| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
03 |
2 |
$750.00 |
$1336.79 |
$1500.00 |
01-29-2014 |
03-0F2204 |
1 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
03 |
2 |
$2000.00 |
$3564.77 |
$4000.00 |
01-29-2014 |
03-0F2204 |
2 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
03 |
2 |
$750.00 |
$1336.79 |
$1500.00 |
01-29-2014 |
03-0F2204 |
3 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
03 |
2 |
$2500.00 |
$4455.97 |
$5000.00 |
01-29-2014 |
03-0F2204 |
4 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
03 |
2 |
$1000.00 |
$1782.39 |
$2000.00 |
01-29-2014 |
03-0F2204 |
5 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
03 |
2 |
$15000.00 |
$26735.80 |
$30000.00 |
01-29-2014 |
03-0F2204 |
6 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
03 |
2 |
$2000.00 |
$3564.77 |
$4000.00 |
01-29-2014 |
03-0F2204 |
7 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
03 |
2 |
$1500.00 |
$2673.58 |
$3000.00 |
01-29-2014 |
03-0F2204 |
8 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
03 |
2 |
$1500.00 |
$2673.58 |
$3000.00 |
01-29-2014 |
03-0F2204 |
9 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
06 |
2 |
$4000.00 |
$7129.55 |
$8000.00 |
02-12-2014 |
06-0P1604 |
1 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
06 |
2 |
$1000.00 |
$1782.39 |
$2000.00 |
02-12-2014 |
06-0P1604 |
2 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
06 |
2 |
$2500.00 |
$4455.97 |
$5000.00 |
02-12-2014 |
06-0P1604 |
3 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
06 |
2 |
$800.00 |
$1425.91 |
$1600.00 |
02-12-2014 |
06-0P1604 |
4 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
06 |
2 |
$1800.00 |
$3208.30 |
$3600.00 |
02-12-2014 |
06-0P1604 |
5 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
06 |
2 |
$1000.00 |
$1782.39 |
$2000.00 |
02-12-2014 |
06-0P1604 |
6 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
06 |
2 |
$5000.00 |
$8911.93 |
$10000.00 |
02-12-2014 |
06-0P1604 |
7 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
4 |
$575.00 |
$1024.87 |
$2300.00 |
03-20-2014 |
07-4T5904 |
1 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
4 |
$4370.00 |
$7789.03 |
$17480.00 |
03-20-2014 |
07-4T5904 |
2 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
4 |
$2500.00 |
$4455.97 |
$10000.00 |
03-20-2014 |
07-4T5904 |
3 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
4 |
$550.00 |
$980.31 |
$2200.00 |
03-20-2014 |
07-4T5904 |
4 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
4 |
$4000.00 |
$7129.55 |
$16000.00 |
03-20-2014 |
07-4T5904 |
5 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
4 |
$2000.00 |
$3564.77 |
$8000.00 |
03-20-2014 |
07-4T5904 |
6 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
4 |
$1000.00 |
$1782.39 |
$4000.00 |
03-20-2014 |
07-4T5904 |
7 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
06 |
3 |
$3500.00 |
$6238.35 |
$10500.00 |
03-26-2014 |
06-0M0204 |
1 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
06 |
3 |
$2500.00 |
$4455.97 |
$7500.00 |
03-26-2014 |
06-0M0204 |
2 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
06 |
3 |
$1200.00 |
$2138.86 |
$3600.00 |
03-26-2014 |
06-0M0204 |
3 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
06 |
3 |
$1000.00 |
$1782.39 |
$3000.00 |
03-26-2014 |
06-0M0204 |
4 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
40 |
$170.00 |
$391.36 |
$6800.00 |
04-03-2014 |
07-296704 |
1 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
40 |
$950.00 |
$2187.01 |
$38000.00 |
04-03-2014 |
07-296704 |
2 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
40 |
$820.00 |
$1887.74 |
$32800.00 |
04-03-2014 |
07-296704 |
3 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
40 |
$850.00 |
$1956.80 |
$34000.00 |
04-03-2014 |
07-296704 |
4 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
40 |
$310.00 |
$713.66 |
$12400.00 |
04-03-2014 |
07-296704 |
5 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
40 |
$800.00 |
$1841.70 |
$32000.00 |
04-03-2014 |
07-296704 |
6 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
7 |
$800.00 |
$1841.70 |
$5600.00 |
04-10-2014 |
07-297004 |
1 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
7 |
$4000.00 |
$9208.48 |
$28000.00 |
04-10-2014 |
07-297004 |
2 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
7 |
$840.00 |
$1933.78 |
$5880.00 |
04-10-2014 |
07-297004 |
3 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
7 |
$845.00 |
$1945.29 |
$5915.00 |
04-10-2014 |
07-297004 |
4 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
7 |
$5850.00 |
$13467.41 |
$40950.00 |
04-10-2014 |
07-297004 |
5 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
7 |
$820.00 |
$1887.74 |
$5740.00 |
04-10-2014 |
07-297004 |
6 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
7 |
$515.00 |
$1185.59 |
$3605.00 |
04-10-2014 |
07-297004 |
7 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
6 |
$500.00 |
$1151.06 |
$3000.00 |
04-17-2014 |
12-0F96C4 |
1 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
6 |
$2000.00 |
$4604.24 |
$12000.00 |
04-17-2014 |
12-0F96C4 |
2 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
6 |
$1000.00 |
$2302.12 |
$6000.00 |
04-17-2014 |
12-0F96C4 |
3 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
6 |
$2600.00 |
$5985.51 |
$15600.00 |
04-17-2014 |
12-0F96C4 |
4 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
6 |
$500.00 |
$1151.06 |
$3000.00 |
04-17-2014 |
12-0F96C4 |
5 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
6 |
$270.00 |
$621.57 |
$1620.00 |
04-17-2014 |
12-0F96C4 |
6 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
6 |
$3000.00 |
$6906.36 |
$18000.00 |
04-17-2014 |
12-0F96C4 |
7 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
6 |
$1200.00 |
$2762.55 |
$7200.00 |
04-17-2014 |
12-0F96C4 |
8 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
6 |
$5000.00 |
$11510.60 |
$30000.00 |
04-17-2014 |
12-0F96C4 |
9 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
6 |
$5000.00 |
$11510.60 |
$30000.00 |
04-17-2014 |
12-0F96C4 |
10 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
05 |
28 |
$860.00 |
$1979.82 |
$24080.00 |
05-07-2014 |
05-0R5304 |
1 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
05 |
28 |
$1200.00 |
$2762.55 |
$33600.00 |
05-07-2014 |
05-0R5304 |
2 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
05 |
28 |
$424.00 |
$976.10 |
$11872.00 |
05-07-2014 |
05-0R5304 |
3 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
05 |
28 |
$400.00 |
$920.85 |
$11200.00 |
05-07-2014 |
05-0R5304 |
4 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
05 |
28 |
$1170.00 |
$2693.48 |
$32760.00 |
05-07-2014 |
05-0R5304 |
5 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
05 |
28 |
$1000.00 |
$2302.12 |
$28000.00 |
05-07-2014 |
05-0R5304 |
6 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
2 |
$1035.00 |
$2382.70 |
$2070.00 |
05-29-2014 |
07-4T5604 |
1 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
2 |
$900.00 |
$2071.91 |
$1800.00 |
05-29-2014 |
07-4T5604 |
2 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
2 |
$2000.00 |
$4604.24 |
$4000.00 |
05-29-2014 |
07-4T5604 |
3 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
2 |
$1800.00 |
$4143.82 |
$3600.00 |
05-29-2014 |
07-4T5604 |
4 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
2 |
$1091.00 |
$2511.61 |
$2182.00 |
05-29-2014 |
07-4T5604 |
5 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
2 |
$1000.00 |
$2302.12 |
$2000.00 |
05-29-2014 |
07-4T5604 |
6 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
21 |
$750.00 |
$1726.59 |
$15750.00 |
06-12-2014 |
07-294904 |
1 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
21 |
$700.00 |
$1611.48 |
$14700.00 |
06-12-2014 |
07-294904 |
2 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
21 |
$800.00 |
$1841.70 |
$16800.00 |
06-12-2014 |
07-294904 |
3 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
21 |
$695.00 |
$1599.97 |
$14595.00 |
06-12-2014 |
07-294904 |
4 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
21 |
$600.00 |
$1381.27 |
$12600.00 |
06-12-2014 |
07-294904 |
5 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
21 |
$735.00 |
$1692.06 |
$15435.00 |
06-12-2014 |
07-294904 |
6 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
21 |
$841.00 |
$1936.08 |
$17661.00 |
06-12-2014 |
07-294904 |
7 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
21 |
$800.00 |
$1841.70 |
$16800.00 |
06-12-2014 |
07-294904 |
8 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
01 |
1 |
$3000.00 |
$6906.36 |
$3000.00 |
06-25-2014 |
01-496504 |
1 |
|
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
01 |
1 |
$4010.00 |
$9231.51 |
$4010.00 |
06-25-2014 |
01-496504 |
2 |
|
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
01 |
1 |
$1500.00 |
$3453.18 |
$1500.00 |
06-25-2014 |
01-496504 |
3 |
|
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
38 |
$750.00 |
$1726.59 |
$28500.00 |
06-26-2014 |
07-295604 |
1 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
38 |
$775.00 |
$1784.14 |
$29450.00 |
06-26-2014 |
07-295604 |
2 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
38 |
$750.00 |
$1726.59 |
$28500.00 |
06-26-2014 |
07-295604 |
3 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
38 |
$750.00 |
$1726.59 |
$28500.00 |
06-26-2014 |
07-295604 |
4 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
38 |
$780.00 |
$1795.65 |
$29640.00 |
06-26-2014 |
07-295604 |
5 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
23 |
$900.00 |
$2071.91 |
$20700.00 |
06-26-2014 |
07-295704 |
1 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
23 |
$1000.00 |
$2302.12 |
$23000.00 |
06-26-2014 |
07-295704 |
2 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
23 |
$500.00 |
$1151.06 |
$11500.00 |
06-26-2014 |
07-295704 |
3 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
23 |
$800.00 |
$1841.70 |
$18400.00 |
06-26-2014 |
07-295704 |
4 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
23 |
$770.00 |
$1772.63 |
$17710.00 |
06-26-2014 |
07-295704 |
5 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
23 |
$750.00 |
$1726.59 |
$17250.00 |
06-26-2014 |
07-295704 |
6 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
23 |
$850.00 |
$1956.80 |
$19550.00 |
06-26-2014 |
07-295704 |
7 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
23 |
$750.00 |
$1726.59 |
$17250.00 |
06-26-2014 |
07-295704 |
8 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
08 |
7 |
$500.00 |
$1111.59 |
$3500.00 |
07-24-2014 |
08-3401U4 |
1 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
08 |
7 |
$600.00 |
$1333.91 |
$4200.00 |
07-24-2014 |
08-3401U4 |
2 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
08 |
7 |
$4500.00 |
$10004.32 |
$31500.00 |
07-24-2014 |
08-3401U4 |
3 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
08 |
7 |
$650.00 |
$1445.07 |
$4550.00 |
07-24-2014 |
08-3401U4 |
4 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
08 |
7 |
$600.00 |
$1333.91 |
$4200.00 |
07-24-2014 |
08-3401U4 |
5 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
08 |
7 |
$645.00 |
$1433.95 |
$4515.00 |
07-24-2014 |
08-3401U4 |
6 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
08 |
7 |
$700.00 |
$1556.23 |
$4900.00 |
07-24-2014 |
08-3401U4 |
7 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
08 |
7 |
$700.00 |
$1556.23 |
$4900.00 |
07-24-2014 |
08-3401U4 |
8 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
08 |
7 |
$10000.00 |
$22231.83 |
$70000.00 |
07-24-2014 |
08-3401U4 |
9 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
08 |
7 |
$750.00 |
$1667.39 |
$5250.00 |
07-24-2014 |
08-3401U4 |
10 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
08 |
7 |
$725.00 |
$1611.81 |
$5075.00 |
07-24-2014 |
08-3401U4 |
11 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
03 |
83 |
$500.00 |
$1111.59 |
$41500.00 |
08-06-2014 |
03-1A8424 |
1 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
03 |
83 |
$265.00 |
$589.14 |
$21995.00 |
08-06-2014 |
03-1A8424 |
2 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
03 |
83 |
$515.00 |
$1144.94 |
$42745.00 |
08-06-2014 |
03-1A8424 |
3 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
4 |
$600.00 |
$1333.91 |
$2400.00 |
08-07-2014 |
12-0H1604 |
1 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
4 |
$600.00 |
$1333.91 |
$2400.00 |
08-07-2014 |
12-0H1604 |
2 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
4 |
$630.00 |
$1400.61 |
$2520.00 |
08-07-2014 |
12-0H1604 |
3 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
4 |
$620.00 |
$1378.37 |
$2480.00 |
08-07-2014 |
12-0H1604 |
4 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
55 |
$500.00 |
$1111.59 |
$27500.00 |
08-14-2014 |
07-295504 |
1 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
55 |
$500.00 |
$1111.59 |
$27500.00 |
08-14-2014 |
07-295504 |
2 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
55 |
$500.00 |
$1111.59 |
$27500.00 |
08-14-2014 |
07-295504 |
3 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
55 |
$1200.00 |
$2667.82 |
$66000.00 |
08-14-2014 |
07-295504 |
4 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
55 |
$500.00 |
$1111.59 |
$27500.00 |
08-14-2014 |
07-295504 |
5 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
55 |
$500.00 |
$1111.59 |
$27500.00 |
08-14-2014 |
07-295504 |
6 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
55 |
$620.00 |
$1378.37 |
$34100.00 |
08-14-2014 |
07-295504 |
7 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
55 |
$500.00 |
$1111.59 |
$27500.00 |
08-14-2014 |
07-295504 |
8 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
55 |
$500.00 |
$1111.59 |
$27500.00 |
08-14-2014 |
07-295504 |
9 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
55 |
$480.00 |
$1067.13 |
$26400.00 |
08-14-2014 |
07-295504 |
10 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
16 |
$650.00 |
$1445.07 |
$10400.00 |
08-21-2014 |
07-294704 |
1 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
16 |
$1000.00 |
$2223.18 |
$16000.00 |
08-21-2014 |
07-294704 |
2 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
16 |
$700.00 |
$1556.23 |
$11200.00 |
08-21-2014 |
07-294704 |
3 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
16 |
$750.00 |
$1667.39 |
$12000.00 |
08-21-2014 |
07-294704 |
4 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
16 |
$750.00 |
$1667.39 |
$12000.00 |
08-21-2014 |
07-294704 |
5 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
16 |
$750.00 |
$1667.39 |
$12000.00 |
08-21-2014 |
07-294704 |
6 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
8 |
$550.00 |
$1222.75 |
$4400.00 |
08-21-2014 |
12-0H0344 |
1 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
8 |
$780.00 |
$1734.08 |
$6240.00 |
08-21-2014 |
12-0H0344 |
2 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
8 |
$400.00 |
$889.27 |
$3200.00 |
08-21-2014 |
12-0H0344 |
3 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
8 |
$800.00 |
$1778.55 |
$6400.00 |
08-21-2014 |
12-0H0344 |
4 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
8 |
$800.00 |
$1778.55 |
$6400.00 |
08-21-2014 |
12-0H0344 |
5 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
8 |
$650.00 |
$1445.07 |
$5200.00 |
08-21-2014 |
12-0H0344 |
6 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
8 |
$594.00 |
$1320.57 |
$4752.00 |
08-21-2014 |
12-0H0344 |
7 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
10 |
16 |
$690.00 |
$1534.00 |
$11040.00 |
08-27-2014 |
10-0T8204 |
1 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
10 |
16 |
$760.00 |
$1689.62 |
$12160.00 |
08-27-2014 |
10-0T8204 |
2 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
10 |
16 |
$427.50 |
$950.41 |
$6840.00 |
08-27-2014 |
10-0T8204 |
3 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
10 |
16 |
$940.00 |
$2089.79 |
$15040.00 |
08-27-2014 |
10-0T8204 |
4 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
10 |
16 |
$800.00 |
$1778.55 |
$12800.00 |
08-27-2014 |
10-0T8204 |
5 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
10 |
16 |
$1200.00 |
$2667.82 |
$19200.00 |
08-27-2014 |
10-0T8204 |
6 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
10 |
1 |
$4000.00 |
$8892.73 |
$4000.00 |
09-03-2014 |
10-0W1904 |
1 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
10 |
1 |
$3000.00 |
$6669.55 |
$3000.00 |
09-03-2014 |
10-0W1904 |
2 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
10 |
1 |
$3000.00 |
$6669.55 |
$3000.00 |
09-03-2014 |
10-0W1904 |
3 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
10 |
1 |
$7500.00 |
$16673.87 |
$7500.00 |
09-03-2014 |
10-0W1904 |
4 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
10 |
1 |
$3000.00 |
$6669.55 |
$3000.00 |
09-03-2014 |
10-0W1904 |
5 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
10 |
1 |
$3000.00 |
$6669.55 |
$3000.00 |
09-03-2014 |
10-0W1904 |
6 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
10 |
1 |
$3150.00 |
$7003.03 |
$3150.00 |
09-03-2014 |
10-0W1904 |
7 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
10 |
1 |
$3000.00 |
$6669.55 |
$3000.00 |
09-03-2014 |
10-0W1904 |
8 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
05 |
5 |
$580.00 |
$1131.20 |
$2900.00 |
10-08-2014 |
05-0S0304 |
1 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
05 |
5 |
$1000.00 |
$1950.35 |
$5000.00 |
10-08-2014 |
05-0S0304 |
2 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
05 |
5 |
$1139.00 |
$2221.45 |
$5695.00 |
10-08-2014 |
05-0S0304 |
3 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
05 |
5 |
$850.00 |
$1657.80 |
$4250.00 |
10-08-2014 |
05-0S0304 |
4 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
05 |
5 |
$1100.00 |
$2145.39 |
$5500.00 |
10-08-2014 |
05-0S0304 |
5 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
62 |
$475.00 |
$926.42 |
$29450.00 |
10-16-2014 |
07-2881U4 |
1 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
62 |
$600.00 |
$1170.21 |
$37200.00 |
10-16-2014 |
07-2881U4 |
2 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
62 |
$700.00 |
$1365.25 |
$43400.00 |
10-16-2014 |
07-2881U4 |
3 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
62 |
$515.00 |
$1004.43 |
$31930.00 |
10-16-2014 |
07-2881U4 |
4 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
62 |
$750.00 |
$1462.76 |
$46500.00 |
10-16-2014 |
07-2881U4 |
5 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
62 |
$500.00 |
$975.18 |
$31000.00 |
10-16-2014 |
07-2881U4 |
6 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
11 |
6 |
$1000.00 |
$1950.35 |
$6000.00 |
10-16-2014 |
11-275504 |
1 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
11 |
6 |
$1000.00 |
$1950.35 |
$6000.00 |
10-16-2014 |
11-275504 |
2 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
11 |
6 |
$1000.00 |
$1950.35 |
$6000.00 |
10-16-2014 |
11-275504 |
3 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
11 |
6 |
$1371.67 |
$2675.24 |
$8230.02 |
10-16-2014 |
11-275504 |
4 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
11 |
6 |
$900.00 |
$1755.32 |
$5400.00 |
10-16-2014 |
11-275504 |
5 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
01 |
12 |
$400.00 |
$780.14 |
$4800.00 |
10-22-2014 |
01-488604 |
1 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
01 |
12 |
$1350.00 |
$2632.98 |
$16200.00 |
10-22-2014 |
01-488604 |
2 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
01 |
12 |
$950.00 |
$1852.84 |
$11400.00 |
10-22-2014 |
01-488604 |
3 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
01 |
12 |
$965.00 |
$1882.09 |
$11580.00 |
10-22-2014 |
01-488604 |
4 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
01 |
12 |
$1000.00 |
$1950.35 |
$12000.00 |
10-22-2014 |
01-488604 |
5 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
01 |
12 |
$450.00 |
$877.66 |
$5400.00 |
10-22-2014 |
01-488604 |
6 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
12 |
$1100.00 |
$2145.39 |
$13200.00 |
10-23-2014 |
12-0F96A4 |
1 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
12 |
$1000.00 |
$1950.35 |
$12000.00 |
10-23-2014 |
12-0F96A4 |
2 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
12 |
$510.00 |
$994.68 |
$6120.00 |
10-23-2014 |
12-0F96A4 |
3 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
12 |
$1200.00 |
$2340.42 |
$14400.00 |
10-23-2014 |
12-0F96A4 |
4 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
12 |
$15000.00 |
$29255.29 |
$180000.00 |
10-23-2014 |
12-0F96A4 |
5 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
06 |
6 |
$1000.00 |
$1950.35 |
$6000.00 |
10-29-2014 |
06-0Q2504 |
1 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
06 |
6 |
$500.00 |
$975.18 |
$3000.00 |
10-29-2014 |
06-0Q2504 |
2 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
06 |
6 |
$1000.00 |
$1950.35 |
$6000.00 |
10-29-2014 |
06-0Q2504 |
3 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
06 |
6 |
$2000.00 |
$3900.71 |
$12000.00 |
10-29-2014 |
06-0Q2504 |
4 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
06 |
6 |
$1000.00 |
$1950.35 |
$6000.00 |
10-29-2014 |
06-0Q2504 |
5 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
71 |
$625.00 |
$1218.97 |
$44375.00 |
10-30-2014 |
12-0L92U4 |
1 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
71 |
$600.00 |
$1170.21 |
$42600.00 |
10-30-2014 |
12-0L92U4 |
2 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
71 |
$800.00 |
$1560.28 |
$56800.00 |
10-30-2014 |
12-0L92U4 |
3 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
71 |
$480.00 |
$936.17 |
$34080.00 |
10-30-2014 |
12-0L92U4 |
4 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
71 |
$550.00 |
$1072.69 |
$39050.00 |
10-30-2014 |
12-0L92U4 |
5 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
20 |
$490.00 |
$955.67 |
$9800.00 |
11-20-2014 |
07-2055A4 |
1 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
20 |
$580.00 |
$1131.20 |
$11600.00 |
11-20-2014 |
07-2055A4 |
2 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
20 |
$200.00 |
$390.07 |
$4000.00 |
11-20-2014 |
07-2055A4 |
3 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
20 |
$510.00 |
$994.68 |
$10200.00 |
11-20-2014 |
07-2055A4 |
4 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
20 |
$600.00 |
$1170.21 |
$12000.00 |
11-20-2014 |
07-2055A4 |
5 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
20 |
$350.00 |
$682.62 |
$7000.00 |
11-20-2014 |
07-2055A4 |
6 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
20 |
$580.00 |
$1131.20 |
$11600.00 |
11-20-2014 |
07-2055A4 |
7 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
20 |
$638.72 |
$1245.73 |
$12774.40 |
11-20-2014 |
07-2055A4 |
8 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
20 |
$560.00 |
$1092.20 |
$11200.00 |
11-20-2014 |
07-2055A4 |
9 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
20 |
$950.00 |
$1852.84 |
$19000.00 |
11-20-2014 |
07-2055A4 |
10 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
20 |
$10500.00 |
$20478.70 |
$210000.00 |
11-20-2014 |
07-2055A4 |
11 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
20 |
$650.00 |
$1267.73 |
$13000.00 |
11-20-2014 |
07-2055A4 |
12 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
04 |
8 |
$1240.00 |
$1892.28 |
$9920.00 |
02-18-2015 |
04-259404 |
1 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
04 |
8 |
$1000.00 |
$1526.04 |
$8000.00 |
02-18-2015 |
04-259404 |
2 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
04 |
8 |
$1302.00 |
$1986.90 |
$10416.00 |
02-18-2015 |
04-259404 |
3 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
04 |
8 |
$1000.00 |
$1526.04 |
$8000.00 |
02-18-2015 |
04-259404 |
4 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
04 |
8 |
$1250.00 |
$1907.55 |
$10000.00 |
02-18-2015 |
04-259404 |
5 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
04 |
8 |
$1300.00 |
$1983.85 |
$10400.00 |
02-18-2015 |
04-259404 |
6 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
06 |
3 |
$2500.00 |
$3815.09 |
$7500.00 |
03-17-2015 |
06-0M0204 |
1 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
06 |
3 |
$3500.00 |
$5341.13 |
$10500.00 |
03-17-2015 |
06-0M0204 |
2 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
06 |
3 |
$3260.00 |
$4974.88 |
$9780.00 |
03-17-2015 |
06-0M0204 |
3 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
06 |
3 |
$4200.00 |
$6409.35 |
$12600.00 |
03-17-2015 |
06-0M0204 |
4 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
06 |
3 |
$3700.00 |
$5646.33 |
$11100.00 |
03-17-2015 |
06-0M0204 |
5 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
06 |
3 |
$1500.00 |
$2289.05 |
$4500.00 |
03-17-2015 |
06-0M0204 |
6 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
06 |
3 |
$3260.00 |
$4974.88 |
$9780.00 |
03-17-2015 |
06-0M0204 |
7 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
06 |
3 |
$3300.00 |
$5035.92 |
$9900.00 |
03-17-2015 |
06-0M0204 |
8 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
03 |
3 |
$1750.00 |
$3730.94 |
$5250.00 |
04-01-2015 |
03-3F7904 |
1 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
03 |
3 |
$2200.00 |
$4690.32 |
$6600.00 |
04-01-2015 |
03-3F7904 |
2 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
03 |
3 |
$1750.00 |
$3730.94 |
$5250.00 |
04-01-2015 |
03-3F7904 |
3 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
03 |
3 |
$1750.00 |
$3730.94 |
$5250.00 |
04-01-2015 |
03-3F7904 |
4 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
03 |
3 |
$2200.00 |
$4690.32 |
$6600.00 |
04-01-2015 |
03-3F7904 |
5 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
05 |
9 |
$750.00 |
$1598.97 |
$6750.00 |
04-01-2015 |
05-1A7204 |
1 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
05 |
9 |
$850.00 |
$1812.17 |
$7650.00 |
04-01-2015 |
05-1A7204 |
2 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
05 |
9 |
$817.52 |
$1742.92 |
$7357.68 |
04-01-2015 |
05-1A7204 |
3 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
02 |
26 |
$910.00 |
$1940.09 |
$23660.00 |
04-08-2015 |
02-3E7714 |
1 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
02 |
26 |
$990.00 |
$2110.65 |
$25740.00 |
04-08-2015 |
02-3E7714 |
2 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
02 |
26 |
$990.00 |
$2110.65 |
$25740.00 |
04-08-2015 |
02-3E7714 |
3 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
08 |
3 |
$1260.00 |
$2686.28 |
$3780.00 |
04-21-2015 |
08-1C0504 |
1 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
08 |
3 |
$1200.00 |
$2558.36 |
$3600.00 |
04-21-2015 |
08-1C0504 |
2 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
08 |
3 |
$1275.00 |
$2718.26 |
$3825.00 |
04-21-2015 |
08-1C0504 |
3 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
08 |
3 |
$1261.75 |
$2690.01 |
$3785.25 |
04-21-2015 |
08-1C0504 |
4 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
08 |
3 |
$1975.00 |
$4210.63 |
$5925.00 |
04-21-2015 |
08-1C0504 |
5 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
2 |
$2000.00 |
$4263.93 |
$4000.00 |
05-12-2015 |
07-4T7304 |
1 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
2 |
$1870.00 |
$3986.78 |
$3740.00 |
05-12-2015 |
07-4T7304 |
2 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
2 |
$500.00 |
$1065.98 |
$1000.00 |
05-12-2015 |
07-4T7304 |
3 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
2 |
$4016.00 |
$8561.97 |
$8032.00 |
05-12-2015 |
07-4T7304 |
4 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
2 |
$2000.00 |
$4263.93 |
$4000.00 |
05-12-2015 |
07-4T7304 |
5 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
08 |
13 |
$800.00 |
$1705.57 |
$10400.00 |
05-21-2015 |
08-0N5404 |
1 |
|
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
08 |
13 |
$1000.00 |
$2131.97 |
$13000.00 |
05-21-2015 |
08-0N5404 |
2 |
|
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
08 |
13 |
$865.00 |
$1844.15 |
$11245.00 |
05-21-2015 |
08-0N5404 |
3 |
|
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
08 |
13 |
$1000.00 |
$2131.97 |
$13000.00 |
05-21-2015 |
08-0N5404 |
4 |
|
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
08 |
13 |
$1100.00 |
$2345.16 |
$14300.00 |
05-21-2015 |
08-0N5404 |
5 |
|
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
08 |
13 |
$1334.00 |
$2844.04 |
$17342.00 |
05-21-2015 |
08-0N5404 |
6 |
|
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
10 |
16 |
$850.00 |
$1812.17 |
$13600.00 |
05-27-2015 |
10-0X1604 |
1 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
10 |
4 |
$1800.00 |
$3837.54 |
$7200.00 |
06-03-2015 |
10-0K1404 |
1 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
10 |
4 |
$500.00 |
$1065.98 |
$2000.00 |
06-03-2015 |
10-0K1404 |
2 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
10 |
4 |
$1000.00 |
$2131.97 |
$4000.00 |
06-03-2015 |
10-0K1404 |
3 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
10 |
4 |
$250.00 |
$532.99 |
$1000.00 |
06-03-2015 |
10-0K1404 |
4 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
LS |
04 |
1 |
$15000.00 |
$31979.48 |
$15000.00 |
06-25-2015 |
04-297624 |
1 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
LS |
04 |
1 |
$12600.00 |
$26862.77 |
$12600.00 |
06-25-2015 |
04-297624 |
2 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
LS |
04 |
1 |
$12000.00 |
$25583.59 |
$12000.00 |
06-25-2015 |
04-297624 |
3 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
LS |
04 |
1 |
$12000.00 |
$25583.59 |
$12000.00 |
06-25-2015 |
04-297624 |
4 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
LS |
04 |
1 |
$10000.00 |
$21319.66 |
$10000.00 |
06-25-2015 |
04-297624 |
5 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
LS |
04 |
1 |
$12000.00 |
$25583.59 |
$12000.00 |
06-25-2015 |
04-297624 |
6 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
LS |
04 |
1 |
$12000.00 |
$25583.59 |
$12000.00 |
06-25-2015 |
04-297624 |
7 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
LS |
04 |
1 |
$13200.00 |
$28141.95 |
$13200.00 |
06-25-2015 |
04-297624 |
8 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
LS |
04 |
1 |
$783.75 |
$1670.93 |
$783.75 |
06-25-2015 |
04-297624 |
9 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
05 |
7 |
$1000.00 |
$2124.24 |
$7000.00 |
07-21-2015 |
05-0R5104 |
1 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
05 |
7 |
$1955.00 |
$4152.89 |
$13685.00 |
07-21-2015 |
05-0R5104 |
2 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
05 |
7 |
$950.00 |
$2018.03 |
$6650.00 |
07-21-2015 |
05-0R5104 |
3 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
03 |
7 |
$1500.00 |
$3186.36 |
$10500.00 |
08-05-2015 |
03-2F6004 |
1 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
03 |
7 |
$1100.00 |
$2336.66 |
$7700.00 |
08-05-2015 |
03-2F6004 |
2 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
03 |
7 |
$1100.00 |
$2336.66 |
$7700.00 |
08-05-2015 |
03-2F6004 |
3 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
03 |
7 |
$1100.00 |
$2336.66 |
$7700.00 |
08-05-2015 |
03-2F6004 |
4 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
10 |
1 |
$7500.00 |
$15931.79 |
$7500.00 |
08-11-2015 |
10-0S7204 |
1 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
10 |
1 |
$7500.00 |
$15931.79 |
$7500.00 |
08-11-2015 |
10-0S7204 |
2 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
10 |
1 |
$3500.00 |
$7434.84 |
$3500.00 |
08-11-2015 |
10-0S7204 |
3 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
10 |
1 |
$8000.00 |
$16993.91 |
$8000.00 |
08-11-2015 |
10-0S7204 |
4 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
11 |
2 |
$2911.09 |
$6183.85 |
$5822.18 |
08-13-2015 |
11-410604 |
1 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
11 |
2 |
$3500.00 |
$7434.84 |
$7000.00 |
08-13-2015 |
11-410604 |
2 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
11 |
2 |
$3460.00 |
$7349.87 |
$6920.00 |
08-13-2015 |
11-410604 |
3 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
05 |
4 |
$1250.00 |
$2655.30 |
$5000.00 |
09-10-2015 |
05-1F69U4 |
1 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
05 |
4 |
$1260.00 |
$2676.54 |
$5040.00 |
09-10-2015 |
05-1F69U4 |
2 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
05 |
4 |
$1200.00 |
$2549.09 |
$4800.00 |
09-10-2015 |
05-1F69U4 |
3 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
05 |
4 |
$1200.00 |
$2549.09 |
$4800.00 |
09-10-2015 |
05-1F69U4 |
4 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
13 |
$400.00 |
$769.69 |
$5200.00 |
10-08-2015 |
07-3X7114 |
1 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
13 |
$800.00 |
$1539.38 |
$10400.00 |
10-08-2015 |
07-3X7114 |
2 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
13 |
$770.00 |
$1481.66 |
$10010.00 |
10-08-2015 |
07-3X7114 |
3 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
13 |
$700.00 |
$1346.96 |
$9100.00 |
10-08-2015 |
07-3X7114 |
4 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
13 |
$1000.00 |
$1924.23 |
$13000.00 |
10-08-2015 |
07-3X7114 |
5 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
13 |
$725.00 |
$1395.07 |
$9425.00 |
10-08-2015 |
07-3X7114 |
6 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
13 |
$770.00 |
$1481.66 |
$10010.00 |
10-08-2015 |
07-3X7114 |
7 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
35 |
$595.00 |
$1144.92 |
$20825.00 |
10-15-2015 |
07-1193U4 |
1 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
35 |
$1500.00 |
$2886.34 |
$52500.00 |
10-15-2015 |
07-1193U4 |
2 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
35 |
$600.00 |
$1154.54 |
$21000.00 |
10-15-2015 |
07-1193U4 |
3 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
35 |
$660.00 |
$1269.99 |
$23100.00 |
10-15-2015 |
07-1193U4 |
4 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
35 |
$1200.00 |
$2309.07 |
$42000.00 |
10-15-2015 |
07-1193U4 |
5 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
35 |
$650.00 |
$1250.75 |
$22750.00 |
10-15-2015 |
07-1193U4 |
6 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
35 |
$698.75 |
$1344.55 |
$24456.25 |
10-15-2015 |
07-1193U4 |
7 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
2 |
$1500.00 |
$2886.34 |
$3000.00 |
10-29-2015 |
07-255104 |
1 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
2 |
$2850.00 |
$5484.05 |
$5700.00 |
10-29-2015 |
07-255104 |
2 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
2 |
$3000.00 |
$5772.69 |
$6000.00 |
10-29-2015 |
07-255104 |
3 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
2 |
$3000.00 |
$5772.69 |
$6000.00 |
10-29-2015 |
07-255104 |
4 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
2 |
$3135.00 |
$6032.46 |
$6270.00 |
10-29-2015 |
07-255104 |
5 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
2 |
$5000.00 |
$9621.14 |
$10000.00 |
10-29-2015 |
07-255104 |
6 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
2 |
$1.00 |
$1.92 |
$2.00 |
10-29-2015 |
07-255104 |
7 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
10 |
4 |
$1750.00 |
$3367.40 |
$7000.00 |
10-29-2015 |
10-0W3604 |
1 |
|
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
10 |
4 |
$1650.00 |
$3174.98 |
$6600.00 |
10-29-2015 |
10-0W3604 |
2 |
|
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
10 |
4 |
$805.00 |
$1549.00 |
$3220.00 |
10-29-2015 |
10-0W3604 |
3 |
|
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
10 |
4 |
$1500.00 |
$2886.34 |
$6000.00 |
10-29-2015 |
10-0W3604 |
4 |
|
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
10 |
4 |
$1500.00 |
$2886.34 |
$6000.00 |
10-29-2015 |
10-0W3604 |
5 |
|
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
04 |
2 |
$25000.00 |
$48105.71 |
$50000.00 |
11-05-2015 |
04-4H2224 |
1 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
04 |
2 |
$2800.00 |
$5387.84 |
$5600.00 |
11-05-2015 |
04-4H2224 |
2 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
04 |
2 |
$500.00 |
$962.11 |
$1000.00 |
11-05-2015 |
04-4H2224 |
3 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
11 |
17 |
$1250.00 |
$2405.29 |
$21250.00 |
12-02-2015 |
11-413304 |
1 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
11 |
17 |
$950.00 |
$1828.02 |
$16150.00 |
12-02-2015 |
11-413304 |
2 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
11 |
17 |
$1000.00 |
$1924.23 |
$17000.00 |
12-02-2015 |
11-413304 |
3 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
11 |
17 |
$900.00 |
$1731.81 |
$15300.00 |
12-02-2015 |
11-413304 |
4 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
11 |
17 |
$900.00 |
$1731.81 |
$15300.00 |
12-02-2015 |
11-413304 |
5 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
86 |
$529.70 |
$1019.26 |
$45554.20 |
12-03-2015 |
07-306204 |
1 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
86 |
$495.00 |
$952.49 |
$42570.00 |
12-03-2015 |
07-306204 |
2 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
86 |
$600.00 |
$1154.54 |
$51600.00 |
12-03-2015 |
07-306204 |
3 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
86 |
$600.00 |
$1154.54 |
$51600.00 |
12-03-2015 |
07-306204 |
4 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
86 |
$593.00 |
$1141.07 |
$50998.00 |
12-03-2015 |
07-306204 |
5 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
86 |
$544.50 |
$1047.74 |
$46827.00 |
12-03-2015 |
07-306204 |
6 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
4 |
$1480.00 |
$2847.86 |
$5920.00 |
12-03-2015 |
12-0N3304 |
1 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
4 |
$1210.00 |
$2328.32 |
$4840.00 |
12-03-2015 |
12-0N3304 |
2 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
4 |
$1500.00 |
$2886.34 |
$6000.00 |
12-03-2015 |
12-0N3304 |
3 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
4 |
$2000.00 |
$3848.46 |
$8000.00 |
12-03-2015 |
12-0N3304 |
4 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
4 |
$1230.00 |
$2366.80 |
$4920.00 |
12-03-2015 |
12-0N3304 |
5 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
4 |
$1130.00 |
$2174.38 |
$4520.00 |
12-03-2015 |
12-0N3304 |
6 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
05 |
1 |
$3000.00 |
$5772.69 |
$3000.00 |
12-08-2015 |
05-1F5704 |
1 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
05 |
1 |
$5000.00 |
$9621.14 |
$5000.00 |
12-08-2015 |
05-1F5704 |
2 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
10 |
3 |
$2200.00 |
$4149.92 |
$6600.00 |
01-06-2016 |
10-0T8104 |
1 |
|
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
10 |
3 |
$2000.00 |
$3772.66 |
$6000.00 |
01-06-2016 |
10-0T8104 |
2 |
|
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
10 |
3 |
$1000.00 |
$1886.33 |
$3000.00 |
01-06-2016 |
10-0T8104 |
3 |
|
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
10 |
3 |
$2000.00 |
$3772.66 |
$6000.00 |
01-06-2016 |
10-0T8104 |
4 |
|
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
10 |
3 |
$2185.00 |
$4121.63 |
$6555.00 |
01-06-2016 |
10-0T8104 |
5 |
|
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
10 |
3 |
$1493.33 |
$2816.91 |
$4479.99 |
01-06-2016 |
10-0T8104 |
6 |
|
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
10 |
3 |
$1000.00 |
$1886.33 |
$3000.00 |
01-06-2016 |
10-0T8104 |
7 |
|
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
48 |
$550.00 |
$1037.48 |
$26400.00 |
02-03-2016 |
07-300604 |
1 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
48 |
$520.00 |
$980.89 |
$24960.00 |
02-03-2016 |
07-300604 |
2 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
48 |
$500.00 |
$943.16 |
$24000.00 |
02-03-2016 |
07-300604 |
3 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
48 |
$529.20 |
$998.25 |
$25401.60 |
02-03-2016 |
07-300604 |
4 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
48 |
$575.00 |
$1084.64 |
$27600.00 |
02-03-2016 |
07-300604 |
5 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
48 |
$630.00 |
$1188.39 |
$30240.00 |
02-03-2016 |
07-300604 |
6 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
08 |
26 |
$380.00 |
$716.80 |
$9880.00 |
02-24-2016 |
08-0J9904 |
1 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
08 |
26 |
$875.00 |
$1650.54 |
$22750.00 |
02-24-2016 |
08-0J9904 |
2 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
08 |
26 |
$850.00 |
$1603.38 |
$22100.00 |
02-24-2016 |
08-0J9904 |
3 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
08 |
26 |
$800.00 |
$1509.06 |
$20800.00 |
02-24-2016 |
08-0J9904 |
4 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
08 |
26 |
$230.00 |
$433.86 |
$5980.00 |
02-24-2016 |
08-0J9904 |
5 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
08 |
26 |
$1000.00 |
$1886.33 |
$26000.00 |
02-24-2016 |
08-0J9904 |
6 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
08 |
26 |
$808.92 |
$1525.89 |
$21031.92 |
02-24-2016 |
08-0J9904 |
7 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
08 |
26 |
$1500.00 |
$2829.49 |
$39000.00 |
02-24-2016 |
08-0J9904 |
8 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
08 |
26 |
$850.00 |
$1603.38 |
$22100.00 |
02-24-2016 |
08-0J9904 |
9 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
03 |
90 |
$380.00 |
$716.80 |
$34200.00 |
03-16-2016 |
03-1F9904 |
1 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
03 |
90 |
$300.00 |
$565.90 |
$27000.00 |
03-16-2016 |
03-1F9904 |
2 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
03 |
90 |
$490.00 |
$924.30 |
$44100.00 |
03-16-2016 |
03-1F9904 |
3 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
03 |
90 |
$445.00 |
$839.42 |
$40050.00 |
03-16-2016 |
03-1F9904 |
4 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
03 |
90 |
$445.00 |
$839.42 |
$40050.00 |
03-16-2016 |
03-1F9904 |
5 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
06 |
3 |
$1580.00 |
$2980.40 |
$4740.00 |
03-22-2016 |
06-0S4304 |
1 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
06 |
3 |
$1000.00 |
$1886.33 |
$3000.00 |
03-22-2016 |
06-0S4304 |
2 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
06 |
3 |
$2800.00 |
$5281.72 |
$8400.00 |
03-22-2016 |
06-0S4304 |
3 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
06 |
3 |
$1506.67 |
$2842.07 |
$4520.01 |
03-22-2016 |
06-0S4304 |
4 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
06 |
3 |
$2500.00 |
$4715.82 |
$7500.00 |
03-22-2016 |
06-0S4304 |
5 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
06 |
3 |
$2315.00 |
$4366.85 |
$6945.00 |
03-22-2016 |
06-0S4304 |
6 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
36 |
$522.50 |
$961.11 |
$18810.00 |
04-26-2016 |
07-300704 |
1 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
36 |
$585.00 |
$1076.07 |
$21060.00 |
04-26-2016 |
07-300704 |
2 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
36 |
$500.00 |
$919.72 |
$18000.00 |
04-26-2016 |
07-300704 |
3 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
36 |
$800.00 |
$1471.55 |
$28800.00 |
04-26-2016 |
07-300704 |
4 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
1 |
$2500.00 |
$4598.61 |
$2500.00 |
04-26-2016 |
12-0N0704 |
1 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
1 |
$8850.00 |
$16279.07 |
$8850.00 |
04-26-2016 |
12-0N0704 |
2 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
1 |
$350.00 |
$643.80 |
$350.00 |
04-26-2016 |
12-0N0704 |
3 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
5 |
$840.00 |
$1545.13 |
$4200.00 |
04-27-2016 |
12-0P4904 |
1 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
5 |
$800.00 |
$1471.55 |
$4000.00 |
04-27-2016 |
12-0P4904 |
2 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
5 |
$820.00 |
$1508.34 |
$4100.00 |
04-27-2016 |
12-0P4904 |
3 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
5 |
$1000.00 |
$1839.44 |
$5000.00 |
04-27-2016 |
12-0P4904 |
4 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
11 |
34 |
$600.00 |
$1103.67 |
$20400.00 |
05-03-2016 |
11-413504 |
1 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
11 |
34 |
$600.00 |
$1103.67 |
$20400.00 |
05-03-2016 |
11-413504 |
2 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
11 |
34 |
$800.00 |
$1471.55 |
$27200.00 |
05-03-2016 |
11-413504 |
3 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
11 |
34 |
$500.00 |
$919.72 |
$17000.00 |
05-03-2016 |
11-413504 |
4 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
27 |
$785.00 |
$1443.96 |
$21195.00 |
05-04-2016 |
07-302604 |
1 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
27 |
$500.00 |
$919.72 |
$13500.00 |
05-04-2016 |
07-302604 |
2 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
27 |
$537.00 |
$987.78 |
$14499.00 |
05-04-2016 |
07-302604 |
3 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
27 |
$500.00 |
$919.72 |
$13500.00 |
05-04-2016 |
07-302604 |
4 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
27 |
$490.00 |
$901.33 |
$13230.00 |
05-04-2016 |
07-302604 |
5 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
27 |
$500.00 |
$919.72 |
$13500.00 |
05-04-2016 |
07-302604 |
6 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
27 |
$650.00 |
$1195.64 |
$17550.00 |
05-04-2016 |
07-302604 |
7 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
4 |
$1500.00 |
$2759.16 |
$6000.00 |
05-25-2016 |
07-4P0204 |
1 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
4 |
$1300.00 |
$2391.28 |
$5200.00 |
05-25-2016 |
07-4P0204 |
2 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
4 |
$590.00 |
$1085.27 |
$2360.00 |
05-25-2016 |
07-4P0204 |
3 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
4 |
$900.00 |
$1655.50 |
$3600.00 |
05-25-2016 |
07-4P0204 |
4 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
4 |
$1500.00 |
$2759.16 |
$6000.00 |
05-25-2016 |
07-4P0204 |
5 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
4 |
$2500.00 |
$4598.61 |
$10000.00 |
05-25-2016 |
07-4P0204 |
6 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
4 |
$1592.50 |
$2929.31 |
$6370.00 |
05-25-2016 |
07-4P0204 |
7 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
4 |
$1675.00 |
$3081.07 |
$6700.00 |
05-25-2016 |
07-4P0204 |
8 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
4 |
$5000.00 |
$9197.21 |
$20000.00 |
05-25-2016 |
07-4P0204 |
9 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
4 |
$1450.00 |
$2667.19 |
$5800.00 |
05-25-2016 |
07-4P0204 |
10 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
4 |
$1600.00 |
$2943.11 |
$6400.00 |
06-08-2016 |
12-0N3604 |
1 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
4 |
$1700.00 |
$3127.05 |
$6800.00 |
06-08-2016 |
12-0N3604 |
2 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
4 |
$1100.00 |
$2023.39 |
$4400.00 |
06-08-2016 |
12-0N3604 |
3 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
4 |
$1150.00 |
$2115.36 |
$4600.00 |
06-08-2016 |
12-0N3604 |
4 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
4 |
$1050.00 |
$1931.41 |
$4200.00 |
06-08-2016 |
12-0N3604 |
5 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
4 |
$1000.00 |
$1839.44 |
$4000.00 |
06-08-2016 |
12-0N3604 |
6 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
4 |
$1500.00 |
$2759.16 |
$6000.00 |
06-08-2016 |
12-0N3604 |
7 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
4 |
$1200.00 |
$2207.33 |
$4800.00 |
06-08-2016 |
12-0N3604 |
8 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
04 |
2 |
$5000.00 |
$7787.52 |
$10000.00 |
07-06-2016 |
04-4H2224 |
1 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
04 |
2 |
$4900.00 |
$7631.77 |
$9800.00 |
07-06-2016 |
04-4H2224 |
2 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
04 |
2 |
$5500.00 |
$8566.27 |
$11000.00 |
07-06-2016 |
04-4H2224 |
3 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
04 |
2 |
$4900.00 |
$7631.77 |
$9800.00 |
07-06-2016 |
04-4H2224 |
4 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
04 |
2 |
$2500.00 |
$3893.76 |
$5000.00 |
07-06-2016 |
04-4H2224 |
5 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
2 |
$3000.00 |
$4672.51 |
$6000.00 |
07-19-2016 |
12-0N6804 |
1 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
2 |
$4000.00 |
$6230.02 |
$8000.00 |
07-19-2016 |
12-0N6804 |
2 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
2 |
$4000.00 |
$6230.02 |
$8000.00 |
07-19-2016 |
12-0N6804 |
3 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
2 |
$1500.00 |
$2336.26 |
$3000.00 |
07-19-2016 |
12-0N6804 |
4 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
2 |
$3000.00 |
$4672.51 |
$6000.00 |
07-19-2016 |
12-0N6804 |
5 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
2 |
$3050.00 |
$4750.39 |
$6100.00 |
07-19-2016 |
12-0N6804 |
6 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
2 |
$4200.00 |
$6541.52 |
$8400.00 |
07-19-2016 |
12-0N6804 |
7 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
2 |
$1700.00 |
$2647.76 |
$3400.00 |
07-19-2016 |
12-0N6804 |
8 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
06 |
53 |
$870.00 |
$1355.03 |
$46110.00 |
08-23-2016 |
06-0P2704 |
1 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
06 |
53 |
$2100.00 |
$3270.76 |
$111300.00 |
08-23-2016 |
06-0P2704 |
2 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
06 |
53 |
$925.00 |
$1440.69 |
$49025.00 |
08-23-2016 |
06-0P2704 |
3 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
05 |
38 |
$750.00 |
$1168.13 |
$28500.00 |
08-30-2016 |
05-1A7504 |
1 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
05 |
38 |
$760.00 |
$1183.70 |
$28880.00 |
08-30-2016 |
05-1A7504 |
2 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
05 |
38 |
$740.00 |
$1152.55 |
$28120.00 |
08-30-2016 |
05-1A7504 |
3 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
05 |
38 |
$796.36 |
$1240.33 |
$30261.68 |
08-30-2016 |
05-1A7504 |
4 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
05 |
38 |
$740.00 |
$1152.55 |
$28120.00 |
08-30-2016 |
05-1A7504 |
5 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
10 |
15 |
$1200.00 |
$1869.01 |
$18000.00 |
09-08-2016 |
10-0V3004 |
1 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
04 |
1 |
$5775.00 |
$8994.59 |
$5775.00 |
09-14-2016 |
04-3G59U4 |
1 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
04 |
1 |
$8500.00 |
$13238.79 |
$8500.00 |
09-14-2016 |
04-3G59U4 |
2 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
04 |
1 |
$5500.00 |
$8566.27 |
$5500.00 |
09-14-2016 |
04-3G59U4 |
3 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
04 |
1 |
$5600.00 |
$8722.02 |
$5600.00 |
09-14-2016 |
04-3G59U4 |
4 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
04 |
1 |
$5000.00 |
$7787.52 |
$5000.00 |
09-14-2016 |
04-3G59U4 |
5 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
04 |
1 |
$25000.00 |
$38937.61 |
$25000.00 |
09-14-2016 |
04-3G59U4 |
6 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
04 |
1 |
$5000.00 |
$7787.52 |
$5000.00 |
09-14-2016 |
04-3G59U4 |
7 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
03 |
3 |
$4000.00 |
$6230.02 |
$12000.00 |
09-22-2016 |
03-4F0604 |
1 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
03 |
3 |
$1250.00 |
$1946.88 |
$3750.00 |
09-22-2016 |
03-4F0604 |
2 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
03 |
3 |
$1250.00 |
$1946.88 |
$3750.00 |
09-22-2016 |
03-4F0604 |
3 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
03 |
3 |
$2500.00 |
$3893.76 |
$7500.00 |
09-22-2016 |
03-4F0604 |
4 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
03 |
3 |
$4000.00 |
$6230.02 |
$12000.00 |
09-22-2016 |
03-4F0604 |
5 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
30 |
$799.00 |
$1244.45 |
$23970.00 |
09-22-2016 |
12-0M4704 |
1 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
30 |
$400.00 |
$623.00 |
$12000.00 |
09-22-2016 |
12-0M4704 |
2 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
30 |
$275.00 |
$428.31 |
$8250.00 |
09-22-2016 |
12-0M4704 |
3 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
30 |
$793.50 |
$1235.88 |
$23805.00 |
09-22-2016 |
12-0M4704 |
4 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
30 |
$338.31 |
$526.92 |
$10149.30 |
09-22-2016 |
12-0M4704 |
5 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
30 |
$600.00 |
$934.50 |
$18000.00 |
09-22-2016 |
12-0M4704 |
6 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
30 |
$1200.00 |
$1869.01 |
$36000.00 |
09-22-2016 |
12-0M4704 |
7 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
30 |
$403.20 |
$627.99 |
$12096.00 |
09-22-2016 |
12-0M4704 |
8 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
30 |
$500.00 |
$778.75 |
$15000.00 |
09-22-2016 |
12-0M4704 |
9 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
30 |
$630.00 |
$981.23 |
$18900.00 |
09-22-2016 |
12-0M4704 |
10 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
30 |
$800.00 |
$1246.00 |
$24000.00 |
09-22-2016 |
12-0M4704 |
11 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
30 |
$600.00 |
$934.50 |
$18000.00 |
09-22-2016 |
12-0M4704 |
12 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
10 |
4 |
$1000.00 |
$1557.50 |
$4000.00 |
09-27-2016 |
10-0Q1604 |
1 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
10 |
4 |
$1050.00 |
$1635.38 |
$4200.00 |
09-27-2016 |
10-0Q1604 |
2 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
10 |
4 |
$2200.00 |
$3426.51 |
$8800.00 |
09-27-2016 |
10-0Q1604 |
3 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
10 |
4 |
$1974.00 |
$3074.51 |
$7896.00 |
09-27-2016 |
10-0Q1604 |
4 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
10 |
4 |
$1975.00 |
$3076.07 |
$7900.00 |
09-27-2016 |
10-0Q1604 |
5 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
10 |
4 |
$2000.00 |
$3115.01 |
$8000.00 |
09-27-2016 |
10-0Q1604 |
6 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
11 |
$550.00 |
$831.61 |
$6050.00 |
10-12-2016 |
12-0H2704 |
1 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
11 |
$842.40 |
$1273.73 |
$9266.40 |
10-12-2016 |
12-0H2704 |
2 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
11 |
$860.00 |
$1300.34 |
$9460.00 |
10-12-2016 |
12-0H2704 |
3 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
11 |
$800.00 |
$1209.62 |
$8800.00 |
10-12-2016 |
12-0H2704 |
4 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
11 |
$1100.00 |
$1663.22 |
$12100.00 |
10-12-2016 |
12-0H2704 |
5 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
12 |
11 |
$850.00 |
$1285.22 |
$9350.00 |
10-12-2016 |
12-0H2704 |
6 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
180 |
$500.00 |
$756.01 |
$90000.00 |
10-19-2016 |
07-290804 |
1 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
180 |
$550.00 |
$831.61 |
$99000.00 |
10-19-2016 |
07-290804 |
2 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
180 |
$525.00 |
$793.81 |
$94500.00 |
10-19-2016 |
07-290804 |
3 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
180 |
$525.00 |
$793.81 |
$94500.00 |
10-19-2016 |
07-290804 |
4 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
180 |
$500.00 |
$756.01 |
$90000.00 |
10-19-2016 |
07-290804 |
5 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
180 |
$900.00 |
$1360.82 |
$162000.00 |
10-19-2016 |
07-290804 |
6 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
03 |
110 |
$800.00 |
$1209.62 |
$88000.00 |
10-26-2016 |
03-3C3804 |
1 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
03 |
110 |
$740.00 |
$1118.90 |
$81400.00 |
10-26-2016 |
03-3C3804 |
2 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
03 |
110 |
$820.00 |
$1239.86 |
$90200.00 |
10-26-2016 |
03-3C3804 |
3 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
03 |
110 |
$100.00 |
$151.20 |
$11000.00 |
10-26-2016 |
03-3C3804 |
4 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
03 |
110 |
$740.00 |
$1118.90 |
$81400.00 |
10-26-2016 |
03-3C3804 |
5 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
03 |
110 |
$271.00 |
$409.76 |
$29810.00 |
10-26-2016 |
03-3C3804 |
6 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
04 |
13 |
$2000.00 |
$3024.04 |
$26000.00 |
10-27-2016 |
04-4H2604 |
1 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
04 |
13 |
$1000.00 |
$1512.02 |
$13000.00 |
10-27-2016 |
04-4H2604 |
2 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
04 |
13 |
$1400.00 |
$2116.83 |
$18200.00 |
10-27-2016 |
04-4H2604 |
3 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
04 |
13 |
$1200.00 |
$1814.43 |
$15600.00 |
10-27-2016 |
04-4H2604 |
4 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
04 |
13 |
$1800.00 |
$2721.64 |
$23400.00 |
10-27-2016 |
04-4H2604 |
5 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
04 |
13 |
$1000.00 |
$1512.02 |
$13000.00 |
10-27-2016 |
04-4H2604 |
6 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
04 |
30 |
$800.00 |
$1209.62 |
$24000.00 |
11-09-2016 |
04-2G4814 |
1 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
04 |
30 |
$600.00 |
$907.21 |
$18000.00 |
11-09-2016 |
04-2G4814 |
2 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
04 |
30 |
$1500.00 |
$2268.03 |
$45000.00 |
11-09-2016 |
04-2G4814 |
3 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
04 |
30 |
$565.00 |
$854.29 |
$16950.00 |
11-09-2016 |
04-2G4814 |
4 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
04 |
30 |
$650.00 |
$982.81 |
$19500.00 |
11-09-2016 |
04-2G4814 |
5 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
04 |
30 |
$2165.00 |
$3273.53 |
$64950.00 |
11-09-2016 |
04-2G4814 |
6 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
8 |
$1500.00 |
$2268.03 |
$12000.00 |
11-16-2016 |
07-302104 |
1 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
8 |
$1566.00 |
$2367.83 |
$12528.00 |
11-16-2016 |
07-302104 |
2 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
8 |
$1650.00 |
$2494.84 |
$13200.00 |
11-16-2016 |
07-302104 |
3 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
8 |
$1477.79 |
$2234.45 |
$11822.32 |
11-16-2016 |
07-302104 |
4 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
07 |
8 |
$2000.00 |
$3024.04 |
$16000.00 |
11-16-2016 |
07-302104 |
5 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
11 |
30 |
$940.00 |
$1421.30 |
$28200.00 |
11-29-2016 |
11-085784 |
1 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
11 |
30 |
$940.00 |
$1421.30 |
$28200.00 |
11-29-2016 |
11-085784 |
2 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
11 |
30 |
$940.00 |
$1421.30 |
$28200.00 |
11-29-2016 |
11-085784 |
3 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
11 |
30 |
$1250.00 |
$1890.03 |
$37500.00 |
11-29-2016 |
11-085784 |
4 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
11 |
30 |
$940.00 |
$1421.30 |
$28200.00 |
11-29-2016 |
11-085784 |
5 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
11 |
30 |
$1000.00 |
$1512.02 |
$30000.00 |
11-29-2016 |
11-085784 |
6 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
06 |
8 |
$1200.00 |
$1814.43 |
$9600.00 |
11-30-2016 |
06-0P5904 |
1 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
06 |
8 |
$2200.00 |
$3326.45 |
$17600.00 |
11-30-2016 |
06-0P5904 |
2 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
06 |
8 |
$1250.00 |
$1890.03 |
$10000.00 |
11-30-2016 |
06-0P5904 |
3 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
06 |
8 |
$1170.00 |
$1769.07 |
$9360.00 |
11-30-2016 |
06-0P5904 |
4 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
06 |
8 |
$3000.00 |
$4536.06 |
$24000.00 |
11-30-2016 |
06-0P5904 |
5 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
03 |
19 |
$1100.00 |
$1663.22 |
$20900.00 |
12-01-2016 |
03-1E7604 |
1 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
03 |
19 |
$758.00 |
$1146.11 |
$14402.00 |
12-01-2016 |
03-1E7604 |
2 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
03 |
19 |
$1260.00 |
$1905.15 |
$23940.00 |
12-01-2016 |
03-1E7604 |
3 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
03 |
23 |
$1085.00 |
$1640.54 |
$24955.00 |
12-07-2016 |
03-1F9704 |
1 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
03 |
23 |
$836.00 |
$1264.05 |
$19228.00 |
12-07-2016 |
03-1F9704 |
2 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
03 |
23 |
$600.00 |
$907.21 |
$13800.00 |
12-07-2016 |
03-1F9704 |
3 |
M |
|
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
04 |
2 |
$5000.00 |
$7560.11 |
$10000.00 |
12-15-2016 |
04-4G4504 |
1 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
04 |
2 |
$1000.00 |
$1512.02 |
$2000.00 |
12-15-2016 |
04-4G4504 |
2 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
04 |
2 |
$3000.00 |
$4536.06 |
$6000.00 |
12-15-2016 |
04-4G4504 |
3 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
04 |
2 |
$5000.00 |
$7560.11 |
$10000.00 |
12-15-2016 |
04-4G4504 |
4 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
04 |
2 |
$2500.00 |
$3780.05 |
$5000.00 |
12-15-2016 |
04-4G4504 |
5 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
04 |
2 |
$8200.00 |
$12398.58 |
$16400.00 |
12-15-2016 |
04-4G4504 |
6 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
11 |
16 |
$1100.00 |
$1616.19 |
$17600.00 |
01-04-2017 |
11-405704 |
1 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
11 |
16 |
$1340.00 |
$1968.82 |
$21440.00 |
01-04-2017 |
11-405704 |
2 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
11 |
16 |
$750.00 |
$1101.95 |
$12000.00 |
01-04-2017 |
11-405704 |
3 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
11 |
16 |
$950.00 |
$1395.80 |
$15200.00 |
01-04-2017 |
11-405704 |
4 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
11 |
16 |
$1237.50 |
$1818.22 |
$19800.00 |
01-04-2017 |
11-405704 |
5 |
M |
TRO |
|
| 733000 - PRE/POST CONSTRUCTION SURVEYS |
EA |
11 |
16 |
$600.00 |
$881.56 |
$9600.00 |
01-04-2017 |
11-405704 |
6 |
M |
TRO |
|
MORE THAN 500 RESULTS RETURNED. ONLY 500 ROWS SHOWN.
|