
$67500.00 |
02-19-2020 |
07-311704 |
1 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
150 |
$2990.00 |
$3650.43 |
$448500.00 |
02-19-2020 |
07-311704 |
2 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
150 |
$335.00 |
$408.99 |
$50250.00 |
02-19-2020 |
07-311704 |
3 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
150 |
$59.55 |
$72.70 |
$8932.50 |
02-19-2020 |
07-311704 |
4 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
150 |
$250.00 |
$305.22 |
$37500.00 |
02-19-2020 |
07-311704 |
5 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
150 |
$280.00 |
$341.85 |
$42000.00 |
02-19-2020 |
07-311704 |
6 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
190 |
$429.17 |
$523.97 |
$81542.30 |
03-17-2020 |
07-3096U4 |
1 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
190 |
$244.59 |
$298.62 |
$46472.10 |
03-17-2020 |
07-3096U4 |
2 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
190 |
$344.00 |
$419.98 |
$65360.00 |
03-17-2020 |
07-3096U4 |
3 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
190 |
$337.29 |
$411.79 |
$64085.10 |
03-17-2020 |
07-3096U4 |
4 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
190 |
$400.00 |
$488.35 |
$76000.00 |
03-17-2020 |
07-3096U4 |
5 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
05 |
8 |
$1270.00 |
$1550.52 |
$10160.00 |
03-24-2020 |
05-1M0004 |
1 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
05 |
8 |
$500.00 |
$610.44 |
$4000.00 |
03-24-2020 |
05-1M0004 |
2 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
05 |
8 |
$1000.00 |
$1220.88 |
$8000.00 |
03-24-2020 |
05-1M0004 |
3 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
11 |
25 |
$650.00 |
$1035.60 |
$16250.00 |
04-09-2020 |
11-2T3464 |
1 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
11 |
25 |
$500.00 |
$796.62 |
$12500.00 |
04-09-2020 |
11-2T3464 |
2 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
06 |
25 |
$953.00 |
$1518.35 |
$23825.00 |
04-15-2020 |
06-0W7604 |
1 |
|
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
06 |
25 |
$325.00 |
$517.80 |
$8125.00 |
04-15-2020 |
06-0W7604 |
2 |
|
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
06 |
25 |
$215.00 |
$342.55 |
$5375.00 |
04-15-2020 |
06-0W7604 |
3 |
|
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
06 |
25 |
$200.00 |
$318.65 |
$5000.00 |
04-15-2020 |
06-0W7604 |
4 |
|
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
06 |
25 |
$800.00 |
$1274.59 |
$20000.00 |
04-15-2020 |
06-0W7604 |
5 |
|
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
14 |
$330.00 |
$525.77 |
$4620.00 |
04-22-2020 |
07-4V0604 |
1 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
14 |
$260.00 |
$414.24 |
$3640.00 |
04-22-2020 |
07-4V0604 |
2 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
14 |
$330.00 |
$525.77 |
$4620.00 |
04-22-2020 |
07-4V0604 |
3 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
14 |
$707.00 |
$1126.42 |
$9898.00 |
04-22-2020 |
07-4V0604 |
4 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
14 |
$550.00 |
$876.28 |
$7700.00 |
04-22-2020 |
07-4V0604 |
5 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
14 |
$150.00 |
$238.99 |
$2100.00 |
04-22-2020 |
07-4V0604 |
6 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
14 |
$560.00 |
$892.21 |
$7840.00 |
04-22-2020 |
07-4V0604 |
7 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
14 |
$600.00 |
$955.94 |
$8400.00 |
04-22-2020 |
07-4V0604 |
8 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
14 |
$500.00 |
$796.62 |
$7000.00 |
04-22-2020 |
07-4V0604 |
9 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
14 |
$123.00 |
$195.97 |
$1722.00 |
04-22-2020 |
07-4V0604 |
10 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
14 |
$579.00 |
$922.48 |
$8106.00 |
04-22-2020 |
07-4V0604 |
11 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
27 |
$560.00 |
$892.21 |
$15120.00 |
04-28-2020 |
07-304504 |
1 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
27 |
$685.00 |
$1091.37 |
$18495.00 |
04-28-2020 |
07-304504 |
2 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
27 |
$715.00 |
$1139.16 |
$19305.00 |
04-28-2020 |
07-304504 |
3 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
27 |
$552.00 |
$879.47 |
$14904.00 |
04-28-2020 |
07-304504 |
4 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
27 |
$240.59 |
$383.32 |
$6495.93 |
04-28-2020 |
07-304504 |
5 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
27 |
$450.00 |
$716.96 |
$12150.00 |
04-28-2020 |
07-304504 |
6 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
27 |
$700.00 |
$1115.27 |
$18900.00 |
04-28-2020 |
07-304504 |
7 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
14 |
$250.00 |
$398.31 |
$3500.00 |
05-06-2020 |
08-1G2914 |
1 |
|
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
14 |
$305.00 |
$485.94 |
$4270.00 |
05-06-2020 |
08-1G2914 |
2 |
|
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
14 |
$480.00 |
$764.75 |
$6720.00 |
05-06-2020 |
08-1G2914 |
3 |
|
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
14 |
$450.00 |
$716.96 |
$6300.00 |
05-06-2020 |
08-1G2914 |
4 |
|
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
14 |
$700.00 |
$1115.27 |
$9800.00 |
05-06-2020 |
08-1G2914 |
5 |
|
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
14 |
$411.00 |
$654.82 |
$5754.00 |
05-06-2020 |
08-1G2914 |
6 |
|
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
14 |
$700.00 |
$1115.27 |
$9800.00 |
05-06-2020 |
08-1G2914 |
7 |
|
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
14 |
$4000.00 |
$6372.95 |
$56000.00 |
05-06-2020 |
08-1G2914 |
8 |
|
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
09 |
6 |
$800.00 |
$1274.59 |
$4800.00 |
05-13-2020 |
09-370104 |
1 |
|
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
09 |
6 |
$500.00 |
$796.62 |
$3000.00 |
05-13-2020 |
09-370104 |
2 |
|
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
09 |
6 |
$2000.00 |
$3186.47 |
$12000.00 |
05-13-2020 |
09-370104 |
3 |
|
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
09 |
6 |
$1200.00 |
$1911.88 |
$7200.00 |
05-13-2020 |
09-370104 |
4 |
|
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
09 |
6 |
$530.00 |
$844.42 |
$3180.00 |
05-13-2020 |
09-370104 |
5 |
|
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
180 |
$400.00 |
$637.29 |
$72000.00 |
05-19-2020 |
08-0K1234 |
1 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
180 |
$131.00 |
$208.71 |
$23580.00 |
05-19-2020 |
08-0K1234 |
2 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
180 |
$360.00 |
$573.57 |
$64800.00 |
05-19-2020 |
08-0K1234 |
3 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
180 |
$313.00 |
$498.68 |
$56340.00 |
05-19-2020 |
08-0K1234 |
4 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
12 |
1 |
$1000.00 |
$1593.24 |
$1000.00 |
05-19-2020 |
12-0P4004 |
1 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
12 |
1 |
$500.00 |
$796.62 |
$500.00 |
05-19-2020 |
12-0P4004 |
2 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
12 |
1 |
$500.00 |
$796.62 |
$500.00 |
05-19-2020 |
12-0P4004 |
3 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
12 |
1 |
$770.00 |
$1226.79 |
$770.00 |
05-19-2020 |
12-0P4004 |
4 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
12 |
1 |
$1400.00 |
$2230.53 |
$1400.00 |
05-19-2020 |
12-0P4004 |
5 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
12 |
1 |
$1500.00 |
$2389.86 |
$1500.00 |
05-19-2020 |
12-0P4004 |
6 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
12 |
1 |
$1266.00 |
$2017.04 |
$1266.00 |
05-19-2020 |
12-0P4004 |
7 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
12 |
1 |
$1200.00 |
$1911.88 |
$1200.00 |
05-19-2020 |
12-0P4004 |
8 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
12 |
1 |
$2750.00 |
$4381.40 |
$2750.00 |
05-19-2020 |
12-0P4004 |
9 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
12 |
1 |
$1399.00 |
$2228.94 |
$1399.00 |
05-19-2020 |
12-0P4004 |
10 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
12 |
1 |
$3235.00 |
$5154.12 |
$3235.00 |
05-19-2020 |
12-0P4004 |
11 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
12 |
1 |
$3000.00 |
$4779.71 |
$3000.00 |
05-19-2020 |
12-0P4004 |
12 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
12 |
1 |
$3500.00 |
$5576.33 |
$3500.00 |
05-19-2020 |
12-0P4004 |
13 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
23 |
$385.00 |
$613.40 |
$8855.00 |
05-29-2020 |
07-4V0204 |
1 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
23 |
$460.00 |
$732.89 |
$10580.00 |
05-29-2020 |
07-4V0204 |
2 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
23 |
$260.00 |
$414.24 |
$5980.00 |
05-29-2020 |
07-4V0204 |
3 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
23 |
$400.00 |
$637.29 |
$9200.00 |
05-29-2020 |
07-4V0204 |
4 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
23 |
$300.00 |
$477.97 |
$6900.00 |
05-29-2020 |
07-4V0204 |
5 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
23 |
$1500.00 |
$2389.86 |
$34500.00 |
05-29-2020 |
07-4V0204 |
6 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
23 |
$299.00 |
$476.38 |
$6877.00 |
05-29-2020 |
07-4V0204 |
7 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
23 |
$180.00 |
$286.78 |
$4140.00 |
05-29-2020 |
07-4V0204 |
8 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
11 |
$1750.00 |
$2512.52 |
$19250.00 |
09-09-2020 |
04-3J7104 |
1 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
11 |
$960.00 |
$1378.30 |
$10560.00 |
09-09-2020 |
04-3J7104 |
2 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
11 |
$300.00 |
$430.72 |
$3300.00 |
09-09-2020 |
04-3J7104 |
3 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
11 |
$600.00 |
$861.43 |
$6600.00 |
09-09-2020 |
04-3J7104 |
4 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
11 |
$1000.00 |
$1435.72 |
$11000.00 |
09-09-2020 |
04-3J7104 |
5 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
11 |
$750.00 |
$1076.79 |
$8250.00 |
09-09-2020 |
04-3J7104 |
6 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
11 |
$1364.00 |
$1958.33 |
$15004.00 |
09-09-2020 |
04-3J7104 |
7 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
100 |
$300.00 |
$430.72 |
$30000.00 |
09-09-2020 |
07-307504 |
1 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
100 |
$415.00 |
$595.83 |
$41500.00 |
09-09-2020 |
07-307504 |
2 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
100 |
$975.00 |
$1399.83 |
$97500.00 |
09-09-2020 |
07-307504 |
3 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
100 |
$325.00 |
$466.61 |
$32500.00 |
09-09-2020 |
07-307504 |
4 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
100 |
$300.00 |
$430.72 |
$30000.00 |
09-09-2020 |
07-307504 |
5 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
100 |
$840.00 |
$1206.01 |
$84000.00 |
09-09-2020 |
07-307504 |
6 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
100 |
$714.00 |
$1025.11 |
$71400.00 |
09-09-2020 |
07-307504 |
7 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
100 |
$275.00 |
$394.82 |
$27500.00 |
09-09-2020 |
07-307504 |
8 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
170 |
$295.00 |
$422.21 |
$50150.00 |
10-06-2020 |
04-2G4604 |
1 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
170 |
$450.00 |
$644.06 |
$76500.00 |
10-06-2020 |
04-2G4604 |
2 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
170 |
$250.00 |
$357.81 |
$42500.00 |
10-06-2020 |
04-2G4604 |
3 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
170 |
$260.00 |
$372.12 |
$44200.00 |
10-06-2020 |
04-2G4604 |
4 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
170 |
$330.00 |
$472.31 |
$56100.00 |
10-06-2020 |
04-2G4604 |
5 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
170 |
$425.00 |
$608.28 |
$72250.00 |
10-06-2020 |
04-2G4604 |
6 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
170 |
$443.00 |
$634.04 |
$75310.00 |
10-06-2020 |
04-2G4604 |
7 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
170 |
$550.00 |
$787.18 |
$93500.00 |
10-06-2020 |
04-2G4604 |
8 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
170 |
$260.00 |
$372.12 |
$44200.00 |
10-06-2020 |
04-2G4604 |
9 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
170 |
$775.00 |
$1109.21 |
$131750.00 |
10-06-2020 |
04-2G4604 |
10 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
170 |
$800.00 |
$1144.99 |
$136000.00 |
10-06-2020 |
04-2G4604 |
11 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
170 |
$175.00 |
$250.47 |
$29750.00 |
10-06-2020 |
04-2G4604 |
12 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
10 |
79 |
$330.00 |
$472.31 |
$26070.00 |
10-06-2020 |
10-1C2804 |
1 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
10 |
79 |
$290.00 |
$415.06 |
$22910.00 |
10-06-2020 |
10-1C2804 |
2 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
10 |
79 |
$220.00 |
$314.87 |
$17380.00 |
10-06-2020 |
10-1C2804 |
3 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
10 |
79 |
$161.63 |
$231.33 |
$12768.77 |
10-06-2020 |
10-1C2804 |
4 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
10 |
79 |
$220.00 |
$314.87 |
$17380.00 |
10-06-2020 |
10-1C2804 |
5 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
10 |
79 |
$225.00 |
$322.03 |
$17775.00 |
10-06-2020 |
10-1C2804 |
6 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
1030 |
$136.00 |
$194.65 |
$140080.00 |
10-15-2020 |
08-1E8404 |
1 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
1030 |
$327.75 |
$469.09 |
$337582.50 |
10-15-2020 |
08-1E8404 |
2 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
1030 |
$137.00 |
$196.08 |
$141110.00 |
10-15-2020 |
08-1E8404 |
3 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
1030 |
$650.00 |
$930.30 |
$669500.00 |
10-15-2020 |
08-1E8404 |
4 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
1030 |
$180.00 |
$257.62 |
$185400.00 |
10-15-2020 |
08-1E8404 |
5 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
1030 |
$358.00 |
$512.38 |
$368740.00 |
10-15-2020 |
08-1E8404 |
6 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
06 |
81 |
$600.00 |
$858.74 |
$48600.00 |
10-21-2020 |
06-0W3604 |
1 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
06 |
81 |
$550.00 |
$787.18 |
$44550.00 |
10-21-2020 |
06-0W3604 |
2 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
06 |
81 |
$325.00 |
$465.15 |
$26325.00 |
10-21-2020 |
06-0W3604 |
3 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
06 |
81 |
$325.00 |
$465.15 |
$26325.00 |
10-21-2020 |
06-0W3604 |
4 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
06 |
81 |
$200.00 |
$286.25 |
$16200.00 |
10-21-2020 |
06-0W3604 |
5 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
06 |
81 |
$300.00 |
$429.37 |
$24300.00 |
10-21-2020 |
06-0W3604 |
6 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
06 |
81 |
$246.00 |
$352.08 |
$19926.00 |
10-21-2020 |
06-0W3604 |
7 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
06 |
81 |
$450.00 |
$644.06 |
$36450.00 |
10-21-2020 |
06-0W3604 |
8 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
06 |
81 |
$250.00 |
$357.81 |
$20250.00 |
10-21-2020 |
06-0W3604 |
9 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
06 |
81 |
$380.00 |
$543.87 |
$30780.00 |
10-21-2020 |
06-0W3604 |
10 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
50 |
$200.00 |
$286.25 |
$10000.00 |
11-04-2020 |
04-3E6024 |
1 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
50 |
$200.00 |
$286.25 |
$10000.00 |
11-04-2020 |
04-3E6024 |
2 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
50 |
$520.00 |
$744.24 |
$26000.00 |
11-04-2020 |
04-3E6024 |
3 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
50 |
$200.00 |
$286.25 |
$10000.00 |
11-04-2020 |
04-3E6024 |
4 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
50 |
$300.00 |
$429.37 |
$15000.00 |
11-04-2020 |
04-3E6024 |
5 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
75 |
$200.00 |
$286.25 |
$15000.00 |
11-05-2020 |
07-303904 |
1 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
75 |
$150.00 |
$214.69 |
$11250.00 |
11-05-2020 |
07-303904 |
2 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
75 |
$325.00 |
$465.15 |
$24375.00 |
11-05-2020 |
07-303904 |
3 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
75 |
$152.00 |
$217.55 |
$11400.00 |
11-05-2020 |
07-303904 |
4 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
75 |
$79.00 |
$113.07 |
$5925.00 |
11-05-2020 |
07-303904 |
5 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
240 |
$70.00 |
$100.19 |
$16800.00 |
11-19-2020 |
08-1F1434 |
1 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
240 |
$120.00 |
$171.75 |
$28800.00 |
11-19-2020 |
08-1F1434 |
2 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
240 |
$200.00 |
$286.25 |
$48000.00 |
11-19-2020 |
08-1F1434 |
3 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
240 |
$250.00 |
$357.81 |
$60000.00 |
11-19-2020 |
08-1F1434 |
4 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
240 |
$300.00 |
$429.37 |
$72000.00 |
11-19-2020 |
08-1F1434 |
5 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
08 |
240 |
$397.41 |
$568.79 |
$95378.40 |
11-19-2020 |
08-1F1434 |
6 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
7 |
$154.14 |
$220.61 |
$1078.98 |
12-16-2020 |
07-210624 |
1 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
7 |
$260.00 |
$372.12 |
$1820.00 |
12-16-2020 |
07-210624 |
2 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
7 |
$476.00 |
$681.27 |
$3332.00 |
12-16-2020 |
07-210624 |
3 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
7 |
$140.00 |
$200.37 |
$980.00 |
12-16-2020 |
07-210624 |
4 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
7 |
$400.00 |
$572.49 |
$2800.00 |
12-16-2020 |
07-210624 |
5 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
7 |
$1000.00 |
$1431.24 |
$7000.00 |
12-16-2020 |
07-210624 |
6 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
7 |
$280.00 |
$400.75 |
$1960.00 |
12-16-2020 |
07-210624 |
7 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
06 |
7 |
$750.00 |
$1290.94 |
$5250.00 |
01-14-2021 |
06-0U1004 |
1 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
06 |
7 |
$650.00 |
$1118.81 |
$4550.00 |
01-14-2021 |
06-0U1004 |
2 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
06 |
7 |
$150.00 |
$258.19 |
$1050.00 |
01-14-2021 |
06-0U1004 |
3 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
06 |
49 |
$325.00 |
$559.41 |
$15925.00 |
01-20-2021 |
06-0S5104 |
1 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
06 |
49 |
$400.00 |
$688.50 |
$19600.00 |
01-20-2021 |
06-0S5104 |
2 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
06 |
49 |
$200.00 |
$344.25 |
$9800.00 |
01-20-2021 |
06-0S5104 |
3 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
230 |
$275.00 |
$473.34 |
$63250.00 |
02-18-2021 |
04-1J3604 |
1 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
230 |
$500.00 |
$860.62 |
$115000.00 |
02-18-2021 |
04-1J3604 |
2 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
230 |
$280.00 |
$481.95 |
$64400.00 |
02-18-2021 |
04-1J3604 |
3 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
230 |
$210.00 |
$361.46 |
$48300.00 |
02-18-2021 |
04-1J3604 |
4 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
230 |
$550.00 |
$946.69 |
$126500.00 |
02-18-2021 |
04-1J3604 |
5 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
230 |
$180.00 |
$309.82 |
$41400.00 |
02-18-2021 |
04-1J3604 |
6 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
41 |
$265.00 |
$456.13 |
$10865.00 |
02-25-2021 |
07-4V1404 |
1 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
41 |
$280.00 |
$481.95 |
$11480.00 |
02-25-2021 |
07-4V1404 |
2 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
41 |
$434.00 |
$747.02 |
$17794.00 |
02-25-2021 |
07-4V1404 |
3 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
41 |
$285.00 |
$490.56 |
$11685.00 |
02-25-2021 |
07-4V1404 |
4 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
41 |
$440.00 |
$757.35 |
$18040.00 |
02-25-2021 |
07-4V1404 |
5 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
41 |
$450.00 |
$774.56 |
$18450.00 |
02-25-2021 |
07-4V1404 |
6 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
41 |
$68.00 |
$117.04 |
$2788.00 |
02-25-2021 |
07-4V1404 |
7 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
41 |
$170.00 |
$292.61 |
$6970.00 |
02-25-2021 |
07-4V1404 |
8 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
11 |
12 |
$1120.00 |
$1587.33 |
$13440.00 |
04-06-2021 |
11-2N0574 |
1 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
11 |
12 |
$750.00 |
$1062.94 |
$9000.00 |
04-06-2021 |
11-2N0574 |
2 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
11 |
12 |
$500.00 |
$708.63 |
$6000.00 |
04-06-2021 |
11-2N0574 |
3 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
11 |
12 |
$1000.00 |
$1417.26 |
$12000.00 |
04-06-2021 |
11-2N0574 |
4 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
11 |
12 |
$530.00 |
$751.15 |
$6360.00 |
04-06-2021 |
11-2N0574 |
5 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
06 |
80 |
$52.00 |
$73.70 |
$4160.00 |
04-07-2021 |
06-360244 |
1 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
06 |
80 |
$160.00 |
$226.76 |
$12800.00 |
04-07-2021 |
06-360244 |
2 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
06 |
80 |
$75.00 |
$106.29 |
$6000.00 |
04-07-2021 |
06-360244 |
3 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
06 |
80 |
$120.00 |
$170.07 |
$9600.00 |
04-07-2021 |
06-360244 |
4 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
06 |
80 |
$200.00 |
$283.45 |
$16000.00 |
04-07-2021 |
06-360244 |
5 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
06 |
80 |
$200.00 |
$283.45 |
$16000.00 |
04-07-2021 |
06-360244 |
6 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
320 |
$445.40 |
$631.25 |
$142528.00 |
04-13-2021 |
04-1J9704 |
1 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
320 |
$325.00 |
$460.61 |
$104000.00 |
04-13-2021 |
04-1J9704 |
2 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
320 |
$105.52 |
$149.55 |
$33766.40 |
04-13-2021 |
04-1J9704 |
3 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
320 |
$400.00 |
$566.90 |
$128000.00 |
04-13-2021 |
04-1J9704 |
4 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
320 |
$250.00 |
$354.31 |
$80000.00 |
04-13-2021 |
04-1J9704 |
5 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
04 |
320 |
$450.00 |
$637.76 |
$144000.00 |
04-13-2021 |
04-1J9704 |
6 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
11 |
140 |
$450.00 |
$637.76 |
$63000.00 |
04-15-2021 |
11-2N0724 |
1 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
11 |
140 |
$280.64 |
$397.74 |
$39289.60 |
04-15-2021 |
11-2N0724 |
2 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
11 |
140 |
$446.25 |
$632.45 |
$62475.00 |
04-15-2021 |
11-2N0724 |
3 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
11 |
140 |
$260.00 |
$368.49 |
$36400.00 |
04-15-2021 |
11-2N0724 |
4 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
11 |
140 |
$125.00 |
$177.16 |
$17500.00 |
04-15-2021 |
11-2N0724 |
5 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
43 |
$235.00 |
$333.05 |
$10105.00 |
04-29-2021 |
07-4V0304 |
1 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
43 |
$310.00 |
$439.35 |
$13330.00 |
04-29-2021 |
07-4V0304 |
2 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
43 |
$190.00 |
$269.28 |
$8170.00 |
04-29-2021 |
07-4V0304 |
3 |
M |
TRO |
|
| 731850 - REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK) (CY) |
CY |
07 |
43 |
$190.00 |
$269.28 |
$8170.00 |
04-29-2021 |
07-4V0304 |
4 |
M |
TRO |
|
MORE THAN 500 RESULTS RETURNED. ONLY 500 ROWS SHOWN.
|