Contract Cost Data

CALIFORNIA DEPARTMENT OF TRANSPORTATION - CONTRACT COST DATA

Select Item No. / Description Unit Dist Qty Unit
Price
Adj
Price
Total Bid Open
Date
Contract
No.
Bid M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 03 2 $750.00 $1336.79 $1500.00 01-29-2014 03-0F2204 1 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 03 2 $2000.00 $3564.77 $4000.00 01-29-2014 03-0F2204 2 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 03 2 $750.00 $1336.79 $1500.00 01-29-2014 03-0F2204 3 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 03 2 $2500.00 $4455.97 $5000.00 01-29-2014 03-0F2204 4 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 03 2 $1000.00 $1782.39 $2000.00 01-29-2014 03-0F2204 5 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 03 2 $15000.00 $26735.80 $30000.00 01-29-2014 03-0F2204 6 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 03 2 $2000.00 $3564.77 $4000.00 01-29-2014 03-0F2204 7 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 03 2 $1500.00 $2673.58 $3000.00 01-29-2014 03-0F2204 8 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 03 2 $1500.00 $2673.58 $3000.00 01-29-2014 03-0F2204 9 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 06 2 $4000.00 $7129.55 $8000.00 02-12-2014 06-0P1604 1 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 06 2 $1000.00 $1782.39 $2000.00 02-12-2014 06-0P1604 2 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 06 2 $2500.00 $4455.97 $5000.00 02-12-2014 06-0P1604 3 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 06 2 $800.00 $1425.91 $1600.00 02-12-2014 06-0P1604 4 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 06 2 $1800.00 $3208.30 $3600.00 02-12-2014 06-0P1604 5 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 06 2 $1000.00 $1782.39 $2000.00 02-12-2014 06-0P1604 6 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 06 2 $5000.00 $8911.93 $10000.00 02-12-2014 06-0P1604 7 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 4 $575.00 $1024.87 $2300.00 03-20-2014 07-4T5904 1 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 4 $4370.00 $7789.03 $17480.00 03-20-2014 07-4T5904 2 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 4 $2500.00 $4455.97 $10000.00 03-20-2014 07-4T5904 3 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 4 $550.00 $980.31 $2200.00 03-20-2014 07-4T5904 4 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 4 $4000.00 $7129.55 $16000.00 03-20-2014 07-4T5904 5 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 4 $2000.00 $3564.77 $8000.00 03-20-2014 07-4T5904 6 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 4 $1000.00 $1782.39 $4000.00 03-20-2014 07-4T5904 7 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 06 3 $3500.00 $6238.35 $10500.00 03-26-2014 06-0M0204 1 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 06 3 $2500.00 $4455.97 $7500.00 03-26-2014 06-0M0204 2 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 06 3 $1200.00 $2138.86 $3600.00 03-26-2014 06-0M0204 3 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 06 3 $1000.00 $1782.39 $3000.00 03-26-2014 06-0M0204 4 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 40 $170.00 $391.36 $6800.00 04-03-2014 07-296704 1 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 40 $950.00 $2187.01 $38000.00 04-03-2014 07-296704 2 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 40 $820.00 $1887.74 $32800.00 04-03-2014 07-296704 3 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 40 $850.00 $1956.80 $34000.00 04-03-2014 07-296704 4 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 40 $310.00 $713.66 $12400.00 04-03-2014 07-296704 5 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 40 $800.00 $1841.70 $32000.00 04-03-2014 07-296704 6 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 7 $800.00 $1841.70 $5600.00 04-10-2014 07-297004 1 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 7 $4000.00 $9208.48 $28000.00 04-10-2014 07-297004 2 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 7 $840.00 $1933.78 $5880.00 04-10-2014 07-297004 3 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 7 $845.00 $1945.29 $5915.00 04-10-2014 07-297004 4 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 7 $5850.00 $13467.41 $40950.00 04-10-2014 07-297004 5 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 7 $820.00 $1887.74 $5740.00 04-10-2014 07-297004 6 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 7 $515.00 $1185.59 $3605.00 04-10-2014 07-297004 7 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 6 $500.00 $1151.06 $3000.00 04-17-2014 12-0F96C4 1 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 6 $2000.00 $4604.24 $12000.00 04-17-2014 12-0F96C4 2 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 6 $1000.00 $2302.12 $6000.00 04-17-2014 12-0F96C4 3 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 6 $2600.00 $5985.51 $15600.00 04-17-2014 12-0F96C4 4 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 6 $500.00 $1151.06 $3000.00 04-17-2014 12-0F96C4 5 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 6 $270.00 $621.57 $1620.00 04-17-2014 12-0F96C4 6 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 6 $3000.00 $6906.36 $18000.00 04-17-2014 12-0F96C4 7 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 6 $1200.00 $2762.55 $7200.00 04-17-2014 12-0F96C4 8 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 6 $5000.00 $11510.60 $30000.00 04-17-2014 12-0F96C4 9 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 6 $5000.00 $11510.60 $30000.00 04-17-2014 12-0F96C4 10 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 05 28 $860.00 $1979.82 $24080.00 05-07-2014 05-0R5304 1 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 05 28 $1200.00 $2762.55 $33600.00 05-07-2014 05-0R5304 2 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 05 28 $424.00 $976.10 $11872.00 05-07-2014 05-0R5304 3 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 05 28 $400.00 $920.85 $11200.00 05-07-2014 05-0R5304 4 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 05 28 $1170.00 $2693.48 $32760.00 05-07-2014 05-0R5304 5 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 05 28 $1000.00 $2302.12 $28000.00 05-07-2014 05-0R5304 6 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 2 $1035.00 $2382.70 $2070.00 05-29-2014 07-4T5604 1 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 2 $900.00 $2071.91 $1800.00 05-29-2014 07-4T5604 2 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 2 $2000.00 $4604.24 $4000.00 05-29-2014 07-4T5604 3 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 2 $1800.00 $4143.82 $3600.00 05-29-2014 07-4T5604 4 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 2 $1091.00 $2511.61 $2182.00 05-29-2014 07-4T5604 5 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 2 $1000.00 $2302.12 $2000.00 05-29-2014 07-4T5604 6 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 21 $750.00 $1726.59 $15750.00 06-12-2014 07-294904 1 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 21 $700.00 $1611.48 $14700.00 06-12-2014 07-294904 2 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 21 $800.00 $1841.70 $16800.00 06-12-2014 07-294904 3 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 21 $695.00 $1599.97 $14595.00 06-12-2014 07-294904 4 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 21 $600.00 $1381.27 $12600.00 06-12-2014 07-294904 5 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 21 $735.00 $1692.06 $15435.00 06-12-2014 07-294904 6 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 21 $841.00 $1936.08 $17661.00 06-12-2014 07-294904 7 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 21 $800.00 $1841.70 $16800.00 06-12-2014 07-294904 8 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 01 1 $3000.00 $6906.36 $3000.00 06-25-2014 01-496504 1    
733000 - PRE/POST CONSTRUCTION SURVEYS EA 01 1 $4010.00 $9231.51 $4010.00 06-25-2014 01-496504 2    
733000 - PRE/POST CONSTRUCTION SURVEYS EA 01 1 $1500.00 $3453.18 $1500.00 06-25-2014 01-496504 3    
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 38 $750.00 $1726.59 $28500.00 06-26-2014 07-295604 1 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 38 $775.00 $1784.14 $29450.00 06-26-2014 07-295604 2 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 38 $750.00 $1726.59 $28500.00 06-26-2014 07-295604 3 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 38 $750.00 $1726.59 $28500.00 06-26-2014 07-295604 4 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 38 $780.00 $1795.65 $29640.00 06-26-2014 07-295604 5 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 23 $900.00 $2071.91 $20700.00 06-26-2014 07-295704 1 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 23 $1000.00 $2302.12 $23000.00 06-26-2014 07-295704 2 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 23 $500.00 $1151.06 $11500.00 06-26-2014 07-295704 3 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 23 $800.00 $1841.70 $18400.00 06-26-2014 07-295704 4 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 23 $770.00 $1772.63 $17710.00 06-26-2014 07-295704 5 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 23 $750.00 $1726.59 $17250.00 06-26-2014 07-295704 6 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 23 $850.00 $1956.80 $19550.00 06-26-2014 07-295704 7 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 23 $750.00 $1726.59 $17250.00 06-26-2014 07-295704 8 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 08 7 $500.00 $1111.59 $3500.00 07-24-2014 08-3401U4 1 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 08 7 $600.00 $1333.91 $4200.00 07-24-2014 08-3401U4 2 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 08 7 $4500.00 $10004.32 $31500.00 07-24-2014 08-3401U4 3 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 08 7 $650.00 $1445.07 $4550.00 07-24-2014 08-3401U4 4 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 08 7 $600.00 $1333.91 $4200.00 07-24-2014 08-3401U4 5 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 08 7 $645.00 $1433.95 $4515.00 07-24-2014 08-3401U4 6 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 08 7 $700.00 $1556.23 $4900.00 07-24-2014 08-3401U4 7 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 08 7 $700.00 $1556.23 $4900.00 07-24-2014 08-3401U4 8 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 08 7 $10000.00 $22231.83 $70000.00 07-24-2014 08-3401U4 9 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 08 7 $750.00 $1667.39 $5250.00 07-24-2014 08-3401U4 10 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 08 7 $725.00 $1611.81 $5075.00 07-24-2014 08-3401U4 11 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 03 83 $500.00 $1111.59 $41500.00 08-06-2014 03-1A8424 1 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 03 83 $265.00 $589.14 $21995.00 08-06-2014 03-1A8424 2 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 03 83 $515.00 $1144.94 $42745.00 08-06-2014 03-1A8424 3 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 4 $600.00 $1333.91 $2400.00 08-07-2014 12-0H1604 1 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 4 $600.00 $1333.91 $2400.00 08-07-2014 12-0H1604 2 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 4 $630.00 $1400.61 $2520.00 08-07-2014 12-0H1604 3 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 4 $620.00 $1378.37 $2480.00 08-07-2014 12-0H1604 4 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 55 $500.00 $1111.59 $27500.00 08-14-2014 07-295504 1 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 55 $500.00 $1111.59 $27500.00 08-14-2014 07-295504 2 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 55 $500.00 $1111.59 $27500.00 08-14-2014 07-295504 3 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 55 $1200.00 $2667.82 $66000.00 08-14-2014 07-295504 4 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 55 $500.00 $1111.59 $27500.00 08-14-2014 07-295504 5 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 55 $500.00 $1111.59 $27500.00 08-14-2014 07-295504 6 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 55 $620.00 $1378.37 $34100.00 08-14-2014 07-295504 7 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 55 $500.00 $1111.59 $27500.00 08-14-2014 07-295504 8 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 55 $500.00 $1111.59 $27500.00 08-14-2014 07-295504 9 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 55 $480.00 $1067.13 $26400.00 08-14-2014 07-295504 10 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 16 $650.00 $1445.07 $10400.00 08-21-2014 07-294704 1 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 16 $1000.00 $2223.18 $16000.00 08-21-2014 07-294704 2 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 16 $700.00 $1556.23 $11200.00 08-21-2014 07-294704 3 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 16 $750.00 $1667.39 $12000.00 08-21-2014 07-294704 4 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 16 $750.00 $1667.39 $12000.00 08-21-2014 07-294704 5 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 16 $750.00 $1667.39 $12000.00 08-21-2014 07-294704 6 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 8 $550.00 $1222.75 $4400.00 08-21-2014 12-0H0344 1 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 8 $780.00 $1734.08 $6240.00 08-21-2014 12-0H0344 2 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 8 $400.00 $889.27 $3200.00 08-21-2014 12-0H0344 3 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 8 $800.00 $1778.55 $6400.00 08-21-2014 12-0H0344 4 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 8 $800.00 $1778.55 $6400.00 08-21-2014 12-0H0344 5 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 8 $650.00 $1445.07 $5200.00 08-21-2014 12-0H0344 6 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 8 $594.00 $1320.57 $4752.00 08-21-2014 12-0H0344 7 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 10 16 $690.00 $1534.00 $11040.00 08-27-2014 10-0T8204 1 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 10 16 $760.00 $1689.62 $12160.00 08-27-2014 10-0T8204 2 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 10 16 $427.50 $950.41 $6840.00 08-27-2014 10-0T8204 3 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 10 16 $940.00 $2089.79 $15040.00 08-27-2014 10-0T8204 4 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 10 16 $800.00 $1778.55 $12800.00 08-27-2014 10-0T8204 5 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 10 16 $1200.00 $2667.82 $19200.00 08-27-2014 10-0T8204 6 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 10 1 $4000.00 $8892.73 $4000.00 09-03-2014 10-0W1904 1 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 10 1 $3000.00 $6669.55 $3000.00 09-03-2014 10-0W1904 2 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 10 1 $3000.00 $6669.55 $3000.00 09-03-2014 10-0W1904 3 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 10 1 $7500.00 $16673.87 $7500.00 09-03-2014 10-0W1904 4 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 10 1 $3000.00 $6669.55 $3000.00 09-03-2014 10-0W1904 5 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 10 1 $3000.00 $6669.55 $3000.00 09-03-2014 10-0W1904 6 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 10 1 $3150.00 $7003.03 $3150.00 09-03-2014 10-0W1904 7 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 10 1 $3000.00 $6669.55 $3000.00 09-03-2014 10-0W1904 8 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 05 5 $580.00 $1131.20 $2900.00 10-08-2014 05-0S0304 1 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 05 5 $1000.00 $1950.35 $5000.00 10-08-2014 05-0S0304 2 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 05 5 $1139.00 $2221.45 $5695.00 10-08-2014 05-0S0304 3 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 05 5 $850.00 $1657.80 $4250.00 10-08-2014 05-0S0304 4 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 05 5 $1100.00 $2145.39 $5500.00 10-08-2014 05-0S0304 5 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 62 $475.00 $926.42 $29450.00 10-16-2014 07-2881U4 1 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 62 $600.00 $1170.21 $37200.00 10-16-2014 07-2881U4 2 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 62 $700.00 $1365.25 $43400.00 10-16-2014 07-2881U4 3 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 62 $515.00 $1004.43 $31930.00 10-16-2014 07-2881U4 4 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 62 $750.00 $1462.76 $46500.00 10-16-2014 07-2881U4 5 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 62 $500.00 $975.18 $31000.00 10-16-2014 07-2881U4 6 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 11 6 $1000.00 $1950.35 $6000.00 10-16-2014 11-275504 1 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 11 6 $1000.00 $1950.35 $6000.00 10-16-2014 11-275504 2 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 11 6 $1000.00 $1950.35 $6000.00 10-16-2014 11-275504 3 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 11 6 $1371.67 $2675.24 $8230.02 10-16-2014 11-275504 4 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 11 6 $900.00 $1755.32 $5400.00 10-16-2014 11-275504 5 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 01 12 $400.00 $780.14 $4800.00 10-22-2014 01-488604 1 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 01 12 $1350.00 $2632.98 $16200.00 10-22-2014 01-488604 2 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 01 12 $950.00 $1852.84 $11400.00 10-22-2014 01-488604 3 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 01 12 $965.00 $1882.09 $11580.00 10-22-2014 01-488604 4 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 01 12 $1000.00 $1950.35 $12000.00 10-22-2014 01-488604 5 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 01 12 $450.00 $877.66 $5400.00 10-22-2014 01-488604 6 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 12 $1100.00 $2145.39 $13200.00 10-23-2014 12-0F96A4 1 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 12 $1000.00 $1950.35 $12000.00 10-23-2014 12-0F96A4 2 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 12 $510.00 $994.68 $6120.00 10-23-2014 12-0F96A4 3 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 12 $1200.00 $2340.42 $14400.00 10-23-2014 12-0F96A4 4 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 12 $15000.00 $29255.29 $180000.00 10-23-2014 12-0F96A4 5 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 06 6 $1000.00 $1950.35 $6000.00 10-29-2014 06-0Q2504 1 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 06 6 $500.00 $975.18 $3000.00 10-29-2014 06-0Q2504 2 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 06 6 $1000.00 $1950.35 $6000.00 10-29-2014 06-0Q2504 3 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 06 6 $2000.00 $3900.71 $12000.00 10-29-2014 06-0Q2504 4 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 06 6 $1000.00 $1950.35 $6000.00 10-29-2014 06-0Q2504 5 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 71 $625.00 $1218.97 $44375.00 10-30-2014 12-0L92U4 1 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 71 $600.00 $1170.21 $42600.00 10-30-2014 12-0L92U4 2 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 71 $800.00 $1560.28 $56800.00 10-30-2014 12-0L92U4 3 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 71 $480.00 $936.17 $34080.00 10-30-2014 12-0L92U4 4 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 71 $550.00 $1072.69 $39050.00 10-30-2014 12-0L92U4 5 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 20 $490.00 $955.67 $9800.00 11-20-2014 07-2055A4 1 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 20 $580.00 $1131.20 $11600.00 11-20-2014 07-2055A4 2 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 20 $200.00 $390.07 $4000.00 11-20-2014 07-2055A4 3 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 20 $510.00 $994.68 $10200.00 11-20-2014 07-2055A4 4 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 20 $600.00 $1170.21 $12000.00 11-20-2014 07-2055A4 5 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 20 $350.00 $682.62 $7000.00 11-20-2014 07-2055A4 6 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 20 $580.00 $1131.20 $11600.00 11-20-2014 07-2055A4 7 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 20 $638.72 $1245.73 $12774.40 11-20-2014 07-2055A4 8 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 20 $560.00 $1092.20 $11200.00 11-20-2014 07-2055A4 9 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 20 $950.00 $1852.84 $19000.00 11-20-2014 07-2055A4 10 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 20 $10500.00 $20478.70 $210000.00 11-20-2014 07-2055A4 11 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 20 $650.00 $1267.73 $13000.00 11-20-2014 07-2055A4 12 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 04 8 $1240.00 $1892.28 $9920.00 02-18-2015 04-259404 1 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 04 8 $1000.00 $1526.04 $8000.00 02-18-2015 04-259404 2 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 04 8 $1302.00 $1986.90 $10416.00 02-18-2015 04-259404 3 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 04 8 $1000.00 $1526.04 $8000.00 02-18-2015 04-259404 4 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 04 8 $1250.00 $1907.55 $10000.00 02-18-2015 04-259404 5 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 04 8 $1300.00 $1983.85 $10400.00 02-18-2015 04-259404 6 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 06 3 $2500.00 $3815.09 $7500.00 03-17-2015 06-0M0204 1 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 06 3 $3500.00 $5341.13 $10500.00 03-17-2015 06-0M0204 2 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 06 3 $3260.00 $4974.88 $9780.00 03-17-2015 06-0M0204 3 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 06 3 $4200.00 $6409.35 $12600.00 03-17-2015 06-0M0204 4 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 06 3 $3700.00 $5646.33 $11100.00 03-17-2015 06-0M0204 5 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 06 3 $1500.00 $2289.05 $4500.00 03-17-2015 06-0M0204 6 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 06 3 $3260.00 $4974.88 $9780.00 03-17-2015 06-0M0204 7 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 06 3 $3300.00 $5035.92 $9900.00 03-17-2015 06-0M0204 8 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 03 3 $1750.00 $3730.94 $5250.00 04-01-2015 03-3F7904 1 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 03 3 $2200.00 $4690.32 $6600.00 04-01-2015 03-3F7904 2 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 03 3 $1750.00 $3730.94 $5250.00 04-01-2015 03-3F7904 3 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 03 3 $1750.00 $3730.94 $5250.00 04-01-2015 03-3F7904 4 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 03 3 $2200.00 $4690.32 $6600.00 04-01-2015 03-3F7904 5 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 05 9 $750.00 $1598.97 $6750.00 04-01-2015 05-1A7204 1 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 05 9 $850.00 $1812.17 $7650.00 04-01-2015 05-1A7204 2 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 05 9 $817.52 $1742.92 $7357.68 04-01-2015 05-1A7204 3 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 02 26 $910.00 $1940.09 $23660.00 04-08-2015 02-3E7714 1 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 02 26 $990.00 $2110.65 $25740.00 04-08-2015 02-3E7714 2 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 02 26 $990.00 $2110.65 $25740.00 04-08-2015 02-3E7714 3 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 08 3 $1260.00 $2686.28 $3780.00 04-21-2015 08-1C0504 1 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 08 3 $1200.00 $2558.36 $3600.00 04-21-2015 08-1C0504 2 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 08 3 $1275.00 $2718.26 $3825.00 04-21-2015 08-1C0504 3 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 08 3 $1261.75 $2690.01 $3785.25 04-21-2015 08-1C0504 4 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 08 3 $1975.00 $4210.63 $5925.00 04-21-2015 08-1C0504 5 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 2 $2000.00 $4263.93 $4000.00 05-12-2015 07-4T7304 1 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 2 $1870.00 $3986.78 $3740.00 05-12-2015 07-4T7304 2 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 2 $500.00 $1065.98 $1000.00 05-12-2015 07-4T7304 3 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 2 $4016.00 $8561.97 $8032.00 05-12-2015 07-4T7304 4 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 2 $2000.00 $4263.93 $4000.00 05-12-2015 07-4T7304 5 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 08 13 $800.00 $1705.57 $10400.00 05-21-2015 08-0N5404 1    
733000 - PRE/POST CONSTRUCTION SURVEYS EA 08 13 $1000.00 $2131.97 $13000.00 05-21-2015 08-0N5404 2    
733000 - PRE/POST CONSTRUCTION SURVEYS EA 08 13 $865.00 $1844.15 $11245.00 05-21-2015 08-0N5404 3    
733000 - PRE/POST CONSTRUCTION SURVEYS EA 08 13 $1000.00 $2131.97 $13000.00 05-21-2015 08-0N5404 4    
733000 - PRE/POST CONSTRUCTION SURVEYS EA 08 13 $1100.00 $2345.16 $14300.00 05-21-2015 08-0N5404 5    
733000 - PRE/POST CONSTRUCTION SURVEYS EA 08 13 $1334.00 $2844.04 $17342.00 05-21-2015 08-0N5404 6    
733000 - PRE/POST CONSTRUCTION SURVEYS EA 10 16 $850.00 $1812.17 $13600.00 05-27-2015 10-0X1604 1 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 10 4 $1800.00 $3837.54 $7200.00 06-03-2015 10-0K1404 1 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 10 4 $500.00 $1065.98 $2000.00 06-03-2015 10-0K1404 2 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 10 4 $1000.00 $2131.97 $4000.00 06-03-2015 10-0K1404 3 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 10 4 $250.00 $532.99 $1000.00 06-03-2015 10-0K1404 4 M  
733000 - PRE/POST CONSTRUCTION SURVEYS LS 04 1 $15000.00 $31979.48 $15000.00 06-25-2015 04-297624 1 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS LS 04 1 $12600.00 $26862.77 $12600.00 06-25-2015 04-297624 2 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS LS 04 1 $12000.00 $25583.59 $12000.00 06-25-2015 04-297624 3 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS LS 04 1 $12000.00 $25583.59 $12000.00 06-25-2015 04-297624 4 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS LS 04 1 $10000.00 $21319.66 $10000.00 06-25-2015 04-297624 5 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS LS 04 1 $12000.00 $25583.59 $12000.00 06-25-2015 04-297624 6 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS LS 04 1 $12000.00 $25583.59 $12000.00 06-25-2015 04-297624 7 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS LS 04 1 $13200.00 $28141.95 $13200.00 06-25-2015 04-297624 8 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS LS 04 1 $783.75 $1670.93 $783.75 06-25-2015 04-297624 9 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 05 7 $1000.00 $2124.24 $7000.00 07-21-2015 05-0R5104 1 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 05 7 $1955.00 $4152.89 $13685.00 07-21-2015 05-0R5104 2 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 05 7 $950.00 $2018.03 $6650.00 07-21-2015 05-0R5104 3 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 03 7 $1500.00 $3186.36 $10500.00 08-05-2015 03-2F6004 1 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 03 7 $1100.00 $2336.66 $7700.00 08-05-2015 03-2F6004 2 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 03 7 $1100.00 $2336.66 $7700.00 08-05-2015 03-2F6004 3 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 03 7 $1100.00 $2336.66 $7700.00 08-05-2015 03-2F6004 4 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 10 1 $7500.00 $15931.79 $7500.00 08-11-2015 10-0S7204 1 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 10 1 $7500.00 $15931.79 $7500.00 08-11-2015 10-0S7204 2 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 10 1 $3500.00 $7434.84 $3500.00 08-11-2015 10-0S7204 3 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 10 1 $8000.00 $16993.91 $8000.00 08-11-2015 10-0S7204 4 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 11 2 $2911.09 $6183.85 $5822.18 08-13-2015 11-410604 1 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 11 2 $3500.00 $7434.84 $7000.00 08-13-2015 11-410604 2 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 11 2 $3460.00 $7349.87 $6920.00 08-13-2015 11-410604 3 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 05 4 $1250.00 $2655.30 $5000.00 09-10-2015 05-1F69U4 1 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 05 4 $1260.00 $2676.54 $5040.00 09-10-2015 05-1F69U4 2 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 05 4 $1200.00 $2549.09 $4800.00 09-10-2015 05-1F69U4 3 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 05 4 $1200.00 $2549.09 $4800.00 09-10-2015 05-1F69U4 4 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 13 $400.00 $769.69 $5200.00 10-08-2015 07-3X7114 1 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 13 $800.00 $1539.38 $10400.00 10-08-2015 07-3X7114 2 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 13 $770.00 $1481.66 $10010.00 10-08-2015 07-3X7114 3 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 13 $700.00 $1346.96 $9100.00 10-08-2015 07-3X7114 4 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 13 $1000.00 $1924.23 $13000.00 10-08-2015 07-3X7114 5 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 13 $725.00 $1395.07 $9425.00 10-08-2015 07-3X7114 6 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 13 $770.00 $1481.66 $10010.00 10-08-2015 07-3X7114 7 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 35 $595.00 $1144.92 $20825.00 10-15-2015 07-1193U4 1 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 35 $1500.00 $2886.34 $52500.00 10-15-2015 07-1193U4 2 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 35 $600.00 $1154.54 $21000.00 10-15-2015 07-1193U4 3 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 35 $660.00 $1269.99 $23100.00 10-15-2015 07-1193U4 4 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 35 $1200.00 $2309.07 $42000.00 10-15-2015 07-1193U4 5 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 35 $650.00 $1250.75 $22750.00 10-15-2015 07-1193U4 6 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 35 $698.75 $1344.55 $24456.25 10-15-2015 07-1193U4 7 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 2 $1500.00 $2886.34 $3000.00 10-29-2015 07-255104 1 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 2 $2850.00 $5484.05 $5700.00 10-29-2015 07-255104 2 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 2 $3000.00 $5772.69 $6000.00 10-29-2015 07-255104 3 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 2 $3000.00 $5772.69 $6000.00 10-29-2015 07-255104 4 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 2 $3135.00 $6032.46 $6270.00 10-29-2015 07-255104 5 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 2 $5000.00 $9621.14 $10000.00 10-29-2015 07-255104 6 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 2 $1.00 $1.92 $2.00 10-29-2015 07-255104 7 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 10 4 $1750.00 $3367.40 $7000.00 10-29-2015 10-0W3604 1    
733000 - PRE/POST CONSTRUCTION SURVEYS EA 10 4 $1650.00 $3174.98 $6600.00 10-29-2015 10-0W3604 2    
733000 - PRE/POST CONSTRUCTION SURVEYS EA 10 4 $805.00 $1549.00 $3220.00 10-29-2015 10-0W3604 3    
733000 - PRE/POST CONSTRUCTION SURVEYS EA 10 4 $1500.00 $2886.34 $6000.00 10-29-2015 10-0W3604 4    
733000 - PRE/POST CONSTRUCTION SURVEYS EA 10 4 $1500.00 $2886.34 $6000.00 10-29-2015 10-0W3604 5    
733000 - PRE/POST CONSTRUCTION SURVEYS EA 04 2 $25000.00 $48105.71 $50000.00 11-05-2015 04-4H2224 1 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 04 2 $2800.00 $5387.84 $5600.00 11-05-2015 04-4H2224 2 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 04 2 $500.00 $962.11 $1000.00 11-05-2015 04-4H2224 3 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 11 17 $1250.00 $2405.29 $21250.00 12-02-2015 11-413304 1 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 11 17 $950.00 $1828.02 $16150.00 12-02-2015 11-413304 2 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 11 17 $1000.00 $1924.23 $17000.00 12-02-2015 11-413304 3 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 11 17 $900.00 $1731.81 $15300.00 12-02-2015 11-413304 4 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 11 17 $900.00 $1731.81 $15300.00 12-02-2015 11-413304 5 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 86 $529.70 $1019.26 $45554.20 12-03-2015 07-306204 1 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 86 $495.00 $952.49 $42570.00 12-03-2015 07-306204 2 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 86 $600.00 $1154.54 $51600.00 12-03-2015 07-306204 3 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 86 $600.00 $1154.54 $51600.00 12-03-2015 07-306204 4 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 86 $593.00 $1141.07 $50998.00 12-03-2015 07-306204 5 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 86 $544.50 $1047.74 $46827.00 12-03-2015 07-306204 6 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 4 $1480.00 $2847.86 $5920.00 12-03-2015 12-0N3304 1 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 4 $1210.00 $2328.32 $4840.00 12-03-2015 12-0N3304 2 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 4 $1500.00 $2886.34 $6000.00 12-03-2015 12-0N3304 3 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 4 $2000.00 $3848.46 $8000.00 12-03-2015 12-0N3304 4 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 4 $1230.00 $2366.80 $4920.00 12-03-2015 12-0N3304 5 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 4 $1130.00 $2174.38 $4520.00 12-03-2015 12-0N3304 6 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 05 1 $3000.00 $5772.69 $3000.00 12-08-2015 05-1F5704 1 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 05 1 $5000.00 $9621.14 $5000.00 12-08-2015 05-1F5704 2 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 10 3 $2200.00 $4149.92 $6600.00 01-06-2016 10-0T8104 1    
733000 - PRE/POST CONSTRUCTION SURVEYS EA 10 3 $2000.00 $3772.66 $6000.00 01-06-2016 10-0T8104 2    
733000 - PRE/POST CONSTRUCTION SURVEYS EA 10 3 $1000.00 $1886.33 $3000.00 01-06-2016 10-0T8104 3    
733000 - PRE/POST CONSTRUCTION SURVEYS EA 10 3 $2000.00 $3772.66 $6000.00 01-06-2016 10-0T8104 4    
733000 - PRE/POST CONSTRUCTION SURVEYS EA 10 3 $2185.00 $4121.63 $6555.00 01-06-2016 10-0T8104 5    
733000 - PRE/POST CONSTRUCTION SURVEYS EA 10 3 $1493.33 $2816.91 $4479.99 01-06-2016 10-0T8104 6    
733000 - PRE/POST CONSTRUCTION SURVEYS EA 10 3 $1000.00 $1886.33 $3000.00 01-06-2016 10-0T8104 7    
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 48 $550.00 $1037.48 $26400.00 02-03-2016 07-300604 1 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 48 $520.00 $980.89 $24960.00 02-03-2016 07-300604 2 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 48 $500.00 $943.16 $24000.00 02-03-2016 07-300604 3 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 48 $529.20 $998.25 $25401.60 02-03-2016 07-300604 4 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 48 $575.00 $1084.64 $27600.00 02-03-2016 07-300604 5 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 48 $630.00 $1188.39 $30240.00 02-03-2016 07-300604 6 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 08 26 $380.00 $716.80 $9880.00 02-24-2016 08-0J9904 1 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 08 26 $875.00 $1650.54 $22750.00 02-24-2016 08-0J9904 2 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 08 26 $850.00 $1603.38 $22100.00 02-24-2016 08-0J9904 3 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 08 26 $800.00 $1509.06 $20800.00 02-24-2016 08-0J9904 4 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 08 26 $230.00 $433.86 $5980.00 02-24-2016 08-0J9904 5 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 08 26 $1000.00 $1886.33 $26000.00 02-24-2016 08-0J9904 6 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 08 26 $808.92 $1525.89 $21031.92 02-24-2016 08-0J9904 7 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 08 26 $1500.00 $2829.49 $39000.00 02-24-2016 08-0J9904 8 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 08 26 $850.00 $1603.38 $22100.00 02-24-2016 08-0J9904 9 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 03 90 $380.00 $716.80 $34200.00 03-16-2016 03-1F9904 1 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 03 90 $300.00 $565.90 $27000.00 03-16-2016 03-1F9904 2 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 03 90 $490.00 $924.30 $44100.00 03-16-2016 03-1F9904 3 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 03 90 $445.00 $839.42 $40050.00 03-16-2016 03-1F9904 4 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 03 90 $445.00 $839.42 $40050.00 03-16-2016 03-1F9904 5 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 06 3 $1580.00 $2980.40 $4740.00 03-22-2016 06-0S4304 1 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 06 3 $1000.00 $1886.33 $3000.00 03-22-2016 06-0S4304 2 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 06 3 $2800.00 $5281.72 $8400.00 03-22-2016 06-0S4304 3 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 06 3 $1506.67 $2842.07 $4520.01 03-22-2016 06-0S4304 4 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 06 3 $2500.00 $4715.82 $7500.00 03-22-2016 06-0S4304 5 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 06 3 $2315.00 $4366.85 $6945.00 03-22-2016 06-0S4304 6 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 36 $522.50 $961.11 $18810.00 04-26-2016 07-300704 1 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 36 $585.00 $1076.07 $21060.00 04-26-2016 07-300704 2 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 36 $500.00 $919.72 $18000.00 04-26-2016 07-300704 3 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 36 $800.00 $1471.55 $28800.00 04-26-2016 07-300704 4 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 1 $2500.00 $4598.61 $2500.00 04-26-2016 12-0N0704 1 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 1 $8850.00 $16279.07 $8850.00 04-26-2016 12-0N0704 2 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 1 $350.00 $643.80 $350.00 04-26-2016 12-0N0704 3 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 5 $840.00 $1545.13 $4200.00 04-27-2016 12-0P4904 1 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 5 $800.00 $1471.55 $4000.00 04-27-2016 12-0P4904 2 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 5 $820.00 $1508.34 $4100.00 04-27-2016 12-0P4904 3 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 5 $1000.00 $1839.44 $5000.00 04-27-2016 12-0P4904 4 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 11 34 $600.00 $1103.67 $20400.00 05-03-2016 11-413504 1 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 11 34 $600.00 $1103.67 $20400.00 05-03-2016 11-413504 2 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 11 34 $800.00 $1471.55 $27200.00 05-03-2016 11-413504 3 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 11 34 $500.00 $919.72 $17000.00 05-03-2016 11-413504 4 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 27 $785.00 $1443.96 $21195.00 05-04-2016 07-302604 1 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 27 $500.00 $919.72 $13500.00 05-04-2016 07-302604 2 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 27 $537.00 $987.78 $14499.00 05-04-2016 07-302604 3 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 27 $500.00 $919.72 $13500.00 05-04-2016 07-302604 4 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 27 $490.00 $901.33 $13230.00 05-04-2016 07-302604 5 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 27 $500.00 $919.72 $13500.00 05-04-2016 07-302604 6 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 27 $650.00 $1195.64 $17550.00 05-04-2016 07-302604 7 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 4 $1500.00 $2759.16 $6000.00 05-25-2016 07-4P0204 1 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 4 $1300.00 $2391.28 $5200.00 05-25-2016 07-4P0204 2 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 4 $590.00 $1085.27 $2360.00 05-25-2016 07-4P0204 3 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 4 $900.00 $1655.50 $3600.00 05-25-2016 07-4P0204 4 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 4 $1500.00 $2759.16 $6000.00 05-25-2016 07-4P0204 5 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 4 $2500.00 $4598.61 $10000.00 05-25-2016 07-4P0204 6 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 4 $1592.50 $2929.31 $6370.00 05-25-2016 07-4P0204 7 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 4 $1675.00 $3081.07 $6700.00 05-25-2016 07-4P0204 8 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 4 $5000.00 $9197.21 $20000.00 05-25-2016 07-4P0204 9 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 4 $1450.00 $2667.19 $5800.00 05-25-2016 07-4P0204 10 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 4 $1600.00 $2943.11 $6400.00 06-08-2016 12-0N3604 1 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 4 $1700.00 $3127.05 $6800.00 06-08-2016 12-0N3604 2 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 4 $1100.00 $2023.39 $4400.00 06-08-2016 12-0N3604 3 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 4 $1150.00 $2115.36 $4600.00 06-08-2016 12-0N3604 4 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 4 $1050.00 $1931.41 $4200.00 06-08-2016 12-0N3604 5 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 4 $1000.00 $1839.44 $4000.00 06-08-2016 12-0N3604 6 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 4 $1500.00 $2759.16 $6000.00 06-08-2016 12-0N3604 7 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 4 $1200.00 $2207.33 $4800.00 06-08-2016 12-0N3604 8 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 04 2 $5000.00 $7787.52 $10000.00 07-06-2016 04-4H2224 1 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 04 2 $4900.00 $7631.77 $9800.00 07-06-2016 04-4H2224 2 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 04 2 $5500.00 $8566.27 $11000.00 07-06-2016 04-4H2224 3 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 04 2 $4900.00 $7631.77 $9800.00 07-06-2016 04-4H2224 4 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 04 2 $2500.00 $3893.76 $5000.00 07-06-2016 04-4H2224 5 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 2 $3000.00 $4672.51 $6000.00 07-19-2016 12-0N6804 1 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 2 $4000.00 $6230.02 $8000.00 07-19-2016 12-0N6804 2 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 2 $4000.00 $6230.02 $8000.00 07-19-2016 12-0N6804 3 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 2 $1500.00 $2336.26 $3000.00 07-19-2016 12-0N6804 4 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 2 $3000.00 $4672.51 $6000.00 07-19-2016 12-0N6804 5 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 2 $3050.00 $4750.39 $6100.00 07-19-2016 12-0N6804 6 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 2 $4200.00 $6541.52 $8400.00 07-19-2016 12-0N6804 7 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 2 $1700.00 $2647.76 $3400.00 07-19-2016 12-0N6804 8 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 06 53 $870.00 $1355.03 $46110.00 08-23-2016 06-0P2704 1 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 06 53 $2100.00 $3270.76 $111300.00 08-23-2016 06-0P2704 2 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 06 53 $925.00 $1440.69 $49025.00 08-23-2016 06-0P2704 3 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 05 38 $750.00 $1168.13 $28500.00 08-30-2016 05-1A7504 1 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 05 38 $760.00 $1183.70 $28880.00 08-30-2016 05-1A7504 2 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 05 38 $740.00 $1152.55 $28120.00 08-30-2016 05-1A7504 3 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 05 38 $796.36 $1240.33 $30261.68 08-30-2016 05-1A7504 4 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 05 38 $740.00 $1152.55 $28120.00 08-30-2016 05-1A7504 5 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 10 15 $1200.00 $1869.01 $18000.00 09-08-2016 10-0V3004 1 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 04 1 $5775.00 $8994.59 $5775.00 09-14-2016 04-3G59U4 1 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 04 1 $8500.00 $13238.79 $8500.00 09-14-2016 04-3G59U4 2 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 04 1 $5500.00 $8566.27 $5500.00 09-14-2016 04-3G59U4 3 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 04 1 $5600.00 $8722.02 $5600.00 09-14-2016 04-3G59U4 4 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 04 1 $5000.00 $7787.52 $5000.00 09-14-2016 04-3G59U4 5 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 04 1 $25000.00 $38937.61 $25000.00 09-14-2016 04-3G59U4 6 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 04 1 $5000.00 $7787.52 $5000.00 09-14-2016 04-3G59U4 7 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 03 3 $4000.00 $6230.02 $12000.00 09-22-2016 03-4F0604 1 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 03 3 $1250.00 $1946.88 $3750.00 09-22-2016 03-4F0604 2 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 03 3 $1250.00 $1946.88 $3750.00 09-22-2016 03-4F0604 3 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 03 3 $2500.00 $3893.76 $7500.00 09-22-2016 03-4F0604 4 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 03 3 $4000.00 $6230.02 $12000.00 09-22-2016 03-4F0604 5 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 30 $799.00 $1244.45 $23970.00 09-22-2016 12-0M4704 1 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 30 $400.00 $623.00 $12000.00 09-22-2016 12-0M4704 2 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 30 $275.00 $428.31 $8250.00 09-22-2016 12-0M4704 3 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 30 $793.50 $1235.88 $23805.00 09-22-2016 12-0M4704 4 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 30 $338.31 $526.92 $10149.30 09-22-2016 12-0M4704 5 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 30 $600.00 $934.50 $18000.00 09-22-2016 12-0M4704 6 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 30 $1200.00 $1869.01 $36000.00 09-22-2016 12-0M4704 7 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 30 $403.20 $627.99 $12096.00 09-22-2016 12-0M4704 8 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 30 $500.00 $778.75 $15000.00 09-22-2016 12-0M4704 9 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 30 $630.00 $981.23 $18900.00 09-22-2016 12-0M4704 10 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 30 $800.00 $1246.00 $24000.00 09-22-2016 12-0M4704 11 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 30 $600.00 $934.50 $18000.00 09-22-2016 12-0M4704 12 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 10 4 $1000.00 $1557.50 $4000.00 09-27-2016 10-0Q1604 1 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 10 4 $1050.00 $1635.38 $4200.00 09-27-2016 10-0Q1604 2 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 10 4 $2200.00 $3426.51 $8800.00 09-27-2016 10-0Q1604 3 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 10 4 $1974.00 $3074.51 $7896.00 09-27-2016 10-0Q1604 4 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 10 4 $1975.00 $3076.07 $7900.00 09-27-2016 10-0Q1604 5 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 10 4 $2000.00 $3115.01 $8000.00 09-27-2016 10-0Q1604 6 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 11 $550.00 $831.61 $6050.00 10-12-2016 12-0H2704 1 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 11 $842.40 $1273.73 $9266.40 10-12-2016 12-0H2704 2 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 11 $860.00 $1300.34 $9460.00 10-12-2016 12-0H2704 3 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 11 $800.00 $1209.62 $8800.00 10-12-2016 12-0H2704 4 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 11 $1100.00 $1663.22 $12100.00 10-12-2016 12-0H2704 5 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 12 11 $850.00 $1285.22 $9350.00 10-12-2016 12-0H2704 6 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 180 $500.00 $756.01 $90000.00 10-19-2016 07-290804 1 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 180 $550.00 $831.61 $99000.00 10-19-2016 07-290804 2 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 180 $525.00 $793.81 $94500.00 10-19-2016 07-290804 3 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 180 $525.00 $793.81 $94500.00 10-19-2016 07-290804 4 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 180 $500.00 $756.01 $90000.00 10-19-2016 07-290804 5 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 180 $900.00 $1360.82 $162000.00 10-19-2016 07-290804 6 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 03 110 $800.00 $1209.62 $88000.00 10-26-2016 03-3C3804 1 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 03 110 $740.00 $1118.90 $81400.00 10-26-2016 03-3C3804 2 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 03 110 $820.00 $1239.86 $90200.00 10-26-2016 03-3C3804 3 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 03 110 $100.00 $151.20 $11000.00 10-26-2016 03-3C3804 4 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 03 110 $740.00 $1118.90 $81400.00 10-26-2016 03-3C3804 5 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 03 110 $271.00 $409.76 $29810.00 10-26-2016 03-3C3804 6 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 04 13 $2000.00 $3024.04 $26000.00 10-27-2016 04-4H2604 1 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 04 13 $1000.00 $1512.02 $13000.00 10-27-2016 04-4H2604 2 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 04 13 $1400.00 $2116.83 $18200.00 10-27-2016 04-4H2604 3 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 04 13 $1200.00 $1814.43 $15600.00 10-27-2016 04-4H2604 4 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 04 13 $1800.00 $2721.64 $23400.00 10-27-2016 04-4H2604 5 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 04 13 $1000.00 $1512.02 $13000.00 10-27-2016 04-4H2604 6 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 04 30 $800.00 $1209.62 $24000.00 11-09-2016 04-2G4814 1 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 04 30 $600.00 $907.21 $18000.00 11-09-2016 04-2G4814 2 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 04 30 $1500.00 $2268.03 $45000.00 11-09-2016 04-2G4814 3 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 04 30 $565.00 $854.29 $16950.00 11-09-2016 04-2G4814 4 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 04 30 $650.00 $982.81 $19500.00 11-09-2016 04-2G4814 5 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 04 30 $2165.00 $3273.53 $64950.00 11-09-2016 04-2G4814 6 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 8 $1500.00 $2268.03 $12000.00 11-16-2016 07-302104 1 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 8 $1566.00 $2367.83 $12528.00 11-16-2016 07-302104 2 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 8 $1650.00 $2494.84 $13200.00 11-16-2016 07-302104 3 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 8 $1477.79 $2234.45 $11822.32 11-16-2016 07-302104 4 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 07 8 $2000.00 $3024.04 $16000.00 11-16-2016 07-302104 5 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 11 30 $940.00 $1421.30 $28200.00 11-29-2016 11-085784 1 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 11 30 $940.00 $1421.30 $28200.00 11-29-2016 11-085784 2 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 11 30 $940.00 $1421.30 $28200.00 11-29-2016 11-085784 3 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 11 30 $1250.00 $1890.03 $37500.00 11-29-2016 11-085784 4 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 11 30 $940.00 $1421.30 $28200.00 11-29-2016 11-085784 5 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 11 30 $1000.00 $1512.02 $30000.00 11-29-2016 11-085784 6 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 06 8 $1200.00 $1814.43 $9600.00 11-30-2016 06-0P5904 1 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 06 8 $2200.00 $3326.45 $17600.00 11-30-2016 06-0P5904 2 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 06 8 $1250.00 $1890.03 $10000.00 11-30-2016 06-0P5904 3 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 06 8 $1170.00 $1769.07 $9360.00 11-30-2016 06-0P5904 4 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 06 8 $3000.00 $4536.06 $24000.00 11-30-2016 06-0P5904 5 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 03 19 $1100.00 $1663.22 $20900.00 12-01-2016 03-1E7604 1 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 03 19 $758.00 $1146.11 $14402.00 12-01-2016 03-1E7604 2 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 03 19 $1260.00 $1905.15 $23940.00 12-01-2016 03-1E7604 3 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 03 23 $1085.00 $1640.54 $24955.00 12-07-2016 03-1F9704 1 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 03 23 $836.00 $1264.05 $19228.00 12-07-2016 03-1F9704 2 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 03 23 $600.00 $907.21 $13800.00 12-07-2016 03-1F9704 3 M  
733000 - PRE/POST CONSTRUCTION SURVEYS EA 04 2 $5000.00 $7560.11 $10000.00 12-15-2016 04-4G4504 1 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 04 2 $1000.00 $1512.02 $2000.00 12-15-2016 04-4G4504 2 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 04 2 $3000.00 $4536.06 $6000.00 12-15-2016 04-4G4504 3 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 04 2 $5000.00 $7560.11 $10000.00 12-15-2016 04-4G4504 4 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 04 2 $2500.00 $3780.05 $5000.00 12-15-2016 04-4G4504 5 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 04 2 $8200.00 $12398.58 $16400.00 12-15-2016 04-4G4504 6 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 11 16 $1100.00 $1616.19 $17600.00 01-04-2017 11-405704 1 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 11 16 $1340.00 $1968.82 $21440.00 01-04-2017 11-405704 2 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 11 16 $750.00 $1101.95 $12000.00 01-04-2017 11-405704 3 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 11 16 $950.00 $1395.80 $15200.00 01-04-2017 11-405704 4 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 11 16 $1237.50 $1818.22 $19800.00 01-04-2017 11-405704 5 M TRO
733000 - PRE/POST CONSTRUCTION SURVEYS EA 11 16 $600.00 $881.56 $9600.00 01-04-2017 11-405704 6 M TRO
MORE THAN 500 RESULTS RETURNED. ONLY 500 ROWS SHOWN.
SUMMARY Unmodified Adjusted    
Average Price/Unit: $ Avg No. Units
Std Dev. (of Unit Price): ±$ Rows Selected
Weighted Avg.: $ Rows Returned
Minimum Price/Unit: $    
Maximum Price/Unit: $    

| Back | New Search |

PARAMETERS: Item = 733000; District=All; Year=All; Convert=No; Bidders=All Bidders
TIMESTAMP: 11/15/2026 02:52:23
CURRENT 12-MO INDEX (CHCCI (2020 Base)): 146.53